AMPLIACIÓN Y CONSTRUCCIÓN DEL SISTEMA DE ALMACENAMIENTO DE AGUA POTABLE R-4 EN EL DISTRITO DE ISLAY, PROVINCIA DE ISLAY, REGION AREQUIPA PROYECTO : "AMPLIACION Y CONSTRUCCIÓN DEL SISTEMA DE ALMACENAMIENTO DE AGUA POTABLE R-4" COMPONENTE HECHO POR : FORMULA : 05. LINEA DE ADUCCION REVISADO POR : ING. J.CHIRINOS LUGAR : DISTRITO DE ISLAY, PROVINCIA DE ISLAY, DEPARTAMENTO DE AREQUIPA FECHA : JUNIO DEL 2014 LARGO ANCHO ALTO 08.00 LINEA DE ADUCCION 08.01 TRABAJOS PRELIMINARES 08.01.01 LIMPIEZA DE TERRENO MANUAL 1.00 2722.03 1.00 2,722.03 2722.03 M2 08.01.02 TRAZO NIVELACION Y REPLANTEO AL INICIO 1.00 2.72 2.72 2.72 KM 08.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO 1.00 2.72 2.72 2.72 KM 08.01.04 MOVILIZACION DE TUBERIA AREQUIPA - MATARANI 10.00 1.00 10.00 10.00 VJE 08.01.05 ACARREO DE TUBERIA EN OBRA 40.00 1.00 40.00 40.00 VJE 08.02 MOVIMIENTO DE TIERRAS FACTOR 08.02.01 EXCAVACION ZANJAS MANUAL TN P/TUBERIA 4" - 6" AP H<1,25 M. 1.00 2522.03 0.15 378.30 378.30 M 08.02.02 EXCAVACION ZANJAS MANUAL TSR S/EXPL. P/TUBERIA 4" - 6" AP H<1,25 M. 1.00 1562.03 0.75 1,171.52 1171.52 M 08.02.03 EXCAVACION ZANJAS MANUAL TSR S/EXPL. P/TUBERIA 4" - 6" AP H<2,50 M. 1.00 760.00 0.75 570.00 570.00 M 08.02.04 EXCAVACION ZANJAS MANUAL TSR S/EXPL. P/TUBERIA 4" - 6" AP H<3,50 M. 1.00 100.00 0.75 75.00 75.00 M 08.02.05 EXCAVACION ZANJAS MANUAL TSR S/EXPL. P/TUBERIA 4" - 6" AP H<4,50 M. 1.00 100.00 0.75 75.00 75.00 M 08.02.06 EXCAVACION ZANJAS TR C/EXPL. P/TUBERIA 4" - 6" AP H<1,25 M. 1.00 1562.03 0.10 156.20 156.20 M 08.02.07 EXCAVACION ZANJAS TR C/EXPL. P/TUBERIA 4" - 6" AP H<2,50 M. 1.00 760.00 0.10 76.00 76.00 M 08.02.08 EXCAVACION ZANJAS TR C/EXPL. P/TUBERIA 4" - 6" AP H<3,50 M. 1.00 100.00 0.10 10.00 10.00 M 08.02.09 EXCAVACION ZANJAS TR C/EXPL. P/TUBERIA 4" - 6" AP H<4,50 M. 1.00 100.00 0.10 10.00 10.00 M ALTURA H<1,25 1562.03 1,562.03 PROG. 0+100 1.00 20.00 0.746 PROG. 0+120 1.00 20.00 0.456 PROG. 0+140 1.00 20.00 0.758 PROG. 0+160 1.00 20.00 0.833 PROG. 0+180 1.00 20.00 0.133 PROG. 0+220 1.00 20.00 0.189 PROG. 0+240 1.00 20.00 0.185 PROG. 0+280 1.00 20.00 0.084 PROG. 0+300 1.00 20.00 