Innovación Tecnológica: Diseño y Construcción Digital ... · Innovación Tecnológica: Diseño...

Preview:

Citation preview

Innovación Tecnológica: Diseño y Construcción Digital

Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.

Innovación Tecnológica: Diseño y Construcción Digital

Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD

2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)

5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Integration

Agency Owner Architect

Engineers GC Subs

Predesign Schematic

Design Design

Development

Construction

Documents

Agency

Permit /

Bidding

Construction Closeout

WHO

REALIZE HOW

WHAT

Traditional

WHAT

WHO

HOW

Agency Owner Architect

Engineers GC

Subs

Conceptual-

ization

Criteria

Design Detailed

Design

Implementation

Documents

Agency Coord /

Final Buyout

Construction Closeout

REALIZE

Integrated

•Define the processes, structure and metrics up front!

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Tradicional

Multi-Party Agreement

Cons.

B101

Sub.

Dueño

Contratista Arquitecto

A201

C401 A401

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Tradicional: Limita la cooperación y la innovación

Multi-Party Agreement

Cons.

B101

Sub.

Dueño

Contratista Arquitecto

A201

C401 A401

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

No se distribuyen ni los riesgos ni las recompensas

Shared Risk/Reward

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Separate Contracts + Joining Agreement

Multi-Party Agreement

Cons.

B195

Sub.

Owner

Contractor Architect

A195

A295

C401 A401

B101 A201

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Value Proposition of Collaboration From the Construction Industry Institute – UT Austin

• Acuerdos:

Prohibido demandarse

Utilidades compartidas

• Problema?

La única alternativa es solucionarlo

• Cambios?

Reaccionar lo mas rápido posible

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Everyone Signs the Same Agreement

Full IPD

Multi-Party Agreement

Owner

Sub. Contractor Cons. Architect

Sub. Cons.

AIA C195

ConsensusDocs 300

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Multi-Party Agreement

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Value Proposition of Collaboration From the Construction Industry Institute – UT Austin

• Acuerdos:

Prohibido demandarse

Utilidades compartidas

• Problema?

La única alternativa es solucionarlo

• Cambios?

Reaccionar lo mas rápido posible

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Integration

Agency Owner Architect

Engineers GC Subs

Predesign Schematic

Design Design

Development

Construction

Documents

Agency

Permit /

Bidding

Construction Closeout

WHO

REALIZE HOW

WHAT

Traditional

WHAT

WHO

HOW

Agency Owner Architect

Engineers GC

Subs

Conceptual-

ization

Criteria

Design Detailed

Design

Implementation

Documents

Agency Coord /

Final Buyout

Construction Closeout

REALIZE

Integrated

•Define the processes, structure and metrics up front!

La Presión de la

Bomba es 2 bar

Si, pero

necesitamos

la presión

de diseño

¿De que bomba

estas hablando?

¿Te refieres a la

presión normal

de succión?

¿Entonces

cual es la

presión

minima de

succión?

Ya les dije:

2 bar

¿Te refieres a la presión minima de succión que

puede soportar la bomba o el proceso?

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Principios IPD

• Respeto y confianza mutua

• Beneficio y recompensa mutua

• Innovacion y toma de decisiones colaborativamente

• Involucramiento temprano de los participantes

• Definición temprana de metas

• Planificación intensiva

• Comunicación abierta

• Tecnología apropiada

Innovación Tecnológica: Diseño y Construcción Digital

Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD

2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)

5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones

Innovación Tecnológica: Diseño y Construcción Digital

Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD

2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)

5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones

BIM+

Innovación Tecnológica: Diseño y Construcción Digital

Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD

2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)

5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones

BIM+

http://www.911memorial.org/webcam

http://www.911memorial.org/webcam

BIM+

BIM+ Product

Modeling

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Principios IPD

• Respeto y confianza mutua

• Beneficio y recompensa mutua

• Innovacion y toma de decisiones colaborativamente

• Involucramiento temprano de los participantes

• Definición temprana de metas

• Planificación intensiva

• Comunicación abierta

• Tecnología apropiada

Innovación Tecnológica: Diseño y Construcción Digital

Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD

2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)

5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones

ICE Integrated Concurrent Engineering

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Integration

Agency Owner Architect

Engineers GC Subs

Predesign Schematic

Design Design

Development

Construction

Documents

Agency

Permit /

Bidding

Construction Closeout

WHO

REALIZE HOW

WHAT

Traditional

WHAT

WHO

HOW

Agency Owner Architect

Engineers GC

Subs

Conceptual-

ization

Criteria

Design Detailed

Design

Implementation

Documents

Agency Coord /

Final Buyout

Construction Closeout

REALIZE

Integrated

•Define the processes, structure and metrics up front!

