Gibson Station Technical Support Co-opCharlotte Ackerman
2
A little about Me
4th year Chemical and Environmental Engineer Minor: Chemistry
University of Toledo Expected Graduation: December 2015
Outline Previous Co-op Sessions Current Co-op Session: Minor projects,
Outage work, Major projects Questions
3
Previous Co-op Sessions
ABB Power System- Wickliffe, OH: Spring 2013
Assist with upgrading control systemDuke Energy Environmental- Plainfield, IN: Fall 2013
Samples for water qualities Calculate air emissions
Environmental- Trenton, OH: Summer 2014 Update oil spill plans Improving Madison Station’s CEMS Working with operators
4
Breakdown of this Semester
Minor Projects Fuel Sample Analyzer Polisher Regen Procedure Chemistry Guideline
Outage Boiler Inspection Chemical Clean Other work
Major Projects Hot Reheat Analyzers Polisher Analyzers
5
Fuel Sample Analyzer
Diesel Fuel #2 Sulfur BTU Specific Gravity
Sulfur Analyzer quit operating Looked for new analyzer or third party
Cost new analyzer: $81,310 Cost per sample: $195
6
Polisher Regen Procedure
Duke Approved format Revisions
7
Chemistry Guideline
Duke Format Revision
Jay Koesters (Previous Chemistry Cycle SME)
8
Boiler Inspection
Purpose: Inspect for issues with boiler that would cause a performance issue within the next 8 years
What I did: Inspect and write up punch lists Outcomes: Issues found and prioritize to be
fixed for this outage or the next
9
Chemical Clean
Purpose: remove iron in boiler done every 10-15 years
Chemicals from HydroChem 4% Hydroxyacetic acid 2% Formic Acid
My scope of work Revision of Procedure Time of Chemical Clean: tell operators when
to open and close valves
10
Other Outage work
Boiler Map More Inspections
FGD, SCRs, Condenser
11
Where’s the polishers are in the Water Cycle
Cleans water from Condensate
Polishers4 Polishers Sample Lines
12
Polisher Resin
Cation Resin
(+)
Na (+) Sulfate
(- 2)
Cl (-)
Anion Resin
(-)
When the Polishers are taken out of service
1100+ running hours PI: Overall Effluent limits
Sodium: 2 ppb Iron: 50 ppb Hand samples to test for out of limit polisher
13
14
Without the Analyzers
High possibility that ions will slip through the exhausted resin
Causes damage to turbine
Ideal Diaphragm
Actual Unit 3 High Pressure Diaphragm
15
Diagram of the Analyzers
Specific Conductivity and Cation Conductivity probes
16
Quotes
Waiting for project approval Sentry (Thornton) : $24,560.00
No DCS connections or regulators Control Specialists (Honeywell): $44,587.00
DCS connects and new regulators Sinks and line connections
17
Turbine with the Sample Line
Sample Line
18
Analyzers
Analyzers: Sodium and Cation Conductivity Grab samples: Chloride, Sulfate, Silica and
Total Organic Carbons (TOC)
19
Actions being done
Waiting for approval Sentry quote: $21,520 plus $1,700 for travels
Find and check lines Replace valves Place olet fittings on cooling lines
Able to work online to extend piping to new panel
Before After
20
With Analyzers
21
Without Analyzers on Intermediate Pressure Rotors
Cost $3 million to repair the HI and IP of the turbine
Includes sandblasting the iron off
Repaired highly eroded parts
22
Questions?