HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
CODIGO DESCRIPCION UND CANT VECES DIMENSIONES UNID LARGO ANCHO
004 CONSTRUCCION DE CERCO PERIMETRICO01 ESTRUCTURAS01.01 TRABAJOS PRELIMINARES01.01.01 LIMPIEZA DEL TERRENO MANUAL m2
Tramo Sur 1 1.00 106.95 1.00
Tramo Norte 1 1.00 124.48 1.00
Tramo Este 1 1.00 55.56 1.00
Tramo Oeste 1 1.00 92.84 1.00
01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2
Tramo Sur 1 1.00 106.95 1.00
Tramo Norte 1 1.00 124.48 1.00
Tramo Este 1 1.00 55.56 1.00
Tramo Oeste 1 1.00 92.84 1.00
01.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2
Tramo Sur 1 1.00 106.95 1.00
Tramo Norte 1 1.00 124.48 1.00
Tramo Este 1 1.00 55.56 1.00
Tramo Oeste 1 1.00 92.84 1.00
01.02 MOVIMIENTO DE TIERRAS01.02.01 EXCAV. MANUAL DE ZANJAS EN MATERIAL SUELTO m3
Tramo Sur
1 1.00 2.70 0.40
2 1.00 3.12 0.40
2 1.00 1.62 0.40
3 1.00 5.21 0.40
1 1.00 2.12 0.40
1 1.00 1.87 0.40
1 1.00 2.35 0.40
1 1.00 23.17 0.40
1 1.00 1.79 0.40
1 1.00 2.69 0.40
1 1.00 1.79 0.40
1 1.00 5.21 0.40
6 1.00 3.72 0.40
Tramo Norte
34 1.00 3.25 0.40
1 1.00 2.17 0.40
Tramo Este
15 1.00 3.35 0.40
Tramo Oeste
25 1.00 3.25 0.40
1 1.00 2.88 0.40
Menos area de Zapata
Tramo Sur
-1 3.00 0.55 0.40
-1 6.00 0.27 0.40
-1 2.00 0.48 0.40
-2 2.00 0.30 0.40
-1 3.00 0.21 0.40
-1 2.00 0.24 0.40
-10 2.00 0.44 0.40
EXPEDIENTE TCNICOSUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
CODIGO DESCRIPCION UND CANT VECES DIMENSIONES UNID LARGO ANCHO
EXPEDIENTE TCNICOSUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
-1 3.00 0.45 0.40
-1 1.00 0.32 0.40
Tramo Norte
-2 1.00 0.50 0.40
-17 2.00 0.27 0.40
-9 2.00 0.32 0.40
-8 2.00 0.44 0.40
Tramo Este
-2 1.00 0.52 0.40
-12 2.00 0.44 0.40
Tramo Oeste
-1 1.00 0.41 0.40
-1 1.00 0.61 0.40
-13 2.00 0.27 0.40
-6 2.00 0.32 0.40
-6 2.00 0.44 0.40
01.02.02 EXCAV. P/ZAPATAS AISLADAS DE 1.40 M A 1.70 M DE PROFUNDIDAD m3
Tramo Sur
Z1 4 1.00 0.90 1.50
Z2 6 1.00 0.80 0.80
Z3 13 1.00 0.80 1.40
Z5 3 1.00 0.80 1.55
Z6 1 1.00 1.50 0.90
Z7 2 1.00 1.50 1.25
Z10 1 1.00 AREA 1.07
Tramo Norte
Z4 17 1.00 0.80 0.80
Z1 9 1.00 0.90 0.90
Z12 1 1.00 AREA 0.87
Z11 1 1.00 AREA 1.07
Z3 8 1.00 0.80 1.40
Tramo Este
Z3 12 1.00 1.40 0.80
Tramo Oeste
Z4 13 1.00 0.80 0.80
Z1 6 1.00 0.90 0.90
Z3 6 1.00 1.40 0.80
01.02.03 EXCAV. MANUAL DE ZANJAS P/SARDINELES DE VEREDA m3
Ingreso 01 1 19.90 0.30
Ingreso 02 1 18.16 0.30
Ingreso 03 1 10.77 0.30
01.02.04 RELLENO CON MATERIAL PROPIO m3
Tramo Sur
1 1.00 2.70 0.25
2 1.00 3.12 0.25
2 1.00 1.62 0.25
3 1.00 5.21 0.25
1 1.00 2.12 0.25
1 1.00 1.87 0.25
1 1.00 2.35 0.25
1 1.00 23.17 0.25
1 1.00 1.79 0.25
HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
CODIGO DESCRIPCION UND CANT VECES DIMENSIONES UNID LARGO ANCHO
EXPEDIENTE TCNICOSUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
1 1.00 2.69 0.25
1 1.00 1.79 0.25
1 1.00 5.21 0.25
6 1.00 3.72 0.25
Tramo Norte
34 1.00 3.25 0.25
1 1.00 2.17 0.25
Tramo Este
15 1.00 3.35 0.25
Tramo Oeste
25 1.00 3.25 0.25
1 1.00 2.88 0.25
Zapatas
Tramo Sur
Z4 5 1.00 0.80 0.80
Z6 1 1.00 1.00 0.96
Z7 1 1.00 1.00 0.87
Z3 6 1.00 1.20 0.80
Z2 2 1.00 0.80 0.80
Z3 3 1.00 1.00 0.95
Z5 1 1.00 1.00 0.95
Z0 1 1.00 0.90 0.90
Z8 1 1.00 1.00 0.81
Z9 1 1.00 1.00 0.81
Tramo Norte
Z4 17 1.00 0.80 0.80
Z1 9 1.00 0.90 0.90
Z12 1 1.00 1.00 0.87
Z11 1 1.00 1.00 1.07
Z3 8 1.00 1.20 0.80
Tramo Este
Z1 10 1.00 0.90 0.90
Z3 4 1.00 1.40 0.80
Tramo Oeste
Z4 13 1.00 0.80 0.80
Z1 6 1.00 0.90 0.90
Z3 6 1.00 1.40 0.80
Menos area de cimientos
Tramo Sur
-1 3.00 0.55 0.40
-1 6.00 0.27 0.40
-1 2.00 0.48 0.40
-2 2.00 0.30 0.40
-1 3.00 0.21 0.40
-1 2.00 0.24 0.40
-10 2.00 0.44 0.40
-1 3.00 0.45 0.40
-1 1.00 0.32 0.40
Tramo Norte
-2 1.00 0.50 0.40
-17 2.00 0.27 0.40
-9 2.00 0.32 0.40
HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
CODIGO DESCRIPCION UND CANT VECES DIMENSIONES UNID LARGO ANCHO
EXPEDIENTE TCNICOSUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
-8 2.00 0.44 0.40
Tramo Este
-2 1.00 0.52 0.40
-12 2.00 0.44 0.40
Tramo Oeste
-1 1.00 0.41 0.40
-1 1.00 0.61 0.40
-13 2.00 0.27 0.40
-6 2.00 0.32 0.40
-6 2.00 0.44 0.40
Menos area de columnas
Tramo Sur
esquina -1 1.00 0.09
circular -5 1.00 0.05
en ingreso 01 -2 1.00 0.08
-16 0.25 0.25
en Ingreso 02 -1 1.00 0.08
en Ingreso 03 -1 1.00 0.10
-1 1.00 0.10
esquina -1 1.00 0.07
Tramo Norte
esquina -1 1.00 0.08
-27 0.25 0.25
circular -17 1.00 0.05
esquina -1 1.00 0.06
Tramo Este
esquina -1 1.00 0.07
-18 1.00 0.05
Tramo Oeste
circular -13 1.00 0.05
-27 0.25 0.25
01.02.05 REFINE, NIVELACION Y COMPACTACION m2
