GUIA PARA EL ANALISIS

DE COSTOS DE EDIFICACIONES

E INDICE DE PRECIOS

EN SANTO DOMINGO, REP. DOMINICANA

PROPUESTA DEL

ARQ. JOSE A. GARCIA SIMO-M.Ave. México 26, 2da. Planta, esq. Rosa Duarte, Don Bosco

Of 809 685-8088 - Cel 809 519-3340 - Res 809 565-9492

FEBRERO 2006

PRECIO BASICO DEL FOLLETO RD$600.00

PRECIO DEL FOLLETO EN EL INTERIOR RD$700.00

PRECIO BASICO EN CD RD$700.00

PRECIO CD VIA INTERNET RD$700.00

PRECIO CD EN EL INTERIOR RD$800.00

E-MAIL: [email protected]

Page 2: 2006 02 Feb Texto

DE COSTOS DE EDIFICACIONES

EN SANTO DOMINGO, REP. DOMINICANA

ARQ. JOSE A. GARCIA SIMO-M.Ave. México 26, 2da. Planta, esq. Rosa Duarte, Don Bosco

Of 809 685-8088 - Cel 809 519-3340 - Res 809 565-9492

: [email protected]

Page 3: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 1

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

I.T.B.I.S. Vigente 16.00% 100.00% 16.00%100 INSUMOS (ITBIS incluido, salvo indicacion)

101 ACEROS Y ALAMBRE DULCE: (Agregar ITBIS)1 Acero ¼" qq 547.00 86.14% 635.002 Acero grado 40, 3/8" x 20´ qq 1,381.40 143.15% 965.003 Acero grado 40, 3/8" x 25' qq 1,381.40 143.15% 965.004 Acero grado 40, ½" x 20´ qq 1,381.40 143.15% 965.005 Acero grado 40, ½" x 25' qq 1,381.40 143.15% 965.006 Acero grado 40, ¾" qq 1,381.40 143.15% 965.007 Acero grado 40, 1" qq 1,381.40 143.15% 965.008 052472 Acero grado 60, 3/8" x 20' qq 1,381.40 143.15% 965.009 052473 Acero grado 60, 3/8" x 25' qq 1,381.40 143.15% 965.00

10 052475 Acero grado 60, ½" x 20' qq 1,381.40 143.15% 965.0011 052476 Acero grado 60, ½" x 25' qq 1,381.40 143.15% 965.0012 052478 Acero grado 60, ¾" x 20' qq 1,381.40 143.15% 965.0013 023422 Acero grado 60, 1" x 20' qq 1,381.40 143.15% 965.0014 Acero malla (D2.3 x D2.3, 100 x 100,Rollo 2.40 x 40.00 m., 4.85 qq) rollo 6,920.00 78.64% 8,800.0015 066278 Alambre galv. Calibre 18 (ITBIS incluido) lb 17.20 110.82% 15.52

102 AGREGADOS, BOTES, ETC.: (Víctor Jiménez, Cel. 299-0869)1 Arena fina para empañete m3 562.50 100.00% 562.502 Arena gruesa lavada m3 750.00 100.00% 750.003 Arena itabo de mina m3 500.00 100.00% 500.004 Arena triturada y lavada (Para hormigón) m3 812.50 100.00% 812.505 Bote de materiales (Con paleros) m3 250.00 100.00% 250.006 Bote de materiales (Con equipo) m3 150.00 100.00% 150.007 Caliche m3 313.00 100.00% 313.008 Cascajo de mina m3 500.00 100.00% 500.009 Grava ¾'' - ½'' triturada m3 562.50 100.00% 562.50

103 TINACOS: (Agregar ITBIS)123456789

101112131415161718 041760 Tinaco "Aquaplástica" 150 gl., plástico, 35Rx38H u 1,683.03 100.00% 1,683.0319 041761 Tinaco "Aquaplástica" 225 gl., plástico u 1,549.11 100.00% 1,549.1120 041762 Tinaco "Aquaplástica" 250 gl., plástico, 40Rx54H u 2,579.06 100.00% 2,579.0621 151252 Tinaco "Aquaplástica" 300 gl., plástico, 43Rx55H u 3,563.43 100.00% 3,563.4322 041763 Tinaco "Aquaplástica" 410 gl., plástico, 50Rx49H u 4,665.93 100.00% 4,665.9323 041764 Tinaco "Aquaplástica" 500 gl., plástico, 53Rx59H u 4,980.93 100.00% 4,980.9324 101063 Tinaco "Aquaplástica" 600 gl., plástico, 55Rx63H u 6,122.81 100.00% 6,122.8125 124158 Tinaco "Aquaplástica" 1000 gl., plástico, 69Rx72H u 10,650.93 100.00% 10,650.9326 159250 Tinaco "Aquaplástica" 2500 gl., plástico, 87Dx118H u 44,571.43 100.00% 44,571.4327 203729 Tinaco "Tinacom" 400 gl., plástico, 53Dx51H u 4,991.00 100.00% 4,991.0028 178291 Tinaco "Tinacom" 530 gl., negro, T-031 u 5,528.00 100.00% 5,528.0029 Tornillo exag. p/madera, h.g. ¼''x4'' (23 unid/lb) u 5.62 100.00% 5.62

104 BALAUSTRES Y PASAMANOS: (Agregar ITBIS)1 Balaustre 45 cms. Gris u 153.00 100.00% 153.002 Balaustre 45 cms. Bco. Cep. u 239.40 100.00% 239.403 Balaustre 50 cms. Gris u 168.30 100.00% 168.304 Balaustre 50 cms. Bco. Cep. u 267.30 100.00% 267.305 Balaustre 55 cms. Gris u 182.70 100.00% 182.706 Balaustre 55 cms. Bco. Cep. u 289.80 100.00% 289.807 Balaustre 64 cms. Gris u 211.50 100.00% 211.508 Balaustre 64 cms. Bco. Cep. u 338.40 100.00% 338.409 Balaustre 67 cms. Gris u 223.20 100.00% 223.20

10 Balaustre 67 cms. Bco. Cep. u 351.00 100.00% 351.0011 Balaustre 72 cms. Gris u 232.20 100.00% 232.2012 Balaustre 72 cms. Bco. Cep. u 373.50 100.00% 373.5013 Balaustre 74 cms. Gris Cep. u 251.10 100.00% 251.1014 Balaustre 74 cms. Bco. Cep. u 401.40 100.00% 401.4015 Pasamano bco. Cep. 30 bocel cuadrado m 672.00 100.00% 672.0016 Pasamano bco. Cep. 30 bocel redondo m 784.00 100.00% 784.0017 Pasamano bco. Pul. 30 bocel cuadrado m 796.00 100.00% 796.0018 Pasamano bco. Pul. 30 bocel redondo m 867.00 100.00% 867.0019 Pasamano super bocel cuadrado m 829.00 100.00% 829.0020 Pasamano super bocel redondo m 976.00 100.00% 976.0021 Transp. balaustre u 2.00 100.00% 2.0022 Transp. pasamano m 8.00 100.00% 8.00

105 BAÑOS, FREGADEROS , CALENTADORES ELECT. Y ACCESORIOS:1 190762 Accesorios 5 piezas, Bco., porcelana u 1,131.00 100.00% 1,131.00

Page 4: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 2

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

2 077336 Accesorios 5 piezas, cromo, corriente, sup. u 371.20 100.00% 371.203 129719 Accesorios 6 piezas, cromo, sup. u 962.60 100.00% 962.604 015472 Arandela plástica 3" ó 4'', para inodoro u 35.76 100.00% 35.765 072796 Asiento p/inodoro, blanco, D60 J. V. u 243.60 100.00% 243.606 008119 Bañera hierro fundido, color, sin mescl. y sin ducha u 12,619.64 100.00% 12,619.647 008126 Bañera hierro fundido, blanca, "Naple" sin mescl. y sin ducha u 12,551.20 100.00% 12,551.208 008229 Bañera liviana, color, sin mescl. y sin ducha u 6,500.64 100.00% 6,500.649 008230 Bañera liviana, blanca, sin mescl. y sin ducha u 6,500.64 100.00% 6,500.64

10 016195 Barra de seguridad cromo 1524 u 281.72 100.00% 281.7211 043116 Barra de seguridad T/L BC-1177-C, cromo u 450.53 100.00% 450.5312 007726 Bidet a color ''Royal'', sin mescl. y sin acces. u 2,378.00 100.00% 2,378.0013 157985 Bidet bco. ''Royal'', sin mescl. y sin acces. u 2,139.04 100.00% 2,139.0414 Boquilla lavamanos, automática, cromo, ''Price Pfister'' u 950.77 100.00% 950.7715 015053 Boquilla lavamanos, pvc, sencilla u 40.60 100.00% 40.6016 015025 Boquilla fregadero, 4 ½", cromo (c/u) u 89.32 100.00% 89.3217 Boquilla lavadero, cromo, con tapón u 64.21 100.00% 64.2118 015040 Boquilla lavadero 2 ½", pvc, con tapón u 39.44 100.00% 39.4419 064329 Botiquín corriente, cromo, 1 puerta, 2 luces R1102 u 3,543.88 100.00% 3,543.8820 008020 Botiquín cromo, Salgar, 2 puertas, 2 luces (Bot 48) u 4,107.64 100.00% 4,107.6421 007512 Botiquín cromo, Salgar, 3 puertas, 2 luces (Bot 60) u 3,075.45 100.00% 3,075.4522 Botiquín cromo, 2 puertas, 2 luces, 3 cajones (Bot 90 C/cajones) u 6,214.20 100.00% 6,214.2023 086746 Botiquín mad. prens., Danubio 700, 27 ½''x26 ½'', 1 pta, Bco., "Salgar" u 3,543.88 100.00% 3,543.8824 056459 Botiquín mad. Prens., Danubio 850, 33 ½''x26 ½'', 2 pta, Bco., "Salgar" u 6,288.73 100.00% 6,288.7325 061437 Calent. eléct. Criollo 20 gls., f. de vidrio u 5,771.00 100.00% 5,771.0026 Calent. eléct. Criollo 30 gls., f. de vidrio u 5,772.99 100.00% 5,772.9927 Calent. eléct. Criollo 42 gls., f. de vidrio u 8,134.39 100.00% 8,134.3928 Calent. eléct. Criollo 60 gls., f. de vidrio u 11,318.13 100.00% 11,318.1329 007983 Calent. eléct. 20 gls., importado u 19,189.72 100.00% 19,189.7230 051491 Calent. eléct. 30 gls., importado u 19,749.00 100.00% 19,749.0031 120270 Calent. eléct. 40 gls., importado u 17,569.86 100.00% 17,569.8632 007988 Calent. eléct. 80 gls., importado u 28,546.36 100.00% 28,546.3633 Cepillera corriente, cromo u 75.61 100.00% 75.6134 015052 Cola ext. lavamanos 1 ¼''x6'', cromo u 92.80 100.00% 92.8035 023194 Cola ext. fregadero 1 ½''x8'', pvc u 39.44 100.00% 39.4436 015029 Cola ext. fregadero 1 ½''x8'', pvc, 10-8w u 12.76 100.00% 12.7637 015828 Cubrefalta 3/8'', cromo, HP323F D-382A u 4.64 100.00% 4.6438 028014 Cubrefalta ½'', cromo, HP323F D-382B u 4.06 100.00% 4.0639 015826 Cubrefalta ¾'', cromo u 5.80 100.00% 5.8040 014829 Desagüe bañera, ''Price Pfister'', pvc u 1,992.88 100.00% 1,992.8841 Desagüe jacuzzi, de cable, pvc u 2,780.85 100.00% 2,780.8542 015469 Desagüe fregadero, 1 1/2"x16, pvc, doble, 130-16 u 96.28 100.00% 96.2843 025860 Ducha "Price Pfister", Ref. 413-0100, cromo u 1,049.80 100.00% 1,049.8044 015070 Ducha plástica completa, cromo u 49.88 100.00% 49.8845 066022 Fregadero sencillo / bar, a. inox, 20''x21'', sin mescl. y sin acces. u 1,124.33 100.00% 1,124.3346 116623 Fregadero sencillo a. inox, 25''x22'', sin mescl. y sin acces. u 1,282.48 100.00% 1,282.4847 194331 Fregadero doble a. inox, 33''x22'', sin mescl. y sin acces. u 1,068.59 100.00% 1,068.5948 Gancho cromo doble, corriente u 50.75 100.00% 50.7549 164960 Inodoro bco., alargado, sin tapa, sin acces, ''Royal'' u 4,411.11 100.00% 4,411.1150 Inodoro bco., sin tapa, sin acces, ''Simplex'' u 2,557.80 100.00% 2,557.8051 Inodoro bco., corriente, sin tapa, sin acces, ''Isabela'' u 3,630.13 100.00% 3,630.1352 143237 Inodoro bco., sin tapa, sin acces, ''Simplex'' u 2,436.00 100.00% 2,436.0053 143236 Inodoro bco., sin tapa, sin acces, ''Taino'' u 1,598.02 100.00% 1,598.0254 196873 Inodoro color, alargado, sin tapa, sin acces, ''Royal'' u 4,895.83 100.00% 4,895.8355 143254 Inodoro color, corriente, sin tapa, sin acces, ''Azteca'' u 3,759.64 100.00% 3,759.6456 137291 Inodoro natural, silencioso, sin tapa, sin acces, "Petit Garson" u 14,145.78 100.00% 14,145.7857 008097 Inodoro fluxómetro bco., sin válvula, ''Royal'' u 3,327.75 100.00% 3,327.7558 Jabonera bañera, agarradera, cromo, corriente u 256.85 100.00% 256.8559 Jabonera bañera, sin agarradera, cromo, corriente u 186.43 100.00% 186.4360 Jacuzzi Blanco, acces. cromo, con bomba, "Acuario" u 37,253.09 100.00% 37,253.0961 Jacuzzi Blanco, acces. cromo, con bomba, "Cadenza" u 40,347.76 100.00% 40,347.7662 Jabonera líquida, cromo, corriente u 228.89 100.00% 228.8963 Juego baño 3 pzas color, sin acces. jgo 12,285.11 100.00% 12,285.1164 Juego baño 3 pzas, bco., sin acces. jgo 12,285.11 100.00% 12,285.1165 015722 Junta de cera u 21.46 100.00% 21.4666 197578 Lavamanos color, 19''x''17'', sin mescl. y sin acces, ''Embajador'' u 1,373.36 100.00% 1,373.3667 163190 Lavamanos Pedestal, color ovalado, sin mescl. y sin acces, "Royal" u 1,473.20 100.00% 1,473.2068 008206 Lavamanos bco., 19''x''17'', sin mescl. y sin acces, ''Isabela'' u 1,032.40 100.00% 1,032.4069 128366 Lavamanos bco., pequeño, 1 llave, sin acces, ''Simplex'' u 677.44 100.00% 677.4470 008188 Lavamanos ovalado color, sin mescl. y sin acces, ''Saona'' u 1,900.08 100.00% 1,900.0871 014997 Lavamanos ovalado bco., sin mescl. y sin acces, ''Saona'' u 1,715.64 100.00% 1,715.6472 185340 Llave angular 1/2" ó 3/8'', ''USA'' u 95.12 100.00% 95.1273 015280 Llave chorro ½'', ''Urrea'' u 124.93 100.00% 124.9374 175628 Llave cromo completa, mescl. para orinal pequeño u 1,641.40 100.00% 1,641.4075 015074 Llave empotrar de ½'', cromo, ''Urrea'' u 221.56 100.00% 221.5676 015067 Llave sencilla cromo, para lavamanos pequeño, "Urrea" u 248.00 100.00% 248.0077 008052 Mezcladora bañera, desagüe, ''Price Pfister'' u 2,969.60 100.00% 2,969.6078 008062 Mezcladora bañera, de 1ra., desagüe, 01-311 ''Price Pfister'' u 2,969.60 100.00% 2,969.6079 Mezcladora bidet, completa, con boquilla ''Price Pfister'' u 4,534.29 100.00% 4,534.2980 008064 Mezcladora fregadero con manguera, H35-121 ''Price Pfister'' u 3,462.60 100.00% 3,462.6081 008527 Mezcladora lavamanos con boquilla, ''Price Pfister'' u 2,900.00 100.00% 2,900.0082 008061 Mezcladora lavamanos con boquilla, de 1ra., H43-128 ''Price Pfister'' u 2,224.88 100.00% 2,224.8883 015851 Niple 3/8''x2 ½'', cromo u 21.46 100.00% 21.4684 007732 Orinal pequeño, bco., sin la llave "Simplex" Ozama 15510 u 1,825.97 100.00% 1,825.9785 007626 Orinal ½ falda, bco., sin llave y sin válvula "Yaque" u 7,653.92 100.00% 7,653.9286 007628 Orinal falda entera, bco., sin llave y sin válvula "Eljer" u 15,553.58 100.00% 15,553.5887 015835 Palometa doble alum., fijar lavamanos par 30.16 100.00% 30.1688 Papelera empotrar, cromo, corriente u 207.14 100.00% 207.1489 014897 Rejilla 3''x2'' cromo, para piso, HP350A R-407B u 34.80 100.00% 34.80

Page 5: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 3

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

90 014894 Rejilla 4" aluminio, para piso u 11.60 100.00% 11.6091 015469 Sifón fregadero 1 ½'', pvc u 96.28 100.00% 96.2892 Sifón lavamanos, 1 ¼'', cromo, completo, ''Urrea'' u 653.01 100.00% 653.0193 015468 Sifón lavamanos, 1 ¼'', cromo, completo, corriente 300-SN u 271.44 100.00% 271.4494 015503 Sifón lavamanos, 1 ¼'', pvc u 46.40 100.00% 46.4095 015429 Tapa p/Cisterna, 27"x27", aluminio u 1,958.08 100.00% 1,958.0896 015831 Tornillos p/bacineta, 1/4"x2 1/2", HP167 R-801AA jgo 8.12 100.00% 8.1297 040152 Toallero 24'' cromo corriente u 76.56 100.00% 76.5698 Toallero 30'' cromo corriente u 155.36 100.00% 155.3699 Toallero 24'', barra de seguridad, a. Inox. u 362.50 100.00% 362.50

100 Toallero 30'', barra de seguridad, a. Inox. u 466.07 100.00% 466.07101 109733 Tubo flexible con tuerca, lavamanos, 1/2"x3/8" 40 cm., EVL-B40 u 80.04 100.00% 80.04102 109735 Tubo flexible con tuerca, inodoro, 3/8"x7/8" 50 cm., EVS-B50 u 83.52 100.00% 83.52103 Tubo flexible económico u 29.83 100.00% 29.83104 015464 Válvula fluxómetro 3/4" para inodoro 402 NVB REXDELANY u 2,826.92 100.00% 2,826.92105 015465 Válvula fluxómetro 3/4" para orinal, 451-NVB u 2,826.92 100.00% 2,826.92

106 BARRO, PRODUCTOS: (Agregar ITBIS)1 BL2 Bloques de barro 4'' u 16.03 100.00% 16.032 BL3 Bloques de barro 6'' u 20.56 100.00% 20.563 BL4 Bloques de barro 8'' u 23.71 100.00% 23.714 CA2 Caballete triangular oscuro u 26.37 100.00% 26.375 BL5 Calados corrientes de barro en 6''x6''x6'' u 25.00 100.00% 25.006 Calados corrientes de barro en 8''x8''x6'' u 25.00 100.00% 25.007 L01 Ladrillos macisos 2''x4''x8'' u 8.04 100.00% 8.048 L04 Ladrillos biscochos 2''x2''x8'' u 6.53 100.00% 6.539 LO02 Losa de barro tipo FERIA grande u 7.00 100.00% 7.00

10 LO01 Losa de barro tipo FERIA pequeña u 3.21 100.00% 3.2111 LO05 Losa de barro exagonal grande (ya no la fabrican) u 9.39 100.00% 9.3912 LO04 Losa de barro exagonal pequeña u 3.67 100.00% 3.6713 T01 Teja criolla curva 16'' x 7" u 9.23 100.00% 9.2314 T02 Teja criolla curva 18'' x 7", oscura u 14.22 100.00% 14.2215 T09 Teja Francesa plana (ya no la fabrican) u 32.74 100.00% 32.7416 T10 Teja Francesa plana, oscura (ya no la fabrican) u 49.09 100.00% 49.0917 T13 Tejas tipo S'', criolla u 28.88 100.00% 28.8818 LO21 Zócalos de barro de 10 ½''x3'' u 7.00 100.00% 7.0019 Transp. Mínimo Sto. Dgo. vje 638.00 100.00% 638.0020 Transp. Teja 16" 5,000 unid. Sto. Dgo. vje 3,750.00 100.00% 3,750.0021 Transp. Teja 16" al interior u 2.81 100.00% 2.8122 Transp. Teja 18" 5,000 unid. Sto. Dgo. vje 4,800.00 100.00% 4,800.0023 Transp. Teja 18" al interior u 6.24 100.00% 6.24

1071 01-0350 Blintel 6''x8''x8'' liso (medio bloque) u 17.61 100.00% 17.612 01-0330 Blintel 8''x8''x8'' liso (medio bloque) u 23.19 100.00% 23.193 01-0340 Blintel 6''x8''x16'' u 25.60 100.00% 25.604 01-0320 Blintel 8''x8''x16'' u 33.56 100.00% 33.565 01-0140 Bloque 4'' liso u 18.14 100.00% 18.146 01-0380 Bloque 4'' (Ticatex) u 24.74 100.00% 24.747 01-0080 Bloque 5'', para verjas (liso) u 19.16 100.00% 19.168 01-0081 Bloque 5'', para verjas (Ticatex) u 23.00 100.00% 23.009 01-0130 Bloque 6'' liso u 20.95 100.00% 20.95

10 01-0370 Bloque 6'' (Ticatex) u 25.15 100.00% 25.1511 01-0120 Bloque 8'' liso u 27.16 100.00% 27.1612 01-0360 Bloque 8'' (Ticatex) u 32.00 100.00% 32.0013 01-0010 Bloque 8'' reforzado u 35.21 100.00% 35.2114 01-0020 Bloque 10'' liso u 70.49 100.00% 70.4915 01-0010 Bloque 12'' liso u 70.84 100.00% 70.8416 01-0070 Bloque 6''x8''x8'', liso (½ bloque 6'') u 15.23 100.00% 15.2317 01-0060 Bloque 8''x8''x8'', liso (½ bloque 8'') u 20.13 100.00% 20.1318 Bloque calado 6'', tipo persiana u 43.75 100.00% 43.7519 Bloque ornamental 8''x8''x16'', gris (Ticarust) u 68.25 100.00% 68.2520 01-0150 Bloque Rusticanales 4'', gris u 80.80 100.00% 80.8021 01-0110 Bloque Rusticanales 8'', gris u 107.53 100.00% 107.5322 Bloque techo .15 x .60 m, gris u 46.75 100.00% 46.7523 Bloque techo .15 x .60 m, color u 62.01 100.00% 62.0124 Bloque techo .11 x .20 x .20 m, gris u 27.18 100.00% 27.1825 01-0280 Bloviga 6''x8"x16" u 40.66 100.00% 40.6626 01-0290 Bloviga 8''x8"x16" u 53.34 100.00% 53.3427 Transp. blintel 6''x8''x8'' (medio Transp. bloque) u 1.05 100.00% 1.0528 Transp. blintel 8''x8''x8'' (medio Transp. bloque) u 1.17 100.00% 1.1729 Transp. blintel 6''x8''x16'' u 1.28 100.00% 1.2830 Transp. blintel 8''x8''x16'' u 1.40 100.00% 1.4031 Transp. bloque 4'' liso u 1.50 100.00% 1.5032 Transp. bloque 5'', para verja u 1.60 100.00% 1.6033 Transp. bloque 6'' liso u 1.70 100.00% 1.7034 Transp. bloque 8'' liso u 1.80 100.00% 1.8035 Transp. bloque 8'' reforzado u 1.30 100.00% 1.3036 Transp. bloque 10'' liso u 2.02 100.00% 2.0237 Transp. bloque 12'' liso u 2.71 100.00% 2.7138 Transp. medio bloque 6'' liso u 0.91 100.00% 0.9139 Transp. medio bloque 8'' liso u 1.06 100.00% 1.0640 Transp. Bloque calado tipo persiana de 6'' u 2.82 100.00% 2.8241 Transp. Bloque ornamental 15x20x40 u 2.82 100.00% 2.8242 Transp. bloque Rusticanal 4'' u 1.17 100.00% 1.1743 Transp. bloque Rusticanal 8'' u 1.63 100.00% 1.6344 Transp. bloque techo .15 x .60 m, gris u 2.71 100.00% 2.7145 Transp. bloque techo .15 x .60 m, color u 1.02 100.00% 1.02

BLOQUES DE CEMENTO: (Agregar ITBIS) (INDUSTRIAS AGUAYO 533-3161)

Page 6: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 4

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

46 Transp. bloque techo .11 x .20 x .20 m, gris u 0.83 100.00% 0.8347 Transp. bloviga 6'' u 1.28 100.00% 1.2848 Transp. bloviga 8'' u 1.40 100.00% 1.40

108 BOMBAS DE AGUA Y TANQUES DE PRESION : (Agregar ITBIS)1 010914 Bomba ½ HP, "Myers" 110/220 v, HR50S, sin tanque u 6,075.86 100.00% 6,075.862 010942 Bomba ¾ HP, "Myers" 110/220 v, HJ75S, sin tanque u 7,147.41 100.00% 7,147.413 035996 Bomba 1 HP, "Myers" 110/220 v, sin tanque u 9,064.66 100.00% 9,064.664 034994 Bomba 5 HP, "Myers" 230 v 1PH,200M-5FA, sin tanque u 27,365.52 100.00% 27,365.525 034919 Bomba sumergible 1 HP, "Myers" 3ST102-20, completa u 16,344.83 100.00% 16,344.836 034914 Bomba sumergible 1 ½ HP, "Myers" 3ST152-20, completa u 20,875.00 100.00% 20,875.007 155863 Bomba sumergible 2 HP, "Myers" J2025B/SS20-25, completa u 15,875.00 100.00% 15,875.008 155865 Bomba sumergible 5 HP, "Myers" J5050B/SS50-50, completa u 25,163.79 100.00% 25,163.799 123967 Tanque hidr. 42 gls., criollo, fibra u 3,050.00 100.00% 3,050.00

10 012288 Tanque hidr. 42 gls., USA, "Well-x-Troll" "WX-202P" u 4,800.00 100.00% 4,800.0011 123969 Tanque hidr. 60 gls., criollo, fibra u 4,600.00 100.00% 4,600.0012 147763 Tanque hidr. 82 gls., USA, "Well-x-Troll" "WX-203P" u 6,849.13 100.00% 6,849.1313 177402 Tanque hidr. 120 gls., criollo, fibra u 6,700.00 100.00% 6,700.0014 144854 Tanque hidr. 120 gls., USA, "Well-x-Troll" "WX-250P" u 8,767.24 100.00% 8,767.2415 131849 Tanque hidr. 180 gls., USA, "Well-x-Troll" "WX-302P" u 12,094.82 100.00% 12,094.82

109565-2487 Fax: 541-3921 y 567-6391

1 JSW 0.7 HP tanque 30 gl. criollo, completa u 7,642.24 100.00% 7,642.242 JSW 0.7 HP tanque 30 gl. horizontal USA u 4,887.93 100.00% 4,887.933 JSW 0.7 HP tanque 42 gl. criollo, completa u 2,599.14 100.00% 2,599.144 JSW 0.7 HP tanque 42 gl. horizontal USA u 6,439.66 100.00% 6,439.665 JSW 0.7 HP tanque 60 gl. criollo, completa u 8,581.03 100.00% 8,581.036 ''Pedrollo'' 1 HP tanque 60 gl. criollo, completa u 9,465.52 100.00% 9,465.527 ''Pedrollo'' 1 HP tanque 82 ó 100 gl. criollo, completa u 12,064.66 100.00% 12,064.668 ''Pedrollo'' 1 HP tanque 82 gl. USA, completa u 14,865.52 100.00% 14,865.529 ''Pedrollo'' 1 ½ HP, 1 impeller, tanque 82 ó 100 gl. criollo, completa u 15,924.57 100.00% 15,924.57

10 ''Pedrollo'' 1 ½ HP, 1 impeller, tanque 120 gl. criollo, completa u 17,037.93 100.00% 17,037.9311 ''Pedrollo'' 1 ½ HP, 1 impeller, tanque 82 gl. USA, completa u 18,737.07 100.00% 18,737.0712 ''Pedrollo'' 1 ½ HP, 1 impeller, tanque 120 gl. USA, completa u 21,650.43 100.00% 21,650.4313 ''Pedrollo'' 1 ½ HP, 2 impeller, tanque 82 ó 100 gl. criollo, completa u 15,672.41 100.00% 15,672.4114 ''Pedrollo'' 1 ½ HP, 2 impeller, tanque 120 gl. criollo, completa u 16,797.41 100.00% 16,797.4115 ''Pedrollo'' 1 ½ HP, 2 impeller, tanque 82 gl. USA, completa u 18,488.79 100.00% 18,488.7916 ''Pedrollo'' 1 ½ HP, 2 impeller, tanque 120 gl. USA, completa u 23,820.52 100.00% 23,820.5217 ''Pedrollo'' 2 HP, 1 impeller, tanque 120 gl. criollo, completa u 17,076.72 100.00% 17,076.7218 ''Pedrollo'' 2 HP, 1 impeller, tanque 120 gl. USA, completa u 23,091.98 100.00% 23,091.9819 ''Pedrollo'' 2 HP, 2 impeller, tanque 120 gl. criollo, completa u 19,520.69 100.00% 19,520.6920 ''Pedrollo'' 2 HP, 2 impeller, tanque 120 gl. USA, completa u 25,155.00 100.00% 25,155.0021 ''Pedrollo'' 3 HP, 1 impeller, tanque 120 gl. criollo, completa u 24,431.90 100.00% 24,431.9022 ''Pedrollo'' 3 HP, 1 impeller, tanque 120 gl. USA, completa u 30,592.24 100.00% 30,592.24

110 CAL, CEMENTOS, ADITIVOS, CURADORES, ENDURECEDORES, SELLADORES:1 Aditivo impermeabilizante ''SX-PEL'', 5 gl. (Agregar ITBIS) gl 180.00 100.00% 180.002 Aditivo retardante ''SX-KRETE-R'', 5 gl. (Agregar ITBIS) gl 165.00 100.00% 165.003 052396 Cal ''Perla-Pomier'' económica o similar (20 Kilos) fda 128.59 100.00% 128.594 052388 Cemento Bco. (90 lb.) fda 430.00 100.00% 430.005 080496 Cemento Gris ''Portland'', a crédito, incluye transporte fda 90.00 112.50% 80.006 Curador-sellador ''SUPRACURE PLUS'', 5 gl., 20 m2/gl. (Agregar ITBIS) gl 420.00 100.00% 420.007 Endur. Met. / pisos ''DURAPLATE NR'', 100 lb., .10 m2/lb., Fda.=55 lb. (Agregar ITBIS) fda 954.00 100.00% 954.008 Mezcla "Antillana" para bloques, 94 lb. fda 125.40 100.00% 125.409 207403 Mezcla "Antillana" para empañete, 94 lb., para 2 m2 fda 162.40 100.00% 162.40

10 Resina epóxica ''Pro-flex'' para junta de piso, 231 pulg.3/gl. gl 2,050.00 100.00% 2,050.0011 Sellador hormigón visto ''SUPRACURE PX'', 5gl., 20 m2/gl. (Agregar ITBIS) gl 360.00 100.00% 360.00

111 CERAMICAS: (Agregar ITBIS)1 Cerámica criolla tipo 01 m2 300.00 100.00% 300.002 Cerámica criolla tipo 02 m2 325.00 100.00% 325.003 Cerámica criolla tipo 03 m2 350.00 100.00% 350.004 Cerámica criolla tipo 04 m2 400.00 100.00% 400.005 Cerámica criolla tipo 05 m2 500.00 100.00% 500.006 Cerámica importada tipo 06 m2 550.00 100.00% 550.007 Cerámica importada tipo 07 m2 650.00 100.00% 650.008 Cerámica importada tipo 08 m2 750.00 100.00% 750.009 Cerámica importada tipo 09 m2 850.00 100.00% 850.00

10 Cerámica importada tipo 10 m2 925.00 100.00% 925.0011 Cerámica importada tipo 11 m2 1,000.00 100.00% 1,000.0012 Cerámica importada tipo 12 m2 1,100.00 100.00% 1,100.0013 Corte de chazos de cerámica u 6.00 100.00% 6.0014 Derretido (rinde 25 m2/fda.) fda 355.05 100.00% 355.0515 023936 Estopa lb 29.00 100.00% 29.0016 Listelo 8x20, import., serie Trama u 110.00 100.00% 110.0017 Pegamento K18 (rinde 6.5 m2/fda.) fda 425.00 100.00% 425.0018 Perfil esquinero PVC, 2.5 m. u 150.00 100.00% 150.0019 Zócalo cerámica 8x34, import. u 50.00 100.00% 50.00

112 CERRAJERIA:1 009975 Bisagras ''Stanley'' 3 ½''x3 ½'', tipo libro, doradas 82-100 par 73.08 100.00% 73.082 051815 Bisagra ''Vaivén'' de piso u 446.60 100.00% 446.603 008410 Candado 50 mm ''Corbin''. u 342.20 100.00% 342.204 023864 Fallebas cromos 3/8" x 9'' u 109.78 100.00% 109.785 037004 Fallebas cromos 3/8" x 12'' u 115.85 100.00% 115.856 039647 Hoja de segueta "U. M." u 23.20 100.00% 23.207 161135 Llavín corriente, doble puño, llave y seguro, ''Yale'' u 377.00 100.00% 377.00

BOMBAS DE AGUA: (Agregar ITBIS) FERRETERIA SANTA CRUZ

Page 7: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 5

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

8 248090 Llavín de calidad, doble puño, llave y seguro, ref. 640, ''Weslock'' CLS-NS u 1,194.82 100.00% 1,194.829 124642 Pestillo 60 MM corriente u 32.48 100.00% 32.48

10 004027 Portacandado 4" corriente u 15.66 100.00% 15.6611 028399 Tarugos plásticos 3/8''x2 1/2'', mamey u 0.55 100.00% 0.5512 023955 Tornillos 3''x16 u 3.48 100.00% 3.4813 009674 Tornillos 3''x3/8" electro galv. Cabeza exagonal u 6.03 100.00% 6.03

113 DIVISA NORTEAMERICANA (US$DOLARES):1 Precio de US$1.00 comprado en el mercado local $ 34.59 98.83% 35.00

114 EBANISTERIA: (Sixto de los Santos: Cel. 865-6774, Ofic. 594-7304, Res. 595-5030)1 Gabinete pared en Caoba, 2 pie de alto, 3/4" p 2,700.00 100.00% 2,700.002 Gabinete pared en Caoba y ''Plywood'', 2 pie de alto, 3/4" p 1,760.00 100.00% 1,760.003 Gabinete pared en Pino p 1,050.00 100.00% 1,050.004 Gabinete pared en Pino y ''Plywood'' p 875.00 100.00% 875.005 Gabinete piso en Caoba p 2,940.00 100.00% 2,940.006 Gabinete piso en Caoba y ''Plywood'' p 1,940.00 100.00% 1,940.007 Gabinete piso en Pino p 1,290.00 100.00% 1,290.008 Gabinete piso en Pino y ''Plywood'' p 1,050.00 100.00% 1,050.009 Marco en pino 1 ½''x4'' p 44.00 100.00% 44.00

10 Marco en caoba 1 ½''x4'' p 136.00 100.00% 136.0011 Puerta Caoba panelada especial p2 575.00 100.00% 575.0012 Puerta Caoba panelada sencilla p2 528.00 100.00% 528.0013 Puerta Caoba tipo francesa p2 550.00 100.00% 550.0014 Puerta ''Plywood'' 3/16'' p2 85.00 100.00% 85.0015 Puerta Pino panelada p2 154.00 100.00% 154.0016 Puerta Pino con marco, hueco .80 X 2.10 m., 2 paneles (medida fija) Hache u 2,225.00 100.00% 2,225.0017 2352672 Puerta Pino con marco, hueco .80 X 2.10 m., 4-6 paneles (medida fija) Hache u 2,640.00 100.00% 2,640.0018 2353993 Puerta Plegable sin marco, color caoba o bco., hueco .865 X 2.03 m., cristales, Hache u 2,760.00 100.00% 2,760.0019 Tope marmolite, Sánchez 547-8920, Cel. 383-7260 p2 190.00 100.00% 190.00

115 ELECTRICIDAD (LAMPARAS Y GLOBOS):1 217302 Globo 6", cristal u 219.24 100.00% 219.242 197037 Base p/globo, blanca u 87.00 100.00% 87.003 229412 Lampara fluores. 2x32 w., superficie, difusor transparente, "Stanca" u 824.76 100.00% 824.764 202215 Lámpara flluorescente 2'x4', p/plafón, sin tubos u 2,378.00 100.00% 2,378.005 238787 Ojos de buey halógeno", aluminio, para plafón u 458.20 100.00% 458.20

116 ELECTRICIDAD RESIDENCIAL (MATERIALES):1 002291 Abrazadera ¾" h.g. u 2.84 100.00% 2.842 002292 Abrazadera 1" h.g. u 3.48 100.00% 3.483 002302 Abrazadera 1½" EMT u 6.96 100.00% 6.964 002303 Abrazadera 2" h.g. u 7.54 100.00% 7.545 002313 Abrazadera 3" h.g. u 40.60 100.00% 40.606 Abrazadera 5/8" tipo perno u 118.47 100.00% 118.477 032933 Alambre thhw-ls/thhn #1/0, Str. p 45.24 100.00% 45.248 032934 Alambre thhw-ls/thhn #2/0, Str. p 60.32 100.00% 60.329 032935 Alambre thhw-ls/thhn #3/0, Str. p 68.44 100.00% 68.44

10 032932 Alambre thhw-ls/thhn #2, Str. p 29.93 100.00% 29.9311 005529 Alambre thhw-ls/thhn #4, Str. p 19.66 100.00% 19.6612 005528 Alambre thhw-ls/thhn #6, Str. p 12.53 100.00% 12.5313 005533 Alambre thhw-ls/thhn #8, Str. p 8.21 100.00% 8.2114 045651 Alambre thhw-ls/thhn #10, Str. p 4.76 100.00% 4.7615 045650 Alambre thhw-ls/thhn #12, Str. p 3.02 100.00% 3.0216 198614 Alambre thhw-ls/thhn #14, Str. p 1.76 100.00% 1.7617 040866 Alambre duplo #18, Str. p 2.23 100.00% 2.2318 115736 Botón timbre con luz piloto, ''Bticino'' u 156.40 100.00% 156.4019 005465 Breakers GE 1P 15 - 30 amp u 111.36 100.00% 111.3620 077932 Caja octagonal de ½-¾'', americana u 20.88 100.00% 20.8821 000949 Caja metal 2''x4'' de ½'', americana u 22.97 100.00% 22.9722 000948 Caja metal 2''x4'' de ¾'', americana u 22.97 100.00% 22.9723 077931 Caja metal 4"x4" de ½-¾'', americana u 30.16 100.00% 30.1624 103938 Cinta de peligro, rollo 3"x1000' u 318.00 100.00% 318.0025 005555 Codo pvc eléct. ½'' x 90º u 3.35 100.00% 3.3526 005554 Codo pvc eléct. ¾'' x 90º u 4.64 100.00% 4.6427 005551 Codo pvc eléct. 1'' x 90º u 7.54 100.00% 7.5428 005553 Codo pvc eléct. 1 ½'' x 90º u 18.56 100.00% 18.5629 005552 Codo pvc eléct. 2'' x 90º u 27.80 100.00% 27.8030 Codo pvc eléct. 3" x 90º u 131.33 100.00% 131.3331 Conector p/varilla de tierra 5/8" u 37.62 100.00% 37.6232 000965 Condulet ¾'' u 80.04 100.00% 80.0433 000966 Condulet 1'' u 88.16 100.00% 88.1634 000980 Condulet 1 ½'' u 172.84 100.00% 172.8435 000981 Condulet 2'' u 161.24 100.00% 161.2436 Condulet 3'' u 475.00 100.00% 475.0037 000994 Condulet 4'' u 539.40 100.00% 539.4038 006220 Interruptor 1 sencillo, sin tapa, "Leviton" 1451-ICP u 24.94 100.00% 24.9439 006221 Interruptor 2 doble, sin tapa, "Leviton" u 110.20 100.00% 110.2040 055395 Interruptor 3 triple, sin tapa, "Leviton" u 138.04 100.00% 138.0441 047734 Interruptor 3 vías, sencillo "Bticino" u 62.40 100.00% 62.4042 129478 Interruptor 4 vías, sencillo con tapa, "Leviton" u 350.32 100.00% 350.3243 006194 Interruptor piloto, sin tapa, ''Leviton'' u 145.00 100.00% 145.0044 000924 Interruptor seg. 30 a, 2 polos, 250 v., "GE" u 1,472.04 100.00% 1,472.0445 000934 Interruptor seg. 60 a, 2 polos, 250 v., "GE" u 1,467.40 100.00% 1,467.4046 000944 Interruptor seg. 100 a, 2 polos 250 v., "GE" u 3,242.20 100.00% 3,242.2047 002282 Panel contador ELECTRO con ''breakers'' de 60 amp. u 2,748.75 100.00% 2,748.7548 Panel contador ELECTRO con ''breakers'' de 100 amp. u 3,723.34 100.00% 3,723.3449 002304 Panel distrib. 2 a 4 ctos., 40 amp. u 551.00 100.00% 551.00

Page 8: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 6

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

50 Panel distrib. 4 a 8 ctos., 125 amp. u 796.45 100.00% 796.4551 002315 Panel distrib. 6 a 12 ctos., 125 amp. u 806.20 100.00% 806.2052 002324 Panel distrib. 8 a 16 ctos., 125 amp. u 1,089.24 100.00% 1,089.2453 002341 Panel distrib. 12 a 24 ctos., 125 amp. u 1,560.20 100.00% 1,560.2054 077931 Registro 4''x4'', ko 1 ¼", americano u 30.16 100.00% 30.1655 000947 Registro 5''x5'', ko 1 ¼", americano u 92.80 100.00% 92.8056 001852 Registro 6''x6''x4'', criollo u 116.00 100.00% 116.0057 224939 Registro 8''x8''x4'', criollo u 406.00 100.00% 406.0058 001934 Registro 10''x10''x4'', criollo u 301.60 100.00% 301.6059 Registro galvanizado 12''x12''x4'', criollo u 485.00 100.00% 485.0060 006369 Roseta "Leviton" 9875, porcelana americana u 31.20 100.00% 31.2061 000974 Tapa ciega 2''x4'', ko ½", metálica. u 8.03 100.00% 8.0362 105583 Tapa 2''x4'' ciega o para interruptor, PVC. u 13.92 100.00% 13.9263 006417 Tapa 2''x4'' ciega o para tomacorriente, PVC. u 13.92 100.00% 13.9264 001001 Tapa 2''x4'' para tomacorriente, metálica. u 11.60 100.00% 11.6065 000800 Tape vinyl ''3M'', super 33T u 133.40 100.00% 133.4066 235736 Timbre corriente, tipo chicharra u 424.56 100.00% 424.5667 006218 Tomacorriente doble, 110 v., 15 A. "Leviton" 5320-ICP u 15.66 100.00% 15.6668 006243 Tomacorriente sencillo, 220 v., 15 A., "Leviton" 5029-I u 65.89 100.00% 65.8969 005525 Varilla de puesta a tierra, 5/8" x 6' sin Conector u 369.75 100.00% 369.75

117 ELECTRICIDAD ALTA TENSION (MATERIALES):

PRECIOS ELIMINADOS PERMANENTEMENTEESPERE: ACCESORIOS ELECTRICOS DE VARIOS TIPOS

BTICINO, VIMAR, OTROS TIPOS

PROXIMAMENTE EL FOLLETO SERA RECONFIGURADO Y AMPLIADO

Page 9: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 7

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

118 EQUIPOS DE CONSTRUCCION, COMBUSTIBLES Y LUBRICANTES:1 101065 Cabo para zapapico, natural, 33", Ref. 1556/94 1565/94 u 134.56 100.00% 134.562 187180 Carretilla metal ''Jeep'', ''Cuervo'', 5p3/madera, Mexicana u 1,786.40 100.00% 1,786.403 001362 Cubo de goma #8 u 99.42 100.00% 99.424 001361 Cubo de goma #10 u 145.00 100.00% 145.005 001368 Escoba plástica para hojas, 16" u 121.80 100.00% 121.806 Gasoil Premium gl 102.80 106.09% 96.907 Gasoil regular gl 99.00 107.03% 92.508 Gasolina Premium gl 132.80 104.81% 126.709 Gasolina regular gl 121.50 105.10% 115.60

10 133543 Hilo de ''nylon'' No. 8, (1 lbr) u 98.60 100.00% 98.6011 Ligadora hidráulica, 2 fundas u 425,000.00 100.00% 425,000.0012 Lubricantes 1/4 gl 88.03 100.00% 88.0313 061941 Mandarria "Stanley" 2 lb., Ref. 6456-399 u 266.80 100.00% 266.8014 075482 Manguera reforzada p/jardín 3/4" x 75' u 823.60 100.00% 823.6015 001359 Pala cuadrada ''Tramontina'', Ref. 77472/424 u 191.40 100.00% 191.4016 123972 Pala redonda ''Tramontina'', Ref. 77470/424 u 179.80 100.00% 179.8017 123968 Rastrillo para piedras, 14 dientes, USA u 150.80 100.00% 150.8018 001366 Zapapico "Tramontina", 5 lb., sin cabo, Ref. 77303/503, 5 lb. u 249.40 100.00% 249.4019 Winche (elevador) 2,000 kilos u 543,000.00 100.00% 543,000.00

119 ESCALONES Y MESETAS GRANITO: (Agregar ITBIS)1 C. Huella 2 y 3, bco. m 186.63 100.00% 186.632 C. Huella 2 y 3, gris m 165.73 100.00% 165.733 C. Huella 4, bco. m 208.85 100.00% 208.854 C. Huella Granito Boticelli bco. m 271.33 100.00% 271.335 C. Huella Granito Boticelli color m 310.01 100.00% 310.016 C. Huella Vibrazo color m 393.66 100.00% 393.667 C. Huella Vibrazo gris m 165.60 100.00% 165.608 Huella 1 y 2, color m 576.38 100.00% 576.389 Huella 2 y 3, bco. m 414.05 100.00% 414.05

10 Huella 2 y 3, gravilla gris m 361.51 100.00% 361.5111 Huella 2 y 3, gris m 338.77 100.00% 338.7712 Huella 4, bco. m 444.63 100.00% 444.6313 Huella 4, color m 621.08 100.00% 621.0814 Huella 4, gris m 338.77 100.00% 338.7715 Huella Granito Boticelli bco. m 548.93 100.00% 548.9316 Huella Granito Boticelli color m 657.94 100.00% 657.9417 Huella super bco. m 421.89 100.00% 421.8918 Huella super color m 490.90 100.00% 490.9019 Huella Vibrazo blanco m 461.10 100.00% 461.1020 Huella Vibrazo color m 578.73 100.00% 578.7321 Huella Vibrazo gris m 330.92 100.00% 330.9222 Huella Vibrorústico blanco m 461.10 100.00% 461.1023 Huella Vibrorústico color m 578.73 100.00% 578.7324 Huella y C. H., 2 y 3, bco. m 580.30 100.00% 580.3025 Huella y C. H., 2 y 3, color m 669.69 100.00% 669.69

Page 10: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 8

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

26 Huella y C. H., 2 y 3, gris m 476.78 100.00% 476.7827 Huella y C. H., 4, bco. m 654.01 100.00% 654.0128 Huella y C. H., 4, color (verde) m 694.78 100.00% 694.7829 Huella y C. H., 4, gris m 536.38 100.00% 536.3830 Huella y C. H. Granito Boticelli bco. m 729.29 100.00% 729.2931 Huella y C. H. Granito Boticelli color (verde) m 993.56 100.00% 993.5632 Huella y C. H. Granito Perlatto Royal, Borde redondo m 1,464.86 100.00% 1,464.8633 Huella y C. H. super bco. m 654.01 100.00% 654.0134 Huella y C. H. super color m 752.81 100.00% 752.8135 Huella y C. H. Vibrazo blanco m 690.08 100.00% 690.0836 Huella y C. H. Vibrazo color m 1,024.15 100.00% 1,024.1537 Huella y C. H. Vibrazo gris m 528.54 100.00% 528.5438 Huella y C. H. Vibrorústico blanco m 600.69 100.00% 600.6939 Huella y C. H. Vibrorústico color m 686.94 100.00% 686.9440 Huella y C. H. Vibrorústico gris m 459.53 100.00% 459.5341 Meseta, 1 y 2, color m2 1,800.49 100.00% 1,800.4942 Meseta, 2 y 3, bco. m2 1,541.71 100.00% 1,541.7143 Meseta, 2 y 3, gravilla color m2 914.36 100.00% 914.3644 Meseta, 2 y 3, gravilla gris m2 792.03 100.00% 792.0345 Meseta, 2 y 3, gris m2 1,248.42 100.00% 1,248.4246 Meseta, 4, bco. m2 1,681.29 100.00% 1,681.2947 Meseta Granito Boticelli bco. m2 2,117.30 100.00% 2,117.3048 Meseta Granito Boticelli color m2 2,435.68 100.00% 2,435.6849 Meseta Granito super bco. m2 1,820.87 100.00% 1,820.8750 Meseta Granito super color m2 1,979.28 100.00% 1,979.2851 Meseta Vibrazo bco. m2 1,522.88 100.00% 1,522.8852 Meseta Vibrazo color (verde) m2 2,228.65 100.00% 2,228.6553 Meseta Vibrazo gris m2 1,187.25 100.00% 1,187.2554 Meseta Vibrorústico bco. m2 1,488.38 100.00% 1,488.3855 Meseta Vibrorústico color m2 1,615.43 100.00% 1,615.4356 Meseta Vibrorústico gris m2 1,028.85 100.00% 1,028.8557 Transp. escalón m 6.72 100.00% 6.7258 Transp. zócalo escalón m 2.63 100.00% 2.6359 Transp. Meseta m2 7.68 100.00% 7.6860 Zócalo escalón, 1 y 2, color u 168.61 100.00% 168.6161 Zócalo escalón, 2 y 3, bco. u 85.09 100.00% 85.0962 Zócalo escalón, 2 y 3, color u 91.36 100.00% 91.3663 Zócalo escalón, 2 y 3, gravilla, gris u 61.04 100.00% 61.0464 Zócalo escalón, 2 y 3, gravilla, super bco. u 108.22 100.00% 108.2265 Zócalo escalón, 2 y 3, gris u 61.04 100.00% 61.0466 Zócalo escalón, 4, bco. u 109.78 100.00% 109.7867 Zócalo escalón, 4, gris u 83.12 100.00% 83.1268 Zócalo escalón Granito Boticelli bco. u 168.61 100.00% 168.6169 Zócalo escalón Granito Boticelli color u 194.88 100.00% 194.8870 Zócalo escalón Granito Perlatto Royal (Redondo) u 269.76 100.00% 269.7671 Zócalo escalón, Granito super, color u 158.41 100.00% 158.4172 Zócalo escalón, Granito super, bco. u 128.08 100.00% 128.0873 Zócalo escalón Vibrazo color u 158.41 100.00% 158.4174 Zócalo escalón Vibrazo gris u 94.10 100.00% 94.10

120 ESTRUCTURA METALICA Y PUERTA ENROLLABLE: (Agregar ITBIS)1 Bajantes pluviales en aluzinc m 439.10 98.83% 444.302 Caballete p/aluzinc 8'x14" m2 76.00 100.00% 76.003 Caballete p/aluzinc 8'x21" m2 101.30 100.00% 101.304 Caballete p/aluzinc 8'x24" m2 126.90 100.00% 126.905 Correa metálica 2''x6''x1/16'' galv. m2 295.20 100.00% 295.206 Correa metálica 3''x8''x1/16'' galv. m2 360.00 100.00% 360.007 Colectores pluviales en aluzinc m 519.60 98.82% 525.808 Cubierta ''Aluzinc'', calibre 26 (m2) m2 564.00 100.00% 564.009 Cubierta ''Aluzinc'', calibre 26 (pie2) p2 52.40 100.00% 52.40

10 Estructura (col., vigas, correas 3''x8'' y cub. aluzinc) ancho=15m. Alto=7.65m Pend.=15% m2 4,000.00 100.00% 4,000.0011 Planchas traslúcidas de 11 pies u 1,522.17 100.00% 1,522.1712 Puerta Enrollable (dimensión de la puerta no del hueco) m2 2,729.08 100.00% 2,729.0813 Ventilador eólico 18'' galv. (turbina circular) u 13,500.00 100.00% 13,500.00

121 HERRERIA:1 Angular ½''x1/8''x20' u 466.77 100.00% 466.772 Angular ½''x3/16''x20' u 384.91 100.00% 384.913 Angular ¾''x1/8''x20' u 105.48 100.00% 105.484 Angular ¾''x3/16''x20' u5 044733 Angular 1''x1/8''x20' u 274.92 100.00% 274.926 044735 Angular 1''x¼''x20' u 881.60 100.00% 881.607 044741 Angular 1 ½''x¼''x20' u 777.20 100.00% 777.208 044744 Angular 2''x¼''x20' u 1,055.60 100.00% 1,055.609 Angular 2 ½''x¼''x20' u 1,886.00 100.00% 1,886.00

10 Angular 3''x¼''x20' u 2,450.00 100.00% 2,450.0011 044852 Barras cuadradas ½''x20' u 245.86 100.00% 245.8612 044853 Barras cuadradas 5/8''x20' u 385.12 100.00% 385.1213 044854 Barras cuadradas ¾''x20' u 550.78 100.00% 550.7814 Malla 4' x 8' de 3/8'' u 526.68 100.00% 526.6815 Planchuela ½''x1/8''x20' u 74.48 100.00% 74.4816 Planchuela ½''x3/16''x20' u 111.72 100.00% 111.7217 044694 Planchuela ¾''x3/16''x20' u 156.60 100.00% 156.6018 044695 Planchuela ¾''x¼''x20' u 339.65 100.00% 339.6519 Planchuela 1 ½''x¼''x20' u 586.00 100.00% 586.0020 044714 Planchuela 2''x¼''x20' u 552.66 100.00% 552.6621 044720 Planchuela 3''x¼''x20' u 1,353.28 100.00% 1,353.2822 044723 Planchuela 4''x¼''x20' u 1,804.38 100.00% 1,804.38

Page 11: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 9

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

23 Rejas livianas, diseño sencillo p2 185.00 100.00% 185.0024 Rejas reforzadas, diseño sencillo p2 296.00 100.00% 296.0025 08573 Soldadura Universal lb 24.36 100.00% 24.3626 Tubo redondo negro 2''x20' u 1,493.40 100.00% 1,493.4027 Tubo redondo negro 3''x20' u 2,926.00 100.00% 2,926.0028 Tubo redondo negro 4''x20' u 3,970.24 100.00% 3,970.2429 052451 Perfil ¾''x¾''x20', galv. 1.2 mm. u 310.88 100.00% 310.8830 151279 Perfil 1''x1''x20' u 448.87 100.00% 448.8731 052447 Perfil 1''x2''x20' u 725.58 100.00% 725.5832 Perfil 1 ½''x1 ½''x20' u 456.00 100.00% 456.0033 Perfil 1 ½''x1 ½''x20' galv. u 729.60 100.00% 729.6034 Perfil 2''x2''x20' u 699.20 100.00% 699.2035 052454 Perfil 2''x2''x20', galv. 1.6 mm. u 1,068.36 100.00% 1,068.3636 052449 Perfil 2''x3''x20' u 1,121.72 100.00% 1,121.7237 052458 Perfil 2''x3''x20', galv. 1.6 mm. u 1,407.08 100.00% 1,407.0838 052450 Perfil 2''x4''x20' u 1,339.80 100.00% 1,339.8039 Perfil 3''x3''x20' u 865.13 100.00% 865.1340 Perfil 4''x4''x20' u 1,816.76 100.00% 1,816.76

122 HORMIGONES INDUSTRIALES Y VACIADOS: (Agregar ITBIS)1 Agua (camión 2,000 gls.) gl 0.32 100.00% 0.32 2 Horm. 100 kg/cm2 m3 2,870.00 100.00% 2,870.003 Horm. 140 kg/cm2 m3 3,040.00 100.00% 3,040.004 Horm. 160 kg/cm2 m3 3,075.00 100.00% 3,075.005 Horm. 180 kg/cm2 m3 3,200.00 100.00% 3,200.006 Horm. 210 kg/cm2 m3 3,320.00 100.00% 3,320.007 Horm. 240 kg/cm2 m3 3,525.00 100.00% 3,525.008 Horm. 250 kg/cm2 m3 3,615.00 100.00% 3,615.009 Horm. 260 kg/cm2 m3 3,725.00 100.00% 3,725.00

10 Horm. 280 kg/cm2 m3 3,795.00 100.00% 3,795.0011 Horm. 300 kg/cm2 m3 3,895.00 100.00% 3,895.0012 Horm. 315 kg/cm2 m3 4,150.00 100.00% 4,150.0013 Horm. 350 kg/cm2 m3 4,410.00 100.00% 4,410.0014 Horm. 400 kg/cm2 m3 4,710.00 100.00% 4,710.0015 Horm. 450 kg/cm2 m3 5,032.00 100.00% 5,032.0016 Horm. 500 kg/cm2 m3 5,347.00 100.00% 5,347.0017 Vaciado con bomba, 10 m3 10m3 4,250.00 100.00% 4,250.0018 Vaciado con bomba, 10.50 m3 en adelante m3 425.00 100.00% 425.0019 Vaciado con bomba adicional p/planta después 4to. Nivel. m3 20.00 100.00% 20.00

123 IMPERMEABILIZANTES:1 ALM, lata de 5 gl. lta 3,042.00 100.00% 3,042.002 Bitupol inst., 2.5 mm., 5 años gar. m2 180.00 100.00% 180.003 Bitupol inst., 3 mm., reforz. con poliester, 10 años gar. m2 220.00 100.00% 220.004 Bitupol inst., 4 mm., reforz. con poliester, 10 años gar. m2 280.00 100.00% 280.005 053886 Sellador de techo ''Popular'' gl 385.00 100.00% 385.006 022657 Sellador de techo ''Domatecho'', Bco., lata 5 gl. lta 1,806.00 100.00% 1,806.007 Sellador de techo ''Lanco'', import., lata 5 gl. lta 2,628.00 100.00% 2,628.008 Silicool, lata 5 gl., Criollo lta 2,715.00 100.00% 2,715.00

124 LAVADEROS Y VERTEDEROS DE GRANITO: (Agregar ITBIS)1 Lavadero doble granito, 1.50x0.50 m. u 2,396.47 100.00% 2,396.472 Lavadero sencillo granito, 1.25x0.50 m. u 1,527.60 100.00% 1,527.603 Tina o vertedero granito, hasta 0.60x0.60 m., gris u 1,188.83 100.00% 1,188.834 Tina o vertedero granito, hasta 0.60x0.60 m., blanco u 1,427.22 100.00% 1,427.225 Transp. lavadero y tina u 47.47 100.00% 47.47

125 LLAVES DE PASO, VALVULAS, CHEQUES Y TAPAS CISTERNA: 1 015272 Cheque horiz. ½'' ''Urrea'', 85N-13 u 261.00 100.00% 261.002 068190 Cheque horiz. ¾'' ''Urrea'', 85N-19 u 281.01 100.00% 281.013 155044 Cheque horiz. 1'' ''Urrea'', 85N-25 u 291.16 100.00% 291.164 007784 Cheque horiz. 1 ½'' ''Urrea'', 85N-38 u 736.60 100.00% 736.605 090603 Cheque horiz. 2'' ''Urrea'', 85N-51 u 789.96 100.00% 789.966 015302 Cheque horiz. 2 ½'' ''Europa'', 100 ITAP u 1,357.83 100.00% 1,357.837 015301 Cheque horiz. 3'' ''Europa'', 100 ITAP u 2,273.60 100.00% 2,273.608 015309 Cheque horiz. 4'' ''Europa'' u 4,245.60 100.00% 4,245.609 015316 Cheque vert. ¾" "Europa" u 171.68 100.00% 171.68

10 015306 Cheque vert. 1" "Europa" u 176.32 100.00% 176.3211 015313 Cheque vert. 1 ½" "Europa" u 388.60 100.00% 388.6012 015541 Cheque vert. 2" "Europa" u 377.00 100.00% 377.0013 015311 Cheque vert. 2 ½'' ''Europa'', 105 ITAP u 1,560.20 100.00% 1,560.2014 015310 Cheque vert. 3'' ''Europa'', 105 ITAP u 2,668.00 100.00% 2,668.0015 015309 Cheque vert. 4'' ''Europa'', 105 ITAP u 4,245.60 100.00% 4,245.6016 066154 Llave de paso 1/2'' de bola palanca, 090 ITAP u 92.80 100.00% 92.8017 066155 Llave de paso 3/4'' de bola palanca, 090 ITAP u 129.92 100.00% 129.9218 070998 Llave de paso 1'' de bola palanca, 090 ITAP u 185.60 100.00% 185.6019 015287 Llave de paso 1 ½'' ''Price Pfister'' u 429.20 100.00% 429.2020 105385 Llave de paso 2'' de bola palanca, 090 ITAP u 668.16 100.00% 668.1621 015259 Llave de paso 2 ½'' de bola ''España'' u 1,206.40 100.00% 1,206.4022 013157 Llave de paso 3'' ''Urrea'' u 2,354.80 100.00% 2,354.8023 015429 Tapa cisterna 27''x27'', aluminio u 2,271.37 100.00% 2,271.3724 183609 Tapa cisterna 30''x30'', tola u 2,452.36 100.00% 2,452.3625 015366 Válvula cisterna, ½'' ''Urrea'', 04N-13 u 89.32 100.00% 89.3226 015367 Válvula cisterna, 3/4'' ''Urrea'', 04N-19 u 202.42 100.00% 202.4227 015368 Válvula cisterna, 1'' ''Urrea'' u 319.00 100.00% 319.0028 015465 Válvula ¾'', orinal fluxómetro, 451-NVB u 2,826.92 100.00% 2,826.9229 014926 Válvula ¾'', seguridad p/calentador tw, R-125C u 127.60 100.00% 127.6030 015464 Válvula 1'', inodoro fluxómetro, 402-NVB u 2,826.92 100.00% 2,826.92

Page 12: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 10

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

126 MADERAS, CLAVOS, ZINC Y OTROS:1 Caoba bruta, larga (Vicente Valiente) p2 116.00 100.00% 116.002 162425 Caballete de zinc 6', cal. 34 u 93.96 100.00% 93.963 162424 Caballete de zinc 6', cal. 29 u 104.40 100.00% 104.404 Cedro bruto, largo (Vicente Valiente) p2 102.00 100.00% 102.005 023120 Clavo corriente, metalizado c/c 2 1/2"x10 lb 19.00 126.75% 14.996 022978 Clavo de acero 2 1/2" lb 26.68 100.00% 26.687 022973 Clavo de zinc, 2 1/2" lb 17.98 100.00% 17.988 Clavo galvanizado c/c 2 1/2"x9 lb 75.35 100.00% 75.359 Clavo galvanizado ¾" para cartón lb 131.53 100.00% 131.53

10 050741 Pino americano 1"x12''x12' bruto (12 pc madera) pza 455.88 100.00% 455.8811 Pino americano 1"x12''x12' bruto tratado (12 pc madera) pza 511.00 100.00% 511.0012 050704 Pino americano 1"x4''x12' bruto (4 pc madera) pza 134.56 100.00% 134.5613 Pino americano 1"x4''x12' bruto tratado (4 pc madera) pza 154.00 100.00% 154.0014 Plancha ''Styrofoam'' 2'x4'x1'', corriente u 217.50 100.00% 217.5015 000493 Plywood Formaleta 4'x8'x¾'' USA (Una cara) u 1,360.68 100.00% 1,360.6816 Plywood brasil 4'x8'x3/16'' u 240.79 100.00% 240.7917 000484 Plywood brasil 4'x8'x1/4'', 6 mm. u 406.00 100.00% 406.0018 000485 Plywood brasil 4'x8'x3/8'' u 570.72 100.00% 570.7219 000486 Plywood brasil 4'x8'x1/2'' u 750.52 100.00% 750.5220 000487 Plywood brasil 4'x8'x3/4'' u 1,218.00 100.00% 1,218.0021 Regla para empañete (Preparada) p2 53.26 100.00% 53.2622 Roble brasileño bruto, largo (INDOMACA) p2 81.40 100.00% 81.4023 0023447 Zinc acanalado, 3'x6', cal. 34 u 162.40 100.00% 162.4024 0023448 Zinc acanalado, 3'x6', cal. 29 u 213.73 100.00% 213.7325 0023449 Zinc acanalado, 3'x6', cal. 27 u 271.44 100.00% 271.4426 0023441 Zinc acanalado, 3'x6', cal. 26 u 344.52 100.00% 344.5227 0023442 Zinc acanalado, 3'x6', cal. 24 u 350.61 100.00% 350.61

127 MALLAS CICLONICAS Y ACCESORIOS:1 081463 Abrazadera redonda 2 ½'' u 15.66 100.00% 15.662 012825 Alambre de púas cal 16x110 m, rollo u 298.16 100.00% 298.163 012826 Alambre de púas cal 14x110 m, rollo u 491.84 100.00% 491.844 078065 Barra tensora de 4' u 39.47 100.00% 39.475 078066 Barra tensora de 6' u 52.20 100.00% 52.206 078068 Barra tensora de 7' u 69.60 100.00% 69.607 078069 Barra tensora de 10' u 92.80 100.00% 92.808 064037 Copa final de 2 ½'' para malla ciclónica u 13.07 100.00% 13.079 Grapas 1'' para alambre de púas lb 28.00 100.00% 28.00

10 054675 Malla ciclónica galv. 6' cal. 9 pie 78.38 100.00% 78.3811 054674 Malla ciclónica galv. 7' cal. 9 pie 98.27 100.00% 98.2712 054705 Palometa 1 ½"x1 ¼", 3 cuerdas, sencilla u 66.35 100.00% 66.3513 054707 Palometa 1 ½"x1 ¼", 3 cuerdas, doble u 123.66 100.00% 123.6614 054697 Terminal de 1 ¼'' u 30.16 100.00% 30.1615 054684 Tubo 1 ½''x15', H.G., p/malla cicl. u 427.60 100.00% 427.6016 054685 Tubo 1 ¼''x20', H.G., p/malla cicl. u 484.59 100.00% 484.59

128 MATERIALES INSTALADOS:1 Caballete en teja asfáltica inst. todo costo m 98.08 100.00% 98.082 Línea doble teja asfáltica inst. todo costo, en bordes m 98.08 100.00% 98.083 Teja asfáltica 3'x1' inst. todo costo m2 276.87 100.00% 276.87

129 PIEDRA EN LAJAS PARA PISOS:1 Piedra color claro m2 225.00 100.00% 225.002 Piedra color gris m2 625.00 100.00% 625.00

130 PINTURAS:1 005079 Acrílica "Popular" blanco 50 gl 358.99 100.00% 358.992 Acrílica (colores preparados) gl 1,211.64 100.00% 1,211.643 039537 Aguarrás ''Popular'' gl 174.00 100.00% 174.004 023387 Blanco de España lb 6.50 100.00% 6.505 Epóxica gl 1,100.00 100.00% 1,100.006 Latex ''Económica'' o ''Pintex'' gl 189.00 100.00% 189.007 038809 Mantenimiento "Popular" blanco 50 gl 498.99 100.00% 498.998 004987 Oxido Rojo "Popular" k-09 gl 270.99 100.00% 270.999 042177 "Thinner" AAA-500 "Popular" gl 308.00 100.00% 308.00

131 PISOS Y ADOQUINES: (Agregar ITBIS)1 01-0660 Adoquín clásico 10x20x20 cm., gris u 33.81 100.00% 33.812 01-0670 Adoquín clásico 10x20x20 cm., rojo u 54.34 100.00% 54.343 01-0960 Adoquín clásico 10x20x20 cm., quemado u 57.76 100.00% 57.764 01-0510 Adoquín colonial 2"x4"x8", gris u 9.61 100.00% 9.615 01-0520 Adoquín colonial 2"x4"x8", rojo u 11.46 100.00% 11.466 01-1180 Adoquín mediterraneo gris u 17.69 100.00% 17.697 01-1190 Adoquín mediterraneo rojo u 20.78 100.00% 20.788 01-1240 Adoquín mediterraneo quemado u 20.78 100.00% 20.789 01-2020 Adoquín mediterraneo diamante gris u 13.86 100.00% 13.86

10 01-2030 Adoquín mediterraneo diamante rojo u 17.07 100.00% 17.0711 01-2040 Adoquín mediterraneo diamante quemado u 17.07 100.00% 17.0712 01-0910 Adoquín olympus 8x12x23 cm., gris u 17.69 100.00% 17.6913 01-0920 Adoquín olympus 8x12x23 cm., rojo u 20.78 100.00% 20.7814 01-0950 Adoquín olympus 8x12x23 cm., quemado u 20.78 100.00% 20.7815 01-0990 Adoquín olympus 8x12x23 cm., negro u 22.79 100.00% 22.7916 Corte chazos 25 u 10.00 100.00% 10.0017 Corte chazos 30 u 12.00 100.00% 12.0018 Corte chazos 40 u 16.00 100.00% 16.0019 Corte ladrillos y adoquines u 32.13 100.00% 32.13

Page 13: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 11

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

20 Corte zócalos u 6.38 100.00% 6.3821 Derretido color fda 624.40 100.00% 624.4022 Derretido crema fda 624.40 100.00% 624.4023 Derretido blanco fda 478.50 100.00% 478.5024 Derretido gris fda 282.03 100.00% 282.0325 Derretido verde fda 799.39 100.00% 799.3926 03-0150 Granito 1 y 2, 2 y 3, 30x30, blanco u 35.32 100.00% 35.3227 Granito 1 y 2, 2 y 3, 30x30, gris u 29.33 100.00% 29.3328 03-0001 Granito 1 y 2, 2 y 3, 40x40, blanco u 57.19 100.00% 57.1929 Granito Boticelli, 40x40, blanco u 146.23 100.00% 146.2330 Granito Boticelli, 40x40, color u 160.90 100.00% 160.9031 Granito Perlatto Royal, 40x40 u 118.06 100.00% 118.0632 Mosaico gravilla 30x30, 1 y 2, 2 y 3, blanco u 44.87 100.00% 44.8733 Mosaico gravilla 30x30, 1 y 2, 2 y 3, gris u 38.05 100.00% 38.0534 Mosaico gravilla 30x30, 1 y 2, 2 y 3, rojo u 59.39 100.00% 59.3935 Mosaico gravilla 30x30, super, blanco u 52.86 100.00% 52.8636 Mosaico gravilla 30x30, super, color u 69.27 100.00% 69.2737 Mosaico gravilla 30x30, super, gris u 44.44 100.00% 44.4438 Mosaico 25x25, rojo u 29.05 100.00% 29.0539 Paragoma gris m 405.02 100.00% 405.0240 01-0530 Tableta 2"x8"x16", gris u 17.67 100.00% 17.6741 01-0540 Tableta 2"x8"x16", roja u 21.04 100.00% 21.0442 01-0700 Tableta 2"x8"x16", quemada u 21.04 100.00% 21.0443 01-0550 Tableta 2"x8"x16", amarilla u 21.04 100.00% 21.0444 Transp. adoquín clásico u 0.98 100.00% 0.9845 Transp. adoquín colonial u 0.49 100.00% 0.4946 Transp. adoquín mediterraneo u 0.58 100.00% 0.5847 Transp. adoquín mediterraneo diamante u 0.58 100.00% 0.5848 Transp. adoquín olympus u 0.58 100.00% 0.5849 Transp. mosaico gravilla 30x30 u 0.60 100.00% 0.6050 Transp. Paragoma gris m 30.60 100.00% 30.6051 Transp. venesaico y mosaico u 0.89 100.00% 0.8952 Transp. tableta u 0.58 100.00% 0.5853 Transp. Vibrazo 30x30 u 0.62 100.00% 0.6254 Transp. Vibrazo 40x40 u 0.89 100.00% 0.8955 Transp. Vibrorústico 30x30 u 0.62 100.00% 0.6256 Transp. zócalo granito y mosaico u 0.60 100.00% 0.6057 Vibrazo 30x30 blanco u 49.22 100.00% 49.2258 Vibrazo 30x30 color u 61.33 100.00% 61.3359 Vibrazo 30x30 gris u 43.77 100.00% 43.7760 Vibrazo 30x30 verde u 78.49 100.00% 78.4961 Vibrazo 40x40 blanco u 103.58 100.00% 103.5862 Vibrazo 40x40 color u 135.65 100.00% 135.6563 Vibrazo 40x40 gris u 97.03 100.00% 97.0364 Vibrazo 40x40 verde u 172.31 100.00% 172.3165 Vibrorústico 30x30 blanco u 53.68 100.00% 53.6866 Vibrorústico 30x30 color u 70.41 100.00% 70.4167 Vibrorústico 30x30 gris u 50.47 100.00% 50.4768 Vibrorústico 30x30 rojo vivo u 77.66 100.00% 77.6669 Vibrorústico 30x30 crema u 68.04 100.00% 68.0470 Vibrorústico 30x30 verde u 92.01 100.00% 92.0171 Zócalo Granito 1 y 2, 2 y 3, 30x07, blanco m 66.79 100.00% 66.7972 Zócalo Granito 1 y 2, 2 y 3, 30x07, gris m 54.24 100.00% 54.2473 Zócalo Granito 1 y 2, 2 y 3, 40x07, blanco m 76.68 100.00% 76.6874 Zócalo Granito Boticelli 40x07, blanco m 141.50 100.00% 141.5075 Zócalo Granito Boticelli 40x07, color m 155.72 100.00% 155.7276 Zócalo Granito Perlatto Royal 40x07 m 114.32 100.00% 114.3277 Zócalo Mosaico rojos, 25x07 u 14.60 100.00% 14.60