0.558 PROG. 0+320 1.00 20.00 0.859 PROG. 0+340 1.00 20.00 0.892 PROG. 0+360 1.00 20.00 0.715 PROG. 0+380 1.00 20.00 0.642 PROG. 0+400 1.00 20.00 0.651 PROG. 0+420 1.00 20.00 0.917 PROG. 0+440 1.00 20.00 1.177 PROG. 0+460 1.00 20.00 1.021 PROG. 0+480 1.00 20.00 1.051 PROG. 0+500 1.00 20.00 1.230 PROG. 0+520 1.00 20.00 1.072 PROG. 0+540 1.00 20.00 0.659 PROG. 0+560 1.00 20.00 0.600 PROG. 0+580 1.00 20.00 0.909 PROG. 0+600 1.00 20.00 1.097 PROG. 0+620 1.00 20.00 0.856 PROG. 0+640 1.00 20.00 0.292 PROG. 0+660 1.00 20.00 0.134 PROG. 0+680 1.00 20.00 0.463 PROG. 0+700 1.00 20.00 1.130 PROG. 0+880 1.00 20.00 1.116 PROG. 0+940 1.00 20.00 0.616 PROG. 0+980 1.00 20.00 0.476 PROG. 1+000 1.00 20.00 1.130 PROG. 1+020 1.00 20.00 1.255 PROG. 1+040 1.00 20.00 1.102 PROG. 1+060 1.00 20.00 0.947 PROG. 1+180 1.00 20.00 1.070 PROG. 1+220 1.00 20.00 0.474 PROG. 1+400 1.00 20.00 1.141 PROG. 1+420 1.00 20.00 0.210 PROG. 1+440 1.00 20.00 0.549 PROG. 1+500 1.00 20.00 1.183 PROG. 1+560 1.00 20.00 1.141 PROG. 1+580 1.00 20.00 0.987 PROG. 1+600 1.00 20.00 1.166 PROG. 1+620 1.00 20.00 1.287 PROG. 1+640 1.00 20.00 1.246 PROG. 1+660 1.00 20.00 1.254 PROG. 1+720 1.00 20.00 1.283 PROG. 1+740 1.00 20.00 1.300 PROG. 1+760 1.00 20.00 1.288 PROG. 1+780 1.00 20.00 1.227 PROG. 1+800 1.00 20.00 1.126 PROG. 1+820 1.00 20.00 1.025 PROG. 1+840 1.00 20.00 0.947 PROG. 1+860 1.00 20.00 0.951 PROG. 1+880 1.00 20.00 1.018 PROG. 1+900 1.00 20.00 0.917 PROG. 1+920 1.00 20.00 0.622 PROG. 1+940 1.00 20.00 0.316 PROG. 1+960 1.00 20.00 0.431 PROG. 1+980 1.00 20.00 0.967 PROG. 2+000 1.00 20.00 1.227 PROG. 2+020 1.00 20.00 1.166 PROG. 2+040 1.00 20.00 1.128 PROG. 2+060 1.00 20.00 1.118 PROG. 2+080 1.00 20.00 1.083 PROG. 2+100 1.00 20.00 1.061 PROG. 2+120 1.00 20.00 1.136 PROG. 2+140 1.00 20.00 1.216 PROG. 2+440 1.00 20.00 0.416 PROG. 2+540 1.00 20.00 0.794 PROG. 2+560 1.00 20.00 1.195 PROG. 2+580 1.00 20.00 1.063 PROG. 2+600 1.00 20.00 0.589 PROG. 2+620 1.00 20.00 0.554 PROG. 2+640 1.00 20.00 1.099 PROG. 2+720 1.00 20.00 1.281 HOJA DE METRADOS ITEM DESCRIPCION DE LA PARTIDA VECES MEDIDAS PARCIAL TOTAL UND HOJA DE METRADOS Pág. 1 de 4