Idem partida de item 2.05 109.80
01.02.06 RELLENO CON MATERIAL CLASIFICADO E=15 CM m2
Ingreso 01 1 area de CAD 50.33
Ingreso 02 1 area de CAD 40.41
Ingreso 03 1 area de CAD 19.06
01.02.07 ELIMIN. DE MATERIAL -MANUAL DIST. PROMD. D=30M. m3
sumatoria items (2.01 + 2.02 +2.03) - 2.04 Mas 25% de esponjamiento 149.56
01.02.08 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 km m3
Idem partida de item 2.06 149.56
01.03 CONCRETO SIMPLE01.03.01 SOLADOS PARA ZAPATAS E=4" CONCRETO 1:12 m2
Tramo Sur
Z1 4 1.00 0.90 1.50
Z2 6 1.00 0.80 0.80
Z3 13 1.00 0.80 1.40
Z5 3 1.00 0.80 1.55
Z6 1 1.00 1.50 0.90
HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
CODIGO DESCRIPCION UND CANT VECES DIMENSIONES UNID LARGO ANCHO
EXPEDIENTE TCNICOSUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
Z7 2 1.00 1.50 1.25
Z10 1 1.00 AREA 1.07
Tramo Norte
Z4 17 1.00 0.80 0.80
Z1 9 1.00 0.90 0.90
Z12 1 1.00 AREA 0.87
Z11 1 1.00 AREA 1.07
Z3 8 1.00 0.80 1.40
Tramo Este
Z3 12 1.00 1.40 0.80
Tramo Oeste
Z4 13 1.00 0.80 0.80
Z1 6 1.00 0.90 0.90
Z3 6 1.00 1.40 0.80
01.03.02 CIMIENTO CORRIDO CONCRETO 1:10 + 30% P G m3
Tramo Sur
1 1.00 2.70 0.40
2 1.00 3.12 0.40
2 1.00 1.62 0.40
3 1.00 5.21 0.40
1 1.00 2.12 0.40
1 1.00 1.87 0.40
1 1.00 2.35 0.40
1 1.00 23.17 0.40
1 1.00 1.79 0.40
1 1.00 2.69 0.40
1 1.00 1.79 0.40
1 1.00 5.21 0.40
6 1.00 3.72 0.40
Tramo Norte
34 1.00 3.25 0.40
1 1.00 2.17 0.40
Tramo Este
15 1.00 3.35 0.40
Tramo Oeste
25 1.00 3.25 0.40
1 1.00 2.88 0.40
Menos area de Zapata
Tramo Sur
-1 3.00 0.55 0.40
-1 6.00 0.27 0.40
-1 2.00 0.48 0.40
-2 2.00 0.30 0.40
-1 3.00 0.21 0.40
-1 2.00 0.24 0.40
-10 2.00 0.44 0.40
-1 3.00 0.45 0.40
-1 1.00 0.32 0.40
Tramo Norte
-2 1.00 0.50 0.40
-17 2.00 0.27 0.40
-9 2.00 0.32 0.40
HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
CODIGO DESCRIPCION UND CANT VECES DIMENSIONES UNID LARGO ANCHO
EXPEDIENTE TCNICOSUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
-8 2.00 0.44 0.40
Tramo Este
-2 1.00 0.52 0.40
-12 2.00 0.44 0.40
Tramo Oeste
-1 1.00 0.41 0.40
-1 1.00 0.61 0.40
-13 2.00 0.27 0.40
-6 2.00 0.32 0.40
-6 2.00 0.44 0.40
01.03.03 SOBRECIMIENTO CONCRETO 1:8+25% PM m3
Tramo Sur
Eje 1 y 2 1 1.00 2.70 0.15
Eje 2 - 3 y 6-7 2 1.00 3.12 0.15
Eje 3 - 4 y 5-6 2 1.00 1.62 0.15
Eje 7 al 10 3 1.00 5.21 0.15
Eje 10 y 11 1 1.00 2.12 0.15
Eje 11 y 12 1 1.00 1.87 0.15
Eje 14 y 15 1 1.00 1.84 0.15
Eje 15 al 30 8 1.00 0.70 0.15
7 1.00 2.00 0.15
Eje 30 y 31 1 1.00 1.32 0.15
Eje 31 y 32 1 1.00 1.79 0.15
Eje 32 y 33 1 1.00 2.69 0.15
Eje 33 al 44 6 1.00 3.28 0.15
6 1.00 1.93 0.15
Eje 45 - 46 1 1.00 2.54 0.15
1 1.00 1.19 0.15
Tramo Norte
Eje 69 y 70 1 1.00 3.25 0.15
Eje 70 y 71 1 1.00 3.25 0.15
Eje 71 y 72 1 1.00 3.25 0.15
Eje 72 y 73 1 1.00 3.25 0.15
Eje 74 y 75 1 1.00 3.25 0.15
Eje 75 y 76 1 1.00 3.25 0.15
Eje 76 y 77 1 1.00 3.25 0.15
Eje 77 y 78 1 1.00 3.25 0.15
Eje 79 al 81 2 1.00 3.25 0.15
Eje 81 y 82 1 1.00 3.25 0.15
Eje 82 y 83 1 1.00 3.25 0.15
Eje 84 y 85 1 1.00 3.25 0.15
Eje 85 y 86 1 1.00 3.25 0.15
Eje 86 y 87 1 1.00 3.25 0.15
Eje 87 y 88 1 1.00 3.25 0.15
Eje 89 y 90 1 1.00 3.25 0.15
Eje 90 y 91 1 1.00 3.25 0.15
Eje 91 y 92 1 1.00 3.25 0.15
Eje 92 y 93 1 1.00 3.25 0.15
Eje 94 y 95 1 1.00 3.25 0.15
Eje 95 y 96 1 1.00 3.25 0.15
Eje 96 y 97 1 1.00 3.25 0.15
Eje 97 y 98 1 1.00 3.25 0.15
HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
CODIGO DESCRIPCION UND CANT VECES DIMENSIONES UNID LARGO ANCHO
EXPEDIENTE TCNICOSUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
Eje 99 y 100 1 1.00 3.25 0.15
Eje 100 y 101 1 1.00 3.25 0.15
Eje 101 al 111 8 1.00 3.25 0.15
Eje 111 al 112 1 1.00 2.17 0.15
Tramo Este
Eje 48 y 49 1 1.00 3.35 0.15
Eje 49 al 53 3 1.00 3.35 0.15
Eje 53 al 58 11 1.00 3.35 0.15
Tramo Oeste
Eje 114 al 115 1 1.00 3.35 0.15
Eje 115 al 116 1 1.00 3.35 0.15
Eje 117 al 118 1 1.00 3.35 0.15
Eje 118 al 119 1 1.00 3.35 0.15
Eje 119 al 120 1 1.00 3.35 0.15
Eje 120 al 121 1 1.00 3.35 0.15
Eje 122 al 123 1 1.00 3.35 0.15
Eje 123 al 124 1 1.00 3.35 0.15
Eje 124 al 125 1 1.00 3.35 0.15
Eje 125 al 126 1 1.00 3.35 0.15
Eje 127 al 128 1 1.00 3.35 0.15
Eje 128 al 129 1 1.00 3.35 0.15
Eje 129 al 130 1 1.00 3.35 0.15
Eje 130 al 131 1 1.00 3.35 0.15
Eje 132 al 133 1 1.00 3.35 0.15
Eje 133 al 134 1 1.00 3.35 0.15
Eje 134 al 135 1 1.00 3.35 0.15
Eje 135 al 136 1 1.00 3.35 0.15
Eje 137 al 145 7 1.00 3.35 0.15
Eje 146 y 147 1 1.00 2.88 0.15
01.03.04 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO M2
Tramo Sur
Eje 1 y 2 1 2.00 2.70
Eje 2 - 3 y 6-7 2 2.00 3.12