132 POZO FILTRANTE:1 Pozo filtrante 8'' + camisa 6'' x 10', PVC SDR-26 u 11,800.00 100.00% 11,800.002 Pozo filtrante 10'' + camisa 8'' x 10', PVC SDR-26 u 14,000.00 100.00% 14,000.00

133 TUBERIAS Y PIEZAS H.G. (HIERRO GALVANIZADO):1 015354 Codo ½''x90, h.g. u 6.05 100.00% 6.052 015355 Codo ¾''x90, h.g. u 9.86 100.00% 9.863 015356 Codo 1''x90, h.g. u 9.86 100.00% 9.864 015357 Codo 1 1/4''x90, h.g. u 20.88 100.00% 20.885 015358 Codo 1 ½''x90, h.g. u 30.74 100.00% 30.746 015359 Codo 2''x90, h.g. u 28.18 100.00% 28.187 Codo 2 ½''x90, h.g. u 80.58 100.00% 80.588 Codo 3''x90, h.g. u 112.23 100.00% 112.239 Codo 4''x90, h.g. u 193.56 100.00% 193.56

10 015405 Codo niple ½'', h.g. u 6.32 100.00% 6.3211 015406 Codo niple ¾'', h.g. u 9.57 100.00% 9.5712 015407 Codo niple 1'', h.g. u 17.40 100.00% 17.4013 015408 Codo niple 1 1/4'', h.g. u 8.12 100.00% 8.1214 033956 Codo niple 1 ½'', h.g. u 32.70 100.00% 32.7015 015409 Codo niple 2'', h.g. u 64.09 100.00% 64.0916 Codo niple 2 ½", h.g. u 191.76 100.00% 191.7617 015410 Codo niple 3", h.g. u 233.03 100.00% 233.0318 Codo niple 4", h.g. u 251.44 100.00% 251.4419 016040 Niple ½''x4'', h.g. u 33.17 100.00% 33.1720 016007 Niple ¾''x4'', h.g. u 39.46 100.00% 39.4621 016019 Niple 1''x4'', h.g. u 47.60 100.00% 47.6022 015994 Niple 1 1/4''x4'', h.g. u 63.80 100.00% 63.8023 016010 Niple 1 ½''x3 ½'', h.g. u 66.99 100.00% 66.9924 016001 Niple 2''x4'', h.g. u 94.60 100.00% 94.60

Page 14: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 12

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

25 Niple 2 ½"x3 ½'', h.g. u 197.13 100.00% 197.1326 Niple 4"x3 ½", h.g. u 242.60 100.00% 242.6027 015216 Reduc. ''bushing'' ½''x3/8'', h.g. u 5.97 100.00% 5.9728 015220 Reduc. ''bushing'' ¾''x½'', h.g. u 6.96 100.00% 6.9629 015196 Reduc. ''bushing'' 1''x¾'', h.g. u 10.44 100.00% 10.4430 015183 Reduc. ''bushing'' 2''x¾'', h.g. u 23.20 100.00% 23.2031 016091 Reduc. ''bushing'' 2''x1'', h.g. u 37.78 100.00% 37.7832 015162 Reduc. ''bushing'' 2 ½''x1'', h.g. u 53.86 100.00% 53.8633 015225 Reduc. copa ½''x3/8'', h.g. u 6.09 100.00% 6.0934 015228 Reduc. copa ¾''x½'', h.g. u 9.28 100.00% 9.2835 015205 Reduc. copa 1''x¾'', h.g. u 8.12 100.00% 8.1236 015191 Reduc. copa 2''x¾'', h.g. u 45.05 100.00% 45.0537 015167 Reduc. copa 2''x1 ½'', h.g. u 42.34 100.00% 42.3438 015170 Reduc. copa 2 ½''x1'', h.g. u 89.08 100.00% 89.0839 015071 Rollo teflón 3/4" u 5.70 100.00% 5.7040 015413 Tapón hembra ½'', h.g. u 6.72 100.00% 6.7241 015414 Tapón hembra ¾'', h.g. u 4.93 100.00% 4.9342 015415 Tapón hembra 1'', h.g. u 8.70 100.00% 8.7043 015434 Tapón hembra 1 ½'', h.g. u 17.86 100.00% 17.8644 015433 Tapón hembra 2'', h.g. u 30.74 100.00% 30.7445 Tapón hembra 2 ½'', h.g. u 101.18 100.00% 101.1846 015431 Tapón hembra 3'', h.g. u 77.37 100.00% 77.3747 015430 Tapón hembra 4'', h.g. u 160.08 100.00% 160.0848 015385 Tapón macho ½'', h.g. u 4.17 100.00% 4.1749 015386 Tapón macho ¾'', h.g. u 6.67 100.00% 6.6750 015387 Tapón macho 1'', h.g. u 7.77 100.00% 7.7751 Tapón macho 1 ½'', h.g. u 17.69 100.00% 17.6952 Tapón macho 2'', h.g. u 24.89 100.00% 24.8953 Tapón macho 2 ½'', h.g. u 57.21 100.00% 57.2154 Tapón macho 3'', h.g. u 79.87 100.00% 79.8755 Tapón macho 4'', h.g. u 141.82 100.00% 141.8256 015372 Tee ½'', h.g. u 9.20 100.00% 9.2057 015373 Tee ¾'', h.g. u 14.09 100.00% 14.0958 015374 Tee 1'', h.g. u 25.81 100.00% 25.8159 015375 Tee 1 1/4'', h.g. u 25.52 100.00% 25.5260 015376 Tee 1 ½'', h.g. u 64.96 100.00% 64.9661 015377 Tee 2'', h.g. u 61.77 100.00% 61.7762 015378 Tee 2 ½'', h.g. u 124.28 100.00% 124.2863 015379 Tee 3'', h.g. u 92.33 100.00% 92.3364 015380 Tee 4'', h.g. u 169.36 100.00% 169.3665 023459 Tubo ½''x20', h.g. u 312.04 100.00% 312.0466 023460 Tubo ¾''x20', h.g. u 424.56 100.00% 424.5667 023461 Tubo 1''x20', h.g. u 593.72 100.00% 593.7268 023462 Tubo 1 1/4''x20', h.g. u 800.40 100.00% 800.4069 023463 Tubo 1 ½''x20', h.g. u 924.52 100.00% 924.5270 023464 Tubo 2''x20', h.g. u 1,199.44 100.00% 1,199.4471 023465 Tubo 2 ½''x20', h.g. u 1,749.28 100.00% 1,749.2872 023466 Tubo 3''x20', h.g. u 2,125.12 100.00% 2,125.1273 058844 Tubo 4''x20', h.g. u 3,093.72 100.00% 3,093.7274 015392 Unión univ. ½'', h.g. u 12.76 100.00% 12.7675 015393 Unión univ. ¾'', h.g. u 15.77 100.00% 15.7776 015394 Unión univ. 1'', h.g. u 36.65 100.00% 36.6577 015395 Unión univ. 1 1/4'', h.g. u 92.80 100.00% 92.8078 015396 Unión univ. 1 ½'', h.g. u 98.60 100.00% 98.6079 015397 Unión univ. 2'', h.g. u 131.08 100.00% 131.0880 015398 Unión univ. 2 ½'', h.g. u 105.73 100.00% 105.7381 015399 Unión univ. 3'', h.g. u 138.04 100.00% 138.0482 015400 Unión univ. 4'', h.g. u 842.16 100.00% 842.16

134 TUBERIAS Y PIEZAS PVC DRENAJE:1 001346 Cemento pvc criollo, 1 gl. (Cano) u 648.04 100.00% 648.042 136312 Cemento pvc criollo, ¼ gl. (Cano) u 187.35 100.00% 187.353 080389 Cemento pvc criollo, 1/32 gl., pinta (Cano) u 30.73 100.00% 30.734 075407 Cemento pvc import., 920 gr. (Tangit) u 502.86 100.00% 502.865 075406 Cemento pvc import., 460 gr. (Tangit) u 296.96 100.00% 296.966 Cemento pvc import., 230 gr. (tubo) (Tangit) u 255.91 100.00% 255.917 001345 Cemento pvc import., 125 gr. (tubo) (Tangit) u 96.51 100.00% 96.518 015479 Codo 2''x90, pvc dren. u 9.43 100.00% 9.439 015478 Codo 3''x90, pvc dren. u 20.01 100.00% 20.01

10 028826 Codo 4''x90, pvc dren. u 38.48 100.00% 38.4811 Codo 6''x90, pvc dren. u 1,144.00 100.00% 1,144.0012 015476 Codo 2''x45, pvc dren. u 6.60 100.00% 6.6013 015475 Codo 3''x45, pvc dren. u 18.02 100.00% 18.0214 015474 Codo 4''x45, pvc dren. u 31.95 100.00% 31.9515 Codo 6''x45, pvc dren. u 508.87 100.00% 508.8716 Red. 3''x1 ½'', pvc dren. u 30.85 100.00% 30.8517 015490 Red. 3''x2'', pvc dren. u 14.12 100.00% 14.1218 015482 Red. 4''x2'', pvc dren. u 28.25 100.00% 28.2519 015481 Red. 4''x3'', pvc dren. u 28.25 100.00% 28.2520 Red. 6''x4'', pvc dren. u 503.06 100.00% 503.0621 015503 Sifón 1 ½'', p/lav.,pvc u 46.40 100.00% 46.4022 015506 Sifón 2'', pvc dren. u 58.46 100.00% 58.4623 Sifón 3'', pvc dren. u 910.26 100.00% 910.2624 Sifón 4'', pvc dren. u 1,046.21 100.00% 1,046.2125 Tapón reg. 2'', pvc dren. u 80.14 100.00% 80.1426 015500 Tapón reg. 3'', pvc dren. u 39.46 100.00% 39.4627 015499 Tapón reg. 4'', pvc dren. u 54.56 100.00% 54.5628 015488 Tee 2''x 2", pvc dren. u 15.50 100.00% 15.50

Page 15: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 13

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

29 015487 Tee 3"x3'', pvc dren. u 41.18 100.00% 41.1830 015486 Tee 4"x4'', pvc dren. u 58.00 100.00% 58.0031 Tee 6"x6'', pvc dren. u 804.81 100.00% 804.8132 015485 Tee red. 3''x2'', pvc dren. u 30.16 100.00% 30.1633 015483 Tee red. 4''x3'', pvc dren. u 60.32 100.00% 60.3234 015484 Tee red. 4''x2'', pvc dren. u 37.51 100.00% 37.5135 Tee red. 6''x3'', pvc dren. u 1,083.62 100.00% 1,083.6236 Tee red. 6''x4'', pvc dren. u 1,219.83 100.00% 1,219.8337 178224 Tubo 1 ½''x19', pvc dren. u 78.74 100.00% 78.7438 178229 Tubo 2''x19', pvc dren. u 128.00 100.00% 128.0039 178234 Tubo 3''x19', pvc dren. u 128.01 100.00% 128.0140 178239 Tubo 4''x19', pvc dren. u 269.06 100.00% 269.0641 178245 Tubo 6''x19', pvc dren. u 740.08 100.00% 740.0842 178251 Tubo 8''x19', pvc dren. u 1,459.28 100.00% 1,459.2843 178230 Tubo 2''x19', pvc SDR-41 u 141.75 100.00% 141.7544 178235 Tubo 3''x19', pvc SDR-41 u 399.04 100.00% 399.0445 178240 Tubo 4''x19', pvc SDR-41 u 645.77 100.00% 645.7746 178246 Tubo 6''x19', pvc SDR-41 u 1,364.16 100.00% 1,364.1647 178252 Tubo 8''x19', pvc SDR-41 u 2,302.60 100.00% 2,302.6048 178232 Tubo 2''x19', pvc SDR-21 u 262.45 100.00% 262.4549 Tubo 3''x19', pvc SDR-21 u50 178243 Tubo 4''x19', pvc SDR-21 u 1,811.92 100.00% 1,811.9251 178249 Tubo 6''x19', pvc SDR-21 u 2,563.60 100.00% 2,563.6052 178255 Tubo 8''x19', pvc SDR-21 u 4,336.08 100.00% 4,336.0853 Tubo ½''x19', pvc SDR-26 u 73.34 100.00% 73.3454 178217 Tubo ¾''x19', pvc SDR-26 u 45.93 100.00% 45.9355 Tubo 1''x19', pvc SDR-26 u 125.72 100.00% 125.7256 178226 Tubo 1 ½''x19', pvc SDR-26 u 136.53 100.00% 136.5357 178231 Tubo 2''x19', pvc SDR-26 u 207.40 100.00% 207.4058 178237 Tubo 3''x19', pvc SDR-26 u 868.26 100.00% 868.2659 178242 Tubo 4''x19', pvc SDR-26 u 1,004.56 100.00% 1,004.5660 178248 Tubo 6''x19', pvc SDR-26 u 3,057.76 100.00% 3,057.7661 178254 Tubo 8''x19', pvc SDR-26 u 3,410.40 100.00% 3,410.4062 015497 Yee 2"x2'', pvc dren. u 23.67 100.00% 23.6763 015496 Yee 3"x3'', pvc dren. u 41.89 100.00% 41.8964 015495 Yee 4"x4'', pvc dren. u 65.28 100.00% 65.2865 015529 Yee 6"x6'', pvc dren. u 348.00 100.00% 348.0066 015494 Yee red. 3''x2'', pvc dren. u 29.87 100.00% 29.8767 035991 Yee red. 4''x2'', pvc dren. u 39.46 100.00% 39.4668 015492 Yee red. 4''x3'', pvc dren. u 58.46 100.00% 58.4668 Yee red. 6''x4'', pvc dren. u 1,754.92 100.00% 1,754.92

135 TUBERIAS Y PIEZAS PVC PRESION:1 015871 Adapt. hembra ½'', pvc presión u 2.43 100.00% 2.432 015872 Adapt. hembra ¾'', pvc presión u 2.92 100.00% 2.923 015873 Adapt. hembra 1'', pvc presión u 4.87 100.00% 4.874 015874 Adapt. hembra 1 ½'', pvc presión u 9.28 100.00% 9.285 015875 Adapt. hembra 2'', pvc presión u 12.18 100.00% 12.186 015095 Adapt. hembra 3'', pvc presión u 35.07 100.00% 35.077 015876 Adapt. hembra 4'', pvc presión u 51.15 100.00% 51.158 Adapt. hembra 6'', pvc presión u9 015864 Adapt. macho ½'', pvc presión u 1.46 100.00% 1.46

10 015865 Adapt. macho ¾'', pvc presión u 2.43 100.00% 2.4311 015866 Adapt. macho 1'', pvc presión u 3.89 100.00% 3.8912 015867 Adapt. macho 1 ½'', pvc presión u 7.79 100.00% 7.7913 015868 Adapt. macho 2'', pvc presión u 11.20 100.00% 11.2014 015869 Adapt. macho 3'', pvc presión u 45.30 100.00% 45.3015 015870 Adapt. macho 4'', pvc presión u 70.64 100.00% 70.6416 Adapt. macho 6'', pvc presión u17 015877 Codo ½''x90, pvc presión u 2.44 100.00% 2.4418 015878 Codo ¾''x90, pvc presión u 3.89 100.00% 3.8919 015879 Codo 1''x90, pvc presión u 6.33 100.00% 6.3320 015880 Codo 1 ½''x90, pvc presión u 11.69 100.00% 11.6921 015881 Codo 2''x90, pvc presión u 19.00 100.00% 19.0022 015882 Codo 3''x90, pvc presión u 74.54 100.00% 74.5423 015883 Codo 4''x90, pvc presión u 120.08 100.00% 120.0824 Codo 6''x90, pvc presión u 697.78 100.00% 697.7825 015895 Reduc. 1 ó ¾''x½'', pvc presión u 2.92 100.00% 2.9226 015899 Reduc. 1 ½''x1'', pvc presión u 14.50 100.00% 14.5027 015902 Reduc. 2''x1'', pvc presión u 41.76 100.00% 41.7628 082206 Reduc. 4''x2'', pvc presión u 61.48 100.00% 61.4829 Reduc. 4''x3'', pvc presión u 218.64 100.00% 218.6430 015904 Tee ½'', pvc presión u 3.41 100.00% 3.4131 015905 Tee ¾'', pvc presión u 4.38 100.00% 4.3832 015906 Tee 1'', pvc presión u 7.30 100.00% 7.3033 015907 Tee 1 ½'', pvc presión u 15.59 100.00% 15.5934 015908 Tee 2'', pvc presión u 23.38 100.00% 23.3835 015909 Tee 3'', pvc presión u 89.64 100.00% 89.6436 015910 Tee 4'', pvc presión u 145.67 100.00% 145.6737 Tee 6'', pvc presión u 1,005.18 100.00% 1,005.1838 178216 Tubo ½''x19', pvc SCH-40 u 81.37 100.00% 81.3739 178220 Tubo ¾''x19', pvc SCH-40 u 107.43 100.00% 107.4340 178223 Tubo 1''x19', pvc SCH-40 u 157.49 100.00% 157.4941 Tubo 1 ½''x19', pvc SCH-40 u 451.69 100.00% 451.6942 178233 Tubo 2''x19', pvc SCH-40 u 343.94 100.00% 343.9443 178238 Tubo 3''x19', pvc SCH-40 u 918.72 100.00% 918.7244 178244 Tubo 4''x19', pvc SCH-40 u 1,311.96 100.00% 1,311.9645 178250 Tubo 6''x19', pvc SCH-40 u 2,308.40 100.00% 2,308.40

Page 16: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 14

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

46 015959 Unión univ. ½'', pvc presión u 18.56 100.00% 18.5647 015963 Unión univ. ¾'', pvc presión u 25.22 100.00% 25.2248 015964 Unión univ. 1'', pvc presión u 37.12 100.00% 37.1249 028007 Unión univ. 1 ½'', pvc presión u 88.16 100.00% 88.1650 028008 Unión univ. 2'', pvc presión u 97.20 100.00% 97.2051 036793 Unión univ. 3'', pvc presión u 382.00 100.00% 382.0052 055394 Unión univ. 4'', pvc presión u 380.20 100.00% 380.20

136 VENTANAS Y PUERTAS ALUMINIO: (Agregar ITBIS) (TALLERES ALCE Tel 565-5511)1 Celosía vidrio natural (Según largo en pulgadas) Pulg. 1.81 100.00% 1.812 Celosía vidrio bronce (Según largo en pulgadas) Pulg. 2.27 100.00% 2.273 Cerradura eléctrica u 3,174.50 100.00% 3,174.504 Cierre botella (color aluminio) u 1,690.92 100.00% 1,690.925 Cierre botella (color bronce) u 1,694.27 100.00% 1,694.276 048144 Masilla blanca ''Rely-on'', tubo (itbis incluido) u 77.72 100.00% 77.727 Masilla bronce, tubo (itbis incluido) u 93.63 100.00% 93.638 Molduras m 420.19 100.00% 420.199 Operador manigueta color alum. o bronce u 110.85 100.00% 110.85

10 Operador palanca aluminio nat. u 46.97 100.00% 46.9711 Palo de 6' para operadores u 141.58 100.00% 141.5812 Pta. corred. alum. anodizado plata, v. claro transp. o martillado m2 2,144.58 100.00% 2,144.5813 Pta. corred. alum. anodizado plata, v. bronce transp. o martillado m2 2,229.88 100.00% 2,229.8814 Pta. corred. alum. anodizado plata, v. "Bluegreen" m2 2,229.88 100.00% 2,229.8815 Pta. corred. alum. anodizado plata, v. refletivo m2 3,192.52 100.00% 3,192.5216 Pta. corred. alum. anodizado plata, con espejos m2 2,619.78 100.00% 2,619.7817 Pta. corred. alum. bronce, v. claro transp. o martillado m2 2,315.17 100.00% 2,315.1718 Pta. corred. alum. bronce, v. bronce transp. o martillado m2 2,375.00 100.00% 2,375.0019 Pta. corred. alum. bronce, v. refletivo m2 3,350.89 100.00% 3,350.8920 Pta. corred. alum. bronce, con espejos m2 2,741.67 100.00% 2,741.6721 Pta. corred. alum. bco., v. claro transp. o martillado m2 2,315.17 100.00% 2,315.1722 Pta. corred. alum. bco., v. bronce transp. o martillado m2 2,376.12 100.00% 2,376.1223 Pta. corred. alum. bco., v. "Bluegreen" m2 2,437.06 100.00% 2,437.0624 Pta. corred. alum. bco., v. refletivo m2 3,350.89 100.00% 3,350.8925 Pta. corred. alum. bco., con espejos m2 2,741.67 100.00% 2,741.6726 Pta. com. 1 hoja, 1 m.,7', alum. anodizado plata, v. claro transp. o martillado u 8,494.51 100.00% 8,494.5127 Pta. com. 1 hoja, 1 m.,7', alum. anodizado plata, v. bronce transp. o martillado u 9,287.33 100.00% 9,287.3328 Pta. com. 1 hoja, 1 m.,7', alum. bronce, v. claro transp. o martillado u 10,759.71 100.00% 10,759.7129 Pta. com. 1 hoja, 1 m.,7', alum. bronce, v. bronce transp. o martillado u 11,552.53 100.00% 11,552.5330 Pta. com. 1 hoja, 1 m., 7', alum. Bco, v. claro transp. o martillado u 10,759.71 100.00% 10,759.7131 Pta. com. 1 hoja, 1 m., 7', alum. Bco, v. bronce transp. o martillado u 11,552.53 100.00% 11,552.5332 Pta. com. 2 hojas, 2 m., 7', alum. anodizado plata, v. claro transp. o martillado u 14,157.51 100.00% 14,157.5133 Pta. com. 2 hojas, 2 m., 7', alum. anodizado plata, v. bronce transp. o martillado u 15,629.89 100.00% 15,629.8934 Pta. com. 2 hojas, 2 m., 7', alum. bronce, v. claro transp. o martillado u 16,422.71 100.00% 16,422.7135 Pta. com. 2 hojas, 2 m., 7', alum. bronce, v. bronce transp. o martillado u 17,895.09 100.00% 17,895.0936 Pta. com. 2 hojas, 2 m., 7', alum. Bco., v. claro transp. o martillado u 16,422.71 100.00% 16,422.7137 Pta. com. 2 hojas, 2 m., 7', alum. Bco., v. bronce transp. o martillado u 17,895.09 100.00% 17,895.0938 004796 Silicone'' en tubo u 193.61 100.00% 193.6139 Transporte e instalación % 7.50% 100.00% 7.50%40 Tubular 4''x1 ¾'' bco. m 886.13 100.00% 886.1341 Tubular 4''x1 ¾'' bronce m 886.13 100.00% 886.1342 Tubular 4''x1 ¾'' mate m 791.72 100.00% 791.7243 Vent. abisagrada alum. anod. plata, v. claro transp. o martillado m2 4,692.61 100.00% 4,692.6144 Vent. abisagrada alum. anod. plata, v. bronce transp. o martillado m2 4,764.87 100.00% 4,764.8745 Vent. abisagrada alum. bronce, v. claro transp. o martillado m2 5,270.19 100.00% 5,270.1946 Vent. abisagrada alum. bronce, v. bronce transp. o martillado m2 5,414.62 100.00% 5,414.6247 Ventana corred. alum. anod. plata, v. claro transp. o martillado m2 2,541.26 100.00% 2,541.2648 Ventana corred. alum. anod. plata, v. bronce transp. o martillado m2 2,642.32 100.00% 2,642.3249 Ventana corred. alum. anod. plata, v. "Bluegreen" m2 2,642.32 100.00% 2,642.3250 Ventana corred. alum. anod. plata, v. reflectivo m2 3,783.03 100.00% 3,783.0351 Ventana corred. alum. anod. plata, con espejos m2 3,104.39 100.00% 3,104.3952 Ventana corred. alum. bronce, v. claro transp. o martillado m2 2,040.75 100.00% 2,040.7553 Ventana corred. alum. bronce, v. bronce transp. o martillado m2 2,815.65 100.00% 2,815.6554 Ventana corred. alum. bronce, v. reflectivo m2 3,970.71 100.00% 3,970.7155 Ventana corred. alum. bronce, con espejos m2 3,248.81 100.00% 3,248.8156 Ventana corred. alum. bco., v. claro transp. o martillado m2 2,743.39 100.00% 2,743.3957 Ventana corred. alum. bco., v. bronce transp. o martillado m2 2,815.65 100.00% 2,815.6558 Ventana corred. alum. bco., v. "Bluegreen" m2 2,887.81 100.00% 2,887.8159 Ventana corred. alum. bco., v. reflectivo m2 3,970.71 100.00% 3,970.7160 Ventana corred. alum. bco., con espejos m2 3,248.81 100.00% 3,248.8161 Vent. proyectada alum. anod. plata, v. claro transp. o martillado m2 4,042.97 100.00% 4,042.9762 Vent. proyectada alum. anod. plata, v. bronce transp. o martillado m2 4,548.19 100.00% 4,548.1963 Vent. proyectada alum. bronce, v. claro transp. o martillado m2 4,403.87 100.00% 4,403.8764 Vent. proyectada alum. bronce, v. bronce transp. o martillado m2 3,038.45 100.00% 3,038.4565 Vent. Salom AA manig, alum. blanco m2 1,950.05 100.00% 1,950.0566 Vent. Salom AA manig, alum. blanco especial m2 2,312.85 100.00% 2,312.8567 Vent. Salom AA manig, alum. blanco, reforzada m2 2,772.19 100.00% 2,772.1968 Vent. Salom AA manig, alum. bronce m2 2,004.47 100.00% 2,004.4769 Vent. Salom AA manig, alum. natural m2 1,905.97 100.00% 1,905.9770 Vent. Salom AA manig, marco natural, v. claro transp. o martillado m2 1,869.68 100.00% 1,869.6871 Vent. Salom AA manig, marco nat., v. bronce transp. o martillado m2 1,992.59 100.00% 1,992.5972 Vent. Salom AA manig, marco nat. sin vidrios m2 1,674.83 100.00% 1,674.8373 Vent. Salom AA manig, marco bco., v. claro transp. o martillado m2 1,963.65 100.00% 1,963.6574 Vent. Salom AA manig, marco bco., v. bronce transp. o martillado m2 2,050.29 100.00% 2,050.2975 Vent. Salom AA manig, marco bco., v. "Bluegreen" m2 2,137.00 100.00% 2,137.0076 Vent. Salom AA manig, marco bco. sin vidrios m2 1,790.46 100.00% 1,790.4677 Vent. Salom AA manig, marco bronce, vidrio claro transp. o martillado m2 1,963.68 100.00% 1,963.6878 Vent. Salom AA manig, marco bronce, vidrio bronce transp. o martillado m2 2,050.29 100.00% 2,050.2979 Vent. Salom AA manig, marco bronce sin vidrios m2 1,790.46 100.00% 1,790.46

Page 17: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 15

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. INSUMOSNo. CODIGO D E S C R I P C I O N U. P. UNIT. INDICE ENE. 2006

80 Vent. Salom BB alum. blanco m2 1,741.44 100.00% 1,741.4481 Vent. Salom BB alum. bronce m2 1,791.33 100.00% 1,791.3382 Vent. Salom BB alum. natural m2 1,677.95 100.00% 1,677.9583 Vent. Salom BB marco bco., v. bronce transp. o martillado m2 1,646.03 100.00% 1,646.0384 Vent. Salom BB marco bco., v. claro transp. o martillado m2 1,501.61 100.00% 1,501.6185 Vent. Salom BB marco bronce, v. bronce transp. o martillado m2 1,646.03 100.00% 1,646.0386 Vent. Salom BB marco bronce, v. claro transp. o martillado m2 1,501.61 100.00% 1,501.6187 Vent. Salom BB marco nat. sin vidrios m2 1,357.29 100.00% 1,357.2988 Vent. Salom BB marco nat., v. claro transp. o martillado m2 1,415.00 100.00% 1,415.0089 Vent. Salom BB marco nat., v. bronce transp. o martillado m2 1,617.13 100.00% 1,617.1390 Vidiro bronce transp. o martillado de ¼'' m2 788.44 100.00% 788.4491 Vidiro claro transp. o martillado de ¼'' m2 687.36 100.00% 687.36

Page 18: 2006 02 Feb Texto

300 INSUMOS 2 (AGREGAR ITBIS)

301 CERRAJERIA:1 009555 Arandela plana 1/2" lb 32.76 100.00%2 145468 Bisagras ''Stanley'' 2 ½''x2 ½'', tipo libro, doradas par 37.07 100.00%3 009974 Bisagras ''Stanley'' 3''x3'', tipo libro, doradas par 57.76 100.00%4 009976 Bisagras ''Stanley'' 4''x4'', tipo libro, doradas par 81.03 100.00%5 023100 Cable de acero 3/8" (10 mm) con forro, 7x19 pie 15.90 100.00%6 036949 Cadena galv. 5/16" (8mm) pie 26.29 100.00%7 Expansión mecánica 1/2" doble u 26.27 100.00%8 013240 Grillete 3/8" u 17.67 100.00%9 128962 Tensor zinccado anilla-anilla TAA110 u 59.48 100.00%

10 009629 Tornillo cabeza exag. 1/2"x4" u 20.01 100.00%11 013576 Tornillo de ojo 3/8"x4", c/tuerca u 13.15 100.00%

302 EQUIPOS DE CONSTRUCCION, COMBUSTIBLES Y LUBRICANTES:1 032819 Cincel criollo largo, c/punta u 74.14 100.00%2 Cincel criollo largo, plano u 74.14 100.00%3 Tanque plástico de 55 gl., para agua u 375.00 100.00%4 Cubeta 5 gl., para agua u 75.00 100.00%

303 ELECTRICIDAD RESIDENCIAL (MATERIALES):1 Alambre thw #4/0, Str. p 100.00 100.00%2 001834 Bombillo incandescente, 60 w. (2 unid.) u 38.84 100.00%3 Breakers GE 60/2 p 581.00 100.00%4 041488 Timbre "Din-Don", "Bticino" u 486.04 100.00%5 005561 Tubo fluorescente 4', 40 w., 2 patas u 37.50 100.00%6 Tarugo plastico ¼" x 1" c/perno tirafondo u 8.87 100.00%7 006173 Conector 5/8" para varilla de tierra u 37.50 100.00%

304 ELECTRICIDAD RESIDENCIAL (ACCESORIOS BTICINO):

305 ELECTRICIDAD RESIDENCIAL (ACCESORIOS OTRO TIPO 01):

306 ELECTRICIDAD RESIDENCIAL (ACCESORIOS LEVITON):

307 ELECTRICIDAD RESIDENCIAL (ACCESORIOS VIMAR):

308 LLAVES DE PASO, VALVULAS, CHEQUES Y TAPAS CISTERNA: 1 176955 Tapa cisterna 24''x24'', tola verde u 1,012.50 100.00%2 089055 Tapa cisterna 30''x30'', acero inox. u 5,130.00 100.00%

309 MADERAS Y CLAVOS:1 Pino americano bruto 1"x4"x10' (3.33 pc) pza 126.51 100.00%2 Pino americano bruto 1"x4"x10', tratado (3.33 pc) pza 141.69 100.00%3 Pino americano bruto 4"x4"x12' (16 pc) pza 607.84 100.00%4 Pino americano bruto 4"x4"x12', tratado (16 pc) pza 46.75 100.00%5 Tratamiento madera pc 4.50 100.00%

310 MATERIALES INSTALADOS:1 024701 Teja asfáltica 3'x1', verde, paq. 26 piezas de 1'x3', 3.07 m2) paq 900.00 100.00%2 211351 Teja asfáltica 3'x1', verde claro, paq. 26 piezas de 1'x3', 3.07 m2) paq 850.00 100.00%3 024712 Teja asfáltica 3'x1', roja, paq. 26 piezas de 1'x3', 3.07 m2) paq 900.00 100.00%4 024699 Teja asfáltica 3'x1', marrón, paq. 26 piezas de 1'x3', 3.07 m2) paq 900.00 100.00%5 024722 Teja asfáltica 3'x1', gris, paq. 26 piezas de 1'x3', 3.07 m2) paq 844.00 100.00%6 024723 Felpa impermeable, 3' ancho x 15' de largo pie 6.68 100.00%

311 TUBERIAS Y PIEZAS CPVC:1 015932 Adaptador hembra 1/2" cpvc u 23.20 100.00%2 015914 Adaptador hembra 3/4" cpvc u 28.71 100.00%3 015931 Adaptador macho 1/2" cpvc u 6.00 100.00%4 015913 Adaptador macho 3/4" cpvc u 6.72 100.00%5 089957 Cemento cpvc, pinta u 106.72 100.00%6 089959 Cemento cpvc, 1/4 gl. u 338.72 100.00%7 028003 Codo 1/2''x90, cpvc u 4.22 100.00%8 028004 Codo 3/4''x90, cpvc u 9.16 100.00%9 098158 Limpiador tubo cpvc, pinta u 90.36 100.00%

10 176954 Limpiador tubo cpvc, 1/4 gl. u 143.84 100.00%11 015930 Tee ½'', cpvc u 10.03 100.00%12 028005 Tee ¾'', cpvc u 14.23 100.00%13 015151 Tubo ½''x19', cpvc u 128.00 100.00%14 015152 Tubo ¾''x19', cpvc u 145.00 100.00%

312 TUBERIAS Y PIEZAS H.G. (HIERRO GALVANIZADO):1 015336 Coupling ½" h.g. u 4.75 100.00%2 015337 Coupling 3/4" h.g. u 6.00 100.00%3 015338 Coupling 1" h.g. u 12.85 100.00%4 015340 Coupling 1 ½" h.g. u 22.28 100.00%5 015341 Coupling 2" h.g. u 38.50 100.00%6 Coupling 2 ½" h.g. u7 Coupling 3" h.g. u 215.53 100.00%8 015344 Coupling 4" h.g. u 62.00 100.00%

313 TUBERIAS Y PIEZAS PVC PRESION:1 015896 Reduc. 1" x ¾'', pvc presión u 2.94 100.00%

314 BAÑOS, FREGADEROS , CALENTADORES ELECT. Y ACCESORIOS:1 072792 Asiento p/inod., corto natural, D60 J. V., "Sadosa" u 210.00 100.00%2 Bañera PVC blanca, 1.4 m. u 2,650.00 100.00%3 Bañera PVC color, 1.4 m. u 2,650.00 100.00%3 056385 Calent. eléct. Criollo 6 gls., "Temp Quip" u 2,662.00 100.00%4 055727 Calent. eléct. Criollo 8 gls., "Temp Quip" u 3,674.00 100.00%5 056386 Calent. eléct. Criollo 12 gls., "Temp Quip" u 3,176.00 100.00%

Page 19: 2006 02 Feb Texto

32.7637.0757.7681.0315.9026.2926.2717.6759.4820.0113.15

74.1474.14

375.0075.00

100.0038.84

581.00486.04

37.508.87

37.50

1,012.505,130.00

126.51141.69607.84

46.754.50

900.00850.00900.00900.00844.00

6.68

23.2028.716.006.72

106.72338.72

4.229.16

90.36143.84

10.0314.23

128.00145.00

4.756.00

12.8522.2838.50

215.5362.00

2.94

210.002,650.002,650.002,662.003,674.003,176.00

Page 20: 2006 02 Feb Texto

Fecha impresión: 04/08/2023PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 1 / 473

LISTADO PARA COTIZAR PRECIOS (Ferretería Americana) FEBRERO 2006No. D E S C R I P C I O N U. CODIGO P. UNIT.

I.T.B.I.S. Vigente 16.00%INSUMOS (ITBIS incluido, salvo indicacion)

BOMBAS DE AGUA Y TANQUES DE PRESION : (Agregar ITBIS)

1 Caja control 1 HP 23317A027 CJF10-2 u 034962 1,810.342 Caja control 1 1/2HP M-23317A28 CJF15-2 u 034966 2,357.753 Caja control 2HP M-CJ20-21 u 005374 4,019.824 Caja control 5HP M-CJ50-21 u 005371 7,381.90

Page 21: 2006 02 Feb Texto

Fecha impresión: 04/08/2023PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 2 / 473

INSUMOSINDICE ENE. 2006 Copiar J en H, antes de cambios

Solo en cajas control Bombas Sumerg.

100.00% 1,810.34 1,810.34

100.00% 2,357.75 2,357.75

100.00% 4,019.82 4,019.82

100.00% 7,381.90 7,381.90

Page 22: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 15

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. REND. MAT.No. D E S C R I P C I O N U. REND.

900 RENDIMIENTO DE MATERIALES

901 CAL, CEMENTOS, ADITIVOS, CURADORES, ENDURECEDORES, SELLADORES:1 Aditivo imperm. P/horm. 180 kg/cm2 ''SX-PEL'', 5 gl. gl / m3 0.262 Aditivo imperm. P/horm. 210 kg/cm2 ''SX-PEL'', 5 gl. gl / m33 Aditivo imperm. P/horm. 240 kg/cm2 ''SX-PEL'', 5 gl. gl / m34 Aditivo imperm. P/horm. 280 kg/cm2 ''SX-PEL'', 5 gl. gl / m35 Aditivo retard. ''SX-KRETE-R'', 5 gl. gl / m3 0.20636 Cal ''Pomier'' o similar, 50 lbs. (en mortero empañete) fda / m3 3.067 Curad., sellad. ''SUPRACURE PLUS'', 5 gl., 20 m2/gl. gl / m2 0.058 Curad., sellad., endur. ''SUPRACURE'', 5gls., 20 m2/gl. gl / m2 0.059 Endur. Met. / pisos ''DURAPLATE NR'', 100 lb., .10 m2/lb. Lb / m2 0.10

10 Resina epóxica ''Pro-flex'' para junta de piso, 231 pulg.3/gl. gl / pulg3 0.00432911 Sellad. horm. visto ''SUPRACURE PX'', 5gl., 20 m2/gl. gl / m2 0.05

902 CEMENTO PVC (NUMERO DE JUNTAS POR GL.):1 En ½'' juntas 2,800.002 En ¾'' juntas 1,600.003 En 1'' juntas 1,200.004 En 1 ½'' juntas 640.005 En 2'' juntas 360.006 En 3'' juntas 280.007 En 4'' juntas 200.008 En 6'' juntas 64.009 En 8'' juntas 32.00

10 En 10'' juntas 24.0011 En 12'' juntas 16.00

903 CEMENTO PVC (NUMERO DE JUNTAS POR KILO):1 En ½'' juntas 700.002 En ¾'' juntas 400.003 En 1'' juntas 300.004 En 1 ½'' juntas 160.005 En 2'' juntas 90.006 En 3'' juntas 70.007 En 4'' juntas 50.008 En 6'' juntas 16.009 En 8'' juntas 8.00

10 En 10'' juntas 6.0011 En 12'' juntas 4.00

904 CEMENTO PVC (NUMERO DE JUNTAS POR PINTA):1 En ½'' juntas 350.002 En ¾'' juntas 200.003 En 1'' juntas 150.004 En 1 ½'' juntas 80.005 En 2'' juntas 45.006 En 3'' juntas 35.007 En 4'' juntas 25.008 En 6'' juntas 8.009 En 8'' juntas 4.00

10 En 10'' juntas 3.0011 En 12'' juntas 2.00

905 CLAVOS (CANTIDAD x LIBRA):1 Clavos acero 1'' u 445.002 Clavos acero 1 ½'' u 137.003 Clavos acero 2'' u 105.004 Clavos acero 2 ½'' u 75.005 Clavos acero 3'' u 67.006 Clavos acero 4'' u 52.007 Clavos corrientes ¾'' u 2,064.008 Clavos corrientes 1'' u 1,513.009 Clavos corrientes 1 ½'' u 445.00

10 Clavos corrientes 2'' u 206.0011 Clavos corrientes 2 ½'' u 87.0012 Clavos corrientes 3'' u 63.0013 Clavos corrientes 4'' u 29.0014 Clavos galv. para cartón ¾" u 322.0015 Clavos de zinc 2 ½'' u 56.00

906 PISOS Y ADOQUINES:1 Adoquín clásico 10x20x20 cm. u / m2 25.0002 Adoquín colonial 5x20x20 cm. u / m2 50.0003 Adoquín mediterraneo gris u / m2 36.6504 Adoquín olympus 8x12x23 cm. u / m2 36.2305 Derretido p/pisos de granito fda / m2 0.031256 Baldosa de .10 x .10 m. u / m2 100.0007 Baldosa de .125 x .20 m. u / m2 40.0008 Baldosa de .125 x .25 m. u / m2 32.0009 Baldosa de .15 x .15 m. u / m2 44.440

10 Baldosa de .15 x .20 m. u / m2 33.33311 Baldosa de .20 x .20 m. u / m2 25.00012 Baldosa de .20 x .25 m. u / m2 20.00013 Baldosa de .20 x .30 m. u / m2 16.66714 Baldosa de .20 x .40 m. u / m2 12.50015 Baldosa de .20 x .50 m. u / m2 10.00016 Baldosa de .25 x .25 m. u / m2 16.000

Page 23: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 16

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. REND. MAT.No. D E S C R I P C I O N U. REND.

17 Baldosa de .25 x .30 m. u / m2 13.33318 Baldosa de .25 x .40 m. u / m2 10.00019 Baldosa de .25 x .50 m. u / m2 8.00020 Baldosa de .30 x .30 m. u / m2 11.11021 Baldosa de .30 x .40 m. u / m2 8.33322 Baldosa de .30 x .50 m. u / m2 6.66723 Baldosa de .30 x .60 m. u / m2 5.55024 Baldosa de .40 x .40 m. u / m2 6.25025 Baldosa de .40 x .50 m. u / m2 5.00026 Baldosa de .40 x .60 m. u / m2 4.17027 Baldosa de .40 x .80 m. u / m2 3.12528 Baldosa de .50 x .50 m. u / m2 4.00029 Baldosa de .50 x .60 m. u / m2 3.33330 Baldosa de .50 x .70 m. u / m2 2.85731 Baldosa de .50 x .80 m. u / m2 2.50032 Baldosa de .50 x .90 m. u / m2 2.22233 Baldosa de .50 x 1.00 m. u / m2 2.00034 Zócalos de cualquier alto x .15 m. u / m 6.66735 Zócalos de cualquier alto x .20 m. u / m 5.00036 Zócalos de cualquier alto x .25 m. u / m 4.00037 Zócalos de cualquier alto x .30 m. u / m 3.33338 Zócalos de cualquier alto x .33 m. u / m 3.00039 Zócalos de cualquier alto x .40 m. u / m 2.50040 Zócalos de cualquier alto x .50 m. u / m 2.00041 Zócalos de cualquier alto x .60 m. u / m 1.66742 Zócalos de cualquier alto x .70 m. u / m 1.43043 Zócalos de cualquier alto x .80 m. u / m 1.25044 Zócalos de cualquier alto x .90 m. u / m 1.11145 Zócalos de cualquier alto x 1.00 m. u / m 1.00046 Derretido p/cerámica (rinde 25 m2/fda.) fda / m2 0.15047 Pegamento K18 fda / m2 6.50048 Perfil esquinero PVC u / m 0.400

907 IMPERMEABILIZANTES:1 ALM, lata de 5 gl. gl / m2 0.092 Bitupol instalado, 3 mm., reforz. fibra vidrio, 5 años gar. rollo / m23 Bitupol instalado, 3 mm., reforz. con poliester, 10 años gar. rollo / m24 Bitupol instalado, 4 mm., reforz. con poliester, 10 años gar. rollo / m25 Sellador de techo ''Popular'' gl / m2 0.096 Sellador de techo ''Sureseal'', import., lata 5 gl. gl / m2 0.097 Sellador de techo ''Lanco'', import., lata 5 gl. gl / m2 0.098 Silicool, lata 5 gl., Criollo, (2 manos) gl / m2 0.09

908 MATERIALES INSTALADOS:1 Caballete en teja asfáltica instalado a todo costo rollo / m2 Línea doble teja asfáltica instalada a todo costo, en bordes rollo / m3 Teja asfáltica 3' x 1' instalada todo costo rollo / m2

909 PINTURAS:1 Acrílica, 2 manos gl / m2 0.1002 Aguarrás en 2 manos pintura mantenimiento gl / m2 0.0803 Epóxica gl / m2 0.0804 Latex ''Económica'' o ''Pintex'', 2 manos gl / m2 0.1005 Mantenimiento, 2 manos gl / m2 0.0806 Oxido Rojo, 2 manos gl / m2 0.0807 ''Thinner'' en 2 manos pintura mantenimiento gl / m2 0.130

Page 24: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 17

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. MANO DE OBRANo. D E S C R I P C I O N P. UNIT. INDICE U. REND./DIA MA OP1 OP2 OP3 AY TC TNC

SALARIO MENSUAL MINIMO EN RD$ 4,377.00 100.00%1000 MANO DE OBRA

JORNAL JORNAL JORNAL

1001 MANO DE OBRA (JORNALES DIARIOS): DIARIO / HORA MENSUAL

1 Ayudante (AY) 345.00 100.00% día 43.125 8,221.352 Brigada topográfica, incluyendo equipos 2,189.00 100.00% día 273.625 52,163.873 Maestro de área (MA) 830.00 100.00% día 103.750 19,778.904 Operario primera categoría (OP1) 639.00 100.00% día 79.875 15,227.375 Operario Segunda categoría (OP2) 511.00 100.00% día 63.875 12,177.136 Operario tercera categoría - Terminador (OP3) 448.00 100.00% día 56.000 10,675.847 Técnico calificado (TC) 294.00 100.00% día 36.750 7,006.028 Técnico no calificado o PEON (TNC) 268.00 100.00% día 33.500 6,386.44

1002 M.O. ALBAÑILERIA (COLOCACION DE BLOQUES):1 Coloc. bloque 4x 8 x16 pulgs. 9.20 100.00% u 125.00 1 1 12 Coloc. bloque 5x8x16 pulgs. 7.20 100.00% u 160.00 1 1 13 Coloc. bloque 6x8x16 pulgs. 7.70 100.00% u 150.00 1 1 14 Coloc. bloque 6x8x18 pulgs. 8.50 100.00% u 135.00 1 1 15 Coloc. bloque 8x8x16 pulgs. 8.50 100.00% u 135.00 1 1 16 Coloc. bloque 12x8x16 pulgs. 15.80 100.00% u 90.00 1 1 1 17 Coloc. bloque ornamental 5x25x20 pulgs. 13.10 100.00% u 75.00 1 18 Coloc. bloque ornamental barro o cemento 17.00 100.00% u 55.00 1 19 Coloc. bloque cristal 46.70 100.00% u 20.00 1 1

10 Coloc. bloque irregular 17.30 100.00% u 57.00 1 111 Violinar junta horiz. y vert. con regla (cada cara) 1.00 100.00% u 785.00 1 1

1003 M.O. ALBAÑILERIA (EMPAÑETES, TERMINACION PAREDES Y PLAFONES):1 Bajo relieve, incluye cantos 107.00 100.00% m 7.50 1 12 Cantos en vigas, columnas, antepechos y mochetas 26.80 100.00% m 30.00 1 13 Capitel 20 a 30 cm. P. A. u 1 14 Careteo con llana 14.60 100.00% m2 55.00 1 15 Cornizas, hasta 12 cm., cemento 142.00 100.00% m 9.00 1 1 16 Empañete columnas desde 20 cm. ancho en adelante 87.00 100.00% m2 19.85 1 1 1 17 Empañete ext., maestrado, a plomo (sin andamios) 78.00 100.00% m2 22.00 1 1 1 18 Empañete HI-RIB, 3 capas 128.00 100.00% m2 10.00 1 1 19 Empañete int., en paredes, maestrado, a plomo 62.00 100.00% m2 28.00 1 1 1 1

10 Empañete pulido a color 75.00 100.00% m2 17.00 1 1 111 Empañete pulido sin color 67.00 100.00% m2 19.00 1 1 112 Empañete rasgado 107.00 100.00% m2 12.00 1 1 113 Empañete rateado horiz. y vertical, punta llana 27.40 100.00% m2 42.00 1 1 114 Empañete techos y vigas 80.00 100.00% m2 20.00 1 1 1 115 Empañete techos, maestrado, a nivel, 2 cm. Mín. 117.00 100.00% m2 10.95 1 1 116 Enpañete en ladrillos P. A. m2 1 1 117 Estrías 50.30 100.00% m 16.00 1 118 Fragüache con escoba 9.30 100.00% m2 69.00 1 119 Goteros colgantes 61.90 100.00% m 13.00 1 120 Goteros en ranuras 53.70 100.00% m 15.00 1 121 Lágrimas en cemento 117.00 100.00% m2 8.00 1 122 Marmolina con piedras 160.00 100.00% m2 8.00 1 1 123 Marmolina frotado 128.00 100.00% m2 10.00 1 1 124 Natilla 35.90 100.00% m2 26.00 1 125 Perrilla 128.00 100.00% m2 10.00 1 1 126 Repello maestrado paredes 36.60 100.00% m2 22.00 1 127 Repello maestrado techo, hasta 2 cm. esp. 62.00 100.00% m2 16.00 1 128 Repello sin maestrar 17.50 100.00% m2 46.00 1 129 Resane con goma 22.10 100.00% m2 52.00 1 1 130 Resane frotado 13.90 100.00% m2 58.00 1 131 Rústico con escoba, plana o llana (sin repello) 46.70 100.00% m2 20.00 1 132 Rústico en decoraciones P. A. m233 Term medio punto o arcos hasta 40 Cm., 2 caras, fondo, cantos 426.00 100.00% m 3.00 1 1 134 Vuelo aistlado de .80 hasta 2.00 m. 113.00 100.00% m 7.10 1 1

1004 M.O. ALBAÑILERIA (TERMINACION TECHOS E IMPERMEABILIZACION):1 Capa atérmica, sin subir mat. 37.30 100.00% m2 25.00 1 12 Fino techo Bermuda, cantos, sin subir mat. 133.00 100.00% m2 13.00 1 1 1 13 Fino techo horiz., sin subir mat. 53.50 100.00% m2 16.00 1 14 Fino techo inclinado, sin subir mat. 32.90 100.00% m2 26.00 1 15 Zabaleta en piso 19.00 100.00% m 45.00 1 16 Zabaleta en techo 28.50 100.00% m 30.00 1 1

1005 M.O. ALBAÑILERIA (PISOS Y ZOCALOS):1 Cemento pulido (fino solo) 36.60 100.00% m2 22.00 1 12 Cerámica criolla 15x15 hasta 20x20 cm., sin base y nivel 156.00 100.00% m2 6.00 1 13 Cerámica criolla 15x15 hasta 20x20 cm., + base y nivel 187.00 100.00% m2 5.00 1 14 Cerámica criolla 30x30 hasta 40x40 cm., sin base y nivel 178.00 100.00% m2 5.25 1 15 Cerámica criolla 30x30 hasta 40x40 cm., + base y nivel 217.00 100.00% m2 4.30 1 16 Cerámica import. 15x15 hasta 20x20 cm., sin base y nivel 164.00 100.00% m2 5.70 1 17 Cerámica import. 15x15 hasta 20x20 cm., + base y nivel 196.00 100.00% m2 4.75 1 18 Cerámica import. 30x30 hasta 40x40 cm., sin base y nivel 203.00 100.00% m2 4.60 1 19 Cerámica import. 30x30 hasta 40x40 cm., + base y nivel 233.00 100.00% m2 4.00 1 1

10 Coloc. adoquines 42.40 100.00% m2 22.00 1 111 Granito 25x25 cm. 91.00 100.00% m2 14.00 1 1 112 Granito 30x30 cm. 98.00 100.00% m2 13.00 1 1 113 Granito 33x33 cm. 98.00 100.00% m2 13.00 1 1 114 Granito 40x40 cm. 116.00 100.00% m2 11.00 1 1 115 Granito 50x50 cm. 122.00 100.00% m2 10.50 1 1 116 Granito en plumilla o cartabón 122.00 100.00% m2 10.50 1 1 117 Losetas ladrillo 12 ½x25 cm. 106.00 100.00% m2 8.80 1 1

Page 25: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 18

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. MANO DE OBRANo. D E S C R I P C I O N P. UNIT. INDICE U. REND./DIA MA OP1 OP2 OP3 AY TC TNC

18 Losetas ladrillo 15x15 y 20x20 cm. 106.00 100.00% m2 8.80 1 119 Losetas ladrillo o cemento / pisos exagonales, ferias y otros 137.00 100.00% m2 6.80 1 120 Losetas mármol criollo, base y nivel 224.00 100.00% m2 4.40 1 121 Losetas mármol imp., base y nivel 259.00 100.00% m2 3.80 1 122 Mosaicos 20x20 cm. y 25x25 cm., corriente 85.00 100.00% m2 15.00 1 1 123 Mosaicos corrientes en plumilla 116.00 100.00% m2 11.00 1 1 124 Mosaicos en cartabón 116.00 100.00% m2 11.00 1 1 125 Mosaicos gravilla 20x20 cm. 85.00 100.00% m2 15.00 1 1 126 Mosaicos gravilla 25x25 cm. 85.00 100.00% m2 15.00 1 1 127 Mosaicos gravilla 30x30 cm. 91.00 100.00% m2 14.00 1 1 128 Mosaicos gravilla 40x40 cm. 98.00 100.00% m2 13.00 1 1 129 Mosaicos gravilla 50x50 cm. 116.00 100.00% m2 11.00 1 1 130 Piso horm. frotado 10 cm. esp. 59.00 100.00% m2 24.00 1 1 1 131 Piso horm. frotado y violinado, 10 cm. esp. 79.00 100.00% m2 18.00 1 1 1 132 Piso horm. pulido, violinado, 10 cm. esp. 83.00 100.00% m2 17.00 1 1 1 133 Piso rejonado pulido, sin color 59.00 100.00% m2 24.00 1 1 1 134 Piso rejonado pulido y marcado a hilo, color 79.00 100.00% m2 18.00 1 1 1 135 Piso rejonado sin pulir 51.00 100.00% m2 28.00 1 1 1 136 Quicios y entre puertas 70.00 100.00% m 13.25 1 137 Terminación aceras entradas, en decoraciones P. A.38 Torcho 20x20 y 25x25 cm. 85.00 100.00% m2 15.00 1 1 139 Vibrazos (parques y terrazas) 102.00 100.00% m2 12.50 1 1 140 Zócalo corriente 31.10 100.00% m 30.00 1 141 Zócalo corriente en escalera 54.90 100.00% m 17.00 1 142 Zócalo granito en escalera 72.00 100.00% m 13.00 1 143 Zócalo granito en piso 42.40 100.00% m 22.00 1 1

1006 M.O. ALBAÑILERIA (ESCALONES):1 Confección escalón y revestir en ladrillo 239.00 100.00% m 3.90 1 12 Escalón revestido cerám. criolla, H. y C. H. y vuelo 250.00 100.00% m 4.90 1 23 Escalón revestido cerám. import., H. y C. H. y vuelo 307.00 100.00% m 4.00 1 24 Escalón revestido en mezcla 101.00 100.00% m 8.00 1 15 Montar escalón en accesos de granito 133.00 100.00% m 7.00 1 16 Montar escalón escalera (H. y C. H.) 117.00 100.00% m 8.00 1 17 Revestir escalón en ladrillo 196.00 100.00% m 4.75 1 18 Revestir escalón en mosaicos 98.00 100.00% m 9.50 1 19 Terminar escalón de cemento 59.60 100.00% m 13.50 1 1

1007 M.O. ALBAÑILERIA (REVESTIMIENTO PAREDES DE BAÑOS):1 Azulejos 10x10 cm., plumilla 373.00 100.00% m2 2.50 1 12 Azulejos 10x10 cm., junta corrida 311.00 100.00% m2 3.00 1 13 Azulejos 15x15 cm., junta corrida 178.00 100.00% m2 5.25 1 14 Azulejos 15x15 cm., junta trabada 187.00 100.00% m2 5.00 1 15 Azulejos en combinación 217.00 100.00% m2 4.30 1 16 Bañera cónica P. A.7 Bañera empotrada revestida cerámica criolla P. A.8 Bañera empotrada revestida cerámica import. P. A.9 Bañera revest. 30 cm. alto, 1.56 hasta 180 m. largo 1,435.00 100.00% u 0.65 1 1

10 Bañera revest. 30 cm. alto hasta 1.55 m. largo 1,244.00 100.00% u 0.75 1 111 Base para bañera 156.00 100.00% u 6.00 1 112 Cerámica criolla 15x15 hasta 20x20 cm. 178.00 100.00% m2 5.25 1 113 Cerámica criolla 30x30 hasta 40x40 cm. 233.00 100.00% m2 4.00 1 114 Cerámica import. 15x15 hasta 20x20 cm. 196.00 100.00% m2 4.75 1 115 Cerámica import. 30x30 hasta 40x40 cm. 267.00 100.00% m2 3.50 1 116 Fachaicos 179.00 100.00% m2 4.50 1 117 Loseta 5x20 cm. en revest. muro 311.00 100.00% m2 3.00 1 118 Loseta 8x20 cm. en revest. muro 267.00 100.00% u 3.50 1 119 Loseta de cemento 12.5x25 cm. 117.00 100.00% m2 8.00 1 120 Loseta ornamental en paredes 233.00 100.00% m2 4.00 1 121 Meseta de baño 406.00 100.00% u 2.30 1 122 Mochetas en azulejos 117.00 100.00% m 8.00 1 123 Mochetas en cerámica criolla 133.00 100.00% m 7.00 1 124 Mochetas en cerámica import. 144.00 100.00% m 6.50 1 125 Prep. superficie colocar pisos 21.20 100.00% m2 44.00 1 1

1008 M.O. ALBAÑILERIA (INSTALACION ACCESORIOS DE BAÑOS):1 Montar accesorios atornillados 93.00 100.00% u 10.00 1 12 Montar accesorios empotrados 133.00 100.00% u 7.00 1 13 Montar botiquín corriente empotrado 373.00 100.00% u 2.50 1 14 Montar botiquín corriente, sin empotrar 104.00 100.00% u 9.00 1 15 Montar botiquín lujo empotrado 933.00 100.00% u 1.00 1 16 Montar botiquín lujo sin empotrar 622.00 100.00% u 1.50 1 17 Montar papelera porta servilletas 93.00 100.00% u 10.00 1 18 Montar repisa corriente para baño 156.00 100.00% u 6.00 1 1

1009 M.O. ALBAÑILERIA (TRABAJOS EN LADRILLOS):1 Arcos de ladrillos P. A.2 Ladrillo limpio 1 cara 4.70 100.00% u 200.00 1 13 Ladrillo limpio 2 caras 5.90 100.00% u 157.00 1 14 Ladrillos no especificados 4.40 100.00% u 210.00 1 15 Ladrillos para empañetar en muros 3.30 100.00% u 285.00 1 16 Ladrillos refractarios 5x10x25 cm. 4.90 100.00% u 190.00 1 1

1010 M.O. ALBAÑILERIA (TRABAJOS EN PIEDRA):1 Piedra caliza aserrada 267.00 100.00% m2 3.50 1 12 Piedra caliza labrada 233.00 100.00% m2 4.00 1 13 Piedra blanca (San Cristóbal, Cambita, Azulada,

La Cumbre, Callao de rio, etc.) 267.00 100.00% m2 3.50 1 1

Page 26: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 19

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. MANO DE OBRANo. D E S C R I P C I O N P. UNIT. INDICE U. REND./DIA MA OP1 OP2 OP3 AY TC TNC

4 Roca o cantos rodados, muros mampost., con fines decor. 982.00 100.00% m3 0.95 1 15 Roca o cantos rodados en muros mampostería 343.00 100.00% m3 2.35 1 16 Roca o cantos rodados, tipo encache, 20 a 30 cm. espesor

revestimiento de terraplenes, canales y cunetas 91.00 100.00% m2 8.80 1 17 Roca o cantos rodados, tipo encache, 20 a 30 cm. espesor

revestimiento de terraplenes, con fines decorativos 242.00 100.00% m2 3.85 1 1

Page 27: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 20

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. MANO DE OBRANo. D E S C R I P C I O N P. UNIT. INDICE U. REND./DIA MA OP1 OP2 OP3 AY TC TNC

1011 M.O. ALBAÑILERIA (TRABAJOS EN MARMOL):1 Mármol criollo en escaleras 233.00 100.00% m 4.00 1 12 Mármol criollo en revest. paredes 373.00 100.00% m2 2.50 1 13 Marmol en pedazos 311.00 100.00% m2 3.00 1 14 Mármol fachaico en 1sola pieza 373.00 100.00% m2 2.50 1 15 Mármol import. en escaleras 287.00 100.00% m 3.25 1 16 Mármol import. en revest. paredes 434.00 100.00% m2 2.15 1 17 Mármol picado 718.00 100.00% m2 1.30 1 18 Marmol travertino en tiritas 467.00 100.00% m2 2.00 1 1

1012 M.O. ALBAÑILERIA (CONTENES, ACERA, BADENES Y COLECTORES):1 Badén ciclópeo hasta 40 cm. ancho, 10 a 20 cm. esp.

horm. frotado, pulido en centro (sin varillas) 618.00 100.00% m3 2.50 1 1 1 12 Badén ciclópeo hasta 40 cm. ancho, > 20 cm. esp.

horm. frotado, pulido en centro (sin varillas) 618.00 100.00% m3 2.50 1 1 1 13 Base para contenes (Telford con mezcla) 223.00 100.00% m3 3.50 1 14 Conf. anillo de filtrante 426.00 100.00% u 3.00 1 1 15 Conf. tapa colector o pozo séptico, encofrado, envarillado, vaciado,

coloc. tapa, hasta 2.00 metros cuadrados 710.00 100.00% u 1.80 1 1 16 Conf. tapa colector o pozo séptico, encofrado, envarillado, vaciado,

P. A.7 Conf. tragante de hasta 50 cm. long. 290.00 100.00% u 4.40 1 1 18 Const. acera frot., viol., .10 m. esp., coloc. horm. 754.00 100.00% m3 2.05 1 1 1 19 Const. pozo séptico, incluyendo terminación P. A. u

10 Const zapatas y pisos colector horm., envarillado y frotado 618.00 100.00% m3 2.50 1 1 1 111 Contén con bordillo 25x15 cm. 70.00 100.00% m 22.00 1 1 1 112 Contén con bordillo 30x8x10 cm. 48.00 100.00% m 32.00 1 1 1 113 Contén con bordillo 40 cm. alto x 20 cm. ancho 119.00 100.00% m 13.00 1 1 1 114 Contén de 55x30x15 cm. 78.00 100.00% m 19.70 1 1 1 1

1013 M.O. ALBAÑILERIA (LAVADEROS, VERTEDEROS, DESAGÜES, REGISTROS Y TRAMPAS DE GRASA):1 Conf. desagüe 20x20 cm. cubierto 134.00 100.00% u 6.00 1 12 Conf. desagüe 20x20 cm. descubierto 81.00 100.00% u 10.00 1 13 Conf. registro hasta 60x60 cm. (medida interior) 537.00 100.00% u 1.50 1 14 Conf. registro más de 60x60 cm. (medida interior) 644.00 100.00% u 1.25 1 15 Conf. trampa de grasa 1,073.00 100.00% u 1.00 1 1 16 Conf. vertedero 60x60 cm. con azulejos 1,201.00 100.00% u 1.00 1 1 17 Conf. vertedero 60x60 cm., pulido 537.00 100.00% u 1.50 1 18 Const. lavadero pulido hasta .60x1.5 m. 1,432.00 100.00% u 1.00 1 1 19 Const. lavadero pulido, > 1.5 m., adicional / recipiente 716.00 100.00% u 2.00 1 1 1

10 Const. lavadero, 1 y 2 bocas, con azulejos arriba P. A.

1014 M.O. ALBAÑILERIA (LABORES VARIAS):1 Acuñe de marco 85.00 100.00% u 9.50 1 12 Coloc. caballete de tejas 128.00 100.00% m 10.00 1 1 17 Coloc. tejas 160.00 100.00% m2 8.00 1 1 18 Corte y amarre varilla bloques a 0.20 m. 1.03 100.00% u 785.00 1 19 Corte y amarre varilla bloques a 0.40 m. 0.69 100.00% u 1,175.00 1 1

10 Corte y amarre varilla bloques a 0.60 m. 0.51 100.00% u 1,565.00 1 111 Corte y amarre varilla bloques a 0.80 m. 0.34 100.00% u 2,350.00 1 112 Llenar hueco bloque a 0.20 m. 2.56 100.00% u 315.00 1 113 Llenar hueco bloque a 0.40 m. 1.38 100.00% u 585.00 1 114 Llenar hueco bloque a 0.60 m. 1.03 100.00% u 785.00 1 115 Llenar hueco bloque a 0.80 m. 0.69 100.00% u 1,175.00 1 116 Montura ''Brissoleil'' de 05x40x200 m. 358.00 100.00% m2 3.00 1 1 1

1015 M.O. ALBAÑILERIA (SUBIR MATERIALES / PLANTA):1 Subir arena por meseta un nivel 55.00 100.00% m3 16.00 32 Subir arena por polea 2do nivel 88.00 100.00% m3 10.00 33 Subir arena por polea 3er nivel 126.00 100.00% m3 7.00 34 Subir arena por polea 4to nivel 176.00 100.00% m3 5.00 35 Subir arena por polea 5to nivel 221.00 100.00% m3 4.00 36 Subir arena por polea 6to nivel 294.00 100.00% m3 3.00 37 Subir bloques 4'' por meseta 2do nivel 0.49 100.00% u 1,800.00 38 Subir bloques 4'' por meseta 3er nivel 0.59 100.00% u 1,500.00 39 Subir bloques 4'' por meseta 4to nivel 0.78 100.00% u 1,125.00 3

10 Subir bloques 4'' por meseta 5to nivel 0.98 100.00% u 900.00 311 Subir bloques 4'' por meseta 6to nivel 1.18 100.00% u 750.00 312 Subir bloques 4'' por polea 2do nivel 0.80 100.00% u 1,100.00 313 Subir bloques 4'' por polea 3er nivel 1.36 100.00% u 650.00 314 Subir bloques 4'' por polea 4to nivel 1.76 100.00% u 500.00 315 Subir bloques 4'' por polea 5to nivel 2.52 100.00% u 350.00 316 Subir bloques 4'' por polea 6to nivel 2.94 100.00% u 300.00 317 Subir bloques 6'' por meseta 2do nivel 0.59 100.00% u 1,500.00 318 Subir bloques 6'' por meseta 3er nivel 0.88 100.00% u 1,000.00 319 Subir bloques 6'' por meseta 4to nivel 1.18 100.00% u 750.00 320 Subir bloques 6'' por meseta 5to nivel 1.47 100.00% u 600.00 321 Subir bloques 6'' por meseta 6to nivel 1.76 100.00% u 500.00 322 Subir bloques 6'' por polea 2do nivel 0.98 100.00% u 900.00 323 Subir bloques 6'' por polea 3er nivel 1.47 100.00% u 600.00 324 Subir bloques 6'' por polea 4to nivel 1.96 100.00% u 450.00 325 Subir bloques 6'' por polea 5to nivel 2.71 100.00% u 325.00 326 Subir bloques 6'' por polea 6to nivel 3.21 100.00% u 275.00 327 Subir bloques 8'' por meseta 2do nivel 0.74 100.00% u 1,200.00 328 Subir bloques 8'' por meseta 3er nivel 1.10 100.00% u 800.00 329 Subir bloques 8'' por meseta 4to nivel 1.47 100.00% u 600.00 330 Subir bloques 8'' por meseta 5to nivel 1.84 100.00% u 480.00 331 Subir bloques 8'' por meseta 6to nivel 2.21 100.00% u 400.00 3

coloc. tapa, > 2.00 m2 (Precio proporcional)

Page 28: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 21

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. MANO DE OBRANo. D E S C R I P C I O N P. UNIT. INDICE U. REND./DIA MA OP1 OP2 OP3 AY TC TNC

32 Subir bloques 8'' por polea 2do nivel 1.24 100.00% u 710.00 333 Subir bloques 8'' por polea 3er nivel 1.86 100.00% u 475.00 334 Subir bloques 8'' por polea 4to nivel 2.48 100.00% u 355.00 335 Subir bloques 8'' por polea 5to nivel 3.09 100.00% u 285.00 336 Subir bloques 8'' por polea 6to nivel 3.75 100.00% u 235.00 337 Subir bloques 10'' por meseta 2do nivel 0.88 100.00% u 1,000.00 338 Subir bloques 10'' por meseta 3er nivel 1.33 100.00% u 665.00 339 Subir bloques 10'' por meseta 4to nivel 1.76 100.00% u 500.00 340 Subir bloques 10'' por meseta 5to nivel 2.21 100.00% u 400.00 341 Subir bloques 10'' por meseta 6to nivel 2.63 100.00% u 335.00 342 Subir bloques 10'' por polea 2do nivel 1.47 100.00% u 600.00 343 Subir bloques 10'' por polea 3er nivel 2.21 100.00% u 400.00 344 Subir bloques 10'' por polea 4to nivel 2.94 100.00% u 300.00 345 Subir bloques 10'' por polea 5to nivel 3.68 100.00% u 240.00 346 Subir bloques 10'' por polea 6to nivel 4.41 100.00% u 200.00 347 Subir bloques 12'' por meseta 2do nivel 1.04 100.00% u 850.00 348 Subir bloques 12'' por meseta 3er nivel 1.60 100.00% u 550.00 349 Subir bloques 12'' por meseta 4to nivel 2.13 100.00% u 415.00 350 Subir bloques 12'' por meseta 5to nivel 2.63 100.00% u 335.00 351 Subir bloques 12'' por meseta 6to nivel 3.15 100.00% u 280.00 352 Subir bloques 12'' por polea 2do nivel 1.76 100.00% u 500.00 353 Subir bloques 12'' por polea 3er nivel 2.63 100.00% u 335.00 354 Subir bloques 12'' por polea 4to nivel 3.53 100.00% u 250.00 355 Subir bloques 12'' por polea 5to nivel 4.41 100.00% u 200.00 356 Subir bloques 12'' por polea 6to nivel 5.35 100.00% u 165.00 357 Subir fundas tipo cem. por polea 2do nivel 3.68 100.00% fda 240.00 358 Subir fundas tipo cem. por polea 3er nivel 5.88 100.00% fda 150.00 359 Subir fundas tipo cem. por polea 4to nivel 8.02 100.00% fda 110.00 360 Subir fundas tipo cem. por polea 5to nivel 10.38 100.00% fda 85.00 361 Subir fundas tipo cem. por polea 6to nivel 13.57 100.00% fda 65.00 362 Subir grava por meseta un nivel 74.00 100.00% m3 12.00 363 Subir grava por polea 2do nivel 110.00 100.00% m3 8.00 364 Subir grava por polea 3er nivel 176.00 100.00% m3 5.00 365 Subir grava por polea 4to nivel 221.00 100.00% m3 4.00 366 Subir grava por polea 5to nivel 294.00 100.00% m3 3.00 367 Subir grava por polea 6to nivel 401.00 100.00% m3 2.20 3

1016 M.O. ALBAÑILERIA (COLOC. ADICIONAL / PLANTA):1 Albañilería por cada piso (según unid de cada partida) 5.00% u

10171 Col. 2 tapas c/retalle >.02 hasta .10 m. 76.00 100.00% m 17.50 1 22 Col. 2 tapas c/retalle >.10 hasta .20 m. 85.00 100.00% m 15.56 1 23 Col. 2 tapas c/retalle >.20 hasta .30 m. 95.00 100.00% m 14.00 1 24 Col. Tapa y tapa >.20 hasta .30 m. ancho 47.00 100.00% m 28.00 1 25 Col. Tapa y tapa >.30 hasta .40 m. ancho 57.00 100.00% m 23.33 1 26 Col. Tapa y tapa >.40 hasta .50 m. ancho 66.00 100.00% m 20.00 1 2

10181 Col. .20x.20 hasta .30x.30 m. 57.00 100.00% m 23.33 1 22 Col. >.30x.30 hasta .40x.40 m. 66.00 100.00% m 20.00 1 23 Col. >.40x.40 hasta .50x.50 m. 76.00 100.00% m 17.50 1 24 Col. >.50x.50 hasta .60x.60 m. 95.00 100.00% m 14.00 1 25 Col. >.60x.60 hasta .70x.70 m. 114.00 100.00% m 11.67 1 26 Col. >.70x.70 hasta .80x.80 m. 133.00 100.00% m 10.00 1 27 Col. >.80x.80 hasta 1.00x1.00 m. 152.00 100.00% m 8.75 1 2

10191 Col. .20x.20 hasta .30x.30 m. 66.00 100.00% m 20.00 1 22 Col. >.30x.30 hasta .40x.40 m. 85.00 100.00% m 15.56 1 23 Col. >.40x.40 hasta .50x.50 m. 95.00 100.00% m 14.00 1 24 Col. >.50x.50 hasta .60x.60 m. 152.00 100.00% m 8.75 1 25 Col. >.60x.60 hasta .70x.70 m. 171.00 100.00% m 7.78 1 26 Col. >.70x.70 hasta .80x.80 m. 190.00 100.00% m 7.00 1 27 Col. >.80x.80 hasta 1.00x1.00 m. 228.00 100.00% m 5.83 1 2

10201 Col. cónica diám. >.50 m. 209.00 100.00% m 6.36 1 22 Col. cónica diám. hasta .50 m. 85.00 100.00% m 15.56 1 23 Col. redonda diám. >.50 m. 161.00 100.00% m 8.24 1 24 Col. redonda diám. hasta .50 m. 85.00 100.00% m 15.56 1 25 Col. cón. o red. adic. p/c .10 m. diám. > .50 m. 20.00% 100.00% m

10211 Columnas 9.50 100.00% m2 140.00 1 22 Arcos 11.40 100.00% m2 116.67 1 23 Dinteles 11.40 100.00% m2 116.67 1 24 Falso Piso, hasta 2.75 m. alt. 13.30 100.00% m2 100.00 1 25 Falso Piso, >2.75 m. alt., p/c m. adic. 2.80 100.00% m2 466.67 1 26 Vigas 11.40 100.00% m2 116.67 1 2

10221 Caballete asbesto 19.00 100.00% u 70.00 1 22 Caballete zinc 18.70 100.00% u 52.50 1 13 Plancha asb. cem. 3'x6', con enlatado 28.50 100.00% u 46.67 1 24 Plancha asb. cem. 3'x6', sin enlatado 22.80 100.00% u 58.33 1 25 Plancha asb. cem. 3'x8', con enlatado 32.30 100.00% u 41.18 1 26 Plancha asb. cem. 3'x8', sin enlatado 28.50 100.00% u 46.67 1 2