45.-Red de Agua Potable

Embed Size (px)

DESCRIPTION

metrado general de la red

Citation preview

Page 1: 45.-Red de Agua Potable

AMPLIACIÓN Y CONSTRUCCIÓN DEL SISTEMA DE ALMACENAMI ENTO DE AGUA POTABLE R-4 EN EL DISTRITO DE ISLAY, PROVINCIA DE I SLAY, REGION AREQUIPA

PROYECTO : "AMPLIACION Y CONSTRUCCIÓN DEL SISTEMA DE ALMACENAMIENTO DE AGUA POTABLE R-4"COMPONENTE HECHO POR : FORMULA : 05. LINEA DE ADUCCION REVISADO POR : ING. J.CHIRINOSLUGAR : DISTRITO DE ISLAY, PROVINCIA DE ISLAY, DEPARTAMENTO DE AREQUIPA FECHA : JUNIO DEL 2014

LARGO ANCHO ALTO08.00 LINEA DE ADUCCION

08.01 TRABAJOS PRELIMINARES

08.01.01 LIMPIEZA DE TERRENO MANUAL 1.00 2722.03 1.00 2,722.03 2722.03 M2

08.01.02 TRAZO NIVELACION Y REPLANTEO AL INICIO 1.00 2.72 2.72 2.72 KM

08.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO 1.00 2.72 2.72 2.72 KM

08.01.04 MOVILIZACION DE TUBERIA AREQUIPA - MATARANI 10.00 1.00 10.00 10.00 VJE

08.01.05 ACARREO DE TUBERIA EN OBRA 40.00 1.00 40.00 40.00 VJE

08.02 MOVIMIENTO DE TIERRAS FACTOR

08.02.01 EXCAVACION ZANJAS MANUAL TN P/TUBERIA 4" - 6" AP H<1,25 M. 1.00 2522.03 0.15 378.30 378.30 M

08.02.02 EXCAVACION ZANJAS MANUAL TSR S/EXPL. P/TUBERIA 4" - 6" AP H<1,25 M. 1.00 1562.03 0.75 1,171.52 1171.52 M

08.02.03 EXCAVACION ZANJAS MANUAL TSR S/EXPL. P/TUBERIA 4" - 6" AP H<2,50 M. 1.00 760.00 0.75 570.00 570.00 M

08.02.04 EXCAVACION ZANJAS MANUAL TSR S/EXPL. P/TUBERIA 4" - 6" AP H<3,50 M. 1.00 100.00 0.75 75.00 75.00 M

08.02.05 EXCAVACION ZANJAS MANUAL TSR S/EXPL. P/TUBERIA 4" - 6" AP H<4,50 M. 1.00 100.00 0.75 75.00 75.00 M

08.02.06 EXCAVACION ZANJAS TR C/EXPL. P/TUBERIA 4" - 6" AP H<1,25 M. 1.00 1562.03 0.10 156.20 156.20 M

08.02.07 EXCAVACION ZANJAS TR C/EXPL. P/TUBERIA 4" - 6" AP H<2,50 M. 1.00 760.00 0.10 76.00 76.00 M

08.02.08 EXCAVACION ZANJAS TR C/EXPL. P/TUBERIA 4" - 6" AP H<3,50 M. 1.00 100.00 0.10 10.00 10.00 M

08.02.09 EXCAVACION ZANJAS TR C/EXPL. P/TUBERIA 4" - 6" AP H<4,50 M. 1.00 100.00 0.10 10.00 10.00 M

ALTURA H<1,25 1562.03 1,562.03 PROG. 0+100 1.00 20.00 0.746 PROG. 0+120 1.00 20.00 0.456PROG. 0+140 1.00 20.00 0.758PROG. 0+160 1.00 20.00 0.833PROG. 0+180 1.00 20.00 0.133PROG. 0+220 1.00 20.00 0.189PROG. 0+240 1.00 20.00 0.185PROG. 0+280 1.00 20.00 0.084PROG. 0+300 1.00 20.00 0.558PROG. 0+320 1.00 20.00 0.859PROG. 0+340 1.00 20.00 0.892PROG. 0+360 1.00 20.00 0.715PROG. 0+380 1.00 20.00 0.642PROG. 0+400 1.00 20.00 0.651PROG. 0+420 1.00 20.00 0.917PROG. 0+440 1.00 20.00 1.177PROG. 0+460 1.00 20.00 1.021PROG. 0+480 1.00 20.00 1.051PROG. 0+500 1.00 20.00 1.230PROG. 0+520 1.00 20.00 1.072PROG. 0+540 1.00 20.00 0.659PROG. 0+560 1.00 20.00 0.600PROG. 0+580 1.00 20.00 0.909PROG. 0+600 1.00 20.00 1.097PROG. 0+620 1.00 20.00 0.856PROG. 0+640 1.00 20.00 0.292PROG. 0+660 1.00 20.00 0.134PROG. 0+680 1.00 20.00 0.463PROG. 0+700 1.00 20.00 1.130PROG. 0+880 1.00 20.00 1.116PROG. 0+940 1.00 20.00 0.616PROG. 0+980 1.00 20.00 0.476PROG. 1+000 1.00 20.00 1.130PROG. 1+020 1.00 20.00 1.255PROG. 1+040 1.00 20.00 1.102PROG. 1+060 1.00 20.00 0.947PROG. 1+180 1.00 20.00 1.070PROG. 1+220 1.00 20.00 0.474PROG. 1+400 1.00 20.00 1.141PROG. 1+420 1.00 20.00 0.210PROG. 1+440 1.00 20.00 0.549PROG. 1+500 1.00 20.00 1.183PROG. 1+560 1.00 20.00 1.141PROG. 1+580 1.00 20.00 0.987PROG. 1+600 1.00 20.00 1.166PROG. 1+620 1.00 20.00 1.287PROG. 1+640 1.00 20.00 1.246PROG. 1+660 1.00 20.00 1.254PROG. 1+720 1.00 20.00 1.283PROG. 1+740 1.00 20.00 1.300PROG. 1+760 1.00 20.00 1.288PROG. 1+780 1.00 20.00 1.227PROG. 1+800 1.00 20.00 1.126PROG. 1+820 1.00 20.00 1.025PROG. 1+840 1.00 20.00 0.947PROG. 1+860 1.00 20.00 0.951PROG. 1+880 1.00 20.00 1.018PROG. 1+900 1.00 20.00 0.917PROG. 1+920 1.00 20.00 0.622PROG. 1+940 1.00 20.00 0.316PROG. 1+960 1.00 20.00 0.431PROG. 1+980 1.00 20.00 0.967PROG. 2+000 1.00 20.00 1.227PROG. 2+020 1.00 20.00 1.166PROG. 2+040 1.00 20.00 1.128PROG. 2+060 1.00 20.00 1.118PROG. 2+080 1.00 20.00 1.083PROG. 2+100 1.00 20.00 1.061PROG. 2+120 1.00 20.00 1.136PROG. 2+140 1.00 20.00 1.216PROG. 2+440 1.00 20.00 0.416PROG. 2+540 1.00 20.00 0.794PROG. 2+560 1.00 20.00 1.195PROG. 2+580 1.00 20.00 1.063PROG. 2+600 1.00 20.00 0.589PROG. 2+620 1.00 20.00 0.554PROG. 2+640 1.00 20.00 1.099PROG. 2+720 1.00 20.00 1.281