Eje 3 - 4 y 5-6 2 2.00 1.62
Eje 7 al 10 3 2.00 5.21
Eje 10 y 11 1 2.00 2.12
Eje 11 y 12 1 2.00 1.87
Eje 14 y 15 1 2.00 1.84
Eje 15 al 30 8 2.00 0.70
7 2.00 2.00
Eje 30 y 31 1 2.00 1.32
Eje 31 y 32 1 2.00 1.79
Eje 32 y 33 1 2.00 2.69
Eje 33 al 44 6 2.00 3.28
6 2.00 1.93
Eje 45 - 46 1 2.00 2.54
1 2.00 1.19
Tramo Norte
Eje 69 y 70 1 2.00 3.25
Eje 70 y 71 1 2.00 3.25
Eje 71 y 72 1 2.00 3.25
Eje 72 y 73 1 2.00 3.25
HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
CODIGO DESCRIPCION UND CANT VECES DIMENSIONES UNID LARGO ANCHO
EXPEDIENTE TCNICOSUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
Eje 74 y 75 1 2.00 3.25
Eje 75 y 76 1 2.00 3.25
Eje 76 y 77 1 2.00 3.25
Eje 77 y 78 1 2.00 3.25
Eje 79 al 81 2 2.00 3.25
Eje 81 y 82 1 2.00 3.25
Eje 82 y 83 1 2.00 3.25
Eje 84 y 85 1 2.00 3.25
Eje 85 y 86 1 2.00 3.25
Eje 86 y 87 1 2.00 3.25
Eje 87 y 88 1 2.00 3.25
Eje 89 y 90 1 2.00 3.25
Eje 90 y 91 1 2.00 3.25
Eje 91 y 92 1 2.00 3.25
Eje 92 y 93 1 2.00 3.25
Eje 94 y 95 1 2.00 3.25
Eje 95 y 96 1 2.00 3.25
Eje 96 y 97 1 2.00 3.25
Eje 97 y 98 1 2.00 3.25
Eje 99 y 100 1 2.00 3.25
Eje 100 y 101 1 2.00 3.25
Eje 101 al 111 8 2.00 3.25
Eje 111 al 112 1 2.00 2.17
Tramo Este
Eje 48 y 49 1 2.00 3.35
Eje 49 al 53 3 2.00 3.35
Eje 53 al 58 11 2.00 3.35
Tramo Oeste
Eje 114 al 115 1 2.00 3.35
Eje 115 al 116 1 2.00 3.35
Eje 117 al 118 1 2.00 3.35
Eje 118 al 119 1 2.00 3.35
Eje 119 al 120 1 2.00 3.35
Eje 120 al 121 1 2.00 3.35
Eje 122 al 123 1 2.00 3.35
Eje 123 al 124 1 2.00 3.35
Eje 124 al 125 1 2.00 3.35
Eje 125 al 126 1 2.00 3.35
Eje 127 al 128 1 2.00 3.35
Eje 128 al 129 1 2.00 3.35
Eje 129 al 130 1 2.00 3.35
Eje 130 al 131 1 2.00 3.35
Eje 132 al 133 1 2.00 3.35
Eje 133 al 134 1 2.00 3.35
Eje 134 al 135 1 2.00 3.35
Eje 135 al 136 1 2.00 3.35
Eje 137 al 145 7 2.00 3.35
Eje 146 y 147 1 2.00 2.88
01.03.05 VEREDA CONCRETO FC=175 KG/CM E= 4" + SARDINEL m2
Ingreso 01 1 area de CAD 50.33
Ingreso 02 1 area de CAD 40.41
HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
CODIGO DESCRIPCION UND CANT VECES DIMENSIONES UNID LARGO ANCHO
EXPEDIENTE TCNICOSUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
01.03.06 VEREDA ENCOFRADO Y DESENCOFRADO m2
Ingreso 01 1 borde vereda 19.88
Ingreso 02 1 borde vereda 18.16
01.04 CONCRETO ARMADO01.04.01 ZAPATAS
01.04.01.01 ZAPATAS CONCRETO F'C=210 kg/cm2 m3
Tramo Sur
Z1 4 1.00 0.90 1.50
Z2 6 1.00 0.80 0.80
Z3 13 1.00 0.80 1.40
Z5 3 1.00 0.80 1.55
Z6 1 1.00 1.50 0.90
Z7 2 1.00 1.50 1.25
Z10 1 1.00 AREA 1.07
Tramo Norte
Z4 17 1.00 0.80 0.80
Z1 9 1.00 0.90 0.90
Z12 1 1.00 AREA 0.87
Z11 1 1.00 AREA 1.07
Z3 8 1.00 0.80 1.40
Tramo Este
Z3 12 1.00 1.40 0.80
Tramo Oeste
Z4 13 1.00 0.80 0.80
Z1 6 1.00 0.90 0.90
Z3 6 1.00 1.40 0.80
01.04.01.02 ZAPATAS ACERO F'Y=4200 KG/CM2 kg
Ver planilla de metrados de acero
01.04.02 COLUMNAS
01.04.02.01 COLUMNAS CONCRETO F'C=210 kg/cm2 m3
portico Igreso 1 4 Area Semicircular con CAD 0.25
01.04.02.02 COLUMNAS CONCRETO F'C=175 kg/cm2 m3
Tramo Sur
Eje 1 1 1.00 AREA 0.09
Eje 4 1 1.00 1.00 0.08
Eje 2,3,5,6,9,10,12,13,20.21,22.23 6 1.00 AREA 0.14
Eje 7, 8 2 1.00 0.25 0.25
Eje 14 AL 19 6 1.00 0.25 0.25
Eje 24 1 1.00 0.35 0.60
Eje 25 1 1.00 0.35 0.60
Eje 26.AL .40 15 1.00 0.15 0.15
Eje 41,43,44 3 1.00 0.25 0.25
Eje 46 AL 59 14 1.00 0.25 0.25
Eje 60 1 1.00 AREA 0.13
Eje 14 1 1.00 0.03
Eje 15 1 1.00 0.04
Eje 16 al 30 15 0.15 0.15
Tramo Norte
Eje 89 1 0.25 0.25
HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
CODIGO DESCRIPCION UND CANT VECES DIMENSIONES UNID LARGO ANCHO
EXPEDIENTE TCNICOSUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
Eje90,92,95,97.100,102,105,107,110,112,115,117,120,122,125,127,130 17 AREA 0.05
Eje 91 .98,101,106,111,116,121,126,131 9 0.25 0.25
Eje 93,94,98,99,103,104,108,109,113,114,118,119,123,124,128,129 16 0.25 0.25
Eje 132 1 0.25 0.25
Tramo EsteEjes 63 al 86 24 0.25 0.25
Eje 97 1 area 0.08
Tramo OesteEJE 134 1 AREA 0.06
Eje 135,138,140,143,145,148,150,153,155,158,160,163.165 13 AREA 0.05
Eje 136,137,141,142,146,147,151,152,156,157,161,162 12 0.25 0.25
Eje 166 1 0.25 0.25
01.04.02.03 COLUMNAS ENCOFRADO Y DESENCOFRADO m2
Tramo Sur
Eje 1 1 1.00 0.60
Eje 4 1 1.00 0.45
Eje 2,3,5,6,9,10,12,13,20.21,22.23 6 1.00 0.50
Eje 7, 8 2 1.00 0.85
Eje 14 AL 19 6 1.00 1.25
Eje 24 1 1.00 1.75
Eje 25 1 1.00 1.75
Eje 26.AL .40 15 1.00 0.30
Eje 41,43,44 3 1.00 0.70
Eje 46 AL 59 14 1.00 1.25
Eje 60 1 1.00 1.27
Eje 14 1 0.60
Eje 15 1 0.60
Eje 16 al 30 15 0.60
Tramo Norte
Eje 89 1 0.85
Eje90,92,95,97.100,102,105,107,110,112,115,117,120,122,125,127,130 17 0.45