M.O. CARPINT., COL., TAPAS, CONF. E INST.:

M.O. CARPINT., COL. CUADRADAS O RECTANG., CONFECCION:

M.O. CARPINT., COL. CUADRADAS O RECTANG., INSTALACION:

M.O. CARPINT., COL. CONICAS Y REDONDAS, CONF. E INST. MOLDE:

M.O. CARPINT., DESENCOFRADOS (AREA CONTACTO FORRO-CONCRETO):

M.O. CARPINT., ESTRUCT. VARIAS, INST. (HASTA 4 M. ALTURA):

Page 29: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 22

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. MANO DE OBRANo. D E S C R I P C I O N P. UNIT. INDICE U. REND./DIA MA OP1 OP2 OP3 AY TC TNC

7 Plancha Sisal cemento, con enlatado 47.00 100.00% u 28.00 1 28 Plancha zinc, con enlatado 24.70 100.00% u 53.85 1 29 Plancha zinc, sin enlatado 15.20 100.00% u 87.50 1 2

10 Tijerilla atornillada p/c p2 madera utiliz., conf. e inst. 19.00 100.00% p2 70.00 1 211 Tijerilla clavada p/c p2 madera utiliz., conf. e inst. 11.40 100.00% p2 116.67 1 2

10231 Escalera, rampa lisa 854.00 100.00% u 1.56 1 22 Escalera, rampa otro tipo no especif. P. A. u 1 23 Falso piso >2.75 hasta 3.00 m. alto 66.00 100.00% m2 20.00 1 24 Falso piso >3.00 hasta 4.00 m. alto 76.00 100.00% m2 17.50 1 25 Falso piso >4.00 hasta 5.00 m. alto 85.00 100.00% m2 15.56 1 26 Falso piso >5.00 hasta 6.00 m. alto 95.00 100.00% m2 14.00 1 27 Falso piso 3 ó más aguas. 148.00 100.00% m2 8.97 1 28 Falso piso forma especial P. A. m2 1 29 Falso piso hasta 2.75 m. alto 57.00 100.00% m2 23.33 1 2

10 Vuelo .10 m. 19.00 100.00% m 70.00 1 211 Vuelo .20 m. 38.00 100.00% m 35.00 1 212 Vuelo .30 m. 57.00 100.00% m 23.33 1 213 Vuelo .40 m. 76.00 100.00% m 17.50 1 214 Vuelo .50 hasta .90 m. 95.00 100.00% m 14.00 1 215 Vuelo 1.00 m. en adelante = Falso piso 57.00 100.00% m2 23.33 1 216 Vuelo con ménsula P. A. 1 2

10241 Molde pref. múlt., transp. mecán., c/cara inst. 38.00 100.00% m2 35.00 1 22 Muro H.A. c/cara lisa, conf. 151.90 100.00% m2 8.75 1 23 Muro H.A. c/cara lisa, inst. 190.00 100.00% m2 7.00 1 2

10251 Arco hasta .2 fondo y hasta .3 m. radio, conf. e inst. 190.00 100.00% m2 7.00 1 22 Otros arcos P. A. 1 2

10261 Cielo raso de asbesto en cuadros 2'x2' 104.00 100.00% m2 12.73 1 22 Cielo raso de cartón acústico, encostillado 104.00 100.00% m2 12.73 1 23 Cielo raso de plywood en cuadros 2'x2' 95.00 100.00% m2 14.00 1 24 Cielo raso de plywood o cartón piedra 76.00 100.00% m2 17.50 1 25 Conf. Puerta biselada clavada 22.80 100.00% u 58.33 1 26 Conf. Puerta clavada 11.40 100.00% p2 116.67 1 27 Conf. Puerta en plumilla 22.80 100.00% p2 58.33 1 28 Conf. Puerta forrada en zinc 28.50 100.00% p2 46.67 1 29 División plywood decorativo P. A. m2 1 2

10 División plywood, 1 lado 66.50 100.00% m2 20.00 1 211 División plywood, 2 lados 95.00 100.00% m2 14.00 1 212 Forro closet, mad. preciosa P. A. m2 1 213 Forro paredes en mad. Preciosa c/relieves P. A. m2 1 214 Montar cerradura corriente 142.00 100.00% u 9.33 1 215 Montar cerradura especial P. A. u 1 216 Montar marco mad. corriente 22.80 100.00% u 58.33 1 217 Montar marco mad. preciosa 28.50 100.00% u 46.67 1 218 Montar marco metal 38.00 100.00% u 35.00 1 219 Montar puerta de plywood 190.00 100.00% u 7.00 1 220 Montar puerta en plumilla, con cáncamo 380.00 100.00% u 3.50 1 221 Montar puerta panelada corriente 237.00 100.00% u 5.60 1 222 Montar puerta pino 190.00 100.00% u 7.00 1 223 Montar puerta plegadiza, corredera 285.00 100.00% u 4.67 1 224 Montar puerta plegadiza, moldura o cubrefalta 380.00 100.00% u 3.50 1 225 Montar puerta vaivén 285.00 100.00% u 4.67 1 2

10271 Antepecho hasta .5 m.; cada .1 m. altura, conf. 19.00 100.00% m 70.00 1 22 Dintel >.2 hasta .4, 2 m. largo, conf. e inst. 133.00 100.00% m 10.00 1 23 Dintel >2 m. largo, conf. e inst. = Vigas m4 Dintel hasta .20, 2 m. largo, conf. e inst. 95.00 100.00% m 14.00 1 25 Viga invertida, c/.10 m. alto, conf. e inst. 28.50 100.00% m 46.67 1 26 Viga invertida, c/.10 m. fondo, conf. e inst. 14.20 100.00% m 93.33 1 27 Viga zap. >.4x.4 hasta .5x.5 m., conf. e inst. 47.00 100.00% m 28.00 1 28 Viga zap. >.5x.5 hasta .6x.6 m., conf. e inst. 57.00 100.00% m 23.33 1 29 Viga amarre .15ó.20 x.20 m. alto, conf. e inst. 57.00 100.00% m 23.33 1 2

10 Viga amarre .15ó.20 x.30 m. alto, conf. e inst. 66.00 100.00% m 20.00 1 211 Viga amarre .15ó.20 x.40 m. alto, conf. e inst. 76.00 100.00% m 17.50 1 212 Viga amarre .15ó.20 x.50 m. alto, conf. e inst. 85.00 100.00% m 15.55 1 213 Viga zap. Hasta .4x.4 m., conf. e inst. 38.00 100.00% m 35.00 1 214 Viga, c/.10 m. alto, apunt. >3.6, adic. c/m. conf. e inst. 20.00% 100.00% m15 Viga, c/.10 m. alto, apunt. hasta 3.6 m., conf. e inst. 19.00 100.00% m 70.00 1 216 Viga, c/.10 m. Fondo 14.20 100.00% m 93.33 1 2

1028 M.O. CARPINTERIA A TODO COSTO:1 Encof. y desenc. antepecho 95.00 100.00% m 28.00 2 42 Encof. y desenc. col. 40 hasta 50 cm. 251.00 100.00% m 10.61 2 43 Encof. y desenc. col. hasta 30x30 cm. 199.00 100.00% m 13.33 2 44 Encof. y desenc. col. y viga amarre 95.00 100.00% m 28.00 2 45 Encof. y desenc. dintel 0.20 ó .30, hasta 2.00 m. 106.00 100.00% m 25.00 2 46 Encof. y desenc. losa 3 ó más aguas 296.00 100.00% m2 8.97 2 47 Encof. y desenc. losa plana, hasta 2.75 m. alto 139.00 100.00% m2 19.18 2 48 Encof. y desenc. muro / cara 325.00 100.00% m2 8.19 2 49 Encof. y desenc. rampa escalera 1,709.00 100.00% rampa 1.56 2 4

M.O. CARPINT., LOSAS, CONF. E INST.:

M.O. CARPINT., MUROS, CONF. E INST. MOLDE:

M.O. CARPINT., OTROS, CONF. E INST. MOLDE:

M.O. CARPINT., TRABAJOS DE TERMINACION:

M.O. CARPINT., VIGAS Y DINTELES, CONF. E INST. MOLDE:

Page 30: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 23

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. MANO DE OBRANo. D E S C R I P C I O N P. UNIT. INDICE U. REND./DIA MA OP1 OP2 OP3 AY TC TNC

10 Encof. y desenc. viga 20x40, hasta 3.6 m. 184.00 100.00% m 14.43 2 411 Encof. y desenc. viga 30x50, hasta 3.6 m. 245.00 100.00% m 10.85 2 412 Encof. y desenc. viga 30x60, hasta 3.6 m. 273.00 100.00% m 9.72 2 413 Encof. y desenc. viga 40x80, hasta 3.6 m. 363.00 100.00% m 7.33 2 4

1029Tel. 1-200-2989, 578-0100. Fax: 5788-9488. E-Mail: [email protected]

1 Andamios 36.90 100.00% m2 72.00 2 42 Arco P. A. u 2 43 Cisterna (mínimo 10.00 m2) 1,631.00 100.00% u 1.63 2 44 Columna hasta .30 m., c/cara 50.80 100.00% m 52.30 2 45 Columna >.30 m., adic. c/cara por c/.1 hasta .8 m., >.8=muro 23.10 100.00% m 115.00 2 46 Columna cilíndrica .20 m. diám., c/ coloc. molde 508.00 100.00% molde 5.23 2 47 Columna cilíndrica .30 m. diám., c/ coloc. molde 647.00 100.00% molde 4.11 2 48 Columna cilíndrica .40 m. diám. 462.00 100.00% m 5.75 2 49 Corniza en losa, c/cara 71.00 100.00% m 37.40 2 4

10 Dintel hasta .20 x .20 m. 120.00 100.00% m 22.15 2 411 Escalera (rampa) P. A. rampa 2 412 Guardera en losa 46.10 100.00% m 57.60 2 413 Guardera en platea hasta .20 m. 55.40 100.00% m 48.00 2 414 Losa inclinada 1 dirección, hasta 3 m. alt. 140.00 100.00% m2 18.95 2 415 Losa inclinada 2 direcciones, hasta 3 m. alt. 152.00 100.00% m2 17.45 2 416 Losa inclinada 3 direcciones, hasta 3 m. alt. 173.00 100.00% m2 15.40 2 417 Losa inclinada >3 direcciones, hasta 3 m. alt. 277.00 100.00% m2 9.60 2 418 Losa plana hasta 2.60 m. alt. 120.00 100.00% m2 22.15 2 419 Losa plana > 2.60 m. hasta 3 m. alt. 132.00 100.00% m2 20.14 2 420 Losa > 3 m. alt., adic. por c/.50 m. alt. Hasta 6.00 m. 17.50 100.00% m2 151.58 2 421 Muro trancado o atornillado c/cara 415.00 100.00% m2 6.40 2 422 Pérgola hasta .20 x .40 m. 185.00 100.00% m 14.40 2 423 Viga de amarre hasta .30 m. 106.00 100.00% m 25.04 2 424 Viga hasta .20 ancho x hasta .40 alt. 173.00 100.00% m 15.40 2 425 Viga hasta .20 x >.40 alt., adic. c/cm hasta .8 m. >.8=muro 5.50 100.00% m 480.00 2 426 Viga >.20 ancho, adic. c/cm hasta .50 m., >.5=muro 5.50 100.00% m 480.00 2 427 Viga inv. hasta .20 x hasta .40 alt. 173.00 100.00% m 15.40 2 428 Viga inv. hasta .20 x >.40 alt., adic. c/cm hasta .8 m. 5.50 100.00% m 480.00 2 429 Viga inv. >.20 ancho, adic. c/cm hasta .50 m., >.5=muro 5.50 100.00% m 480.00 2 430 Viga sobre muro hasta .30 m. 120.00 100.00% m 22.15 2 431 Viga sobre muro >.30 m. Hasta .50 m. 152.00 100.00% m 17.45 2 432 Vuelo plano hasta 2.60 m. alt. 120.00 100.00% m 22.15 2 433 Vuelo inclinado losa 1 dirección, hasta 3 m. alt. 140.00 100.00% m 18.95 2 434 Vuelo inclinado losa 2 direcciones, hasta 3 m. alt. 152.00 100.00% m 17.45 2 435 Vuelo inclinado losa 3 direcciones, hasta 3 m. alt. 173.00 100.00% m 15.40 2 436 Vuelo inclinado losa >3 direcciones, hasta 3 m. alt. 277.00 100.00% m 9.60 2 437 Vuelo >3 m. alt., adic. c/0.50 m. hasta 6.00 m. alt. 17.50 100.00% m 151.58 2 438 Precios 2do. Nivel en adelante (incremento sobre el p. u.) 15.00 100.00% p. u.

1030 M.O. DEMOLICIONES:1 Cimientos de horm. armado 588.00 100.00% m3 0.50 12 Cimientos de piedra 196.00 100.00% m3 1.50 13 Cimientos viejos de horm. simple 346.00 100.00% m3 0.85 14 Muros de horm. armado 588.00 100.00% m3 0.50 15 Muros de piedra 168.00 100.00% m3 1.75 16 Muros de tapia 74.00 100.00% m3 4.00 17 Techo de tejas 29.40 100.00% m2 10.00 18 Techo horm. armado con mallas 74.00 100.00% m2 4.00 19 Techo horm. armado con varillas 147.00 100.00% m2 2.00 1

*Acero recuperable: 0.50 quintal por cada metro cúbico

1031 M.O. EBANISTERIA:1 Aplicar laca, todo costo (2 caras) 1,049.00 100.00% m2 1.40 1 1 12 Montar puerta, marco y llavín 735.00 100.00% u 2.00 1 1 1

1032 M.O. ELECTRICIDAD:1 Botón timbre 244.00 100.00% u 5.91 1 1 12 Interruptor piloto 300.00 100.00% u 4.81 1 1 13 Interruptor 1 244.00 100.00% u 5.91 1 1 14 Interruptor 2 300.00 100.00% u 4.81 1 1 15 Interruptor 3 333.00 100.00% u 4.33 1 1 16 Interruptor 3 vías 300.00 100.00% u 4.81 1 1 17 Interruptor 4 vías 366.00 100.00% u 3.94 1 1 18 Interruptor seg. 30 a 281.00 100.00% u 5.14 1 1 19 Interruptor seg. 60 a 481.00 100.00% u 3.00 1 1 1

10 Interruptor seg. 100 a 601.00 100.00% u 2.40 1 1 111 Luces 244.00 100.00% u 5.91 1 1 112 Paneles distribución 481.00 100.00% u 3.00 1 1 113 Timbre corriente 244.00 100.00% u 5.91 1 1 114 Tomacorriente 110 v 244.00 100.00% u 5.91 1 1 115 Tomacorriente 220 v 281.00 100.00% u 5.14 1 1 1

1033 M.O. ELECTRICIDAD (SALIDAS TIPO ECONOMICO EN TUB.):1 Salida sin tub. exteriormente visible 111.00 100.00% u 13.00 1 1 12 Salida sin tub. oculta en plafón, cielo raso, etc. 166.00 100.00% u 8.67 1 1 1

1034 M.O. ELECTRICIDAD (CONEXIÓN APARATOS):1 Aire acond. Hasta 2 hp (montura sin materiales) 665.00 100.00% u 2.17 1 1 12 Breakers, instalación 56.00 100.00% u 26.00 1 1 13 Calentador 110 v sin estar provisto un plot y cordón 222.00 100.00% u 6.50 1 1 14 Calentador 220 v sin estar provisto un plot y cordón 333.00 100.00% u 4.33 1 1 1

M.O. CARPINTERIA A TODO COSTO: (CARLOS MARTE ENCOFRADOS)

Page 31: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 24

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. MANO DE OBRANo. D E S C R I P C I O N P. UNIT. INDICE U. REND./DIA MA OP1 OP2 OP3 AY TC TNC

5 Estufa 220 v. 333.00 100.00% u 4.33 1 1 16 Extractor de aire 110 v. 222.00 100.00% u 6.50 1 1 17 Moledor de desperdicios 110 v. 222.00 100.00% u 6.50 1 1 18 Regulador de intensidad (dimmer) 177.00 100.00% u 8.13 1 1 19 Timbre campana de 4 notas 333.00 100.00% u 4.33 1 1 1

1035 M.O. EXCAVACIONES Y CORTES CON EQUIPO:1 Corte con PALA MECANICA en tierra 37.00 100.00% m32 Exc. Caliche a mano 3.00 m. prof. 273.00 100.00% m3 0.98 13 Exc. Caliche a mano 3.01 - 5.00 m. prof. 301.00 100.00% m3 0.89 14 Exc. Caliche a mano 5.01 - 7.00 m. prof. 331.00 100.00% m3 0.81 15 Exc. Horm. armado, 3.00 m. prof. 696.00 100.00% m3 0.77 26 Exc. Roca blanda a mano 3.00 m. prof. 439.00 100.00% m3 0.61 17 Exc. Roca blanda a mano 3.01 - 5.00 m. prof. 462.00 100.00% m3 0.58 18 Exc. Roca blanda a mano 5.01 - 7.00 m. prof. 506.00 100.00% m3 0.53 19 Exc. Roca compresor 3.00 m. prof. 575.00 100.00% m3

10 Exc. Roca compresor 3.01 - 5.00 m. prof. 632.00 100.00% m311 Exc. Roca compresor 5.01 - 7.00 m. prof. 690.00 100.00% m312 Exc. Roca dura a mano 3.00 m. prof. 558.00 100.00% m3 0.48 113 Exc. Roca dura a mano 3.01 - 5.00 m. prof. 583.00 100.00% m3 0.46 114 Exc. Roca dura a mano 5.01 - 7.00 m. prof. 623.00 100.00% m3 0.43 115 Exc. Roca tosca a mano 3.00 m. prof. 377.00 100.00% m3 0.71 116 Exc. Roca tosca a mano 3.01 - 5.00 m. prof. 400.00 100.00% m3 0.67 117 Exc. Roca tosca a mano 5.01 - 7.00 m. prof. 432.00 100.00% m3 0.62 118 Exc. Tierra a mano 3.00 m. prof. 169.00 100.00% m3 1.59 119 Exc. Tierra a mano 3.01 - 5.00 m. prof. 189.00 100.00% m3 1.42 120 Exc. Tierra a mano 5.01 - 7.00 m. prof. 206.00 100.00% m3 1.30 1

1036 M.O. MALLA CICLONICA (ZABALETAS, TUBOS, MALLA, PALOMETAS Y ALAMBRE DE PUAS):1 Coloc. malla ciclónica 3' 152.00 100.00% m 10.00 1 1 22 Coloc. malla ciclónica 4' 169.00 100.00% m 9.00 1 1 23 Coloc. malla ciclónica 6' 179.00 100.00% m 8.50 1 1 24 Coloc. malla ciclónica 7' 188.00 100.00% m 8.10 1 1 25 Coloc. malla ciclónica 10' 196.00 100.00% m 7.76 1 1 2

1037 M.O. PINTURA:1 Barniz, 1ra. mano 11.90 100.00% m2 99.08 1 12 Barniz, 2da. mano 11.90 100.00% m2 99.08 1 13 Cal y Carburo, 1ra. mano 6.40 100.00% m2 184.00 1 14 Cal y Carburo, 2da. mano 4.60 100.00% m2 257.60 1 15 Cornisa 14.60 100.00% m 80.50 1 16 De agua, 1ra. mano, p. LISA, masilla, lija y piedra 10.90 100.00% m2 107.33 1 17 De agua, 2da. mano, pared LISA 7.30 100.00% m2 161.00 1 18 De agua, 2 manos, p. LISA, masilla, lija, piedra 18.20 100.00% m2 64.40 1 19 De agua, 1ra. mano, pared RUSTICA 18.20 100.00% m2 64.40 1 1

10 De agua, 2da. mano, pared RUSTICA 15.50 100.00% m2 75.76 1 111 De agua, 2 manos, pared RUSTICA 33.80 100.00% m2 34.81 1 112 Imperm., 1ra. Mano, limpieza y sellar grietas 12.80 100.00% m2 92.00 1 113 Impermeabilizante, 2da. mano 7.30 100.00% m2 161.00 1 114 Mant., 1ra. mano, p. LISA, masilla, lija sin piedra 11.90 100.00% m2 99.08 1 115 Mant., 2da. mano, pared LISA, sin piedra 10.90 100.00% m2 107.33 1 116 Mant., 2 manos, p. LISA, masilla, lija sin piedra 22.80 100.00% m2 51.52 1 117 Oxido de Zinc, 1ra. mano 9.10 100.00% m2 128.80 1 118 Oxido de Zinc, 2da. mano 6.40 100.00% m2 184.00 1 119 Piedra sobre paredes 3.70 100.00% m2 94.50 120 Rapilla total y/o parcial 14.60 100.00% m2 23.63 121 Volutas en ventanas y en muros 12.80 100.00% m 92.00 1 1

1038 M.O. PLOMERIA (ARRASTRE DOMIC., FUERA C. BAÑO):1 Arrastre en tub. 2'' 7.30 100.00% m 160.00 1 12 Arrastre en tub. 3'' ó 4'' 11.20 100.00% m 105.00 1 13 Arrastre en tub. 5'' ó 6'' 17.00 100.00% m 69.00 1 1

1039 M.O. PLOMERIA (AUMENTO POR PLANTA EN EDIFICIOS):1 Valor adic. 2da planta 10.00% u2 Valor adic. 3ra planta 15.00% u3 Valor adic. 4ta planta 20.00% u4 Valor adic. 5ta planta 25.00% u5 Valor adic. 6ta planta 30.00% u6 Valor adic. 7ma. planta y siguientes / piso 35.00% u

1040 M.O. PLOMERIA (BAJANTE O VENTILACION / PLANTA):1 Baj. o vent. 2'' 181.00 100.00% u 6.50 1 12 Baj. o vent. 3'' ó 4'' 261.00 100.00% u 4.50 1 13 Baj. o vent. 6'' 336.00 100.00% u 3.50 1 1

1041 M.O. PLOMERIA (BOMBA AGUA, INST. CIRCUITO COMPLETO):1 Circuito tub. ½'' ó ¾'' 2,938.00 100.00% u 0.40 1 12 Circuito tub. 1'' ó 1 ¼'' 3,917.00 100.00% u 0.30 1 13 Circuito tub. 1 ½'' ó 2'' 5,875.00 100.00% u 0.20 1 1

1042 M.O. PLOMERIA (BOMBA AGUA, SIN EL CIRCUITO):1 En tub. ½'' ó ¾'' 1,469.00 100.00% u 0.80 1 12 En tub. 1'' ó 1 ¼'' 2,136.00 100.00% u 0.55 1 13 En tub. 1 ½'' ó 2'' 2,938.00 100.00% u 0.40 1 1

1043 M.O. PLOMERIA (CALENTADOR DE AGUA EXCLUSIV.):1 Inst. calent. eléct. 6-12 gl. 883.00 100.00% u 1.33 1 1

Page 32: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 25

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. MANO DE OBRANo. D E S C R I P C I O N P. UNIT. INDICE U. REND./DIA MA OP1 OP2 OP3 AY TC TNC

2 Inst. calent. eléct. 18-50 gl. 1,031.00 100.00% u 1.14 1 13 Inst. calent.gas 1,175.00 100.00% u 1.00 1 1

1044 M.O. PLOMERIA (COL. ABASTECER AGUA, POR PLANTA):1 Tub. h.g. ½'' ó ¾'' 181.00 100.00% u 6.50 1 12 Tub. h.g. 1'' ó 1 ¼'' 206.00 100.00% u 5.70 1 13 Tub. h.g. 1 ½'' ó 2'' 235.00 100.00% u 5.00 1 1

1045 M.O. PLOMERIA (COL. DESAGÜE PLUVIAL, POR PLANTA):1 Desagüe pluvial 2'' 181.00 100.00% u 6.50 1 12 Desagüe pluvial 3'' ó 4'' 196.00 100.00% u 6.00 1 13 Desagüe pluvial 5'' ó 6'' 261.00 100.00% u 4.50 1 1

1046 M.O. PLOMERIA (CONEXION AL SEPTICO Y FILTRANTE):1 Séptico 1 cám. y filt., tub. 4'' 1,175.00 100.00% u 1.00 1 12 Séptico 1 cám. y filt., tub. 5'' 1,306.00 100.00% u 0.90 1 13 Séptico 1 cám. y filt., tub. 6'' 1,469.00 100.00% u 0.80 1 14 Séptico 1 cám. y filt., tub. 8'' 1,679.00 100.00% u 0.70 1 15 Séptico 2 cám.s y filt., tub. 4'' 1,469.00 100.00% u 0.80 1 16 Séptico 2 cám.s y filt., tub. 5'' 1,567.00 100.00% u 0.75 1 17 Séptico 2 cám.s y filt., tub. 6'' 1,679.00 100.00% u 0.70 1 18 Séptico 2 cám.s y filt., tub. 8'' 1,958.00 100.00% u 0.60 1 19 Conexión cloaca 588.00 100.00% u 2.00 1 1

1047 M.O. PLOMERIA (DESAGÜE APARATOS, POR SALIDA):1 Desagüe 2'' 206.00 100.00% u 5.70 1 12 Desagüe 3'' y 4'' 235.00 100.00% u 5.00 1 13 Desagüe inodoro de pared 247.00 100.00% u 4.75 1 14 Desagüe piso 2'', con parrilla 247.00 100.00% u 4.75 1 15 Desagüe piso 3'' y 4'', con parrilla 294.00 100.00% u 4.00 1 1

1048 M.O. PLOMERIA (DESMONTAR APARATOS):1 Desmontar cualquier aparato 50.00% u

1049 M.O. PLOMERIA (EMPALME A TUB. AGUA EXIST.):1 Empalme a tub. ½'' ó ¾'' 276.00 100.00% u 4.25 1 12 Empalme a tub. 1'' 313.00 100.00% u 3.75 1 13 Empalme a tub. 1 ¼'' 336.00 100.00% u 3.50 1 14 Empalme a tub. 1 ½'' 362.00 100.00% u 3.25 1 15 Empalme a tub. 2'' 392.00 100.00% u 3.00 1 1

1050 M.O. PLOMERIA (EMPALME A TUB. DRENAJE EXIST.):1 Empalme a tub. 2'' 235.00 100.00% u 5.00 1 12 Empalme a tub. 3'' 294.00 100.00% u 4.00 1 13 Empalme a tub. 4'' 353.00 100.00% u 3.33 1 14 Empalme a tub. 6'' 427.00 100.00% u 2.75 1 1

1051 M.O. PLOMERIA (INST. LLAVES PASO Y CHORRO):1 Llave de chorro ½'' ó ¾'' 147.00 100.00% u 8.00 1 12 Llave de paso ½'' ó ¾'' 147.00 100.00% u 8.00 1 13 Llave de paso 1'' ó 1 ¼'' 181.00 100.00% u 6.50 1 14 Llave de paso 1 ½'' ó 2'' 235.00 100.00% u 5.00 1 1

1052 M.O. PLOMERIA (INST. NEVERAS, BEBEDEROS Y FILTROS):1 Bebedero de animales 235.00 100.00% u 5.00 1 12 Filtro doméstico 313.00 100.00% u 3.75 1 13 Nevera de pie, de tomar agua 336.00 100.00% u 3.50 1 1

1053 M.O. PLOMERIA (INST. TRAMPA GRASA Y CAMARA INSP.):1 Cámara insp., tub. 2'' 181.00 100.00% u 6.50 1 12 Cámara insp., tub. 3'' y 4'' 235.00 100.00% u 5.00 1 13 Cámara insp. tub. 5'' y 6'' 261.00 100.00% u 4.50 1 14 Trampa de grasa 1 cámara 267.00 100.00% u 4.40 1 15 Trampa de grasa 2 cámaras 294.00 100.00% u 4.00 1 1

*Para + de 2 entradas, 20% adic. por entrada extra

1054 M.O. PLOMERIA (INSTALACION LAVADORAS):1 Lavadora automát., doméstica 336.00 100.00% u 3.50 1 1

1055 M.O. PLOMERIA (MONTAR BAÑERAS Y DUCHAS):1 Bañera esp. de hierro, tipo ''Romano'' 1,124.00 100.00% u 2.00 1 1 42 Bañera liviana 588.00 100.00% u 2.00 1 13 Bañera pesada de hierro 899.00 100.00% u 2.50 1 1 44 Ducha tipo teléfono 118.00 100.00% u 10.00 1 15 Llave empotrada para ducha 196.00 100.00% u 6.00 1 16 Mezcladora de baño 392.00 100.00% u 3.00 1 17 Terminación de baño 118.00 100.00% u 10.00 1 1

1056 M.O. PLOMERIA (MONTAR FREGADEROS):1 Fregadero acero inox. 1 cámara 442.00 100.00% u 2.66 1 12 Fregadero acero inox., 2 cámaras 511.00 100.00% u 2.30 1 13 Fregadero corriente 250.00 100.00% u 4.70 1 14 Trituradora de huesos 588.00 100.00% u 2.00 1 1

1057 M.O. PLOMERIA (MONTAR INODOROS):1 Inodoro dos cuerpos 470.00 100.00% u 2.50 1 12 Inodoro especial, 1 cuerpo o pieza 783.00 100.00% u 1.50 1 13 Inodoro especial, pared 810.00 100.00% u 1.45 1 1

Page 33: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 26

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. MANO DE OBRANo. D E S C R I P C I O N P. UNIT. INDICE U. REND./DIA MA OP1 OP2 OP3 AY TC TNC

4 Inodoro fluxómetro o automát. 522.00 100.00% u 2.25 1 1

1058 M.O. PLOMERIA (MONTAR LAVAMANOS Y BIDET):1 Bidet 470.00 100.00% u 2.50 1 12 Lavamanos clínico (unidad conjunto) 940.00 100.00% u 1.25 1 13 Lavamanos con patas 522.00 100.00% u 2.25 1 14 Lavamanos empotrado 588.00 100.00% u 2.00 1 15 Lavamanos pedestal 588.00 100.00% u 2.00 1 16 Lavamanos salón de belleza 632.00 100.00% u 1.86 1 17 Lavamanos sin patas 470.00 100.00% u 2.50 1 1

1059 M.O. PLOMERIA (MONTAR ORINALES):1 Orinal ½ falda 470.00 100.00% u 2.50 1 12 Orinal de cemento (terminación) 235.00 100.00% u 5.00 1 13 Orinal falda completa 588.00 100.00% u 2.00 1 14 Orinal sencillo 352.00 100.00% u 3.34 1 1

1060 M.O. PLOMERIA (SALIDAS DE AGUA APARATOS SANIT.):1 Salida de agua tub. ½'' ó ¾'' 294.00 100.00% u 4.00 1 12 Salida de agua tub. 1'' 336.00 100.00% u 3.50 1 13 Salida de agua tub. 1 ¼'' 367.00 100.00% u 3.20 1 14 Salida de agua tub. 1 ½'' 412.00 100.00% u 2.85 1 15 Salida de agua tub. 2'' 435.00 100.00% u 2.70 1 1

Nota: Salida agua colgante, pagar 35% del costo establecido

1061 M.O. PLOMERIA (TERM. LAVADEROS Y VERTEDEROS):1 Lavadero 1 cámara 181.00 100.00% u 6.50 1 12 Lavadero 2 cámaras 235.00 100.00% u 5.00 1 13 Vertedero de hierro 392.00 100.00% u 3.00 1 14 Vertedero cemento o granito (terminación) 181.00 100.00% u 6.50 1 1

1062 M.O. PLOMERIA (TUB. AGUA POTABLE, FUERA C. BAÑO):1 Tub galv. ½'' ó ¾'' 11.80 100.00% m 100.00 1 12 Tub galv. 1'' ó 1 ¼'' 15.50 100.00% m 76.00 1 13 Tub galv. 1 ½'' ó 2'' 19.30 100.00% m 61.00 1 1

1063 M.O. PULIMENTO Y BRILLADO PISOS, TODO COSTO: (Agregar ITBIS)1 Cristalizado pisos (40 m2 mínimo) 58.00 100.00% m2 20.41 1 12 Limpieza escalón 47.00 100.00% m 25.00 1 13 Limpieza zócalos 33.00 100.00% m 35.89 1 14 Limpieza, sal y cera 66.00 100.00% m2 17.86 1 15 Pulimento básico 106.00 100.00% m2 11.11 1 16 Pulimento escalón 127.00 100.00% m 9.26 1 17 Pulimento mesetas 116.00 100.00% m2 10.09 1 18 Pulimento Super Chapa 141.00 100.00% m2 8.33 1 19 Pulimento y cristalizado 163.00 100.00% m2 7.19 1 1

10 Pulimento y reparación piso viejo 176.00 100.00% m2 6.67 1 1

1064 M.O. VACIADOS:1 Vaciado y ligado a mano (Ver análisis) 405.65 100.00% m32 Vaciado y ligado con ligadora (Ver análisis) 258.93 100.74% m3

1065 M.O. VARILLEROS:1 Coloc. acero ¼'' en piso o losa 230.00 100.00% qq 6.389 1 1 12 Coloc. acero alta resistencia 230.00 100.00% qq 7.889 1 2 13 Coloc. acero col. 3/8" ó ½", hasta 6 de ½" 51.00 100.00% m 28.750 1 1 14 Coloc. acero col. Redonda 6 de ½" hasta 4 de ¾" 77.00 100.00% m 19.167 1 1 15 Coloc. acero dintel y v. Amarre hasta .20x.40 y ½" ó 3/8" 51.00 100.00% m 28.750 1 1 16 Coloc. Acero fuera ciudad (30 km. o más) (25% adic.) 25.00% 100.00%7 Coloc. acero losa con Lima Hoya o Lima Tesa (50% adic.) 230.00 100.00% qq 7.889 1 2 18 Coloc. acero malla electrosoldada 230.00 100.00% qq 6.389 1 1 19 Coloc. acero normal 153.00 100.00% qq 9.583 1 1 1

10 Coloc. acero rampa escalera corriente 1,512.00 100.00% rampa 1.200 1 2 111 Coloc. acero viga 6 de ½" ó ¾", 2 de 1" y 2 de ¾", 25x40 51.00 100.00% m 35.500 1 2 112 Coloc. acero viga postens. Y pórticos en col. 243.00 100.00% qq 7.470 1 2 113 Coloc. acero zapata de muros 51.00 100.00% m 28.750 1 1 114 Subir acero techo 2do. Nivel (10%) 15.30 100.00% qq 70.000 415 Subir acero techo 3er. Nivel (15%) 22.95 100.00% qq 46.667 416 Subir acero techo 4to. Nivel (20%) 30.60 100.00% qq 35.000 417 Subir acero techo 5to. Nivel (25%) 38.25 100.00% qq 28.000 418 Subir acero techo 6to. Nivel (30%) 45.90 100.00% qq 23.333 419 Trasladar acero distancia > 10 m. (10% adicional) 10.00% 100.00% qq

1066 M.O. VENTANAS (INSTALACION): (Agregar ITBIS)1 Instalación ventana alum., altura normal 4.50 100.00% p2 100.00 12 Instalación ventana alum. con escalera o andamio 5.50 100.00% p2 83.00 1

1067 M.O. YESO (A TODO COSTO):1 Capitel (anillo en columna) 1,351.00 100.00% u 2.27 1 1 1 1 1 12 Cornisa 180.00 100.00% m 17.00 1 1 1 1 1 13 Panderetas 1,128.00 100.00% m2 2.72 1 1 1 1 1 14 Plafón (directo sobre techo horm.) 180.00 100.00% m2 17.00 1 1 1 1 1 15 Plafón en láminas 1,128.00 100.00% m2 2.72 1 1 1 1 1 16 Rosetas 16'' 226.00 100.00% u 13.60 1 1 1 1 1 17 Rosetas 24'' 338.00 100.00% u 9.07 1 1 1 1 1 1

Page 34: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 27

MANO DE OBRAENE. 2006

4,377.00

345.002,189.00

830.00639.00511.00448.00294.00268.00

9.207.207.708.508.50

15.8013.1017.0046.7017.301.00

107.0026.80P. A.14.60

142.0087.0078.00

128.0062.0075.0067.00

107.0027.4080.00

117.00P. A.50.309.30

61.9053.70

117.00160.00128.00

35.90128.00

36.6062.0017.5022.1013.9046.70P. A.

426.00113.00

37.30133.00

53.5032.9019.0028.50

36.60156.00187.00178.00217.00164.00196.00203.00233.00

42.4091.0098.0098.00

116.00122.00122.00106.00

Page 35: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 28

MANO DE OBRAENE. 2006

106.00137.00224.00259.00

85.00116.00116.00

85.0085.0091.0098.00

116.0059.0079.0083.0059.0079.0051.0070.00P. A.85.00

102.0031.1054.9072.0042.40

239.00250.00307.00101.00133.00117.00196.00

98.0059.60

373.00311.00178.00187.00217.00

P. A.P. A.P. A.

1,435.001,244.00

156.00178.00233.00196.00267.00179.00311.00267.00117.00233.00406.00117.00133.00144.00

21.20

93.00133.00373.00104.00933.00622.00

93.00156.00

P. A.4.705.904.403.304.90

267.00233.00

267.00

Page 36: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 29

MANO DE OBRAENE. 2006

982.00343.00

91.00

242.00

Page 37: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 30

MANO DE OBRAENE. 2006

233.00373.00311.00373.00287.00434.00718.00467.00

618.00

618.00223.00426.00

710.00

P. A.290.00754.00

P. A.618.00

70.0048.00

119.0078.00

134.0081.00

537.00644.00

1,073.001,201.00

537.001,432.00

716.00P. A.

85.00128.00160.00

1.030.690.510.342.561.381.030.69

358.00

55.0088.00

126.00176.00221.00294.00

0.490.590.780.981.180.801.361.762.522.940.590.881.181.471.760.981.471.962.713.210.741.101.471.842.21

Page 38: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 31

MANO DE OBRAENE. 2006

1.241.862.483.093.750.881.331.762.212.631.472.212.943.684.411.041.602.132.633.151.762.633.534.415.353.685.888.02

10.3813.5774.00

110.00176.00221.00294.00401.00

5.00%

76.0085.0095.0047.0057.0066.00

57.0066.0076.0095.00

114.00133.00152.00

66.0085.0095.00

152.00171.00190.00228.00

209.0085.00

161.0085.00

20.00%

9.5011.4011.4013.302.80

11.40

19.0018.7028.5022.8032.3028.50

Page 39: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 32

MANO DE OBRAENE. 2006

47.0024.7015.2019.0011.40

854.00P. A.66.0076.0085.0095.00

148.00P. A.57.0019.0038.0057.0076.0095.0057.00P. A.

38.00151.90190.00

190.00P. A.

104.00104.00

95.0076.0022.8011.4022.8028.50P. A.66.5095.00P. A.P. A.

142.00P. A.22.8028.5038.00

190.00380.00237.00190.00285.00380.00285.00

19.00133.00

95.0028.5014.2047.0057.0057.0066.0076.0085.0038.00

20.00%19.0014.20

95.00251.00199.00

95.00106.00296.00139.00325.00

1,709.00

Page 40: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 33

MANO DE OBRAENE. 2006

184.00245.00273.00363.00

36.90P. A.

1,631.0050.8023.10

508.00647.00462.00

71.00120.00

P. A.46.1055.40

140.00152.00173.00277.00120.00132.00

17.50415.00185.00106.00173.00

5.505.50

173.005.505.50

120.00152.00120.00140.00152.00173.00277.00

17.5015.00

588.00196.00346.00588.00168.00

74.0029.4074.00

147.00

1,049.00735.00

244.00300.00244.00300.00333.00300.00366.00281.00481.00601.00244.00481.00244.00244.00281.00

111.00166.00

665.0056.00

222.00333.00

Page 41: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 34

MANO DE OBRAENE. 2006

333.00222.00222.00177.00333.00

37.00273.00301.00331.00696.00439.00462.00506.00575.00632.00690.00558.00583.00623.00377.00400.00432.00169.00189.00206.00

152.00169.00179.00188.00196.00

11.9011.906.404.60

14.6010.907.30

18.2018.2015.5033.8012.807.30

11.9010.9022.809.106.403.70

14.6012.80

7.3011.2017.00

10.00%15.00%20.00%25.00%30.00%35.00%

181.00261.00336.00

2,938.003,917.005,875.00

1,469.002,136.002,938.00

883.00

Page 42: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 35

MANO DE OBRAENE. 2006

1,031.001,175.00

181.00206.00235.00

181.00196.00261.00

1,175.001,306.001,469.001,679.001,469.001,567.001,679.001,958.00

588.00

206.00235.00247.00247.00294.00

50.00%

276.00313.00336.00362.00392.00

235.00294.00353.00427.00

147.00147.00181.00235.00

235.00313.00336.00

181.00235.00261.00267.00294.00

336.00

1,124.00588.00899.00118.00196.00392.00118.00

442.00511.00250.00588.00

470.00783.00810.00

Page 43: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 36

MANO DE OBRAENE. 2006

522.00

470.00940.00522.00588.00588.00632.00470.00

470.00235.00588.00352.00

294.00336.00367.00412.00435.00

181.00235.00392.00181.00

11.8015.5019.30

58.0047.0033.0066.00

106.00127.00116.00141.00163.00176.00

405.65257.04

230.00230.00

51.0077.0051.00

25.00%230.00230.00153.00

1,512.0051.00

243.0051.0015.3022.9530.6038.2545.90

10.00%

4.505.50

1,351.00180.00

1,128.00180.00

1,128.00226.00338.00

Page 44: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 26

FEBRERO 2006No.

10000

10100

1010112

1010212

1010312

1010412

1010512

1010612

1010712

1010812

1010912

10110

Page 45: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 27

FEBRERO 2006No.

12

1011112

1011212

1011312

10200

1020112345678

1020212345678

1020312

Page 46: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 28

FEBRERO 2006No.

345678

Page 47: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 29

FEBRERO 2006No.

10300

10301123456789

10302123456789

10303123456789

1030412345

Page 48: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 30

FEBRERO 2006No.

6789

10305123456789

10306123456789

10307123456789

1030812

Page 49: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 31

FEBRERO 2006No.

3456789

10309123456789

10310123456789

10311123456789

Page 50: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 32

FEBRERO 2006No.

10312123456789

10313123456789

1031412345678

10315123

10316123

Page 51: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 33

FEBRERO 2006No.

10317123

10400

10401

a)b)c)d)e)123456789

10111213141516

10402

a)b)c)d)e)

Page 52: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 34

FEBRERO 2006No.

f)g)h)i)j)k)l)

m)n)ñ)o)p)123456789

10111213141516

10500

12345

Page 53: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 35

FEBRERO 2006No.

67

10600

1060112345

1060212345

10700

1070112

10702123

1070312

10704123

Page 54: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 36

FEBRERO 2006No.

1070512345

10706123

1070712345

10708123456

10709123456

1071012345

Page 55: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 37

FEBRERO 2006No.

6

1071112345

10712123456

10713123

10714123

10715123

10716123

Page 56: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 38

FEBRERO 2006No.

10800

108011234

108021234

108031234

108041234

108051234

108061234

1080512

Page 57: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 39

FEBRERO 2006No.

34

108061234

108071234

108081234

108091234

10900

10901123456789

10

Page 58: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 40

FEBRERO 2006No.

1090212

1090312

Page 59: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 41

FEBRERO 2006No.

1090412

11000

11001123456789

1011

1100212

11003123

1100412

110051234567

Page 60: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 42

FEBRERO 2006No.

89

1011

1100612

11007123456789

109

1100812

11009123456789

1011

110101

Page 61: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 43

FEBRERO 2006No.

2

11011123456789

101112

1101212

11013123456789

101112

1101412

1101512

Page 62: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 44

FEBRERO 2006No.

3456789

1011

1101612

11017123456789

1011

11018123

11019123

11020123

Page 63: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 45

FEBRERO 2006No.

11021123456789

1011

11022123

Page 64: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 46

FEBRERO 2006No.

11023123456789

1011

11024123

11025123

11026123

1102712

Page 65: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 47

FEBRERO 2006No.

34

11028123

110291233

11030123

11031123456789

1011

11032123

11033123

Page 66: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 48

FEBRERO 2006No.

4

11034123

11035123456789

101112

11036123

110371234

11038123

11039123

Page 67: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 49

FEBRERO 2006No.

45

11040123

1104112333

11042123

11043123456789

101112

11044123

110451

Page 68: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 50

FEBRERO 2006No.

2345

11046123

11047123456789

1011

11048123

110491234

11050123

110511

Page 69: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 51

FEBRERO 2006No.

23456789

1011

11052123

110531234

11054123

11055123456789

1011

11056

Page 70: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 52

FEBRERO 2006No.

123

110571234

11058123

11059123456789

101112

Page 71: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 53

FEBRERO 2006No.

11060123

110611234

11062123

1106312345

11064123

1106512333

11066123

11067

Page 72: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 54

FEBRERO 2006No.

123456789

101112

11068123

1106912345

11070123

11071123456789

10

Page 73: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 55

FEBRERO 2006No.

11

11072123

110731234

11074123

11075123456789

1011

11076123

110771234

Page 74: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 56

FEBRERO 2006No.

11078123

11079123456789

1011

11080123

110811234

11082123

1108312345

Page 75: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 57

FEBRERO 2006No.

6789

101112

11084123

110851234

Page 76: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 58

FEBRERO 2006No.

11086123

1108712345

11088123

1108912333

11090123

11091123456789

1011

Page 77: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 59

FEBRERO 2006No.

12

11092123

1109312345

11094123

11095123456789

1011

11096123

11097123

Page 78: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 60

FEBRERO 2006No.

4

11098123

Page 79: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 61

FEBRERO 2006No.

11200

11201123456789

10

11202123456789

10

11203123456789

10

1120412

Page 80: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 62

FEBRERO 2006No.

3456789

10

11205123456789

10

11206123456789

10

11300

113011234

Page 81: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 63

FEBRERO 2006No.

56789

1011

11302123456789

1011

11303123456789

1011

11304123456

Page 82: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 64

FEBRERO 2006No.

789

1011

11305123456789

1011

11306123456789

1011

1130712345678

Page 83: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 65

FEBRERO 2006No.

910

11308123456789

10

11309123456789

1011

11310123456789

1011

Page 84: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 66

FEBRERO 2006No.

11311123456789

10

11400

11401123456789

10

1140212

11403123

11404123

Page 85: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 67

FEBRERO 2006No.

11405123456789

10

1140612

11407123

11408123

11409123456789

10

1141012

Page 86: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 68

FEBRERO 2006No.

11411123

11412123

11413123456789

10

1141412

11415123

11416123

11500

11501

Page 87: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 69

FEBRERO 2006No.

123456789

1011

1150212

11503123

11504123

11505123456789

1011

Page 88: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 70

FEBRERO 2006No.

1150612

11507123

11508123

11509123456789

1011

1151012

11511123

11512123

Page 89: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 71

FEBRERO 2006No.

11513123456789

1011

1151412

11515123

11516123

11517123456789

1011

11518

Page 90: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 72

FEBRERO 2006No.

12

11519123

11520123

11521123456789

1011

1152212

11523123

11524123

11525

Page 91: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 73

FEBRERO 2006No.

123456789

1011

1152612

11527123

11528123

11529123456789

1011

115301

Page 92: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 74

FEBRERO 2006No.

2

11531123

11532123

11533123456789

1011

1153412

11535123

11536123

11600

Page 93: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 75

FEBRERO 2006No.

11601123456789

10

11602123

11603123

11604123

1160512

11606123

11607123

Page 94: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 76

FEBRERO 2006No.

4

11608123

11609123456789

10

11610112

11611112

Page 95: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 77

FEBRERO 2006No.

11612112

11613123456789

10

11614112

11615112

11616112

1161712345678

Page 96: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 78

FEBRERO 2006No.

910

11618112

11619112

11620112

11700

11701123456789

1011

117021234

11703

Page 97: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 79

FEBRERO 2006No.

123456789

1011

117041234

11705123456789

1011

117061234

11707123

Page 98: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 80

FEBRERO 2006No.

456789

101112

11708123

1170912345

11710123456789

1011

11711123

11712

Page 99: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 81

FEBRERO 2006No.

1234

117131234

11714123456789

1011

11715123

117161234

117171234

Page 100: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 82

FEBRERO 2006No.

11718123456789

1011

11719123

117201234

117211234

11722123456789

10

Page 101: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 83

FEBRERO 2006No.

1112

11723123

1172412345

1172512345

1172612345

Page 102: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 84

FEBRERO 2006No.

1172712345

11728123456789

1011

11729123

117301234

117311234

11732123

Page 103: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 85

FEBRERO 2006No.

456789

1011

11733123

117341234

117351234

11736123456789

1011

117371

Page 104: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 86

FEBRERO 2006No.

23

117381234

Page 105: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 87

FEBRERO 2006No.

117391234

11740123456789

101112

11741123

1174212345

1174312345

117441

Page 106: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 88

FEBRERO 2006No.

2345

1174512345

11746123456789

1011

11747123

117481234

117491234

Page 107: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 89

FEBRERO 2006No.

11750123456789

1011

11751123

117521234

117531232

11754123456789

Page 108: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 90

FEBRERO 2006No.

1011

11755123

117561234

117571234

11758123456789

101112

11759123

117601

Page 109: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 91

FEBRERO 2006No.

2345

1176112345

1176212345

Page 110: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 92

FEBRERO 2006No.

1176312345

11800

11801123456789

10

11802123456789

10

11803123456

Page 111: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 93

FEBRERO 2006No.

789

11804123456789

11900

11901123456789

10

1190212

11903123

119041

Page 112: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 94

FEBRERO 2006No.

23

11905123456789

10

1190612

11907123

11908123

11909123456789

10

Page 113: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 95

FEBRERO 2006No.

1191012

11911123

11912123

11913123456789

10

1191412

11915123

11916123

Page 114: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 96

FEBRERO 2006No.

12000

12001

1234

12002

1234

12003

1234

12004

1234

12005

1234

12006

12

Page 115: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 97

FEBRERO 2006No.

34

12007

1234

12008

1234

12009

1234

12010

1234

12011

1234

12012

1

Page 116: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 98

FEBRERO 2006No.

234

12013

1234

12014

1234

12015

1234

12016

1234

12017

1234

12018

Page 117: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 99

FEBRERO 2006No.

1234

12019

1234

12020

1234

12021

1234

12022

1234

12023

1234

12024

Page 118: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 100

FEBRERO 2006No.

1234

12025

1234

12026

1234

12027

1234

12028

1234

12029

123

Page 119: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 101

FEBRERO 2006No.

4

12030

1234

12031

1234

12032

1234

12033

1234

12034

1234

12035

12

Page 120: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 102

FEBRERO 2006No.

34

12036

1234

12037

1234

12038

1234

12039

1234

12040

1232

12100

Page 121: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 103

FEBRERO 2006No.

12101

1234

12102

1234

12103

1234

12104

1234

12105

1234

12106

1234

Page 122: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 104

FEBRERO 2006No.

12107

1234

12108

1234

12109

1234

12110

1234

12111

1234

12112

123

Page 123: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 105

FEBRERO 2006No.

4

12200

122011234

12202123

1220312

Page 124: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 106

FEBRERO 2006No.

3

12204123

122051234

122061234

122071234

122081234

12209123

12210123

Page 125: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 107

FEBRERO 2006No.

12211123

122121234

12213123

12214123

12215123

122161234

12217123

12218123

Page 126: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 108

FEBRERO 2006No.

12219123

1222012

Page 127: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 109

FEBRERO 2006No.

3

12221123

12222123

12223123

12300

12301123

12302123

12303123

12304123

12305

Page 128: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 110

FEBRERO 2006No.

123

12306123

12307123

12308123

12309123

12310123

12311123

12312123

12400

Page 129: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 111

FEBRERO 2006No.

12401

123456789

101112

12402123456789

1011

12403

1234

Page 130: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 112

FEBRERO 2006No.

56

1240412345

1240512345

12406123456

12407123456789

1240812

Page 131: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 113

FEBRERO 2006No.

345

1240912345

1241012345

1241112345

1241212345

1241312345

12500

Page 132: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 114

FEBRERO 2006No.

125011234

125021234

12600

1260112345678

12602123456789

12603123

Page 133: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 115

FEBRERO 2006No.

456789

12604123456789

12605123456789

Page 134: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 116

FEBRERO 2006No.

12606123456789

12607123456789

12608123456789

126091234567

Page 135: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 117

FEBRERO 2006No.

89

10

12610123456789

1261112345678

12612123456789

126131234

Page 136: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 118

FEBRERO 2006No.

56789

1261412345

1261512345

1261612345

1261712345

1261812345

Page 137: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 119

FEBRERO 2006No.

1261912345

1262012345

12700

12701123456789

1011121314151617181920212223

Page 138: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 120

FEBRERO 2006No.

2425

12702123456789

10111213141516171819202122232425

12703123456789

10

Page 139: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 121

FEBRERO 2006No.

111213141516171819202122232425

12704123456789

101112131415161718192021222324

Page 140: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 122

FEBRERO 2006No.

12705123456789

101112131415161718192021222324

12706123456789

1270712

Page 141: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 123

FEBRERO 2006No.

3456789

12708123456789

12709123456789

10111213

12710123456

Page 142: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 124

FEBRERO 2006No.

789

10111213

12711123456789

10111213

12712123456789

1011121314151617

Page 143: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 125

FEBRERO 2006No.

18

12713123456789

101112131415161718

12714123456789

101112131415161718

Page 144: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 126

FEBRERO 2006No.

1271512345678

1271612345678

1271712345678

1271812345678

Page 145: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 127

FEBRERO 2006No.

12719123456789

101112131415161718192021

12720123456789

1011121314151617

Page 146: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 128

FEBRERO 2006No.

181920212223242526

12721123456789

1011121314151617181920212223242526

1272212

Page 147: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 129

FEBRERO 2006No.

3456789

101112131415161718192021222324

12723123456789

1011121314151617

Page 148: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 130

FEBRERO 2006No.

18192021222324

12724123456789

101112131415161718192021222324

12725123456

Page 149: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 131

FEBRERO 2006No.

789

101112131415161718192021222324

12726123456789

101112131415161718192021

Page 150: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 132

FEBRERO 2006No.

22

12727123456789

1011121314151617181920212223

12728123456789

10111213

Page 151: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 133

FEBRERO 2006No.

1415161718192021222324

12729123456789

101112131415161718192021222324

Page 152: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 134

FEBRERO 2006No.

12730123456789

10111213141516171819202122232425

12731123456789

10111213

Page 153: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 135

FEBRERO 2006No.

141516171819202122232425

12732123456789

101112131415161718192021222324

127331

Page 154: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 136

FEBRERO 2006No.

23456789

1011121314151617181920

12734123456789

10111213141516

1273512

Page 155: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 137

FEBRERO 2006No.

3456789

1011121314151617181920

12736123456789

10111213141516

12737123

Page 156: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 138

FEBRERO 2006No.

456789

1011121314151617181920

127381234567

127391234567

127401234

Page 157: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 139

FEBRERO 2006No.

567

12741123456789

101112131415161718192021

12800

12801123456789

10

Page 158: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 140

FEBRERO 2006No.

11121314151617181920212223

12900

129011234

12902123

129031234

1290412345

Page 159: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 141

FEBRERO 2006No.

12905123

129061234

13000

130011234

130021234

1300312345

1300412345

13005

Page 160: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 142

FEBRERO 2006No.

1234

130061234

1300712345

13008123456

13100

13101123456

13102123

Page 161: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 143

FEBRERO 2006No.

4567

131031234567

131041234567

131051234567

131061234567

Page 162: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 144

FEBRERO 2006No.

131071234567

131081234567

131091234567

1311012345678

13111123

Page 163: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 145

FEBRERO 2006No.

45678

131121234567

131131234567

131141234567

131151234567

Page 164: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 146

FEBRERO 2006No.

131161234567

131171234567

131181234567

131191234567

13120123

Page 165: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 147

FEBRERO 2006No.

4567

131211234567

131221234567

131231234567

131241234567

Page 166: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 148

FEBRERO 2006No.

131251234567

131261234567

131271234567

131281234567

131291234

Page 167: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 149

FEBRERO 2006No.

567

131301234567

131311234567

131321234567

131331234567

13134

Page 168: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 150

FEBRERO 2006No.

123456

13135123456

131361234567

13137123456

13138123456

13139

Page 169: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 151

FEBRERO 2006No.

123456

1314012345

1314112345

1314212345

1314312345

1314412345

Page 170: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 152

FEBRERO 2006No.

1314512

1314612345

1314712345

1314812345

13149123

1315012345

1315112

Page 171: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 153

FEBRERO 2006No.

345

1315212345

1315312345

1315412345

13200

132011234567

13202123

Page 172: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 154

FEBRERO 2006No.

4567

132031234567

132041234567

13205123456

13206123456789

Page 173: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 155

FEBRERO 2006No.

10

13300

133011234

1330212345

133031234

1330412345

1330512345

1330612

Page 174: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 156

FEBRERO 2006No.

3456

13307123

133081234

1330912

13400

13401

12345678

13500

135011

Page 175: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 157

FEBRERO 2006No.

23456

13502123456

135031234

1350412345

13600

13601

Page 176: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 158

FEBRERO 2006No.

13602

123456789

10111213131415161718

Page 177: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 159

FEBRERO 2006No.

13603

123456789

10111213141516171819

13604

123456789

10111213

Page 178: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 160

FEBRERO 2006No.

141516171819

13605

123456789

10111213131415161718

13606

123456

Page 179: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 161

FEBRERO 2006No.

789

10111213141516171819202122

13607

123456789

1011121314151617181920

Page 180: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 162

FEBRERO 2006No.

2122

13608

123456789

10111213141516171819202122

13609

1234567

Page 181: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 163

FEBRERO 2006No.

89

10111213141516171819202122

1361012342345

13611123456789

10

1361212

Page 182: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 164

FEBRERO 2006No.

3456789

13700

13701123456

137021234

137031234

13704123

13800

138011

Page 183: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 165

FEBRERO 2006No.

23

13802123

13803123

13804123

13805123

13806123

13807123

Page 184: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 166

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

ANALISIS DE COSTOS

A C E R O S

ACERO DE ¼'':Acero ¼" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

ACERO GRADO 40, 3/8" x 20':Acero 3/8" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

ACERO GRADO 40, 3/8" x 25':Acero 3/8" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

ACERO GRADO 40, ½" x 20':Acero ½" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

ACERO GRADO 40, ½" x 25':Acero ½" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

ACERO GRADO 40, ¾":Acero ¾" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

ACERO GRADO 40, DE 1":Acero 1" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

ACERO GRADO 60, 3/8" x 20':Acero 3/8" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

ACERO GRADO 60, 3/8" x 25':Acero 3/8" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

ACERO GRADO 60, ½" x 20':

Page 185: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 167

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero ½" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

ACERO GRADO 60, ½" x 25':Acero ½" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

ACERO GRADO 60, ¾":Acero ¾" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

ACERO GRADO 60, DE 1":Acero 1" + I.T.B.I.S.Alambre #18 + I.T.B.I.S.

BORDILLOS

BORDILLO 4", 2 LINEAS, 1:2:4, ZAP. .20x.15 M.)Excavación (1.00 x .20 x .55 m.)Relleno de reposiciónBote material excavado sobranteHorm. 1:2:4 en zapata (2 de 3/8" + 3/8 a .30 m.)Bloques de 4"EmpañeteCantosPintura acrílica

BORDILLO 6", 2 LINEAS, 1:2:4, ZAP. .30x.15 M.)Excavación (1.00 x .30 x .55 m.)Relleno de reposiciónBote material excavado sobranteHorm. 1:2:4 en zapata (2 de 3/8" + 3/8 a .30 m.)Bloques de 6"EmpañeteCantosPintura acrílica

BORDILLO 6", 2 LINEAS, 1:2:4, ZAP. .40x.15 M.)Excavación (1.00 x .40 x .55 m.)Relleno de reposición

Page 186: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 168

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Bote material excavado sobranteHorm. 1:2:4 en zapata (2 de 3/8" + 3/8 a .30 m.)Bloques de 6"EmpañeteCantosPintura acrílica

Page 187: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 169

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

BLOQUES

Bloques horm. + 4% desp. + itbisMortero 1:3 en juntas + 30% desp.Horm. en cámaras + 10% desp.Acero ¼'' + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

Bloques horm. + 4% desp. + itbisMortero 1:3 en juntas + 30% desp.Horm. en cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

Bloques horm. + 4% desp. + itbisMortero 1:3 en juntas + 30% desp.Horm. en cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

Bloques horm. + 4% desp. + itbisMortero 1:3 en juntas + 30% desp.Horm. en cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.

BLOQUES HORM. 4'', ¼" A .80 M.:

BLOQUES HORM. 5'', 3/8" A .80 M.:

BLOQUES HORM. 6'', 3/8" A .40 M.:

BLOQUES HORM. 6'', 3/8" A .80 M.:

Page 188: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 170

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

BLOQUES HORM. 6" VIOL. 2 CARAS, 3/8" A .80 M.:Bloques horm. + 4% desp. + itbisMortero de juntas + 30% desp.Horm. en cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques + violinado ambas caras.

Bloques horm. + 4% desp. + itbisMortero 1:3 en juntas + 30% desp.Horm. en cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

Bloques horm. + 4% desp. + itbisMortero 1:3 en juntas + 30% desp.Horm. en cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

Bloques horm. + 4% desp. + itbisMortero 1:3 en juntas + 30% desp.

BLOQUES HORM. 8", 3/8" A .20 M.:

BLOQUES HORM. 8", 3/8" A .40 M.:

BLOQUES HORM. 8", 3/8" A .80 M.:

Page 189: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 171

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Horm. en cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

BLOQUES HORM. 8", C. LLENAS, 3/8" A 0.40 M.:Bloques horm. + 4% desp. + itbisMortero 1:3 en juntas + 30% desp.Horm. en todas las cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

BLOQUES HORM. 8", C. LLENAS, 3/8" A 0.20 M.:Bloques horm. + 4% desp. + itbisMortero 1:3 en juntas + 30% desp.Horm. en todas las cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

BLOQUES HORM. 10", 3/8" A .80 M.:Bloques horm. + 4% desp. + itbisMortero 1:3 en juntas + 30% desp.Horm. en cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

Page 190: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 172

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

BLOQUES HORM. 12", 3/8" A .80 M.:Bloques horm. + 4% desp. + itbisMortero 1:3 en juntas + 30% desp.Horm. en cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

BLOQUES RUSTICANALES 4", 3/8" A .80 M.:Bloques Rusticanales + 4% desp. + itbisMortero 1:3 en juntas + 30% desp.Horm. en cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

BLOQUES RUSTICANALES 8", 3/8" A .80 M.:Bloques Rusticanales + 4% desp. + itbisHorm. en cámaras + 10% desp.Acero 3/8" x 20' grado 40 + 20% desp.Andamios.Conf. andamios.Corte y amarre varilla.Llenado huecos.Coloc. bloques.

BLOQUES CALADOS LADRILLO 6"x6"x6":Mortero 1:4 para empañete + 10% desp.Bloques calados + 5% desp. + itbisColocación bloques calados.

BLOQUES CALADOS LADRILLO 8"x8"x6":Mortero 1:4 para empañete + 10% desp.Bloques calados + 5% desp. + itbisColocación bloques calados.

Page 191: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 173

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

BLOQUES CALADOS ORNAMENT. 15x20x40:Mortero 1:4 para empañete + 10% desp.Bloques calados + 5% desp. + itbisColocación bloques calados.

CASETAS DE MATERIALES

CASETA MAT. 12'x16', P/200 F. CEMENTO:Area de casetaParales pino bruto amer. (14 de 2"x4"x12')Durmientes pino bruto amer. (7 de 2"x4"x8')Cargaderas pino bruto amer. (5 de 2"x4"x14')Enlates pino bruto amer. (5 de 2"x4"x18')Puerta pino bruto amer. (4 de 1"x4"x8')Total pino bruto amer. (4 usos + 25% desp.)Plywood 4'x8'x¾", 2 caras, 6 usos (13 unid.)Puerta en Plywood 4'x8'x¾", 2 caras, 6 usos (1 unid.)Zinc acanalado 3'x7' cal. 26, 4 usos (14 / 4)Clavos corrientes (5 lb. / 100 pie madera).Clavos de zinc + 5% desp. (.133 lb. / plancha)Bisagras 3 ½" x 3 ½"PestilloPortacandadoCandadoSalida lucesSalida interruptor sencilloSalida tomacorrientes 110 v.Replanteo y excavación 14 hoyos de .2x.2x.3 m.Carpintero 2da., montar y desmontarAyudante carpintero, montar y desmontar

CASETA MAT. 12'x32', P/500 F. CEMENTO:Area de la casetaParales pino bruto amer. (4 de 4"x4"x12')Parales pino bruto amer. (5 de 4"x4"x10')Parales pino bruto amer. (12 de 2"x4"x12')Parales pino bruto amer. (5 de 2"x4"x10')Durmientes pino bruto amer. (9 de 2"x4"x14')

Page 192: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 174

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Durmientes pino bruto amer. (18 de 2"x4"x12')Cargaderas pino bruto amer. (9 de 2"x4"x16')Correas pino bruto amer. (7 de 1"x4"x18')Correas pino bruto amer. (7 de 1"x4"x16')Enlates pino bruto amer. (3 de 1"x4"x14')Enlates pino bruto amer. (5 de 1"x4"x12')Enlates pino bruto amer. (2 de 1"x4"x10')Enlates pino bruto amer. (2 de 1"x4"x8')Puertas (2), pino bruto amer. (8 de 1"x4"x8')Ventanas (5 de 4'x4'), pino bruto amer. (15 de 1"x8"x8')Ventanas (5 de 4'x4'), pino bruto amer. (5 de 1"x4"x8')Ventanas (5 de 4'x4'), pino bruto amer. (5 de 1"x4"x6')Total pino bruto amer. (4 usos + 25% desp.)Plywood 4'x8'x¾", 2 caras, 6 usos (17 unid.)Puerta en Plywood 4'x8'x¾", 2 caras, 6 usos (2 unid.)Zinc acanalado 3'x7' cal. 26, 4 usos (27 / 4)Clavos corrientes (5 lb. / 100 pie madera).Clavos de zinc + 5% desp. (.133 lb. / plancha)Bisagras 3 ½" x 3 ½"PestilloPortacandadoCandadoSalida lucesSalida interruptor sencilloSalida tomacorrientes 110 v.Replanteo y excavación 14 hoyos de .2x.2x.3 m.Carpintero 2da., montar y desmontarAyudante carpintero, montar y desmontar

CONTEN (TELFORD)Area de sección: 0.10 m2Volumen / metro: 0.10 m3Volumen analizado: 1.00 m3Longitud total: 10.00 m

Madera (110 p2 / 10 usos + 10% desp.).Clavos (5 lb. / 100 p2).Hormigón 1:3:5 contén + 2% desp.Base horm. 1:3:5 + 85% de piedras, 0.15 m. espesor + 10% desp.Mortero 1:2 para pulido.

Page 193: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 175

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Base contén (mano de obra solamente).Construcción contén.

DESAGÜES PLUVIALES

DESAGÜES PLUVIALES 3":Tubo 3"x20' PVC SDR-26 + 10% desp.Codo 3" PVC Drenaje.Cemento PVC + 25% desp. (¼ galón).Confección hueco.Mano de obra plomero.

DESAGÜES PLUVIALES 4":Tubo 4"x20' PVC SDR-26 + 10% desp.Codo 4" PVC Drenaje.Cemento PVC + 25% desp. (¼ galón).Conf. hueco.Mano de obra plomero.

EMPAÑETES

CARETEO CON LLANA, SIN ANDAMIOS:Mortero 1:4 p/empañete + 30% desp., 1.5 mm. esp.Mano de obra.

FRAGÜACHE, SIN ANDAMIOS:Mortero 1:4 p/empañete + 50% desp., 1.5 mm. esp.Regla (1 de 1"x4"x10' / 100 usos).Mano de obra.

NATILLA, SIN ANDAMIOS:Cemento gris (15 m2 / funda)Mano de obra.

RESANE, SIN ANDAMIOS:Mortero 1:4 p/empañete + 30% desp., 1.5 mm. esp.Regla (1 de 1"x4"x10' / 100 usos).Mano de obra.

Page 194: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 176

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

EMPAÑETE maestrado COLUMNAS:Mortero 1:4 p/empañete + 30% desp., 2 cm. esp.Regla (1 de 1"x4"x10' / 100 usos).Andamios (1.091 p2 / 6 usos).Conf. andamios.Mano de obra.

REPELLO maestrado TECHOS (SIN ANDAMIOS):Mortero 1:4 p/empañete + 30% desp., 2 cm. esp.Regla (1 de 1"x4"x10' / 10 usos).Mano de obra.

EMPAÑETE maestrado INTERIOR:Mortero 1:4 p/empañete + 30% desp., 2 cm. esp.Regla (1 de 1"x4"x10' / 100 usos).Andamios (1.091 p2 / 6 usos).Conf. andamios.Mano de obra.

EMPAÑETE maestrado EXTERIOR:Mortero 1:4 p/empañete + 30% desp., 2.5 cm. esp.Regla (1 de 1"x4"x10' / 100 usos).Andamios.Conf. andamios.Clavos corrientes.Mano de obra.

EMPAÑETE rasgado:Mortero 1:4 p/empañete + 30% desp., 1.67 cm. esp.Regla (2 de 1"x4"x10' / 100 usos).Andamios.Conf. andamios.Clavos corrientes.Mano de obra.

EMPAÑETE maestrado TECHOS Y VIGAS:Mortero 1:4 p/empañete + 30% desp., 2.5 cm. esp.Regla (1 de 1"x4"x10' / 100 usos).Andamios (.25 planchas plywood / 10 usos).Conf. andamios.Clavos corrientes.

Page 195: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 177

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Mano de obra.

EMPAÑETE RUSTICO (ESCOBA, PAPEL O BROCHA):Mortero 1:4 p/empañete + 30% desp., 2.5 cm. esp.Andamios (1.091 p2 / 6 usos).Conf. andamios.Clavos corrientes.Mano de obra.

EMPAÑETE PULIDO SIN COLOR:Mortero 1:4 p/empañete + 30% desp., 2 cm. esp.Regla (1 de 1"x4"x10' / 100 usos).Andamios (1.091 p2 / 6 usos).Conf. andamios.Cemento 2da. capa + 30% desp.Mano de obra.

CANTOS:Mortero 1:4 p/empañete + 30% desp.Reglas (2 de 1"x4"x3.28' / 10 usos).Mano de obra.

ESTRIAS:Mortero 1:4 p/empañete + 30% desp.Reglas (1 de 1"x1"x3.28').Mano de obra.

GOTEROS COLGANTES:Mortero 1:4 p/empañete + 30% desp.Reglas (2 de 1"x4"x3.28' / 10 usos).Mano de obra.

GOTEROS DE RANURA:Mortero 1:4 p/empañete + 30% desp.Reglas (1 de 1"x4"x3.28' / 10 usos).Mano de obra.

Page 196: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 178

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

ESCALONES

ESCALON GRANITO 2 y 3 BLANCOEscalón .17 x .30 m. Bocel redondo + 10% desp. + itbisMortero de fijación + 10% desp.Colocación Huella y Contra HuellaPulido y brillado

ESCALON GRANITO 2 y 3 COLOREscalón .17 x .30 m. Bocel redondo + 10% desp. + itbisMortero de fijación + 10% desp.Colocación Huella y Contra HuellaPulido y brillado

ESCALON GRANITO 2 y 3 GRISEscalón .17 x .30 m. Bocel redondo + 10% desp. + itbisMortero de fijación + 10% desp.Colocación Huella y Contra HuellaPulido y brillado

ESCALON GRANITO BOTICELLI BLANCOEscalón .17 x .30 m. Bocel redondo + 10% desp. + itbisMortero de fijación + 10% desp.Colocación Huella y Contra HuellaPulido y brillado

ESCALON GRANITO BOTICELLI COLOREscalón .17 x .30 m. Bocel redondo + 10% desp. + itbisMortero de fijación + 10% desp.Colocación Huella y Contra HuellaPulido y brillado

ESCALON MARMOL AGLOMERADO (PERLATTO ROYAL)Escalón .17 x .30 m. Bocel redondo + 10% desp. + itbisMortero de fijación + 10% desp.Colocación Huella y Contra HuellaPulido y brillado

ESCALON SUPER CHAPA BLANCOEscalón .17 x .30 m. Bocel redondo + 10% desp. + itbisMortero de fijación + 10% desp.

Page 197: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 179

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Colocación Huella y Contra HuellaPulido y brillado

ESCALON SUPER CHAPA COLOREscalón .17 x .30 m. Bocel redondo + 10% desp. + itbisMortero de fijación + 10% desp.Colocación Huella y Contra HuellaPulido y brillado

ESCALON VIBRAZO BLANCOEscalón .17 x .30 m. Bocel redondo + 10% desp. + itbisMortero de fijación + 10% desp.Colocación Huella y Contra HuellaPulido y brillado

ESCALON VIBRAZO COLOREscalón .17 x .30 m. Bocel redondo + 10% desp. + itbisMortero de fijación + 10% desp.Colocación Huella y Contra HuellaPulido y brillado

ESCALON VIBRAZO GRISEscalón .17 x .30 m. Bocel redondo + 10% desp. + itbisMortero de fijación + 10% desp.Colocación Huella y Contra HuellaPulido y brillado

HORM. ARMADO ANTEPECHOS

ANTEPECHO .40x.15, 1:2:4, 3/8" grado 40 A .40 + 2 DE 3/8":Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Subida acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4 lig. y winche + 10% desp.

Page 198: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 180

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

ANTEPECHO .40x.15, 180 kg/Cm², 3/8" grado 40 A .40, 2 DE 3/8":Partidas comunes del análisis anterior (1-9)Horm. 180 Kg/Cm².

ANTEPECHO .40x.15, 210 kg/Cm², 3/8" grado 40 A .40, 2 DE 3/8":Partidas comunes del análisis anterior (1-9)Horm. 210 Kg/Cm².

Page 199: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 181

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

ANTEPECHO .40x.15, 240 kg/Cm², 3/8" grado 40 A .40, 2 DE 3/8":Partidas comunes del análisis anterior (1-9)Horm. 240 Kg/Cm².