HOJA DE METRADOS

ITEM DESCRIPCION DE LA PARTIDA VECESMEDIDAS

PARCIAL TOTAL UND

HOJA DE METRADOS Pág. 1 de 4

Page 2: 45.-Red de Agua Potable

AMPLIACIÓN Y CONSTRUCCIÓN DEL SISTEMA DE ALMACENAMI ENTO DE AGUA POTABLE R-4 EN EL DISTRITO DE ISLAY, PROVINCIA DE I SLAY, REGION AREQUIPA

PROYECTO : "AMPLIACION Y CONSTRUCCIÓN DEL SISTEMA DE ALMACENAMIENTO DE AGUA POTABLE R-4"COMPONENTE HECHO POR : FORMULA : 05. LINEA DE ADUCCION REVISADO POR : ING. J.CHIRINOSLUGAR : DISTRITO DE ISLAY, PROVINCIA DE ISLAY, DEPARTAMENTO DE AREQUIPA FECHA : JUNIO DEL 2014

LARGO ANCHO ALTO

HOJA DE METRADOS

ITEM DESCRIPCION DE LA PARTIDA VECESMEDIDAS

PARCIAL TOTAL UND

PROG. 2+722 1.00 2.03 1.223ALTURA H<2,50 760.00 760.00 PROG. 0+020 1.00 20.00 1.404PROG. 0+040 1.00 20.00 1.772PROG. 0+060 1.00 20.00 1.763PROG. 0+080 1.00 20.00 1.331PROG. 0+720 1.00 20.00 1.691PROG. 0+740 1.00 20.00 2.049PROG. 0+840 1.00 20.00 2.250PROG. 0+860 1.00 20.00 1.270PROG. 0+900 1.00 20.00 1.459PROG. 0+920 1.00 20.00 1.312PROG. 1+080 1.00 20.00 1.666PROG. 1+100 1.00 20.00 2.309PROG. 1+120 1.00 20.00 2.196PROG. 1+140 1.00 20.00 2.204PROG. 1+160 1.00 20.00 2.204PROG. 1+240 1.00 20.00 2.484PROG. 1+380 1.00 20.00 2.415PROG. 1+520 1.00 20.00 1.447PROG. 1+540 1.00 20.00 1.421PROG. 1+680 1.00 20.00 1.345PROG. 1+700 1.00 20.00 1.325PROG. 2+160 1.00 20.00 1.395PROG. 2+180 1.00 20.00 1.778PROG. 2+200 1.00 20.00 2.137PROG. 2+220 1.00 20.00 2.326PROG. 2+240 1.00 20.00 2.372PROG. 2+260 1.00 20.00 2.236PROG. 2+280 1.00 20.00 2.006PROG. 2+300 1.00 20.00 1.748PROG. 2+320 1.00 20.00 1.502PROG. 2+340 1.00 20.00 1.332PROG. 2+360 1.00 20.00 1.318PROG. 2+380 1.00 20.00 1.504PROG. 2+400 1.00 20.00 1.618PROG. 2+420 1.00 20.00 1.308PROG. 2+660 1.00 20.00 1.432PROG. 2+680 1.00 20.00 1.575PROG. 2+700 1.00 20.00 1.490ALTURA H<3,50 100.00 100.00 PROG. 0+760 1.00 20.00 2.547PROG. 0+780 1.00 20.00 2.727PROG. 0+800 1.00 20.00 2.669PROG. 0+820 1.00 20.00 2.674PROG. 1+360 1.00 20.00 3.336ALTURA H<4,50 100.00 100.00 PROG. 1+260 1.00 20.00 3.701PROG. 1+280 1.00 20.00 3.758PROG. 1+300 1.00 20.00 4.302PROG. 1+320 1.00 20.00 4.674PROG. 1+340 1.00 20.00 4.133RELLENOS 200.00 200.00 PROG. 0+200 1.00 20.00 -0.178PROG. 0+260 1.00 20.00 -0.118PROG. 0+960 1.00 20.00 -0.081PROG. 1+200 1.00 20.00 -0.175PROG. 1+460 1.00 20.00 -0.103PROG. 1+480 1.00 20.00 -0.145PROG. 2+460 1.00 20.00 -0.568PROG. 2+480 1.00 20.00 -0.982PROG. 2+500 1.00 20.00 -0.791PROG. 2+520 1.00 20.00 -0.084