Eje 91 .98,101,106,111,116,121,126,131 9 0.70
Eje 93,94,98,99,103,104,108,109,113,114,118,119,123,124,128,129 16 1.25
Eje 132 1 0.85
Tramo EsteEjes 63 al 86 24 1.25
Eje 87 1 0.72
Tramo OesteEJE 134 1 0.63
Eje 135,138,140,143,145,148,150,153,155,158,160,163.165 13 0.45
Eje 136,137,141,142,146,147,151,152,156,157,161,162 12 1.25
Eje 166 1 0.85
01.04.02.04 COLUMNAS ACERO F'C=4200 KG/CM2 kg
Ver planilla de metrados de acero
01.04.03 COLUMNETAS
01.04.03.01 COLUMNETAS CONCRETO 175Kg/cm2 m3
ENTRE EJES CON VANOS EN FORMA DE MARCOS 23 2.00 2.45 0.15
ENTRE EJES 26 AL 40 15 1.00 1.20 0.15
01.04.03.02 ENCOFRADO Y DESNCOFRADO m2
HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
CODIGO DESCRIPCION UND CANT VECES DIMENSIONES UNID LARGO ANCHO
EXPEDIENTE TCNICOSUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
ENTRE EJES CON VANOS EN FORMA DE MARCOS 23 2.00 2.45
ENTRE EJES 26 AL 40 15 1.00 1.20
01.04.03.03 COLUMNETAS ACERO F'C=4200 KG/CM2 kg
Ver cuadro de metrados 1 351.41
01.04.04 VIGAS
01.04.04.01 VIGAS CONCRETO F'C=210 kg/cm2 m3
VA-1 (25X20) 3 1.75 0.25
01.04.04.02 VIGAS CONCRETO F'C=175 kg/cm2 m3
AMBOS LADOS DE LA SCOLUMNAS CIRCULARES 31 2.00 AREA 0.79
EN FOR MA DEL MARCO DEL VANO 23 1.00 2.10 0.15
ARRIOSTRE 23 2.00 2.40 0.15
01.04.04.03 VIGAS ENCOFRADO Y DESENCOFRADO m2
AMBOS LADOS DE LA SCOLUMNAS CIRCULARES 31 4.00 AREA 0.79
31 4.00 2.00
EN FOR MA DEL MARCO DEL VANO 23 1.00 2.10
ARRIOSTRE 23 4.00 2.40
01.04.04.04 VIGAS ACERO FY=4200 KG/CM2 kg
Ver planilla de metrados de acero 1 1131.83
01.05 ESTRUCTURA DE METAL Y COBERTURA01.05.01 CORREAS DE TUBO CUADRADO 2" x 2" E=1.5MM ML
6 1.50
3 7.34
12 2.50
01.05.02 COBERTURA DE POLICARBONATO 8MM m2
1 7.85 2.00
HOJA DE METRADOS CERCO PERIMETRICO
METRADOALTO PARCIAL TOTAL
379.83
106.95
124.48
55.56
92.84
379.83
106.95
124.48
55.56
92.84
379.83
106.95
124.48
55.56
92.84
74.51
0.70 0.76
0.70 1.75
0.70 0.91
0.70 4.38
0.70 0.59
0.70 0.52
0.70 0.66
0.60 5.56
0.70 0.50
0.70 0.75
0.70 0.50
0.70 1.46
0.70 6.25
0.70 30.94
0.70 0.61
0.70 14.07
0.70 22.75
0.70 0.81
0.00
0.70 -0.46
0.70 -0.45
0.70 -0.27
0.70 -0.34
0.70 -0.18
0.70 -0.13
0.70 -2.46
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
HOJA DE METRADOS CERCO PERIMETRICO
METRADOALTO PARCIAL TOTAL
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
0.70 -0.38
0.70 -0.09
0.70 -0.28
0.70 -2.57
0.70 -1.61
0.70 -1.97
0.70 -0.29
0.70 -2.96
0.70 -0.11
0.70 -0.17
0.70 -1.97
0.70 -1.08
0.70 -1.48
97.93
1.20 6.48
1.00 3.84
1.00 14.56
1.00 3.72
1.00 1.35
1.20 4.50
1.00 1.07
1.00 10.88
1.00 7.29
1.00 0.87
1.00 1.07
1.00 8.96
1.00 13.44
1.00 8.32
1.00 4.86
1.00 6.72
4.39
0.30 1.79
0.30 1.63
0.30 0.97
27.27
0.10 0.07
0.10 0.16
0.10 0.08
0.10 0.39
0.10 0.05
0.10 0.05
0.10 0.06
0.10 0.58
0.10 0.04
HOJA DE METRADOS CERCO PERIMETRICO
METRADOALTO PARCIAL TOTAL
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
0.10 0.07
0.10 0.04
0.10 0.13
0.10 0.56
0.10 2.76
0.10 0.05
0.10 1.26
0.10 2.03
0.10 0.07
0.40 1.28
0.40 0.38
0.40 0.35
0.40 2.30
0.60 0.77
0.60 1.71
0.60 0.57
0.60 0.49
0.60 0.49
0.60 0.49
0.40 4.35
0.40 2.92
0.40 0.35
0.40 0.43
0.40 3.07
0.40 3.24
0.40 1.79
0.40 3.33
0.40 1.94
0.40 2.69
0.40 -0.26
0.40 -0.26
0.40 -0.15
0.40 -0.19
0.40 -0.10
0.40 -0.08
0.40 -1.41
0.40 -0.22
0.40 -0.05
0.40 -0.16
0.40 -1.47
0.40 -0.92
HOJA DE METRADOS CERCO PERIMETRICO
METRADOALTO PARCIAL TOTAL
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
0.40 -1.13
0.40 -0.17
0.40 -1.69
0.40 -0.07
0.40 -0.10
0.40 -1.12
0.40 -0.61
0.40 -0.84
0.40 -0.04
0.40 -0.10
0.40 -0.07
0.40 -0.40
0.40 -0.03
0.40 -0.04
0.40 -0.04
0.40 -0.03
0.40 -0.03
0.40 -0.68
0.40 -0.33
0.40 -0.02
0.40 -0.03
0.40 -0.35
0.40 -0.25
0.40 -0.68
109.80
109.80
109.80
50.33
40.41
19.06
149.56
149.56
149.56
149.56
97.93
1.20 6.48
1.00 3.84
1.00 14.56
1.00 3.72
1.00 1.35
HOJA DE METRADOS CERCO PERIMETRICO
METRADOALTO PARCIAL TOTAL
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
1.20 4.50
1.00 1.07
1.00 10.88
1.00 7.29
1.00 0.87
1.00 1.07
1.00 8.96
1.00 13.44
1.00 8.32
1.00 4.86
1.00 6.72
69.23
0.60 0.65
0.60 1.50
0.60 0.78
0.60 3.75
0.60 0.51
0.60 0.45
0.60 0.56
0.50 4.63
0.60 0.43
0.60 0.65
0.60 0.43
0.60 1.25
0.60 5.36
0.60 26.52
0.60 0.52
0.60 12.06
0.60 19.50
0.60 0.69
0.40 -0.26
0.40 -0.26
0.40 -0.15
0.40 -0.19
0.40 -0.10
0.40 -0.08
0.40 -1.41
0.40 -0.22
0.40 -0.05
0.40 -0.16
0.40 -1.47
0.40 -0.92
HOJA DE METRADOS CERCO PERIMETRICO
METRADOALTO PARCIAL TOTAL
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
0.40 -1.13
0.40 -0.17