HORM. ARMADO COLUMNAS

COL. 20x20, 1:2:4, 40,4 DE 3/8", ¼" A 20, LIG.:Acero ¼" + 10% desp.Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

COL. 20x20, 1:2:4, 40, 4 DE 3/8", ¼" A 20 A MANO:Partidas comunes de la analizada anteriormente (1-10)Horm. 1:2:4 a mano + 10% desp.

COL. 20x20, 1:2:4, 40, 4 DE ½", 3/8" A 20, LIG.:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (3-11)

COL. 20x20, 1:2:4, 40, 4 DE ½", 3/8" A 20 A MANO:Partidas comunes de la analizada completa anterior (1-10)Horm. 1:2:4 a mano + 10% desp.

COL. 20x30, 1:2:4, 40, 4 DE ½", 3/8" A 20, LIG.:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).

Page 200: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 182

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Confección madera.Instalación madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

COL. 20x30, 1:2:4, 40, 4 DE ½", 3/8" A 20 A MANO:Partidas comunes de la analizada completa anterior (1-10)Horm. 1:2:4 a mano + 10% desp.

COL. 30x30, 1:2:4, 40, 8 DE ½", 3/8" A 20, LIG.:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

COL. 30x30, 1:2:4, 40, 8 DE ½", 3/8" A 20 A MANO:Partidas comunes de la analizada completa anterior (1-10)Horm. 1:2:4 a mano + 10% desp.

COL. 30x40, 1:2:4, 40, 4 DE ¾", 3/8" A 30, LIG.:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

COL. 30x40, 1:2:4, 40, 4 DE ¾", 3/8" A 30 A MANO:Partidas comunes de la analizada completa anterior (1-10)

Page 201: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 183

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Horm. 1:2:4 a mano + 10% desp.

COL. 40x40, 1:2:4, 40, 4 DE ½" + 4 DE ¾", 3/8" A 20, LIG.:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.Acero ¾" grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

COL. 40x40, 1:2:4, 40, 4 DE ½" + 4 DE ¾", 3/8" A 20 A MANO:Partidas comunes de la analizada completa anterior (1-11)Horm. 1:2:4 a mano + 10% desp.

COL. 50x50, 1:2:4, 40, 4 DE ¾" + 4 DE 1", 3/8" A 20, LIG.:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" x 20' grado 40 + 10% desp.Acero 1" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

COL. 50x50, 1:2:4, 40, 4 DE ¾" + 4 DE 1", 3/8" A 20 A MANO:Partidas comunes de la analizada completa anterior (1-11)Horm. 1:2:4 a mano + 10% desp.

COL. 60x60, 1:2:4, 40, 12 DE 1", 3/8" A 20, LIG.:Acero 3/8" x 20' grado 40 + 10% desp.Acero 1" x 20' grado 40 + 10% desp.

Page 202: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 184

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

COL. 60x60, 1:2:4, 40, 12 DE 1", 3/8" A 20 A MANO:Partidas comunes de la analizada completa anterior (1-11)Horm. 1:2:4 a mano + 10% desp.

COL. 20x20, 180 kg/Cm², 40, 4 DE ½", 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 180 Kg/Cm² + 5% desp.

COL. 20x20, 180 kg/Cm², 40, 4 DE ½" x 25', 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 25' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (3-11)

COL. 20x20, 180 kg/Cm², 60, 4 DE ½" x 20', 3/8" x 20' A 20:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (3-11)

COL. 20x20, 180 kg/Cm², 60, 4 DE ½" x 25', 3/8" x 20' A 20:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (3-11)

Page 203: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 185

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

COL. 20x30, 180 kg/Cm², 60, 4 DE ½", 3/8" A 20:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 180 Kg/Cm² + 5% desp.

COL. 20x30, 180 kg/Cm², 60, 4 DE ½" x 25', 3/8" x 20' A 20:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (3-11)

Page 204: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 186

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

COL. 30x30, 180 kg/Cm², 40, 8 DE ½", 3/8" A 30:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 180 Kg/Cm² + 5% desp.

COL. 30x30, 180 kg/Cm², 40, 8 DE ½", 3/8" A 30: PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x30, 180 kg/Cm², 40, 8 DE ½" x 25', 3/8" A:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 25' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (3-11)

COL. 30x30, 180 kg/Cm², 40, 8 DE ½"x25', 3/8" A 30: PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x30, 180 kg/Cm², 60, 8 DE ½", 3/8" A 30:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.

Page 205: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 187

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x30, 180 kg/Cm², 60, 8 DE ½", 3/8" A 30: PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x30, 180 kg/Cm², 60, 8 DE ½"x25', 3/8" x 20' A 30:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x30, 180 kg/Cm², 60, 8 DE ½"x25', 3/8" A 30: PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x40, 180 kg/Cm², 40, 4 DE ¾", 3/8" A 30:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 180 Kg/Cm² + 5% desp.

COL. 30x40, 180 kg/Cm², 40, 4 DE ¾", 3/8" A 30: PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x40, 180 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" x 20' grado 60 + 10% desp.M.O. acero.

Page 206: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 188

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Partidas comunes de la analizada completa anterior (4-11)

COL. 30x40, 180 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 40x40, 180 kg/Cm², 40, 4 DE ½" + 4 DE ¾", 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.Acero ¾" + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 180 Kg/Cm² + 5% desp.

COL. 40x40, 180 kg/Cm², 40, 4 DE ½" + 4 DE ¾", 3/8" A 20: PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 40x40, 180 kg/Cm², 40, 4 DE ½"x25' + 4 DE ¾"x25', 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 25' grado 40 + 10% desp.Acero ¾" + 10% desp.Partidas comunes de la analizada completa anterior (4-12)

COL. 40x40, 180 kg/Cm², 40, 4 DE ½"x25' + 4 DE ¾"x25', 3/8" A 20: PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 40x40, 180 kg/Cm², 60, 4 DE ½" + 4 DE ¾", 3/8" A 30:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.Acero ¾" + 10% desp.

Page 207: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 189

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 40x40, 180 kg/Cm², 60, 4 DE ½" + 4 DE ¾", 3/8" A 30: PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 40x40, 180 kg/Cm², 60, 4 DE ½"x25' + 4 DE 3/4"x25', 3/8" A 30:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 40x40, 180 kg/Cm², 60, 4 DE ½" x 25' + 4 DE 4/4", 3/8" x 20' A 30: PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 50x50, 180 kg/Cm², 40, 4 DE ¾" + 4 DE 1", 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" + 10% desp.Acero 1" + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 180 Kg/Cm² + 5% desp.

COL. 50x50, 180 kg/Cm², 40, 4 DE ¾" + 4 DE 1", 3/8" A 20: PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 50x50, 180 kg/Cm², 60, 4 DE ¾" + 4 DE 1", 3/8" A 20, x 20':Acero 3/8" x 20' grado 60 + 10% desp.

Page 208: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 190

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero ¾" x 20' grado 60 + 10% desp.Acero 1" + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 50x50, 180 kg/Cm², 60, 4 DE ¾" + 4 DE 1", 3/8" A 20, x 20': PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 60x60, 180 kg/Cm², 40, 12 DE 1", 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero 1" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 180 Kg/Cm² + 5% desp.

COL. 60x60, 180 kg/Cm², 40, 12 DE 1", 3/8" A 30: PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 60x60, 180 kg/Cm², 60, 12 DE 1", 3/8" A 30, x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero 1" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 60x60, 180 kg/Cm², 60, 12 DE 1", 3/8" A 30, x 20': PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x30, 210 kg/Cm², 40, 4 DE ¾", 3/8" A 30:Acero 3/8" x 20' grado 40 + 10% desp.

Page 209: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 191

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero ¾" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 210 Kg/Cm² + 5% desp.

COL. 30x30, 210 kg/Cm², 40, 4 DE ¾", 3/8" A 30: PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x30, 210 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x30, 210 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x40, 210 kg/Cm², 40, 4 DE ¾", 3/8" A 30:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 210 Kg/Cm² + 5% desp.

COL. 30x40, 210 kg/Cm², 40, 4 DE ¾", 3/8" A 30: PORTICO

Page 210: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 192

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Partidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x40, 210 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x40, 210 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 40x40, 210 kg/Cm², 40, 4 DE ½" + 4 DE ¾", 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.Acero ¾" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 210 Kg/Cm² + 5% desp.

Page 211: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 193

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

COL. 40x40, 210 kg/Cm², 40, 4 DE ½" + 4 DE ¾", 3/8" A 20: PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 40x40, 210 kg/Cm², 40, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 25' grado 40 + 10% desp.Acero ¾" + 10% desp.Partidas comunes de la analizada completa anterior (4-12)

COL. 40x40, 210 kg/Cm², 40, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 20: PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 40x40, 210 kg/Cm², 60, 4 DE ½" + 4 DE ¾", 3/8" A 30, x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.Acero ¾" + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 40x40, 210 kg/Cm², 60, 4 DE ½" + 4 DE ¾", 3/8" A 30, x 20': PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 40x40, 210 kg/Cm², 60, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 30 x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 40x40, 210 kg/Cm², 60, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 30 x 20': PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 50x50, 210 kg/Cm², 40, 4 DE ¾" + 4 DE 1", 3/8" A 20:

Page 212: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 194

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" x 20' grado 40 + 10% desp.Acero 1" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 210 Kg/Cm² + 5% desp.

COL. 50x50, 210 kg/Cm², 40, 4 DE ¾" + 4 DE 1", 3/8" A 20: PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 50x50, 210 kg/Cm², 60, 4 DE ¾" + 4 DE 1", 3/8" A 20, x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" x 20' grado 60 + 10% desp.Acero 1" + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 50x50, 210 kg/Cm², 60, 4 DE ¾" + 4 DE 1", 3/8" A 20, x 20': PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 60x60, 210 kg/Cm², 40, 12 DE 1", 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero 1" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.

Page 213: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 195

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Horm. 210 Kg/Cm² + 5% desp.

COL. 60x60, 210 kg/Cm², 40, 12 DE 1", 3/8" A 30: PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 60x60, 210 kg/Cm², 60, 12 DE 1", 3/8" A 30, x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero 1" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 60x60, 210 kg/Cm², 60, 12 DE 1", 3/8" A 30, x 20': PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x30, 240 kg/Cm², 40, 4 DE ¾", 3/8" A 30:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 240 Kg/Cm² + 5% desp.

COL. 30x30, 240 kg/Cm², 40, 4 DE ¾", 3/8" A 30: PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x30, 240 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

Page 214: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 196

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

COL. 30x30, 240 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x40, 240 kg/Cm², 40, 4 DE ¾", 3/8" A 30:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 240 Kg/Cm² + 5% desp.

COL. 30x40, 240 kg/Cm², 40, 4 DE ¾", 3/8" A 30: PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x40, 240 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 30x40, 240 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 40x40, 240 kg/Cm², 40, 4 DE ½" + 4 DE ¾", 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.Acero ¾" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).

Page 215: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 197

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 240 Kg/Cm² + 5% desp.

COL. 40x40, 240 kg/Cm², 40, 4 DE ½" + 4 DE ¾", 3/8" A 20: PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 40x40, 240 kg/Cm², 40, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 25' grado 40 + 10% desp.Acero ¾" + 10% desp.Partidas comunes de la analizada completa anterior (4-12)

Page 216: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 198

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

COL. 40x40, 240 kg/Cm², 40, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 20: PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 40x40, 240 kg/Cm², 60, 4 DE ½" + 4 DE ¾", 3/8" A 30, x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.Acero ¾" + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 40x40, 240 kg/Cm², 60, 4 DE ½" + 4 DE ¾", 3/8" A 30, x 20': PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 40x40, 240 kg/Cm², 60, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 30 x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 40x40, 240 kg/Cm², 60, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 30 x 20': PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 50x50, 240 kg/Cm², 40, 4 DE ¾" + 4 DE 1", 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" x 20' grado 40 + 10% desp.Acero 1" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.

Page 217: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 199

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Horm. 240 Kg/Cm² + 5% desp.

COL. 50x50, 240 kg/Cm², 40, 4 DE ¾" + 4 DE 1", 3/8" A 20: PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 50x50, 240 kg/Cm², 60, 4 DE ¾" + 4 DE 1", 3/8" A 20, x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" x 20' grado 60 + 10% desp.Acero 1" + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 50x50, 240 kg/Cm², 60, 4 DE ¾" + 4 DE 1", 3/8" A 20, x 20': PORTICOPartidas comunes del análisis anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

COL. 60x60, 240 kg/Cm², 40, 12 DE 1", 3/8" A 20:Acero 3/8" x 20' grado 40 + 10% desp.Acero 1" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección madera.Instalación madera.Desencofrado.Horm. 240 Kg/Cm² + 5% desp.

COL. 60x60, 240 kg/Cm², 40, 12 DE 1", 3/8" A 20: PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

COL. 60x60, 240 kg/Cm², 60, 12 DE 1", 3/8" A 20, x 20':Acero 3/8" x 20' grado 60 + 10% desp.Acero 1" x 20' grado 60 + 10% desp.M.O. acero.

Page 218: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 200

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Partidas comunes de la analizada completa anterior (4-11)

COL. 60x60, 240 kg/Cm², 60, 12 DE 1", 3/8" A 20, x 20': PORTICOPartidas comunes del análisis anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

Page 219: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 201

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

HORM. ARMADO COL. AMARRE

COL. AMARRE 15x20, 1:2:4, 40, 4 DE 3/8", ¼" A 20, LIG.:Acero ¼" + 10% desp..Acero 3/8" x 20' grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

COL. AMARRE 15x20, 1:2:4, 40, 4 DE 3/8", ¼" A 20 A MANO:Acero ¼" + 10% desp..Acero 3/8" x 20' grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4 a mano + 10% desp.

COL. AMARRE 15x20, 1:2:4, 40, 4 DE 3/8", 3/8" A 20, LIG.:Acero 3/8" + 10% desp. en entribosAcero 3/8" x 20' grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

COL. AMARRE 15x20, 1:2:4, 40, 4 DE 3/8", 3/8" A 20 A MANO:Acero 3/8" + 10% desp. en entribosAcero 3/8" x 20' grado 40 + 10% desp..

Page 220: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 202

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4 a mano + 10% desp.

COL. AMARRE 20x20, 1:2:4, 40, 4 DE 3/8", ¼" A 20, LIG.:Acero ¼" + 10% desp..Acero 3/8" x 20' grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

COL. AMARRE 20x20, 1:2:4, 40, 4 DE 3/8", ¼" A 20 A MANO:Acero ¼" + 10% desp..Acero 3/8" x 20' grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4 a mano + 10% desp.

HORM. ARMADO DINTELES

DINTEL 10x20, 1:2:4, 40, 2 DE ½"-2 DE 3/8", ¼" A .20, LIG.:Acero ¼" + 10% desp.Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.

Page 221: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 203

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

DINTEL 10x20, 1:2:4, 40, 2 DE ½"-2 DE 3/8", ¼" A .20 A MANO:Acero ¼" + 10% desp.Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4 a mano + 10% desp.

DINTEL 15x20, 1:2:4, 40, 3 DE ½"-2 DE 3/8", ¼" A .20, LIG.:Acero ¼" + 10% desp.Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

DINTEL 15x20, 1:2:4, 40, 3 DE ½"-2 DE 3/8", ¼" A .20 A MANO:Acero ¼" + 10% desp.Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).

Page 222: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 204

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4 a mano + 10% desp.

DINTEL 15x20, 1:2:4, 40, 3 DE ½"-2 DE 3/8", " 3/8" A .20, LIG.:Acero 3/8" + 10% desp. en estribosAcero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

DINTEL 15x20, 1:2:4, 40, 3 DE ½"-2 DE 3/8", 3/8" A .20 A MANO:Acero 3/8" + 10% desp. en estribosAcero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4 a mano + 10% desp.

DINTEL 20x20, 1:2:4, 40, 3 DE ½"-2 DE 3/8", 3/8" A .20, LIG.:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.

Page 223: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 205

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

DINTEL 20x20, 1:2:4, 40, 3 DE ½"-2 DE 3/8", 3/8" A .20 A MANO:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4 a mano + 10% desp.

DINTEL 10x20, 180 kg/Cm², 40, 2 DE ½"-2 DE 3/8", ¼" A .20:Acero ¼" + 10% desp.Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 180 Kg/Cm².

DINTEL 15x20, 180 kg/Cm², 40, 3 DE ½"-2 DE 3/8", ¼" A .20:Acero ¼" + 10% desp.Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 180 Kg/Cm².

Page 224: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 206

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

DINTEL 20x20, 180 kg/Cm², 40, 3 DE ½"-2 DE 3/8", 3/8" A .20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 180 Kg/Cm².

HORM. ARMADO LOSAS

LOSA H=10, 1:2:4, 40, 3/8" x 20' A 25 A. D. LIG. Y WINCHE:Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Subida acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (.08 lb / m2).Alambre calibre #14 (.15 lb. / m2).Confección madera.Desencofrado.Horm. 1:2:4 lig. y winche + 10% desp.

LOSA H=10, 1:2:4, 40, 3/8" >20' A 25 A. D. LIG. Y WINCHE:Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes del análisis anterior (2-10)

LOSA H=10, 1:2:4, 60, 3/8" x 20' A 25 A. D. LIG. Y WINCHE:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

LOSA H=10, 1:2:4, 60, 3/8" x 25' A 25 A. D. LIG. Y WINCHE:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

Page 225: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 207

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

LOSA H=12, 1:2:4, 40, 3/8" x 20' A 25 A. D. LIG. Y WINCHE:Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Subida acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (.08 lb / m2).Alambre calibre #14 (.15 lb. / m2).ConfecciónDesencofrado.Horm. 1:2:4 lig. y winche + 10% desp.

LOSA H=12 1:2:4, 40, 3/8" >20' A 25 A. D. LIG. Y WINCHE:Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes del análisis anterior (2-10)

LOSA H=12, 1:2:4, 60, 3/8" x 20' A 25 A. D. LIG. Y WINCHE:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

LOSA H=12, 1:2:4, 60, 3/8" x 25' A 25 A. D. LIG. Y WINCHE:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

LOSA H=10, 180 kg/Cm², 40, 3/8" x 20' A 25 A. D.:Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Subida acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (.08 lb / m2).Alambre calibre #14 (.15 lb. / m2).Confección madera.Desencofrado.Horm. 180 Kg/Cm².

LOSA H=10, 180 kg/Cm², 40, 3/8" >20' A 25 A. D., HORM. IND.:Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes del análisis anterior (2-10)

Page 226: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 208

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

LOSA H=10, 180 kg/Cm², 60, 3/8" x 20' A 25 A. D., HORM. IND.:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

LOSA H=10, 180 kg/Cm², 60, 3/8" x 25' A 25 A. D., HORM. IND.:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

LOSA H=12, 180 kg/Cm², 40, 3/8" x 20' A 25 A. D., HORM. IND.:Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Subida acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (.08 lb / m2).Alambre calibre #14 (.15 lb. / m2).Confección madera.Desencofrado.Horm. 180 Kg/Cm².

LOSA H=12 180 kg/Cm², 40, 3/8" >20' A 25 A. D., HORM. IND.:Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes del análisis anterior (2-10)

LOSA H=12, 180 Kg/Cm², 60, 3/8" x 20' A 25 A., D. HORM. IND.:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

LOSA H=12, 180 Kg/Cm², 60, 3/8" x 25' A 25 A. D., HORM. IND.:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

HORM. ARMADO MUROS

MUROS 0.15, 180 Kg/Cm², 40, 3/8" x 20' A .20 A.D., 2 CARAS:

Page 227: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 209

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Planchas plywood 4'x8'x¾" (8 usos).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (½ lb / m²).Alambre calibre #14 (½ lb. / m²).Confección madera (dos caras).Instalación madera (dos caras).Desencofrado.Horm. 180 Kg/Cm² + 5% desp.

MUROS 0.15, 180 Kg/Cm², 40, 3/8" x 25' A .20 A.D., 2 CARAS:Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes del análisis anterior (2-11)

MUROS 0.15, 180 Kg/Cm², 60, 3/8" x 20' A .20 A.D., 2 CARAS:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.15, 180 Kg/Cm², 60, 3/8" x 25' A .20 A.D., 2 CARAS:Acero 3/8" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.15, 210 Kg/Cm², 40 3/8" x 20' A .20 A.D., 2 CARAS:Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Planchas plywood 4'x8'x¾" (8 usos).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (½ lb / m²).Alambre calibre #14 (½ lb. / m²).Confección madera (dos caras).Instalación madera (dos caras).Desencofrado.Horm. 210 Kg/Cm² + 5% desp.

Page 228: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 210

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

MUROS 0.15, 210 Kg/Cm², 40 3/8" x 25' A .20 A.D., 2 CARAS:Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes del análisis anterior (2-11)

MUROS 0.15, 210 Kg/Cm², 60, 3/8" x 20' A .20 A.D., 2 CARAS:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.15, 210 Kg/Cm², 60, 3/8" x 25' A .20 A.D., 2 CARAS:Acero 3/8" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.15, 240 Kg/Cm², 40, 3/8" x 20' A .20 A.D., 2 CARAS:Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Planchas plywood 4'x8'x¾" (8 usos).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (½ lb / m²).Alambre calibre #14 (½ lb. / m²).Confección madera (dos caras).Instalación madera (dos caras).Desencofrado.Horm. 240 Kg/Cm² + 5% desp.

MUROS 0.15, 240 Kg/Cm², 40, 3/8" x 25' A .20 A.D., 2 CARAS:Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes del análisis anterior (2-11)

MUROS 0.15, 240 Kg/Cm², 60, 3/8" x 20' A .20 A.D., 2 CARAS:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.15, 240 Kg/Cm², 60, 3/8" x 25' A .20 A.D., 2 CARAS:Acero 3/8" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

Page 229: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 211

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

MUROS 0.20, 180 Kg/Cm², 40, 3/8" x 20' A .20 A.D., 2 CARAS:Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Planchas plywood 4'x8'x¾" (8 usos).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (½ lb / m²).Alambre calibre #14 (½ lb. / m²).Confección madera (dos caras).Instalación madera (dos caras).Desencofrado.Horm. 180 Kg/Cm² + 5% desp.

MUROS 0.20, 180 Kg/Cm², 40, 3/8" x 25' A .20 A.D., 2 CARAS:Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes del análisis anterior (2-11)

MUROS 0.20, 180 Kg/Cm², 60, 3/8" x 20' A .20 A.D., 2 CARAS:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.20, 180 Kg/Cm², 60, 3/8" x 25' A .20 A.D., 2 CARAS:Acero 3/8" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.20, 210 Kg/Cm², 40, 3/8" x 20' A .20 A.D., 2 CARAS:Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Planchas plywood 4'x8'x¾" (8 usos).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (½ lb / m²).Alambre calibre #14 (½ lb. / m²).Confección madera (dos caras).Instalación madera (dos caras).Desencofrado.Horm. 210 Kg/Cm² + 5% desp.

MUROS 0.20, 210 Kg/Cm², 40, 3/8" x 25' A .20 A.D., 2 CARAS:

Page 230: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 212

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes del análisis anterior (2-11)

MUROS 0.20, 210 Kg/Cm², 60, 3/8" x 20' A .20 A.D., 2 CARAS:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.20, 210 Kg/Cm², 60, 3/8" x 25' A .20 A.D., 2 CARAS:Acero 3/8" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.20, 210 Kg/Cm², 40, ½" x 20' A .10 A.D., 2 CARAS:Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Planchas plywood 4'x8'x¾" (8 usos).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (½ lb / m²).Alambre calibre #14 (½ lb. / m²).Confección madera (dos caras).Instalación madera (dos caras).Desencofrado.Horm. 210 Kg/Cm² + 5% desp.

MUROS 0.20, 210 Kg/Cm², 40, ½" x 25' A .10 A.D., 2 CARAS:Acero ½" x 25' grado 40 + 10% desp.Partidas comunes del análisis anterior (2-11)

MUROS 0.20, 210 Kg/Cm², 60, ½" x 20' A .10 A.D., 2 CARAS:Acero ½" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.20, 210 Kg/Cm², 60, ½" >20' A .10 A.D., 2 CARAS:Acero ½" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.20, 210 Kg/Cm², 40, ½" x 20' A .20 A.D., 2 CARAS:

Page 231: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 213

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Planchas plywood 4'x8'x¾" (8 usos).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (½ lb / m²).Alambre calibre #14 (½ lb. / m²).Confección madera (dos caras).Instalación madera (dos caras).Desencofrado.Horm. 210 Kg/Cm² + 5% desp.

MUROS 0.20, 210 Kg/Cm², 40, ½" x 25' A .20 A.D., 2 CARAS:Acero ½" x 25' grado 40 + 10% desp.Partidas comunes del análisis anterior (2-11)

MUROS 0.20, 210 Kg/Cm², 60, ½" x 20' A .20 A.D., 2 CARAS:Acero ½" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.20, 210 Kg/Cm², 60, ½" x 25' A .20 A.D., 2 CARAS:Acero ½" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.20, 240 Kg/Cm², 40, ½" x 20' A .10 A.D., 2 CARAS:Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Planchas plywood 4'x8'x¾" (8 usos).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (½ lb / m²).Alambre calibre #14 (½ lb. / m²).Confección madera (dos caras).Instalación madera (dos caras).Desencofrado.Horm. 240 Kg/Cm² + 5% desp.

MUROS 0.20, 240 Kg/Cm², 40, ½" x 25' A .10 A.D., 2 CARAS:Acero ½" x 25' grado 40 + 10% desp.

Page 232: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 214

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Partidas comunes del análisis anterior (2-11)

MUROS 0.20, 240 Kg/Cm², 60, ½" x 20' A .10 A.D., 2 CARAS:Acero ½" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.20, 240 Kg/Cm², 60, ½" x 25' A .10 A.D., 2 CARAS:Acero ½" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.20, 240 Kg/Cm², 40, ½" x 20' A .20 A.D., 2 CARAS:Acero ½" x 20' grado 40 + 10% desp.M.O. acero.Planchas plywood 4'x8'x¾" (8 usos).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (½ lb / m²).Alambre calibre #14 (½ lb. / m²).Confección madera (dos caras).Instalación madera (dos caras).Desencofrado.Horm. 240 Kg/Cm² + 5% desp.

MUROS 0.20, 240 Kg/Cm², 40, ½" x 25' A .20 A.D., 2 CARAS:Acero ½" x 25' grado 40 + 10% desp.Partidas comunes del análisis anterior (2-11)

MUROS 0.20, 240 Kg/Cm², 60, ½" x 20' A .20 A.D., 2 CARAS:Acero ½" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

MUROS 0.20, 240 Kg/Cm², 60, ½" x 25' A .20 A.D., 2 CARAS:Acero ½" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-11)

HORM. ARMADO RAMPAS ESCALERAS

Page 233: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 215

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

RAMPAS H=12, 1:2:4, 40, ½" A .20, 3/8" A .20, LIG. Y WINCHE:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero (rampa).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (.10 lb / m2).Alambre calibre #14 (.30 lb. / m2).Encofrado.Desencofrado.Horm. 1:2:4 lig. y winche + 10% desp.

RAMPAS H=12, 1:2:4, 40, ½"X25' A .20, 3/8" A .20, LIG. Y WINCHE:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 25' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (3-10)

RAMPAS H=12, 1:2:4, 60, ½" X 20' A .20, 3/8" A .20, LIG. Y WINCHE:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (3-10)

RAMPAS H=12, 1:2:4, 60, ½"X25' A .20, 3/8" A .20, LIG. Y WINCHE:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (3-10)

RAMPAS H=12, 1:2:4, 40, ½" A .20, 3/8" A .20, A MANO:Partidas comunes de la analizada completa anterior (1-9)Horm. 1:2:4 a mano + 10% desp.

RAMPAS H=12, 1:2:4, 40, ½"X25' A .20, 3/8" A .20, A MANO:Acero ½" x 25' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (1, 3-9)Horm. 1:2:4 a mano + 10% desp.

RAMPAS H=12, 1:2:4, 60, ½" X 20' A .20, 3/8" A .20, A MANO:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (3-9)

Page 234: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 216

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Horm. 1:2:4 a mano + 10% desp.

RAMPAS H=12, 1:2:4, 60, ½"X25' A .20, 3/8" A .20, A MANO:Acero ½" x 25' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (1, 3-9)Horm. 1:2:4 a mano + 10% desp.

RAMPAS H=12, 180 kg/Cm², 40, ½" A .20 Y 3/8" A .20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero (rampa).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (.10 lb / m2).Alambre Calibre #14 (.30 lb. / m2).Encofrado.Desencofrado.Horm. 180 Kg/Cm².

RAMPAS H=12, 180 kg/Cm², 40, ½"X25' A .20 Y 3/8" A .20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 25' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (3-10)

RAMPAS H=12, 180 kg/Cm², 60, ½" A .20 Y 3/8" A .20:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (3-10)

Page 235: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 217

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

RAMPAS H=12, 180 kg/Cm², 60, ½"X25' A .20 Y 3/8" A .20:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (3-10)

RAMPAS H=12, 210 kg/Cm², 40, ½" A .20 Y 3/8" A .20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero (rampa).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (.10 lb / m2).Alambre Calibre #14 (.30 lb. / m2).Encofrado.Desencofrado.Horm. 210 Kg/Cm².

RAMPAS H=12, 210 kg/Cm², 40, ½"X25' A .20 Y 3/8" A .20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 25' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (3-10)

RAMPAS H=12, 210 kg/Cm², 60, ½" A .20 Y 3/8" A .20:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (3-10)

RAMPAS H=12, 210 kg/Cm², 60, ½"X25' A .20 Y 3/8" A .20:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (3-10)

RAMPAS H=12, 240 kg/Cm², 40, ½" A .20 Y 3/8" A .20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.M.O. acero (rampa).Madera bruta amer. (4 usos).Clavos corrientes (10 lb. / 100 pie madera).Clavos de acero (.10 lb / m2).Alambre Calibre #14 (.30 lb. / m2).Encofrado.

Page 236: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 218

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Desencofrado.Horm. 240 Kg/Cm².

RAMPAS H=12, 240 kg/Cm², 40, ½" A .20 Y 3/8" A .20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 25' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (3-10)

RAMPAS H=12, 240 kg/Cm², 60, ½" A .20 Y 3/8" A .20:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (3-10)

RAMPAS H=12, 240 kg/Cm², 60, ½" A .20 Y 3/8" A .20:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Partidas comunes de la analizada completa anterior (3-10)

HORM. ARMADO VIGAS

H. A. VIGA 20X40, 1:2:4, 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20, LIG. Y WINCHE:Acero 3/8" x 20' grado 40 + 10% desp..Acero ¾" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 1:2:4 lig. y winche + 10% desp.

H. A. VIGA 20X40, 1:2:4, 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20, LIG. Y WINCHE:Acero 3/8" x 20' grado 60 + 10% desp..Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

H. A. VIGA 25X50, 1:2:4, 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25, LIG. Y WINCHE:

Page 237: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 219

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero 3/8" x 20' grado 40 + 10% desp..Acero ¾" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 1:2:4 lig. y winche + 10% desp.

H. A. VIGA 25X50, 1:2:4, 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25, LIG. Y WINCHE:Acero 3/8" x 20' grado 60 + 10% desp..Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

H. A. VIGA 30X60, 1:2:4, 40, 4 DE 1", 2 DE 3/8", 3/8" A .25, LIG. Y WINCHE:Acero 3/8" x 20' grado 40 + 10% desp..Acero 1" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 1:2:4 lig. y winche + 10% desp.

H. A. VIGA 30X60, 1:2:4, 60, 4 DE 1", 2 DE 3/8", 3/8" A .25, LIG. Y WINCHE:Acero 3/8" x 20' grado 60 + 10% desp..Acero 1" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (4-11)

H. A. VIGA 40X80, 1:2:4, 40, 5 DE 1", 2 DE ½", 3/8" A .25, LIG. Y WINCHE:Acero 3/8" x 20' grado 40 + 10% desp..Acero ½" x 20' grado 40 + 10% desp.Acero 1" grado 40 + 10% desp..

Page 238: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 220

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 1:2:4 lig. y winche + 10% desp.

H. A. VIGA 40X80, 1:2:4, 40, 5 DE 1", 2 DE ½" X 25', 3/8" A .25, LIG. Y WINCHE:Acero 3/8" x 20' grado 40 + 10% desp..Acero ½" x 25' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (3-12)

H. A. VIGA 40X80, 1:2:4, 60, 5 DE 1", 2 DE ½", 3/8" A .25, LIG. Y WINCHE:Acero 3/8" x 20' grado 60 + 10% desp..Acero ½" x 20' grado 60 + 10% desp.Acero 1" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 20X40, 180 kg/Cm², 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 180 Kg/Cm².

H. A. VIGA 20X40, 180 kg/Cm², 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20: PORTICOPartidas comunes de la analizada completa anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 20X40, 180 kg/Cm², 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20:

Page 239: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 221

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 20X40, 180 kg/Cm², 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 25X50, 180 kg/Cm², 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 180 Kg/Cm².

H. A. VIGA 20X50, 180 kg/Cm², 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25: PORTICOPartidas comunes de la analizada completa anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 20X50, 180 kg/Cm², 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25:Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 20X50, 180 kg/Cm², 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

Page 240: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 222

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

H. A. VIGA 30X60, 180 kg/Cm², 40, 4 DE 1", 2 DE 3/8", 3/8" A .25:Acero 3/8" x 20' grado 40 + 10% desp.Acero 1" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 180 Kg/Cm².

H. A. VIGA 30X60, 180 kg/Cm², 40, 4 DE 1", 2 DE 3/8", 3/8" A .25: PORTICOPartidas comunes de la analizada completa anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 30X60, 180 kg/Cm², 60, 4 DE 1", 2 DE 3/8", 3/8" A .25:Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 30X60, 180 kg/Cm², 60, 4 DE 1", 2 DE 3/8", 3/8" A .25: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 180 kg/Cm², 40, 5 DE 1", 2 DE ½", 3/8" A .25:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.Acero 1" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.

Page 241: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 223

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Desencofrado.Horm. 180 Kg/Cm².

H. A. VIGA 40X80, 180 kg/Cm², 40, 5 DE 1", 2 DE ½", 3/8" A .25: PORTICOPartidas comunes de la analizada completa anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 180 kg/Cm², 60, 5 DE 1", 2 DE ½", 3/8" A .25:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.Acero 1" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 180 kg/Cm², 60, 5 DE 1", 2 DE ½", 3/8" A .25: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.Acero 1" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 180 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

Page 242: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 224

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

H. A. VIGA 40X80, 180 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 20X40, 210 kg/Cm², 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 210 Kg/Cm².

H. A. VIGA 20X40, 210 kg/Cm², 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20: PORTICOPartidas comunes de la analizada completa anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 20X40, 210 kg/Cm², 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20:Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 20X40, 210 kg/Cm², 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 25X50, 210 kg/Cm², 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" grado 40 + 10% desp..M.O. acero.

Page 243: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 225

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 210 Kg/Cm².

H. A. VIGA 25X50, 210 kg/Cm², 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25: PORTICOPartidas comunes de la analizada completa anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 25X50, 210 kg/Cm², 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25:Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 25X50, 210 kg/Cm², 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 30X60, 210 kg/Cm², 40, 4 DE 1", 2 DE 3/8", 3/8" A .25:Acero 3/8" x 20' grado 40 + 10% desp.Acero 1" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 210 Kg/Cm².

H. A. VIGA 30X60, 210 kg/Cm², 40, 4 DE 1", 2 DE 3/8", 3/8" A .25: PORTICOPartidas comunes de la analizada completa anterior (1-2)

Page 244: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 226

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 30X60, 210 kg/Cm², 60, 4 DE 1", 2 DE 3/8", 3/8" A .25:Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

Page 245: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 227

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

H. A. VIGA 30X60, 210 kg/Cm², 60, 4 DE 1", 2 DE 3/8", 3/8" A .25: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 210 kg/Cm², 40, 5 DE 1", 2 DE ½", 3/8" A .25:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.Acero 1" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 210 Kg/Cm².

H. A. VIGA 40X80, 210 kg/Cm², 40, 5 DE 1", 2 DE ½", 3/8" A .25: PORTICOPartidas comunes de la analizada completa anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 210 kg/Cm², 60, 5 DE 1", 2 DE ½", 3/8" A .25:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.Acero 1" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 210 kg/Cm², 60, 5 DE 1", 2 DE ½", 3/8" A .25: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.Acero 1" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 210 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25:Acero 3/8" x 20' grado 60 + 10% desp.

Page 246: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 228

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero ½" x 25' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 210 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 20X40, 240 kg/Cm², 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 240 Kg/Cm².

H. A. VIGA 20X40, 240 kg/Cm², 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20: PORTICOPartidas comunes de la analizada completa anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 20X40, 240 kg/Cm², 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20:Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 20X40, 240 kg/Cm², 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

Page 247: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 229

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

H. A. VIGA 25X50, 240 kg/Cm², 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25:Acero 3/8" x 20' grado 40 + 10% desp.Acero ¾" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 240 Kg/Cm².

H. A. VIGA 25X50, 240 kg/Cm², 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25: PORTICOPartidas comunes de la analizada completa anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 25X50, 240 kg/Cm², 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25:Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 25X50, 240 kg/Cm², 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 30X60, 240 kg/Cm², 40, 4 DE 1", 2 DE 3/8", 3/8" A .25:Acero 3/8" x 20' grado 40 + 10% desp.Acero 1" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.

Page 248: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 230

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Desencofrado.Horm. 240 Kg/Cm².

H. A. VIGA 30X60, 240 kg/Cm², 40, 4 DE 1", 2 DE 3/8", 3/8" A .25: PORTICOPartidas comunes de la analizada completa anterior (1-2)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 30X60, 240 kg/Cm², 60, 4 DE 1", 2 DE 3/8", 3/8" A .25:Acero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 30X60, 240 kg/Cm², 60, 4 DE 1", 2 DE 3/8", 3/8" A .25: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 240 kg/Cm², 40, 5 DE 1", 2 DE ½", 3/8" A .25:Acero 3/8" x 20' grado 40 + 10% desp.Acero ½" x 20' grado 40 + 10% desp.Acero 1" grado 40 + 10% desp..M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Encofrado tapas laterales.Encofrado fondo.Desencofrado.Horm. 240 Kg/Cm².

H. A. VIGA 40X80, 240 kg/Cm², 40, 5 DE 1", 2 DE ½", 3/8" A .25: PORTICOPartidas comunes de la analizada completa anterior (1-3)M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 240 kg/Cm², 60, 5 DE 1", 2 DE ½", 3/8" A .25:Acero 3/8" x 20' grado 60 + 10% desp.

Page 249: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 231

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero ½" x 20' grado 60 + 10% desp.Acero 1" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 240 kg/Cm², 60, 5 DE 1", 2 DE ½", 3/8" A .25: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 20' grado 60 + 10% desp.Acero 1" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

H. A. VIGA 40X80, 240 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25:Acero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

Page 250: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 232

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

H. A. VIGA 40X80, 240 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25: PORTICOAcero 3/8" x 20' grado 60 + 10% desp.Acero ½" x 25' grado 60 + 10% desp.Acero ¾" grado 60 + 10% desp..M.O. acero.Partidas comunes de la analizada completa anterior (5-12)

HORM. ARMADO VIGAS AMARRE

VIGA AMARRE 15x20, 1:2:4, 4 DE 3/8" grado 40, ¼" A 20, LIG.:Acero ¼" + 10% desp..Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

VIGA AMARRE 15x20, 1:2:4, 4 DE 3/8" grado 40, ¼" A 20 A MANO:Acero ¼" + 10% desp..Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4 a mano + 10% desp.

VIGA AMARRE 20x20, 1:2:4, 4 DE 3/8", 3/8" A .20 grado 40, LIG.:Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).

Page 251: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 233

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Confección e instalación de madera.Desencofrado.Horm. 1:2:4, LIG. + 10% desp.

VIGA AMARRE 20x20, 1:2:4, 4 DE 3/8", 3/8" A .20 grado 40 A MANO:Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4 a mano + 10% desp.

HORM. ARMADO VUELOS

VUELOS .40x.10, 1:2:4, 40, 3/8" A .20 + 2 DE 3/8", LIG. Y WINCHE:Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Subida acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4 lig. y winche + 10% desp.

VUELOS .40x.10, 1:2:4, 40, 3/8" x 25' A .20 + 2 DE 3/8", LIG. Y WINCHE:Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (2-10)

VUELOS .40x.10, 1:2:4, 60, 3/8" A .20 + 2 DE 3/8", LIG. Y WINCHE:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

VUELOS .40x.10, 1:2:4, 60, 3/8" x 25' A .20 + 2 DE 3/8", LIG. Y WINCHE:Acero 3/8" x 25' grado 60 + 10% desp.

Page 252: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 234

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

VUELOS .40x.12, 1:2:4, 40, 3/8" A .20 + 2 DE 3/8", LIG. Y WINCHE:Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Subida acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 1:2:4 lig. y winche + 10% desp.

VUELOS .40x.12, 1:2:4, 40, 3/8" x 25' A .20 + 2 DE 3/8", LIG. Y WINCHE:Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (2-10)

VUELOS .40x.12, 1:2:4, 60, 3/8" A .20 + 2 DE 3/8", LIG. Y WINCHE:Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

VUELOS .40x.12, 1:2:4, 60, 3/8" x 25' A .20 + 2 DE 3/8", LIG. Y WINCHE:Acero 3/8" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

VUELOS .40x.10, 180 kg/Cm², 40, 3/8" A .20 + 2 DE 3/8" :Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Subida acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 180 Kg/Cm².

Page 253: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 235

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

VUELOS .40x.10, 180 kg/Cm², 40, 3/8" x 25' A .20 + 2 DE 3/8":Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (2-10)

VUELOS .40x.10, 180 kg/Cm², 60, 3/8" A .20 + 2 DE 3/8":Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

VUELOS .40x.10, 180 kg/Cm², 60, 3/8" x 25' A .20 + 2 DE 3/8":Acero 3/8" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

VUELOS .40x.12, 180 kg/Cm², 40, 3/8" A .20 + 2 DE 3/8":Acero 3/8" x 20' grado 40 + 10% desp.M.O. acero.Subida acero.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (¼ lb / metro).Alambre calibre #14 (¼ lb. / metro).Confección e instalación de madera.Desencofrado.Horm. 180 Kg/Cm².

VUELOS .40x.12, 180 kg/Cm², 40, 3/8" x 25' A .20 + 2 DE 3/8", :Acero 3/8" x 25' grado 40 + 10% desp.Partidas comunes de la analizada completa anterior (2-10)

VUELOS .40x.12, 180 kg/Cm², 60, 3/8" A .20 + 2 DE 3/8", :Acero 3/8" x 20' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

VUELOS .40x.12, 180 kg/Cm², 60, 3/8" x 25' A .20 + 2 DE 3/8":Acero 3/8" x 25' grado 60 + 10% desp.M.O. acero.Partidas comunes de la analizada completa anterior (3-10)

Page 254: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 236

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

HORM. ARMADO ZAP. COLUMNAS (1 CAMADA ACERO)

ZAP. COL., 1.2x1.2, 1:3:5, 40, 8 DE ½" A.D., LIG.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 40 + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 1:3:5, LIG. + 2% desp.

ZAP. COL., 1.2x1.2, 1:3:5, 40, 8 DE ½" x 25' A.D., LIG.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 40 + 5% desp.Acero ¾" grado 40 + 5% desp.M.O. acero.Horm. 1:3:5, LIG. + 2% desp.

ZAP. COL., 1.2x1.2, 1:3:5, 60, 8 DE ½" A.D., LIG.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 60 + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 1:3:5, LIG. + 2% desp.

ZAP. COL., 1.2x1.2, 1:3:5, 60, 8 DE ½" x 25' A.D., LIG.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 60 + 5% desp.Acero ¾" grado 60 + 5% desp.M.O. acero.Horm. 1:3:5, LIG. + 2% desp.

ZAP. COL., 1.2x1.2, 1:3:5, 40, 8 DE ½" A.D., LIG.:ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 40 + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 1:3:5, LIG. + 2% desp.

ZAP. COL., 1.2x1.2, 1:3:5, 40, 8 DE ½" x 25' A.D., LIG.:ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 40 + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.

Page 255: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 237

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

M.O. acero.Horm. 1:3:5, LIG. + 2% desp.

ZAP. COL., 1.2x1.2, 1:3:5, 60, 8 DE ½" A.D., LIG.:ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 60 + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 1:3:5, LIG. + 2% desp.

ZAP. COL., 1.2x1.2, 1:3:5, 60, 8 DE ½" x 25' A.D., LIG.:ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 60 + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 1:3:5, LIG. + 2% desp.

ZAP. COL., 1.2x1.2, 140, 40, 8 DE ½" A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" y ¾" grado 40 + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 140 Kg/Cm².

ZAP. COL., 1.2x1.2, 140, 40, 8 DE ½" x 25' A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 40 + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 140 Kg/Cm².

ZAP. COL., 1.2x1.2, 140, 60, 8 DE ½" A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" y ¾" grado 60 + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 140 Kg/Cm².

ZAP. COL., 1.2x1.2, 140, 60, 8 DE ½" x 25' A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 60 + 5% desp.

Page 256: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 238

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 140 Kg/Cm².

ZAP. COL., 1.2x1.2, 140, 40, 8 DE ½" A.D.:ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 140 Kg/Cm².

ZAP. COL., 1.2x1.2, 140, 40, 8 DE ½" x 25' A.D.:ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 140 Kg/Cm².

ZAP. COL., 1.2x1.2, 140, 60, 8 DE ½" A.D.:ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 140 Kg/Cm².

ZAP. COL., 1.2x1.2, 140, 60, 8 DE ½" x 25' A.D.:ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 140 Kg/Cm².

ZAP. COL., 1.2x1.2, 180, 40, 8 DE ½" A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. COL., 1.2x1.2, 180, 40, 8 DE ½" x 25' A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"

Page 257: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 239

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Acero ½" x 25' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. COL., 1.2x1.2, 180, 60, 8 DE ½" A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. COL., 1.2x1.2, 180, 60, 8 DE ½" x 25' A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. COL., 1.2x1.2, 180, 40, 8 DE ½" A.D.:ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. COL., 1.2x1.2, 180, 40, 8 DE ½" x 25' A.D.:ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. COL., 1.2x1.2, 180, 60, 8 DE ½" A.D.:ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. COL., 1.2x1.2, 180, 60, 8 DE ½" x 25' A.D.:

Page 258: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 240

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. COL., 1.2x1.2, 210 Kg/Cm², 40, 8 DE ½" A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 210 Kg/Cm².

ZAP. COL., 1.2x1.2, 210 Kg/Cm², 40, 8 DE ½" x 25' A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 210 Kg/Cm².

ZAP. COL., 1.2x1.2, 210 Kg/Cm², 60, 8 DE ½" A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 210 Kg/Cm².

ZAP. COL., 1.2x1.2, 210 Kg/Cm², 60, 8 DE ½" x 25' A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 210 Kg/Cm².

ZAP. COL., 1.2x1.2, 210 Kg/Cm², 40, 8 DE ½" A.D.:ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.

Page 259: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 241

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Horm. 210 Kg/Cm².

ZAP. COL., 1.2x1.2, 210 Kg/Cm², 40, 8 DE ½" x 25' A.D.:ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 210 Kg/Cm².

ZAP. COL., 1.2x1.2, 210 Kg/Cm², 60, 8 DE ½" A.D.:ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 210 Kg/Cm².

ZAP. COL., 1.2x1.2, 210 Kg/Cm², 60, 8 DE ½" x 25' A.D.:ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 210 Kg/Cm².

ZAP. COL., 1.2x1.2, 240 Kg/Cm², 40, 8 DE ½" A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 240 Kg/Cm².

ZAP. COL., 1.2x1.2, 240 Kg/Cm², 40, 8 DE ½" x 25' A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 240 Kg/Cm².

ZAP. COL., 1.2x1.2, 240 Kg/Cm², 60, 8 DE ½" A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.

Page 260: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 242

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

M.O. acero.Horm. 240 Kg/Cm².

ZAP. COL., 1.2x1.2, 240 Kg/Cm², 60, 8 DE ½" x 25' A.D.:ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 240 Kg/Cm².

ZAP. COL., 1.2x1.2, 240 Kg/Cm², 40, 8 DE ½" A.D.:ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 240 Kg/Cm².

ZAP. COL., 1.2x1.2, 240 Kg/Cm², 40, 8 DE ½" x 25' A.D.:ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 40 y ¾" + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 240 Kg/Cm².

ZAP. COL., 1.2x1.2, 240 Kg/Cm², 60, 8 DE ½" A.D.:ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"Acero ½" x 20' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 240 Kg/Cm².

ZAP. COL., 1.2x1.2, 240 Kg/Cm², 60, 8 DE ½" x 25' A.D.:ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"Acero ½" x 25' grado 60 y ¾" + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 240 Kg/Cm².

HORM. ARMADO ZAP. COLUMNAS (2 CAMADAS ACERO)

Page 261: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 243

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

ZAP. COL., 2.15x2.80, 180, 40, 20 DE ½", 17 DE ½" X 20', 2 CAM.:ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"Acero ½" x 20' grado 40 + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. COL., 2.15x2.80, 180, 40, 20 DE ½", 17 DE ½" x 25', 2 CAM.:ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"Acero ½" x 25' grado 40 + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. COL., 2.15x2.80, 180, 60, 20 DE ½", 17 DE ½" X 20', 2 CAM.:ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"Acero ½" x 20' grado 60 + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. COL., 2.15x2.80, 180, 60, 20 DE ½", 17 DE ½" x 25', 2 CAM.:ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"Acero ½" x 25' grado 60 + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. COL., 2.15x2.80, 210 Kg/Cm², 40, 20 DE ½", 17 DE ½" X 20', 2 CAM.:ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"Acero ½" x 20' grado 40 + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 210 Kg/Cm².

ZAP. COL., 2.15x2.80, 210 Kg/Cm², 40, 20 DE ½", 17 DE ½" x 25', 2 CAM.:ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"Acero ½" x 25' grado 40 + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 210 Kg/Cm².

Page 262: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 244

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

ZAP. COL., 2.15x2.80, 210 Kg/Cm², 60, 20 DE ½", 17 DE ½" X 20', 2 CAM.:ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"Acero ½" x 20' grado 60 + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 210 Kg/Cm².

ZAP. COL., 2.15x2.80, 210 Kg/Cm², 60, 20 DE ½", 17 DE ½" x 25', 2 CAM.:ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"Acero ½" x 25' grado 60 + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 210 Kg/Cm².

ZAP. COL., 2.15x2.80, 240 Kg/Cm², 40, 20 DE ½", 17 DE ½" X 20', 2 CAM.:ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"Acero ½" x 20' grado 40 + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 240 Kg/Cm².

ZAP. COL., 2.15x2.80, 240 Kg/Cm², 40, 20 DE ½", 17 DE ½" x 25', 2 CAM.:ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"Acero ½" x 25' grado 40 + 5% desp.Acero ¾" x 20' grado 40 + 5% desp.M.O. acero.Horm. 240 Kg/Cm².

ZAP. COL., 2.15x2.80, 240 Kg/Cm², 60, 20 DE ½", 17 DE ½" X 20', 2 CAM.:ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"Acero ½" x 20' grado 60 + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.Horm. 240 Kg/Cm².

ZAP. COL., 2.15x2.80, 240 Kg/Cm², 60, 20 DE ½", 17 DE ½" x 25', 2 CAM.:ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"Acero ½" x 25' grado 60 + 5% desp.Acero ¾" x 20' grado 60 + 5% desp.M.O. acero.

Page 263: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 245

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Horm. 240 Kg/Cm².

HORMIGON ARMADO ZAPATAS DE MUROS

ZAP. MURO, 30x20, 1:3:5, 2 DE 3/8", 3/8" A .25 grado 40, LIG.:Acero ¼" (bastones) + 5% desp.Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 1:3:5, LIG. + 2% desp.

ZAP. MURO, 45x20, 1:3:5, 3 DE 3/8", 3/8" A .25 grado 40, LIG.:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 1:3:5, LIG. + 2% desp.

ZAP. MURO, 45x25, 1:3:5, 3 DE 3/8", 3/8" A .25 grado 40, LIG.:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.

Page 264: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 246

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Horm. 1:3:5, LIG. + 2% desp.

ZAP. MURO, 60x25, 1:3:5, 3 DE 3/8", 3/8" A .25 grado 40, LIG.:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 1:3:5, LIG. + 2% desp.

ZAP. MURO, 20x15, 1:2:4, 2 DE 3/8", 3/8" A .30 grado 40, LIG., para Bordillos:Acero ¼" (bastones) + 5% desp.Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 1:2:4, LIG. + 2% desp.

ZAP. MURO, 30x15, 1:2:4, 2 DE 3/8", 3/8" A .30 grado 40, LIG., para Bordillos:Acero 3/8" (bastones) + 5% desp.Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 1:2:4, LIG. + 2% desp.

ZAP. MURO, 40x15, 1:2:4, 2 DE 3/8", 3/8" A .30 grado 40, LIG., para Bordillos:Acero 3/8" (bastones) + 5% desp.Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 1:2:4, LIG. + 2% desp.

ZAP. MURO, 30x20, 1:2:4, 2 DE 3/8", 3/8" A .25 grado 40, LIG.:Acero ¼" (bastones) + 5% desp.Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 1:2:4, LIG. + 2% desp.

ZAP. MURO, 45x20, 1:2:4, 3 DE 3/8", 3/8" A .25 grado 40, LIG.:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 1:2:4, LIG. + 2% desp.

ZAP. MURO, 45x25, 1:2:4, 3 DE 3/8", 3/8" A .25 grado 40, LIG.:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 1:2:4, LIG. + 2% desp.

Page 265: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 247

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

ZAP. MURO, 60x25, 1:2:4, 3 DE 3/8", 3/8" A .25 grado 40, LIG.:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 1:2:4, LIG. + 2% desp.

ZAP. MURO, 30x20, 140, 2 DE 3/8", 3/8" A .25 grado 40:Acero ¼" (bastones) + 5% desp.Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 140 Kg/Cm².

ZAP. MURO, 45x20, 140, 3 DE 3/8", 3/8" A .25 grado 40:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 140 Kg/Cm².

ZAP. MURO, 45x25, 140, 3 DE 3/8", 3/8" A .25 grado 40:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 140 Kg/Cm².

ZAP. MURO, 60x25, 140, 3 DE 3/8", 3/8" A .25 grado 40:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 140 Kg/Cm².

ZAP. MURO, 30x20, 180, 2 DE 3/8", 3/8" A .25 grado 40:Acero ¼" (bastones) + 5% desp.Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. MURO, 45x20, 180, 3 DE 3/8", 3/8" A .25 grado 40:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. MURO, 45x25, 180, 3 DE 3/8", 3/8" A .25 grado 40:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

Page 266: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 248

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

ZAP. MURO, 60x25, 180, 3 DE 3/8", 3/8" A .25 grado 40:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 180 Kg/Cm².

ZAP. MURO, 45x25, 210 Kg/Cm², 3 DE 3/8", 3/8" A .25 grado 40:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.

Page 267: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 249

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Horm. 210 Kg/Cm².

ZAP. MURO, 60x25, 210 Kg/Cm², 3 DE 3/8", 3/8" A .25 grado 40:Acero 3/8" x 20' grado 40 + 5% desp.M.O. acero.Horm. 210 Kg/Cm².

ZAP. MURO, 45x25, 240 Kg/Cm², 3 DE 3/8", 3/8" A .25 grado 40:Acero 3/8" x 20' grado 60 + 5% desp.M.O. acero.Horm. 240 Kg/Cm².

ZAP. MURO, 60x25, 240 Kg/Cm², 3 DE 3/8", 3/8" A .25 grado 40:Acero 3/8" x 20' grado 60 + 5% desp.M.O. acero.Horm. 240 Kg/Cm².

HORMIGONES INDUSTRIALES

HORM. 140 Kg/Cm²:Horm. industrial + 10% desp. + itbisBomba + personal + 10% desp. + itbisAditivo + itbis

HORM. 160 Kg/Cm²:Horm. industrial + 10% desp. + itbisBomba + personal + 10% desp. + itbisAditivo + itbis

HORM. 180 Kg/Cm²:Horm. industrial + 10% desp. + itbisBomba + personal + 10% desp. + itbisAditivo + itbis

HORM. 210 Kg/Cm²:Horm. industrial + 10% desp. + itbisBomba + personal + 10% desp. + itbisAditivo + itbis

HORM. 240 Kg/Cm²:

Page 268: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 250

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Horm. industrial + 10% desp. + itbisBomba + personal + 10% desp. + itbisAditivo + itbis

HORM. 250 Kg/Cm²:Horm. industrial + 10% desp. + itbisBomba + personal + 10% desp. + itbisAditivo + itbis

HORM. 260 Kg/Cm²:Horm. industrial + 10% desp. + itbisBomba + personal + 10% desp. + itbisAditivo + itbis

HORM. 280 Kg/Cm²:Horm. industrial + 10% desp. + itbisBomba + personal + 10% desp. + itbisAditivo + itbis

HORM. 300 Kg/Cm²:Horm. industrial + 10% desp. + itbisBomba + personal + 10% desp. + itbisAditivo + itbis

HORM. 315 Kg/Cm²:Horm. industrial + 10% desp. + itbisBomba + personal + 10% desp. + itbisAditivo + itbis

HORM. 350 Kg/Cm²:Horm. industrial + 10% desp. + itbisBomba + personal + 10% desp. + itbisAditivo + itbis

HORM. 400 Kg/Cm²:Horm. industrial + 10% desp. + itbisBomba + personal + 10% desp. + itbisAditivo + itbis

HORMIGONES SIMPLES

Page 269: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 251

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

LIGADO Y VACIADO A MANO:14.00 m3 horm. 1:3:5 vaciados en 8 horas, a 1.75 m3 por hora.

Madera para puentes (4 de 2"x10"x 12', 6 usos).Carretilla (7 meses de uso).Palas (7 meses de uso).Tanques de agua (7 meses de uso).Cubetas para medir el agua (7 meses de uso).Maestro.Llenador de agregados (TC).Maleteros o acarreadores de agregados (TC).Ligadores (TC).Cementero (acarreador de cemento) (TC).Vaciador y tenedor (TC).Aguatero (TC).

LIGADORA 2 FUNDAS:Rendimiento del equipo: 18.00 m3 horm. 1:3:5 en 5 horas.Potencia del equipo.Vida útil: 5 años. Veloc. depreciación: 20% / año.Costo del equipo.Deprec. 40% 1er. año (Doble veloc. deprec.).Tiempo de trabajo: 1,200 horas / año.Deprec. horaria: Deprec. 1er. año ÷ Tiempo trabajo.Costo inversión: 36% del costo equipo.Costo inv. horario (Costo inversión ÷ Tiempo trabajo).Combustible / hora (.05 gls. / HP potencia).Lubricante (15% consumo combustible).

WINCHE (ELEVADOR):Capacidad: 2000 kilosAltura elevación: 12 m. Velocidad elevación: 0.50 m./seg.Tiempo elevación: 24 seg. Cant. m3 elevado: 4 m3 / hora.Vaciado: 18.00 m3 en 5 horas.

Costo del equipo.Depreciación 40% 1er. año (Doble velocidad deprec.).Tiempo de trabajo: 1,200 horas / año.Deprec. horaria: Deprec. 1er. año ÷ Tiempo trabajo.

Page 270: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 252

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Costo inversión: 36% del costo del equipo.Costo inv. horario (Costo inversión ÷ Tiempo trabajo).

COSTO USO, LIG. P/HORA:Depreciación horaria.Costo inversión horaria.Mant. y reparaciones (75% Deprec. horaria).Combustible.Lubricante (15% valor combustible consumido).

COSTO USO WINCHE (ELEVADOR) P/HORA:Depreciación horaria.Costo inversión horaria.Mant. y reparaciones (75% Deprec. horaria).Combustible.Lubricante (15% valor combustible consumido).

LIGADO Y VACIADO,, LIG. 2 FUNDAS:Uso, LIG..Maestro.Cargadores agregados y cemento (3 hombres)Operador.Transp. horm. (3 hombres).Tendedor.

LIGADO Y VACIADO, LIG. 2 FDA. Y WINCHE:Uso, LIG..Uso Winche.Maestro.Cargadores agregados y cemento (3 hombres)Operador.Operador Winche (cargador).Transp. horm. (3 hombres).Vaciador en Winche (cargador).Tendedor.

HORMIGON (1:3:5) A MANO:Arena gruesa lavada.Grava combinada.

Page 271: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 253

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Agua.Cemento gris.Vaciado a mano.

HORMIGON (1:3:5), LIG.:Arena gruesa lavada.Grava combinada.Agua.Cemento gris.Vaciado con, LIG..

HORMIGON (1:3:5) LIG. Y WINCHE:Arena gruesa lavada.Grava combinada.Agua.Cemento gris.Vaciado con lig. y winche.

HORMIGON (1:2:4) A MANO:Arena gruesa lavada.Grava combinada.Agua.Cemento gris.Vaciado a mano.

HORMIGON (1:2:4), LIG.:Arena gruesa lavada.Grava combinada.Agua.Cemento gris.Vaciado con, LIG..

HORMIGON (1:2:4) LIG. Y WINCHE:Arena gruesa lavada.Grava combinada.Agua.Cemento gris.Vaciado con lig. y winche.

IMPERMEABILIZANTES

Page 272: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 254

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

AQUAPEL + TRIPLESEAL (IMPERM. ESTRUCTURAL):Limpieza superficie."AQUAPEL" para .2125 m3 horm. 180.Sellador "TRIPLESEAL" sobre área expuesta.Mano de obra.

SILICOOL:Limpieza superficie.Sellador ALM + 10% desp.Silicool + 10% desp.Mano de obra.

INSTALACION ELECTRICA

LUZ CENITAL:Tubo ½"x20' PVC SDR-26 + 15% desp.Caja octagonal.Alambre #12 TW.Roseta de porcelana.Cinta adhesiva "3M" (rollo).Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Gastos indirectos contratistas eléctricos.

INTERRUPTOR SENCILLO:Tubo ½"x20' PVC SDR-26 + 15% desp.Caja rectangular de ½".Alambre #12 TW.Accesorio.Codos plásticos ½".Cinta adhesiva "3M" (rollo).Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Beneficios contratistas eléctricos.

INTERRUPTOR DOBLE:Tubo ½"x20' PVC SDR-26 + 15% desp.Caja rectangular ½".Alambre #12 TW.

Page 273: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 255

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Accesorio.Codos plásticos ½".Cinta adhesiva "3M" (rollo).Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Beneficios contratistas eléctricos.

INTERRUPTOR TRIPLE:Tubo ½"x20' PVC SDR-26 + 15% desp.Caja rectangular ½".Alambre #12 TW.Accesorio.Codos plásticos ½".Cinta adhesiva "3M" (rollo).Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Beneficios contratistas eléctricos.

INTERRUPTOR TRES VIAS:Tubo ½"x20' PVC SDR-26 + 15% desp.Caja rectangular ½".Alambre #12 TW.Accesorio.Codos plásticos ½".Cinta adhesiva "3M" (rollo).Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Beneficios contratistas eléctricos.

Page 274: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 256

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

INTERRUPTOR CUATRO VIAS:Tubo ½"x20' PVC SDR-26 + 15% desp.Caja rectangular ½".Alambre #12 TW.Accesorio.Codos plásticos ½".Cinta adhesiva "3M" (rollo).Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Beneficios contratistas eléctricos.

INTERRUPTOR PILOTO:Tubo ½"x20' PVC SDR-26 + 15% desp.Caja rectangular ½".Alambre #12 TW.Accesorio.Codos plásticos ½".Cinta adhesiva "3M" (rollo).Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Beneficios contratistas eléctricos.

TOMACORRIENTE DOBLE 110 V.:Tubo ½"x20' PVC SDR-26 + 15% desp.Caja rectangular ½".Alambre #12 TW+ 5% desp.Accesorio.Codos plásticos ½".Cinta adhesiva "3M" (rollo).Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Beneficios contratistas eléctricos.

TOMACORRIENTE SENCILLO 220 V.:Tubo ¾"x10' PVC SDR-26 + 15% desp.Caja rectangular ¾".Alambre #10 TW + 5% desp.Alambre #12 TW+ 5% desp.Accesorio.Codos plásticos ¾".Cinta adhesiva "3M" (rollo).

Page 275: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 257

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Beneficios contratistas eléctricos.

SALIDA CALENTADOR:Tubo ½"x20' PVC SDR-26 + 15% desp.Caja rectangular ½".Alambre #12 TW+ 5% desp.Accesorio.Codos plásticos ½".Cinta adhesiva "3M" (rollo).Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Beneficios contratistas eléctricos.

SALIDA TELEFONO:Tubo ½"x20' PVC SDR-26 + 15% desp.Caja rectangular ½".Alambre dulce #18+ 5% desp.Accesorio (tapa ciega pvc).Codos plásticos ½".Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Beneficios contratistas eléctricos.

TIMBRE CORRIENTE:Tubo ½"x20' PVC SDR-26 + 15% desp.Caja rectangular ½".Alambre #14 TW+ 5% desp.Accesorio.Codos plásticos ½".Cinta adhesiva "3M" (rollo).Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Beneficios contratistas eléctricos.

BOTON DE TIMBRE:Tubo ½"x20' PVC SDR-26 + 15% desp.Caja rectangular ½".Alambre #14 TW + 5% desp.Accesorio.

Page 276: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 258

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Codos plásticos ½".Cinta adhesiva "3M" (rollo).Cemento PVC + 30% desp. (¼ gl.)Mano de obra.Beneficios contratistas eléctricos.

PANEL DISTRIBUCION 2 CIRCUITOS:"Breakers" 15 A.Panel distribución.Hacer hueco y colocar panel.Coloc. "Breakers".Beneficios contratistas eléctricos.

PANEL DISTRIBUCION 4 CIRCUITOS:"Breakers" 15 A.Panel distribución.Hacer hueco y colocar panel.Coloc. "Breakers".Beneficios contratistas eléctricos.

PANEL DISTRIBUCION 6 CIRCUITOS:"Breakers" 15 y 20 A.Panel distribución.Hacer hueco y colocar panel.Coloc. "Breakers".Beneficios contratistas eléctricos.

PANEL DISTRIBUCION 8 CIRCUITOS:"Breakers" 15 y 20 A.Panel distribución.Hacer hueco y colocar panel.Coloc. "Breakers".Beneficios contratistas eléctricos.

PANEL DISTRIBUCION 12 CIRCUITOS:"Breakers" 15 y 20 A.Panel distribución.Hacer hueco y colocar panel.Coloc. "Breakers".Beneficios contratistas eléctricos.

Page 277: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 259

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

PANEL DISTRIBUCION 16 CIRCUITOS:"Breakers" 15 y 20 A.Panel distribución.Hacer hueco y colocar panel.Coloc. "Breakers".Beneficios contratistas eléctricos.

PANEL DISTRIBUCION 24 CIRCUITOS:"Breakers" 15 y 20 A.Panel distribución.Hacer hueco y colocar panel.Coloc. "Breakers".Beneficios contratistas eléctricos.

INSTALACION SANITARIA

BAÑERA LIVIANA, BLANCA O A COLOR:Tubo 2", pvc SDR-41 + 10% desp.Sifón 2", pvc drenaje.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Unión univ. ½", h.g.Niple ½"x4", h.g.Pintura OXIDO ROJO en tub. h.g.BAÑERA liviana blanca o a color.Mezcl. p/bañera, 3 puños, "SAYCO".Desagüe autom. p/bañera, pvc.Sifón 2", pvc.Cemento bco.Teflón + 25% desp.Horm. frotado en base p/bañera.Excavar y tapar zanja (tierra).Mano de obra desagüe de 2.Mano de obra salidas ½".Mano de obra albañilería, base p/bañera.

Page 278: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 260

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Mano de obra coloc. mezcl..Mano de obra coloc. bañera liviana.

BAÑERA HIERRO FUNDIDO, BLANCA:Tubo 2", pvc SDR-41 + 10% desp.Sifón 2", pvc dren.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Unión univ. ½", h.g.Niple ½"x4", h.g.Pintura OXIDO ROJO en tub. h.g.BAÑERA hierro fundido bca.Mezcl. p/bañera, 3 puños, "SAYCO".Desagüe autom. p/bañera, pvc.Sifón 2", pvc.Cemento bco.Teflón + 25% desp.Horm. frotado en base p/bañera.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra albañilería, base p/bañera.Mano de obra coloc. mezcl..Mano de obra coloc. bañera hierro fundido.

BAÑERA HIERRO FUNDIDO, A COLOR:Tubo 2", pvc SDR-41 + 10% desp.Sifón 2", pvc dren.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Unión univ. ½", h.g.

Page 279: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 261

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Niple ½"x4", h.g.Pintura OXIDO ROJO en tub. h.g.BAÑERA hierro fundido a color.Mezcl. p/bañera, 3 puños, "SAYCO".Desagüe autom. p/bañera, pvc.Sifón 2", pvc.Cemento bco.Teflón + 25% desp.Horm. frotado en base p/bañera.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra albañilería, base p/bañera.Mano de obra coloc. mezcl..Mano de obra coloc. bañera hierro fundido.

BIDET BLANCO:Tubo 2", pvc SDR-41 + 10% desp.Sifón 2", pvc dren.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.BIDET bco.Mezcl. p/bidet, completa, con boquilla.Tornillos fijación.Cemento bco.Llave angular 3/8".Niple 3/8"x2 ½", cromo.Tubo flexible con tuerca.Cubrefalta 3/8", cromo.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. bidet.

Page 280: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 262

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

BIDET A COLOR:Tubo 2", pvc SDR-41 + 10% desp.Sifón 2", pvc dren.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.BIDET a color.Mezcl. p/bidet, completa, con boquilla.Tornillos fijación.Cemento bco.Llave angular 3/8".Niple 3/8"x2 ½", cromo.Tubo flexible con tuerca.Cubrefalta 3/8", cromo.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. bidet.

CAMARA INSP., CALICHE, .60X.60X.60 M. INT.:Excavación caliche (.8x.8x.8 m.).Bote material excavado.Horm. 1:3:5 en losas.Acero ¼" incrustado losa.Acero 3/8" x 20' grado 40 en tapa.Bloques 4".Horm. 1:3:5 en int.Mortero 1:2 imperm. (4 mm. + 20% desp.)Mano de obra.

CAMARA INSP., ROCA, .60X.60X.60 M. INT.:Excavación roca (.8x.8x.8 m.).Bote material excavado.

Page 281: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 263

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Horm. 1:3:5 en losas.Acero ¼" incrustado losa.Acero 3/8" x 20' grado 40 en tapa.Bloques 4".Horm. 1:3:5 en int.Mortero 1:2 imperm. (4 mm. + 20% desp.)Mano de obra.

CAMARA INSP., TIERRA, .60X.60X.60 M. INT.:Excavación en tierra (.8x.8x.8 m.).Bote material excavado.Horm. 1:3:5 en losas.Acero ¼" incrustado losa.Acero 3/8" x 20' grado 40 en tapa.Bloques 4".Horm. 1:3:5 en int.Mortero 1:2 imperm. (4 mm. + 20% desp.)Mano de obra.

CAMARA SEPTICA, CALICHE, 1.70X3.40X1.60 M. INT.:Excav. caliche (2.00x3.70x2.00 mt.).Bote material excavado.Horm. 1:2:4 en losas.Acero 3/8" x 20' grado 40 en losas.Bloques 6".Horm. 1:3:5 llenado todos los hoyos.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (.08 lb / m2).Alambre calibre #14 (.15 lb. / m2).Confección madera.Desencofrado.Empañete pulido int.

CAMARA SEPTICA, ROCA, 1.70X3.40X1.60 M. INT.:Excav. roca a mano (2.00x3.70x2.00 mt.).Bote material excavado.Horm. 1:2:4 en losas.Acero 3/8" x 20' grado 40 en losas.Bloques 6".Horm. 1:3:5 llenado todos los hoyos.

Page 282: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 264

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (.08 lb / m2).Alambre calibre #14 (.15 lb. / m2).Confección madera.Desencofrado.Empañete pulido int.

CAMARA SEPTICA, TIERRA, 1.70X3.40X1.60 M. INT.:Excav. tierra (2.00x3.70x2.00 mt.).Bote material excavado.Horm. 1:2:4 en losas.Acero 3/8" x 20' grado 40 en losas.Bloques 6".Horm. 1:3:5 llenado todos los hoyos.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (.08 lb / m2).Alambre calibre #14 (.15 lb. / m2).Confección madera.Desencofrado.Empañete pulido int.

CISTERNA 4,000 GLS., CALICHE, 2.50X3.50X2.00 M. INT.:Excav. en caliche (3.0x4.0x2.50 m.).Bote material excavado.Horm. 1:2:4 en losas (losa piso y losa superior h=0.12 m.).Acero 3/8" x 20' grado 40 en losa piso.Acero 3/8" x 20' grado 40 en losa superior.Bloques 8" todos los hoyos llenos.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (.08 lb / m2).Alambre calibre #14 (.15 lb. / m2).Confección madera.Desencofrado.Empañete pulido int.Zabaletas en esq. paredes int. y en piso.Bloques 6" en tapa.Empañete liso en tapa.Cantos en tapa.

Page 283: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 265

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Tapa de Hierro.

CISTERNA 8,000 GLS., ROCA, 2.50X3.50X2.00 M. INT.:Excav. roca a mano (3.00x4.00x2.50 m.).Bote material excavado.Horm. 1:2:4 en losas (losa piso y losa superior h=0.12 m.).Acero 3/8" x 20' grado 40 en losa piso.Acero 3/8" x 20' grado 40 en losa superior.Bloques 8'' todos los hoyos llenos.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (.08 lb / m2).Alambre calibre #14 (.15 lb. / m2).Confección madera.Desencofrado.Empañete pulido int.Zabaletas en esq. paredes int. y en piso.Bloques 6'' en tapa.Empañete liso en tapa.Cantos en tapa.Tapa de Hierro.

CISTERNA 8,000 GLS., TIERRA, 2.50X3.50X2.00 M. INT.:Excav. en tierra (3.0x4.0x2.50 m.).Bote material excavado.Horm. 1:2:4 en losas (losa piso y losa superior h=0.12 m.).Acero 3/8" x 20' grado 40 en losa piso.Acero 3/8" x 20' grado 40 en losa superior.Bloques 8" todos los hoyos llenos.Madera bruta amer. (4 usos).Clavos corrientes (5 lb. / 100 pie madera).Clavos de acero (.08 lb / m2).Alambre calibre #14 (.15 lb. / m2).Confección madera.Desencofrado.Empañete pulido int. (paredes y piso).Zabaletas en esq. paredes int. y en piso.Bloques 6" en tapa.Empañete liso en tapa.Cantos en tapa.Tapa de Hierro.