08.02.10 EXCAVACION ZANJAS EN TSR SIN EXPLOSIVOS 3.00 1.80 1.20 2.15 13.93 13.93 M3

08.02.11 REFINE NIVELACION ZANJA P/TUBERIA HASTA 1,20 M. 1.00 1562.03 1,562.03 1562.03 M

08.02.12 REFINE NIVELACION ZANJA P/TUBERIA HASTA 2,50 M. 1.00 760.00 760.00 760.00 M

08.02.13 REFINE NIVELACION ZANJA P/TUBERIA HASTA 3,50 M. 1.00 100.00 100.00 100.00 M

08.02.14 REFINE NIVELACION ZANJA P/TUBERIA HASTA 4,50 M. 1.00 100.00 100.00 100.00 M

08.02.15 CAMA DE ARENA EN ZANJA P/TUB. 160 - 200 mm. HASTA 1,20 M. E=0,10 m. 1.00 1762.03 1,762.03 1762.03 M

08.02.16 CAMA DE ARENA EN ZANJA P/TUB. 160 - 200 mm. HASTA 2,50 M. E=0,10 m. 1.00 760.00 760.00 760.00 M

08.02.17 CAMA DE ARENA EN ZANJA P/TUB. 160 - 200 mm. HASTA 3,50 M. E=0,10 m. 1.00 100.00 100.00 100.00 M

08.02.18 CAMA DE ARENA EN ZANJA P/TUB. 160 - 200 mm. HASTA 4,50 M. E=0,10 m. 1.00 100.00 100.00 100.00 M

08.02.19 PRIMER RELLENO COMP.ZANJA TSR -P/TUB. 160 - 200 mm. AGUA POTABLE 1.00 2722.03 2,722.03 2722.03 M

08.02.20 RELLENO COMPACTADO C/EQ. ZANJA P/TUB. 160-200MM, DE HASTA 1.20m DE PROF. 1.00 1762.03 1,762.03 1762.03 M

08.02.21 RELLENO COMPACTADO C/EQ. ZANJA P/TUB. 160-200MM, DE HASTA 2,50m DE PROF. 1.00 760.00 760.00 760.00 M

08.02.22 RELLENO COMPACTADO C/EQ. ZANJA P/TUB. 160-200MM, DE HASTA 3,50m DE PROF. 1.00 100.00 100.00 100.00 M

08.02.23 RELLENO COMPACTADO C/EQ. ZANJA P/TUB. 160-200MM, DE HASTA 4,50m DE PROF. 1.00 100.00 100.00 100.00 M

08.02.24 ACARREO: MATERIAL EXCEDENTE 2658.29 M3

CAMARAS CRP 1.30 13.93 18.11 PROG. 0+100 1.30 20.00 0.60 0.746 11.64 PROG. 0+120 1.30 20.00 0.60 0.456 7.11 PROG. 0+140 1.30 20.00 0.60 0.758 11.82 PROG. 0+160 1.30 20.00 0.60 0.833 12.99 PROG. 0+180 1.30 20.00 0.60 0.133 2.07 PROG. 0+220 1.30 20.00 0.60 0.189 2.95 PROG. 0+240 1.30 20.00 0.60 0.185 2.89 PROG. 0+280 1.30 20.00 0.60 0.084 1.31 PROG. 0+300 1.30 20.00 0.60 0.558 8.70 PROG. 0+320 1.30 20.00 0.60 0.859 13.40 PROG. 0+340 1.30 20.00 0.60 0.892 13.92 PROG. 0+360 1.30 20.00 0.60 0.715 11.15 PROG. 0+380 1.30 20.00 0.60 0.642 10.02 PROG. 0+400 1.30 20.00 0.60 0.651 10.16 PROG. 0+420 1.30 20.00 0.60 0.917 14.31 PROG. 0+440 1.30 20.00 0.60 1.177 18.36 PROG. 0+460 1.30 20.00 0.60 1.021 15.93

HOJA DE METRADOS Pág. 2 de 4

Page 3: 45.-Red de Agua Potable

AMPLIACIÓN Y CONSTRUCCIÓN DEL SISTEMA DE ALMACENAMI ENTO DE AGUA POTABLE R-4 EN EL DISTRITO DE ISLAY, PROVINCIA DE I SLAY, REGION AREQUIPA

PROYECTO : "AMPLIACION Y CONSTRUCCIÓN DEL SISTEMA DE ALMACENAMIENTO DE AGUA POTABLE R-4"COMPONENTE HECHO POR : FORMULA : 05. LINEA DE ADUCCION REVISADO POR : ING. J.CHIRINOSLUGAR : DISTRITO DE ISLAY, PROVINCIA DE ISLAY, DEPARTAMENTO DE AREQUIPA FECHA : JUNIO DEL 2014