0.40 -1.69
0.40 -0.07
0.40 -0.10
0.40 -1.12
0.40 -0.61
0.40 -0.84
57.68
0.60 0.24
0.60 0.56
0.60 0.29
0.60 1.41
0.60 0.19
0.60 0.17
0.75 0.21
0.60 0.50
0.75 1.58
0.75 0.15
0.60 0.16
0.60 0.24
0.85 2.51
0.75 1.30
0.85 0.32
0.75 0.13
1.00 0.49
0.80 0.39
1.50 0.73
1.10 0.54
1.10 0.54
1.00 0.49
0.60 0.29
1.00 0.49
0.60 0.59
0.80 0.39
0.70 0.34
0.80 0.39
0.70 0.34
1.30 0.63
1.10 0.54
1.00 0.49
0.70 0.34
0.80 0.39
0.70 0.34
0.80 0.39
0.70 0.34
0.80 0.39
0.70 0.34
HOJA DE METRADOS CERCO PERIMETRICO
METRADOALTO PARCIAL TOTAL
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
0.80 0.39
0.70 0.34
0.60 2.34
0.60 0.20
1.15 0.58
0.70 1.06
0.60 3.32
0.95 0.48
0.80 0.40
1.00 0.50
0.80 0.40
1.10 0.55
0.90 0.45
1.10 0.55
0.85 0.43
1.10 0.55
0.90 0.45
1.00 0.50
0.80 0.40
0.90 0.45
0.70 0.35
0.80 0.40
0.70 0.35
0.75 0.38
0.65 0.33
6.00 21.11
0.60 0.26
769.04
0.60 3.24
0.60 7.49
0.60 3.89
0.60 18.76
0.60 2.54
0.60 2.24
0.75 2.76
0.60 6.72
0.75 21.00
0.75 1.98
0.60 2.15
0.60 3.23
0.85 33.46
0.75 17.37
0.85 4.32
0.75 1.79
1.00 6.50
0.80 5.20
1.50 9.75
1.10 7.15
HOJA DE METRADOS CERCO PERIMETRICO
METRADOALTO PARCIAL TOTAL
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
1.10 7.15
1.00 6.50
0.60 3.90
1.00 6.50
0.60 7.80
0.80 5.20
0.70 4.55
0.80 5.20
0.70 4.55
1.30 8.45
1.10 7.15
1.00 6.50
0.70 4.55
0.80 5.20
0.70 4.55
0.80 5.20
0.70 4.55
0.80 5.20
0.70 4.55
0.80 5.20
0.70 4.55
0.60 31.20
0.60 2.60
1.15 7.71
0.70 14.07
0.60 44.22
0.95 6.37
0.80 5.36
1.00 6.70
0.80 5.36
1.10 7.37
0.90 6.03
1.10 7.37
0.85 5.70
1.10 7.37
0.90 6.03
1.00 6.70
0.80 5.36
0.90 6.03
0.70 4.69
0.80 5.36
0.70 4.69
0.75 5.03
0.65 4.36
6.00 281.40
0.60 3.46
90.74
50.33
40.41
HOJA DE METRADOS CERCO PERIMETRICO
METRADOALTO PARCIAL TOTAL
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
7.61
0.20 3.98
0.20 3.63
97.93
1.20 6.48
1.00 3.84
1.00 14.56
1.00 3.72
1.00 1.35
1.20 4.50
1.00 1.07
1.00 10.88
1.00 7.29
1.00 0.87
1.00 1.07
1.00 8.96
1.00 13.44
1.00 8.32
1.00 4.86
1.00 6.72
813.45
813.45
8.41
8.41 8.41
29.66
3.05 0.27
3.75 0.31
3.05 2.56
3.05 0.38
2.90 1.09
2.85 0.60
3.55 0.75
1.20 0.41
3.85 0.72
3.50 3.06
2.85 0.37
1.75 0.06
1.75 0.07
1.75 0.59
3.20 0.20
HOJA DE METRADOS CERCO PERIMETRICO
METRADOALTO PARCIAL TOTAL
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
3.75 3.19
3.20 1.80
3.20 3.20
3.20 0.20
2.95 4.43
3.30 0.26
3.10 0.19
3.75 2.44
3.10 2.33
3.15 0.20
425.03
3.05 1.83
3.75 1.69
3.05 9.15
3.05 5.19
2.90 21.75
2.85 4.99
3.55 6.21
1.20 5.40
3.85 8.09
3.50 61.25
2.85 3.62
1.75 1.05
1.75 1.05
1.75 15.75
3.20 2.72
3.20 24.48
3.20 20.16
3.20 64.00
3.20 2.72
2.95 88.50
3.30 2.38
3.10 1.95
3.75 21.94
3.10 46.50
3.15 2.68
6466.856,466.85
2.94
0.15 2.54
0.15 0.41
61.52
HOJA DE METRADOS CERCO PERIMETRICO
METRADOALTO PARCIAL TOTAL
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
0.45 50.72
0.60 10.80
351.41
351.41
0.26
0.20 0.26
10.92
0.15 7.35
0.15 1.09
0.15 2.48
190.02
97.96
0.15 37.20
0.45 21.74
0.15 33.12
1131.83
1131.83
61.02
9.00
22.02
30.00
15.70
15.70
PROYECTO: "SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO DE HUACHOCOLPA, TAYACAJA, HUANCAVELICA"
METRADOS DE ACERO CERCO PERIMETRICO
PARTIDA DESCRIPCION DISEO DE FIERRO CANTIDAD N DE ELEMENTOS LONG. DEL ELEMENTOLONGITUD POR EN M.L.
1/4" 3/8"01.04.01.02 ZAPATAS ACERO F'Y=4200 KG/CM2
Tramo SurZapata 1
eje xx 1/2" 4 4 1.35eje yy 1/2" 4 7 0.75
Zapata 2eje xx 1/2" 5 4 1.05eje yy 1/2" 5 4 0.65
Zapata 3eje xx 1/2" 13 4 1.25eje yy 1/2" 13 7 0.65
Zapata 4eje xx 1/2" 1 4 0.65eje yy 1/2" 1 4 0.65
Zapata 5eje xx 1/2" 3 4 0.65eje yy 1/2" 3 6 0.9
Zapata 6eje xx 1/2" 2 7 0.65eje yy 1/2" 2 4 1.3
Zapata 7eje xx 1/2" 2 6 1.35eje yy 1/2" 2 7 1.1
Zapata 10eje xx 1/2" 1 5 0.65
eje yy 1/2" 1 4 0.95Tramo Norte
Zapata 4eje xx 1/2" 17 4 0.65eje yy 1/2" 17 4 0.65
Zapata 1eje xx 1/2" 9 4 0.75eje yy 1/2" 9 4 0.75
Zapata 12eje xx 1/2" 1 5 0.68eje yy 1/2" 1 4 0.9
Zapata 11eje xx 1/2" 1 4 1.05eje yy 1/2" 1 6 0.65
Zapata 3eje xx 1/2" 8 4 1.25eje yy 1/2" 8 7 0.65
Tramo EsteZapata 3
eje xx 1/2" 12 4 1.25eje yy 1/2" 12 7 0.65
Tramo OesteZapata 4
eje xx 1/2" 13 4 0.65eje yy 1/2" 13 4 0.65
Zapata 1eje xx 1/2" 6 4 0.75eje yy 1/2" 6 4 0.75
Zapata 3eje xx 1/2" 6 4 1.25eje yy 1/2" 6 7 0.65
Diametro 1/4" 3/8" 1/2" 5/8"peso en kilos por M.L: 0.25 0.58 1.02 1.6Long. Total por en ML. 0.00 0 797.5 0
Unidades de Varilla de 9 ml 0.00 0.00 88.61Total Kilos por 0.00 0.00 813.45 0Total Kilos 813.45
PARTIDA DESCRIPCION DISEO DE FIERRO CANTIDAD N DE ELEMENTOS LONG. DEL ELEMENTOLONGITUD POR EN M.L.