Page 284: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 266

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

DESAGÜE DE PISO 2", INSTALADO (TUB. MATRIZ 4"):Tubo 2", pvc SDR-41 + 10% desp.Sifón 2", pvc dren.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Rejilla de piso 2", cromo.Cemento pvc criollo, PINTA + 25% desp..Mano de obra desagüe 2".

DESAGÜE DE PISO 3", INSTALADO (TUB. MATRIZ 4"):Tubo 3", pvc SDR-41 + 10% desp.Sifón 3", pvc dren.Yee red. 4"x3", pvc dren.Codo 3"x45, pvc dren.Codo 3"x90, pvc dren.Rejilla de piso 3" x 1 ½", cromoCemento pvc criollo, PINTA + 25% desp..Mano de obra desagüe 3".

DESAGÜE DE PISO 4", INSTALADO (TUB. MATRIZ 4"):Tubo 4", pvc SDR-41 + 10% desp.Sifón 4", pvc dren.Yee de 4"x4", pvc dren.Codo 4"x45, pvc dren.Codo 4"x90, pvc dren.Rejilla de piso 4", aluminioCemento pvc criollo, PINTA + 25% desp..Mano de obra desagüe 4".

DESAGÜE DE PISO 4", INSTALADO (TUB. MATRIZ 6"):Tubo 4", pvc SDR-41 + 10% desp.Sifón 4", pvc dren.Yee de 6"x4", pvc dren.Codo 4"x45, pvc dren.Codo 4"x90, pvc dren.Rejilla de piso 4", aluminioCemento pvc criollo, PINTA + 25% desp..Mano de obra desagüe 4".

Page 285: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 267

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

DUCHA: (Agua fría solamente)Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Unión univ. ½", h.g.Niple ½"x4", h.g.Pintura OXIDO ROJO en tub. h.g.Ducha cte. plástica, ½", cromo.Llave de empotrar ½", cromo, NIBCO.Sifón 2", pvc.Cemento bco.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe de 2.Mano de obra salidas ½".Mano de obra coloc. llave de empotrar.Mano de obra coloc. ducha.

FREG. A. INOX. DOBLE, H.G., MANGUERA:Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.FREG. DOBLE a. inox..Mezcl. "SAYCO" con manguera.Boquilla para freg., cromo.Sifón 1 ½", pvc.Desagüe doble para freg., pvc."Silicone" para sellar (tubo).Cemento bco.

Page 286: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 268

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Llave angular 3/8".Niple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. fregadero doble.

FREG. A. INOX. SENCILLO, H.G., MANGUERA:Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub.s h.g.FREG. SENCILLO a. inox.Mezcl. "SAYCO" con manguera.Boquilla para freg., cromo.Sifón 1 ½", pvc.Desagüe doble para fregadero, pvc."Silicone" para sellar (tubo).Cemento bco.Llave angular 3/8".Niple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. fregadero sencillo.

INODORO BCO., TAPA: BAÑO SERVICIOTubo 4", pvc SDR-41 + 10% desp.Yee de 4"x4", pvc dren.

Page 287: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 269

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Codo 4"x45, pvc dren.Codo 4"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub.s h.g.INODORO corriente, bco., CON TAPA.Arandela pvc 4", para fijar inodoro.Tornillos fijación.Junta de cera.Cemento bco.Llave angular 3/8".Niple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 4".Mano de obra salidas ½".Mano de obra coloc. inodoro.

INODORO, BCO., SIN TAPA: BAÑO SERV.Tubo 4", pvc SDR-41 + 10% desp.Yee de 4"x4", pvc dren.Codo 4"x45, pvc dren.Codo 4"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub.s h.g.INODORO corriente, bco., SIN TAPA.Arandela pvc 4", para fijar inodoro.Tornillos fijación.Junta de cera.Cemento bco.Llave angular 3/8".Niple 3/8"x2 ½", cromo.

Page 288: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 270

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 4".Mano de obra salidas ½".Mano de obra coloc. inodoro.

INODORO ALARGADO BCO.:Tubo 4", pvc SDR-41 + 10% desp.Yee de 4"x4", pvc dren.Codo 4"x45, pvc dren.Codo 4"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.INODORO alargado, bco., TAPA.Arandela pvc 4", para fijar inodoro.Tornillos fijación.Junta de cera.Cemento bco.Llave angular 3/8".Niple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 4".Mano de obra salidas ½".Mano de obra coloc. inodoro.

INODORO ALARGADO A COLOR:Tubo 4", pvc SDR-41 + 10% desp.Yee de 4"x4", pvc dren.Codo 4"x45, pvc dren.Codo 4"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).

Page 289: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 271

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.INODORO alargado, color, TAPA.Arandela pvc de 4", para fijar inodoro.Tornillos fijación.Junta de cera.Cemento bco.Llave angular 3/8".Niple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 4".Mano de obra salidas ½".Mano de obra coloc. inodoro.

LAVADERO GRANITO BCO., DOBLE:Tubo 2", pvc SDR-41 + 10% desp. (enterrado).Tubo 1 ½", pvc dren. + 10% desp. (visible).Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Sifón 2", pvc.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.Lavadero GRANITO, doble + itbisTransporte lavadero Sto. Dgo., + itbis (variable)Boquilla para lavadero, cromo, con tapón.Parrilla de piso 4", aluminio.Cemento bco.Llave de chorro ½".Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salida ½".

Page 290: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 272

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Mano de obra coloc. lavadero doble.

LAVADERO GRANITO BCO., SENCILLO:Tubo 2", pvc SDR-41 + 10% desp. (enterrado).Tubo 1 ½", pvc dren. + 10% desp. (visible).Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Sifón 2", pvc.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.Lavadero GRANITO, sencillo + itbisTransporte lavadero Sto. Dgo., + itbis (variable)Boquilla para lavadero, cromo, con tapón.Parrilla de piso 4", aluminio.Cemento bco.Llave de chorro ½".Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salida ½".Mano de obra tub. ½" en piso.Mano de obra coloc. lavadero sencillo.

LAVAMANOS 19"x17", BCO.:Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.Lavamanos 19"x17", BCO.Mezcl. "SAYCO" con boquilla cromo.Sifón 1 ¼", cromo, NIBCO.

Page 291: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 273

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Cola ext. 1 ¼"x8", cromo.Cemento bco.Llave angular 3/8".Niple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. lavamanos.

LAVAMANOS 19"x17", COLOR:Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.Lavamanos 19"x17", COLOR.Mezcl. "SAYCO" con boquilla cromo.Sifón 1 ¼", cromo, NIBCO.Cola ext. 1 ¼"x8", cromo.Cemento bco.Llave angular 3/8".Niple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. lavamanos.

Page 292: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 274

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

LAVAMANOS OVALADO BCO., EMPOTRAR:Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.Lav. ovalado, BCO., empotrar, "SAONA".Mezcl. "SAYCO" con boquilla cromo.Sifón 1 ¼", cromo, NIBCO.Cola ext. 1 ¼"x8", cromo.Cemento bco.Llave angular 3/8".Niple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp."Silicone" para sellar (tubo).Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. lavamanos.

LAVAMANOS OVALADO COLOR, EMPOTRAR:Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.Lavamanos ovalado, COLOR, "SAONA".Mezcl. "SAYCO" con boquilla cromo.Sifón 1 ¼", cromo, NIBCO.

Page 293: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 275

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Cola ext. 1 ¼"x8", cromo.Cemento bco.Llave angular 3/8".Niple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp."Silicone" para sellar (tubo).Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. lavamanos.

LAVAMANOS PEQUEÑO, BCO.: BAÑO SERV.Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.Lavamanos BCO. pequeño, "SIMPLEX".Llave sencilla, cromo.Boquilla para lavamanos, pvc.Sifón 1 ¼", pvc.Cemento bco.Llave angular 3/8".Niple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible pvc.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. lavamanos.

ORINAL ½ FALDA, BCO.:Tubo 2", pvc SDR-41 + 10% desp.

Page 294: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 276

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.Orinal ½ falda "Yaque"Llave cromada p/orinalNiple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. Orinal ½ falda

ORINAL ½ FALDA, BCO., FLUXOMETRO:Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ¾" h.g.Tubo ¾" h.g. + 10% desp.Codo ¾" h.g.Pintura OXIDO ROJO en tub. h.g.Orinal ½ falda "Yaque"Válvula fluxómetro 3/4"Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. Orinal ½ falda

ORINAL FALDA COMPLETA, BCO.:Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.

Page 295: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 277

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.Orinal falda completa"Yaque"Llave cromada p/orinalNiple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. Orinal falda completa

ORINAL FALDA COMPLETA, BCO., FLUXOMETRO:Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ¾" h.g.Tubo ¾" h.g. + 10% desp.Codo ¾" h.g.Pintura OXIDO ROJO en tub. h.g.Orinal falda completa"Yaque"Válvula fluxómetro 3/4"Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ¾".Mano de obra coloc. Orinal falda completa

ORINAL PEQUEÑO, BCO.:Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.

Page 296: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 278

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Codo 2"x90, pvc dren.Cemento pvc criollo, PINTA + 25% desp..Tee ½" h.g. (fría y cal.).Tubo ½" h.g. + 10% desp. (fría y cal.).Codo ½" h.g. (fría y cal.).Red. bushing ½" a 3/8", h.g. (fría y cal.).Pintura OXIDO ROJO en tub. h.g.

Llave cromada p/orinal pequeñoNiple 3/8"x2 ½", cromo.Cubrefalta 3/8", cromo.Tubo flexible con tuerca.Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salidas ½".Mano de obra coloc. Orinal pequeño

TRAMPA GRASA, CALICHE, 1.00X1.00X1.00 M. INT.:Excav. caliche (1.20x1.20x1.20 mt.).Bote material excavado.Horm. 1:3:5 en losas.Acero 3/8" x 20' grado 40 en tapa.Bloques 4".Mortero 1:2 imperm. (4 mm. + 20% desp.)Mano de obra.

TRAMPA GRASA, ROCA, 1.00X1.00X1.00 M. INT.:Excav. roca a mano (1.20x1.20x1.20 mt.).Bote material excavado.Horm. 1:3:5 en losas.Acero 3/8" x 20' grado 40 en tapa.Bloques 4".Mortero 1:2 imperm. (4 mm. + 20% desp.)Mano de obra.

TRAMPA GRASA, TIERRA, 1.00X1.00X1.00 M. INT.:Excav. tierra (1.20x1.20x1.20 m.).Bote material excavado.Horm. 1:3:5 en losas.Acero 3/8" x 20' grado 40 en tapa.

Orinal pequeño, bco. "Simplex"

Page 297: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 279

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Bloques 4".Mortero 1:2 imperm. (4 mm. + 20% desp.)Mano de obra.

VERTEDERO O TINA DE GRANITO, GRIS:Tubo 2", pvc SDR-41 + 10% desp.Yee red. 4"x2", pvc dren.Codo 2"x45, pvc dren.Codo 2"x90, pvc dren.Sifón 2", pvc.Cemento pvc criollo, PINTA + 25% desp..Tee ½" galv.Tubo ½" galv. + 10% desp.Codo ½" galv.Pintura OXIDO ROJO en tub. h.g.Vertedero de GRANITO de una boca + itbisTransporte vertedero en Sto. Dgo. + itbis (variable)Parrilla de piso 4", aluminio.Cemento bco.Llave de chorro ½".Teflón + 25% desp.Excavar y tapar zanja (tierra).Mano de obra desagüe 2".Mano de obra salida ½".Mano de obra tub. ½" en piso.Mano de obra coloc. vertedero sencillo.

MALLAS CICLONICAS

MALLA CICLONICA DE 6 PIES DE ALTO:Abrazadera de 1 ½"Alambre de puas cal. 16 x 90 m. (rollo)Alambre galvanizado #14Barra tensora de 6'Bote material excavadoCarpintería columnas de amarreColocar mallasCopa Final 1 ½"Corte y soldadura de abrazaderasEmpañete liso (en 3 líneas de bloques)

Page 298: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 280

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Excación de zapata (tierra)Hoja de seguetaHorm. 1:2:4 en columnas de amarre (.15 x .20 x .80 m.)Horm. armado zapata (1:3:5, .45 x .20, 3 de 3/8" y 3/8" a .25 m.)Malla ciclónica 6 pies, cal. 9 + 5% desp.Muro de bloques de 6" x 8" x 16" (4 líneas)Reata de amarre (zabaleta doble sin mano de obra)Relleno de reposiciónPalometa 1 ½" doble, en aluminio fundidoTerminal de 1 ¼" + abrazadera de 1 ½"Tubo HG de agua, de 1" x 20" para unir tubos de 1 ¼"Tubo HG ligero de 1 ½" x 15'Tubo HG ligero de 1 ¼" x 20'

M O R T E R O S

MORTERO 1:3, P/COLOCAR BLOQUES:Arena gruesa lavada + 2% desp.Agua.Cemento gris.Mano de obra mezclado (un peón).

MEZCLA DE EMPAÑETE:Arena fina + 2% desp.Cal hidratada (50 lbs.).Mano de obra mezclado (un peón).

MORTERO 1:4 PARA EMPAÑETE:Mezcla de empañete + 3% desp.Cemento gris.Agua.Mano de obra mezclado (un peón).

MORTERO 1:2 IMPERMEABLE P/PULIDO:Arena fina + 2% desp.Agua.Cal hidratada (50 lbs.).Cemento gris.Mano de obra mezclado (un peón).

Page 299: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 281

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

MEZCLA CAL Y ARENA, P/MORTERO COLOC. PISO:Arena gruesa lavada + 2% desp.Cal hidratada (50 lbs.).Mano de obra mezclado (un peón).

MORTERO 1:10, COLOCAR PISOS:Mezcla cal y arena para pisos + 20% desp.Cemento gris.Agua.Mano de obra mezclado (un peón).

PINTURAS

PINTURA ACRILICA EXTERIOR:Pintura (colores preparados).Piedra sobre paredes.Aplicación (dos manos).Desperdicios y retoques.

PINTURA ACRILICA INTERIOR:Pintura.Piedra sobre paredes.Aplicación (dos manos).Desperdicios y retoques.

PINTURA ACRILICA EXTERIOR CON ANDAMIOS:Pintura (colores preparados).Piedra sobre paredes.Aplicación (dos manos).Andamios y GindolasDesperdicios y retoques.

PINTURA EPOXICA:Pintura.Thinner.Piedra sobre paredes.Aplicación (dos manos).Desperdicios y retoques.

PINTURA LACA PARA PUERTAS:

Page 300: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 282

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Pintura.Piedra sobre paredes.Aplicación (dos manos).Desperdicios y retoques.

PINTURA LATEX ''ECONOMICA'' O ''PINTEX'':Pintura.Piedra sobre paredes.Aplicación (dos manos).Desperdicios y retoques.

PINTURA MANTENIMIENTO:Pintura.Thinner.Piedra sobre paredes.Aplicación (dos manos).Desperdicios y retoques.

PINTURA MANTENIMIENTO CON ANDAMIOS:Pintura.Thinner.Piedra sobre paredes.Aplicación (dos manos).Andamios y GindolasDesperdicios y retoques.

PISOS

ACERA FROTADA Y VIOLINADA:Preparación terreno.Horm. 1:3:5 + 5% desp.Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Elaboración, vaciado y frotado.Cantos laterales.

ADOQUIN CLASICO 10X20X20 CM., GRIS:Preparación terreno.Arena lavada.Baldosas + transporte + 5% desp. + itbis

Page 301: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 283

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Corte de chazos.Regla (2 de 1''x4''x2.62' / 10 usos).Cantos laterales.Colocación.

ADOQUIN CLASICO 10X20X20 CM., ROJO:Preparación terreno.Arena lavada.Baldosas + transporte + 5% desp. + itbisCorte de chazos.Regla (2 de 1''x4''x2.62' / 10 usos).Cantos laterales.Colocación.

ADOQUIN CLASICO 10X20X20 CM., QUEMADO:Preparación terreno.Arena lavada.Baldosas + transporte + 5% desp. + itbisCorte de chazos.Regla (2 de 1''x4''x2.62' / 10 usos).Cantos laterales.Colocación.

ADOQUIN COLONIAL 5X10X20 CM., GRIS:Preparación terreno.Arena lavada.Baldosas + transporte + 5% desp. + itbisCorte de chazos.Regla (2 de 1''x4''x2.62' / 10 usos).Cantos laterales.Colocación.

ADOQUIN COLONIAL 5X10X20 CM., ROJO:Preparación terreno.Arena lavada.Baldosas + transporte + 5% desp. + itbisCorte de chazos.Regla (2 de 1''x4''x2.62' / 10 usos).Cantos laterales.Colocación.

Page 302: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 284

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

ADOQUIN MEDITERRANEO, GRIS:Preparación terreno.Arena lavada.Baldosas + transporte + 5% desp. + itbisCorte de chazos.Regla (2 de 1''x4''x2.62' / 10 usos).Cantos laterales.Colocación.

ADOQUIN MEDITERRANEO, ROJO:Preparación terreno.Arena lavada.Baldosas + transporte + 5% desp. + itbisCorte de chazos.Regla (2 de 1''x4''x2.62' / 10 usos).Cantos laterales.Colocación.

ADOQUIN MEDITERRANEO, QUEMADO:Preparación terreno.Arena lavada.Baldosas + transporte + 5% desp. + itbisCorte de chazos.Regla (2 de 1''x4''x2.62' / 10 usos).Cantos laterales.Colocación.

CERAMICA CRIOLLA TIPO 01: Preparación terreno.Horm. 1:3:5 + 5% desp. h=.10 m.Mortero 1:2 imp. + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento bco. + 10% desp.Estopa (1 lb. / 20 m2).Colocación.

CERAMICA IMPORTADA TIPO 09:Preparación terreno.Horm. 1:3:5 + 5% desp. h=.10 m.Mortero 1:2 imp. + 5% desp.

Page 303: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 285

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento bco. + 10% desp.Estopa (1 lb. / 20 m2).Colocación.

GRANITO BOTICELLI 40x40, BLANCO:Preparación terreno.Mortero 1:10 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Derreterido blanco + 10% desp.Colocación.Pulido y brillado.

GRANITO BOTICELLI 40x40, COLOR:Preparación terreno.Mortero 1:10 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Derretido color + 10% desp.Colocación.Pulido y cristalizado.

GRANITO PERLATTO ROYAL 40x40:Preparación terreno.Mortero 1:10 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Derretido color + 10% desp.Colocación.Pulido y cristalizado.

GRANITO 30x30, 1-2-3, BLANCO:Preparación terreno.Mortero 1:10 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Derreterido blanco + 10% desp.Colocación.Pulido y cristalizado.

Page 304: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 286

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

GRANITO 30x30, 1-2-3, GRIS:Preparación terreno.Mortero 1:10 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Derreterido gris + 10% desp.Colocación.Pulido y cristalizado.

GRANITO 40x40, 1-2-3, BLANCO:Preparación terreno.Mortero 1:10 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Derreterido blanco + 10% desp.Colocación.Pulido y cristalizado.

HORMIGON ARMADO 3/8'' A 20, 1:2:4, PISO .10 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 1:2:4 + 5% desp.Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Elaboración, vaciado y frotado.

HORMIGON ARMADO 3/8'' A 20, 1:2:4, PISO .12 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 1:2:4 + 5% desp.Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Elaboración, vaciado y frotado.

HORMIGON ARMADO 3/8'' A 20, 1:2:4, PISO .15 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.

Page 305: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 287

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Horm. 1:2:4 + 5% desp.Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Elaboración, vaciado y frotado.

HORMIGON ARMADO 3/8'' A 20, 1:2:4, PISO .20 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 1:2:4 + 5% desp.Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Elaboración, vaciado y frotado.

HORMIGON ARMADO 3/8'' A 20, 140 Kg/Cm², PISO .10 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 140 Kg/Cm².Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Frotado.

HORMIGON ARMADO 3/8'' A 20, 140 Kg/Cm², PISO .12 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 140 Kg/Cm².Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Frotado.

HORMIGON ARMADO 3/8'' A 20, 140 Kg/Cm², PISO .15 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 140 Kg/Cm².Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Frotado.

Page 306: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 288

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

HORMIGON ARMADO 3/8'' A 20, 140 Kg/Cm², PISO .20 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 140 Kg/Cm².Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Frotado.

HORMIGON ARMADO 3/8'' A 20, 180 Kg/Cm², PISO .10 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 180 Kg/Cm².Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Frotado.

HORMIGON ARMADO 3/8'' A 20, 180 Kg/Cm², PISO .12 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 180 Kg/Cm².Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Frotado.

HORMIGON ARMADO 3/8'' A 20, 180 Kg/Cm², PISO .15 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 180 Kg/Cm².Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Frotado.

HORMIGON ARMADO 3/8'' A 20, 180 Kg/Cm², PISO .20 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 180 Kg/Cm².

Page 307: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 289

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Frotado.

HORMIGON ARMADO 3/8'' A 20, 210 Kg/Cm², PISO .10 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 210 Kg/Cm².Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Frotado.

HORMIGON ARMADO 3/8'' A 20, 210 Kg/Cm², PISO .12 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 210 Kg/Cm².Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Frotado.

HORMIGON ARMADO 3/8'' A 20, 210 Kg/Cm², PISO .15 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 210 Kg/Cm².Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Frotado.

HORMIGON ARMADO 3/8'' A 20, 210 Kg/Cm², PISO .20 M. ESP.:Preparación terreno.Acero de 3/8'' + 10% desp.Mano de obra acero.Horm. 210 Kg/Cm².Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Frotado.

HORMIGON FROTADO, PISO 10 CM.:

Page 308: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 290

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Preparación terreno.Horm. 1:3:5 + 5% desp.Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Elaboración, vaciado y frotado.Cantos laterales.

HORMIGON FROTADO Y VIOLINADO, PISO 10 CM.:Preparación terreno.Horm. 1:3:5 + 5% desp.Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Elaboración, vaciado ,frotado y pulido.Cantos laterales.

HORMIGON PULIDO, PISO 10 CM.:Preparación terreno.Horm. 1:3:5 + 5% desp.Mortero 1:4 + 5% desp.Regla (1 de 1''x4''x2.62' / 10 usos).Elaboración, vaciado ,frotado y pulido.Cantos laterales.Cemento gris para pulido.

LADRILLO EXAGONAL PEQUEÑA, PISO:Preparación terreno.Mortero 1:10 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Derretido gris + 10% desp.Colocación.

LADRILLO TIPO FERIA PEQUEÑA, PISO:Preparación terreno.Mortero 1:10 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Derretido gris + 10% desp.Colocación.

MOSAICOS 25x25, ROJO:

Page 309: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 291

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Preparación terreno.Mortero 1:10 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Derretido gris + 10% desp.Colocación.

QUICIO GRANITO BOTICELLI 40x07, COLOR:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento gris + 10% desp.Colocación.

QUICIO GRANITO 30x07, BLANCO:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento blanco + 10% desp.Colocación.

QUICIO GRANITO 40x07, BLANCO:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento blanco + 10% desp.Colocación.

QUICIO MOSAICOS 25x07, ROJO:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento gris + 10% desp.Colocación.

QUICIO LADRILLO:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento gris + 10% desp.Colocación.

Page 310: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 292

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

ZABALETA DE PISO:Mortero 1:3.Mano de obra.

ZOCALO GRANITO BOTICELLI 40x07, BLANCO:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento gris + 10% desp.Colocación.

ZOCALO GRANITO BOTICELLI 40x07, COLOR:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento con color + 10% desp.Colocación.

ZOCALO GRANITO PERLATTO ROYAL 40x07:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento con color + 10% desp.Colocación.

ZOCALO P/ESCALONES, PERLATTO ROYAL:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisColocación.

ZOCALO GRANITO 30x07, BLANCO:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento blanco + 10% desp.Colocación.

ZOCALO GRANITO 30x07, GRIS:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbis

Page 311: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 293

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Corte de chazos.Lechada cemento gris + 10% desp.Colocación.

ZOCALO GRANITO 40x07, BLANCO:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento blanco + 10% desp.Colocación.

ZOCALO LADRILLOS 28x7:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento gris + 10% desp.Colocación.

ZOCALO MOSAICOS 25x07, ROJO:Mortero 1:3 + 5% desp.Baldosas + transporte + 10% desp. + itbisCorte de chazos.Lechada cemento gris + 10% desp.Colocación.

PORTAJE

PUERTA DE PLYWOOD 3'x7':Marco de pino.Puerta plywood 3'x7'.Bisagras ''STANLEY'' 3 ½''x3 ½''.Tornillos 3''x14.Tarugos 3/8'' plásticos.Llavín corriente.Montura todo costo.

M2PUERTA DE PINO PANEL. 3'x7':Marco de pino.Puerta pino 3'x7'.Bisagras ''STANLEY'' 3 ½''x3 ½''.

Page 312: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 294

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Tornillos 3''x14.Tarugos 3/8'' plásticos.Llavín corriente.Montura todo costo.

M2PUERTA DE CAOBA PANEL. 3'x7':Marco de caoba.Puerta caoba 3'x7'.Bisagras ''STANLEY'' 3 ½''x3 ½''.Tornillos 3''x14.Tarugos 3/8'' plásticos.Llavín de calidad.Montura todo costo.

M2PUERTA DE CAOBA PANEL. ESP. 3'x7':Marco de caoba.Puerta caoba 3'x7'.Bisagras ''STANLEY'' 3 ½''x3 ½''.Tornillos 3''x14.Tarugos 3/8'' plásticos.Llavín especial.Montura todo costo.

M2PUERTA DE CAOBA, VAIVEN 3'x7':Marco de caoba.Puerta caoba 3'x7'.Bisagra vaiven de piso.Tornillos 3''x14.Tarugos 3/8'' plásticos.Montura todo costo.

M2PUERTA DE CAOBA, FRANCESA: (Ancho = 2.8 m.)Marco caoba (4 de 7' + 9.18').Puerta caoba 9.18'x7'.Bisagras ''STANLEY'' 3 ½''x3 ½''.Tornillos 3''x14.Tarugos 3/8'' plásticos.Fallebas 6''.Fallebas 10''.Clavos 2''.Llavín de calidad.

Page 313: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 295

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Montura todo costo.M2

RELLENOS Y REMOCION CAPA VEGETAL

RELLENO ARENA O CASCAJO (A MANO):Arena o cascajo de mina + 15% abult. + 3%.AguaTraslado material (1 TC = 5.00 m3 / dia).Regar, mojar y apis. (1 TC = 15.45 m3 / dia).

RELLENO ARENA O CASCAJO (CON EQUIPO):Alquiler compactador mecánico + transporte + itbisArena o cascajo de mina + 15% abult. + 3%.AguaTraslado material (1 TC = 5.00 m3 / dia).Regar, mojar y apis. (1 TC = 23.18 m3 / dia).

RELLENO CALICHE (A MANO):Caliche fino + 30 % abult. + 3% desp.AguaTraslado material (1 TC = 3.33 m3 / dia).Regar, mojar y apis. (1 TC = 9.80 m3 / dia).

RELLENO CALICHE (CON EQUIPO):Alquiler compactador mecánico + transporte + itbisCaliche fino + 30 % abult. + 3% desp.AguaTraslado material (1 TC = 3.33 m3 / dia).Regar, mojar y apis. (1 TC = 14.70 m3 / dia).

RELLENO CALICHE Y ARENA O CASCAJO (A MANO):Caliche fino + 30 % abult. + 3% desp.Arena itabo o cascajo fino + 15% abult. + 3%.AguaTraslado del material (1 TC = 4.00 m3 / dia).Regar, mojar y apis. (1 TC = 13.17 m3 / dia).

RELLENO CALICHE Y ARENA O CASCAJO (CON EQUIPO):Alquiler compactador mecánico + transporte + itbisCaliche fino + 30 % abult. + 3% desp.

Page 314: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 296

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Arena itabo o cascajo fino + 15% abult. + 3%.AguaTraslado del material (1 TC = 4.00 m3 / dia).Regar, mojar y apis. (1 TC = 19.76 m3 / dia).

RELLENO DE REPOSICION CALICHE SUELTO (A MANO):AguaTraslado del material (1 TC = 4.00 m3 / dia).Regar, mojar y apisonar (1 TC = 9.80 m3 compactado / dia)

RELLENO DE REPOSICION SUELTO (Caliche) (CON EQUIPO):Alquiler compactador mecánico + transporte + itbisAguaTraslado del material (1 TC = 4.00 m3 / dia).Regar, mojar (1 TC = 14.70 m3 compactado / dia)

REMOCION CAPA VEGETAL (A MANO):Excavación a mano.Traslado del material (1 TC = 3.33 m3 / dia).

REPLANTEO

CHARRANCHA, CASA 10.00x20.00 M.:Area de la charranchaClavos corrientes (1 m. = 10 clavos).Cal 50 lbs (1 m. = .04 fda.).Madera bruta americana (4 usos + 25 % desp).Hilo de nylon (1 m. = .005 rollo).Técnico Calificado (TC) (1 m. = .034 día).Carpintero de segunda (OP2) (1 m. = .015 día).Maestro de área (MA) (1 m. = .015 día).Brigada topográfica (1 m. = .015 día).

REVESTIMIENTO EN PAREDES

CERAMICA CRIOLLA TIPO 01:Mortero 1:2 imp. + 5% desp.

Page 315: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 297

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Baldosas + 10% desp. + itbisCorte de chazos.Lechada cemento bco. + 10% desp.Estopa (1 lb. / 20 m2).Colocación.

CERAMICA IMPORT. TIPO 09:Mortero 1:2 imp. + 5% desp.Baldosas + 10% desp. + itbisCorte de chazos.Lechada cemento bco. + 10% desp.Estopa (1 lb. / 20 m2).Colocación.

LADRILLO BISCOCHO 2''x2''x8'':Mortero 1:2 imp. + 20% desp.Ladrillos + transporte + 5% desp. + itbisCorte de chazos.Colocación.

LADRILLO 2''x4''x8'':Mortero 1:2 imp. + 20% desp.Ladrillos + transporte + 5% desp. + itbisCorte de chazos.Estopa (1 lb. / 20 m2).Colocación.

T E C H O S

TECHO ASBESTO Y TIJERILLA EN PINO:

Page 316: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 298

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

TECHO TEJA ASF., FORRADO EN CAOBA (SOBRE DINTEL CORRIDO):Durmientes: 2" x 4". Vigas (Limatesa): 2" x 6"Bajantes cada .5 m. y separadores cada 1 m: 1 ½" x 6"Tablas (borde perimetral): 1" x 6"Durmientes en caoba sobre dintel + 25% desp.Vigas (limatesa) en caoba + 25% desp.Bajantes o cargaderas en caoba + 25% desp.Separadores de Bajantes en caoba + 25% desp.Tablas en caoba en borde perimetral + 25% desp.Tablas (forro) en caoba + 25% desp.Teja asfáltica 3' x 1', Felpa, instadada + 10% desp.TransporteCaballete de teja asfáltica + 10% desp.Línea doble teja asfáltica inst. todo costo, en bordesClavos corrientes (5 lb. / 100 p2).Clavos galvanizados en forro (5 lb. / 100 p2).Clavos galv. ¾" para cartón (125 unid. / m2).AndamiosPlacas unir vigas (¼") inst. + 10% desp.Placas unir bajantes-vigas (¼") inst.+ 10% desp.Tornillos 3/8" x 3", galv., arandela + tuerca + 10%Mano de obra madera sin forro.Mano de obra madera del forro + laqueado.

Page 317: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 299

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

TECHO TEJA ASF., FORRADO EN CEDRO (SOBRE DINTEL CORRIDO):Durmientes: 2" x 4". Vigas (Limatesa): 2" x 6"Bajantes cada .5 m. y separadores cada 1 m: 1 ½" x 6"Tablas (borde perimetral): 1" x 6"Durmientes en cedro sobre dintel + 25% desp.Vigas (limatesa) en cedro + 25% desp.Bajantes o cargaderas en cedro + 25% desp.Separadores de Bajantes en cedro + 25% desp.Tablas en cedro en borde perimetral + 25% desp.Tablas (forro) en cedro + 25% desp.Teja asfáltica 3' x 1', Felpa, instadada + 10% desp.TransporteCaballete de teja asfáltica + 10% desp.Línea doble teja asfáltica inst. todo costo, en bordesClavos corrientes (5 lb. / 100 p2).Clavos galvanizados en forro (5 lb. / 100 p2).Clavos galv. ¾" para cartón (125 unid. / m2).AndamiosPlacas unir vigas (¼") inst. + 10% desp.Placas unir bajantes-vigas (¼") inst.+ 10% desp.Tornillos 3/8" x 3", galv., arandela + tuerca + 10%Mano de obra madera sin forro.Mano de obra madera del forro + laqueado.

TECHO TEJA ASF., FORRADO EN PINO TRAT. (SOBRE DINTEL CORRIDO):Durmientes: 2" x 4". Vigas (Limatesa): 2" x 6"Bajantes cada .5 m. y separadores cada 1 m: 1 ½" x 6"Tablas (borde perimetral): 1" x 6"Durmientes en pino trat. sobre dintel + 25% desp.Vigas (limatesa) en pino trat. + 25% desp.Bajantes o cargaderas en pino trat. + 25% desp.Separadores de Bajantes en pino trat. + 25% desp.Tablas en pino trat. en borde perimetral + 25% desp.Tablas (forro) en pino trat. + 25% desp.Teja asfáltica 3' x 1', Felpa, instadada + 10% desp.TransporteCaballete de teja asfáltica + 10% desp.Línea doble teja asfáltica inst. todo costo, en bordesClavos corrientes (5 lb. / 100 p2).Clavos galvanizados en forro (5 lb. / 100 p2).Clavos galv. ¾" para cartón (125 unid. / m2).

Page 318: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 300

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

AndamiosPlacas unir vigas (¼") inst. + 10% desp.Placas unir bajantes-vigas (¼") inst.+ 10% desp.Tornillos 3/8" x 3", galv., arandela + tuerca + 10%Mano de obra madera sin forro.Mano de obra madera del forro + laqueado.

TECHO TEJA ASF., FORRADO EN ROBLE BRASILEÑO (SOBRE DINTEL CORRIDO):Durmientes: 2" x 4". Vigas (Limatesa): 2" x 6"Bajantes cada .5 m. y separadores cada 1 m: 1 ½" x 6"Tablas (borde perimetral): 1" x 6"Durmientes en roble sobre dintel + 25% desp.Vigas (limatesa) en roble + 25% desp.Bajantes o cargaderas en roble + 25% desp.Separadores de Bajantes en roble + 25% desp.Tablas en roble en borde perimetral + 25% desp.Tablas (forro) en roble + 25% desp.Teja asfáltica 3' x 1', Felpa, instadada + 10% desp.TransporteCaballete de teja asfáltica + 10% desp.Línea doble teja asfáltica inst. todo costo, en bordesClavos corrientes (5 lb. / 100 p2).Clavos galvanizados en forro (5 lb. / 100 p2).Clavos galv. ¾" para cartón (125 unid. / m2).AndamiosPlacas unir vigas (¼") inst. + 10% desp.Placas unir bajantes-vigas (¼") inst.+ 10% desp.Tornillos 3/8" x 3", galv., arandela + tuerca + 10%Mano de obra madera sin forro.Mano de obra madera del forro + laqueado.

TECHO TEJA CURVA BARRO, FORRADO EN CAOBA (SOBRE DINTEL CORRIDO):Durmientes: 3" x 6". Vigas (Limatesa): 2" x 10"Bajantes cada .5 m. y separadores cada 1 m: 1 ½" x 10"Tablas (borde perimetral): 1" x 10"Durmientes en caoba sobre dintel + 25% desp.Vigas (limatesa) en caoba + 25% desp.Bajantes o cargaderas en caoba + 25% desp.Separadores de Bajantes en caoba + 25% desp.Tablas en caoba en borde perimetral + 25% desp.Tablas (forro) en caoba + 25% desp.

Page 319: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 301

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Tejas 16" (.18 y .13x.40 m.) + 25% desp. + itbisMortero 1:2 imp. + 10% desp.Estopa (1 lb. / 20 m2).Transporte + itbis (camión con 5,000 unid.)Caballete de teja + itbisClavos corrientes (5 lb. / 100 p2).Clavos galvanizados en forro (5 lb. / 100 p2).AndamiosPlacas unir vigas (¼") inst. + 10% desp.Placas unir bajantes-vigas (¼") inst.+ 10% desp.Tornillos 3/8" x 3", galv., arandela + tuerca + 10%Mano de obra madera sin forro.Mano de obra madera del forro + laqueado.Bitupol 4 mm., reforz. poliester, 10 años gar.Coloc. de tejas.Coloc. caballete.

TECHO TEJA CURVA BARRO, FORRADO EN CEDRO (SOBRE DINTEL CORRIDO):Durmientes: 3" x 6". Vigas (Limatesa): 2" x 10"Bajantes cada .5 m. y separadores cada 1 m: 1 ½" x 10"Tablas (borde perimetral): 1" x 10"Durmientes en cedro sobre dintel + 25% desp.Vigas (limatesa) en cedro + 25% desp.Bajantes o cargaderas en cedro + 25% desp.Separadores de Bajantes en cedro + 25% desp.Tablas en cedro en borde perimetral + 25% desp.Tablas (forro) en cedro + 25% desp.Tejas 16" (.18 y .13x.40 m.) + 25% desp. + itbisMortero 1:2 imp. + 10% desp.Estopa (1 lb. / 20 m2).Transporte + itbis (camión con 5,000 unid.)Caballete de teja.Clavos corrientes (5 lb. / 100 p2).Clavos galvanizados en forro (5 lb. / 100 p2).AndamiosPlacas unir vigas (¼") inst. + 10% desp.Placas unir bajantes-vigas (¼") inst.+ 10% desp.Tornillos 3/8" x 3", galv., arandela + tuerca + 10%Mano de obra madera sin forro.Mano de obra madera del forro + laqueado.Bitupol 4 mm., reforz. poliester, 10 años gar.

Page 320: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 302

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Coloc. de tejas.Coloc. caballete.

TECHO TEJA CURVA BARRO, FORRADO EN PINO TRAT. (SOBRE DINTEL CORRIDO):Durmientes: 3" x 6". Vigas (Limatesa): 2" x 10"Bajantes cada .5 m. y separadores cada 1 m: 1 ½" x 10"Tablas (borde perimetral): 1" x 10"Durmientes en pino sobre dintel + 25% desp.Vigas (limatesa) en pino + 25% desp.Bajantes o cargaderas en pino + 25% desp.Separadores de Bajantes en pino + 25% desp.Tablas en pino en borde perimetral + 25% desp.Tablas (forro) en pino + 25% desp.Tejas 16" (.18 y .13x.40 m.) + 25% desp. + itbisMortero 1:2 imp. + 10% desp.Estopa (1 lb. / 20 m2).Transporte + itbis (camión con 5,000 unid.)Caballete de teja.Clavos corrientes (5 lb. / 100 p2).Clavos galvanizados en forro (5 lb. / 100 p2).AndamiosPlacas unir vigas (¼") inst. + 10% desp.Placas unir bajantes-vigas (¼") inst.+ 10% desp.Tornillos 3/8" x 3", galv., arandela + tuerca + 10%Mano de obra madera sin forro.Mano de obra madera del forro + laqueado.Bitupol 4 mm., reforz. poliester, 10 años gar.Coloc. de tejas.Coloc. caballete.

TECHO TEJA CURVA BARRO, FORRADO EN ROBLE BRASILEÑO (SOBRE DINTEL CORRIDO):Durmientes: 3" x 6". Vigas (Limatesa): 2" x 10"Bajantes cada .5 m. y separadores cada 1 m: 1 ½" x 10"Tablas (borde perimetral): 1" x 10"Durmientes en roble sobre dintel + 25% desp.Vigas (limatesa) en roble + 25% desp.Bajantes o cargaderas en roble + 25% desp.Separadores de Bajantes en roble + 25% desp.Tablas en roble en borde perimetral + 25% desp.Tablas (forro) en roble + 25% desp.Tejas 16" (.18 y .13x.40 m.) + 25% desp. + itbis

Page 321: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 303

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Mortero 1:2 imp. + 10% desp.Estopa (1 lb. / 20 m2).Transporte + itbis (camión con 5,000 unid.)Caballete de teja.Clavos corrientes (5 lb. / 100 p2).Clavos galvanizados en forro (5 lb. / 100 p2).AndamiosPlacas unir vigas (¼") inst. + 10% desp.Placas unir bajantes-vigas (¼") inst.+ 10% desp.Tornillos 3/8" x 3", galv., arandela + tuerca + 10%Mano de obra madera sin forro.Mano de obra madera del forro + laqueado.Bitupol 4 mm., reforz. poliester, 10 años gar.Coloc. de tejas.Coloc. caballete.

TECHO TEJA CURVA BARRO SOBRE FINO DE HORM. IMPERMEABILIZADO:Tejas 16" (.18 y .13x.40 m.) + 25% desp. + itbisMortero 1:2 imp. + 10% desp.Estopa (1 lb. / 20 m2).Transporte + itbis (camión con 5,000 unid.)Caballete de teja.Bitupol 4 mm., reforz. poliester, 10 años gar.Coloc. de tejas.Coloc. caballete.

TECHO TEJA CURVA BARRO Y TIJERILLA EN PINO:Madera tijerilla + 25% desp.Correas, .948 piezas 2''x4''x10' + 25% desp., pino am. bruto.Tejas 16" (.18 y .13x.40 m.) + 25% desp. + itbisTransporte + itbis (camión con 5,000 unid.)Caballete de teja.Alambre #18 (0.5 lb. / m2).Clavos corrientes (5 lb. / 100 p2).Mano de obra madera.Coloc. de tejas.Coloc. caballete.

TECHO ZINC CAL. 26 Y TIJERILLA EN PINO:Madera tijerilla + 25% desp.Correas, .677 piezas 2''x4''x10' + 25% desp., pino am. bruto.

Page 322: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 304

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Planchas de ZINC ACANALADO cal. 26, de 3'x6' + 25% desp.Caballete de zinc de 3', cal. 29.Clavos corrientes (5 lb. / 100 p2).Clavos de zinc + 5% desp.Mano de obra madera.Coloc. láminas de zinc.Coloc. caballete de zinc.

TECHOS (TERMINACION)

FINO TECHO BERMUDA:Fino inclinado para preparar superficieMortero 1:3 + 5% desp., 4.5 cm. espesor.Reglas (1 de 1''x4''x10' / 10 usos).Subida materiales.Mano de obra Bermuda, sin los cantos.Cantos cada 0.40 m.

FINO TECHO INCLINADO:Mortero 1:3 + 5% desp., 4 cm. espesor.Reglas (1 de 1''x4''x10' / 10 usos).Subida materiales.Mano de obra.

FINO TECHO PLANO:Mortero 1:3 + 5% desp. (6 cm. espesor promedio).Reglas (1 de 1''x4''x10' / 10 usos).Subida materiales.Mano de obra.

ZABALETA DE TECHO:Mortero 1:3.Subida materiales.Mano de obra.

VENTANAS

VENTANA SALOM. ALUM. NAT. Y VIDRIO CLARO, MANIG. AA:Ventana + itbis

Page 323: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 305

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.D E S C R I P C I O N

Operador de maniguetaTransporte + Instalación (7.5% + itbis)

P2

VENTANA SALOM. ALUMINIO BCO., MANIG. AA:Ventana + itbisOperador de maniguetaTransporte + Instalación (7.5% + itbis)

P2

VENTANA SALOM. ALUMINIO BRONCE, MANIG. AA:Ventana + itbisOperador de maniguetaTransporte + Instalación (7.5% + itbis)

P2

VENTANA SALOM. ALUM. Y VIDRIO, TODO BRONCE,MANIG. AA:Ventana + itbisOperador de maniguetaTransporte + Instalación (7.5% + itbis)

P2

VENTANA SALOM. ALUM. NAT. Y VIDRIO CLARO, PALANCA:Ventana + itbisOperador de palancaTransporte + Instalación (7.5% + itbis)

P2

VENTANA SALOM. ALUMINIO BCO., PALANCA:Ventana + itbisOperador de palancaTransporte + Instalación (7.5% + itbis)

P2

VENTANA SALOM. ALUM. NAT., VIDRIO BRONCE, PALANCA:Ventana + itbisOperador de palancaTransporte + Instalación (7.5% + itbis)

P2

Page 324: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 306

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

Para actualiazar estos análisis con los nuevos precios, copie la columna delos P. UNIT. del análisis nuevo, a partir del primer precio en esta columna, donde

aparece la flecha. Todos los análisis se modificarán con los nuevos precios vigentes

1.00 qq 634.52 634.522.50 lb 19.95 49.88

QQ $684.40 87.56% 781.60

1.00 qq 1,602.42 1,602.422.00 lb 19.95 39.90

QQ $1,642.32 142.14% 1,155.40

1.00 qq 1,602.42 1,602.422.00 lb 19.95 39.90

QQ $1,642.32 142.14% 1,155.40

1.00 qq 1,602.42 1,602.422.00 lb 19.95 39.90

QQ $1,642.32 142.14% 1,155.40

1.00 qq 1,602.42 1,602.422.00 lb 19.95 39.90

QQ $1,642.32 142.14% 1,155.40

1.00 qq 1,602.42 1,602.422.00 lb 19.95 39.90

QQ $1,642.32 142.14% 1,155.40

1.00 qq 1,602.42 1,602.422.00 lb 19.95 39.90

QQ $1,642.32 142.14% 1,155.40

1.00 qq 1,602.42 1,602.422.00 lb 19.95 39.90

QQ $1,642.32 142.14% 1,155.40

1.00 qq 1,602.42 1,602.422.00 lb 19.95 39.90

QQ $1,642.32 142.14% 1,155.40

Page 325: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 307

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 qq 1,602.42 1,602.422.00 lb 19.95 39.90

QQ $1,642.32 142.14% 1,155.40

1.00 qq 1,602.42 1,602.422.00 lb 19.95 39.90

QQ $1,642.32 142.14% 1,155.40

1.00 qq 1,602.42 1,602.422.00 lb 19.95 39.90

QQ $1,642.32 142.14% 1,155.40

1.00 qq 1,602.42 1,602.422.00 lb 19.95 39.90

QQ $1,642.32 142.14% 1,155.40

0.11 m3 169.00 18.590.0400 m3 138.81 5.550.0900 m3 250.00 22.500.0300 m3 5,726.71 171.800.4000 m2 615.88 246.350.7000 m2 143.64 100.55

1.10 m 48.05 52.860.70 m2 142.60 99.82

M $718.02 103.36% 694.65

0.17 m3 169.00 28.730.0636 m3 138.81 8.830.1400 m3 250.00 35.000.0500 m3 4,646.00 232.300.4000 m2 670.21 268.080.8000 m2 143.64 114.91

1.10 m 48.05 52.860.80 m2 142.60 114.08

M $854.79 104.44% 818.43

0.22 m3 169.00 37.180.0800 m3 138.81 11.10

Page 326: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 308

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.1800 m3 250.00 45.000.0600 m3 4,108.14 246.490.4000 m2 801.87 320.750.8000 m2 143.64 114.91

1.10 m 48.05 52.860.80 m2 142.60 114.08

M $942.37 104.15% 904.86

Page 327: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 309

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

13.00 u 30.44 395.720.0200 m3 1,953.49 39.070.0092 m3 2,060.46 18.960.0110 qq 684.40 7.530.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 0.34 4.4213.00 u 0.69 8.9713.00 u 9.20 119.60

M2 $615.88 100.30% 614.06

13.00 u 24.08 313.040.0260 m3 1,953.49 50.790.0083 m3 2,060.46 17.100.0296 qq 1,642.32 48.610.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 0.34 4.4213.00 u 0.69 8.9713.00 u 7.70 100.10

M2 $564.64 103.28% 546.71

13.00 u 31.15 404.950.0312 m3 1,953.49 60.950.0200 m3 2,060.46 41.210.0592 qq 1,642.32 97.230.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 0.69 8.9713.00 u 1.38 17.9413.00 u 7.70 100.10

M2 $752.96 104.69% 719.26

13.00 u 31.15 404.950.0312 m3 1,953.49 60.950.0100 m3 2,060.46 20.600.0296 qq 1,642.32 48.610.1818 p2 37.99 6.91

Page 328: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 310

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.0230 día 639.00 14.7013.00 u 0.34 4.4213.00 u 0.69 8.9713.00 u 7.70 100.10

M2 $670.21 102.86% 651.57

13.00 u 31.15 404.950.0312 m3 1,953.49 60.950.0100 m3 2,060.46 20.600.0296 qq 1,642.32 48.610.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 0.34 4.4213.00 u 0.69 8.9713.00 u 9.70 126.10

M2 $696.21 102.75% 677.57

13.00 u 39.21 509.730.0390 m3 1,953.49 76.190.0265 m3 2,060.46 54.600.0740 qq 1,642.32 121.530.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 1.03 13.3913.00 u 2.56 33.2813.00 u 8.50 110.50

M2 $940.83 104.70% 898.62

13.00 u 39.21 509.730.0390 m3 1,953.49 76.190.0212 m3 2,060.46 43.680.0592 qq 1,642.32 97.230.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 0.69 8.9713.00 u 1.38 17.9413.00 u 8.50 110.50

M2 $885.85 104.07% 851.17

13.00 u 39.21 509.730.0390 m3 1,953.49 76.19

Page 329: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 311

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.0106 m3 2,060.46 21.840.0296 qq 1,642.32 48.610.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 0.34 4.4213.00 u 0.69 8.9713.00 u 8.50 110.50

M2 $801.87 102.50% 782.29

13.00 u 39.21 509.730.0390 m3 1,953.49 76.190.0686 m3 2,060.46 141.350.0444 qq 1,642.32 72.920.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 0.68 8.8413.00 u 1.38 17.9413.00 u 8.50 110.50

M2 $959.08 103.28% 928.58

13.00 u 39.21 509.730.0390 m3 1,953.49 76.190.0686 m3 2,060.46 141.350.0888 qq 1,642.32 145.840.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 1.02 13.2613.00 u 1.38 17.9413.00 u 8.50 110.50

M2 $1,036.42 105.30% 984.30

13.00 u 84.11 1,093.430.0570 m3 1,953.49 111.350.0270 m3 2,060.46 55.630.0296 qq 1,642.32 48.610.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 0.34 4.4213.00 u 0.69 8.9713.00 u 12.75 165.75

M2 $1,509.77 101.53% 1,487.07

Page 330: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 312

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

13.00 u 85.32 1,109.160.0593 m3 1,953.49 115.840.0324 m3 2,060.46 66.760.0296 qq 1,642.32 48.610.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 0.34 4.4213.00 u 0.69 8.9713.00 u 15.80 205.40

M2 $1,580.77 101.50% 1,557.47

13.00 u 95.09 1,236.170.0312 m3 1,953.49 60.950.0106 m3 2,060.46 21.840.0296 qq 1,642.32 48.610.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 0.34 4.4213.00 u 0.69 8.9713.00 u 7.70 100.10

M2 $1,502.67 101.26% 1,483.99

13.00 u 126.63 1,646.190.0106 m3 2,060.46 21.840.0296 qq 1,642.32 48.610.1818 p2 37.99 6.910.0230 día 639.00 14.7013.00 u 0.34 4.4213.00 u 0.69 8.9713.00 u 12.75 165.75

M2 $1,917.39 100.79% 1,902.30

0.0180 m3 2,240.77 40.3346.67 u 32.27 1,506.0446.67 u 17.00 793.39

M2 $2,339.76 100.07% 2,338.06

0.0116 m3 2,240.77 25.9926.25 u 32.27 847.0926.25 u 17.00 446.25

Page 331: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 313

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

M2 $1,319.33 100.08% 1,318.24

0.0086 m3 2,240.77 19.2713.13 u 82.44 1,082.4513.13 u 17.00 223.21

M2 $1,324.93 100.06% 1,324.12

17.86 m2112.00 p237.33 p218.67 p224.00 p210.67 p263.33 p2 37.99 2,405.91

2.17 u 1,360.68 2,952.680.17 u 1,360.68 231.323.50 u 344.52 1,205.82

10.13 lb 19.00 192.541.86 lb 17.98 33.442.00 pares 73.08 146.161.00 u 32.48 32.481.00 u 15.66 15.661.00 u 342.20 342.202.00 u 599.08 1,198.162.00 u 598.09 1,196.181.00 u 663.46 663.46

14.00 u 26.80 375.204.00 días 511.00 2,044.004.00 días 345.00 1,380.00

Unid. $14,415.21 100.28% 14,374.57M2 $807.12 100.28% 804.85

33.67 m264.00 p266.67 p296.00 p233.33 p284.00 p2

Page 332: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 314

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

144.00 p296.00 p242.00 p237.33 p214.00 p220.00 p2

6.67 p25.33 p2

21.33 p280.00 p213.33 p210.00 p2

260.62 p2 37.99 9,900.952.83 u 1,360.68 3,850.720.33 u 1,360.68 449.026.75 u 213.73 1,442.68

41.70 lb 19.00 792.293.59 lb 17.98 64.558.00 pares 73.08 584.647.00 u 32.48 227.362.00 u 15.66 31.322.00 u 342.20 684.403.00 u 599.08 1,797.243.00 u 598.09 1,794.271.00 u 663.46 663.46

26.00 u 26.80 696.808.00 días 511.00 4,088.008.00 días 345.00 2,760.00

Unid. $29,827.70 100.56% 29,660.49M2 $885.88 100.56% 880.92

12.10 p2 37.99 459.685.50 lb 19.00 104.501.02 m3 2,060.46 2,101.670.74 m3 787.19 582.520.10 m3 2,735.64 273.56

Page 333: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 315

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.08 m3 223.00 17.8410.00 m 78.00 780.00

M3 $4,319.77 102.66% 4,207.68M $431.98 102.66% 420.77

0.1833 tubo 868.26 159.150.67 u 20.01 13.41

0.0119 u 187.35 2.230.07 dia 268.00 18.761.00 m 196.00 196.00

M $389.55 100.00% 389.55

0.1833 tubo 1,004.56 184.140.67 u 38.48 25.78

0.0166 u 187.35 3.110.07 día 268.00 18.761.00 m 196.00 196.00

M $427.79 100.00% 427.79

0.00195 m3 2,240.77 4.371.00 m2 14.60 14.60

M2 $18.97 100.96% 18.79

0.00225 m3 2,240.77 5.040.0333 p2 53.26 1.77

1.00 m2 9.30 9.30M2 $16.11 101.32% 15.90

0.06667 m3 90.00 6.001.00 m2 35.90 35.90

M2 $41.90 101.63% 41.23

0.00195 m3 2,240.77 4.370.0333 p2 53.26 1.77

1.00 m2 22.10 22.10M2 $28.24 100.64% 28.06

Page 334: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 316

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.0260 m3 2,240.77 58.260.0333 p2 53.26 1.770.1820 p2 37.99 6.910.0230 día 639.00 14.70

1.00 m2 87.00 87.00M2 $168.64 101.48% 166.18

0.0260 m3 2,240.77 58.260.3333 p2 53.26 17.75

1.00 m2 62.00 62.00M2 $138.01 101.81% 135.55

0.0260 m3 2,240.77 58.260.0333 p2 53.26 1.770.1820 p2 37.99 6.910.0230 día 639.00 14.70

1.00 m2 62.00 62.00M2 $143.64 101.74% 141.18

0.0325 m3 2,240.77 72.830.0333 p2 53.26 1.771.4402 p2 37.99 54.710.0703 día 639.00 44.920.1590 lb 19.00 3.02

1.00 m2 78.00 78.00M2 $255.25 101.48% 251.53

0.002171 m3 2,240.77 4.860.0667 p2 53.26 3.551.4402 p2 37.99 54.710.0703 día 639.00 44.920.1590 lb 19.00 3.02

1.00 m2 78.00 78.00M2 $189.06 100.45% 188.22

0.0325 m3 2,240.77 72.830.0333 p2 53.26 1.770.0250 u 1,360.68 34.020.0703 día 639.00 44.920.1590 lb 19.00 3.02

Page 335: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 317

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m2 117.00 117.00M2 $273.56 101.38% 269.84

0.0325 m3 2,240.77 72.831.4402 p2 53.26 76.710.0703 día 639.00 44.920.1590 lb 19.00 3.02

1.00 m2 46.70 46.70M2 $244.18 101.55% 240.46

0.0260 m3 2,240.77 58.260.0333 p2 53.26 1.770.1820 p2 37.99 6.910.0230 día 639.00 14.700.0530 fda 90.00 4.77

1.00 m2 67.00 67.00M2 $153.41 101.99% 150.42

0.0043 m3 2,240.77 9.640.2180 p2 53.26 11.61

1.00 m 26.80 26.80M $48.05 100.86% 47.64

0.00798 m3 2,240.77 17.880.2700 p2 53.26 14.38

1.00 m 50.30 50.30M $82.56 100.92% 81.81

0.00954 m3 2,240.77 21.380.2180 p2 53.26 11.61

1.00 m 61.90 61.90M $94.89 100.97% 93.98

0.00477 m3 2,240.77 10.690.1090 p2 53.26 5.81

1.00 m 53.70 53.70M $70.20 100.65% 69.75

Page 336: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 318

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.10 m 673.15 740.470.0561 m3 1,953.49 109.59

1.10 m 117.00 128.701.10 m 147.32 162.05

M $1,140.81 100.57% 1,134.35

1.10 m 776.84 854.520.0561 m3 1,953.49 109.59

1.10 m 117.00 128.701.10 m 147.32 162.05

M $1,254.86 100.52% 1,248.40

1.10 m 553.06 608.370.0561 m3 1,953.49 109.59

1.10 m 117.00 128.701.10 m 147.32 162.05

M $1,008.71 100.64% 1,002.25

1.10 m 845.98 930.580.0561 m3 1,953.49 109.59

1.10 m 117.00 128.701.10 m 147.32 162.05

M $1,330.92 100.49% 1,324.46

1.10 m 1,152.53 1,267.780.0561 m3 1,953.49 109.59

1.10 m 117.00 128.701.10 m 147.32 162.05

M $1,668.12 100.39% 1,661.66

1.10 m 1,699.24 1,869.160.0561 m3 1,953.49 109.59

1.10 m 117.00 128.701.10 m 147.32 162.05

M $2,269.50 100.29% 2,263.04

1.10 m 758.65 834.520.0561 m3 1,953.49 109.59

Page 337: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 319

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.10 m 117.00 128.701.10 m 147.32 162.05

M $1,234.86 100.53% 1,228.40

1.10 m 873.26 960.590.0561 m3 1,953.49 109.59

1.10 m 117.00 128.701.10 m 147.32 162.05

M $1,360.93 100.48% 1,354.47

1.10 m 800.49 880.540.0561 m3 1,953.49 109.59

1.10 m 117.00 128.701.10 m 147.32 162.05

M $1,280.88 100.51% 1,274.42

1.10 m 1,188.01 1,306.810.0561 m3 1,953.49 109.59

1.10 m 117.00 128.701.10 m 147.32 162.05

M $1,707.15 100.38% 1,700.69

1.10 m 613.11 674.420.0561 m3 1,953.49 109.59

1.10 m 117.00 128.701.10 m 147.32 162.05

M $1,074.76 100.60% 1,068.30

1.6338 qq 1,642.32 2,683.221.6338 qq 153.00 249.971.6338 qq 15.30 25.00183.06 p2 37.99 6,954.4536.61 lb 19.00 695.59

8.34 lb 26.68 222.518.34 lb 17.20 143.45

33.35 m 76.00 2,534.6026.68 m2 11.40 304.15

1.10 m3 2,233.18 2,456.50

Page 338: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 320

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

M3 $16,269.44 106.91% 15,217.25

1.00 m3 13,812.94 13,812.941.00 m3 4,660.05 4,660.05

M3 $18,472.99 105.46% 17,516.64

1.00 m3 13,812.94 13,812.941.00 m3 4,818.11 4,818.11

M3 $18,631.05 105.41% 17,674.70

Page 339: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 321

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m3 13,812.94 13,812.941.00 m3 5,079.69 5,079.69

M3 $18,892.63 105.33% 17,936.28

0.804 qq 684.40 550.261.462 qq 1,642.32 2,401.0725.00 m 51.00 1,275.00

254.77 p2 37.99 9,678.7150.95 lb 19.00 968.05

6.25 lb 26.68 166.756.25 lb 17.20 107.50

25.00 m 57.00 1,425.0025.00 m 66.00 1,650.0020.00 m2 9.50 190.00

1.10 m3 1,978.60 2,176.46M3 $20,588.80 104.79% 19,646.91

1.000 m3 18,412.34 18,412.341.10 m3 2,176.67 2,394.34

M3 $20,806.68 104.73% 19,867.61

1.778 qq 684.40 1,216.862.598 qq 1,642.32 4,266.751.000 m3 17,637.47 17,637.47

M3 $23,121.08 106.45% 21,720.72

1.000 m3 23,121.08 23,121.081.10 m3 2,176.67 2,394.34

M3 $25,515.42 106.21% 24,024.53

1.506 qq 1,642.32 2,473.331.732 qq 1,642.32 2,844.5013.13 m 51.00 669.63

130.36 p2 37.99 4,952.3826.07 lb 19.00 495.33

3.28 lb 26.68 87.513.28 lb 17.20 56.42

Page 340: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 322

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

13.13 m 57.00 748.4113.13 m 66.00 866.5813.13 m2 9.50 124.74

1.10 m3 1,978.60 2,176.46M3 $15,495.29 112.98% 13,715.24

1.000 m3 13,318.83 13,318.831.10 m3 2,176.67 2,394.34

M3 $15,713.17 112.75% 13,935.94

1.144 qq 1,642.32 1,878.812.278 qq 1,642.32 3,741.203.422 qq 153.00 523.57

134.11 p2 37.99 5,094.8426.82 lb 19.00 509.58

2.78 lb 26.68 74.172.78 lb 17.20 47.82

11.11 m 57.00 633.2711.11 m 66.00 733.2613.33 m2 9.50 126.64

1.10 m3 1,978.60 2,176.46M3 $15,539.62 113.69% 13,667.82

1.000 m3 13,363.16 13,363.161.10 m3 2,176.67 2,394.34

M3 $15,757.50 113.46% 13,888.52

0.744 qq 1,642.32 1,221.891.979 qq 1,642.32 3,250.152.723 qq 153.00 416.6276.99 p2 37.99 2,924.85

15.4 lb 19.00 292.602.08 lb 26.68 55.492.08 lb 17.20 35.788.33 m 66.00 549.788.33 m 85.00 708.05

11.66 m2 9.50 110.771.10 m3 1,978.60 2,176.46

M3 $11,742.44 114.47% 10,257.96

1.000 m3 9,565.98 9,565.98

Page 341: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 323

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.10 m3 2,176.67 2,394.34M3 $11,960.32 114.14% 10,478.66

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.282.981 qq 153.00 456.0987.25 p2 37.99 3,314.6317.45 lb 19.00 331.55

1.56 lb 26.68 41.621.56 lb 17.20 26.836.25 m 66.00 412.506.25 m 85.00 531.25

10.00 m2 9.50 95.001.10 m3 1,978.60 2,176.46

M3 $12,281.69 115.17% 10,664.24

1.000 m3 8,692.83 8,692.831.10 m3 2,176.67 2,394.34

M3 $11,087.17 112.09% 9,891.30

0.687 qq 1,642.32 1,128.270.948 qq 1,642.32 1,556.921.733 qq 1,642.32 2,846.143.368 qq 153.00 515.3063.41 p2 37.99 2,408.9512.68 lb 19.00 240.92

1.00 lb 26.68 26.681.00 lb 17.20 17.204.00 m 76.00 304.004.00 m 95.00 380.008.00 m2 9.50 76.001.10 m3 2,176.67 2,394.34

M3 $11,894.72 117.63% 10,111.72

1.000 m3 8,372.11 8,372.111.10 m3 1,978.60 2,176.46

M3 $10,548.57 115.95% 9,097.26

1.718 qq 1,642.32 2,821.513.612 qq 1,642.32 5,932.06

Page 342: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 324

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

5.330 qq 153.00 815.4949.29 p2 37.99 1,872.53

9.86 lb 19.00 187.340.70 lb 26.68 18.680.70 lb 17.20 12.042.78 m 95.00 264.102.78 m 152.00 422.566.67 m2 9.50 63.371.10 m3 2,176.67 2,394.34

M3 $14,804.02 122.58% 12,077.48

1.000 m3 12,409.68 12,409.681.10 m3 1,978.60 2,176.46

M3 $14,586.14 123.02% 11,856.78

1.778 qq 1,642.32 2,920.042.598 qq 1,642.32 4,266.7525.00 m 51.00 1,275.00

177.79 p2 37.99 6,754.2435.56 lb 19.00 675.64

6.25 lb 26.68 166.756.25 lb 17.20 107.50

25.00 m 57.00 1,425.0025.00 m 66.00 1,650.0020.00 m2 9.50 190.00

1.00 m3 4,660.05 4,660.05M3 $24,090.97 110.47% 21,807.11

1.778 qq 1,642.32 2,920.042.598 qq 1,642.32 4,266.75

1.00 u 16,904.18 16,904.18M3 $24,090.97 110.47% 21,807.11

1.778 qq 1,642.32 2,920.042.598 qq 1,642.32 4,266.75

1.00 m3 16,904.18 16,904.18M3 $24,090.97 110.47% 21,807.11

1.778 qq 1,642.32 2,920.042.598 qq 1,642.32 4,266.75

1.00 m3 16,904.18 16,904.18

Page 343: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 325

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

M3 $24,090.97 110.47% 21,807.11

1.506 qq 1,642.32 2,473.331.732 qq 1,642.32 2,844.5013.13 m 51.00 669.63

130.36 p2 37.99 4,952.3826.07 lb 19.00 495.33

3.28 lb 26.68 87.513.28 lb 17.20 56.42

13.13 m 57.00 748.4113.13 m 66.00 866.5813.13 m2 9.50 124.74

1.00 m3 4,660.05 4,660.05M3 $17,978.88 110.35% 16,292.18

1.506 qq 1,642.32 2,473.331.732 qq 1,642.32 2,844.50

1.00 m3 12,661.05 12,661.05M3 $17,978.88 110.35% 16,292.18

Page 344: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 326

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.144 qq 1,642.32 1,878.812.278 qq 1,642.32 3,741.203.422 qq 153.00 523.57

134.11 p2 37.99 5,094.8426.82 lb 19.00 509.58

2.78 lb 26.68 74.172.78 lb 17.20 47.82

11.11 m 57.00 633.2711.11 m 66.00 733.2613.33 m2 9.50 126.64

1.00 m3 4,660.05 4,660.05M3 $18,023.21 110.95% 16,244.76

1.00 u 5,620.01 5,620.013.422 qq 243.00 831.55

1.00 u 11,879.63 11,879.63M3 $18,331.19 110.74% 16,552.74

1.144 qq 1,642.32 1,878.812.278 qq 1,642.32 3,741.20

1.00 u 12,403.20 12,403.20M3 $18,023.21 110.95% 16,244.76

1.00 u 5,620.01 5,620.013.422 qq 243.00 831.55

1.00 u 11,879.63 11,879.63M3 $18,331.19 110.74% 16,552.74

1.144 qq 1,642.32 1,878.812.278 qq 1,642.32 3,741.20

Page 345: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 327

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

3.422 qq 230.00 787.061.00 u 11,879.63 11,879.63

M3 $18,286.70 110.77% 16,508.25

1.00 u 5,620.01 5,620.013.422 qq 243.00 831.55

1.00 u 11,879.63 11,879.63M3 $18,331.19 110.74% 16,552.74

1.144 qq 1,642.32 1,878.812.278 qq 1,642.32 3,741.203.422 qq 230.00 787.06

1.00 u 11,879.63 11,879.63M3 $18,286.70 110.77% 16,508.25

1.00 u 5,620.01 5,620.013.422 qq 243.00 831.55

1.00 u 11,879.63 11,879.63M3 $18,331.19 110.74% 16,552.74

0.744 qq 1,642.32 1,221.891.979 qq 1,642.32 3,250.152.723 qq 153.00 416.62

76.990 p2 37.99 2,924.8515.4 lb 19.00 292.602.08 lb 26.68 55.492.08 lb 17.20 35.788.33 m 66.00 549.788.33 m 85.00 708.05

11.66 m2 9.50 110.771.00 m3 4,660.05 4,660.05

M3 $14,226.03 110.84% 12,834.90

1.00 u 4,472.04 4,472.042.723 qq 243.00 661.69

1.00 u 9,337.37 9,337.37M3 $14,471.10 110.64% 13,079.97

0.744 qq 1,642.32 1,221.891.979 qq 1,642.32 3,250.152.723 qq 230.00 626.29

Page 346: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 328

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 9,337.37 9,337.37M3 $14,435.70 110.66% 13,044.57

1.00 u 4,472.04 4,472.042.723 qq 243.00 661.69

1.00 u 9,337.37 9,337.37M3 $14,471.10 110.64% 13,079.97

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.282.981 qq 153.00 456.0987.25 p2 37.99 3,314.6317.45 lb 19.00 331.55

1.56 lb 26.68 41.621.56 lb 17.20 26.836.25 m 66.00 412.506.25 m 85.00 531.25

10.00 m2 9.50 95.001.00 m3 4,660.05 4,660.05

M3 $14,765.28 111.51% 13,241.18

1.00 u 4,895.76 4,895.762.981 qq 243.00 724.38

1.00 u 9,413.43 9,413.43M3 $15,033.57 111.28% 13,509.47

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.28

1.00 u 9,869.52 9,869.52M3 $14,765.28 111.51% 13,241.18

1.00 u 4,895.76 4,895.762.981 qq 243.00 724.38

1.00 u 9,413.43 9,413.43M3 $15,033.57 111.28% 13,509.47

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.28

Page 347: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 329

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

2.981 qq 230.00 685.631.00 u 9,413.43 9,413.43

M3 $14,994.82 111.31% 13,470.72

1.00 u 4,895.76 4,895.762.981 qq 243.00 724.38

1.00 u 9,413.43 9,413.43M3 $15,033.57 111.28% 13,509.47

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.282.981 qq 230.00 685.63

1.00 u 9,413.43 9,413.43M3 $14,994.82 111.31% 13,470.72

COL. 40x40, 180 kg/Cm², 60, 4 DE ½" x 25' + 4 DE 4/4", 3/8" x 20' A 30: PORTICO1.00 u 4,895.76 4,895.76

2.981 qq 243.00 724.381.00 u 9,413.43 9,413.43

M3 $15,033.57 111.28% 13,509.47

0.687 qq 1,642.32 1,128.270.948 qq 1,642.32 1,556.921.733 qq 1,642.32 2,846.143.368 qq 153.00 515.3063.41 p2 37.99 2,408.9512.68 lb 19.00 240.92

1.00 lb 26.68 26.681.00 lb 17.20 17.204.00 m 76.00 304.004.00 m 95.00 380.008.00 m2 9.50 76.001.00 m3 4,660.05 4,660.05

M3 $14,160.43 113.57% 12,467.96

1.00 u 4,403.06 4,403.063.368 qq 243.00 818.42

1.00 u 8,113.80 8,113.80M3 $13,335.28 111.34% 11,977.32

0.687 qq 1,642.32 1,128.27

Page 348: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 330

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.948 qq 1,642.32 1,556.921.733 qq 1,642.32 2,846.143.368 qq 230.00 774.64

1.00 u 8,113.80 8,113.80M3 $14,419.77 113.30% 12,727.30

1.00 u 5,531.33 5,531.333.368 qq 243.00 818.42

1.00 u 8,113.80 8,113.80M3 $14,463.55 113.25% 12,771.08

1.718 qq 1,642.32 2,821.513.612 qq 1,642.32 5,932.065.330 qq 153.00 815.4949.29 p2 37.99 1,872.53

9.86 lb 19.00 187.341.00 lb 26.68 26.681.00 lb 17.20 17.204.00 m 76.00 304.004.00 m 95.00 380.008.00 m2 9.50 76.001.00 m3 4,660.05 4,660.05

M3 $17,092.86 118.24% 14,456.35

1.00 u 8,753.57 8,753.575.330 qq 243.00 1,295.19

1.00 u 7,523.80 7,523.80M3 $17,572.56 117.65% 14,936.05

1.718 qq 1,642.32 2,821.513.612 qq 1,642.32 5,932.065.330 qq 230.00 1,225.90

1.00 u 7,523.80 7,523.80M3 $17,503.27 117.73% 14,866.76

1.00 u 8,753.57 8,753.575.330 qq 243.00 1,295.19

1.00 u 7,523.80 7,523.80M3 $17,572.56 117.65% 14,936.05

1.144 qq 1,642.32 1,878.81

Page 349: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 331

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

2.278 qq 1,642.32 3,741.203.422 qq 153.00 523.57

134.11 p2 37.99 5,094.8426.82 lb 19.00 509.58

2.78 lb 26.68 74.172.78 lb 17.20 47.82

11.11 m 57.00 633.2711.11 m 66.00 733.2613.33 m2 9.50 126.64

1.00 m3 4,818.11 4,818.11M3 $18,181.27 110.84% 16,402.82

1.00 u 5,620.01 5,620.013.422 qq 243.00 831.55

1.00 u 12,037.69 12,037.69M3 $18,489.25 110.64% 16,710.80

1.144 qq 1,642.32 1,878.812.278 qq 1,642.32 3,741.203.422 qq 230.00 787.06

1.00 u 12,037.69 12,037.69M3 $18,444.76 110.67% 16,666.31

1.00 u 5,620.01 5,620.013.422 qq 243.00 831.55

1.00 u 12,037.69 12,037.69M3 $18,489.25 110.64% 16,710.80

0.744 qq 1,642.32 1,221.891.979 qq 1,642.32 3,250.152.723 qq 153.00 416.6276.99 p2 37.99 2,924.85

15.4 lb 19.00 292.602.08 lb 26.68 55.492.08 lb 17.20 35.788.33 m 66.00 549.788.33 m 85.00 708.05

11.66 m2 9.50 110.771.00 m3 4,818.11 4,818.11

M3 $14,384.09 110.71% 12,992.96

Page 350: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 332

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 4,472.04 4,472.042.723 qq 243.00 661.69