LARGO ANCHO ALTO

HOJA DE METRADOS

ITEM DESCRIPCION DE LA PARTIDA VECESMEDIDAS

PARCIAL TOTAL UND

PROG. 0+480 1.30 20.00 0.60 1.051 16.40 PROG. 0+500 1.30 20.00 0.60 1.230 19.19 PROG. 0+520 1.30 20.00 0.60 1.072 16.72 PROG. 0+540 1.30 20.00 0.60 0.659 10.28 PROG. 0+560 1.30 20.00 0.60 0.600 9.36 PROG. 0+580 1.30 20.00 0.60 0.909 14.18 PROG. 0+600 1.30 20.00 0.60 1.097 17.11 PROG. 0+620 1.30 20.00 0.60 0.856 13.35 PROG. 0+640 1.30 20.00 0.60 0.292 4.56 PROG. 0+660 1.30 20.00 0.60 0.134 2.09 PROG. 0+680 1.30 20.00 0.60 0.463 7.22 PROG. 0+700 1.30 20.00 0.60 1.130 17.63 PROG. 0+880 1.30 20.00 0.60 1.116 17.41 PROG. 0+940 1.30 20.00 0.60 0.616 9.61 PROG. 0+980 1.30 20.00 0.60 0.476 7.43 PROG. 1+000 1.30 20.00 0.60 1.130 17.63 PROG. 1+020 1.30 20.00 0.60 1.255 19.58 PROG. 1+040 1.30 20.00 0.60 1.102 17.19 PROG. 1+060 1.30 20.00 0.60 0.947 14.77 PROG. 1+180 1.30 20.00 0.60 1.070 16.69 PROG. 1+220 1.30 20.00 0.60 0.474 7.39 PROG. 1+400 1.30 20.00 0.60 1.141 17.80 PROG. 1+420 1.30 20.00 0.60 0.210 3.28 PROG. 1+440 1.30 20.00 0.60 0.549 8.56 PROG. 1+500 1.30 20.00 0.60 1.183 18.45 PROG. 1+560 1.30 20.00 0.60 1.141 17.80 PROG. 1+580 1.30 20.00 0.60 0.987 15.40 PROG. 1+600 1.30 20.00 0.60 1.166 18.19 PROG. 1+620 1.30 20.00 0.60 1.287 20.08 PROG. 1+640 1.30 20.00 0.60 1.246 19.44 PROG. 1+660 1.30 20.00 0.60 1.254 19.56 PROG. 1+720 1.30 20.00 0.60 1.283 20.01 PROG. 1+740 1.30 20.00 0.60 1.300 20.28 PROG. 1+760 1.30 20.00 0.60 1.288 20.09 PROG. 1+780 1.30 20.00 0.60 1.227 19.14 PROG. 1+800 1.30 20.00 0.60 1.126 17.57 PROG. 1+820 1.30 20.00 0.60 1.025 15.99 PROG. 1+840 1.30 20.00 0.60 0.947 14.77 PROG. 1+860 1.30 20.00 0.60 0.951 14.84 PROG. 1+880 1.30 20.00 0.60 1.018 15.88 PROG. 1+900 1.30 20.00 0.60 0.917 14.31 PROG. 1+920 1.30 20.00 0.60 0.622 9.70 PROG. 1+940 1.30 20.00 0.60 0.316 4.93 PROG. 1+960 1.30 20.00 0.60 0.431 6.72 PROG. 1+980 1.30 20.00 0.60 0.967 15.09 PROG. 2+000 1.30 20.00 0.60 1.227 19.14 PROG. 2+020 1.30 20.00 0.60 1.166 18.19 PROG. 2+040 1.30 20.00 0.60 1.128 17.60 PROG. 2+060 1.30 20.00 0.60 1.118 