45

Integrated Concurrent Engineering (ICE) en JPL y CIFE

Propiedades: • Organización en el mismo lugar físico (Red

de conocimiento cercana) • Excelente infraestructura técnica • Métrica formales • Cultura y procesos informales

Photo thanks to JPL

Alaskan Way Viaduct Replacement

Project –Single Bore Tunnel, Seattle Wa.

Parsons

Brinckerhoff

Alaskan Way Viaduct and Seawall Replacement Program

Visualization uses:

- Communication to a non professional audience and stakeholders

Approximately 3.2 km. long; 17 mt. in diameter

Up to 65.5 mt. feet deep to the crown

Construction started in fall 2011 and will run to 2015/2016

BIM Model - Under Seattle

• Seattle Underground 3D Model:

• Used in design validation and clearance check

• Used as a design tool, contributed to design decision process

Alaskan Way Viaduct and Seawall Replacement Program

Collaborative Design Sessions

Parsons

Brinckerhoff

Computer Analysis and Visualization Environment (CAVE) Collaborative Work Environment

Tunnel Cross Section Systems Coordination: 3 sessions in 3 weeks Attendees: WSDOT, Seattle Fire Dept, PB Engineers (MEP/Structural/Civil) VDC Model used for: -Communication - all designers presented Using 3d Model not 2D drawings -Addressed all questions related to: Egress and MEP Systems, Lighting and staging Results: Traditional Process: 12 weeks VDC Process: 3 weeks

Alaskan Way Viaduct and Seawall Replacement Program

Bored Tunnel – Systems Coordination

Tunnel Cross Section Systems coordination Model Uses: -MEP Coordination -Construction Sequencing – Typical 500’ section

Alaskan Way Viaduct and Seawall Replacement Program

Bored Tunnel – Systems Coordination

Tunnel Cross Section Systems coordination Model Uses: -MEP Coordination -Construction Sequencing – Typical 500’ section

Alaskan Way Viaduct and Seawall Replacement Program

UCSF Mission Bay Hospital ICE Session

• UCSF Mission Bay Hospital

– 60,000 m2 Hospital; 23,000 m2

Edificio para pacientes; 9,000 m2

Centro de energía

– Presupuesto ~ US$ 1,600

– Plazo Dic. 2014

• Workshop VDC de planificación

integrada . 4 días. En el CIFE con 32

participantes clave del proyecto

• “Big Room” con 100 profesionales

trabajando en el proyecto (dueño,

arquitecto, ingenieros, contratistas,

subcontratistas)

Image Courtesy DPR Inc.

Image Courtesy DPR Inc.

(c) 2012 56

Mejoramiento dramático de las métricas cuando el equipo del proyecto trabaja en el mismo ambiente de trabajo utilizando VDC

Innovación Tecnológica: Diseño y Construcción Digital

Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD

2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)

5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones

BIM+ Product

Modeling

BIM+ Product

Modeling

ICE Integrated Concurrent Engineering

Project Objectives

BIM+ Product

Modeling

Process Modeling

ICE Integrated Concurrent Engineering

VIRTUAL DESIGN AND CONSTRUCTION

(VDC)

Innovación Tecnológica: Diseño y Construcción Digital

Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD

2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)

5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones

DIGITAL PROTOTYPE

Innovación Tecnológica: Diseño y Construcción Digital

Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD

2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)

5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones

Click to edit Master title style

May 01, 2009 Slide ‹#›

Lessons learned from applied Integrated Project Delivery AIA National Convention: F32

Integration

Agency Owner Architect

Engineers GC Subs

Predesign Schematic

Design Design

Development

Construction

Documents

Agency

Permit /

Bidding

Construction Closeout

WHO

REALIZE HOW

WHAT

Traditional

WHAT

WHO

HOW

Agency Owner Architect

Engineers GC

Subs

Conceptual-

ization

Criteria

Design Detailed

Design

Implementation

Documents

Agency Coord /

Final Buyout

Construction Closeout

REALIZE

Integrated

•Define the processes, structure and metrics up front!

Tool

Set

Skill

Set

Mind

Set

Tool

Set

Skill

Set

Mind

Set

CAMBIAR EL CHIP

Innovación Tecnológica: Diseño y Construcción Digital

Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.