1.00 u 9,495.43 9,495.43M3 $14,629.16 110.51% 13,238.03

0.744 qq 1,642.32 1,221.891.979 qq 1,642.32 3,250.152.723 qq 230.00 626.29

1.00 u 9,495.43 9,495.43M3 $14,593.76 110.54% 13,202.63

1.00 u 4,472.04 4,472.042.723 qq 243.00 661.69

1.00 u 9,495.43 9,495.43M3 $14,629.16 110.51% 13,238.03

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.282.981 qq 153.00 456.0987.25 p2 37.99 3,314.6317.45 lb 19.00 331.55

1.56 lb 26.68 41.621.56 lb 17.20 26.836.25 m 66.00 412.506.25 m 85.00 531.25

10.00 m2 9.50 95.001.00 m3 4,818.11 4,818.11

M3 $14,923.34 111.37% 13,399.24

Page 351: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 333

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 4,895.76 4,895.762.981 qq 243.00 724.38

1.00 u 9,571.49 9,571.49M3 $15,191.63 111.15% 13,667.53

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.28

1.00 u 10,027.58 10,027.58M3 $14,923.34 111.37% 13,399.24

1.00 u 4,895.76 4,895.762.981 qq 243.00 724.38

1.00 u 9,571.49 9,571.49M3 $15,191.63 111.15% 13,667.53

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.282.981 qq 230.00 685.63

1.00 u 9,571.49 9,571.49M3 $15,152.88 111.18% 13,628.78

1.00 u 4,895.76 4,895.762.981 qq 243.00 724.38

1.00 u 9,571.49 9,571.49M3 $15,191.63 111.15% 13,667.53

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.282.981 qq 230.00 685.63

1.00 u 9,571.49 9,571.49M3 $15,152.88 111.18% 13,628.78

COL. 40x40, 210 kg/Cm², 60, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 30 x 20': PORTICO1.00 u 4,895.76 4,895.76

2.981 qq 243.00 724.381.00 u 9,571.49 9,571.49

M3 $15,191.63 111.15% 13,667.53

Page 352: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 334

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.687 qq 1,642.32 1,128.270.948 qq 1,642.32 1,556.921.733 qq 1,642.32 2,846.143.368 qq 153.00 515.3063.41 p2 37.99 2,408.9512.68 lb 19.00 240.92

1.00 lb 26.68 26.681.00 lb 17.20 17.204.00 m 76.00 304.004.00 m 95.00 380.008.00 m2 9.50 76.001.00 m3 4,818.11 4,818.11

M3 $14,318.49 113.40% 12,626.02

1.00 u 4,403.06 4,403.063.368 qq 243.00 818.42

1.00 u 8,271.86 8,271.86M3 $13,493.34 111.19% 12,135.38

0.687 qq 1,642.32 1,128.270.948 qq 1,642.32 1,556.921.733 qq 1,642.32 2,846.143.368 qq 230.00 774.64

1.00 u 8,271.86 8,271.86M3 $14,577.83 113.13% 12,885.36

1.00 u 5,531.33 5,531.333.368 qq 243.00 818.42

1.00 u 8,271.86 8,271.86M3 $14,621.61 113.09% 12,929.14

1.718 qq 1,642.32 2,821.513.612 qq 1,642.32 5,932.065.330 qq 153.00 815.4949.29 p2 37.99 1,872.53

9.86 lb 19.00 187.340.70 lb 26.68 18.680.70 lb 17.20 12.042.78 m 95.00 264.102.78 m 152.00 422.566.67 m2 9.50 63.37

Page 353: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 335

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m3 4,818.11 4,818.11M3 $17,227.79 118.07% 14,591.78

1.00 u 8,753.57 8,753.575.330 qq 243.00 1,295.19

1.00 u 7,658.73 7,658.73M3 $17,707.49 117.49% 15,071.48

1.718 qq 1,642.32 2,821.513.612 qq 1,642.32 5,932.065.330 qq 230.00 1,225.90

1.00 u 7,658.73 7,658.73M3 $17,638.20 117.57% 15,002.19

1.00 u 8,753.57 8,753.575.330 qq 243.00 1,295.19

1.00 u 7,658.73 7,658.73M3 $17,707.49 117.49% 15,071.48

1.144 qq 1,642.32 1,878.812.278 qq 1,642.32 3,741.203.422 qq 153.00 523.57

134.11 p2 37.99 5,094.8426.82 lb 19.00 509.58

2.78 lb 26.68 74.172.78 lb 17.20 47.82

11.11 m 57.00 633.2711.11 m 66.00 733.2613.33 m2 9.50 126.64

1.00 m3 5,079.69 5,079.69M3 $18,442.85 110.67% 16,664.40

1.00 u 5,620.01 5,620.013.422 qq 243.00 831.55

1.00 u 12,299.27 12,299.27M3 $18,750.83 110.48% 16,972.38

1.144 qq 1,642.32 1,878.812.278 qq 1,642.32 3,741.203.422 qq 230.00 787.06

1.00 u 12,299.27 12,299.27

Page 354: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 336

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

M3 $18,706.34 110.51% 16,927.89

1.00 u 5,620.01 5,620.013.422 qq 243.00 831.55

1.00 u 12,299.27 12,299.27M3 $18,750.83 110.48% 16,972.38

0.744 qq 1,642.32 1,221.891.979 qq 1,642.32 3,250.152.723 qq 153.00 416.6276.99 p2 37.99 2,924.85

15.4 lb 19.00 292.602.08 lb 26.68 55.492.08 lb 17.20 35.788.33 m 66.00 549.788.33 m 85.00 708.05

11.66 m2 9.50 110.771.00 m3 5,079.69 5,079.69

M3 $14,645.67 110.50% 13,254.54

1.00 u 4,472.04 4,472.042.723 qq 243.00 661.69

1.00 u 9,757.01 9,757.01M3 $14,890.74 110.30% 13,499.61

0.744 qq 1,642.32 1,221.891.979 qq 1,642.32 3,250.152.723 qq 230.00 626.29

1.00 u 9,757.01 9,757.01M3 $14,855.34 110.33% 13,464.21

1.00 u 4,472.04 4,472.042.723 qq 243.00 661.69

1.00 u 9,757.01 9,757.01M3 $14,890.74 110.30% 13,499.61

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.282.981 qq 153.00 456.0987.25 p2 37.99 3,314.63

Page 355: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 337

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

17.45 lb 19.00 331.551.56 lb 26.68 41.621.56 lb 17.20 26.836.25 m 66.00 412.506.25 m 85.00 531.25

10.00 m2 9.50 95.001.00 m3 5,079.69 5,079.69

M3 $15,184.92 111.16% 13,660.82

1.00 u 4,895.76 4,895.762.981 qq 243.00 724.38

1.00 u 9,833.07 9,833.07M3 $15,453.21 110.94% 13,929.11

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.28

1.00 u 10,289.16 10,289.16M3 $15,184.92 111.16% 13,660.82

Page 356: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 338

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 4,895.76 4,895.762.981 qq 243.00 724.38

1.00 u 9,833.07 9,833.07M3 $15,453.21 110.94% 13,929.11

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.282.981 qq 230.00 685.63

1.00 u 9,833.07 9,833.07M3 $15,414.46 110.97% 13,890.36

1.00 u 4,895.76 4,895.762.981 qq 243.00 724.38

1.00 u 9,833.07 9,833.07M3 $15,453.21 110.94% 13,929.11

0.860 qq 1,642.32 1,412.400.640 qq 1,642.32 1,051.081.481 qq 1,642.32 2,432.282.981 qq 230.00 685.63

1.00 u 9,833.07 9,833.07M3 $15,414.46 110.97% 13,890.36

COL. 40x40, 240 kg/Cm², 60, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 30 x 20': PORTICO1.00 u 4,895.76 4,895.76

2.981 qq 243.00 724.381.00 u 9,833.07 9,833.07

M3 $15,453.21 110.94% 13,929.11

0.687 qq 1,642.32 1,128.270.948 qq 1,642.32 1,556.921.733 qq 1,642.32 2,846.143.368 qq 153.00 515.3063.41 p2 37.99 2,408.9512.68 lb 19.00 240.92

1.00 lb 26.68 26.681.00 lb 17.20 17.204.00 m 76.00 304.004.00 m 95.00 380.008.00 m2 9.50 76.00

Page 357: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 339

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m3 5,079.69 5,079.69M3 $14,580.07 113.13% 12,887.60

1.00 u 4,403.06 4,403.063.368 qq 243.00 818.42

1.00 u 8,533.44 8,533.44M3 $13,754.92 110.95% 12,396.96

0.687 qq 1,642.32 1,128.270.948 qq 1,642.32 1,556.921.733 qq 1,642.32 2,846.143.368 qq 230.00 774.64

1.00 u 8,533.44 8,533.44M3 $14,839.41 112.87% 13,146.94

1.00 u 5,531.33 5,531.333.368 qq 243.00 818.42

1.00 u 8,533.44 8,533.44M3 $14,883.19 112.83% 13,190.72

1.718 qq 1,642.32 2,821.513.612 qq 1,642.32 5,932.065.330 qq 153.00 815.4949.29 p2 37.99 1,872.53

9.86 lb 19.00 187.340.70 lb 26.68 18.680.70 lb 17.20 12.042.78 m 95.00 264.102.78 m 152.00 422.566.67 m2 9.50 63.371.00 m3 5,079.69 5,079.69

M3 $17,489.37 117.75% 14,853.36

1.00 u 8,753.57 8,753.575.330 qq 243.00 1,295.19

1.00 u 7,920.31 7,920.31M3 $17,969.07 117.19% 15,333.06

1.718 qq 1,642.32 2,821.513.612 qq 1,642.32 5,932.065.330 qq 230.00 1,225.90

Page 358: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 340

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 7,920.31 7,920.31M3 $17,899.78 117.27% 15,263.77

1.00 u 8,753.57 8,753.575.330 qq 243.00 1,295.19

1.00 u 7,920.31 7,920.31M3 $17,969.07 117.19% 15,333.06

Page 359: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 341

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.779 qq 684.40 533.151.899 qq 1,642.32 3,118.7733.33 m 51.00 1,699.8397.97 p2 37.99 3,721.8819.59 lb 19.00 372.21

8.33 lb 26.68 222.248.33 lb 17.20 143.28

33.33 m 47.00 1,566.5113.33 m2 9.50 126.64

1.10 m3 1,978.60 2,176.46M3 $13,680.97 108.18% 12,646.11

0.779 qq 684.40 533.151.899 qq 1,642.32 3,118.7733.33 m 51.00 1,699.8397.97 p2 37.99 3,721.8819.59 lb 19.00 372.21

8.33 lb 26.68 222.248.33 lb 17.20 143.28

33.33 m 47.00 1,566.5113.33 m2 9.50 126.64

1.10 m3 2,176.67 2,394.34M3 $13,898.85 108.02% 12,866.81

1.723 qq 1,642.32 2,829.721.899 qq 1,642.32 3,118.7733.33 m 51.00 1,699.8397.97 p2 37.99 3,721.8819.59 lb 19.00 372.21

8.33 lb 26.68 222.248.33 lb 17.20 143.28

33.33 m 47.00 1,566.5113.33 m2 9.50 126.64

1.10 m3 1,978.60 2,176.46M3 $15,977.54 113.90% 14,027.99

1.723 qq 1,642.32 2,829.721.899 qq 1,642.32 3,118.77

Page 360: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 342

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

33.33 m 51.00 1,699.8397.97 p2 37.99 3,721.8819.59 lb 19.00 372.21

8.33 lb 26.68 222.248.33 lb 17.20 143.28

33.33 m 47.00 1,566.5113.33 m2 9.50 126.64

1.10 m3 2,176.67 2,394.34M3 $16,195.42 113.66% 14,248.69

0.668 qq 684.40 457.181.424 qq 1,642.32 2,338.6625.00 m 51.00 1,275.0094.36 p2 37.99 3,584.7418.87 lb 19.00 358.53

6.25 lb 26.68 166.756.25 lb 17.20 107.50

25.00 m 47.00 1,175.0010.00 m2 9.50 95.00

1.10 m3 1,978.60 2,176.46M3 $11,734.82 107.39% 10,926.86

0.668 qq 684.40 457.181.424 qq 1,642.32 2,338.6625.00 m 51.00 1,275.0094.36 p2 37.99 3,584.7418.87 lb 19.00 358.53

6.25 lb 26.68 166.756.25 lb 17.20 107.50

25.00 m 47.00 1,175.0010.00 m2 9.50 95.00

1.10 m3 2,176.67 2,394.34M3 $11,952.70 107.22% 11,147.56

0.998 qq 684.40 683.031.424 qq 1,642.32 2,338.662.594 qq 1,642.32 4,260.1850.00 m 51.00 2,550.00

Page 361: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 343

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

242.18 p2 37.99 9,200.4248.44 lb 19.00 920.3612.50 lb 26.68 333.5012.50 lb 17.20 215.0050.00 m 95.00 4,750.0020.00 m2 11.40 228.00

1.10 m3 1,978.60 2,176.46M3 $27,655.61 108.51% 25,487.59

0.998 qq 684.40 683.031.424 qq 1,642.32 2,338.662.594 qq 1,642.32 4,260.1850.00 m 51.00 2,550.00

242.18 p2 37.99 9,200.4248.44 lb 19.00 920.3612.50 lb 26.68 333.5012.50 lb 17.20 215.0050.00 m 95.00 4,750.0020.00 m2 11.40 228.00

1.10 m3 2,176.67 2,394.34M3 $27,873.49 108.42% 25,708.29

0.779 qq 684.40 533.150.950 qq 1,642.32 1,560.202.594 qq 1,642.32 4,260.1833.33 m 51.00 1,699.83

169.13 p2 37.99 6,425.2533.83 lb 19.00 642.77

8.33 lb 26.68 222.248.33 lb 17.20 143.28

33.33 m 95.00 3,166.3513.33 m2 11.40 151.96

1.10 m3 1,978.60 2,176.46M3 $20,981.67 109.92% 19,088.74

0.779 qq 684.40 533.150.950 qq 1,642.32 1,560.202.594 qq 1,642.32 4,260.1833.33 m 51.00 1,699.83

169.13 p2 37.99 6,425.2533.83 lb 19.00 642.77

Page 362: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 344

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

8.33 lb 26.68 222.248.33 lb 17.20 143.28

33.33 m 95.00 3,166.3513.33 m2 11.40 151.96

1.10 m3 2,176.67 2,394.34M3 $21,199.55 109.79% 19,309.44

1.723 qq 1,642.32 2,829.720.950 qq 1,642.32 1,560.202.594 qq 1,642.32 4,260.1833.33 m 51.00 1,699.83

169.13 p2 37.99 6,425.2533.83 lb 19.00 642.77

8.33 lb 26.68 222.248.33 lb 17.20 143.28

33.33 m 95.00 3,166.3513.33 m2 11.40 151.96

1.10 m3 1,978.60 2,176.46M3 $23,278.24 113.72% 20,470.62

1.723 qq 1,642.32 2,829.720.950 qq 1,642.32 1,560.202.594 qq 1,642.32 4,260.1833.33 m 51.00 1,699.83

169.13 p2 37.99 6,425.2533.83 lb 19.00 642.77

8.33 lb 26.68 222.248.33 lb 17.20 143.28

33.33 m 95.00 3,166.3513.33 m2 11.40 151.96

1.10 m3 2,176.67 2,394.34M3 $23,496.12 113.56% 20,691.32

2.069 qq 1,642.32 3,397.961.945 qq 1,642.32 3,194.3125.00 m 51.00 1,275.00

132.62 p2 37.99 5,038.2326.52 lb 19.00 503.88

6.25 lb 26.68 166.756.25 lb 17.20 107.50

25.00 m 95.00 2,375.00

Page 363: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 345

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

10.00 m2 11.40 114.001.10 m3 1,978.60 2,176.46

M3 $18,349.09 113.38% 16,184.39

2.069 qq 1,642.32 3,397.961.945 qq 1,642.32 3,194.3125.00 m 51.00 1,275.00

132.62 p2 37.99 5,038.2326.52 lb 19.00 503.88

6.25 lb 26.68 166.756.25 lb 17.20 107.50

25.00 m 95.00 2,375.0010.00 m2 11.40 114.00

1.10 m3 2,176.67 2,394.34M3 $18,566.97 113.18% 16,405.09

0.998 qq 684.40 683.031.424 qq 1,642.32 2,338.662.594 qq 1,642.32 4,260.1850.00 m 51.00 2,550.00

242.18 p2 37.99 9,200.4248.44 lb 19.00 920.3612.50 lb 26.68 333.5012.50 lb 17.20 215.0050.00 m 95.00 4,750.0020.00 m2 11.40 228.00

1.00 m3 4,660.05 4,660.05M3 $30,139.20 107.39% 28,064.53

0.779 qq 684.40 533.150.950 qq 1,642.32 1,560.202.594 qq 1,642.32 4,260.1833.33 m 51.00 1,699.83

169.13 p2 37.99 6,425.2533.83 lb 19.00 642.77

8.33 lb 26.68 222.248.33 lb 17.20 143.28

33.33 m 95.00 3,166.3513.33 m2 11.40 151.96

1.00 m3 4,660.05 4,660.05M3 $23,465.26 108.31% 21,665.68

Page 364: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 346

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

2.069 qq 1,642.32 3,397.961.945 qq 1,642.32 3,194.3125.00 m 51.00 1,275.00

132.62 p2 37.99 5,038.2326.52 lb 19.00 503.88

6.25 lb 26.68 166.756.25 lb 17.20 107.50

25.00 m 95.00 2,375.0010.00 m2 11.40 114.00

1.00 m3 4,660.05 4,660.05M3 $20,832.68 111.04% 18,761.33

1.819 qq 1,642.32 2,987.381.819 qq 153.00 278.311.819 qq 15.30 27.8369.89 p2 37.99 2,655.1213.98 lb 19.00 265.62

0.80 lb 26.68 21.341.50 lb 17.20 25.80

10.00 m2 57.00 570.0010.00 m2 13.30 133.00

1.10 m3 2,233.18 2,456.50M3 $9,420.90 112.41% 8,380.77

1.819 qq 1,642.32 2,987.381.00 u 6,433.52 6,433.52

M3 $9,420.90 112.41% 8,380.77

1.819 qq 1,642.32 2,987.381.819 qq 230.00 418.37

1.00 u 6,155.21 6,155.21M3 $9,560.96 112.21% 8,520.83

1.819 qq 1,642.32 2,987.381.819 qq 230.00 418.37

1.00 u 6,155.21 6,155.21M3 $9,560.96 112.21% 8,520.83

Page 365: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 347

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.496 qq 1,642.32 2,456.911.496 qq 153.00 228.891.496 qq 15.30 22.8956.95 p2 37.99 2,163.5311.39 lb 19.00 216.41

0.67 lb 26.68 17.881.25 lb 17.20 21.508.35 m2 57.00 475.958.35 m2 13.30 111.061.10 m3 2,233.18 2,456.50

M3 $8,171.52 111.95% 7,299.48

1.496 qq 1,642.32 2,456.911.00 u 5,714.61 5,714.61

M3 $8,171.52 111.95% 7,299.48

1.496 qq 1,642.32 2,456.911.496 qq 230.00 344.08

1.00 u 5,485.72 5,485.72M3 $8,286.71 111.76% 7,414.67

1.496 qq 1,642.32 2,456.911.496 qq 230.00 344.08

1.00 u 5,485.72 5,485.72M3 $8,286.71 111.76% 7,414.67

1.819 qq 1,642.32 2,987.381.819 qq 153.00 278.311.819 qq 15.30 27.8369.89 p2 37.99 2,655.1213.98 lb 19.00 265.62

0.80 lb 26.68 21.341.50 lb 17.20 25.80

10.00 m2 57.00 570.0010.00 m2 13.30 133.00

1.00 m3 4,660.05 4,660.05M3 $11,624.45 108.84% 10,680.16

1.819 qq 1,642.32 2,987.381.00 u 8,637.07 8,637.07

Page 366: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 348

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

M3 $11,624.45 108.84% 10,680.16

1.819 qq 1,642.32 2,987.381.819 qq 230.00 418.37

1.00 u 8,358.76 8,358.76M3 $11,764.51 108.73% 10,820.22

1.819 qq 1,642.32 2,987.381.819 qq 230.00 418.37

1.00 u 8,358.76 8,358.76M3 $11,764.51 108.73% 10,820.22

1.496 qq 1,642.32 2,456.911.496 qq 153.00 228.891.496 qq 15.30 22.8956.95 p2 37.99 2,163.5311.39 lb 19.00 216.41

0.67 lb 26.68 17.881.25 lb 17.20 21.508.35 m2 57.00 475.958.35 m2 13.30 111.061.00 m3 4,660.05 4,660.05

M3 $10,375.07 108.09% 9,598.87

1.496 qq 1,642.32 2,456.911.00 u 7,918.16 7,918.16

M3 $10,375.07 108.09% 9,598.87

1.496 qq 1,642.32 2,456.911.496 qq 230.00 344.08

1.00 u 7,689.27 7,689.27M3 $10,490.26 107.99% 9,714.06

1.496 qq 1,642.32 2,456.911.496 qq 230.00 344.08

1.00 u 7,689.27 7,689.27M3 $10,490.26 107.99% 9,714.06

Espesor = 0.15

Page 367: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 349

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.8156 qq 1,642.32 2,981.801.8156 qq 153.00 277.79

0.56 u 1,360.68 761.9846.33 p2 37.99 1,760.0818.53 lb 19.00 352.07

6.67 lb 26.68 177.966.67 lb 17.20 114.72

13.333 m2 151.90 2,025.2813.333 m2 190.00 2,533.2713.333 m2 9.50 126.66

1.00 m3 4,660.05 4,660.05M3 $15,771.66 106.55% 14,802.09

1.8156 qq 1,642.32 2,981.801.00 u 12,789.86 12,789.86

M3 $15,771.66 106.55% 14,802.09

1.8156 qq 1,642.32 2,981.801.8156 qq 230.00 417.59

1.00 u 12,512.07 12,512.07M3 $15,911.46 106.49% 14,941.89

1.8156 qq 1,642.32 2,981.801.8156 qq 230.00 417.59

1.00 u 12,512.07 12,512.07M3 $15,911.46 106.49% 14,941.89

Espesor = 0.151.8156 qq 1,642.32 2,981.801.8156 qq 153.00 277.79

0.56 u 1,360.68 761.9846.33 p2 37.99 1,760.0818.53 lb 19.00 352.07

6.67 lb 26.68 177.966.67 lb 17.20 114.72

13.333 m2 151.90 2,025.2813.333 m2 190.00 2,533.2713.333 m2 9.50 126.66

1.00 m3 4,818.11 4,818.11M3 $15,929.72 106.48% 14,960.15

Page 368: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 350

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.8156 qq 1,642.32 2,981.801.00 u 12,947.92 12,947.92

M3 $15,929.72 106.48% 14,960.15

1.8156 qq 1,642.32 2,981.801.8156 qq 230.00 417.59

1.00 u 12,670.13 12,670.13M3 $16,069.52 106.42% 15,099.95

1.8156 qq 1,642.32 2,981.801.8156 qq 230.00 417.59

1.00 u 12,670.13 12,670.13M3 $16,069.52 106.42% 15,099.95

Espesor = 0.151.8156 qq 1,642.32 2,981.801.8156 qq 153.00 277.79

0.56 u 1,360.68 761.9846.33 p2 37.99 1,760.0818.53 lb 19.00 352.07

6.67 lb 26.68 177.966.67 lb 17.20 114.72

13.333 m2 151.90 2,025.2813.333 m2 190.00 2,533.2713.333 m2 9.50 126.66

1.00 m3 5,079.69 5,079.69M3 $16,191.30 106.37% 15,221.73

1.8156 qq 1,642.32 2,981.801.00 u 13,209.50 13,209.50

M3 $16,191.30 106.37% 15,221.73

1.8156 qq 1,642.32 2,981.801.8156 qq 230.00 417.59

1.00 u 12,931.71 12,931.71M3 $16,331.10 106.31% 15,361.53

1.8156 qq 1,642.32 2,981.801.8156 qq 230.00 417.59

1.00 u 12,931.71 12,931.71M3 $16,331.10 106.31% 15,361.53

Page 369: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 351

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006Espesor = 0.20

1.3634 qq 1,642.32 2,239.141.3634 qq 153.00 208.60

0.42 u 1,360.68 571.4934.79 p2 37.99 1,321.6713.92 lb 19.00 264.48

5.00 lb 26.68 133.405.00 lb 17.20 86.00

10.000 m2 151.90 1,519.0010.000 m2 190.00 1,900.0010.000 m2 9.50 95.00

1.00 m3 4,660.05 4,660.05M3 $12,998.83 105.93% 12,270.74

1.3634 qq 1,642.32 2,239.141.00 u 10,759.69 10,759.69

M3 $12,998.83 105.93% 12,270.74

1.3634 qq 1,642.32 2,239.141.3634 qq 230.00 313.58

1.00 u 10,551.09 10,551.09M3 $13,103.81 105.88% 12,375.72

1.3634 qq 1,642.32 2,239.141.3634 qq 230.00 313.58

1.00 u 10,551.09 10,551.09M3 $13,103.81 105.88% 12,375.72

Espesor = 0.201.3634 qq 1,642.32 2,239.141.3634 qq 153.00 208.60

0.42 u 1,360.68 571.4934.79 p2 37.99 1,321.6713.92 lb 19.00 264.48

5.00 lb 26.68 133.405.00 lb 17.20 86.00

10.000 m2 151.90 1,519.0010.000 m2 190.00 1,900.0010.000 m2 9.50 95.00

1.00 m3 4,818.11 4,818.11M3 $13,156.89 105.86% 12,428.80

Page 370: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 352

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.3634 qq 1,642.32 2,239.141.00 u 10,917.75 10,917.75

M3 $13,156.89 105.86% 12,428.80

1.3634 qq 1,642.32 2,239.141.3634 qq 230.00 313.58

1.00 u 10,709.15 10,709.15M3 $13,261.87 105.81% 12,533.78

1.3634 qq 1,642.32 2,239.141.3634 qq 230.00 313.58

1.00 u 10,709.15 10,709.15M3 $13,261.87 105.81% 12,533.78

Espesor = 0.204.8444 qq 1,642.32 7,956.064.8444 qq 153.00 741.19

0.42 u 1,360.68 571.4934.79 p2 37.99 1,321.6713.92 lb 19.00 264.48

5.00 lb 26.68 133.405.00 lb 17.20 86.00

10.000 m2 151.90 1,519.0010.000 m2 190.00 1,900.0010.000 m2 9.50 95.00

1.00 m3 4,818.11 4,818.11M3 $19,406.40 114.27% 16,983.34

4.8444 qq 1,642.32 7,956.061.00 u 11,450.34 11,450.34

M3 $19,406.40 114.27% 16,983.34

4.8444 qq 1,642.32 7,956.064.8444 qq 230.00 1,114.21

1.00 u 10,709.15 10,709.15M3 $19,779.42 113.96% 17,356.36

4.8444 qq 1,642.32 7,956.064.8444 qq 230.00 1,114.21

1.00 u 10,709.15 10,709.15M3 $19,779.42 113.96% 17,356.36

Espesor = 0.20

Page 371: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 353

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

2.4222 qq 1,642.32 3,978.032.4222 qq 153.00 370.60

0.42 u 1,360.68 571.4934.79 p2 37.99 1,321.6713.92 lb 19.00 264.48

5.00 lb 26.68 133.405.00 lb 17.20 86.00

10.000 m2 151.90 1,519.0010.000 m2 190.00 1,900.0010.000 m2 9.50 95.00

1.00 m3 4,818.11 4,818.11M3 $15,057.78 109.00% 13,814.14

2.4222 qq 1,642.32 3,978.031.00 u 11,079.75 11,079.75

M3 $15,057.78 109.00% 13,814.14

2.4222 qq 1,642.32 3,978.032.4222 qq 230.00 557.11

1.00 u 10,709.15 10,709.15M3 $15,244.29 108.88% 14,000.65

2.4222 qq 1,642.32 3,978.032.4222 qq 230.00 557.11

1.00 u 10,709.15 10,709.15M3 $15,244.29 108.88% 14,000.65

Espesor = 0.204.8444 qq 1,642.32 7,956.064.8444 qq 153.00 741.19

0.42 u 1,360.68 571.4934.79 p2 37.99 1,321.6713.92 lb 19.00 264.48

5.00 lb 26.68 133.405.00 lb 17.20 86.00

10.000 m2 151.90 1,519.0010.000 m2 190.00 1,900.0010.000 m2 9.50 95.00

1.00 m3 5,079.69 5,079.69M3 $19,667.98 114.05% 17,244.92

4.8444 qq 1,642.32 7,956.06

Page 372: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 354

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 11,711.92 11,711.92M3 $19,667.98 114.05% 17,244.92

4.8444 qq 1,642.32 7,956.064.8444 qq 230.00 1,114.21

1.00 u 10,970.73 10,970.73M3 $20,041.00 113.75% 17,617.94

4.8444 qq 1,642.32 7,956.064.8444 qq 230.00 1,114.21

1.00 u 10,970.73 10,970.73M3 $20,041.00 113.75% 17,617.94

Espesor = 0.202.4222 qq 1,642.32 3,978.032.4222 qq 153.00 370.60

0.42 u 1,360.68 571.4934.79 p2 37.99 1,321.6713.92 lb 19.00 264.48

5.00 lb 26.68 133.405.00 lb 17.20 86.00

10.000 m2 151.90 1,519.0010.000 m2 190.00 1,900.0010.000 m2 9.50 95.00

1.00 m3 5,079.69 5,079.69M3 $15,319.36 108.84% 14,075.72

2.4222 qq 1,642.32 3,978.031.00 u 11,341.33 11,341.33

M3 $15,319.36 108.84% 14,075.72

2.4222 qq 1,642.32 3,978.032.4222 qq 230.00 557.11

1.00 u 10,970.73 10,970.73M3 $15,505.87 108.72% 14,262.23

2.4222 qq 1,642.32 3,978.032.4222 qq 230.00 557.11

1.00 u 10,970.73 10,970.73M3 $15,505.87 108.72% 14,262.23

Page 373: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 355

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.140 qq 1,642.32 1,872.241.620 qq 1,642.32 2,660.56

3.00 u 1,512.00 4,536.0042.22 p2 37.99 1,603.9416.89 lb 19.00 320.91

0.30 lb 26.68 8.000.90 lb 17.20 15.483.00 u 854.00 2,562.009.17 m2 13.30 121.961.10 m3 2,233.18 2,456.50

M3 $16,157.59 110.30% 14,648.62

1.140 qq 1,642.32 1,872.241.620 qq 1,642.32 2,660.56

1.00 u 11,624.79 11,624.79M3 $16,157.59 110.30% 14,648.62

1.140 qq 1,642.32 1,872.241.620 qq 1,642.32 2,660.56

1.00 u 11,624.79 11,624.79M3 $16,157.59 110.30% 14,648.62

1.140 qq 1,642.32 1,872.241.620 qq 1,642.32 2,660.56

1.00 u 11,624.79 11,624.79M3 $16,157.59 110.30% 14,648.62

1.000 u 13,701.09 13,701.091.10 m3 2,176.67 2,394.34

M3 $16,095.43 110.30% 14,591.77

1.620 qq 1,642.32 2,660.561.00 u 11,040.53 11,040.531.10 m3 2,176.67 2,394.34

M3 $16,095.43 110.30% 14,591.77

1.140 qq 1,642.32 1,872.241.620 qq 1,642.32 2,660.561.000 u 9,168.29 9,168.29

Page 374: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 356

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.10 m3 2,176.67 2,394.34M3 $16,095.43 110.30% 14,591.77

1.620 qq 1,642.32 2,660.561.00 u 11,040.53 11,040.531.10 m3 2,176.67 2,394.34

M3 $16,095.43 110.30% 14,591.77

1.140 qq 1,642.32 1,872.241.620 qq 1,642.32 2,660.56

3.00 u 1,512.00 4,536.0042.22 p2 37.99 1,603.9416.89 lb 19.00 320.91

0.30 lb 26.68 8.000.90 lb 17.20 15.483.00 u 854.00 2,562.009.17 m2 13.30 121.961.00 m3 4,660.05 4,660.05

M3 $18,361.14 108.34% 16,948.01

1.1400 qq 1,642.32 1,872.241.6200 qq 1,642.32 2,660.56

1.00 u 13,828.34 13,828.34M3 $18,361.14 108.34% 16,948.01

1.1400 qq 1,642.32 1,872.241.6200 qq 1,642.32 2,660.56

1.00 u 13,828.34 13,828.34M3 $18,361.14 108.34% 16,948.01

Page 375: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 357

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.1400 qq 1,642.32 1,872.241.6200 qq 1,642.32 2,660.56

1.00 u 13,828.34 13,828.34M3 $18,361.14 108.34% 16,948.01

1.140 qq 1,642.32 1,872.241.620 qq 1,642.32 2,660.56

3.00 u 1,512.00 4,536.0042.22 p2 37.99 1,603.9416.89 lb 19.00 320.91

0.30 lb 26.68 8.000.90 lb 17.20 15.483.00 u 854.00 2,562.009.17 m2 13.30 121.961.00 m3 4,818.11 4,818.11

M3 $18,519.20 108.26% 17,106.07

1.1400 qq 1,642.32 1,872.241.6200 qq 1,642.32 2,660.56

1.00 u 13,986.40 13,986.40M3 $18,519.20 108.26% 17,106.07

1.1400 qq 1,642.32 1,872.241.6200 qq 1,642.32 2,660.56

1.00 u 13,986.40 13,986.40M3 $18,519.20 108.26% 17,106.07

1.1400 qq 1,642.32 1,872.241.6200 qq 1,642.32 2,660.56

1.00 u 13,986.40 13,986.40M3 $18,519.20 108.26% 17,106.07

1.140 qq 1,642.32 1,872.241.620 qq 1,642.32 2,660.56

3.00 u 1,512.00 4,536.0042.22 p2 37.99 1,603.9416.89 lb 19.00 320.91

0.30 lb 26.68 8.000.90 lb 17.20 15.483.00 u 854.00 2,562.00

Page 376: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 358

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

9.17 m2 13.30 121.961.00 m3 5,079.69 5,079.69

M3 $18,780.78 108.14% 17,367.65

1.1400 qq 1,642.32 1,872.241.6200 qq 1,642.32 2,660.56

1.00 u 14,247.98 14,247.98M3 $18,780.78 108.14% 17,367.65

1.1400 qq 1,642.32 1,872.241.6200 qq 1,642.32 2,660.56

1.00 u 14,247.98 14,247.98M3 $18,780.78 108.14% 17,367.65

1.1400 qq 1,642.32 1,872.241.6200 qq 1,642.32 2,660.56

1.00 u 14,247.98 14,247.98M3 $18,780.78 108.14% 17,367.65

1.502 qq 1,642.32 2,466.762.226 qq 1,642.32 3,655.803.728 qq 153.00 570.3884.25 p2 37.99 3,200.6616.85 lb 19.00 320.15

3.13 lb 26.68 83.513.13 lb 17.20 53.84

12.50 m 76.00 950.0012.50 m 28.40 355.0012.50 m2 11.40 142.50

1.10 m3 2,233.18 2,456.50M3 $14,255.10 116.17% 12,271.20

1.502 qq 1,642.32 2,466.762.226 qq 1,642.32 3,655.803.728 qq 230.00 857.44

1.00 u 7,562.16 7,562.16M3 $14,542.16 115.80% 12,558.26

Page 377: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 359

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.967 qq 1,642.32 1,588.121.899 qq 1,642.32 3,118.772.866 qq 153.00 438.5061.51 p2 37.99 2,336.7612.30 lb 19.00 233.70

2.00 lb 26.68 53.362.00 lb 17.20 34.408.00 m 95.00 760.008.00 m 35.50 284.00

10.00 m2 11.40 114.001.10 m3 2,233.18 2,456.50

M3 $11,418.11 115.64% 9,874.07

0.967 qq 1,642.32 1,588.121.899 qq 1,642.32 3,118.772.866 qq 230.00 659.18

1.00 u 6,272.72 6,272.72M3 $11,638.79 115.30% 10,094.75

0.776 qq 1,642.32 1,274.442.400 qq 1,642.32 3,941.573.176 qq 153.00 485.9348.02 p2 37.99 1,824.28

9.60 lb 19.00 182.401.39 lb 26.68 37.091.39 lb 17.20 23.915.56 m 114.00 633.845.56 m 42.60 236.868.34 m2 11.40 95.081.10 m3 2,233.18 2,456.50

M3 $11,191.90 117.70% 9,508.76

0.776 qq 1,642.32 1,274.442.400 qq 1,642.32 3,941.573.176 qq 230.00 730.48

1.00 u 5,489.96 5,489.96M3 $11,436.45 117.26% 9,753.31

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.88

Page 378: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 360

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

2.441 qq 153.00 373.4739.23 p2 37.99 1,490.35

7.85 lb 19.00 149.150.78 lb 26.68 20.810.78 lb 17.20 13.423.13 m 152.00 475.763.13 m 56.80 177.786.26 m2 11.40 71.361.10 m3 2,233.18 2,456.50

M3 $9,503.56 117.22% 8,107.47H. A. VIGA 40X80, 1:2:4, 40, 5 DE 1", 2 DE ½" X 25', 3/8" A .25, LIG. Y WINCHE:

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.06

1.00 u 8,002.48 8,002.48M3 $9,503.56 117.22% 8,107.47

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 230.00 561.43

1.00 u 4,855.13 4,855.13M3 $9,691.52 116.83% 8,295.43

1.502 qq 1,642.32 2,466.762.226 qq 1,642.32 3,655.803.728 qq 153.00 570.3884.25 p2 37.99 3,200.6616.85 lb 19.00 320.15

3.13 lb 26.68 83.513.13 lb 17.20 53.84

12.50 m 76.00 950.0012.50 m 28.40 355.0012.50 m2 11.40 142.50

1.00 m3 4,660.05 4,660.05M3 $16,458.65 112.96% 14,570.59

1.000 u 6,122.56 6,122.563.728 qq 243.00 905.90

1.00 u 9,765.71 9,765.71M3 $16,794.17 112.67% 14,906.11

Page 379: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 361

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.502 qq 1,642.32 2,466.762.226 qq 1,642.32 3,655.803.728 qq 230.00 857.44

1.00 u 9,765.71 9,765.71M3 $16,745.71 112.71% 14,857.65

1.502 qq 1,642.32 2,466.762.226 qq 1,642.32 3,655.803.728 qq 243.00 905.90

1.00 u 9,765.71 9,765.71M3 $16,794.17 112.67% 14,906.11

0.967 qq 1,642.32 1,588.121.899 qq 1,642.32 3,118.772.866 qq 153.00 438.5061.51 p2 37.99 2,336.7612.30 lb 19.00 233.70

2.00 lb 26.68 53.362.00 lb 17.20 34.408.00 m 95.00 760.008.00 m 35.50 284.00

10.00 m2 11.40 114.001.00 m3 4,660.05 4,660.05

M3 $13,621.66 111.90% 12,173.46

1.000 u 4,706.89 4,706.892.866 qq 243.00 696.44

1.00 u 8,476.27 8,476.27M3 $13,879.60 111.65% 12,431.40

0.967 qq 1,642.32 1,588.121.899 qq 1,642.32 3,118.772.866 qq 230.00 659.18

1.00 u 8,476.27 8,476.27M3 $13,842.34 111.68% 12,394.14

0.967 qq 1,642.32 1,588.121.899 qq 1,642.32 3,118.772.866 qq 243.00 696.44

1.00 u 8,476.27 8,476.27M3 $13,879.60 111.65% 12,431.40

Page 380: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 362

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.776 qq 1,642.32 1,274.442.400 qq 1,642.32 3,941.573.176 qq 153.00 485.9348.02 p2 37.99 1,824.28

9.60 lb 19.00 182.401.39 lb 26.68 37.091.39 lb 17.20 23.915.56 m 114.00 633.845.56 m 42.60 236.868.34 m2 11.40 95.081.00 m3 4,660.05 4,660.05

M3 $13,395.45 113.44% 11,808.15

1.000 u 5,216.01 5,216.013.176 qq 243.00 771.77

1.00 u 7,693.51 7,693.51M3 $13,681.29 113.12% 12,093.99

0.776 qq 1,642.32 1,274.442.400 qq 1,642.32 3,941.573.176 qq 230.00 730.48

1.00 u 7,693.51 7,693.51M3 $13,640.00 113.17% 12,052.70

0.776 qq 1,642.32 1,274.442.400 qq 1,642.32 3,941.573.176 qq 243.00 771.77

1.00 u 7,693.51 7,693.51M3 $13,681.29 113.12% 12,093.99

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 153.00 373.4739.23 p2 37.99 1,490.35

7.85 lb 19.00 149.150.78 lb 26.68 20.810.78 lb 17.20 13.423.13 m 152.00 475.763.13 m 56.80 177.78

Page 381: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 363

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

6.26 m2 11.40 71.361.00 m3 4,660.05 4,660.05

M3 $11,707.11 112.49% 10,406.86

1.000 u 4,274.96 4,274.962.441 qq 243.00 593.16

1.00 u 7,058.68 7,058.68M3 $11,926.80 112.24% 10,626.55

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 230.00 561.43

1.00 u 7,058.68 7,058.68M3 $11,895.07 112.27% 10,594.82

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 243.00 593.16

1.00 u 7,058.68 7,058.68M3 $11,926.80 112.24% 10,626.55

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 230.00 561.43

1.00 u 7,058.68 7,058.68M3 $11,895.07 112.27% 10,594.82

Page 382: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 364

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

H. A. VIGA 40X80, 180 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25: PORTICO0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 243.00 593.16

1.00 u 7,058.68 7,058.68M3 $11,926.80 112.24% 10,626.55

1.502 qq 1,642.32 2,466.762.226 qq 1,642.32 3,655.803.728 qq 153.00 570.3884.25 p2 37.99 3,200.6616.85 lb 19.00 320.15

3.13 lb 26.68 83.513.13 lb 17.20 53.84

12.50 m 76.00 950.0012.50 m 28.40 355.0012.50 m2 11.40 142.50

1.00 m3 4,818.11 4,818.11M3 $16,616.71 112.82% 14,728.65

1.000 u 6,122.56 6,122.563.728 qq 243.00 905.90

1.00 u 9,923.77 9,923.77M3 $16,952.23 112.53% 15,064.17

1.502 qq 1,642.32 2,466.762.226 qq 1,642.32 3,655.803.728 qq 230.00 857.44

1.00 u 9,923.77 9,923.77M3 $16,903.77 112.57% 15,015.71

1.502 qq 1,642.32 2,466.762.226 qq 1,642.32 3,655.803.728 qq 243.00 905.90

1.00 u 9,923.77 9,923.77M3 $16,952.23 112.53% 15,064.17

0.967 qq 1,642.32 1,588.121.899 qq 1,642.32 3,118.772.866 qq 153.00 438.50

Page 383: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 365

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

61.51 p2 37.99 2,336.7612.30 lb 19.00 233.70

2.00 lb 26.68 53.362.00 lb 17.20 34.408.00 m 95.00 760.008.00 m 35.50 284.00

10.00 m2 11.40 114.001.00 m3 4,818.11 4,818.11

M3 $13,779.72 111.74% 12,331.52

1.000 u 4,706.89 4,706.892.866 qq 243.00 696.44

1.00 u 8,634.33 8,634.33M3 $14,037.66 111.50% 12,589.46

0.967 qq 1,642.32 1,588.121.899 qq 1,642.32 3,118.772.866 qq 230.00 659.18

1.00 u 8,634.33 8,634.33M3 $14,000.40 111.54% 12,552.20

0.967 qq 1,642.32 1,588.121.899 qq 1,642.32 3,118.772.866 qq 243.00 696.44

1.00 u 8,634.33 8,634.33M3 $14,037.66 111.50% 12,589.46

0.776 qq 1,642.32 1,274.442.400 qq 1,642.32 3,941.573.176 qq 153.00 485.9348.02 p2 37.99 1,824.28

9.60 lb 19.00 182.401.39 lb 26.68 37.091.39 lb 17.20 23.915.56 m 114.00 633.845.56 m 42.60 236.868.34 m2 11.40 95.081.00 m3 4,818.11 4,818.11

M3 $13,553.51 113.26% 11,966.21

1.000 u 5,216.01 5,216.01

Page 384: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 366

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

3.176 qq 243.00 771.771.00 u 7,851.57 7,851.57

M3 $13,839.35 112.96% 12,252.05

0.776 qq 1,642.32 1,274.442.400 qq 1,642.32 3,941.573.176 qq 230.00 730.48

1.00 u 7,851.57 7,851.57M3 $13,798.06 113.00% 12,210.76

Page 385: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 367

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.776 qq 1,642.32 1,274.442.400 qq 1,642.32 3,941.573.176 qq 243.00 771.77

1.00 u 7,851.57 7,851.57M3 $13,839.35 112.96% 12,252.05

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 153.00 373.4739.23 p2 37.99 1,490.35

7.85 lb 19.00 149.150.78 lb 26.68 20.810.78 lb 17.20 13.423.13 m 152.00 475.763.13 m 56.80 177.786.26 m2 11.40 71.361.00 m3 4,818.11 4,818.11

M3 $11,865.17 112.31% 10,564.92

1.000 u 4,274.96 4,274.962.441 qq 243.00 593.16

1.00 u 7,216.74 7,216.74M3 $12,084.86 112.06% 10,784.61

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 230.00 561.43

1.00 u 7,216.74 7,216.74M3 $12,053.13 112.09% 10,752.88

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 243.00 593.16

1.00 u 7,216.74 7,216.74M3 $12,084.86 112.06% 10,784.61

0.752 qq 1,642.32 1,235.02

Page 386: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 368

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 230.00 561.43

1.00 u 7,216.74 7,216.74M3 $12,053.13 112.09% 10,752.88

H. A. VIGA 40X80, 210 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25: PORTICO0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 243.00 593.16

1.00 u 7,216.74 7,216.74M3 $12,084.86 112.06% 10,784.61

1.502 qq 1,642.32 2,466.762.226 qq 1,642.32 3,655.803.728 qq 153.00 570.3884.25 p2 37.99 3,200.6616.85 lb 19.00 320.15

3.13 lb 26.68 83.513.13 lb 17.20 53.84

12.50 m 76.00 950.0012.50 m 28.40 355.0012.50 m2 11.40 142.50

1.00 m3 5,079.69 5,079.69M3 $16,878.29 112.60% 14,990.23

1.000 u 6,122.56 6,122.563.728 qq 243.00 905.90

1.00 u 10,185.35 10,185.35M3 $17,213.81 112.32% 15,325.75

1.502 qq 1,642.32 2,466.762.226 qq 1,642.32 3,655.803.728 qq 230.00 857.44

1.00 u 10,185.35 10,185.35M3 $17,165.35 112.36% 15,277.29

1.502 qq 1,642.32 2,466.762.226 qq 1,642.32 3,655.803.728 qq 243.00 905.90

1.00 u 10,185.35 10,185.35

Page 387: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 369

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

M3 $17,213.81 112.32% 15,325.75

0.967 qq 1,642.32 1,588.121.899 qq 1,642.32 3,118.772.866 qq 153.00 438.5061.51 p2 37.99 2,336.7612.30 lb 19.00 233.70

2.00 lb 26.68 53.362.00 lb 17.20 34.408.00 m 95.00 760.008.00 m 35.50 284.00

10.00 m2 11.40 114.001.00 m3 5,079.69 5,079.69

M3 $14,041.30 111.50% 12,593.10

1.000 u 4,706.89 4,706.892.866 qq 243.00 696.44

1.00 u 8,895.91 8,895.91M3 $14,299.24 111.27% 12,851.04

0.967 qq 1,642.32 1,588.121.899 qq 1,642.32 3,118.772.866 qq 230.00 659.18

1.00 u 8,895.91 8,895.91M3 $14,261.98 111.30% 12,813.78

0.967 qq 1,642.32 1,588.121.899 qq 1,642.32 3,118.772.866 qq 243.00 1,235.02

1.00 u 8,895.91 8,895.91M3 $14,837.82 113.93% 13,023.46

0.776 qq 1,642.32 1,274.442.400 qq 1,642.32 3,941.573.176 qq 153.00 485.9348.02 p2 37.99 1,824.28

9.60 lb 19.00 182.401.39 lb 26.68 37.091.39 lb 17.20 23.915.56 m 114.00 633.845.56 m 42.60 236.86

Page 388: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 370

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

8.34 m2 11.40 95.081.00 m3 5,079.69 5,079.69

M3 $13,815.09 112.98% 12,227.79

1.000 u 5,216.01 5,216.013.176 qq 243.00 771.77

1.00 u 8,113.15 8,113.15M3 $14,100.93 112.68% 12,513.63

0.776 qq 1,642.32 1,274.442.400 qq 1,642.32 3,941.573.176 qq 230.00 730.48

1.00 u 8,113.15 8,113.15M3 $14,059.64 112.73% 12,472.34

0.776 qq 1,642.32 1,274.442.400 qq 1,642.32 3,941.573.176 qq 243.00 771.77

1.00 u 8,113.15 8,113.15M3 $14,100.93 112.68% 12,513.63

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 153.00 373.4739.23 p2 37.99 1,490.35

7.85 lb 19.00 149.150.78 lb 26.68 20.810.78 lb 17.20 13.423.13 m 152.00 475.763.13 m 56.80 177.786.26 m2 11.40 71.361.00 m3 5,079.69 5,079.69

M3 $12,126.75 112.01% 10,826.50

1.000 u 4,274.96 4,274.962.441 qq 243.00 593.16

1.00 u 7,478.32 7,478.32M3 $12,346.44 111.77% 11,046.19

0.752 qq 1,642.32 1,235.02

Page 389: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 371

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 230.00 561.43

1.00 u 7,478.32 7,478.32M3 $12,314.71 111.80% 11,014.46

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 243.00 593.16

1.00 u 7,478.32 7,478.32M3 $12,346.44 111.77% 11,046.19

0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 230.00 561.43

1.00 u 7,478.32 7,478.32M3 $12,314.71 111.80% 11,014.46

Page 390: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 372

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

H. A. VIGA 40X80, 240 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25: PORTICO0.752 qq 1,642.32 1,235.020.162 qq 1,642.32 266.061.689 qq 1,642.32 2,773.882.441 qq 243.00 593.16

1.00 u 7,478.32 7,478.32M3 $12,346.44 111.77% 11,046.19

0.779 qq 684.40 533.151.899 qq 1,642.32 3,118.7733.33 m 51.00 1,699.8397.97 p2 37.99 3,721.8819.59 lb 19.00 372.21

8.33 lb 26.68 222.248.33 lb 17.20 143.28

33.33 m 57.00 1,899.8113.33 m2 11.40 151.96

1.10 m3 1,978.60 2,176.46M3 $14,039.59 107.96% 13,004.73

0.779 qq 684.40 533.151.899 qq 1,642.32 3,118.7733.33 m 51.00 1,699.8397.97 p2 37.99 3,721.8819.59 lb 19.00 372.21

8.33 lb 26.68 222.248.33 lb 17.20 143.28

33.33 m 57.00 1,899.8113.33 m2 11.40 151.96

1.10 m3 2,176.67 2,394.34M3 $14,257.47 107.80% 13,225.43

2.781 qq 1,642.32 4,567.2925.00 m 51.00 1,275.0097.97 p2 37.99 3,721.8819.59 lb 19.00 372.21

6.25 lb 26.68 166.756.25 lb 17.20 107.50

Page 391: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 373

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

25.00 m 57.00 1,425.0010.00 m2 11.40 114.00

1.10 m3 1,978.60 2,176.46M3 $13,926.09 112.40% 12,389.56

2.781 qq 1,642.32 4,567.2925.00 m 51.00 1,275.0097.97 p2 37.99 3,721.8819.59 lb 19.00 372.21

6.25 lb 26.68 166.756.25 lb 17.20 107.50

25.00 m 57.00 1,425.0010.00 m2 11.40 114.00

1.10 m3 2,176.67 2,394.34M3 $14,143.97 112.16% 12,610.26

1.857 qq 1,642.32 3,049.791.857 qq 153.00 284.121.857 qq 15.30 28.41

106.34 p2 37.99 4,039.8621.27 lb 19.00 404.13

6.25 lb 26.68 166.756.25 lb 17.20 107.50

25.00 m 57.00 1,425.0010.00 m2 13.30 133.00

1.10 m3 2,233.18 2,456.50M3 $12,095.06 109.96% 10,999.22

1.857 qq 1,642.32 3,049.791.00 u 9,045.27 9,045.27

M3 $12,095.06 109.96% 10,999.22

1.857 qq 1,642.32 3,049.791.857 qq 230.00 427.11

1.00 u 8,761.15 8,761.15M3 $12,238.05 109.84% 11,142.21

1.857 qq 1,642.32 3,049.79

Page 392: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 374

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.857 qq 230.00 427.111.00 u 8,761.15 8,761.15

M3 $12,238.05 109.84% 11,142.21

1.548 qq 1,642.32 2,542.311.548 qq 153.00 236.841.548 qq 15.30 23.6890.62 p2 37.99 3,442.6518.12 lb 19.00 344.28

5.21 lb 26.68 139.005.21 lb 17.20 89.61

20.83 m 76.00 1,583.088.33 m2 13.30 110.821.10 m3 2,233.18 2,456.50

M3 $10,968.77 109.27% 10,037.77

1.548 qq 1,642.32 2,542.311.00 u 8,426.46 8,426.46

M3 $10,968.77 109.27% 10,037.77

1.548 qq 1,642.32 2,542.311.548 qq 230.00 356.04

1.00 u 8,189.62 8,189.62M3 $11,087.97 109.17% 10,156.97

1.548 qq 1,642.32 2,542.311.548 qq 230.00 356.04

1.00 u 8,189.62 8,189.62M3 $11,087.97 109.17% 10,156.97

1.857 qq 1,642.32 3,049.791.857 qq 153.00 284.121.857 qq 15.30 28.41

106.34 p2 37.99 4,039.8621.27 lb 19.00 404.13

6.25 lb 26.68 166.756.25 lb 17.20 107.50

25.00 m 57.00 1,425.0010.00 m2 13.30 133.00

1.00 m3 4,660.05 4,660.05M3 $14,298.61 107.52% 13,298.61

Page 393: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 375

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.857 qq 1,642.32 3,049.791.00 u 11,248.82 11,248.82

M3 $14,298.61 107.52% 13,298.61

1.857 qq 1,642.32 3,049.791.857 qq 230.00 427.11

1.00 u 10,964.70 10,964.70M3 $14,441.60 107.44% 13,441.60

1.857 qq 1,642.32 3,049.791.857 qq 230.00 427.11

1.00 u 10,964.70 10,964.70M3 $14,441.60 107.44% 13,441.60

1.548 qq 1,642.32 2,542.311.548 qq 153.00 236.841.548 qq 15.30 23.6890.62 p2 37.99 3,442.6518.12 lb 19.00 344.28

5.21 lb 26.68 139.005.21 lb 17.20 89.61

20.83 m 57.00 1,187.318.33 m2 13.30 110.821.00 m3 4,660.05 4,660.05

M3 $12,776.55 106.99% 11,941.39

1.548 qq 1,642.32 2,542.311.00 u 10,234.24 10,234.24

M3 $12,776.55 106.99% 11,941.39

1.548 qq 1,642.32 2,542.311.548 qq 230.00 356.04

1.00 u 9,997.40 9,997.40M3 $12,895.75 106.92% 12,060.59

1.548 qq 1,642.32 2,542.311.548 qq 230.00 356.04

1.00 u 9,997.40 9,997.40M3 $12,895.75 106.92% 12,060.59

Page 394: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 376

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 153.00 265.76

1.02 m3 1,857.98 1,895.14M3 $5,013.61 122.29% 4,099.90

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 153.00 265.76

1.02 m3 1,857.98 1,895.14M3 $5,013.61 122.29% 4,099.90

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 230.00 399.51

1.02 m3 1,857.98 1,895.14M3 $5,147.36 121.58% 4,233.65

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 230.00 399.51

1.02 m3 1,857.98 1,895.14M3 $5,147.36 121.58% 4,233.65

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 153.00 206.70

1.02 m3 1,857.98 1,895.14M3 $4,320.61 120.19% 3,594.86

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.15

Page 395: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 377

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.351 qq 153.00 206.701.02 m3 1,857.98 1,895.14

M3 $4,320.61 120.19% 3,594.86

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 230.00 310.73

1.02 m3 1,857.98 1,895.14M3 $4,424.64 119.62% 3,698.89

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 230.00 310.73

1.02 m3 1,857.98 1,895.14M3 $4,424.64 119.62% 3,698.89

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 153.00 265.76

1.00 m3 4,446.01 4,446.01M3 $7,564.48 112.59% 6,718.70

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 153.00 265.76

1.00 m3 4,446.01 4,446.01M3 $7,564.48 112.59% 6,718.70

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 230.00 399.51

1.00 m3 4,495.82 4,495.82M3 $7,748.04 112.25% 6,902.26

1.299 qq 1,642.32 2,133.37

Page 396: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 378

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.438 qq 1,642.32 719.341.737 qq 230.00 399.51

1.00 m3 4,495.82 4,495.82M3 $7,748.04 112.25% 6,902.26

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 153.00 206.70

1.00 m3 4,446.01 4,446.01M3 $6,871.48 110.59% 6,213.66

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 153.00 206.70

1.00 m3 4,446.01 4,446.01M3 $6,871.48 110.59% 6,213.66

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 230.00 310.73

1.00 m3 4,495.82 4,495.82M3 $7,025.32 110.33% 6,367.50

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 230.00 310.73

1.00 m3 4,495.82 4,495.82M3 $7,025.32 110.33% 6,367.50

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 153.00 265.76

1.00 m3 4,660.05 4,660.05M3 $7,778.52 112.20% 6,932.74

Page 397: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 379

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 153.00 265.76

1.00 m3 4,660.05 4,660.05M3 $7,778.52 112.20% 6,932.74

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 230.00 399.51

1.00 m3 4,660.05 4,660.05M3 $7,912.27 111.97% 7,066.49

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 230.00 399.51

1.00 m3 4,660.05 4,660.05M3 $7,912.27 111.97% 7,066.49

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 153.00 206.70

1.00 m3 4,660.05 4,660.05M3 $7,085.52 110.23% 6,427.70

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 153.00 206.70

1.00 m3 4,660.05 4,660.05M3 $7,085.52 110.23% 6,427.70

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 230.00 310.73

1.00 m3 4,660.05 4,660.05M3 $7,189.55 110.07% 6,531.73

Page 398: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 380

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 230.00 310.73

1.00 m3 4,660.05 4,660.05M3 $7,189.55 110.07% 6,531.73

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 153.00 265.76

1.00 m3 4,818.11 4,818.11M3 $7,936.58 111.93% 7,090.80

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 153.00 265.76

1.00 m3 4,818.11 4,818.11M3 $7,936.58 111.93% 7,090.80

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 230.00 399.51

1.00 m3 4,818.11 4,818.11M3 $8,070.33 111.71% 7,224.55

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 230.00 399.51

1.00 m3 4,818.11 4,818.11M3 $8,070.33 111.71% 7,224.55

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 153.00 206.70

Page 399: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 381

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m3 4,818.11 4,818.11M3 $7,243.58 109.99% 6,585.76

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 153.00 206.70

1.00 m3 4,818.11 4,818.11M3 $7,243.58 109.99% 6,585.76

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 230.00 310.73

1.00 m3 4,818.11 4,818.11M3 $7,347.61 109.83% 6,689.79

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 230.00 310.73

1.00 m3 4,818.11 4,818.11M3 $7,347.61 109.83% 6,689.79

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 153.00 265.76

1.00 m3 5,079.69 5,079.69M3 $8,198.16 111.50% 7,352.38

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 153.00 265.76

1.00 m3 5,079.69 5,079.69M3 $8,198.16 111.50% 7,352.38

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.34

Page 400: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 382

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.737 qq 230.00 399.511.00 m3 5,079.69 5,079.69

M3 $8,331.91 111.30% 7,486.13

1.299 qq 1,642.32 2,133.370.438 qq 1,642.32 719.341.737 qq 230.00 399.51

1.00 m3 5,079.69 5,079.69M3 $8,331.91 111.30% 7,486.13

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 153.00 206.70

1.00 m3 5,079.69 5,079.69M3 $7,505.16 109.61% 6,847.34

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 153.00 206.70

1.00 m3 5,079.69 5,079.69M3 $7,505.16 109.61% 6,847.34

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 230.00 310.73

1.00 m3 5,079.69 5,079.69M3 $7,609.19 109.46% 6,951.37

0.974 qq 1,642.32 1,599.620.377 qq 1,642.32 619.151.351 qq 230.00 310.73

1.00 m3 5,079.69 5,079.69M3 $7,609.19 109.46% 6,951.37

Page 401: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 383

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

2.737 qq 1,642.32 4,495.030.374 qq 1,642.32 614.233.111 qq 153.00 475.98

1.00 m3 4,660.05 4,660.05M3 $10,245.29 117.35% 8,730.48

2.737 qq 1,642.32 4,495.030.374 qq 1,642.32 614.233.111 qq 153.00 475.98

1.00 m3 4,660.05 4,660.05M3 $10,245.29 117.35% 8,730.48

2.737 qq 1,642.32 4,495.030.374 qq 1,642.32 614.233.111 qq 230.00 715.53

1.00 m3 4,660.05 4,660.05M3 $10,484.84 116.89% 8,970.03

2.737 qq 1,642.32 4,495.030.374 qq 1,642.32 614.233.111 qq 230.00 715.53

1.00 m3 4,660.05 4,660.05M3 $10,484.84 116.89% 8,970.03

2.737 qq 1,642.32 4,495.030.374 qq 1,642.32 614.233.111 qq 153.00 475.98

1.00 m3 4,818.11 4,818.11M3 $10,403.35 117.04% 8,888.54

2.737 qq 1,642.32 4,495.030.374 qq 1,642.32 614.233.111 qq 153.00 475.98

1.00 m3 4,818.11 4,818.11

Page 402: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 384

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

M3 $10,403.35 117.04% 8,888.54

2.737 qq 1,642.32 4,495.030.374 qq 1,642.32 614.233.111 qq 230.00 715.53

1.00 m3 4,818.11 4,818.11M3 $10,642.90 116.60% 9,128.09

2.737 qq 1,642.32 4,495.030.374 qq 1,642.32 614.233.111 qq 230.00 715.53

1.00 m3 4,818.11 4,818.11M3 $10,642.90 116.60% 9,128.09

2.737 qq 1,642.32 4,495.030.374 qq 1,642.32 614.233.111 qq 153.00 475.98

1.00 m3 5,079.69 5,079.69M3 $10,664.93 116.56% 9,150.12

2.737 qq 1,642.32 4,495.030.374 qq 1,642.32 614.233.111 qq 153.00 475.98

1.00 m3 5,079.69 5,079.69M3 $10,664.93 116.56% 9,150.12

2.737 qq 1,642.32 4,495.030.374 qq 1,642.32 614.233.111 qq 230.00 715.53

1.00 m3 5,079.69 5,079.69M3 $10,904.48 116.13% 9,389.67

2.737 qq 1,642.32 4,495.030.374 qq 1,642.32 614.233.111 qq 230.00 715.53

Page 403: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 385

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m3 5,079.69 5,079.69M3 $10,904.48 116.13% 9,389.67

0.083 qq 684.40 56.810.971 qq 1,642.32 1,594.69

16.667 m 51.00 850.021.02 m3 1,857.98 1,895.14

M3 $4,339.85 114.23% 3,799.12

0.873 qq 1,642.32 1,433.7511.111 m 51.00 566.66

1.02 m3 1,857.98 1,895.14M3 $3,895.55 114.49% 3,402.53

0.717 qq 1,642.32 1,177.548.889 m 51.00 453.34

Page 404: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 386

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.02 m3 1,857.98 1,895.14M3 $3,526.02 113.41% 3,108.97

0.596 qq 1,642.32 978.826.667 m 51.00 340.02

1.02 m3 1,857.98 1,895.14M3 $3,213.98 112.54% 2,855.85

0.198 qq 684.40 135.511.223 qq 1,642.32 2,008.56

33.333 m 51.00 1,699.981.02 m3 1,978.60 2,018.17

M3 $5,726.71 113.52% 5,044.64

0.292 qq 1,642.32 479.560.910 qq 1,642.32 1,494.51

22.222 m 51.00 1,133.321.02 m3 1,978.60 2,018.17

M3 $4,646.00 112.87% 4,116.34

0.219 qq 1,642.32 359.670.755 qq 1,642.32 1,239.95

16.667 m 51.00 850.021.02 m3 1,978.60 2,018.17

M3 $4,108.14 112.43% 3,653.96

0.083 qq 684.40 56.810.971 qq 1,642.32 1,594.69

16.667 m 51.00 850.021.02 m3 1,978.60 2,018.17

M3 $4,462.88 114.33% 3,903.52

0.873 qq 1,642.32 1,433.7511.111 m 51.00 566.66

1.02 m3 1,978.60 2,018.17M3 $4,018.58 114.59% 3,506.93

0.717 qq 1,642.32 1,177.548.889 m 51.00 453.34

1.02 m3 1,978.60 2,018.17M3 $3,649.05 113.56% 3,213.37

Page 405: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 387

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.596 qq 1,642.32 978.826.667 m 51.00 340.02

1.02 m3 1,978.60 2,018.17M3 $3,337.01 112.73% 2,960.25

0.083 qq 684.40 56.810.971 qq 1,642.32 1,594.69

16.667 m 51.00 850.021.00 m3 4,446.01 4,446.01

M3 $6,890.72 107.37% 6,417.92

0.873 qq 1,642.32 1,433.7511.111 m 51.00 566.66

1.00 m3 4,446.01 4,446.01M3 $6,446.42 107.06% 6,021.33

0.717 qq 1,642.32 1,177.548.889 m 51.00 453.34

1.00 m3 4,446.01 4,446.01M3 $6,076.89 106.10% 5,727.77

0.596 qq 1,642.32 978.826.667 m 51.00 340.02

1.00 m3 4,446.01 4,446.01M3 $5,764.85 105.30% 5,474.65

0.083 qq 684.40 56.810.971 qq 1,642.32 1,594.69

16.667 m 51.00 850.021.00 m3 4,660.05 4,660.05

M3 $7,104.76 107.13% 6,631.96

0.873 qq 1,642.32 1,433.7511.111 m 51.00 566.66

1.00 m3 4,660.05 4,660.05M3 $6,660.46 106.82% 6,235.37

0.717 qq 1,642.32 1,177.548.889 m 51.00 453.34

1.00 m3 4,660.05 4,660.05

Page 406: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 388

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

M3 $6,290.93 105.88% 5,941.81

0.596 qq 1,642.32 978.826.667 m 51.00 340.02

1.00 m3 4,660.05 4,660.05M3 $5,978.89 105.10% 5,688.69

0.717 qq 1,642.32 1,177.548.889 m 51.00 453.34

Page 407: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 389

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m3 4,818.11 4,818.11M3 $6,448.99 105.72% 6,099.87

0.596 qq 1,642.32 978.826.667 m 51.00 340.02

1.00 m3 4,818.11 4,818.11M3 $6,136.95 104.96% 5,846.75

0.717 qq 1,642.32 1,177.548.889 m 51.00 453.34

1.00 m3 5,079.69 5,079.69M3 $6,710.57 105.49% 6,361.45

0.596 qq 1,642.32 978.826.667 m 51.00 340.02

1.00 m3 5,079.69 5,079.69M3 $6,398.53 104.75% 6,108.33

1.10 m3 3,526.40 3,879.041.10 m3 493.00 542.30

0.1289 gl 191.40 24.67M3 $4,446.01 100.00% 4,446.01

1.10 m3 3,567.00 3,923.701.10 m3 493.00 542.30

0.1558 gl 191.40 29.82M3 $4,495.82 100.00% 4,495.82

1.10 m3 3,712.00 4,083.201.10 m3 493.00 542.30

0.1805 gl 191.40 34.55M3 $4,660.05 100.00% 4,660.05

1.10 m3 3,851.20 4,236.321.10 m3 493.00 542.30

0.2063 gl 191.40 39.49M3 $4,818.11 100.00% 4,818.11

Page 408: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 390

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.10 m3 4,089.00 4,497.901.10 m3 493.00 542.30

0.2063 gl 191.40 39.49M3 $5,079.69 100.00% 5,079.69

1.10 m3 4,193.40 4,612.741.10 m3 493.00 542.30

0.2063 gl 191.40 39.49M3 $5,194.53 100.00% 5,194.53

1.10 m3 4,321.00 4,753.101.10 m3 493.00 542.30

0.2063 gl 191.40 39.49M3 $5,334.89 100.00% 5,334.89

1.10 m3 4,402.20 4,842.421.10 m3 493.00 542.30

0.2063 gl 191.40 39.49M3 $5,424.21 100.00% 5,424.21

1.10 m3 4,518.20 4,970.021.10 m3 493.00 542.30

0.2063 gl 191.40 39.49M3 $5,551.81 100.00% 5,551.81

1.10 m3 4,814.00 5,295.401.10 m3 493.00 542.30

0.2063 gl 191.40 39.49M3 $5,877.19 100.00% 5,877.19

1.10 m3 5,115.60 5,627.161.10 m3 493.00 542.30

0.2063 gl 191.40 39.49M3 $6,208.95 100.00% 6,208.95

1.10 m3 5,463.60 6,009.961.10 m3 493.00 542.30

0.2063 gl 191.40 39.49M3 $6,591.75 100.00% 6,591.75

Page 409: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 391

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

14.00 p2 37.99 531.865.00 u 204.55 1,022.756.00 u 21.43 128.554.00 u 45.64 182.562.00 u 21.72 43.441.00 u 830.00 830.001.00 u 294.00 294.002.00 u 294.00 588.004.00 u 294.00 1,176.001.00 u 294.00 294.001.00 u 294.00 294.001.00 u 294.00 294.00

Total 5,679.16 100.00% 5,679.16M3 $405.65 100.00% 405.65

18.00 m320 hp

425,000.00 $170,000.00 $

1,200 horas141.67 $

153,000.00 $127.50 $

1.00 gl18.22 $

543,000.00 $217,200.00 $

1,200 horas181.00 $

Page 410: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 392

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

195,480.00 $162.90 $

1.00 u 141.67 141.671.00 u 127.50 127.501.00 u 106.25 106.251.00 gl 121.50 121.50

15% 18.23Hora $515.15 101.34% 508.36

1.00 u 181.00 181.001.00 u 162.90 162.901.00 u 135.75 135.750.90 gl 121.50 109.35

15% 16.40Hora $605.40 101.02% 599.30

18.00 m35.00 horas 515.15 2,575.755.00 horas 103.75 518.75

15.00 horas 36.75 551.255.00 horas 36.75 183.75

15.00 horas 36.75 551.255.00 horas 56.00 280.00

Total $4,660.75 100.73% 4,626.80M3 $258.93 100.74% 257.04

18.00 m35.00 horas 515.15 2,575.755.00 horas 605.40 3,027.005.00 horas 103.75 518.75

15.00 horas 36.75 551.255.00 horas 36.75 183.755.00 horas 36.75 183.75

15.00 horas 36.75 551.255.00 horas 36.75 183.755.00 horas 56.00 280.00

Total $8,055.25 100.81% 7,990.80M3 $447.51 100.81% 443.93

0.5229 m3 812.50 424.860.8544 m3 562.50 480.60

Page 411: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 393

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

60.00 gl 0.32 19.206.40 fda 90.00 576.001.38 m3 405.65 559.80

M3 $2,060.46 103.21% 1,996.46

0.5229 m3 812.50 424.860.8544 m3 562.50 480.6060.00 gl 0.32 19.20

6.40 fda 90.00 576.001.38 m3 258.93 357.32

M3 $1,857.98 103.72% 1,791.38

0.5229 m3 812.50 424.860.8544 m3 562.50 480.6060.00 gl 0.32 19.20

6.40 fda 90.00 576.001.38 m3 447.51 617.56

M3 $2,118.22 103.36% 2,049.28

0.4483 m3 812.50 364.240.8976 m3 562.50 504.9060.00 gl 0.32 19.20

8.23 fda 90.00 740.701.35 m3 405.65 547.63

M3 $2,176.67 103.93% 2,094.37

0.4483 m3 812.50 364.240.8976 m3 562.50 504.9060.00 gl 0.32 19.20

8.23 fda 90.00 740.701.35 m3 258.93 349.56

M3 $1,978.60 104.48% 1,893.74

0.4483 m3 812.50 364.240.8976 m3 562.50 504.9060.00 gl 0.32 19.20

8.23 fda 90.00 740.701.35 m3 447.51 604.14

M3 $2,233.18 104.06% 2,146.05

Page 412: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 394

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m2 21.20 21.200.26 gl 208.80 54.29

0.042 gl 487.20 20.461.00 m2 53.50 53.50

M2 $149.45 100.00% 149.45

1.00 m2 21.20 21.200.090 gl 608.40 54.760.090 gl 543.00 48.87

1.00 m2 22.80 22.80M2 $147.63 100.00% 147.63

1.00 u 73.34 73.341.00 u 20.88 20.88

40.00 p 3.02 120.801.00 u 31.20 31.200.05 u 133.40 6.67

0.0125 u 187.35 2.341.00 u 244.00 244.00

20.00% 99.85Unid. $599.08 100.00% 599.08

1.00 u 73.34 73.341.00 u 22.97 22.97

40.00 p 3.02 120.801.00 u 24.94 24.941.00 u 3.35 3.350.05 u 133.40 6.67

0.0125 u 187.35 2.341.00 u 244.00 244.00

20.00% 99.68Unid. $598.09 100.00% 598.09

1.00 u 73.34 73.341.00 u 22.97 22.97

60.00 p 3.02 181.20

Page 413: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 395

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 110.20 110.201.00 u 3.35 3.350.05 u 133.40 6.67

