DT & Optimization Project Review
NORTH WEST REGION
FEBRUARY 2014
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
2/15
Summary
DT activities commenced on the project from the month of June 2013.
Although I joined the project but I quickly acclimatized myself wit the work scope,
which comprises of:
1. Pre DT of Clusters assigned to the engineers
2. Raised work order
3. Implementation of work order approved
4. Post DT of cluster been implemented
5. Attending to customer complain from SPOC, DTH, Sales personnel and STH.
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
3/15
DT Team Information
DT Team Information
S/N Team No Team Name Team phone No Area Cover
1 Team 26 Nura Musa 08033132530 Kano and Yobe
2 Team 27 Zailani Muazu 08108455655 Katsina and Jigawa
3 Team 28 Ojapa Dominion 08065716738 Kaduna and Zamfara
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
4/15
Scope of work
Scope of work
S/N Team No Team Name No. ofClusters No of Highway DT
1 Team 26 Nura Musa 22 Clusters 4
2 Team 27 Zailani Muazu 20 Clusters 2
3 Team 28 Ojapa Dominion 27 Clusters 2
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
5/15
DT tool configuration (3 MS)
DT tool configuration (3 MS)S/N Team No Team Name
1 MS1 Short Call 2G
2 MS2 Short Call 3G
3 MS3 IRAT Idle
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
6/15
Work done till date
Month
TotalNumberOf
ClustersforDT
Totalnumberofsitesin
DT
NoofClustersP
reDT
Completed
NoofClustersPostDT
Completed
CustomerComplaint
Attended
SiteAuditDo
ne
WOraised
AntennaCorrections
Done
AntennaSwapResolved
NeighbourOptim
ization
Done
2G
3G
Over All 68 617 162 65 30 57 330 61 90 17 20
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
7/15
Work done till date
Work done till date
S/N Team No Team NameNo of Pre
Done
No of
Implementati
on
No of WO
raised
No of Post
done
No of High
way DT Pre
done
1 Team 26 Nura Musa 18 16 18 12 1
2 Team 27 Zailani Muazu 20 16 20 14 0
3 Team 28Ojapa
Dominion27 9 23 10 0
0
5
10
15
20
25
30
Nura Musa Ojapa Dominion Zailani Muazu
Sum of No of Clusters
Sum of No of Pre Done
Sum of No of Post done
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
8/15
DT report of some major
towns.
Te link below is for DT report of Kaduna and Zaria City
Zaria Kaduna
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
9/15
KPIs for reports shown.
Kaduna
KPI KPI (2G/3G) Pre Value (%) Post Value (%)
Accessibility Call Setup Success Rate (CSSR) 23.13% 96.08%
3G 56.00% 95.54%
Retainability Call Drop Rate (CDR) 5.97% 1.41%3G 42.67% 10.71%
Mobility
Soft Handover Success Rate
(SHOSR) 100.00% 100.00%
GSM Handover Success Rate 97.20% 95.39%
Coverage RSCP (dbm) >= -95dbm 71.20% 76.07%
Rxlev_Sub (dBm) >= -95 dBm 92.34% 95.88%Quality EcNo (dB) > -13dB 93.03% 95.38%
RxQual_Sub < 5 89.89% 95.12%
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
10/15
KPIs for reports shown.
Zaria
KPI KPI (2G/3G)
Pre Value
(%)
Post
Value (%)
Accessibility Call Setup Success Rate (CSSR) 98.95% 99.50%
3G 96.21% 96.92%
Retainability Call Drop Rate (CDR) 1.04% 1.00%3G 8.92% 6.92%
Mobility Soft Handover Success Rate (SHOSR) 100.00% 100.00%
GSM Handover Success Rate 99.65% 99.48%
Coverage RSCP (dbm) >= -95dbm 72.95% 76.25%
Rxlev_Sub (dBm) >= -95 dBm 94.83% 97.53%
Quality EcNo (dB) > -13dB 97.31.% 97.51%
RxQual_Sub < 5 85.14% 90.45%
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
11/15
Sample WO and
site audit information.
Below is the link sample of WO and site audit information
Work Order Site Audit
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
12/15
Special initiatives
1. I have organize team viewer training for the DT engineers in the region
2. I have supply DT analysis material to the DT engineers in the region
3. I have given DT engineers in the region extensive training on 3G DT event
analysis.
4. Periodical Check of traffic affecting alarms BSC based
5. I shared alarm affecting traffic wit my colleagues on huawei
6. I learnt and shared how to collect alarm logs on WMS
7. Fetching overshooting cells in Abuja city by matching there KPI wit Max TA
and make recommendation wit lots of improvement
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
13/15
Case study for anytwo network
improvement actions.
1. 2G/3G KPI network for Abuja metropolis
2. 2G/3G KPI analysis for N. West region categories into rural and urbancells.
3. Traffic and KPI affecting alarm detection on Huawei equipment
4. Part of team for PHC AFP
5. Fetching PD counter on NPO which is equivalent to TA in 2G KPIs and
shared with my colleagues
By Dada Opeyemi
8/12/2019 Mahalle's Presentation PPT
14/15
8/12/2019 Mahalle's Presentation PPT
15/15By Dada Opeyemi