Anal is is de Cos to Sunita Rios

  • Upload
    miilusc

  • View
    18

  • Download
    0

Embed Size (px)

Citation preview

Analisis PU 10 2011ANALISIS DE PRECIOS UNITARIOSDESCRIPCIONUNIDADCANTIDADUNITARIOPARCIALSUBTOTALTRABAJOS PRELIMINARESCerco de Madera, h=2.20 m.Rendimiento: 1.00 ml /daUnidad: mlCLAVOS 2"KG.0.94004.123.87MADERA TORNILLO (LARGA)P25.60002.9316.4120.28CAPATAZ (E)HH0.800017.0413.63OPERARIO (E)HH8.000014.37114.96OFICIAL (E)HH8.000012.91103.28PEON (E)HH8.000011.4091.20323.07Concreto para Sobrecimentom30.0231196.334.544.54TOTAL347.89Oficina, Almacn, Caseta de GuardianaRendimiento: 7.00 m2 /daUnidad; m2CLAVOS 2"KG.0.01464.120.06MADERA TORNILLO (LARGA)P21.70002.934.98TRIPLAY LUPUNA 4x8x12 MMPL0.071043.733.10PLANC.CORRUG.SUPER TECHALIT 1.80M.UND0.16007.931.279.41CAPATAZ (E)HH0.114317.041.95OPERARIO (E)HH2.285714.3732.85OFICIAL (E)HH2.285712.9129.51PEON (E)HH4.571411.4052.11116.42HERRAMIENTAS% M.O.5.0000116.42582.10582.10Concreto para Falso Piso e=4"m21.000027.0427.0427.04TOTAL734.97Cartel de obra 3,6 x 7,2 mRendimiento: 1.00 und/daUnidad: undCLAVOS 3"KG.1.50004.126.18PIEDRA GRANDE PARA ZANJAM30.976025.4224.81HORMIGON (PLANTA)M30.976019.7719.30CEMENTO PORTLAND TIPO IBOL3.650014.2952.16LIJA PARA MADERAHJA3.00000.852.55PERNO 5/8" x 10" CON TUERCAKG15.00004.8773.05ARANDELA 5/8"UND15.00000.629.30MADERA TORNILLO (LARGA)P2247.50002.93725.18TRIPLAY LUPUNA 4x8x12 MMPL9.000043.73393.57PINTURA ESMALTE SINTETICO STANDARDGAL1.000026.4826.481332.57CAPATAZ (E)HH2.400017.0440.90OPERARIO (E)HH24.000014.37344.88OFICIAL (E)HH16.000012.91206.56PEON (E)HH8.000011.4091.20683.54HERRAMIENTAS% M.O.20.0000683.54136.71136.71TOTAL2152.81LIMPIEZA DE TERRENOSLimpieza Manual de TerrenoRendimiento: 40.00 m2 /daUnidad: m2OPERARIO (E)HH0.020014.370.29PEON (E)HH0.200011.402.282.57HERRAMIENTAS% M.O.5.00002.570.130.13TOTAL2.70Limpieza de Terreno, con MquinaRendimiento: 600.00 m2 /daUnidad: m2CAPATAZ (E)HH0.001317.040.02PEON (E)HH0.026711.400.300.32TRACTOR SOBRE ORUGAS 100 HPHM0.0133149.111.98HERRAMIENTAS% M.O.3.00000.320.011.99TOTAL2.31TRAZO Y REPLANTEOTrazo y Replanteo de Ejes y NivelesRendimiento: 500.00 m2 /daUnidad: m2CLAVOS 3"KG.0.00504.120.02YESO (20 KG.)BOL0.02506.520.16WINCHAUND0.001030.000.03MADERA TORNILLO (LARGA)P20.02642.930.08ESMALTE SINTET.PINTOR BLANCO Y COLORESGLN0.002065.350.130.42TOPOGRAFO (E)HH0.016013.800.22CAPATAZ (E)HH0.001617.040.03OFICIAL (E)HH0.016012.910.21PEON (E)HH0.048011.400.551.01MIRA TOPOGRAFICAHra0.01600.980.02JALONHra0.03200.750.02TEODOLITOHra0.01609.620.15HERRAMIENTAS% M.O.5.00001.010.050.24TOTAL1.67Colocacin de Plantillas de NivelRendimiento: 80.00 pto/daUnidad: pto.YESO (20 KG.)BOL0.01006.520.070.07TOPOGRAFO (E)HH0.100013.801.38CAPATAZ (E)HH0.100017.041.70OFICIAL (E)HH0.100012.911.29PEON (E)HH0.300011.403.427.79MIRA TOPOGRAFICAHra0.10000.980.10NIVEL TOPOGRAFICOHra0.10007.770.78HERRAMIENTAS% M.O.3.00007.790.231.11TOTAL8.97DEMOLICIONESDEMOLICIONES DE ESTRUCTURA DE CONCRETODemolicin Manual de CimientosRendimiento: 0.30 m3 /daUnidad: m3CAPATAZ (E)HH2.666717.0445.44PEON (E)HH26.666711.40304.00349.44HERRAMIENTAS% M.O.5.0000349.4417.4717.47TOTAL366.91Demolicin Manual de ColumnasRendimiento: 0.25 m3 /daUnidad: m3CAPATAZ (E)HH3.200017.0454.53PEON (E)HH32.000011.40364.80419.33HERRAMIENTAS% M.O.5.0000419.3320.9720.97TOTAL440.30Demolicin de Est. de Concreto Armado, con Martillo