0.0125 u 187.35 2.341.00 u 300.00 300.00

20.00% 140.01Unid. $840.08 100.00% 840.08

1.00 u 73.34 73.341.00 u 22.97 22.97

80.00 p 3.02 241.601.00 u 138.04 138.041.00 u 3.35 3.350.05 u 133.40 6.67

0.0125 u 187.35 2.341.00 u 333.00 333.00

20.00% 164.26Unid. $985.57 100.00% 985.57

1.00 u 73.34 73.341.00 u 22.97 22.97

60.00 p 3.02 181.201.00 u 62.40 62.401.00 u 3.35 3.350.05 u 133.40 6.67

0.0125 u 187.35 2.341.00 u 300.00 300.00

20.00% 130.45Unid. $782.72 100.00% 782.72

Page 414: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 396

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 73.34 73.341.00 u 22.97 22.97

80.00 p 3.02 241.601.00 u 350.32 350.321.00 u 3.35 3.350.05 u 133.40 6.67

0.0125 u 187.35 2.341.00 u 366.00 366.00

20.00% 213.32Unid. $1,279.91 100.00% 1,279.91

1.00 u 73.34 73.341.00 u 22.97 22.97

60.00 p 3.02 181.201.00 u 145.00 145.001.00 u 3.35 3.350.05 u 133.40 6.67

0.0125 u 187.35 2.341.00 u 300.00 300.00

20.00% 146.97Unid. $881.84 100.00% 881.84

1.00 u 73.34 73.341.00 u 22.97 22.97

60.00 p 3.02 181.201.00 u 15.66 15.662.00 u 3.35 6.700.05 u 133.40 6.67

0.0125 u 187.35 2.341.00 u 244.00 244.00

20.00% 110.58Unid. $663.46 100.00% 663.46

2.00 u 45.93 91.861.00 u 22.97 22.97

80.00 p 4.76 380.8040.00 p 3.02 120.80

1.00 u 65.89 65.892.00 u 4.64 9.280.05 u 133.40 6.67

Page 415: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 397

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.0125 u 187.35 2.341.00 u 281.00 281.00

20.00% 196.32Unid. $1,177.93 100.00% 1,177.93

2.00 u 73.34 146.681.00 u 22.97 22.97

40.00 p 3.02 120.801.00 u 65.89 65.892.00 u 3.35 6.700.05 u 133.40 6.67

0.0125 u 187.35 2.341.00 u 281.00 281.00

20.00% 130.61Unid. $783.66 100.00% 783.66

2.00 u 73.34 146.681.00 u 22.97 22.970.33 lb 17.20 5.681.00 u 13.92 13.922.00 u 3.35 6.70

0.0125 u 187.35 2.341.00 u 244.00 244.00

20.00% 88.46Unid. $530.75 100.13% 530.08

1.50 u 73.34 110.011.00 u 22.97 22.97

100.00 p 1.76 176.001.00 u 424.56 424.561.00 u 3.35 3.350.05 u 133.40 6.67

0.0125 u 187.35 2.341.00 u 244.00 244.00

20.00% 197.98Unid. $1,187.88 100.00% 1,187.88

1.50 u 73.34 110.011.00 u 22.97 22.97

50.00 p 1.76 88.001.00 u 156.40 156.40

Page 416: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 398

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

2.00 u 3.35 6.700.05 u 133.40 6.67

0.0125 u 187.35 2.341.00 u 244.00 244.00

20.00% 127.42Unid. $764.51 100.00% 764.51

2.00 u 111.36 222.721.00 u 551.00 551.001.00 u 481.00 481.002.00 u 56.00 112.00

20.00% 273.34Unid. $1,640.06 100.00% 1,640.06

4.00 u 111.36 445.441.00 u 796.45 796.451.00 u 481.00 481.004.00 u 56.00 224.00

20.00% 389.38Unid. $2,336.27 100.00% 2,336.27

6.00 u 111.36 668.161.00 u 806.20 806.201.00 u 481.00 481.006.00 u 56.00 336.00

20.00% 458.27Unid. $2,749.63 100.00% 2,749.63

8.00 u 111.36 890.881.00 u 1,089.24 1,089.241.00 u 481.00 481.008.00 u 56.00 448.00

20.00% 581.82Unid. $3,490.94 100.00% 3,490.94

12.00 u 111.36 1,336.321.00 u 1,560.20 1,560.201.00 u 481.00 481.00

12.00 u 56.00 672.0020.00% 809.90

Unid. $4,859.42 100.00% 4,859.42

Page 417: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 399

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

16.00 u 111.36 1,781.761.00 u 1,089.24 1,089.241.00 u 481.00 481.00

16.00 u 56.00 896.0020.00% 849.60

Unid. $5,097.60 100.00% 5,097.60

24.00 u 111.36 2,672.641.00 u 1,560.20 1,560.201.00 u 481.00 481.00

24.00 u 56.00 1,344.0020.00% 1,211.57

Unid. $7,269.41 100.00% 7,269.41

0.17 tubo 141.75 24.101.00 u 58.46 58.461.00 u 39.46 39.461.00 u 6.60 6.601.00 u 9.43 9.430.24 pinta 30.73 7.382.00 u 9.20 18.400.90 tubo 312.04 280.843.00 u 6.05 18.152.00 u 12.76 25.522.00 u 33.17 66.340.09 gl 270.99 24.391.00 u 6,500.64 6,500.641.00 u 2,969.60 2,969.601.00 u 1,992.88 1,992.881.00 u 58.46 58.460.03 fda 430.00 12.901.50 rollo 5.70 8.551.20 m2 388.98 466.780.12 día 268.00 32.161.00 u 206.00 206.003.00 u 294.00 882.001.00 u 156.00 156.00

Page 418: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 400

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 392.00 392.001.00 u 588.00 588.00

Unid. $14,845.04 100.07% 14,834.08

0.17 tubo 141.75 24.101.00 u 58.46 58.461.00 u 39.46 39.461.00 u 6.60 6.601.00 u 9.43 9.430.24 pinta 30.73 7.382.00 u 9.20 18.400.90 tubo 312.04 280.843.00 u 6.05 18.152.00 u 12.76 25.522.00 u 33.17 66.340.09 gl 270.99 24.391.00 u 12,551.20 12,551.201.00 u 2,969.60 2,969.601.00 u 1,992.88 1,992.881.00 u 58.46 58.460.03 fda 430.00 12.901.50 rollo 5.70 8.551.20 m2 388.98 466.780.12 día 268.00 32.161.00 u 206.00 206.003.00 u 294.00 882.001.00 u 156.00 156.001.00 u 392.00 392.001.00 u 899.00 899.00

Unid. $21,206.60 100.05% 21,195.64

0.17 tubo 141.75 24.101.00 u 58.46 58.461.00 u 39.46 39.461.00 u 6.60 6.601.00 u 9.43 9.430.24 pinta 30.73 7.382.00 u 9.20 18.400.90 tubo 312.04 280.843.00 u 6.05 18.152.00 u 12.76 25.52

Page 419: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 401

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

2.00 u 33.17 66.340.09 gl 270.99 24.391.00 u 12,619.64 12,619.641.00 u 2,969.60 2,969.601.00 u 1,992.88 1,992.881.00 u 58.46 58.460.03 fda 430.00 12.901.50 rollo 5.70 8.551.20 m2 388.98 466.780.12 día 268.00 32.161.00 u 206.00 206.003.00 u 294.00 882.001.00 u 156.00 156.001.00 u 392.00 392.001.00 u 899.00 899.00

Unid. $21,275.04 100.05% 21,264.08

0.17 tubo 141.75 24.101.00 u 58.46 58.461.00 u 39.46 39.461.00 u 6.60 6.601.00 u 9.43 9.430.24 pinta 30.73 7.382.00 u 9.20 18.400.20 tubo 312.04 62.414.00 u 6.05 24.202.00 u 5.97 11.940.02 gl 270.99 5.421.00 u 2,139.04 2,139.041.00 u 4,534.29 4,534.291.00 juego 8.12 8.120.03 fda 430.00 12.902.00 u 95.12 190.242.00 u 21.46 42.922.00 u 80.04 160.082.00 u 4.64 9.281.40 rollo 5.70 7.980.12 día 268.00 32.161.00 u 206.00 206.002.00 u 294.00 588.001.00 u 470.00 470.00

Page 420: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 402

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

Unid. $8,668.81 100.00% 8,668.81

0.17 tubo 141.75 24.101.00 u 58.46 58.461.00 u 39.46 39.461.00 u 6.60 6.601.00 u 9.43 9.430.24 pinta 30.73 7.382.00 u 9.20 18.400.20 tubo 312.04 62.414.00 u 6.05 24.202.00 u 5.97 11.940.02 gl 270.99 5.421.00 u 2,378.00 2,378.001.00 u 4,534.29 4,534.291.00 juego 8.12 8.120.03 fda 430.00 12.902.00 u 95.12 190.242.00 u 21.46 42.922.00 u 80.04 160.082.00 u 4.64 9.281.40 rollo 5.70 7.980.12 día 268.00 32.161.00 u 206.00 206.002.00 u 294.00 588.001.00 u 470.00 470.00

Unid. $8,907.77 100.00% 8,907.77

0.512 m3 273.00 139.780.690 m3 250.00 172.500.049 m3 2,060.46 100.960.003 qq 684.40 2.050.180 qq 1,642.32 295.621.646 m2 615.88 1,013.740.029 m3 2,060.46 59.75

0.0069 m3 2,735.64 18.881.00 u 537.00 537.00

Unid. $2,340.28 104.30% 2,243.72

0.512 m3 575.00 294.400.820 m3 250.00 205.00

Page 421: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 403

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.049 m3 2,060.46 100.960.003 qq 684.40 2.050.180 qq 1,642.32 295.621.646 m2 615.88 1,013.740.029 m3 2,060.46 59.75

0.0069 m3 2,735.64 18.881.00 u 537.00 537.00

Unid. $2,527.40 103.97% 2,430.84

0.512 m3 169.00 86.530.670 m3 250.00 167.500.049 m3 2,060.46 100.960.003 qq 684.40 2.050.180 qq 1,642.32 295.621.800 m2 615.88 1,108.580.029 m3 2,060.46 59.75

0.0069 m3 2,735.64 18.881.00 u 537.00 537.00

Unid. $2,376.87 104.25% 2,280.04

14.80 m3 273.00 4,040.4019.98 m3 250.00 4,995.001.156 m3 2,176.67 2,516.231.550 qq 1,642.32 2,545.6018.20 m2 670.21 12,197.820.568 m3 2,060.46 1,170.3440.40 p2 37.99 1,534.80

8.08 lb 19.00 153.520.46 lb 26.68 12.270.87 lb 17.20 14.965.78 m2 57.00 329.465.78 m2 13.30 76.87

22.10 m2 153.41 3,390.36Unid. $32,977.63 104.19% 31,652.22

14.80 m3 558.00 8,258.4023.68 m3 250.00 5,920.001.156 m3 2,176.67 2,516.231.550 qq 1,642.32 2,545.6018.20 m2 670.21 12,197.820.568 m3 2,060.46 1,170.34

Page 422: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 404

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

40.40 p2 37.99 1,534.808.08 lb 19.00 153.520.46 lb 26.68 12.270.87 lb 17.20 14.965.78 m2 57.00 329.465.78 m2 13.30 76.87

22.10 m2 153.41 3,390.36Unid. $38,120.63 103.60% 36,795.22

14.80 m3 169.00 2,501.2019.24 m3 250.00 4,810.001.156 m3 2,176.67 2,516.231.550 qq 1,642.32 2,545.6018.20 m2 670.21 12,197.820.568 m3 2,060.46 1,170.3440.40 p2 37.99 1,534.80

8.08 lb 19.00 153.520.46 lb 26.68 12.270.87 lb 17.20 14.965.78 m2 57.00 329.465.78 m2 13.30 76.87

22.10 m2 153.41 3,390.36Unid. $31,253.43 104.43% 29,928.02

30.00 m3 273.00 8,190.0040.50 m3 250.00 10,125.00

2.49 m3 2,176.67 5,419.911.56 qq 1,642.32 2,562.023.12 qq 1,642.32 5,124.04

25.60 m2 959.08 24,552.4561.15 p2 37.99 2,323.0912.23 lb 19.00 232.37

0.70 lb 26.68 18.681.31 lb 17.20 22.538.75 m2 57.00 498.758.75 m2 13.30 116.38

32.75 m2 153.41 5,024.1820.00 m 39.51 790.20

2.04 m2 670.21 1,367.234.59 m2 255.25 1,171.609.20 m 48.05 442.06

Page 423: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 405

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 2,271.37 2,271.37Unid. $70,251.86 105.24% 66,755.10

30.00 m3 558.00 16,740.0048.00 m3 250.00 12,000.00

2.49 m3 2,176.67 5,419.911.56 qq 1,642.32 2,562.023.12 qq 1,642.32 5,124.04

25.60 m2 959.08 24,552.4561.15 p2 37.99 2,323.0912.23 lb 19.00 232.37

0.70 lb 26.68 18.681.31 lb 17.20 22.538.75 m2 57.00 498.758.75 m2 13.30 116.38

32.75 m2 153.41 5,024.1820.00 m 39.51 790.20

2.04 m2 670.21 1,367.234.59 m2 255.25 1,171.609.20 m 48.05 442.061.00 u 2,271.37 2,271.37

Unid. $80,676.86 104.53% 77,180.10

30.00 m3 169.00 5,070.0039.00 m3 250.00 9,750.00

2.49 m3 2,176.67 5,419.911.56 qq 1,642.32 2,562.023.12 qq 1,642.32 5,124.04

25.60 m2 959.08 24,552.4561.15 p2 37.99 2,323.0912.23 lb 19.00 232.37

0.70 lb 26.68 18.681.31 lb 17.20 22.538.75 m2 57.00 498.758.75 m2 13.30 116.38

32.75 m2 153.41 5,024.1820.00 m 39.51 790.20

2.04 m2 670.21 1,367.234.59 m2 255.25 1,171.609.20 m 48.05 442.061.00 u 2,271.37 2,271.37

Page 424: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 406

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

Unid. $66,756.86 105.53% 63,260.10

0.17 tubo 141.75 24.101.00 u 58.46 58.461.00 u 39.46 39.461.00 u 6.60 6.601.00 u 9.43 9.431.00 u 34.80 34.800.16 pinta 30.73 4.921.00 u 206.00 206.00

Unid. $383.77 100.00% 383.77

0.17 tubo 399.04 67.841.00 u 910.26 910.261.00 u 58.46 58.461.00 u 18.02 18.021.00 u 20.01 20.011.00 u 34.80 34.800.23 pinta 30.73 7.071.00 u 294.00 294.00

Unid. $1,410.46 100.00% 1,410.46

0.17 tubo 645.77 109.781.00 u 1,046.21 1,046.211.00 u 65.28 65.281.00 u 31.95 31.951.00 u 38.48 38.481.00 u 11.60 11.600.30 pinta 30.73 9.221.00 u 294.00 294.00

Unid. $1,606.52 100.00% 1,606.52

0.17 tubo 645.77 109.781.00 u 1,046.21 1,046.211.00 u 1,754.92 1,754.921.00 u 31.95 31.951.00 u 38.48 38.481.00 u 11.60 11.600.30 pinta 30.73 9.221.00 u 294.00 294.00

Unid. $3,296.16 100.00% 3,296.16

Page 425: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 407

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.17 tubo 141.75 24.101.00 u 39.46 39.461.00 u 6.60 6.601.00 u 9.43 9.430.24 pinta 30.73 7.381.00 u 9.20 9.200.51 tubo 312.04 159.142.00 u 6.05 12.102.00 u 12.76 25.522.00 u 33.17 66.340.05 gl 270.99 13.551.00 u 49.88 49.881.00 u 221.56 221.561.00 u 58.46 58.460.03 fda 430.00 12.901.00 rollo 5.70 5.700.12 día 268.00 32.161.00 u 206.00 206.001.00 u 294.00 294.001.00 u 196.00 196.001.00 u 118.00 118.00

Unid. $1,567.48 100.00% 1,567.48

0.33 tubo 141.75 46.781.00 u 39.46 39.461.00 u 6.60 6.602.00 u 9.43 18.860.24 pinta 30.73 7.383.00 u 9.20 27.600.47 tubo 312.04 146.665.00 u 6.05 30.253.00 u 5.97 17.910.05 gl 270.99 13.551.00 u 1,068.59 1,068.591.00 u 3,462.60 3,462.602.00 u 89.32 178.641.00 u 96.28 96.281.00 u 96.28 96.281.00 u 193.61 193.610.03 fda 430.00 12.90

Page 426: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 408

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

2.00 u 95.12 190.242.00 u 21.46 42.922.00 u 4.64 9.282.00 u 80.04 160.082.00 rollo 5.70 11.400.25 día 268.00 67.001.00 u 206.00 206.002.00 u 294.00 588.001.00 u 511.00 511.00

Unid. $7,249.87 100.00% 7,249.87

0.33 tubo 141.75 46.781.00 u 39.46 39.461.00 u 6.60 6.602.00 u 9.43 18.860.24 pinta 30.73 7.383.00 u 9.20 27.600.47 tubo 312.04 146.665.00 u 6.05 30.253.00 u 5.97 17.910.05 gl 270.99 13.551.00 u 1,282.48 1,282.481.00 u 3,462.60 3,462.602.00 u 89.32 178.641.00 u 96.28 96.281.00 u 96.28 96.281.00 u 193.61 193.610.03 fda 430.00 12.902.00 u 95.12 190.242.00 u 21.46 42.922.00 u 4.64 9.282.00 u 80.04 160.082.00 rollo 5.70 11.400.25 día 268.00 67.001.00 u 206.00 206.002.00 u 294.00 588.001.00 u 442.00 442.00

Unid. $7,394.76 100.00% 7,394.76

0.17 tubo 645.77 109.781.00 u 65.28 65.28

Page 427: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 409

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 31.95 31.951.00 u 38.48 38.480.35 pinta 30.73 10.761.00 u 9.20 9.200.17 tubo 312.04 53.052.00 u 6.05 12.101.00 u 5.97 5.970.02 gl 270.99 5.421.00 u 2,557.80 2,557.801.00 u 35.76 35.761.00 juego 8.12 8.121.00 u 21.46 21.460.04 fda 430.00 17.201.00 u 95.12 95.121.00 u 21.46 21.461.00 u 4.64 4.641.00 u 83.52 83.520.70 rollo 5.70 3.990.12 día 268.00 32.161.00 u 235.00 235.001.00 u 294.00 294.001.00 u 470.00 470.00

Unid. $4,222.22 100.00% 4,222.22

0.17 tubo 645.77 109.781.00 u 65.28 65.281.00 u 31.95 31.951.00 u 38.48 38.480.35 pinta 30.73 10.761.00 u 9.20 9.200.17 tubo 312.04 53.052.00 u 6.05 12.101.00 u 5.97 5.970.02 gl 270.99 5.421.00 u 2,436.00 2,436.001.00 u 35.76 35.761.00 juego 8.12 8.121.00 u 21.46 21.460.04 fda 430.00 17.201.00 u 95.12 95.121.00 u 21.46 21.46

Page 428: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 410

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 4.64 4.641.00 u 83.52 83.520.70 rollo 5.70 3.990.12 día 268.00 32.161.00 u 235.00 235.001.00 u 294.00 294.001.00 u 470.00 470.00

Unid. $4,100.42 100.00% 4,100.42

0.17 tubo 645.77 109.781.00 u 65.28 65.281.00 u 31.95 31.951.00 u 38.48 38.480.35 pinta 30.73 10.761.00 u 9.20 9.200.17 tubo 312.04 53.052.00 u 6.05 12.101.00 u 5.97 5.970.02 gl 270.99 5.421.00 u 4,621.11 4,621.111.00 u 35.76 35.761.00 juego 8.12 8.121.00 u 21.46 21.460.04 fda 430.00 17.201.00 u 95.12 95.121.00 u 21.46 21.461.00 u 4.64 4.641.00 u 83.52 83.520.70 rollo 5.70 3.990.12 día 268.00 32.161.00 u 235.00 235.001.00 u 294.00 294.001.00 u 470.00 470.00

Unid. $6,285.53 100.00% 6,285.53

0.17 tubo 645.77 109.781.00 u 65.28 65.281.00 u 31.95 31.951.00 u 38.48 38.480.35 pinta 30.73 10.761.00 u 9.20 9.20

Page 429: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 411

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.17 tubo 312.04 53.052.00 u 6.05 12.101.00 u 5.97 5.970.02 gl 270.99 5.421.00 u 5,105.83 5,105.831.00 u 35.76 35.761.00 juego 8.12 8.121.00 u 21.46 21.460.04 fda 430.00 17.201.00 u 95.12 95.121.00 u 21.46 21.461.00 u 4.64 4.641.00 u 83.52 83.520.70 rollo 5.70 3.990.12 día 268.00 32.161.00 u 235.00 235.001.00 u 294.00 294.001.00 u 470.00 470.00

Unid. $6,770.25 100.00% 6,770.25

0.17 tubo 141.75 24.100.22 tubo 78.74 17.321.00 u 39.46 39.461.00 u 6.60 6.601.00 u 9.43 9.431.00 u 58.46 58.460.24 pinta 30.73 7.382.00 u 9.20 18.400.46 tubo 312.04 143.544.00 u 6.05 24.200.05 gl 270.99 13.551.00 u 2,779.91 2,779.911.00 u 55.07 55.072.00 u 64.21 128.431.00 u 11.60 11.600.03 fda 430.00 12.902.00 u 124.93 249.861.10 rollo 5.70 6.270.12 día 268.00 32.161.00 u 206.00 206.002.00 u 294.00 588.00

Page 430: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 412

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 235.00 235.00Unid. $4,667.64 100.00% 4,667.64

0.17 tubo 141.75 24.100.11 tubo 78.74 8.661.00 u 39.46 39.461.00 u 6.60 6.601.00 u 9.43 9.431.00 u 58.46 58.460.24 pinta 30.73 7.381.00 u 9.20 9.200.37 tubo 312.04 115.452.00 u 6.05 12.100.04 gl 270.99 10.841.00 u 1,772.02 1,772.021.00 u 55.07 55.071.00 u 64.21 64.211.00 u 11.60 11.600.03 fda 430.00 12.901.00 u 124.93 124.930.50 rollo 5.70 2.850.12 día 268.00 32.161.00 u 206.00 206.001.00 u 294.00 294.000.60 m 11.80 7.081.00 u 181.00 181.00

Unid. $3,065.50 100.00% 3,065.50

0.33 tubo 141.75 46.781.00 u 39.46 39.461.00 u 6.60 6.602.00 u 9.43 18.860.24 pinta 30.73 7.382.00 u 9.20 18.400.47 tubo 312.04 146.664.00 u 6.05 24.202.00 u 5.97 11.940.05 gl 270.99 13.551.00 u 1,032.40 1,032.401.00 u 2,900.00 2,900.001.00 u 653.01 653.01

Page 431: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 413

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 92.80 92.800.03 fda 430.00 12.902.00 u 95.12 190.242.00 u 21.46 42.922.00 u 4.64 9.282.00 u 80.04 160.081.40 rollo 5.70 7.980.25 día 268.00 67.001.00 u 206.00 206.002.00 u 294.00 588.001.00 u 470.00 470.00

Unid. $6,766.44 100.00% 6,766.44

0.33 tubo 141.75 46.781.00 u 39.46 39.461.00 u 6.60 6.602.00 u 9.43 18.860.24 pinta 30.73 7.382.00 u 9.20 18.400.47 tubo 312.04 146.664.00 u 6.05 24.202.00 u 5.97 11.940.05 gl 270.99 13.551.00 u 1,373.36 1,373.361.00 u 2,900.00 2,900.001.00 u 653.01 653.011.00 u 92.80 92.800.03 fda 430.00 12.902.00 u 95.12 190.242.00 u 21.46 42.922.00 u 4.64 9.282.00 u 80.04 160.081.40 rollo 5.70 7.980.25 día 268.00 67.001.00 u 206.00 206.002.00 u 294.00 588.001.00 u 470.00 470.00

Unid. $7,107.40 100.00% 7,107.40

Page 432: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 414

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.33 tubo 141.75 46.781.00 u 39.46 39.461.00 u 6.60 6.602.00 u 9.43 18.860.24 pinta 30.73 7.382.00 u 9.20 18.400.47 tubo 312.04 146.664.00 u 6.05 24.202.00 u 5.97 11.940.05 gl 270.99 13.551.00 u 1,715.64 1,715.641.00 u 2,900.00 2,900.001.00 u 653.01 653.011.00 u 92.80 92.800.03 fda 430.00 12.902.00 u 95.12 190.242.00 u 21.46 42.922.00 u 4.64 9.282.00 u 80.04 160.081.40 rollo 5.70 7.980.25 u 193.61 48.400.25 día 268.00 67.001.00 u 206.00 206.002.00 u 294.00 588.001.00 u 470.00 470.00

Unid. $7,498.08 100.00% 7,498.08

0.33 tubo 141.75 46.781.00 u 39.46 39.461.00 u 6.60 6.602.00 u 9.43 18.860.24 pinta 30.73 7.382.00 u 9.20 18.400.47 tubo 312.04 146.664.00 u 6.05 24.202.00 u 5.97 11.940.05 gl 270.99 13.551.00 u 1,900.08 1,900.081.00 u 2,900.00 2,900.001.00 u 653.01 653.01

Page 433: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 415

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 92.80 92.800.03 fda 430.00 12.902.00 u 95.12 190.242.00 u 21.46 42.922.00 u 4.64 9.282.00 u 80.04 160.081.40 rollo 5.70 7.980.25 u 193.61 48.400.25 día 268.00 67.001.00 u 206.00 206.002.00 u 294.00 588.001.00 u 470.00 470.00

Unid. $7,682.52 100.00% 7,682.52

0.33 tubo 141.75 46.781.00 u 39.46 39.461.00 u 6.60 6.602.00 u 9.43 18.860.24 pinta 30.73 7.381.00 u 9.20 9.200.24 tubo 312.04 74.892.00 u 6.05 12.101.00 u 5.97 5.970.02 gl 270.99 5.421.00 u 677.44 677.441.00 u 248.00 248.001.00 u 40.60 40.601.00 u 46.40 46.400.03 fda 430.00 12.901.00 u 95.12 95.121.00 u 21.46 21.461.00 u 4.64 4.641.00 u 29.83 29.830.70 rollo 5.70 3.990.25 día 268.00 67.001.00 u 206.00 206.001.00 u 294.00 294.001.00 u 470.00 470.00

Unid. $2,444.04 100.00% 2,444.04

0.33 tubo 141.75 46.78

Page 434: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 416

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 39.46 39.461.00 u 6.60 6.602.00 u 9.43 18.860.24 pinta 30.73 7.381.00 u 9.20 9.200.24 tubo 312.04 74.892.00 u 6.05 12.101.00 u 5.97 5.970.02 gl 270.99 5.421.00 u 7,653.92 7,653.921.00 u 1,641.40 1,641.401.00 u 21.46 21.461.00 u 4.64 4.641.00 u 80.04 80.040.70 rollo 5.70 3.990.25 día 268.00 67.001.00 u 206.00 206.001.00 u 294.00 294.001.00 u 470.00 470.00

Unid. $10,669.11 100.00% 10,669.11

0.33 tubo 141.75 46.781.00 u 39.46 39.461.00 u 6.60 6.602.00 u 9.43 18.860.24 pinta 30.73 7.381.00 u 14.09 14.090.24 tubo 424.56 101.892.00 u 9.86 19.720.02 gl 270.99 5.421.00 u 7,653.92 7,653.921.00 u 2,826.92 2,826.920.50 rollo 5.70 2.850.25 día 268.00 67.001.00 u 206.00 206.001.00 u 294.00 294.001.00 u 470.00 470.00

Unid. $11,780.89 100.00% 11,780.89

0.33 tubo 141.75 46.781.00 u 39.46 39.46

Page 435: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 417

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 6.60 6.602.00 u 9.43 18.860.24 pinta 30.73 7.381.00 u 9.20 9.200.24 tubo 312.04 74.892.00 u 6.05 12.101.00 u 5.97 5.970.02 gl 270.99 5.421.00 u 15,553.58 15,553.581.00 u 1,641.40 1,641.401.00 u 21.46 21.461.00 u 4.64 4.641.00 u 80.04 80.040.70 rollo 5.70 3.990.25 día 268.00 67.001.00 u 206.00 206.001.00 u 294.00 294.001.00 u 588.00 588.00

Unid. $18,686.77 100.00% 18,686.77

0.33 tubo 141.75 46.781.00 u 39.46 39.461.00 u 6.60 6.602.00 u 9.43 18.860.24 pinta 30.73 7.381.00 u 14.09 14.090.24 tubo 424.56 101.892.00 u 9.86 19.720.02 gl 270.99 5.421.00 u 15,553.58 15,553.581.00 u 2,826.92 2,826.920.50 rollo 5.70 2.850.25 día 268.00 67.001.00 u 206.00 206.001.00 u 294.00 294.001.00 u 588.00 588.00

Unid. $19,798.55 100.00% 19,798.55

0.33 tubo 141.75 46.781.00 u 39.46 39.461.00 u 6.60 6.60

Page 436: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 418

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

2.00 u 9.43 18.860.24 pinta 30.73 7.381.00 u 9.20 9.200.24 tubo 312.04 74.892.00 u 6.05 12.101.00 u 5.97 5.970.02 gl 270.99 5.421.00 u 1,825.97 1,825.971.00 u 1,641.40 1,641.401.00 u 21.46 21.461.00 u 4.64 4.641.00 u 80.04 80.040.70 rollo 5.70 3.990.25 día 268.00 67.001.00 u 206.00 206.001.00 u 294.00 294.001.00 u 352.00 352.00

Unid. $4,723.16 100.00% 4,723.16

1.73 m3 273.00 472.292.34 m3 250.00 585.00

0.288 m3 2,060.46 593.410.361 qq 1,642.32 592.88

4.00 m2 615.88 2,463.520.0192 m3 2,735.64 52.52

1.00 u 1,073.00 1,073.00Unid. $5,832.62 103.64% 5,627.74

1.73 m3 558.00 965.342.77 m3 250.00 692.50

0.288 m3 2,060.46 593.410.361 qq 1,642.32 592.88

4.00 m2 615.88 2,463.520.0192 m3 2,735.64 52.52

1.00 u 1,073.00 1,073.00Unid. $6,433.17 103.29% 6,228.29

1.73 m3 169.00 292.372.25 m3 250.00 562.50

0.288 m3 2,060.46 593.410.361 qq 1,642.32 592.88

Page 437: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 419

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

4.00 m2 615.88 2,463.520.0192 m3 2,735.64 52.52

1.00 u 1,073.00 1,073.00Unid. $5,630.20 103.78% 5,425.32

0.17 tubo 141.75 24.101.00 u 39.46 39.461.00 u 6.60 6.601.00 u 9.43 9.431.00 u 58.46 58.460.24 pinta 30.73 7.381.00 u 9.20 9.200.24 tubo 312.04 74.892.00 u 6.05 12.100.02 gl 270.99 5.421.00 u 1,379.04 1,379.041.00 u 55.07 55.071.00 u 11.60 11.600.03 fda 430.00 12.901.00 u 124.93 124.930.50 rollo 5.70 2.850.12 día 268.00 32.161.00 u 206.00 206.001.00 u 294.00 294.000.30 m 11.80 3.541.00 u 181.00 181.00

Unid. $2,550.13 100.00% 2,550.13

0.780 u 15.66 12.210.040 u 298.16 11.930.050 lb 17.20 0.860.080 u 52.20 4.180.160 m3 250.00 40.000.264 m 95.00 25.081.000 m 179.00 179.000.060 u 13.07 0.780.260 u 37.46 9.741.200 m2 143.64 172.37

Page 438: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 420

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.18 día 169.00 30.420.050 u 23.20 1.160.008 m3 1,978.60 15.830.090 m3 3,213.98 289.26

3.50 pie 78.38 274.330.800 m2 670.21 536.172.000 m 41.02 82.040.060 m3 138.81 8.330.280 u 123.66 34.620.200 u 45.82 9.160.120 u 593.72 71.250.180 u 427.60 76.970.160 u 484.59 77.53

M $1,963.22 102.92% 1,907.53

0.998 m3 750.00 748.5069.04 gl 0.32 22.0911.51 fda 90.00 1,035.90

0.50 día 294.00 147.00M3 $1,953.49 106.26% 1,838.39

1.02 m3 562.50 573.753.06 fda 128.59 393.490.50 día 294.00 147.00

M3 $1,114.24 100.00% 1,114.24

1.102 m3 1,114.24 1,227.899.46 fda 90.00 851.40

45.24 gl 0.32 14.480.50 día 294.00 147.00

M3 $2,240.77 104.41% 2,146.17

1.02 m3 562.50 573.75100.00 gl 0.32 32.00

3.06 fda 128.59 393.4917.66 fda 90.00 1,589.40

0.50 día 294.00 147.00M3 $2,735.64 106.90% 2,559.04

Page 439: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 421

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.02 m3 750.00 765.003.06 fda 128.59 393.490.50 día 294.00 147.00

M3 $1,305.49 100.00% 1,305.49

1.20 m3 1,305.49 1,566.595.24 fda 90.00 471.60

70.00 gl 0.32 22.400.50 día 294.00 147.00

M3 $2,207.59 102.43% 2,155.19

0.08 gl 1,211.64 96.931.00 m2 3.70 3.701.00 m2 18.20 18.20

20.00% 23.77M2 $142.60 100.00% 142.60

0.08 gl 358.99 28.721.00 m2 3.70 3.701.00 m2 18.20 18.20

20.00% 10.12M2 $60.74 100.00% 60.74

0.08 gl 1,211.64 96.931.00 m2 3.70 3.701.00 m2 18.20 18.201.00 m2 36.90 36.90

20.00% 23.77M2 $179.50 100.00% 179.50

0.08 gl 1,100.00 88.000.13 gl 308.00 40.041.00 m2 3.70 3.701.00 m2 22.80 22.80

20.00% 30.91M2 $185.45 100.00% 185.45

Page 440: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 422

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.10 gl 472.50 47.251.00 m2 3.70 3.701.00 m2 18.20 18.20

20.00% 13.83M2 $82.98 100.00% 82.98

0.10 gl 189.00 18.901.00 m2 3.70 3.701.00 m2 18.20 18.20

20.00% 8.16M2 $48.96 100.00% 48.96

0.08 gl 498.99 39.920.13 gl 308.00 40.041.00 m2 3.70 3.701.00 m2 22.80 22.80

20.00% 21.29M2 $127.75 100.00% 127.75

0.08 gl 498.99 39.920.13 gl 308.00 40.041.00 m2 3.70 3.701.00 m2 22.80 22.801.00 m2 36.90 36.90

20.00% 21.29M2 $164.65 100.00% 164.65

1.00 m2 21.20 21.200.105 m3 2,060.46 216.350.022 m3 2,240.77 49.300.088 p2 53.26 4.69

1.00 m2 75.40 75.400.80 m 48.05 38.44

M2 $405.38 102.30% 396.25

1.00 m2 31.80 31.800.08 m3 812.50 65.00

26.50 u 40.36 1,069.54

Page 441: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 423

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

3.98 u 32.13 127.880.176 p2 53.26 9.37

0.80 m 48.05 38.441.00 m2 42.40 42.40

M2 $1,384.43 100.02% 1,384.10

1.00 m2 31.80 31.800.08 m3 812.50 65.00

26.50 u 64.17 1,700.513.98 u 32.13 127.88

0.176 p2 53.26 9.370.80 m 48.05 38.441.00 m2 42.40 42.40

M2 $2,015.40 100.02% 2,015.07

1.00 m2 31.80 31.800.08 m3 812.50 65.00

26.50 u 68.14 1,805.713.98 u 32.13 127.88

0.176 p2 53.26 9.370.80 m 48.05 38.441.00 m2 42.40 42.40

M2 $2,120.60 100.02% 2,120.27

1.00 m2 31.80 31.800.08 m3 812.50 65.00

56.68 u 11.72 664.298.50 u 32.13 273.11

0.176 p2 53.26 9.370.80 m 48.05 38.441.00 m2 42.40 42.40

M2 $1,124.41 100.03% 1,124.08

1.00 m2 31.80 31.800.08 m3 812.50 65.00

56.68 u 13.86 785.588.50 u 32.13 273.11

0.176 p2 53.26 9.370.80 m 48.05 38.441.00 m2 42.40 42.40

M2 $1,245.70 100.03% 1,245.37

Page 442: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 424

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m2 31.80 31.800.08 m3 812.50 65.00

38.85 u 21.19 823.235.83 u 32.13 187.32

0.176 p2 53.26 9.370.80 m 48.05 38.441.00 m2 42.40 42.40

M2 $1,197.56 100.03% 1,197.23

1.00 m2 31.80 31.800.08 m3 812.50 65.00

38.85 u 24.78 962.705.83 u 32.13 187.32

0.176 p2 53.26 9.370.80 m 48.05 38.441.00 m2 42.40 42.40

M2 $1,337.03 100.02% 1,336.70

1.00 m2 31.80 31.800.08 m3 812.50 65.00

38.85 u 24.78 962.705.83 u 32.13 187.32

0.176 p2 53.26 9.370.80 m 48.05 38.441.00 m2 42.40 42.40

M2 $1,337.03 100.02% 1,336.70

1.00 m2 21.20 21.200.105 m3 2,060.46 216.35

0.0053 m3 2,735.64 14.501.10 m2 348.00 382.805.00 u 6.00 30.00

0.0330 fda 430.00 14.190.05 lb 29.00 1.451.00 m2 187.00 187.00

M2 $867.49 100.89% 859.83

1.00 m2 21.20 21.200.105 m3 2,060.46 216.35

0.0053 m3 2,735.64 14.50

Page 443: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 425

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.10 m2 986.00 1,084.605.00 u 6.00 30.00

0.0330 fda 430.00 14.190.05 lb 29.00 1.451.00 m2 196.00 196.00

M2 $1,578.29 100.49% 1,570.63

1.00 m2 21.20 21.200.0315 m3 2,207.59 69.54

6.88 u 170.66 1,174.142.50 u 16.00 40.00

0.0344 fda 478.50 16.461.00 m2 116.00 116.001.00 m2 163.00 163.00

M2 $1,600.34 100.10% 1,598.69

1.00 m2 21.20 21.200.0315 m3 2,207.59 69.54

6.88 u 187.68 1,291.242.50 u 16.00 40.00

0.0344 fda 624.40 21.481.00 m2 116.00 116.001.00 m2 163.00 163.00

M2 $1,722.46 100.10% 1,720.81

1.00 m2 21.20 21.200.0315 m3 2,207.59 69.54

6.88 u 137.98 949.302.50 u 16.00 40.00

0.0344 fda 624.40 21.481.00 m2 116.00 116.001.00 m2 163.00 163.00

M2 $1,380.52 100.12% 1,378.87

1.00 m2 21.20 21.200.0315 m3 2,207.59 69.5412.22 u 42.00 513.24

3.33 u 12.00 39.960.0344 fda 478.50 16.46

1.00 m2 98.00 98.001.00 m2 163.00 163.00

Page 444: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 426

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

M2 $921.40 100.18% 919.75

1.00 m2 21.20 21.200.0315 m3 2,207.59 69.5412.22 u 35.06 428.43

3.33 u 12.00 39.960.0344 fda 282.03 9.70

1.00 m2 98.00 98.001.00 m2 163.00 163.00

M2 $829.83 100.20% 828.18

1.00 m2 21.20 21.200.0315 m3 2,207.59 69.54

6.88 u 67.37 463.512.5 u 16.00 40.00

0.0344 fda 478.50 16.461.00 m2 116.00 116.001.00 m2 163.00 163.00

M2 $889.71 100.19% 888.06

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.105 m3 2,060.46 216.350.022 m3 2,240.77 49.300.088 p2 53.26 4.69

1.00 m2 59.00 59.00M2 $605.18 114.15% 530.15

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.130 m3 2,060.46 267.860.022 m3 2,240.77 49.300.110 p2 53.26 5.86

1.00 m2 59.00 59.00M2 $657.86 113.18% 581.23

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.28

Page 445: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 427

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.160 m3 2,060.46 329.670.022 m3 2,240.77 49.300.130 p2 53.26 6.92

1.00 m2 59.00 59.00M2 $720.73 112.23% 642.18

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.210 m3 2,060.46 432.700.022 m3 2,240.77 49.300.180 p2 53.26 9.59

1.00 m2 59.00 59.00M2 $826.43 110.98% 744.68

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.100 m3 4,446.01 444.600.022 m3 2,240.77 49.300.088 p2 53.26 4.69

1.00 m2 59.00 59.00M2 $833.43 108.93% 765.12

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.120 m3 4,446.01 533.520.022 m3 2,240.77 49.300.110 p2 53.26 5.86

1.00 m2 59.00 59.00M2 $923.52 107.99% 855.21

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.150 m3 4,446.01 666.900.022 m3 2,240.77 49.300.130 p2 53.26 6.92

1.00 m2 59.00 59.00M2 $1,057.96 106.90% 989.65

Page 446: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 428

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.200 m3 4,446.01 889.200.022 m3 2,240.77 49.300.180 p2 53.26 9.59

1.00 m2 59.00 59.00M2 $1,282.93 105.62% 1,214.62

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.100 m3 4,660.05 466.010.022 m3 2,240.77 49.300.088 p2 53.26 4.69

1.00 m2 59.00 59.00M2 $854.84 108.68% 786.53

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.120 m3 4,660.05 559.210.022 m3 2,240.77 49.300.110 p2 53.26 5.86

1.00 m2 59.00 59.00M2 $949.21 107.75% 880.90

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.150 m3 4,660.05 699.010.022 m3 2,240.77 49.300.130 p2 53.26 6.92

1.00 m2 59.00 59.00M2 $1,090.07 106.69% 1,021.76

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.200 m3 4,660.05 932.01

Page 447: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 429

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.022 m3 2,240.77 49.300.180 p2 53.26 9.59

1.00 m2 59.00 59.00M2 $1,325.74 105.43% 1,257.43

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.100 m3 4,818.11 481.810.022 m3 2,240.77 49.300.088 p2 53.26 4.69

1.00 m2 59.00 59.00M2 $870.64 108.51% 802.33

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.120 m3 4,818.11 578.170.022 m3 2,240.77 49.300.110 p2 53.26 5.86

1.00 m2 59.00 59.00M2 $968.17 107.59% 899.86

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.150 m3 4,818.11 722.720.022 m3 2,240.77 49.300.130 p2 53.26 6.92

1.00 m2 59.00 59.00M2 $1,113.78 106.53% 1,045.47

1.00 m2 21.20 21.200.136 qq 1,642.32 223.360.136 qq 230.00 31.280.200 m3 4,818.11 963.620.022 m3 2,240.77 49.300.180 p2 53.26 9.59

1.00 m2 59.00 59.00M2 $1,357.35 105.30% 1,289.04

Page 448: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 430

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m2 21.20 21.200.105 m3 2,060.46 216.350.022 m3 2,240.77 49.300.088 p2 53.26 4.69

1.00 m2 59.00 59.000.80 m 48.05 38.44

M2 $388.98 102.40% 379.85

1.00 m2 21.20 21.200.105 m3 2,060.46 216.350.022 m3 2,240.77 49.300.088 p2 53.26 4.69

1.00 m2 79.00 79.000.80 m 48.05 38.44

M2 $408.98 102.28% 399.85

1.00 m2 21.20 21.200.105 m3 2,060.46 216.350.022 m3 2,240.77 49.300.088 p2 53.26 4.69

1.00 m2 83.00 83.000.80 m 48.05 38.440.04 fda 90.00 3.60

M2 $416.58 102.34% 407.05

1.00 m2 21.20 21.200.0315 m3 2,207.59 69.5455.00 u 5.29 290.95

6.00 u 10.00 60.000.0344 fda 282.03 9.70

1.00 m2 106.00 106.00M2 $557.39 100.30% 555.74

1.00 m2 21.20 21.200.0315 m3 2,207.59 69.5471.50 u 4.76 340.34

3.00 u 10.00 30.000.0344 fda 282.03 9.70

1.00 m2 137.00 137.00M2 $607.78 100.27% 606.13

Page 449: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 431

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m2 21.20 21.200.0315 m3 2,207.59 69.5417.60 u 34.73 611.25

4.00 u 10.00 40.000.0344 fda 282.03 9.70

1.00 m2 85.00 85.00M2 $836.69 100.20% 835.04

0.0021 m3 1,953.49 4.102.75 u 72.95 200.611.00 u 16.00 16.00

0.001 fda 624.40 0.621.00 m 70.00 70.00

M $291.33 100.08% 291.09

0.0021 m3 1,953.49 4.103.67 u 23.96 87.931.00 u 12.00 12.00

0.001 fda 478.50 0.481.00 m 70.00 70.00

M $174.51 100.14% 174.27

0.0021 m3 1,953.49 4.102.75 u 36.28 99.771.00 u 16.00 16.00

0.001 fda 478.50 0.481.00 m 70.00 70.00

M $190.35 100.13% 190.11

0.0021 m3 1,953.49 4.104.40 u 17.63 77.571.00 u 16.00 16.00

0.001 fda 282.03 0.281.00 m 70.00 70.00

M $167.95 100.14% 167.71

0.0021 m3 1,953.49 4.104.40 u 8.82 38.811.00 u 6.38 6.38

0.001 fda 282.03 0.281.00 m 70.00 70.00

Page 450: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 432

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

M $119.57 100.20% 119.33

0.0105 m3 1,953.49 20.511.00 m 19.00 19.00

M $39.51 103.16% 38.30

0.0021 m3 1,953.49 4.102.75 u 66.35 182.461.00 u 6.38 6.38

0.001 fda 478.50 0.481.00 m 42.40 42.40

M $235.82 100.10% 235.58

0.0021 m3 1,953.49 4.102.75 u 72.95 200.611.00 u 6.38 6.38

0.001 fda 624.40 0.621.00 m 42.40 42.40

M $254.11 100.09% 253.87

0.0021 m3 1,953.49 4.102.75 u 53.74 147.791.00 u 6.38 6.38

0.001 fda 624.40 0.621.00 m 42.40 42.40

M $201.29 100.12% 201.05

0.0063 m3 1,953.49 12.311.00 u 313.62 313.621.00 u 72.00 72.00

U $397.93 100.18% 397.20

0.0021 m3 1,953.49 4.103.67 u 23.96 87.931.00 u 6.38 6.38

0.001 fda 478.50 0.481.00 m 42.40 42.40

M $141.29 100.17% 141.05

0.0021 m3 1,953.49 4.103.67 u 19.59 71.90

Page 451: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 433

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 u 6.38 6.380.001 fda 282.03 0.28

1.00 m 42.40 42.40M $125.06 100.19% 124.82

0.0021 m3 1,953.49 4.102.75 u 36.28 99.771.00 u 6.38 6.38

0.001 fda 478.50 0.481.00 m 42.40 42.40

M $153.13 100.16% 152.89

0.0021 m3 1,953.49 4.103.93 u 8.82 34.661.00 u 6.38 6.38

0.001 fda 282.03 0.281.00 m 42.40 42.40

M $87.82 100.27% 87.58

0.0021 m3 1,953.49 4.104.40 u 17.63 77.571.00 u 6.38 6.38

0.001 fda 282.03 0.281.00 m 31.10 31.10

M $119.43 100.20% 119.19

16.73 p 44.00 736.1221.00 p2 85.00 1,785.00

1.50 par 73.08 109.627.00 u 3.48 24.377.00 u 0.55 3.851.00 u 377.00 377.001.00 u 735.00 735.00

$1,932.17 Unid. $3,770.96 100.00% 3,770.96

16.73 p 44.00 736.1221.00 p2 154.00 3,234.00

1.50 par 73.08 109.62

Page 452: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 434

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

7.00 u 3.48 24.377.00 u 0.55 3.851.00 u 377.00 377.001.00 u 735.00 735.00

$2,674.61 Unid. $5,219.96 100.00% 5,219.96

16.73 p 136.00 2,275.2821.00 p2 528.00 11,088.00

1.50 par 73.08 109.627.00 u 3.48 24.377.00 u 0.55 3.851.00 u 1,194.82 1,194.821.00 u 735.00 735.00

$7,906.52 Unid. $15,430.94 100.00% 15,430.94

16.73 p 136.00 2,275.2821.00 p2 543.00 11,403.00

1.50 par 73.08 109.627.00 u 3.48 24.377.00 u 0.55 3.851.00 u 3,584.46 3,584.461.00 u 735.00 735.00

$9,292.33 Unid. $18,135.58 100.00% 18,135.58

16.73 p 136.00 2,275.2821.00 p2 528.00 11,088.00

1.00 u 446.60 446.607.00 u 3.48 24.377.00 u 0.55 3.851.00 u 735.00 735.00

$7,466.98 Unid. $14,573.10 100.00% 14,573.10

37.18 p 136.00 5,056.4863.27 p2 528.00 33,406.56

3.00 par 73.08 219.2410.00 u 3.48 34.8110.00 u 0.55 5.50

1.00 u 109.78 109.781.00 u 115.85 115.850.50 lb 19.00 9.501.00 u 1,194.82 1,194.82

Page 453: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 435

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

4.00 u 735.00 2,940.00$7,328.52 Unid. $43,092.54 100.00% 43,090.54

1.185 m3 500.00 592.5015.22 gl 0.37 5.630.237 día 294.00 69.680.077 día 294.00 22.64

M3 $690.45 100.00% 690.45

0.375 hr 187.32 70.251.185 m3 500.00 592.5015.22 gl 0.37 5.630.237 día 294.00 69.680.051 día 294.00 14.99

M3 $753.05 100.00% 753.05

1.339 m3 313.00 419.1115.22 gl 0.37 5.630.402 día 294.00 118.190.137 día 294.00 40.28

M3 $583.21 100.00% 583.21

0.375 hr 187.32 70.251.339 m3 313.00 419.1115.22 gl 0.37 5.630.402 día 294.00 118.190.091 día 294.00 26.75

M3 $639.93 100.00% 639.93

0.670 m3 313.00 209.710.592 m3 500.00 296.0015.22 gl 0.37 5.630.316 día 294.00 92.900.096 día 294.00 28.22

M3 $632.46 100.00% 632.46

0.375 hr 187.32 70.250.670 m3 313.00 209.71

Page 454: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 436

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.592 m3 500.00 296.0015.22 gl 0.37 5.630.316 día 294.00 92.900.051 día 294.00 14.99

M3 $689.48 100.00% 689.48

15.22 gl 0.37 5.630.316 día 294.00 92.900.137 día 294.00 40.28

M3 $138.81 100.00% 138.81

0.375 hr 187.32 70.2515.22 gl 0.37 5.630.316 día 294.00 92.900.091 día 294.00 26.75

M3 $195.53 100.00% 195.53

1.00 m3 169.00 169.000.300 día 294.00 88.20

M3 $257.20 100.00% 257.20

68.00 m200.00 m2

7.16 lb 19.00 136.042.72 fda 128.59 349.76

41.34 p2 37.99 1,570.510.34 u 98.60 33.522.30 u 294.00 676.201.00 u 511.00 511.001.00 u 830.00 830.001.00 u 2,189.00 2,189.00

Unid. $6,296.03 100.46% 6,267.32M $92.59 100.46% 92.17

M2 $31.48 100.45% 31.34

0.0053 m3 2,735.64 14.50

Page 455: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 437

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.10 m2 348.00 382.805.00 u 6.00 30.00

0.0330 fda 430.00 14.190.05 lb 29.00 1.451.00 m2 178.00 178.00

M2 $620.94 100.15% 620.00

0.0053 m3 2,735.64 14.501.10 m2 986.00 1,084.605.00 u 6.00 30.00

0.0330 fda 430.00 14.190.05 lb 29.00 1.451.00 m2 196.00 196.00

M2 $1,340.74 100.07% 1,339.80

0.0120 m3 2,735.64 32.8358.00 u 8.71 505.18

5.80 u 32.13 186.3558.00 u 4.40 255.20

M2 $979.56 100.22% 977.44

0.0120 m3 2,735.64 32.8358.00 u 10.46 606.68

5.80 u 32.13 186.350.05 lb 29.00 1.45

58.00 u 4.40 255.20M2 $1,082.51 100.20% 1,080.39

Page 456: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 438

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.39 p2 116.00 161.241.63 p2 116.00 189.087.75 p2 116.00 899.003.66 p2 116.00 424.561.17 p2 116.00 135.72

16.50 p2 116.00 1,914.001.16 m2 276.87 321.17

34.84 u 0.30 10.450.40 m 98.08 39.230.60 m 98.08 58.850.78 lb 19.00 14.820.83 lb 75.35 62.160.43 lb 131.53 56.561.11 m2 36.90 40.960.11 u 2,450.00 269.501.80 u 1,131.60 2,036.88

12.61 u 6.33 79.8215.60 p2 56.99 889.0411.93 p2 119.67 1,427.66

M2 $9,030.70 100.03% 9,027.57

Page 457: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 439

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.39 p2 102.00 141.781.63 p2 102.00 166.267.75 p2 102.00 790.503.66 p2 102.00 373.321.17 p2 102.00 119.34

16.50 p2 102.00 1,683.001.16 m2 276.87 321.17

34.84 u 0.30 10.450.40 m 98.08 39.230.60 m 98.08 58.850.78 lb 19.00 14.820.83 lb 75.35 62.160.43 lb 131.53 56.561.11 m2 5.50 6.110.11 u 2,450.00 269.501.80 u 1,131.60 2,036.88

12.61 u 6.33 79.8215.60 p2 56.99 889.0411.93 p2 119.67 1,427.66

M2 $8,546.45 100.04% 8,543.32TECHO TEJA ASF., FORRADO EN PINO TRAT. (SOBRE DINTEL CORRIDO):

1.39 p2 42.58 59.191.63 p2 42.58 69.417.75 p2 42.58 330.003.66 p2 42.58 155.841.17 p2 42.58 49.82

16.50 p2 42.58 702.571.16 m2 276.87 321.17

34.84 u 0.30 10.450.40 m 98.08 39.230.60 m 98.08 58.850.78 lb 19.00 14.820.83 lb 75.35 62.160.43 lb 131.53 56.56

Page 458: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 440

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.11 m2 36.90 40.960.11 u 2,450.00 269.501.80 u 1,131.60 2,036.88

12.61 u 6.33 79.8215.60 p2 56.99 889.0411.93 p2 119.67 1,427.66

M2 $6,673.93 100.05% 6,670.80TECHO TEJA ASF., FORRADO EN ROBLE BRASILEÑO (SOBRE DINTEL CORRIDO):

1.39 p2 81.40 113.151.63 p2 81.40 132.687.75 p2 81.40 630.853.66 p2 81.40 297.921.17 p2 81.40 95.24

16.50 p2 81.40 1,343.101.16 m2 276.87 321.17

34.84 u 0.30 10.450.40 m 98.08 39.230.60 m 98.08 58.850.78 lb 19.00 14.820.83 lb 75.35 62.160.43 lb 131.53 56.561.11 m2 36.90 40.960.11 u 2,450.00 269.501.80 u 1,131.60 2,036.88

12.61 u 6.33 79.8215.60 p2 56.99 889.0411.93 p2 119.67 1,427.66

M2 $7,920.04 100.04% 7,916.91TECHO TEJA CURVA BARRO, FORRADO EN CAOBA (SOBRE DINTEL CORRIDO):

3.13 p2 116.00 363.082.71 p2 116.00 314.36

12.92 p2 116.00 1,498.726.09 p2 116.00 706.441.94 p2 116.00 225.04

16.50 p2 116.00 1,914.00

Page 459: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 441

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

34.84 u 10.71 373.150.055 m3 2,735.64 150.46

0.06 lb 29.00 1.7434.84 u 0.87 30.31

0.20 u 30.59 6.221.34 lb 19.00 25.460.83 lb 75.35 62.161.11 m2 36.90 40.960.11 u 2,450.00 269.501.80 u 1,131.60 2,036.88

12.61 u 6.33 79.8226.79 p2 56.99 1,526.7611.93 p2 119.67 1,427.66

1.11 m2 280.00 310.801.00 m2 160.00 160.000.20 u 19.00 3.86

M2 $11,527.38 100.13% 11,512.30TECHO TEJA CURVA BARRO, FORRADO EN CEDRO (SOBRE DINTEL CORRIDO):

3.13 p2 102.00 319.262.71 p2 102.00 276.42

12.92 p2 102.00 1,317.846.09 p2 102.00 621.181.94 p2 102.00 197.88

16.50 p2 102.00 1,683.0034.84 u 10.71 373.150.055 m3 2,735.64 150.46

0.06 lb 29.00 1.7434.84 u 0.87 30.31

0.20 u 26.37 5.361.34 lb 19.00 25.460.83 lb 75.35 62.161.11 m2 36.90 40.960.11 u 2,450.00 269.501.80 u 1,131.60 2,036.88

12.61 u 6.33 79.8226.79 p2 56.99 1,526.7611.93 p2 119.67 1,427.66

1.11 m2 280.00 310.80

Page 460: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 442

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.00 m2 160.00 160.000.20 u 19.00 3.86

M2 $10,920.46 100.14% 10,905.38TECHO TEJA CURVA BARRO, FORRADO EN PINO TRAT. (SOBRE DINTEL CORRIDO):

3.13 p2 42.58 133.282.71 p2 42.58 115.39

12.92 p2 42.58 550.136.09 p2 42.58 259.311.94 p2 42.58 82.61

16.50 p2 42.58 702.5734.84 u 10.71 373.150.055 m3 2,735.64 150.46

0.06 lb 29.00 1.7434.84 u 0.87 30.31

0.20 u 26.37 5.361.34 lb 19.00 25.460.83 lb 75.35 62.161.11 m2 36.90 40.960.11 u 2,450.00 269.501.80 u 1,131.60 2,036.88

12.61 u 6.33 79.8226.79 p2 56.99 1,526.7611.93 p2 119.67 1,427.66

1.11 m2 280.00 310.801.00 m2 160.00 160.000.20 u 19.00 3.86

M2 $8,348.17 100.18% 8,333.09TECHO TEJA CURVA BARRO, FORRADO EN ROBLE BRASILEÑO (SOBRE DINTEL CORRIDO):

3.13 p2 81.40 254.782.71 p2 81.40 220.59

12.92 p2 81.40 1,051.696.09 p2 81.40 495.731.94 p2 81.40 157.92

16.50 p2 81.40 1,343.1034.84 u 10.71 373.15

Page 461: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 443

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

0.055 m3 2,735.64 150.460.06 lb 29.00 1.74

34.84 u 0.87 30.310.20 u 26.37 5.361.34 lb 19.00 25.460.83 lb 75.35 62.161.11 m2 36.90 40.960.11 u 2,450.00 269.501.80 u 1,131.60 2,036.88

12.61 u 6.33 79.8226.79 p2 56.99 1,526.7611.93 p2 119.67 1,427.66

1.11 m2 280.00 310.801.00 m2 160.00 160.000.20 u 19.00 3.86

M2 $10,028.69 100.15% 10,013.61TECHO TEJA CURVA BARRO SOBRE FINO DE HORM. IMPERMEABILIZADO:

34.84 u 10.71 373.150.055 m3 2,735.64 150.46

0.06 lb 29.00 1.7434.84 u 0.87 30.31

0.20 u 26.37 5.361.11 m2 280.00 310.801.00 m2 160.00 160.000.20 u 19.00 3.86

M2 $1,035.68 100.95% 1,025.97

2.91 p2 37.99 110.397.90 p2 37.99 300.12

34.84 u 10.71 373.1534.84 u 0.87 30.31

0.20 u 26.37 5.360.50 lb 17.20 8.600.54 lb 19.00 10.32

10.86 p2 56.99 619.081.00 m2 160.00 160.000.20 u 19.00 3.86

M2 $1,621.19 100.19% 1,618.17

2.9058 p2 37.99 110.395.6417 p2 37.99 214.33

Page 462: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 444

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

1.05 u 344.52 361.750.1354 m 104.40 14.14

0.43 lb 19.00 8.170.14 lb 17.98 2.528.55 p2 56.99 487.121.33 u 15.20 20.220.14 u 18.70 2.53

M2 $1,221.17 100.14% 1,219.45

1.00 m2 149.74 149.740.0473 m3 1,953.49 92.400.3333 p2 53.26 17.750.0473 m3 405.65 19.19

1.00 m2 133.00 133.003.00 m 26.80 80.40

M2 $492.48 102.13% 482.20

0.0420 m3 1,953.49 82.050.3333 p2 53.26 17.750.0420 m3 405.65 17.04

1.00 m2 32.90 32.90M2 $149.74 103.34% 144.90

0.0630 m3 1,953.49 123.070.3333 p2 53.26 17.750.0630 m3 405.65 25.56

1.00 m2 53.50 53.50M2 $219.88 103.41% 212.63

0.0105 m3 1,953.49 20.510.0105 m3 405.65 4.26

1.00 m 28.50 28.50M $53.27 102.32% 52.06

1.00 m2 2,168.83 2,168.83

Page 463: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 445

GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM. ANALISIS DE COSTOSCANT. U. P. UNIT SUBTOTAL INDICE ENE. 2006

2.0833 u 128.59 267.898.70% 211.99

$246.16 M2 $2,648.71 100.00% 2,648.71

1.00 m2 2,262.06 2,262.062.0833 u 128.59 267.89

8.70% 220.11$255.58 M2 $2,750.06 100.00% 2,750.06

1.00 m2 2,311.40 2,311.402.0833 u 128.59 267.89

8.70% 224.40$260.57 M2 $2,803.69 100.00% 2,803.69

1.00 m2 2,325.19 2,325.192.0833 u 128.59 267.89

8.70% 225.60$261.96 M2 $2,818.68 100.00% 2,818.68

1.00 m2 1,641.40 1,641.402.0833 u 54.49 113.52

8.70% 152.68$177.29 M2 $1,907.60 100.00% 1,907.60

1.00 m2 2,020.07 2,020.072.0833 u 54.49 113.52

8.70% 185.62$215.54 M2 $2,319.21 100.00% 2,319.21

1.00 m2 1,909.39 1,909.392.0833 u 54.49 113.52

8.70% 175.99$204.36 M2 $2,198.90 100.00% 2,198.90

Page 464: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 86

FEBRERO 2006 RESUMEN DE LOS ANALISISNo. D E S C R I P C I O N $/UNID. UNID. $ /QQ $ /M $ /M2 $ /M3

10000 RESUMEN DE LOS ANALISIS DE COSTOS:

10100 A C E R O S10101 ACERO DE ¼'': QQ $684.4010102 ACERO GRADO 40, 3/8" x 20': QQ $1,642.3210103 ACERO GRADO 40, 3/8" x 25': QQ $1,642.3210104 ACERO GRADO 40, ½" x 20': QQ $1,642.3210105 ACERO GRADO 40, ½" x 25': QQ $1,642.3210106 ACERO GRADO 40, ¾": QQ $1,642.3210107 ACERO GRADO 40, DE 1": QQ $1,642.3210108 ACERO GRADO 60, 3/8" x 20': QQ $1,642.3210109 ACERO GRADO 60, 3/8" x 25': QQ $1,642.3210110 ACERO GRADO 60, ½" x 20': QQ $1,642.3210111 ACERO GRADO 60, ½" x 25': QQ $1,642.3210112 ACERO GRADO 60, ¾": QQ $1,642.3210113 ACERO GRADO 60, DE 1": QQ $1,642.32

10200 BORDILLOS10201 BORDILLO 4", 2 LINEAS, 1:2:4, ZAP. .20x.15 M.) M $718.0210202 BORDILLO 6", 2 LINEAS, 1:2:4, ZAP. .30x.15 M.) M $854.7910203 BORDILLO 6", 2 LINEAS, 1:2:4, ZAP. .40x.15 M.) M $942.37

10300 BLOQUES10301 BLOQUES HORM. 4'', ¼" A .80 M.: M2 $615.8810302 BLOQUES HORM. 5'', 3/8" A .80 M.: M2 $564.6410303 BLOQUES HORM. 6'', 3/8" A .40 M.: M2 $752.9610304 BLOQUES HORM. 6'', 3/8" A .80 M.: M2 $670.2110305 BLOQUES HORM. 6" VIOL. 2 CARAS, 3/8" A .80 M.: M2 $696.2110306 BLOQUES HORM. 8", 3/8" A .20 M.: M2 $940.8310307 BLOQUES HORM. 8", 3/8" A .40 M.: M2 $885.8510308 BLOQUES HORM. 8", 3/8" A .80 M.: M2 $801.8710309 BLOQUES HORM. 8", C. LLENAS, 3/8" A 0.40 M.: M2 $959.0810310 BLOQUES HORM. 8", C. LLENAS, 3/8" A 0.20 M.: M2 $1,036.4210311 BLOQUES HORM. 10", 3/8" A .80 M.: M2 $1,509.7710312 BLOQUES HORM. 12", 3/8" A .80 M.: M2 $1,580.7710313 BLOQUES RUSTICANALES 4", 3/8" A .80 M.: M2 $1,502.6710314 BLOQUES RUSTICANALES 8", 3/8" A .80 M.: M2 $1,917.3910315 BLOQUES CALADOS LADRILLO 6"x6"x6": M2 $2,339.7610316 BLOQUES CALADOS LADRILLO 8"x8"x6": M2 $1,319.3310317 BLOQUES CALADOS ORNAMENT. 15x20x40: M2 $1,324.93

10400 CASETAS DE MATERIALES10401 CASETA MAT. 12'x16', P/200 F. CEMENTO: $14,415.21 $807.1210402 CASETA MAT. 12'x32', P/500 F. CEMENTO: $29,827.70 $885.88

10500 CONTEN (TELFORD) $431.98 $4,319.77

10600 DESAGÜES PLUVIALES10601 DESAGÜES PLUVIALES 3": M $389.5510602 DESAGÜES PLUVIALES 4": M $427.79

10700 EMPAÑETES10701 CARETEO CON LLANA, SIN ANDAMIOS: M2 $18.9710702 FRAGÜACHE, SIN ANDAMIOS: M2 $16.1110703 NATILLA, SIN ANDAMIOS: M2 $41.9010704 RESANE, SIN ANDAMIOS: M2 $28.2410705 EMPAÑETE maestrado COLUMNAS: M2 $168.6410706 REPELLO maestrado TECHOS (SIN ANDAMIOS): M2 $138.0110707 EMPAÑETE maestrado INTERIOR: M2 $143.6410708 EMPAÑETE maestrado EXTERIOR: M2 $255.2510709 EMPAÑETE rasgado: M2 $189.0610710 EMPAÑETE maestrado TECHOS Y VIGAS: M2 $273.5610711 EMPAÑETE RUSTICO (ESCOBA, PAPEL O BROCHA): M2 $244.1810712 EMPAÑETE PULIDO SIN COLOR: M2 $153.4110713 CANTOS: M $48.0510714 ESTRIAS: M $82.5610715 GOTEROS COLGANTES: M $94.8910716 GOTEROS DE RANURA: M $70.20

10800 ESCALONES10801 ESCALON GRANITO 2 y 3 BLANCO M $1,140.8110802 ESCALON GRANITO 2 y 3 COLOR M $1,254.8610803 ESCALON GRANITO 2 y 3 GRIS M $1,008.7110804 ESCALON GRANITO BOTICELLI BLANCO M $1,330.9210805 ESCALON GRANITO BOTICELLI COLOR M $1,668.1210806 ESCALON SUPER CHAPA COLOR M $1,360.9310807 ESCALON VIBRAZO BLANCO M $1,280.8810808 ESCALON VIBRAZO COLOR M $1,707.1510809 ESCALON VIBRAZO GRIS M $1,074.76

10900 HORM. ARMADO ANTEPECHOS10901 ANTEPECHO .40x.15, 1:2:4, 3/8" grado 40 A .40 + 2 DE 3/8": M3 $16,269.4410902 ANTEPECHO .40x.15, 180 kg/Cm², 3/8" grado 40 A .40, 2 DE 3/8": M3 $18,472.9910903 ANTEPECHO .40x.15, 210 kg/Cm², 3/8" grado 40 A .40, 2 DE 3/8": M3 $18,631.05

11000 HORM. ARMADO COLUMNAS11001 COL. 20x20, 1:2:4, 40,4 DE 3/8", ¼" A 20, LIG.: M3 $20,588.8011002 COL. 20x20, 1:2:4, 40, 4 DE 3/8", ¼" A 20 A MANO: M3 $20,806.6811003 COL. 20x20, 1:2:4, 40, 4 DE ½", 3/8" A 20, LIG.: M3 $23,121.0811004 COL. 20x20, 1:2:4, 40, 4 DE ½", 3/8" A 20 A MANO: M3 $25,515.4211005 COL. 20x30, 1:2:4, 40, 4 DE ½", 3/8" A 20, LIG.: M3 $15,495.2911006 COL. 20x30, 1:2:4, 40, 4 DE ½", 3/8" A 20 A MANO: M3 $15,713.1711007 COL. 30x30, 1:2:4, 40, 8 DE ½", 3/8" A 20, LIG.: M3 $15,539.6211008 COL. 30x30, 1:2:4, 40, 8 DE ½", 3/8" A 20 A MANO: M3 $15,757.5011009 COL. 30x40, 1:2:4, 40, 4 DE ¾", 3/8" A 30, LIG.: M3 $11,742.4411010 COL. 30x40, 1:2:4, 40, 4 DE ¾", 3/8" A 30 A MANO: M3 $11,960.3211011 COL. 40x40, 1:2:4, 40, 4 DE ½" + 4 DE ¾", 3/8" A 20, LIG.: M3 $12,281.6911012 COL. 40x40, 1:2:4, 40, 4 DE ½" + 4 DE ¾", 3/8" A 20 A MANO: M3 $11,087.1711013 COL. 50x50, 1:2:4, 40, 4 DE ¾" + 4 DE 1", 3/8" A 20, LIG.: M3 $11,894.7211014 COL. 50x50, 1:2:4, 40, 4 DE ¾" + 4 DE 1", 3/8" A 20 A MANO: M3 $10,548.5711015 COL. 60x60, 1:2:4, 40, 12 DE 1", 3/8" A 20, LIG.: M3 $14,804.0211016 COL. 60x60, 1:2:4, 40, 12 DE 1", 3/8" A 20 A MANO: M3 $14,586.1411017 COL. 20x20, 180 kg/Cm², 40, 4 DE ½", 3/8" A 20: M3 $24,090.9711018 COL. 20x20, 180 kg/Cm², 40, 4 DE ½" x 25', 3/8" A 20: M3 $24,090.9711019 COL. 20x20, 180 kg/Cm², 60, 4 DE ½" x 20', 3/8" x 20' A 20: M3 $24,090.9711020 COL. 20x20, 180 kg/Cm², 60, 4 DE ½" x 25', 3/8" x 20' A 20: M3 $24,090.9711021 COL. 20x30, 180 kg/Cm², 60, 4 DE ½", 3/8" A 20: M3 $17,978.8811022 COL. 20x30, 180 kg/Cm², 60, 4 DE ½" x 25', 3/8" x 20' A 20: M3 $17,978.8811023 COL. 30x30, 180 kg/Cm², 40, 8 DE ½", 3/8" A 30: M3 $18,023.2111024 COL. 30x30, 180 kg/Cm², 40, 8 DE ½", 3/8" A 30: PORTICO M3 $18,331.1911025 COL. 30x30, 180 kg/Cm², 40, 8 DE ½" x 25', 3/8" A: M3 $18,023.2111026 COL. 30x30, 180 kg/Cm², 40, 8 DE ½"x25', 3/8" A 30: PORTICO M3 $18,331.1911027 COL. 30x30, 180 kg/Cm², 60, 8 DE ½", 3/8" A 30: M3 $18,286.70

