TVC Tracking for New Construction Projects
A Path Forward
MERCER TECHNICAL SERVICES
Historical Perspective• 1935, The "American Tentative Standard Code for Pressure Piping”, ASA
B31.1 was issued
• 1955, Section 8, designated B31.1.8, represented a significant technical advancement in requirements for natural gas transmission and distribution piping systems
• 1970, DOT issues original versions of 49 CFR Parts 191 & 192
• 2011, PHMSA issues Advisory Bulletin requiring material to be “Traceable, Verifiable and Complete”
• 2016, PHMSA NPRM: Safety of Gas Transmission & Gathering Pipelines
MERCER TECHNICAL SERVICES
Steel Pipe (proposed rule)
§ 192.67 Records: Materials.Each operator of transmission pipelines must acquire and retain for the life of the pipeline the original steel pipe manufacturing records that document tests, inspections, and attributes required by the manufacturing specification in effect at the time the pipe was manufactured, including, but not limited to, yield strength, ultimate tensile strength, and chemical composition of materials for pipe in accordance with § 192.55.
MERCER TECHNICAL SERVICES
Pipeline Components (proposed rule)
§ 192.205 Records: Pipeline components.Each operator of transmission pipelines must acquire and retain records documenting the manufacturing standard and pressure rating to which each valve was manufactured and tested in accordance with this subpart. Flanges, fittings, branch connections, extruded outlets, anchor forgings, and other components with material yield strength grades of 42,000 psi or greater must have records documenting the manufacturing specification in effect at the time of manufacture, including, but not limited to, yield strength, ultimate tensile strength, and chemical composition of materials.
MERCER TECHNICAL SERVICES
Welders (proposed rule)
§ 192.227 Qualification of welders.* * * * *(c) Records for transmission pipelines demonstrating each individual welder qualification in accordance with this section must be retained for the life of the pipeline.
MERCER TECHNICAL SERVICES
We Have Come a Long Way…..
MERCER TECHNICAL SERVICES
Typical Work Flow
Receive Material at Pipe Yard and Create a Pipe Tally with
HN and JN
MTR’sPipe Mill
String Pipe and Document Check HN and
JN to Pipe Tally
Load Out Pipe At Pipe Yard and Track InventoryCheck HN and
JN to Pipe Tally
As-Build SurveyCollects GPS
Shots in Ditch and Check HN and JN to Pipe
Tally
As-Build SurveyOff Line Features
As-Build Drawings, Check
HN and JN to Pipe Tally
Data to Client
X-Check to Pipe Tally
MTR’s to Client
MERCER TECHNICAL SERVICES
Typical Records
MERCER TECHNICAL SERVICES
Risk
Risk = Probability of Failure x Consequence (Missing Records) (Financial Impact)
MERCER TECHNICAL SERVICES
Material Identification
1930 1940 1950 1960 1970 1980 1990 2000 2010 20200
100
200
300
400
500
600
700
800
900
1,000
Probability of Not Meeting Code ???
MERCER TECHNICAL SERVICES
Time Dependent
Pipe Mill Coating Mill Transport Staging Yard
Stringing Welded Hydro In-Service Audit Failure0
100
200
300
400
500
600
700
800
900
1,000
Consequence
MERCER TECHNICAL SERVICES
Mitigate Risk
Ensure material is RTVC when consequence is low
Receive Material at Pipe Yard and Scan
Material
Pipe Mill Receive MTR’s and Enter into
Database
String Pipe and Scan to
Track Material
Load Out Pipe At Pipe Yard and
Scan to Track Inventory
As-Build SurveyCollects GPS
Shots in Ditch and Scan
As-Build SurveyOff Line Features
As-Build Drawings, Use
Information From Database
Data to Client
Interactive Database
MERCER TECHNICAL SERVICES
Material Tracking Systems
• Tagging system have been in the pipeline industry since 19XX• Various types of tags can be used• RFD• Bar Codes• Wide range of quality• One tag does not fit all needs
• Material Database• What is tracked in the database• Is the database real time
MERCER TECHNICAL SERVICES
Lessons Learned - Tags
• Tags places on the inside of pipe• Comes off the pipe and flows with the product
• Tags prevents pipe coating from being jeeped• Tags destroyed during handling• Pipe is cut at the firing line and pup moved ahead• Tags deteriorated on pipe being stored due to UVThe type and style of the tags you use on your
project is a critical desicion point
MERCER TECHNICAL SERVICES
Material Database Requirements• What data will be stored and the method of storage• Remote access to the database• Office• Field• Operator
• Database security• Levels of access to database• Cyber security
• Storage requirements• Data transfer to operator at end of project
MERCER TECHNICAL SERVICES
Database
Material database can evolve into a project database• Tracking of X-Rays• Welder Qualifications• Hydrostatic test• Maintenance tickets for defective material• Tracking location of material• Inventory control
MERCER TECHNICAL SERVICES
Mapping
• You must be able to tie your material information to the physical location of the material• Fencing will not be excepted• Survey must be integrated with the database• Survey accuracy will be key• Mapping material on a liner pipeline is no problem• Mapping material for fabrication is challenging
MERCER TECHNICAL SERVICES
Planning
• As with any project, planning is key in implementing a material tracking system• Review the process with all stake holders• The material tracking starts with the ordering of the
material to the final as-built into the operators records system• Work with the affected service providers • Combined traditional tasks with new tasks needed
for material tracking
MERCER TECHNICAL SERVICES
Value Added
• Transparency for the project team• Streamline communications through real time
reporting (dashboards)• Reduce the time from physical completion of
project to completion of the project
MERCER TECHNICAL SERVICES
Contact Information
Mark E. Anderson
Vice PresidentMercer Technical Services
8826 Santa Fe Drive, Suite 150Overland Park, KS 66212
mark.anderson@mertechserv.comP: 913.433.4099
Recommended