17.44 PROG. 2+080 1.30 20.00 0.60 1.083 16.89 PROG. 2+100 1.30 20.00 0.60 1.061 16.55 PROG. 2+120 1.30 20.00 0.60 1.136 17.72 PROG. 2+140 1.30 20.00 0.60 1.216 18.97 PROG. 2+440 1.30 20.00 0.60 0.416 6.49 PROG. 2+540 1.30 20.00 0.60 0.794 12.39 PROG. 2+560 1.30 20.00 0.60 1.195 18.64 PROG. 2+580 1.30 20.00 0.60 1.063 16.58 PROG. 2+600 1.30 20.00 0.60 0.589 9.19 PROG. 2+620 1.30 20.00 0.60 0.554 8.64 PROG. 2+640 1.30 20.00 0.60 1.099 17.14 PROG. 2+720 1.30 20.00 0.60 1.281 19.98 PROG. 2+722 1.30 2.03 0.60 1.223 1.94 PROG. 0+020 1.30 20.00 0.60 1.404 21.90 PROG. 0+040 1.30 20.00 0.60 1.772 27.64 PROG. 0+060 1.30 20.00 0.60 1.763 27.50 PROG. 0+080 1.30 20.00 0.60 1.331 20.76 PROG. 0+720 1.30 20.00 0.60 1.691 26.38 PROG. 0+740 1.30 20.00 0.60 2.049 31.96 PROG. 0+840 1.30 20.00 0.60 2.250 35.10 PROG. 0+860 1.30 20.00 0.60 1.270 19.81 PROG. 0+900 1.30 20.00 0.60 1.459 22.76 PROG. 0+920 1.30 20.00 0.60 1.312 20.47 PROG. 1+080 1.30 20.00 0.60 1.666 25.99 PROG. 1+100 1.30 20.00 0.60 2.309 36.02 PROG. 1+120 1.30 20.00 0.60 2.196 34.26 PROG. 1+140 1.30 20.00 0.60 2.204 34.38 PROG. 1+160 1.30 20.00 0.60 2.204 34.38 PROG. 1+240 1.30 20.00 0.60 2.484 38.75 PROG. 1+380 1.30 20.00 0.60 2.415 37.67 PROG. 1+520 1.30 20.00 0.60 1.447 22.57 PROG. 1+540 1.30 20.00 0.60 1.421 22.17 PROG. 1+680 1.30 20.00 0.60 1.345 20.98 PROG. 1+700 1.30 20.00 0.60 1.325 20.67 PROG. 2+160 1.30 20.00 0.60 1.395 21.76 PROG. 2+180 1.30 20.00 0.60 1.778 27.74 PROG. 2+200 1.30 20.00 0.60 2.137 33.34 PROG. 2+220 1.30 20.00 0.60 2.326 36.29 PROG. 2+240 1.30 20.00 0.60 2.372 37.00 PROG. 2+260 1.30 20.00 0.60 2.236 34.88 PROG. 2+280 1.30 20.00 0.60 2.006 31.29 PROG. 2+300 1.30 20.00 0.60 1.748 27.27 PROG. 2+320 1.30 20.00 0.60 1.502 23.43 PROG. 2+340 1.30 20.00 0.60 1.332 20.78 PROG. 2+360 1.30 20.00 0.60 1.318 20.56 PROG. 2+380 1.30 20.00 0.60 1.504 23.46 PROG. 2+400 1.30 20.00 0.60 1.618 25.24 PROG. 2+420 1.30 20.00 0.60 1.308 20.40 PROG. 2+660 1.30 20.00 0.60 1.432 22.34 PROG. 2+680 1.30 20.00 0.60 1.575 24.57 PROG. 2+700 1.30 20.00 0.60 1.490 23.24