1/4" 3/8"01.04.02.04 COLUMNAS ACERO F'C=4200 KG/CM2
Ingreso 01Portico 5/8" 4 4 4.86
5/8" 4 4 8.265/8" 4 4 8.095/8" 4 4 7.785/8" 4 4 7.66
estribos 3/8" 4 148 1.69 1000.48
Tramo SurC-4 Eje 1 1/2" 1 6 4.3
3/8" 1 38 0.84 31.92C-3 columna forma de Quena 1/2" 5 5 5.15
3/8" 5 22 0.74 81.40C-2 Eje 3,6y11 1/2" 3 6 4.3
3/8" 3 48 0.84 120.96C-1 Eje 4,5,31y 32' 1/2" 4 4 5.15
3/8" 4 24 0.87 83.52C-6 Eje 32 y 33 1/2" 2 6 4.3
3/8" 2 48 0.86 82.56C-1 Eje 34 1/2" 1 4 4.15
3/8" 1 23 0.87 20.01C-1 Eje 35 1/2" 1 4 4.1
3/8" 1 23 0.87 20.01C-1 Eje 36 1/2" 1 4 4.8
3/8" 1 26 0.87 22.62
C-1 Eje 37 1/2" 1 4 5.13/8" 1 27 0.87 23.49
C-1 Eje 38 1/2" 1 4 4.753/8" 1 26 0.87 22.62
C-1 Eje 39 1/2" 1 4 4.13/8" 1 23 0.87 20.01
C-1 Eje 40 1/2" 1 4 5.053/8" 1 27 0.87 23.49
C-1 Eje 41 1/2" 1 4 4.13/8" 1 23 0.87 20.01
C-1 Eje 42 1/2" 1 4 4.83/8" 1 26 0.87 22.62
C-1 Eje 43 1/2" 1 4 4.13/8" 1 23 0.87 20.01
C-1 Eje 44 1/2" 1 4 4.853/8" 1 26 0.87 22.62
C-1 Eje 45 1/2" 1 4 4.13/8" 1 23 0.87 20.01
C-1 Eje 46 1/2" 1 4 4.653/8" 1 25 0.87 21.75
C-1 columnetas 3/8" 26 2 4 208.001/4" 26 20 0.25 130
C-1 Eje 14 3/8" 1 4 2.7 10.801/4" 1 13 0.72 9.36
C-1 Eje 15 3/8" 1 6 2.7 16.201/4" 1 26 0.49 12.74
C-1 Eje 16 al 30 3/8" 15 2 2.7 81.001/4" 15 13 0.25 48.75
Tramo NorteC-1 Eje 46 1/2" 1 4 5.4
3/8" 1 28 0.87 24.36C-1 Eje 71 1/2" 1 4 4.95
3/8" 1 26 0.87 22.62C-1 Eje 73 y 88 1/2" 2 4 4.05
3/8" 2 23 0.87 40.02C-1 Eje 74 1/2" 1 4 4.55
3/8" 1 25 0.87 21.75C-1 Eje 76,83,93,98,101,103 al 1 1/2" 12 4 4
3/8" 12 23 0.87 240.12C-1 Eje 78 1/2" 1 4 4.4
3/8" 1 24 0.87 20.88C-1 Eje 79 1/2" 1 4 3.95
3/8" 1 23 0.87 20.01C-1 Eje 81,84 y 96 1/2" 3 4 4.25
3/8" 3 24 0.87 62.64C-1 Eje 86 1/2" 1 4 4.75
3/8" 1 26 0.87 22.62C-1 Eje 89 1/2" 1 4 4.5
3/8" 1 25 0.87 21.75C-1 Eje 91 y 94 1/2" 2 4 4.2
3/8" 2 24 0.87 41.76C-3 Eje 70 columna forma de 1/2" 1 5 5
3/8" 1 23 0.74 17.02C-3 Eje 72 y 87 columna form 1/2" 2 5 5.3
3/8" 2 23 0.74 34.04C-3 Eje 75 columna forma de 1/2" 1 5 5.25
3/8" 1 23 0.74 17.02C-3 Eje 77, 80 y 102 al 110 c 1/2" 6 5 4.8
3/8" 6 21 0.74 93.24C-3 Eje 82,85,90 al 100 colum 1/2" 7 5 4.9
3/8" 7 21 0.74 108.78Tramo Este
C-1 Eje 48,52, 54 al 68 1/2" 16 4 4.23/8" 16 23 0.87 320.16
C-1 Eje 49 1/2" 1 4 4.553/8" 1 25 0.87 21.75
C-1 Eje 50 y 51 1/2" 2 4 4.13/8" 2 23 0.87 40.02
C-1 Eje 53 1/2" 1 4 4.153/8" 1 23 0.87 20.01
columnetas 3/8" 15 2 4 120.001/4" 15 13 0.25 48.75
Tramo OesteC-1 Eje 114 1/2" 1 4 4.35
3/8" 1 24 0.87 20.88C-1 Eje 116,121,126,131 136 a 1/2" 11 4 4
3/8" 11 23 0.87 220.11C-1 Eje 117 1/2" 1 4 4.4
3/8" 1 24 0.87 20.88C-1 Eje 119 1/2" 1 4 4.5
3/8" 1 25 0.87 21.75C-1 Eje 122 y 124 1/2" 2 4 4.55
3/8" 2 25 0.87 43.50C-1 Eje 127 1/2" 1 4 4.45
3/8" 1 25 0.87 21.75C-1 Eje 129 1/2" 11 4 4.3
3/8" 11 24 0.87 229.68C-1 Eje 132 1/2" 11 4 4.3
3/8" 11 24 0.87 229.68C-1 Eje 134 1/2" 11 4 4.15
3/8" 11 23 0.87 220.11C-3 Eje 115 columna forma de 1/2" 1 5 4.95
3/8" 1 22 0.74 17.02C-3 Eje 118 y 128 columna fo 1/2" 2 5 5
3/8" 2 22 0.74 17.02C-3 Eje 120 y 125 columna fo 1/2" 2 5 5.05
3/8" 2 22 0.74 17.02C-3 Eje 123 columna forma de 1/2" 1 5 4.55
3/8" 1 20 0.74 17.02C-3 Eje 130 y 133 columna fo 1/2" 2 5 4.9
3/8" 2 21 0.74 17.02C-3 Eje 135 columna forma de 1/2" 1 5 4.85
3/8" 1 21 0.74 17.02C-3 Eje 138 al 145 columna f 1/2" 1 5 4.8
3/8" 1 21 0.74 17.02Diametro 1/4" 3/8" 1/2" 5/8"peso en kilos por M.L: 0.25 0.58 1.02 1.6Long. Total por en ML. 249.60 4474.16 2814.9 586.4Unidades de Varilla de 9 ml 27.73 497.13 312.77 65.16Total Kilos por 62.40 2595.01 2871.198 938.24Total Kilos 6,466.85
PARTIDA DESCRIPCION DISEO DE FIERRO CANTIDAD N DE ELEMENTOS LONG. DEL ELEMENTOLONGITUD POR EN M.L.