Page 465: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 87

FEBRERO 2006 RESUMEN DE LOS ANALISISNo. D E S C R I P C I O N $/UNID. UNID. $ /QQ $ /M $ /M2 $ /M311028 COL. 30x30, 180 kg/Cm², 60, 8 DE ½", 3/8" A 30: PORTICO M3 $18,331.1911029 COL. 30x30, 180 kg/Cm², 60, 8 DE ½"x25', 3/8" x 20' A 30: M3 $18,286.7011030 COL. 30x30, 180 kg/Cm², 60, 8 DE ½"x25', 3/8" A 30: PORTICO M3 $18,331.1911031 COL. 30x40, 180 kg/Cm², 40, 4 DE ¾", 3/8" A 30: M3 $14,226.0311032 COL. 30x40, 180 kg/Cm², 40, 4 DE ¾", 3/8" A 30: PORTICO M3 $14,471.1011033 COL. 30x40, 180 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': M3 $14,435.7011034 COL. 30x40, 180 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': PORTICO M3 $14,471.1011035 COL. 40x40, 180 kg/Cm², 40, 4 DE ½" + 4 DE ¾", 3/8" A 20: M3 $14,765.2811036 COL. 40x40, 180 kg/Cm², 40, 4 DE ½" + 4 DE ¾", 3/8" A 20: PORTICO M3 $15,033.5711037 COL. 40x40, 180 kg/Cm², 40, 4 DE ½"x25' + 4 DE ¾"x25', 3/8" A 20: M3 $14,765.2811038 COL. 40x40, 180 kg/Cm², 40, 4 DE ½"x25' + 4 DE ¾"x25', 3/8" A 20: PORTICO M3 $15,033.5711039 COL. 40x40, 180 kg/Cm², 60, 4 DE ½" + 4 DE ¾", 3/8" A 30: M3 $14,994.8211040 COL. 40x40, 180 kg/Cm², 60, 4 DE ½" + 4 DE ¾", 3/8" A 30: PORTICO M3 $15,033.5711041 COL. 40x40, 180 kg/Cm², 60, 4 DE ½"x25' + 4 DE 3/4"x25', 3/8" A 30: M3 $14,994.8211042 COL. 40x40, 180 kg/Cm², 60, 4 DE ½" x 25' + 4 DE 4/4", 3/8" x 20' A 30: PORTICO M3 $15,033.5711043 COL. 50x50, 180 kg/Cm², 40, 4 DE ¾" + 4 DE 1", 3/8" A 20: M3 $14,160.4311044 COL. 50x50, 180 kg/Cm², 40, 4 DE ¾" + 4 DE 1", 3/8" A 20: PORTICO M3 $13,335.2811045 COL. 50x50, 180 kg/Cm², 60, 4 DE ¾" + 4 DE 1", 3/8" A 20, x 20': M3 $14,419.7711046 COL. 50x50, 180 kg/Cm², 60, 4 DE ¾" + 4 DE 1", 3/8" A 20, x 20': PORTICO M3 $14,463.5511047 COL. 60x60, 180 kg/Cm², 40, 12 DE 1", 3/8" A 20: M3 $17,092.8611048 COL. 60x60, 180 kg/Cm², 40, 12 DE 1", 3/8" A 30: PORTICO M3 $17,572.5611049 COL. 60x60, 180 kg/Cm², 60, 12 DE 1", 3/8" A 30, x 20': M3 $17,503.2711050 COL. 60x60, 180 kg/Cm², 60, 12 DE 1", 3/8" A 30, x 20': PORTICO M3 $17,572.5611051 COL. 30x30, 210 kg/Cm², 40, 4 DE ¾", 3/8" A 30: M3 $18,181.2711052 COL. 30x30, 210 kg/Cm², 40, 4 DE ¾", 3/8" A 30: PORTICO M3 $18,489.2511053 COL. 30x30, 210 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': M3 $18,444.7611054 COL. 30x30, 210 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': PORTICO M3 $18,489.2511055 COL. 30x40, 210 kg/Cm², 40, 4 DE ¾", 3/8" A 30: M3 $14,384.0911056 COL. 30x40, 210 kg/Cm², 40, 4 DE ¾", 3/8" A 30: PORTICO M3 $14,629.1611057 COL. 30x40, 210 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': M3 $14,593.7611058 COL. 30x40, 210 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': PORTICO M3 $14,629.1611059 COL. 40x40, 210 kg/Cm², 40, 4 DE ½" + 4 DE ¾", 3/8" A 20: M3 $14,923.3411060 COL. 40x40, 210 kg/Cm², 40, 4 DE ½" + 4 DE ¾", 3/8" A 20: PORTICO M3 $15,191.6311061 COL. 40x40, 210 kg/Cm², 40, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 20: M3 $14,923.3411062 COL. 40x40, 210 kg/Cm², 40, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 20: PORTICO M3 $15,191.6311063 COL. 40x40, 210 kg/Cm², 60, 4 DE ½" + 4 DE ¾", 3/8" A 30, x 20': M3 $15,152.8811064 COL. 40x40, 210 kg/Cm², 60, 4 DE ½" + 4 DE ¾", 3/8" A 30, x 20': PORTICO M3 $15,191.6311065 COL. 40x40, 210 kg/Cm², 60, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 30 x 20': M3 $15,152.8811066 COL. 40x40, 210 kg/Cm², 60, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 30 x 20': PORTICO M3 $15,191.6311067 COL. 50x50, 210 kg/Cm², 40, 4 DE ¾" + 4 DE 1", 3/8" A 20: M3 $14,318.4911068 COL. 50x50, 210 kg/Cm², 40, 4 DE ¾" + 4 DE 1", 3/8" A 20: PORTICO M3 $13,493.3411069 COL. 50x50, 210 kg/Cm², 60, 4 DE ¾" + 4 DE 1", 3/8" A 20, x 20': M3 $14,577.8311070 COL. 50x50, 210 kg/Cm², 60, 4 DE ¾" + 4 DE 1", 3/8" A 20, x 20': PORTICO M3 $14,621.6111071 COL. 60x60, 210 kg/Cm², 40, 12 DE 1", 3/8" A 20: M3 $17,227.7911072 COL. 60x60, 210 kg/Cm², 40, 12 DE 1", 3/8" A 30: PORTICO M3 $17,707.4911073 COL. 60x60, 210 kg/Cm², 60, 12 DE 1", 3/8" A 30, x 20': M3 $17,638.2011074 COL. 60x60, 210 kg/Cm², 60, 12 DE 1", 3/8" A 30, x 20': PORTICO M3 $17,707.4911075 COL. 30x30, 240 kg/Cm², 40, 4 DE ¾", 3/8" A 30: M3 $18,442.8511076 COL. 30x30, 240 kg/Cm², 40, 4 DE ¾", 3/8" A 30: PORTICO M3 $18,750.8311077 COL. 30x30, 240 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': M3 $18,706.3411078 COL. 30x30, 240 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': PORTICO M3 $18,750.8311079 COL. 30x40, 240 kg/Cm², 40, 4 DE ¾", 3/8" A 30: M3 $14,645.6711080 COL. 30x40, 240 kg/Cm², 40, 4 DE ¾", 3/8" A 30: PORTICO M3 $14,890.7411081 COL. 30x40, 240 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': M3 $14,855.3411082 COL. 30x40, 240 kg/Cm², 60, 4 DE ¾", 3/8" A 30, x 20': PORTICO M3 $14,890.7411083 COL. 40x40, 240 kg/Cm², 40, 4 DE ½" + 4 DE ¾", 3/8" A 20: M3 $15,184.9211084 COL. 40x40, 240 kg/Cm², 40, 4 DE ½" + 4 DE ¾", 3/8" A 20: PORTICO M3 $15,453.2111085 COL. 40x40, 240 kg/Cm², 40, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 20: M3 $15,184.9211086 COL. 40x40, 240 kg/Cm², 40, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 20: PORTICO M3 $15,453.2111087 COL. 40x40, 240 kg/Cm², 60, 4 DE ½" + 4 DE ¾", 3/8" A 30, x 20': M3 $15,414.4611088 COL. 40x40, 240 kg/Cm², 60, 4 DE ½" + 4 DE ¾", 3/8" A 30, x 20': PORTICO M3 $15,453.2111089 COL. 40x40, 240 kg/Cm², 60, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 30 x 20': M3 $15,414.4611090 COL. 40x40, 240 kg/Cm², 60, 4 DE ½" x 25' + 4 DE ¾", 3/8" A 30 x 20': PORTICO M3 $15,453.2111091 COL. 50x50, 240 kg/Cm², 40, 4 DE ¾" + 4 DE 1", 3/8" A 20: M3 $14,580.0711092 COL. 50x50, 240 kg/Cm², 40, 4 DE ¾" + 4 DE 1", 3/8" A 20: PORTICO M3 $13,754.9211093 COL. 50x50, 240 kg/Cm², 60, 4 DE ¾" + 4 DE 1", 3/8" A 20, x 20': M3 $14,839.4111094 COL. 50x50, 240 kg/Cm², 60, 4 DE ¾" + 4 DE 1", 3/8" A 20, x 20': PORTICO M3 $14,883.1911095 COL. 60x60, 240 kg/Cm², 40, 12 DE 1", 3/8" A 20: M3 $17,489.3711096 COL. 60x60, 240 kg/Cm², 40, 12 DE 1", 3/8" A 20: PORTICO M3 $17,969.0711097 COL. 60x60, 240 kg/Cm², 60, 12 DE 1", 3/8" A 20, x 20': M3 $17,899.7811098 COL. 60x60, 240 kg/Cm², 60, 12 DE 1", 3/8" A 20, x 20': PORTICO M3 $17,969.07

11200 HORM. ARMADO COL. AMARRE11201 COL. AMARRE 15x20, 1:2:4, 40, 4 DE 3/8", ¼" A 20, LIG.: M3 $13,680.9711202 COL. AMARRE 15x20, 1:2:4, 40, 4 DE 3/8", ¼" A 20 A MANO: M3 $13,898.8511205 COL. AMARRE 20x20, 1:2:4, 40, 4 DE 3/8", ¼" A 20, LIG.: M3 $11,734.8211206 COL. AMARRE 20x20, 1:2:4, 40, 4 DE 3/8", ¼" A 20 A MANO: M3 $11,952.70

11300 HORM. ARMADO DINTELES11301 DINTEL 10x20, 1:2:4, 40, 2 DE ½"-2 DE 3/8", ¼" A .20, LIG.: M3 $27,655.6111302 DINTEL 10x20, 1:2:4, 40, 2 DE ½"-2 DE 3/8", ¼" A .20 A MANO: M3 $27,873.4911303 DINTEL 15x20, 1:2:4, 40, 3 DE ½"-2 DE 3/8", ¼" A .20, LIG.: M3 $20,981.6711304 DINTEL 15x20, 1:2:4, 40, 3 DE ½"-2 DE 3/8", ¼" A .20 A MANO: M3 $21,199.5511307 DINTEL 20x20, 1:2:4, 40, 3 DE ½"-2 DE 3/8", 3/8" A .20, LIG.: M3 $18,349.0911308 DINTEL 20x20, 1:2:4, 40, 3 DE ½"-2 DE 3/8", 3/8" A .20 A MANO: M3 $18,566.9711309 DINTEL 10x20, 180 kg/Cm², 40, 2 DE ½"-2 DE 3/8", ¼" A .20: M3 $30,139.2011310 DINTEL 15x20, 180 kg/Cm², 40, 3 DE ½"-2 DE 3/8", ¼" A .20: M3 $23,465.2611311 DINTEL 20x20, 180 kg/Cm², 40, 3 DE ½"-2 DE 3/8", 3/8" A .20: M3 $20,832.68

11400 HORM. ARMADO LOSAS11401 LOSA H=10, 1:2:4, 40, 3/8" x 20' A 25 A. D. LIG. Y WINCHE: M3 $9,420.9011402 LOSA H=10, 1:2:4, 40, 3/8" >20' A 25 A. D. LIG. Y WINCHE: M3 $9,420.9011403 LOSA H=10, 1:2:4, 60, 3/8" x 20' A 25 A. D. LIG. Y WINCHE: M3 $9,560.9611404 LOSA H=10, 1:2:4, 60, 3/8" x 25' A 25 A. D. LIG. Y WINCHE: M3 $9,560.9611405 LOSA H=12, 1:2:4, 40, 3/8" x 20' A 25 A. D. LIG. Y WINCHE: M3 $8,171.5211406 LOSA H=12 1:2:4, 40, 3/8" >20' A 25 A. D. LIG. Y WINCHE: M3 $8,171.5211407 LOSA H=12, 1:2:4, 60, 3/8" x 20' A 25 A. D. LIG. Y WINCHE: M3 $8,286.7111408 LOSA H=12, 1:2:4, 60, 3/8" x 25' A 25 A. D. LIG. Y WINCHE: M3 $8,286.7111409 LOSA H=10, 180 kg/Cm², 40, 3/8" x 20' A 25 A. D.: M3 $11,624.4511410 LOSA H=10, 180 kg/Cm², 40, 3/8" >20' A 25 A. D., HORM. IND.: M3 $11,624.4511411 LOSA H=10, 180 kg/Cm², 60, 3/8" x 20' A 25 A. D., HORM. IND.: M3 $11,764.5111412 LOSA H=10, 180 kg/Cm², 60, 3/8" x 25' A 25 A. D., HORM. IND.: M3 $11,764.5111413 LOSA H=12, 180 kg/Cm², 40, 3/8" x 20' A 25 A. D., HORM. IND.: M3 $10,375.0711414 LOSA H=12 180 kg/Cm², 40, 3/8" >20' A 25 A. D., HORM. IND.: M3 $10,375.0711415 LOSA H=12, 180 Kg/Cm², 60, 3/8" x 20' A 25 A., D. HORM. IND.: M3 $10,490.2611416 LOSA H=12, 180 Kg/Cm², 60, 3/8" x 25' A 25 A. D., HORM. IND.: M3 $10,490.26

11500 HORM. ARMADO MUROS11501 MUROS 0.15, 180 Kg/Cm², 40, 3/8" x 20' A .20 A.D., 2 CARAS: M3 $15,771.6611502 MUROS 0.15, 180 Kg/Cm², 40, 3/8" x 25' A .20 A.D., 2 CARAS: M3 $15,771.6611503 MUROS 0.15, 180 Kg/Cm², 60, 3/8" x 20' A .20 A.D., 2 CARAS: M3 $15,911.4611504 MUROS 0.15, 180 Kg/Cm², 60, 3/8" x 25' A .20 A.D., 2 CARAS: M3 $15,911.4611505 MUROS 0.15, 210 Kg/Cm², 40 3/8" x 20' A .20 A.D., 2 CARAS: M3 $15,929.72

Page 466: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 88

FEBRERO 2006 RESUMEN DE LOS ANALISISNo. D E S C R I P C I O N $/UNID. UNID. $ /QQ $ /M $ /M2 $ /M311506 MUROS 0.15, 210 Kg/Cm², 40 3/8" x 25' A .20 A.D., 2 CARAS: M3 $15,929.7211507 MUROS 0.15, 210 Kg/Cm², 60, 3/8" x 20' A .20 A.D., 2 CARAS: M3 $16,069.5211508 MUROS 0.15, 210 Kg/Cm², 60, 3/8" x 25' A .20 A.D., 2 CARAS: M3 $16,069.5211509 MUROS 0.15, 240 Kg/Cm², 40, 3/8" x 20' A .20 A.D., 2 CARAS: M3 $16,191.3011510 MUROS 0.15, 240 Kg/Cm², 40, 3/8" x 25' A .20 A.D., 2 CARAS: M3 $16,191.3011511 MUROS 0.15, 240 Kg/Cm², 60, 3/8" x 20' A .20 A.D., 2 CARAS: M3 $16,331.1011512 MUROS 0.15, 240 Kg/Cm², 60, 3/8" x 25' A .20 A.D., 2 CARAS: M3 $16,331.1011513 MUROS 0.20, 180 Kg/Cm², 40, 3/8" x 20' A .20 A.D., 2 CARAS: M3 $12,998.8311514 MUROS 0.20, 180 Kg/Cm², 40, 3/8" x 25' A .20 A.D., 2 CARAS: M3 $12,998.8311515 MUROS 0.20, 180 Kg/Cm², 60, 3/8" x 20' A .20 A.D., 2 CARAS: M3 $13,103.8111516 MUROS 0.20, 180 Kg/Cm², 60, 3/8" x 25' A .20 A.D., 2 CARAS: M3 $13,103.8111517 MUROS 0.20, 210 Kg/Cm², 40, 3/8" x 20' A .20 A.D., 2 CARAS: M3 $13,156.8911518 MUROS 0.20, 210 Kg/Cm², 40, 3/8" x 25' A .20 A.D., 2 CARAS: M3 $13,156.8911519 MUROS 0.20, 210 Kg/Cm², 60, 3/8" x 20' A .20 A.D., 2 CARAS: M3 $13,261.8711520 MUROS 0.20, 210 Kg/Cm², 60, 3/8" x 25' A .20 A.D., 2 CARAS: M3 $13,261.8711521 MUROS 0.20, 210 Kg/Cm², 40, ½" x 20' A .10 A.D., 2 CARAS: M3 $19,406.4011522 MUROS 0.20, 210 Kg/Cm², 40, ½" x 25' A .10 A.D., 2 CARAS: M3 $19,406.4011523 MUROS 0.20, 210 Kg/Cm², 60, ½" x 20' A .10 A.D., 2 CARAS: M3 $19,779.4211524 MUROS 0.20, 210 Kg/Cm², 60, ½" >20' A .10 A.D., 2 CARAS: M3 $19,779.4211525 MUROS 0.20, 210 Kg/Cm², 40, ½" x 20' A .20 A.D., 2 CARAS: M3 $15,057.7811526 MUROS 0.20, 210 Kg/Cm², 40, ½" x 25' A .20 A.D., 2 CARAS: M3 $15,057.7811527 MUROS 0.20, 210 Kg/Cm², 60, ½" x 20' A .20 A.D., 2 CARAS: M3 $15,244.2911528 MUROS 0.20, 210 Kg/Cm², 60, ½" x 25' A .20 A.D., 2 CARAS: M3 $15,244.2911529 MUROS 0.20, 240 Kg/Cm², 40, ½" x 20' A .10 A.D., 2 CARAS: M3 $19,667.9811530 MUROS 0.20, 240 Kg/Cm², 40, ½" x 25' A .10 A.D., 2 CARAS: M3 $19,667.9811531 MUROS 0.20, 240 Kg/Cm², 60, ½" x 20' A .10 A.D., 2 CARAS: M3 $20,041.0011532 MUROS 0.20, 240 Kg/Cm², 60, ½" x 25' A .10 A.D., 2 CARAS: M3 $20,041.0011533 MUROS 0.20, 240 Kg/Cm², 40, ½" x 20' A .20 A.D., 2 CARAS: M3 $15,319.3611534 MUROS 0.20, 240 Kg/Cm², 40, ½" x 25' A .20 A.D., 2 CARAS: M3 $15,319.3611535 MUROS 0.20, 240 Kg/Cm², 60, ½" x 20' A .20 A.D., 2 CARAS: M3 $15,505.8711536 MUROS 0.20, 240 Kg/Cm², 60, ½" x 25' A .20 A.D., 2 CARAS: M3 $15,505.87

11600 HORM. ARMADO RAMPAS ESCALERAS11601 RAMPAS H=12, 1:2:4, 40, ½" A .20, 3/8" A .20, LIG. Y WINCHE: M3 $16,157.5911602 RAMPAS H=12, 1:2:4, 40, ½"X25' A .20, 3/8" A .20, LIG. Y WINCHE: M3 $16,157.5911603 RAMPAS H=12, 1:2:4, 60, ½" X 20' A .20, 3/8" A .20, LIG. Y WINCHE: M3 $16,157.5911604 RAMPAS H=12, 1:2:4, 60, ½"X25' A .20, 3/8" A .20, LIG. Y WINCHE: M3 $16,157.5911605 RAMPAS H=12, 1:2:4, 40, ½" A .20, 3/8" A .20, A MANO: M3 $16,095.4311606 RAMPAS H=12, 1:2:4, 40, ½"X25' A .20, 3/8" A .20, A MANO: M3 $16,095.4311607 RAMPAS H=12, 1:2:4, 60, ½" X 20' A .20, 3/8" A .20, A MANO: M3 $16,095.4311608 RAMPAS H=12, 1:2:4, 60, ½"X25' A .20, 3/8" A .20, A MANO: M3 $16,095.4311609 RAMPAS H=12, 180 kg/Cm², 40, ½" A .20 Y 3/8" A .20: M3 $18,361.1411610 RAMPAS H=12, 180 kg/Cm², 40, ½"X25' A .20 Y 3/8" A .20: M3 $18,361.1411611 RAMPAS H=12, 180 kg/Cm², 60, ½" A .20 Y 3/8" A .20: M3 $18,361.1411612 RAMPAS H=12, 180 kg/Cm², 60, ½"X25' A .20 Y 3/8" A .20: M3 $18,361.1411613 RAMPAS H=12, 210 kg/Cm², 40, ½" A .20 Y 3/8" A .20: M3 $18,519.2011614 RAMPAS H=12, 210 kg/Cm², 40, ½"X25' A .20 Y 3/8" A .20: M3 $18,519.2011615 RAMPAS H=12, 210 kg/Cm², 60, ½" A .20 Y 3/8" A .20: M3 $18,519.2011616 RAMPAS H=12, 210 kg/Cm², 60, ½"X25' A .20 Y 3/8" A .20: M3 $18,519.2011617 RAMPAS H=12, 240 kg/Cm², 40, ½" A .20 Y 3/8" A .20: M3 $18,780.7811618 RAMPAS H=12, 240 kg/Cm², 40, ½" A .20 Y 3/8" A .20: M3 $18,780.7811619 RAMPAS H=12, 240 kg/Cm², 60, ½" A .20 Y 3/8" A .20: M3 $18,780.7811620 RAMPAS H=12, 240 kg/Cm², 60, ½" A .20 Y 3/8" A .20: M3 $18,780.78

11700 HORM. ARMADO VIGAS11701 H. A. VIGA 20X40, 1:2:4, 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20, LIG. Y WINCHE: M3 $14,255.1011702 H. A. VIGA 20X40, 1:2:4, 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20, LIG. Y WINCHE: M3 $14,542.1611703 H. A. VIGA 25X50, 1:2:4, 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25, LIG. Y WINCHE: M3 $11,418.1111704 H. A. VIGA 25X50, 1:2:4, 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25, LIG. Y WINCHE: M3 $11,638.7911705 H. A. VIGA 30X60, 1:2:4, 40, 4 DE 1", 2 DE 3/8", 3/8" A .25, LIG. Y WINCHE: M3 $11,191.9011706 H. A. VIGA 30X60, 1:2:4, 60, 4 DE 1", 2 DE 3/8", 3/8" A .25, LIG. Y WINCHE: M3 $11,436.4511707 H. A. VIGA 40X80, 1:2:4, 40, 5 DE 1", 2 DE ½", 3/8" A .25, LIG. Y WINCHE: M3 $9,503.5611708 H. A. VIGA 40X80, 1:2:4, 40, 5 DE 1", 2 DE ½" X 25', 3/8" A .25, LIG. Y WINCHE: M3 $9,503.5611709 H. A. VIGA 40X80, 1:2:4, 60, 5 DE 1", 2 DE ½", 3/8" A .25, LIG. Y WINCHE: M3 $9,691.5211710 H. A. VIGA 20X40, 180 kg/Cm², 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20: M3 $16,458.6511711 H. A. VIGA 20X40, 180 kg/Cm², 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20: PORTICO M3 $16,794.1711712 H. A. VIGA 20X40, 180 kg/Cm², 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20: M3 $16,745.7111713 H. A. VIGA 20X40, 180 kg/Cm², 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20: PORTICO M3 $16,794.1711714 H. A. VIGA 25X50, 180 kg/Cm², 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25: M3 $13,621.6611715 H. A. VIGA 20X50, 180 kg/Cm², 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25: PORTICO M3 $13,879.6011716 H. A. VIGA 20X50, 180 kg/Cm², 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25: M3 $13,842.3411717 H. A. VIGA 20X50, 180 kg/Cm², 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25: PORTICO M3 $13,879.6011718 H. A. VIGA 30X60, 180 kg/Cm², 40, 4 DE 1", 2 DE 3/8", 3/8" A .25: M3 $13,395.4511719 H. A. VIGA 30X60, 180 kg/Cm², 40, 4 DE 1", 2 DE 3/8", 3/8" A .25: PORTICO M3 $13,681.2911720 H. A. VIGA 30X60, 180 kg/Cm², 60, 4 DE 1", 2 DE 3/8", 3/8" A .25: M3 $13,640.0011721 H. A. VIGA 30X60, 180 kg/Cm², 60, 4 DE 1", 2 DE 3/8", 3/8" A .25: PORTICO M3 $13,681.2911722 H. A. VIGA 40X80, 180 kg/Cm², 40, 5 DE 1", 2 DE ½", 3/8" A .25: M3 $11,707.1111723 H. A. VIGA 40X80, 180 kg/Cm², 40, 5 DE 1", 2 DE ½", 3/8" A .25: PORTICO M3 $11,926.8011724 H. A. VIGA 40X80, 180 kg/Cm², 60, 5 DE 1", 2 DE ½", 3/8" A .25: M3 $11,895.0711725 H. A. VIGA 40X80, 180 kg/Cm², 60, 5 DE 1", 2 DE ½", 3/8" A .25: PORTICO M3 $11,926.8011726 H. A. VIGA 40X80, 180 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25: M3 $11,895.0711727 H. A. VIGA 40X80, 180 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25: PORTICO M3 $11,926.8011728 H. A. VIGA 20X40, 210 kg/Cm², 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20: M3 $16,616.7111729 H. A. VIGA 20X40, 210 kg/Cm², 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20: PORTICO M3 $16,952.2311730 H. A. VIGA 20X40, 210 kg/Cm², 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20: M3 $16,903.7711731 H. A. VIGA 20X40, 210 kg/Cm², 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20: PORTICO M3 $16,952.2311732 H. A. VIGA 25X50, 210 kg/Cm², 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25: M3 $13,779.7211733 H. A. VIGA 25X50, 210 kg/Cm², 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25: PORTICO M3 $14,037.6611734 H. A. VIGA 25X50, 210 kg/Cm², 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25: M3 $14,000.4011735 H. A. VIGA 25X50, 210 kg/Cm², 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25: PORTICO M3 $14,037.6611736 H. A. VIGA 30X60, 210 kg/Cm², 40, 4 DE 1", 2 DE 3/8", 3/8" A .25: M3 $13,553.5111737 H. A. VIGA 30X60, 210 kg/Cm², 40, 4 DE 1", 2 DE 3/8", 3/8" A .25: PORTICO M3 $13,839.3511738 H. A. VIGA 30X60, 210 kg/Cm², 60, 4 DE 1", 2 DE 3/8", 3/8" A .25: M3 $13,798.0611739 H. A. VIGA 30X60, 210 kg/Cm², 60, 4 DE 1", 2 DE 3/8", 3/8" A .25: PORTICO M3 $13,839.3511740 H. A. VIGA 40X80, 210 kg/Cm², 40, 5 DE 1", 2 DE ½", 3/8" A .25: M3 $11,865.1711741 H. A. VIGA 40X80, 210 kg/Cm², 40, 5 DE 1", 2 DE ½", 3/8" A .25: PORTICO M3 $12,084.8611742 H. A. VIGA 40X80, 210 kg/Cm², 60, 5 DE 1", 2 DE ½", 3/8" A .25: M3 $12,053.1311743 H. A. VIGA 40X80, 210 kg/Cm², 60, 5 DE 1", 2 DE ½", 3/8" A .25: PORTICO M3 $12,084.8611744 H. A. VIGA 40X80, 210 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25: M3 $12,053.1311745 H. A. VIGA 40X80, 210 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25: PORTICO M3 $12,084.8611746 H. A. VIGA 20X40, 240 kg/Cm², 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20: M3 $16,878.2911747 H. A. VIGA 20X40, 240 kg/Cm², 40, 3 DE ¾", 2 DE 3/8", 3/8" A .20: PORTICO M3 $17,213.8111748 H. A. VIGA 20X40, 240 kg/Cm², 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20: M3 $17,165.3511749 H. A. VIGA 20X40, 240 kg/Cm², 60, 3 DE ¾", 2 DE 3/8", 3/8" A .20: PORTICO M3 $17,213.8111750 H. A. VIGA 25X50, 240 kg/Cm², 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25: M3 $14,041.3011751 H. A. VIGA 25X50, 240 kg/Cm², 40, 4 DE ¾", 2 DE 3/8", 3/8" A .25: PORTICO M3 $14,299.2411752 H. A. VIGA 25X50, 240 kg/Cm², 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25: M3 $14,261.9811753 H. A. VIGA 25X50, 240 kg/Cm², 60, 4 DE ¾", 2 DE 3/8", 3/8" A .25: PORTICO M3 $14,837.8211754 H. A. VIGA 30X60, 240 kg/Cm², 40, 4 DE 1", 2 DE 3/8", 3/8" A .25: M3 $13,815.0911755 H. A. VIGA 30X60, 240 kg/Cm², 40, 4 DE 1", 2 DE 3/8", 3/8" A .25: PORTICO M3 $14,100.9311756 H. A. VIGA 30X60, 240 kg/Cm², 60, 4 DE 1", 2 DE 3/8", 3/8" A .25: M3 $14,059.6411757 H. A. VIGA 30X60, 240 kg/Cm², 60, 4 DE 1", 2 DE 3/8", 3/8" A .25: PORTICO M3 $14,100.9311758 H. A. VIGA 40X80, 240 kg/Cm², 40, 5 DE 1", 2 DE ½", 3/8" A .25: M3 $12,126.75

Page 467: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 89

FEBRERO 2006 RESUMEN DE LOS ANALISISNo. D E S C R I P C I O N $/UNID. UNID. $ /QQ $ /M $ /M2 $ /M311759 H. A. VIGA 40X80, 240 kg/Cm², 40, 5 DE 1", 2 DE ½", 3/8" A .25: PORTICO M3 $12,346.4411760 H. A. VIGA 40X80, 240 kg/Cm², 60, 5 DE 1", 2 DE ½", 3/8" A .25: M3 $12,314.7111761 H. A. VIGA 40X80, 240 kg/Cm², 60, 5 DE 1", 2 DE ½", 3/8" A .25: PORTICO M3 $12,346.4411762 H. A. VIGA 40X80, 240 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25: M3 $12,314.7111763 H. A. VIGA 40X80, 240 kg/Cm², 60, 5 DE 1", 2 DE ½" x 25', 3/8" A .25: PORTICO M3 $12,346.44

11800 HORM. ARMADO VIGAS AMARRE11801 VIGA AMARRE 15x20, 1:2:4, 4 DE 3/8" grado 40, ¼" A 20, LIG.: M3 $14,039.5911802 VIGA AMARRE 15x20, 1:2:4, 4 DE 3/8" grado 40, ¼" A 20 A MANO: M3 $14,257.4711803 VIGA AMARRE 20x20, 1:2:4, 4 DE 3/8", 3/8" A .20 grado 40, LIG.: M3 $13,926.0911804 VIGA AMARRE 20x20, 1:2:4, 4 DE 3/8", 3/8" A .20 grado 40 A MANO: M3 $14,143.97

11900 HORM. ARMADO VUELOS11901 VUELOS .40x.10, 1:2:4, 40, 3/8" A .20 + 2 DE 3/8", LIG. Y WINCHE: M3 $12,095.0611902 VUELOS .40x.10, 1:2:4, 40, 3/8" x 25' A .20 + 2 DE 3/8", LIG. Y WINCHE: M3 $12,095.0611903 VUELOS .40x.10, 1:2:4, 60, 3/8" A .20 + 2 DE 3/8", LIG. Y WINCHE: M3 $12,238.0511904 VUELOS .40x.10, 1:2:4, 60, 3/8" x 25' A .20 + 2 DE 3/8", LIG. Y WINCHE: M3 $12,238.0511905 VUELOS .40x.12, 1:2:4, 40, 3/8" A .20 + 2 DE 3/8", LIG. Y WINCHE: M3 $10,968.7711906 VUELOS .40x.12, 1:2:4, 40, 3/8" x 25' A .20 + 2 DE 3/8", LIG. Y WINCHE: M3 $10,968.7711907 VUELOS .40x.12, 1:2:4, 60, 3/8" A .20 + 2 DE 3/8", LIG. Y WINCHE: M3 $11,087.9711908 VUELOS .40x.12, 1:2:4, 60, 3/8" x 25' A .20 + 2 DE 3/8", LIG. Y WINCHE: M3 $11,087.9711909 VUELOS .40x.10, 180 kg/Cm², 40, 3/8" A .20 + 2 DE 3/8" : M3 $14,298.6111910 VUELOS .40x.10, 180 kg/Cm², 40, 3/8" x 25' A .20 + 2 DE 3/8": M3 $14,298.6111911 VUELOS .40x.10, 180 kg/Cm², 60, 3/8" A .20 + 2 DE 3/8": M3 $14,441.6011912 VUELOS .40x.10, 180 kg/Cm², 60, 3/8" x 25' A .20 + 2 DE 3/8": M3 $14,441.6011913 VUELOS .40x.12, 180 kg/Cm², 40, 3/8" A .20 + 2 DE 3/8": M3 $12,776.5511914 VUELOS .40x.12, 180 kg/Cm², 40, 3/8" x 25' A .20 + 2 DE 3/8", : M3 $12,776.5511915 VUELOS .40x.12, 180 kg/Cm², 60, 3/8" A .20 + 2 DE 3/8", : M3 $12,895.7511916 VUELOS .40x.12, 180 kg/Cm², 60, 3/8" x 25' A .20 + 2 DE 3/8": M3 $12,895.75

12000 HORM. ARMADO ZAP. COLUMNAS (1 CAMADA ACERO)12001 ZAP. COL., 1.2x1.2, 1:3:5, 40, 8 DE ½" A.D., LIG.: M3 $5,013.61

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12002 ZAP. COL., 1.2x1.2, 1:3:5, 40, 8 DE ½" x 25' A.D., LIG.: M3 $5,013.61

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12003 ZAP. COL., 1.2x1.2, 1:3:5, 60, 8 DE ½" A.D., LIG.: M3 $5,147.36

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12004 ZAP. COL., 1.2x1.2, 1:3:5, 60, 8 DE ½" x 25' A.D., LIG.: M3 $5,147.36

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12005 ZAP. COL., 1.2x1.2, 1:3:5, 40, 8 DE ½" A.D., LIG.: M3 $4,320.61

ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"12006 ZAP. COL., 1.2x1.2, 1:3:5, 40, 8 DE ½" x 25' A.D., LIG.: M3 $4,320.61

ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"12007 ZAP. COL., 1.2x1.2, 1:3:5, 60, 8 DE ½" A.D., LIG.: M3 $4,424.64

ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"12008 ZAP. COL., 1.2x1.2, 1:3:5, 60, 8 DE ½" x 25' A.D., LIG.: M3 $4,424.64

ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"12009 ZAP. COL., 1.2x1.2, 140, 40, 8 DE ½" A.D.: M3 $7,564.48

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12010 ZAP. COL., 1.2x1.2, 140, 40, 8 DE ½" x 25' A.D.: M3 $7,564.48

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12011 ZAP. COL., 1.2x1.2, 140, 60, 8 DE ½" A.D.: M3 $7,748.04

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12012 ZAP. COL., 1.2x1.2, 140, 60, 8 DE ½" x 25' A.D.: M3 $7,748.04

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12013 ZAP. COL., 1.2x1.2, 140, 40, 8 DE ½" A.D.: M3 $6,871.48

ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"12014 ZAP. COL., 1.2x1.2, 140, 40, 8 DE ½" x 25' A.D.: M3 $6,871.48

ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"12015 ZAP. COL., 1.2x1.2, 140, 60, 8 DE ½" A.D.: M3 $7,025.32

ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"12016 ZAP. COL., 1.2x1.2, 140, 60, 8 DE ½" x 25' A.D.: M3 $7,025.32

ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"12017 ZAP. COL., 1.2x1.2, 180, 40, 8 DE ½" A.D.: M3 $7,778.52

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12018 ZAP. COL., 1.2x1.2, 180, 40, 8 DE ½" x 25' A.D.: M3 $7,778.52

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12019 ZAP. COL., 1.2x1.2, 180, 60, 8 DE ½" A.D.: M3 $7,912.27

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12020 ZAP. COL., 1.2x1.2, 180, 60, 8 DE ½" x 25' A.D.: M3 $7,912.27

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12021 ZAP. COL., 1.2x1.2, 180, 40, 8 DE ½" A.D.: M3 $7,085.52

ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"12022 ZAP. COL., 1.2x1.2, 180, 40, 8 DE ½" x 25' A.D.: M3 $7,085.52

ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"12023 ZAP. COL., 1.2x1.2, 180, 60, 8 DE ½" A.D.: M3 $7,189.55

ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"12024 ZAP. COL., 1.2x1.2, 180, 60, 8 DE ½" x 25' A.D.: M3 $7,189.55

ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"12025 ZAP. COL., 1.2x1.2, 210 Kg/Cm², 40, 8 DE ½" A.D.: M3 $7,936.58

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12026 ZAP. COL., 1.2x1.2, 210 Kg/Cm², 40, 8 DE ½" x 25' A.D.: M3 $7,936.58

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12027 ZAP. COL., 1.2x1.2, 210 Kg/Cm², 60, 8 DE ½" A.D.: M3 $8,070.33

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12028 ZAP. COL., 1.2x1.2, 210 Kg/Cm², 60, 8 DE ½" x 25' A.D.: M3 $8,070.33

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12029 ZAP. COL., 1.2x1.2, 210 Kg/Cm², 40, 8 DE ½" A.D.: M3 $7,243.58

ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"12030 ZAP. COL., 1.2x1.2, 210 Kg/Cm², 40, 8 DE ½" x 25' A.D.: M3 $7,243.58

ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"12031 ZAP. COL., 1.2x1.2, 210 Kg/Cm², 60, 8 DE ½" A.D.: M3 $7,347.61

ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"12032 ZAP. COL., 1.2x1.2, 210 Kg/Cm², 60, 8 DE ½" x 25' A.D.: M3 $7,347.61

ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"12033 ZAP. COL., 1.2x1.2, 240 Kg/Cm², 40, 8 DE ½" A.D.: M3 $8,198.16

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12034 ZAP. COL., 1.2x1.2, 240 Kg/Cm², 40, 8 DE ½" x 25' A.D.: M3 $8,198.16

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12035 ZAP. COL., 1.2x1.2, 240 Kg/Cm², 60, 8 DE ½" A.D.: M3 $8,331.91

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12036 ZAP. COL., 1.2x1.2, 240 Kg/Cm², 60, 8 DE ½" x 25' A.D.: M3 $8,331.91

ESPESOR = .30 MT. ACERO COL.: 6 DE ¾"12037 ZAP. COL., 1.2x1.2, 240 Kg/Cm², 40, 8 DE ½" A.D.: M3 $7,505.16

ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"12038 ZAP. COL., 1.2x1.2, 240 Kg/Cm², 40, 8 DE ½" x 25' A.D.: M3 $7,505.16

ESPESOR = .40 MT. ACERO COL.: 6 DE ¾"12039 ZAP. COL., 1.2x1.2, 240 Kg/Cm², 60, 8 DE ½" A.D.: M3 $7,609.19

ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"12040 ZAP. COL., 1.2x1.2, 240 Kg/Cm², 60, 8 DE ½" x 25' A.D.: M3 $7,609.19

ESPESOR = .60 MT. ACERO COL.: 6 DE ¾"

12100 HORM. ARMADO ZAP. COLUMNAS (2 CAMADAS ACERO)

Page 468: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 90

FEBRERO 2006 RESUMEN DE LOS ANALISISNo. D E S C R I P C I O N $/UNID. UNID. $ /QQ $ /M $ /M2 $ /M312101 ZAP. COL., 2.15x2.80, 180, 40, 20 DE ½", 17 DE ½" X 20', 2 CAM.: M3 $10,245.29

ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"12102 ZAP. COL., 2.15x2.80, 180, 40, 20 DE ½", 17 DE ½" x 25', 2 CAM.: M3 $10,245.29

ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"12103 ZAP. COL., 2.15x2.80, 180, 60, 20 DE ½", 17 DE ½" X 20', 2 CAM.: M3 $10,484.84

ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"12104 ZAP. COL., 2.15x2.80, 180, 60, 20 DE ½", 17 DE ½" x 25', 2 CAM.: M3 $10,484.84

ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"12105 ZAP. COL., 2.15x2.80, 210 Kg/Cm², 40, 20 DE ½", 17 DE ½" X 20', 2 CAM.: M3 $10,403.35

ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"12106 ZAP. COL., 2.15x2.80, 210 Kg/Cm², 40, 20 DE ½", 17 DE ½" x 25', 2 CAM.: M3 $10,403.35

ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"12107 ZAP. COL., 2.15x2.80, 210 Kg/Cm², 60, 20 DE ½", 17 DE ½" X 20', 2 CAM.: M3 $10,642.90

ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"12108 ZAP. COL., 2.15x2.80, 210 Kg/Cm², 60, 20 DE ½", 17 DE ½" x 25', 2 CAM.: M3 $10,642.90

ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"12109 ZAP. COL., 2.15x2.80, 240 Kg/Cm², 40, 20 DE ½", 17 DE ½" X 20', 2 CAM.: M3 $10,664.93

ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"12110 ZAP. COL., 2.15x2.80, 240 Kg/Cm², 40, 20 DE ½", 17 DE ½" x 25', 2 CAM.: M3 $10,664.93

ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"12111 ZAP. COL., 2.15x2.80, 240 Kg/Cm², 60, 20 DE ½", 17 DE ½" X 20', 2 CAM.: M3 $10,904.48

ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"12112 ZAP. COL., 2.15x2.80, 240 Kg/Cm², 60, 20 DE ½", 17 DE ½" x 25', 2 CAM.: M3 $10,904.48

ESPESOR = .35 MT. ACERO COL.: 18 DE ¾"

12200 HORMIGON ARMADO ZAPATAS DE MUROS12201 ZAP. MURO, 30x20, 1:3:5, 2 DE 3/8", 3/8" A .25 grado 40, LIG.: M3 $4,339.8512202 ZAP. MURO, 45x20, 1:3:5, 3 DE 3/8", 3/8" A .25 grado 40, LIG.: M3 $3,895.5512203 ZAP. MURO, 45x25, 1:3:5, 3 DE 3/8", 3/8" A .25 grado 40, LIG.: M3 $3,526.0212204 ZAP. MURO, 60x25, 1:3:5, 3 DE 3/8", 3/8" A .25 grado 40, LIG.: M3 $3,213.9812205 ZAP. MURO, 20x15, 1:2:4, 2 DE 3/8", 3/8" A .30 grado 40, LIG., para Bordillos: M3 $5,726.7112206 ZAP. MURO, 30x15, 1:2:4, 2 DE 3/8", 3/8" A .30 grado 40, LIG., para Bordillos: M3 $4,646.0012207 ZAP. MURO, 40x15, 1:2:4, 2 DE 3/8", 3/8" A .30 grado 40, LIG., para Bordillos: M3 $4,108.1412208 ZAP. MURO, 30x20, 1:2:4, 2 DE 3/8", 3/8" A .25 grado 40, LIG.: M3 $4,462.8812209 ZAP. MURO, 45x20, 1:2:4, 3 DE 3/8", 3/8" A .25 grado 40, LIG.: M3 $4,018.5812210 ZAP. MURO, 45x25, 1:2:4, 3 DE 3/8", 3/8" A .25 grado 40, LIG.: M3 $3,649.0512211 ZAP. MURO, 60x25, 1:2:4, 3 DE 3/8", 3/8" A .25 grado 40, LIG.: M3 $3,337.0112212 ZAP. MURO, 30x20, 140, 2 DE 3/8", 3/8" A .25 grado 40: M3 $6,890.7212213 ZAP. MURO, 45x20, 140, 3 DE 3/8", 3/8" A .25 grado 40: M3 $6,446.4212214 ZAP. MURO, 45x25, 140, 3 DE 3/8", 3/8" A .25 grado 40: M3 $6,076.8912215 ZAP. MURO, 60x25, 140, 3 DE 3/8", 3/8" A .25 grado 40: M3 $5,764.8512216 ZAP. MURO, 30x20, 180, 2 DE 3/8", 3/8" A .25 grado 40: M3 $7,104.7612217 ZAP. MURO, 45x20, 180, 3 DE 3/8", 3/8" A .25 grado 40: M3 $6,660.4612218 ZAP. MURO, 45x25, 180, 3 DE 3/8", 3/8" A .25 grado 40: M3 $6,290.9312219 ZAP. MURO, 60x25, 180, 3 DE 3/8", 3/8" A .25 grado 40: M3 $5,978.8912220 ZAP. MURO, 45x25, 210 Kg/Cm², 3 DE 3/8", 3/8" A .25 grado 40: M3 $6,448.9912221 ZAP. MURO, 60x25, 210 Kg/Cm², 3 DE 3/8", 3/8" A .25 grado 40: M3 $6,136.9512222 ZAP. MURO, 45x25, 240 Kg/Cm², 3 DE 3/8", 3/8" A .25 grado 40: M3 $6,710.5712223 ZAP. MURO, 60x25, 240 Kg/Cm², 3 DE 3/8", 3/8" A .25 grado 40: M3 $6,398.53

12300 HORMIGONES INDUSTRIALES12301 HORM. 140 Kg/Cm²: M3 $4,446.0112302 HORM. 160 Kg/Cm²: M3 $4,495.8212303 HORM. 180 Kg/Cm²: M3 $4,660.0512304 HORM. 210 Kg/Cm²: M3 $4,818.1112305 HORM. 240 Kg/Cm²: M3 $5,079.6912306 HORM. 250 Kg/Cm²: M3 $5,194.5312307 HORM. 260 Kg/Cm²: M3 $5,334.8912308 HORM. 280 Kg/Cm²: M3 $5,424.2112309 HORM. 300 Kg/Cm²: M3 $5,551.8112310 HORM. 315 Kg/Cm²: M3 $5,877.1912311 HORM. 350 Kg/Cm²: M3 $6,208.9512312 HORM. 400 Kg/Cm²: M3 $6,591.75

12400 HORMIGONES SIMPLES12401 LIGADO Y VACIADO A MANO: M3 $405.6512402 LIGADORA 2 FUNDAS: $425,000.0012403 WINCHE (ELEVADOR): $543,000.0012404 COSTO USO, LIG. P/HORA: $515.15 Hora12405 COSTO USO WINCHE (ELEVADOR) P/HORA: $605.40 Hora12406 LIGADO Y VACIADO,, LIG. 2 FUNDAS: M3 $258.9312407 LIGADO Y VACIADO, LIG. 2 FDA. Y WINCHE: M3 $447.5112408 HORMIGON (1:3:5) A MANO: M3 $2,060.4612409 HORMIGON (1:3:5), LIG.: M3 $1,857.9812410 HORMIGON (1:3:5) LIG. Y WINCHE: M3 $2,118.2212411 HORMIGON (1:2:4) A MANO: M3 $2,176.6712412 HORMIGON (1:2:4), LIG.: M3 $1,978.6012413 HORMIGON (1:2:4) LIG. Y WINCHE: M3 $2,233.18

12500 IMPERMEABILIZANTES12501 AQUAPEL + TRIPLESEAL (IMPERM. ESTRUCTURAL): M3 $149.4512502 SILICOOL: M3 $147.63

12600 INSTALACION ELECTRICA12601 LUZ CENITAL: $599.08 U12602 INTERRUPTOR SENCILLO: $598.09 U12603 INTERRUPTOR DOBLE: $840.08 U12604 INTERRUPTOR TRIPLE: $985.57 U12605 INTERRUPTOR TRES VIAS: $782.72 U12606 INTERRUPTOR CUATRO VIAS: $1,279.91 U12607 INTERRUPTOR PILOTO: $881.84 U12608 TOMACORRIENTE DOBLE 110 V.: $663.46 U12609 TOMACORRIENTE SENCILLO 220 V.: $1,177.93 U12610 SALIDA CALENTADOR: $783.66 U12611 SALIDA TELEFONO: $530.75 U12612 TIMBRE CORRIENTE: $1,187.88 U12613 BOTON DE TIMBRE: $764.51 U12614 PANEL DISTRIBUCION 2 CIRCUITOS: $1,640.06 U12615 PANEL DISTRIBUCION 4 CIRCUITOS: $2,336.27 U12616 PANEL DISTRIBUCION 6 CIRCUITOS: $2,749.63 U12617 PANEL DISTRIBUCION 8 CIRCUITOS: $3,490.94 U12618 PANEL DISTRIBUCION 12 CIRCUITOS: $4,859.42 U12619 PANEL DISTRIBUCION 16 CIRCUITOS: $5,097.60 U12620 PANEL DISTRIBUCION 24 CIRCUITOS: $7,269.41 U

12700 INSTALACION SANITARIA12701 BAÑERA LIVIANA, BLANCA O A COLOR: $14,845.04 U12702 BAÑERA HIERRO FUNDIDO, BLANCA: $21,206.60 U12703 BAÑERA HIERRO FUNDIDO, A COLOR: $21,275.04 U12704 BIDET BLANCO: $8,668.81 U12705 BIDET A COLOR: $8,907.77 U12706 CAMARA INSP., CALICHE, .60X.60X.60 M. INT.: $2,340.28 U12707 CAMARA INSP., ROCA, .60X.60X.60 M. INT.: $2,527.40 U

Page 469: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 91

FEBRERO 2006 RESUMEN DE LOS ANALISISNo. D E S C R I P C I O N $/UNID. UNID. $ /QQ $ /M $ /M2 $ /M312708 CAMARA INSP., TIERRA, .60X.60X.60 M. INT.: $2,376.87 U12709 CAMARA SEPTICA, CALICHE, 1.70X3.40X1.60 M. INT.: $32,977.63 U12710 CAMARA SEPTICA, ROCA, 1.70X3.40X1.60 M. INT.: $38,120.63 U12711 CAMARA SEPTICA, TIERRA, 1.70X3.40X1.60 M. INT.: $31,253.43 U12712 CISTERNA 4,000 GLS., CALICHE, 2.50X3.50X2.00 M. INT.: $70,251.86 U12713 CISTERNA 8,000 GLS., ROCA, 2.50X3.50X2.00 M. INT.: $80,676.86 U12714 CISTERNA 8,000 GLS., TIERRA, 2.50X3.50X2.00 M. INT.: $66,756.86 U12715 DESAGÜE DE PISO 2", INSTALADO (TUB. MATRIZ 4"): $383.77 U12716 DESAGÜE DE PISO 3", INSTALADO (TUB. MATRIZ 4"): $1,410.46 U12717 DESAGÜE DE PISO 4", INSTALADO (TUB. MATRIZ 4"): $1,606.52 U12719 DUCHA: (Agua fría solamente) $1,567.48 U12720 FREG. A. INOX. DOBLE, H.G., MANGUERA: $7,249.87 U12721 FREG. A. INOX. SENCILLO, H.G., MANGUERA: $7,394.76 U12722 INODORO BCO., TAPA: BAÑO SERVICIO $4,222.22 U12723 INODORO, BCO., SIN TAPA: BAÑO SERV. $4,100.42 U12724 INODORO ALARGADO BCO.: $6,285.53 U12725 INODORO ALARGADO A COLOR: $6,770.25 U12726 LAVADERO GRANITO BCO., DOBLE: $4,667.64 U12727 LAVADERO GRANITO BCO., SENCILLO: $3,065.50 U12728 LAVAMANOS 19"x17", BCO.: $6,766.44 U12729 LAVAMANOS 19"x17", COLOR: $7,107.40 U12730 LAVAMANOS OVALADO BCO., EMPOTRAR: $7,498.08 U12731 LAVAMANOS OVALADO COLOR, EMPOTRAR: $7,682.52 U12732 LAVAMANOS PEQUEÑO, BCO.: BAÑO SERV. $2,444.04 U12733 ORINAL ½ FALDA, BCO.: $10,669.11 U12734 ORINAL ½ FALDA, BCO., FLUXOMETRO: $11,780.89 U12735 ORINAL FALDA COMPLETA, BCO.: $18,686.77 U12736 ORINAL FALDA COMPLETA, BCO., FLUXOMETRO: $19,798.55 U12737 ORINAL PEQUEÑO, BCO.: $4,723.16 U12738 TRAMPA GRASA, CALICHE, 1.00X1.00X1.00 M. INT.: $5,832.62 U12739 TRAMPA GRASA, ROCA, 1.00X1.00X1.00 M. INT.: $6,433.17 U12740 TRAMPA GRASA, TIERRA, 1.00X1.00X1.00 M. INT.: $5,630.20 U12741 VERTEDERO O TINA DE GRANITO, GRIS: $2,550.13 U

12800 MALLAS CICLONICAS12801 MALLA CICLONICA DE 6 PIES DE ALTO: M $1,963.22

12900 M O R T E R O S12901 MORTERO 1:3, P/COLOCAR BLOQUES: M3 $1,953.4912902 MEZCLA DE EMPAÑETE: M3 $1,114.2412903 MORTERO 1:4 PARA EMPAÑETE: M3 $2,240.7712904 MORTERO 1:2 IMPERMEABLE P/PULIDO: M3 $2,735.6412905 MEZCLA CAL Y ARENA, P/MORTERO COLOC. PISO: M3 $1,305.4912906 MORTERO 1:10, COLOCAR PISOS: M3 $2,207.59

13000 PINTURAS13001 PINTURA ACRILICA EXTERIOR: M2 $142.6013002 PINTURA ACRILICA INTERIOR: M2 $60.7413003 PINTURA ACRILICA EXTERIOR CON ANDAMIOS: M2 $179.5013004 PINTURA EPOXICA: M2 $185.4513005 PINTURA LACA PARA PUERTAS: M2 $82.9813006 PINTURA LATEX ''ECONOMICA'' O ''PINTEX'': M2 $48.9613007 PINTURA MANTENIMIENTO: M2 $127.7513008 PINTURA MANTENIMIENTO CON ANDAMIOS: M2 $164.65

13100 PISOS13101 ACERA FROTADA Y VIOLINADA: M2 $405.3813102 ADOQUIN CLASICO 10X20X20 CM., GRIS: M2 $1,384.4313103 ADOQUIN CLASICO 10X20X20 CM., ROJO: M2 $2,015.4013104 ADOQUIN CLASICO 10X20X20 CM., QUEMADO: M2 $2,120.6013105 ADOQUIN COLONIAL 5X10X20 CM., GRIS: M2 $1,124.4113106 ADOQUIN COLONIAL 5X10X20 CM., ROJO: M2 $1,245.7013107 ADOQUIN MEDITERRANEO, GRIS: M2 $1,197.5613108 ADOQUIN MEDITERRANEO, ROJO: M2 $1,337.0313109 ADOQUIN MEDITERRANEO, QUEMADO: M2 $1,337.0313110 CERAMICA CRIOLLA TIPO 01: M2 $867.4913111 CERAMICA IMPORTADA TIPO 09: M2 $1,578.2913112 GRANITO BOTICELLI 40x40, BLANCO: M2 $1,600.3413113 GRANITO BOTICELLI 40x40, COLOR: M2 $1,722.4613114 GRANITO PERLATTO ROYAL 40x40: M2 $1,380.5213115 GRANITO 30x30, 1-2-3, BLANCO: M2 $921.4013117 GRANITO 40x40, 1-2-3, BLANCO: M2 $889.7113118 HORMIGON ARMADO 3/8'' A 20, 1:2:4, PISO .10 M. ESP.: M2 $605.1813119 HORMIGON ARMADO 3/8'' A 20, 1:2:4, PISO .12 M. ESP.: M2 $657.8613120 HORMIGON ARMADO 3/8'' A 20, 1:2:4, PISO .15 M. ESP.: M2 $720.7313121 HORMIGON ARMADO 3/8'' A 20, 1:2:4, PISO .20 M. ESP.: M2 $826.4313122 HORMIGON ARMADO 3/8'' A 20, 140 Kg/Cm², PISO .10 M. ESP.: M2 $833.4313123 HORMIGON ARMADO 3/8'' A 20, 140 Kg/Cm², PISO .12 M. ESP.: M2 $923.5213124 HORMIGON ARMADO 3/8'' A 20, 140 Kg/Cm², PISO .15 M. ESP.: M2 $1,057.9613125 HORMIGON ARMADO 3/8'' A 20, 140 Kg/Cm², PISO .20 M. ESP.: M2 $1,282.9313126 HORMIGON ARMADO 3/8'' A 20, 180 Kg/Cm², PISO .10 M. ESP.: M2 $854.8413127 HORMIGON ARMADO 3/8'' A 20, 180 Kg/Cm², PISO .12 M. ESP.: M2 $949.2113128 HORMIGON ARMADO 3/8'' A 20, 180 Kg/Cm², PISO .15 M. ESP.: M2 $1,090.0713129 HORMIGON ARMADO 3/8'' A 20, 180 Kg/Cm², PISO .20 M. ESP.: M2 $1,325.7413130 HORMIGON ARMADO 3/8'' A 20, 210 Kg/Cm², PISO .10 M. ESP.: M2 $870.6413131 HORMIGON ARMADO 3/8'' A 20, 210 Kg/Cm², PISO .12 M. ESP.: M2 $968.1713132 HORMIGON ARMADO 3/8'' A 20, 210 Kg/Cm², PISO .15 M. ESP.: M2 $1,113.7813133 HORMIGON ARMADO 3/8'' A 20, 210 Kg/Cm², PISO .20 M. ESP.: M2 $1,357.3513134 HORMIGON FROTADO, PISO 10 CM.: M2 $388.9813135 HORMIGON FROTADO Y VIOLINADO, PISO 10 CM.: M2 $408.9813136 HORMIGON PULIDO, PISO 10 CM.: M2 $416.5813137 LADRILLO EXAGONAL PEQUEÑA, PISO: M2 $557.3913138 LADRILLO TIPO FERIA PEQUEÑA, PISO: M2 $607.7813139 MOSAICOS 25x25, ROJO: M2 $836.6913140 QUICIO GRANITO BOTICELLI 40x07, COLOR: M $291.3313141 QUICIO GRANITO 30x07, BLANCO: M $174.5113142 QUICIO GRANITO 40x07, BLANCO: M $190.3513143 QUICIO MOSAICOS 25x07, ROJO: M $167.9513144 QUICIO LADRILLO: M $119.5713145 ZABALETA DE PISO: M $39.5113146 ZOCALO GRANITO BOTICELLI 40x07, BLANCO: M $235.8213147 ZOCALO GRANITO BOTICELLI 40x07, COLOR: M $254.1113148 ZOCALO GRANITO PERLATTO ROYAL 40x07: M $201.2913149 ZOCALO P/ESCALONES, PERLATTO ROYAL: M $397.9313150 ZOCALO GRANITO 30x07, BLANCO: M $141.2913151 ZOCALO GRANITO 30x07, GRIS: M $125.0613152 ZOCALO GRANITO 40x07, BLANCO: M $153.1313153 ZOCALO LADRILLOS 28x7: M $87.8213154 ZOCALO MOSAICOS 25x07, ROJO: M $119.43

13200 PORTAJE13201 PUERTA DE PLYWOOD 3'x7': $3,770.96 $1,932.1713202 PUERTA DE PINO PANEL. 3'x7': $5,219.96 $2,674.61

Page 470: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 92

FEBRERO 2006 RESUMEN DE LOS ANALISISNo. D E S C R I P C I O N $/UNID. UNID. $ /QQ $ /M $ /M2 $ /M313203 PUERTA DE CAOBA PANEL. 3'x7': $15,430.94 $7,906.5213204 PUERTA DE CAOBA PANEL. ESP. 3'x7': $18,135.58 $9,292.3313205 PUERTA DE CAOBA, VAIVEN 3'x7': $14,573.10 $7,466.9813206 PUERTA DE CAOBA, FRANCESA: (Ancho = 2.8 m.) $43,092.54 $7,328.52

13300 RELLENOS Y REMOCION CAPA VEGETAL13301 RELLENO ARENA O CASCAJO (A MANO): M3 $690.4513302 RELLENO ARENA O CASCAJO (CON EQUIPO): M3 $753.0513303 RELLENO CALICHE (A MANO): M3 $583.2113304 RELLENO CALICHE (CON EQUIPO): M3 $639.9313305 RELLENO CALICHE Y ARENA O CASCAJO (A MANO): M3 $632.4613306 RELLENO CALICHE Y ARENA O CASCAJO (CON EQUIPO): M3 $689.4813307 RELLENO DE REPOSICION CALICHE SUELTO (A MANO): M3 $138.8113308 RELLENO DE REPOSICION SUELTO (Caliche) (CON EQUIPO): M3 $195.5313309 REMOCION CAPA VEGETAL (A MANO): M3 $257.20

13400 REPLANTEO13401 CHARRANCHA, CASA 10.00x20.00 M.: $6,296.03 $92.59

13500 REVESTIMIENTO EN PAREDES13501 CERAMICA CRIOLLA TIPO 01: M2 $620.9413502 CERAMICA IMPORT. TIPO 09: M2 $1,340.7413503 LADRILLO BISCOCHO 2''x2''x8'': M2 $979.5613504 LADRILLO 2''x4''x8'': M2 $1,082.51

13600 T E C H O S13601 TECHO ASBESTO Y TIJERILLA EN PINO: M2 $0.0013602 TECHO TEJA ASF., FORRADO EN CAOBA (SOBRE DINTEL CORRIDO): M2 $9,030.7013603 TECHO TEJA ASF., FORRADO EN CEDRO (SOBRE DINTEL CORRIDO): M2 $8,546.4513604 TECHO TEJA ASF., FORRADO EN PINO TRAT. (SOBRE DINTEL CORRIDO): M2 $6,673.9313605 TECHO TEJA ASF., FORRADO EN ROBLE BRASILEÑO (SOBRE DINTEL CORRIDO): M2 $7,920.0413606 TECHO TEJA CURVA BARRO, FORRADO EN CAOBA (SOBRE DINTEL CORRIDO): M2 $11,527.3813607 TECHO TEJA CURVA BARRO, FORRADO EN CEDRO (SOBRE DINTEL CORRIDO): M2 $10,920.4613608 TECHO TEJA CURVA BARRO, FORRADO EN PINO TRAT. (SOBRE DINTEL CORRIDO): M2 $8,348.1713609 TECHO TEJA CURVA BARRO, FORRADO EN ROBLE BRASILEÑO (SOBRE DINTEL CORRIDO): M2 $10,028.6913610 TECHO TEJA CURVA BARRO SOBRE FINO DE HORM. IMPERMEABILIZADO: M2 $1,035.6813611 TECHO TEJA CURVA BARRO Y TIJERILLA EN PINO: M2 $1,621.1913612 TECHO ZINC CAL. 26 Y TIJERILLA EN PINO: M2 $1,221.17

13700 TECHOS (TERMINACION)13701 FINO TECHO BERMUDA: M2 $492.4813702 FINO TECHO INCLINADO: M2 $149.7413703 FINO TECHO PLANO: M2 $219.8813704 ZABALETA DE TECHO: M $53.27

13800 VENTANAS13801 VENTANA SALOM. ALUM. NAT. Y VIDRIO CLARO, MANIG. AA: M2 $2,648.7113802 VENTANA SALOM. ALUMINIO BCO., MANIG. AA: M2 $2,750.0613803 VENTANA SALOM. ALUMINIO BRONCE, MANIG. AA: M2 $2,803.6913804 VENTANA SALOM. ALUM. Y VIDRIO, TODO BRONCE,MANIG. AA: M2 $2,818.6813805 VENTANA SALOM. ALUM. NAT. Y VIDRIO CLARO, PALANCA: M2 $1,907.6013806 VENTANA SALOM. ALUMINIO BCO., PALANCA: M2 $2,319.2113807 VENTANA SALOM. ALUM. NAT., VIDRIO BRONCE, PALANCA: M2 $2,198.90

Page 471: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 94

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.

PARTIDA No. I N D I C E PAG.HIPERVINCULO

100 INSUMOS (ITBIS incluido, salvo indicacion)101 ACEROS Y ALAMBRE DULCE: (Agregar ITBIS) 1102 AGREGADOS, BOTES, ETC.: (Víctor Jiménez, Cel. 299-0869) 1103 TINACOS: (Agregar ITBIS) 1104 BALAUSTRES Y PASAMANOS: (Agregar ITBIS) 1105 BAÑOS, FREGADEROS , CALENTADORES ELECT. Y ACCESORIOS: 1106 BARRO, PRODUCTOS: (Agregar ITBIS) 3107 BLOQUES DE CEMENTO: (Agregar ITBIS) (INDUSTRIAS AGUAYO 533-3161) 3108 BOMBAS DE AGUA Y TANQUES DE PRESION : (Agregar ITBIS) 3109 BOMBAS DE AGUA: (Agregar ITBIS) FERRETERIA SANTA CRUZ 4110 CAL, CEMENTOS, ADITIVOS, CURADORES, ENDURECEDORES, SELLADORES: 4111 CERAMICAS: (Agregar ITBIS) 4112 CERRAJERIA: 4113 DIVISA NORTEAMERICANA (US$DOLARES): 4114 EBANISTERIA: (Sixto de los Santos: Cel. 865-6774, Ofic. 594-7304, Res. 595-5030) 4115 ELECTRICIDAD (LAMPARAS Y GLOBOS): 5116 ELECTRICIDAD RESIDENCIAL (MATERIALES): 5117 ELECTRICIDAD ALTA TENSION (MATERIALES): 6118 EQUIPOS DE CONSTRUCCION, COMBUSTIBLES Y LUBRICANTES: 7119 ESCALONES Y MESETAS GRANITO: (Agregar ITBIS) 7120 ESTRUCTURA METALICA Y PUERTA ENROLLABLE: (Agregar ITBIS) 8121 HERRERIA: 8122 HORMIGONES INDUSTRIALES Y VACIADOS: (Agregar ITBIS) 8123 IMPERMEABILIZANTES: 9124 LAVADEROS Y VERTEDEROS DE GRANITO: (Agregar ITBIS) 9125 LLAVES DE PASO, VALVULAS, CHEQUES Y TAPAS CISTERNA: 9126 MADERAS, CLAVOS, ZINC Y OTROS: 9127 MALLAS CICLONICAS Y ACCESORIOS: 10128 MATERIALES INSTALADOS: 10129 PIEDRA EN LAJAS PARA PISOS: 10130 PINTURAS: 10131 PISOS Y ADOQUINES: (Agregar ITBIS) 10132 POZO FILTRANTE: 11133 TUBERIAS Y PIEZAS H.G. (HIERRO GALVANIZADO): 11134 TUBERIAS Y PIEZAS PVC DRENAJE: 12135 TUBERIAS Y PIEZAS PVC PRESION: 12136 VENTANAS Y PUERTAS ALUMINIO: (Agregar ITBIS) (TALLERES ALCE Tel 565-5511) 13

900 RENDIMIENTO DE MATERIALES901 CAL, CEMENTOS, ADITIVOS, CURADORES, ENDURECEDORES, SELLADORES: 15902 CEMENTO PVC (NUMERO DE JUNTAS POR GL.): 15903 CEMENTO PVC (NUMERO DE JUNTAS POR KILO): 15904 CEMENTO PVC (NUMERO DE JUNTAS POR PINTA): 15905 CLAVOS (CANTIDAD x LIBRA): 15906 PISOS Y ADOQUINES: 15907 IMPERMEABILIZANTES: 16908 MATERIALES INSTALADOS: 16909 PINTURAS: 16

1000 MANO DE OBRA1001 MANO DE OBRA (JORNALES DIARIOS): 171002 M.O. ALBAÑILERIA (COLOCACION DE BLOQUES): 171003 M.O. ALBAÑILERIA (EMPAÑETES, TERMINACION PAREDES Y PLAFONES): 171004 M.O. ALBAÑILERIA (TERMINACION TECHOS E IMPERMEABILIZACION): 171005 M.O. ALBAÑILERIA (PISOS Y ZOCALOS): 171006 M.O. ALBAÑILERIA (ESCALONES): 181007 M.O. ALBAÑILERIA (REVESTIMIENTO PAREDES DE BAÑOS): 181008 M.O. ALBAÑILERIA (INSTALACION ACCESORIOS DE BAÑOS): 181009 M.O. ALBAÑILERIA (TRABAJOS EN LADRILLOS): 181010 M.O. ALBAÑILERIA (TRABAJOS EN PIEDRA): 181011 M.O. ALBAÑILERIA (TRABAJOS EN MARMOL): 191012 M.O. ALBAÑILERIA (CONTENES, ACERA, BADENES Y COLECTORES): 191013 M.O. ALBAÑILERIA (LAVADEROS, VERTEDEROS, DESAGÜES, REGISTROS Y TRAMPAS DE GRASA): 191014 M.O. ALBAÑILERIA (LABORES VARIAS): 191015 M.O. ALBAÑILERIA (SUBIR MATERIALES / PLANTA): 191016 M.O. ALBAÑILERIA (COLOC. ADICIONAL / PLANTA): 201017 M.O. CARPINT., COL., TAPAS, CONF. E INST.: 201018 M.O. CARPINT., COL. CUADRADAS O RECTANG., CONFECCION: 201019 M.O. CARPINT., COL. CUADRADAS O RECTANG., INSTALACION: 201020 M.O. CARPINT., COL. CONICAS Y REDONDAS, CONF. E INST. MOLDE: 201021 M.O. CARPINT., DESENCOFRADOS (AREA CONTACTO FORRO-CONCRETO): 201022 M.O. CARPINT., ESTRUCT. VARIAS, INST. (HASTA 4 M. ALTURA): 201023 M.O. CARPINT., LOSAS, CONF. E INST.: 201024 M.O. CARPINT., MUROS, CONF. E INST. MOLDE: 211025 M.O. CARPINT., OTROS, CONF. E INST. MOLDE: 211026 M.O. CARPINT., TRABAJOS DE TERMINACION: 211027 M.O. CARPINT., VIGAS Y DINTELES, CONF. E INST. MOLDE: 211028 M.O. CARPINTERIA A TODO COSTO: 211029 M.O. CARPINTERIA A TODO COSTO: (CARLOS MARTE ENCOFRADOS) 211030 M.O. DEMOLICIONES: 22

Page 472: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 95

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.

PARTIDA No. I N D I C E PAG.HIPERVINCULO

1031 M.O. EBANISTERIA: 221032 M.O. ELECTRICIDAD: 221033 M.O. ELECTRICIDAD (SALIDAS TIPO ECONOMICO EN TUB.): 221034 M.O. ELECTRICIDAD (CONEXIÓN APARATOS): 221035 M.O. EXCAVACIONES Y CORTES CON EQUIPO: 221036 M.O. MALLA CICLONICA (ZABALETAS, TUBOS, MALLA, PALOMETAS Y ALAMBRE DE PUAS): 231037 M.O. PINTURA: 231038 M.O. PLOMERIA (ARRASTRE DOMIC., FUERA C. BAÑO): 231039 M.O. PLOMERIA (AUMENTO POR PLANTA EN EDIFICIOS): 231040 M.O. PLOMERIA (BAJANTE O VENTILACION / PLANTA): 231041 M.O. PLOMERIA (BOMBA AGUA, INST. CIRCUITO COMPLETO): 231042 M.O. PLOMERIA (BOMBA AGUA, SIN EL CIRCUITO): 231043 M.O. PLOMERIA (CALENTADOR DE AGUA EXCLUSIV.): 231044 M.O. PLOMERIA (COL. ABASTECER AGUA, POR PLANTA): 231045 M.O. PLOMERIA (COL. DESAGÜE PLUVIAL, POR PLANTA): 231046 M.O. PLOMERIA (CONEXION AL SEPTICO Y FILTRANTE): 231047 M.O. PLOMERIA (DESAGÜE APARATOS, POR SALIDA): 241048 M.O. PLOMERIA (DESMONTAR APARATOS): 241049 M.O. PLOMERIA (EMPALME A TUB. AGUA EXIST.): 241050 M.O. PLOMERIA (EMPALME A TUB. DRENAJE EXIST.): 241051 M.O. PLOMERIA (INST. LLAVES PASO Y CHORRO): 241052 M.O. PLOMERIA (INST. NEVERAS, BEBEDEROS Y FILTROS): 241053 M.O. PLOMERIA (INST. TRAMPA GRASA Y CAMARA INSP.): 241054 M.O. PLOMERIA (INSTALACION LAVADORAS): 241055 M.O. PLOMERIA (MONTAR BAÑERAS Y DUCHAS): 241056 M.O. PLOMERIA (MONTAR FREGADEROS): 241057 M.O. PLOMERIA (MONTAR INODOROS): 241058 M.O. PLOMERIA (MONTAR LAVAMANOS Y BIDET): 241059 M.O. PLOMERIA (MONTAR ORINALES): 241060 M.O. PLOMERIA (SALIDAS DE AGUA APARATOS SANIT.): 241061 M.O. PLOMERIA (TERM. LAVADEROS Y VERTEDEROS): 251062 M.O. PLOMERIA (TUB. AGUA POTABLE, FUERA C. BAÑO): 251063 M.O. PULIMENTO Y BRILLADO PISOS, TODO COSTO: (Agregar ITBIS) 251064 M.O. VACIADOS: 251065 M.O. VARILLEROS: 251066 M.O. VENTANAS (INSTALACION): (Agregar ITBIS) 251067 M.O. YESO (A TODO COSTO): 25

10000 ANALISIS DE COSTOS10100 A C E R O S 2610200 BORDILLOS 2610300 BLOQUES 2710400 CASETAS DE MATERIALES 2810500 CONTEN (TELFORD) 2910600 DESAGÜES PLUVIALES 2910700 EMPAÑETES 2910800 ESCALONES 3110900 HORM. ARMADO ANTEPECHOS 3111000 HORM. ARMADO COLUMNAS 3211200 HORM. ARMADO COL. AMARRE 4011300 HORM. ARMADO DINTELES 4011400 HORM. ARMADO LOSAS 4211500 HORM. ARMADO MUROS 4311600 HORM. ARMADO RAMPAS ESCALERAS 4611700 HORM. ARMADO VIGAS 4711800 HORM. ARMADO VIGAS AMARRE 5311900 HORM. ARMADO VUELOS 5312000 HORM. ARMADO ZAP. COLUMNAS (1 CAMADA ACERO) 5412100 HORM. ARMADO ZAP. COLUMNAS (2 CAMADAS ACERO) 5712200 HORMIGON ARMADO ZAPATAS DE MUROS 5812300 HORMIGONES INDUSTRIALES 6012400 HORMIGONES SIMPLES 6012500 IMPERMEABILIZANTES 6212600 INSTALACION ELECTRICA 6212700 INSTALACION SANITARIA 6412800 MALLAS CICLONICAS 7312900 M O R T E R O S 7313000 PINTURAS 7413100 PISOS 7413200 PORTAJE 7913300 RELLENOS Y REMOCION CAPA VEGETAL 8013400 REPLANTEO 8113500 REVESTIMIENTO EN PAREDES 8113600 T E C H O S 8113700 TECHOS (TERMINACION) 8413800 VENTANAS 84

10000 RESUMEN DE LOS ANALISIS DE COSTOS:10100 A C E R O S 8610200 BORDILLOS 86

Page 473: 2006 02 Feb Texto

PROPUESTA DEL ARQ. JOSE ALEJ. GARCIA SIMO-M., E-MAIL: [email protected] Pág. 96

FEBRERO 2006 GUIA DE ANALISIS DE COSTOS EDIFICACIONES EN SANTO DOMINGO, REP. DOM.

PARTIDA No. I N D I C E PAG.HIPERVINCULO

10300 BLOQUES 8610400 CASETAS DE MATERIALES 8610500 CONTEN (TELFORD) 8610600 DESAGÜES PLUVIALES 8610700 EMPAÑETES 8610800 ESCALONES 8610900 HORM. ARMADO ANTEPECHOS 8611000 HORM. ARMADO COLUMNAS 8611200 HORM. ARMADO COL. AMARRE 8711300 HORM. ARMADO DINTELES 8711400 HORM. ARMADO LOSAS 8811500 HORM. ARMADO MUROS 8811600 HORM. ARMADO RAMPAS ESCALERAS 8811700 HORM. ARMADO VIGAS 8811800 HORM. ARMADO VIGAS AMARRE 8911900 HORM. ARMADO VUELOS 8912000 HORM. ARMADO ZAP. COLUMNAS (1 CAMADA ACERO) 8912100 HORM. ARMADO ZAP. COLUMNAS (2 CAMADAS ACERO) 9012200 HORMIGON ARMADO ZAPATAS DE MUROS 9012300 HORMIGONES INDUSTRIALES 9112400 HORMIGONES SIMPLES 9112500 IMPERMEABILIZANTES 9112600 INSTALACION ELECTRICA 9112700 INSTALACION SANITARIA 9112800 MALLAS CICLONICAS 9112900 M O R T E R O S 9213000 PINTURAS 9213100 PISOS 9213200 PORTAJE 9213300 RELLENOS Y REMOCION CAPA VEGETAL 9213400 REPLANTEO 9213500 REVESTIMIENTO EN PAREDES 9213600 T E C H O S 9313700 TECHOS (TERMINACION) 9313800 VENTANAS 93