HOJA DE METRADOS Pág. 3 de 4

Page 4: 45.-Red de Agua Potable

AMPLIACIÓN Y CONSTRUCCIÓN DEL SISTEMA DE ALMACENAMI ENTO DE AGUA POTABLE R-4 EN EL DISTRITO DE ISLAY, PROVINCIA DE I SLAY, REGION AREQUIPA

PROYECTO : "AMPLIACION Y CONSTRUCCIÓN DEL SISTEMA DE ALMACENAMIENTO DE AGUA POTABLE R-4"COMPONENTE HECHO POR : FORMULA : 05. LINEA DE ADUCCION REVISADO POR : ING. J.CHIRINOSLUGAR : DISTRITO DE ISLAY, PROVINCIA DE ISLAY, DEPARTAMENTO DE AREQUIPA FECHA : JUNIO DEL 2014

LARGO ANCHO ALTO

HOJA DE METRADOS

ITEM DESCRIPCION DE LA PARTIDA VECESMEDIDAS

PARCIAL TOTAL UND

PROG. 0+760 1.30 20.00 0.60 2.547 39.73 PROG. 0+780 1.30 20.00 0.60 2.727 42.54 PROG. 0+800 1.30 20.00 0.60 2.669 41.64 PROG. 0+820 1.30 20.00 0.60 2.674 41.71 PROG. 1+360 1.30 20.00 0.60 3.336 52.04 PROG. 1+260 1.30 20.00 0.60 3.701 57.74 PROG. 1+280 1.30 20.00 0.60 3.758 58.62 PROG. 1+300 1.30 20.00 0.60 4.302 67.11 PROG. 1+320 1.30 20.00 0.60 4.674 72.91 PROG. 1+340 1.30 20.00 0.60 4.133 64.47

08.02.25 ELIMINACION MATERIAL CARGUIO MANUAL VOLQUETE 6 m3 V=30 km/h D= 5 km 1.00 2658.29 2,658.29 2658.29 M3

08.03 INSTALACION DE TUBERIA

08.03.01 SUMINISTRO E INSTALACION TUB. PVC. SAP ISO 4422 DN160MM C-15 UF 1.00 2722.03 2,722.03 2722.03 M

08.03.02 PRUEBA A ZANJA TAPADA PARA TUBERIA DE AGUA DN 160 mm. 1.00 2722.03 2,722.03 2722.03 M

08.03.03 DESINFECCION C/EMPLEO DE CISTERNA+EQ.BOMBEO P/LLENADO 1.00 2722.03 2,722.03 2722.03 M

08.04 ACCESORIOS SANITARIOS Y OTROS

08.04.01 CODO HD x22.5° DN 160 mm. 1.00 9.00 9.00 9.00 PZA

08.04.02 CODO HD x45° DN 160 mm. 1.00 4.00 4.00 4.00 PZA

08.04.03 VALVULA DE PURGA HD DN160 mm 1.00 3.00 3.00 3.00 UND

08.04.04 VALVULA DE ALIVIO HD DN 160 mm. 1.00 17.00 17.00 17.00 UND

08.04.05 CAMARA REDUCTORA DE PRESION

08.04.05.01 ACERO DE REFUERZO Fy=4200 Kg/cm2 1.00 1310.76 1,310.76 1310.76 KG.

08.04.05.02 ENCOFRADO Y DESENCOFRADO PARA CAMARAS 51.84 M2

Muros Exteriores 3.00 5.20 1.80 28.08

Muros Interiores 3.00 3.60 1.60 17.28

Muro Central 3.00 1.20 1.20 4.32

Losa de Techo 3.00 1.20 0.60 2.16

08.04.05.03 CONCRETO F´C=210 kg/cm2 EN CAMARAS 7.92 M2

Piso 3.00 1.60 1.20 0.20 1.15

Talón 3.00 1.80 1.20 0.20 1.30

Vacio -3.00 0.80 0.60 0.20 (0.29)

Muros 3.00 1.60 1.00 1.80 8.64

Muro central 3.00 0.80 0.20 1.20 0.58

Vacio -3.00 1.20 0.60 1.60 (3.46)

HOJA DE METRADOS Pág. 4 de 4