1/4" 3/8"01.04.03.02 COLUMNETAS ACERO FY=4200 KG/CM2
V. LADO DERECHO DEL ACCESO 3/8" 15 4 1.4 84Estribos 3/8" 15 9 0.6 81
V. COM MARCO DE VANO 3/8" 23 4 4 3681/4" 23 20 0.6 276
Diametro 1/4" 3/8" 1/2" 5/8"peso en kilos por M.L: 0.25 0.58 1.02 1.6Long. Total por en ML. 357.00 452 0 0Unidades de Varilla de 9 ml 39.67 50.22Total Kilos por 89.25 262.16 0 0Total Kilos 351.41
PARTIDA DESCRIPCION DISEO DE FIERRO CANTIDAD N DE ELEMENTOS LONG. DEL ELEMENTOLONGITUD POR EN M.L.
1/4" 3/8"01.04.04.04 VIGAS ACERO FY=4200 KG/CM2
V. AMBOS LADOS DE C. CIRCULARES 3/8" 31 4 8.84 1096.16Estribos 3/8" 31 32 0.6 595.2
V. COM MARCO DE VANO 3/8" 46 4 1.7 312.81/4" 46 7 0.6 193.2
3/8" 23 4 1.75 1611/4" 23 7 0.6 96.6
Diametro 1/4" 3/8" 1/2" 5/8"peso en kilos por M.L: 0.25 0.58 1.02 1.6Long. Total por en ML. 885.00 1569.96 0 0Unidades de Varilla de 9 ml 98.33 174.44Total Kilos por 221.25 910.5768 0 0Total Kilos 1,131.83
PROYECTO: "SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA DISTRITO DE HUACHOCOLPA, TAYACAJA, HUANCAVELICA"
METRADOS DE ACERO CERCO PERIMETRICO
LONGITUD POR EN M.L.
1/2" 5/8" 3/4" 1"
21.6021.00
21.0013.00
65.0059.15
2.602.60
7.8016.20
9.1010.40
16.2015.40
3.25
3.80
44.2044.20
27.0027.00
3.403.60
4.203.90
40.0036.40
60.0054.60
33.8033.80
18.0018.00
30.0027.30
3/4" 1"
2.26 4.04
0 0
0 0
LONGITUD POR EN M.L.
1/2" 5/8" 3/4" 1"
77.76132.16129.44124.48122.56
25.80
128.75
77.40
82.40
51.60
16.60
16.40
19.20
20.40
19.00
16.40
20.20
16.40
19.20
16.40
19.40
16.40
18.60
21.60
19.80
32.40
18.20
192.00
17.60
15.80
51.00
19.00
18.00
33.60
25.00
53.00
26.25
144.00
171.50
268.80
18.20
32.80
16.60
17.40
176.00
17.60
18.00
36.40
17.80
189.20
189.20
182.60
25
25
25
25
25
25
25
3/4" 1"2.26 4.04
0 0
0 0
LONGITUD POR EN M.L.
1/2" 5/8" 3/4" 1"
3/4" 1"2.26 4.04
0 0
0 0
LONGITUD POR EN M.L.
1/2" 5/8" 3/4" 1"
3/4" 1"2.26 4.04
0 0
0 0
HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
CODIGO DESCRIPCION UND CANT VECES DIMENSIONES
LARGO ANCHO
004 CONSTRUCCION DE CERCO PERIMETRICO02 ARQUITECTURA02.01 MUROS Y TABIQUES DE ALBAILERIA02.01.01 MURO LADRILLO KING-KONG (9x12x24) SOGA J/1.5CM C:A/1:4 m2
Tramo Sur
Eje 41-42 1.00 1.00 1.79
Eje 32-33 2.00 1.00 1.70
Eje 33-34 1.00 1.00 1.93
1.00 1.00 1.93
Eje 46-60 6.00 1.00 1.19
4.00 1.00 1.19
1.00 1.00 1.19
1.00 1.00 1.19
Tramo Norte
Eje 89 al 133 34.00 1.00 1.00 Area
Eje 111-112 1.00 1.00 2.18
Tramo Este
Eje 62 AL 87 26 1.00 1.00
Tramo Oeste
Eje 134 AL 166 26 1.00 1.00 Area
02.02 REVOQUES ENLUCIDOS Y DERRAMES
02.02.01 REVESTIMIENTO CON GRANITO LAVADO m2
portico Igreso 1 4 2.00 Area Semicircular con CAD
4 1.00 Interior Semi Cir 0.25
4 1.00 Interior Semi Cir 0.25
VA-1 (25X20) 3 2.00 1.75
3 1.00 1.75 0.25
02.02.02 TARRAJEO EN COLUMNAS (MORTERO 1:5) m2
Tramo Sur
Eje 1 1 1.00 0.60
Eje 4 1 1.00 0.45
Eje 2,3,5,6,9,10,12,13,20.21,22.23 6 1.00 0.50
Eje 7, 8 2 1.00 0.85
Eje 14 AL 19 6 1.00 1.25
Eje 24 1 1.00 1.75
Eje 25 1 1.00 1.75
Eje 26.AL .40 15 1.00 0.30
Eje 41,43,44 3 1.00 0.70
Eje 46 AL 59 14 1.00 1.25
Eje 60 1 1.00 1.27
Eje 14 1 0.60
Eje 15 1 0.60
Eje 16 al 30 15 0.60
Tramo Norte
Eje 89 1 0.85
Eje90,92,95,97.100,102,105,107,110,112,115,117,120,122,125,127,130 17 0.45
EXPEDIENTE TCNICOSUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
Eje 91 .98,101,106,111,116,121,126,131 9 0.70
Eje 93,94,98,99,103,104,108,109,113,114,118,119,123,124,128,129 16 1.25
Eje 132 1 0.85
Tramo EsteEjes 63 al 86 24 1.25
Eje 87 1 0.72
Tramo OesteEJE 134 1 0.63
Eje 135,138,140,143,145,148,150,153,155,158,160,163.165 13 0.45
Eje 136,137,141,142,146,147,151,152,156,157,161,162 12 1.25
Eje 166 1 0.85
02.02.03 TARRAJEO EN VIGAS (MORTERO 1:5) m2
AMBOS LADOS DE LA SCOLUMNAS CIRCULARES 31 4.00 AREA 0.79
31 4.00 2.00
EN FOR MA DEL MARCO DEL VANO 23 1.00 2.10
ARRIOSTRE 23 4.00 2.40
02.02.04 BRUAS ML
Tramo Sur
13 1.00 1.35
37 1.00 0.40
15 1.00 0.50
Tramo Norte
70 1.00 0.40
Tramo Este
15 1.00 1.35
30 1.00 0.40
Tramo Oeste
70 1.00 0.40
02.03 ZOCALOS Y CONTRAZOCALOS02.03.01 CONTRAZOCALO CEMENTO S/N COLOREAR H = 30 cm ML
Eje 1 AL 7 6 2.00 2.70
Eje 8 AL 24 3 2.00 5.21
1 2.00 2.12
1 2.00 1.87
1 2.00 1.84
8 2.00 0.70
7 2.00 2.00
Eje 41 AL 60 10 2.00 4.20
Tramo Norte
Eje 89 al 132 34 2.00 4.20
Tramo Este
Eje 62 al 87 13 2.00 4.20
Tramo Oeste
Eje 133 al 166 26 2.00 4.20
02.04 CARPINTERIA METALICA Y HERRERIA
02.04.01 PORTON METALICO (INC. PUERTA/M2) m2
