Gibson Station Technical Support Co-opCharlotte Ackerman

2

A little about Me

4th year Chemical and Environmental Engineer Minor: Chemistry

University of Toledo Expected Graduation: December 2015

Outline Previous Co-op Sessions Current Co-op Session: Minor projects,

Outage work, Major projects Questions

3

Previous Co-op Sessions

ABB Power System- Wickliffe, OH: Spring 2013

Assist with upgrading control systemDuke Energy Environmental- Plainfield, IN: Fall 2013

Samples for water qualities Calculate air emissions

Environmental- Trenton, OH: Summer 2014 Update oil spill plans Improving Madison Station’s CEMS Working with operators

4

Breakdown of this Semester

Minor Projects Fuel Sample Analyzer Polisher Regen Procedure Chemistry Guideline

Outage Boiler Inspection Chemical Clean Other work

Major Projects Hot Reheat Analyzers Polisher Analyzers

5

Fuel Sample Analyzer

Diesel Fuel #2 Sulfur BTU Specific Gravity

Sulfur Analyzer quit operating Looked for new analyzer or third party

Cost new analyzer: $81,310 Cost per sample: $195

6

Polisher Regen Procedure

Duke Approved format Revisions

7

Chemistry Guideline

Duke Format Revision

Jay Koesters (Previous Chemistry Cycle SME)

8

Boiler Inspection

Purpose: Inspect for issues with boiler that would cause a performance issue within the next 8 years

What I did: Inspect and write up punch lists Outcomes: Issues found and prioritize to be

fixed for this outage or the next

9

Chemical Clean

Purpose: remove iron in boiler done every 10-15 years

Chemicals from HydroChem 4% Hydroxyacetic acid 2% Formic Acid

My scope of work Revision of Procedure Time of Chemical Clean: tell operators when

to open and close valves

10

Other Outage work

Boiler Map More Inspections

FGD, SCRs, Condenser

11

Where’s the polishers are in the Water Cycle

Cleans water from Condensate

Polishers4 Polishers Sample Lines

12

Polisher Resin

Cation Resin

(+)

Na (+) Sulfate

(- 2)

Cl (-)

Anion Resin

(-)

When the Polishers are taken out of service

1100+ running hours PI: Overall Effluent limits

Sodium: 2 ppb Iron: 50 ppb Hand samples to test for out of limit polisher

13

14

Without the Analyzers

High possibility that ions will slip through the exhausted resin

Causes damage to turbine

Ideal Diaphragm

Actual Unit 3 High Pressure Diaphragm

15

Diagram of the Analyzers

Specific Conductivity and Cation Conductivity probes

16

Quotes

Waiting for project approval Sentry (Thornton) : $24,560.00

No DCS connections or regulators Control Specialists (Honeywell): $44,587.00

DCS connects and new regulators Sinks and line connections

17

Turbine with the Sample Line

Sample Line

18

Analyzers

Analyzers: Sodium and Cation Conductivity Grab samples: Chloride, Sulfate, Silica and

Total Organic Carbons (TOC)

19

Actions being done

Waiting for approval Sentry quote: $21,520 plus $1,700 for travels

Find and check lines Replace valves Place olet fittings on cooling lines

Able to work online to extend piping to new panel

Before After

20

With Analyzers

21

Without Analyzers on Intermediate Pressure Rotors

Cost $3 million to repair the HI and IP of the turbine

Includes sandblasting the iron off

Repaired highly eroded parts

22

Questions?