Ingreso 01 1 1.00 4.00
Ingreso 02 1 1.00 1.00 Area polig
02.04.02 CERCO PERIMETRICO REJA METALICA m2
Tramo Sur
Eje 1 y 2 1 2.00 0.68
Eje 2 - 3 y 6-7 2 2.00 0.89
Eje 3 - 4 y 5-6 2 1.00 1.62
Eje 7 al 10 3 2.00 1.93
Eje 10 y 11 1 1.00 2.12
Eje 11 y 12 1 1.00 1.00
Eje 14 y 15 1 1.00 1.84
Eje 15 al 30 8 1.00 0.70
7 1.00 2.00
Eje 30 y 31 1 1.00 1.32
13 1.00 1.05
Tramo Norte
34 1.00 1.00 Area polig
Tramo Este
15 1.00 1.05
Tramo Oeste
26 1.00 1.00 Area polig
02.05 CERRAJERIA
02.05.01 CERRADURA PARCHE 3 GOLPES UN
2 1.00
02.06 PINTURA
02.06.01 PINTURA EN COLUMNAS AL LATEX m2
Tramo Sur
Eje 1 1 1.00 0.60
Eje 4 1 1.00 0.45
Eje 2,3,5,6,9,10,12,13,20.21,22.23 6 1.00 0.50
Eje 7, 8 2 1.00 0.85
Eje 14 AL 19 6 1.00 1.25
Eje 24 1 1.00 1.75
Eje 25 1 1.00 1.75
Eje 26.AL .40 15 1.00 0.30
Eje 41,43,44 3 1.00 0.70
Eje 46 AL 59 14 1.00 1.25
Eje 60 1 1.00 1.27
Eje 14 1 0.60
Eje 15 1 0.60
Eje 16 al 30 15 0.60
Tramo Norte
Eje 89 1 0.85
Eje90,92,95,97.100,102,105,107,110,112,115,117,120,122,125,127,130 17 0.45
Eje 91 .98,101,106,111,116,121,126,131 9 0.70
Eje 93,94,98,99,103,104,108,109,113,114,118,119,123,124,128,129 16 1.25
Eje 132 1 0.85
Tramo EsteEjes 63 al 86 24 1.25
Eje 87 1 0.72
Tramo OesteEJE 134 1 0.63
Eje 135,138,140,143,145,148,150,153,155,158,160,163.165 13 0.45
Eje 136,137,141,142,146,147,151,152,156,157,161,162 12 1.25
Eje 166 1 0.85
02.06.02 PINTURA EN VIGAS AL LATEX m2
AMBOS LADOS DE LA SCOLUMNAS CIRCULARES 31 4.00 AREA 0.79
31 4.00 2.00
EN FOR MA DEL MARCO DEL VANO 23 1.00 2.10
ARRIOSTRE 23 4.00 2.40
02.06.03 PINTURA ESMALTE EN CONTRAZOCALOS H=30CM ML
Eje 1 AL 7 6 2.00 2.70
Eje 8 AL 24 3 2.00 5.21
1 2.00 2.12
1 2.00 1.87
1 2.00 1.84
8 2.00 0.70
7 2.00 2.00
Eje 41 AL 60 10 2.00 4.20
Tramo Norte
Eje 89 al 132 34 2.00 4.20
Tramo Este
Eje 62 al 87 13 2.00 4.20
Tramo Oeste
Eje 133 al 166 26 2.00 4.20
02.06.04 PINTURA EN CARPINTERIA METALICA C/EPOXICO m2
Ingreso 01 1 1.00 4.25
Ingreso 02 1 1.00 1.00 Area trapezoidal
Tramo Sur
Eje 1 y 2 1 2.00 0.68
Eje 2 - 3 y 6-7 2 2.00 0.89
Eje 3 - 4 y 5-6 2 1.00 1.62
Eje 7 al 10 3 2.00 1.93
Eje 10 y 11 1 1.00 2.12
Eje 11 y 12 1 1.00 1.00
Eje 14 y 15 1 1.00 1.84
Eje 15 al 30 8 1.00 0.70
7 1.00 2.00
Eje 30 y 31 1 1.00 1.32
13 1.00 1.05
Tramo Norte
34 1.00 1.00 Area polig
Tramo Este
15 1.00 1.05
Tramo Oeste
26 1.00 1.00 Area polig
02.07 VARIOS, LIMPIEZA Y JARDINERIA02.07.01 JUNTA SISMICA DE 1" EN MUROS E= 25cm ML
Tramo Sur
16
Tramo Norte
10
Tramo Este
13
Tramo Oeste
7
02.07.02 JUNTA DE DILATACION EN PISO EXT. C/SELLO ASFALT. ML
Ingreso 01
3 3.70
2 2.55
1 13.72
Ingreso 02
3 3.20
2 1.98
1 12.07
HOJA DE METRADOS CERCO PERIMETRICODISTRITO : HUACHOCOLPAPROVINCIA : TAYACAJADEPARTAMENTO : HUANCAVELICACLIENTE : MUNICIPALIDAD DISTRITAL DE HUACHOCOLPAFECHA : MARZO 2012
DIMENSIONES METRADO
ALTO PARCIAL TOTAL
295.63
2.00 3.58
2.00 6.80
2.00 3.86
2.10 4.05
1.80 12.85
2.25 10.71
2.40 2.86
2.15 2.56
3.20 108.80
2.00 4.36
2.00 52.00
3.20 83.20
95.68
8.41 67.28
11.61 11.61
13.38 13.38
0.20 2.10
1.31
425.03
3.05 1.83
3.75 1.69
3.05 9.15
3.05 5.19
2.90 21.75
2.85 4.99
3.55 6.21
1.20 5.40
3.85 8.09
3.50 61.25
2.85 3.62
1.75 1.05
1.75 1.05
1.75 15.75
3.20 2.72
3.20 24.48
SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO SANTA ROSA
3.20 20.16
3.20 64.00
3.20 2.72
2.95 88.50
3.30 2.38
3.10 1.95
3.75 21.94
3.10 46.50
3.15 2.68
190.02
97.96
0.15 37.20
0.45 21.74
0.15 33.12
128.10
17.55
14.80
7.50
28.00
20.25
12.00
28.00
811.72
32.40
31.26
4.24
3.74
3.68
11.20
28.00
84.00
285.60
109.20
218.40
21.99
2.55 10.20
11.79 11.79
350.69
2.15 2.90
2.15 7.61
2.00 6.48
2.15 24.90
2.15 4.56
6.56 6.56
1.03 1.90
1.00 5.60
1.03 14.42
1.03 1.36
2.15 29.35
3.52 119.68
2.15 33.86
3.52 91.52
2.00
2.00
425.03
3.05 1.83
3.75 1.69
3.05 9.15
3.05 5.19
2.90 21.75
2.85 4.99
3.55 6.21
1.20 5.40
3.85 8.09
3.50 61.25
2.85 3.62
1.75 1.05
1.75 1.05
1.75 15.75
3.20 2.72
3.20 24.48
3.20 20.16
3.20 64.00
3.20 2.72
2.95 88.50
3.30 2.38
3.10 1.95
3.75 21.94
3.10 46.50
3.15 2.68
190.02
97.96
0.15 37.20
0.45 21.74
0.15 33.12
811.72
32.40
31.26
4.24
3.74
3.68
11.20
28.00
84.00
285.60
109.20
218.40
373.11
2.50 10.63
11.79 11.79
2.15 2.90
2.15 7.61
2.00 6.48
2.15 24.90
2.15 4.56
6.56 6.56
1.03 1.90
1.00 5.60
1.03 14.42
1.03 1.36
2.15 29.35
3.52 119.68
2.15 33.86
3.52 91.52
117.30
2.55 40.80
2.55 25.50
2.55 33.15
2.55 17.85
55.55
11.10
5.10
13.72
9.60
3.96
12.07
ESTRUCTURASACEROARQUITECTURA