NeumticoRendimiento: 4.00 m3 /daUnidad: m3CAPATAZ (E)HH0.200017.043.41OFICIAL (E)HH4.000012.9151.64PEON (E)HH2.000011.4022.80OPERADOR DE EQUIPO LIVIANO (E)HH4.000015.8863.52141.37COMPRESORA NEUMATICA 76 HP 125-175 PCMHM2.000052.45104.90MARTILLO MEUMATICO 21-24 KGHM4.00005.2220.88HERRAMIENTAS% M.O.5.0000141.377.07132.85TOTAL274.22Demolicin de Piso de Concreto, con Martillo NeumticoRendimiento: 100.00 m2 /daUnidad: m2CAPATAZ (E)HH0.080017.041.36OFICIAL (E)HH0.160012.912.07PEON (E)HH0.320011.403.65OPERADOR DE EQUIPO LIVIANO (E)HH0.160015.882.549.62COMPRESORA NEUMATICA 76 HP 125-175 PCMHM0.080052.454.20MARTILLO MEUMATICO 21-24 KGHM0.16005.220.84HERRAMIENTAS% M.O.5.00009.620.485.52TOTAL15.14Demolicin de concreto simple manualRendimiento: 0.60 m3 /daUnidad: m3CAPATAZH-H1.333317.0422.72PEONH-H13.333311.40152.00174.72HERRAMIENTAS% M.O.5.0000174.728.748.74TOTAL183.46Picado de concreto para anclaje columnasRendimiento: 0.40 m3 /daUnidad: m3CAPATAZH-H2.000017.0434.08PEONH-H20.000011.40228.00262.08HERRAMIENTAS% M.O.3.0000262.087.867.86TOTAL269.94DEMOLICIONES DE ALBAILERIADemolicin de Muros de Lad. KK-Soga, ManualRendimiento: 6.00 m2 /daUnidad: m2CAPATAZ (E)HH0.133317.042.27PEON (E)HH1.333311.4015.2017.47HERRAMIENTAS% M.O.3.000017.470.520.52TOTAL17.99Demolicion de Muros de Lad. KK-Cabeza, ManualRendimiento: 4.50 m2 /daUnidad: m2CAPATAZ (E)HH0.177817.043.03PEON (E)HH1.777811.4020.2723.30HERRAMIENTAS% M.O.3.000023.300.700.70TOTAL24.00Demolicin de Muros Ladrillo KK canto, ManualRendimiento: 8.00 m2 /daUnidad: m2CAPATAZH-H0.100017.041.70PEONH-H1.000011.4011.4013.10HERRAMIENTAS% M.O.3.000013.100.390.39TOTAL13.49Demolicin de Muros de Adobe\QuinchaRendimiento: 14.00 m2 /daUnidad: m2CAPATAZH-H0.057117.040.97PEONH-H0.571411.406.517.48HERRAMIENTAS% M.O.3.00007.480.220.22TOTAL7.70DEMOLICIONES DE PISOSDemolicin de Piso de LosetaRendimiento: 12.00 m2 /daUnidad: m2CAPATAZH-H0.066717.041.14PEONH-H0.666711.407.608.74HERRAMIENTAS% M.O.3.00008.740.260.26TOTAL9.00Demolicin de Pisos de MaderaRendimiento: 20.00 m2 /daUnidad: m2CAPATAZH-H0.040017.040.68PEONH-H0.400011.404.565.24HERRAMIENTAS% M.O.3.00005.240.160.16TOTAL5.40Demolicin de piso de parquetRendimiento: 40.00 m2 /daUnidad: m2CAPATAZH-H0.020017.040.34PEONH-H0.200011.402.282.62HERRAMIENTAS% M.O.5.00002.620.130.13TOTAL2.75DESMONTAJESDesmontaje de Puertas de MaderaRendimiento: 16.00 m2 /daUnidad: m2CAPATAZH-H0.050017.040.85OPERARIOH-H0.500014.377.19PEONH-H0.500011.405.7013.74HERRAMIENTAS% M.O.5.000013.740.690.69TOTAL14.43Desmontaje de CalaminasRendimiento: 60.00 m2 /daUnidad: m2CAPATAZH-H0.013317.040.23OPERARIOH-H0.133314.371.92PEONH-H0.133311.401.523.67HERRAMIENTAS% M.O.3.00003.670.110.11TOTAL3.78Retiro de Aparatos SanitariosRendimiento: 10.00 und/daUnidad: undCAPATAZH-H0.080017.041.36OPERARIOH-H0.800014.3711.50PEONH-H0.800011.409.1221.98HERRAMIENTAS% M.O.5.000021.981.101.10TOTAL23.08Desmontaje de Artefactos de IluminacionRendimiento: 8.00 und/daUnidad: undCAPATAZH-H0.100017.041.70OPERARIOH-H1.000014.3714.37PEONH-H2.000011.4022.8038.87HERRAMIENTAS% M.O.3.000038.871.171.17TOTAL40.04Desmontaje de VentanasRendimiento: 40.00 m2 /daUnidad: m2CAPATAZH-H0.020017.040.34OPERARIOH-H0.200014.372.87PEONH-H0.200011.402.285.49HERRAMIENTAS% M.O.3.00005.490.160.16TOTAL5.65MOVIMIENTO DE TIERRASCORTE Y NIVELACION DE TERRENOCorte Superficial Manual, e=0.20mRendimiento: 200.00 m2 /daUnidad: m2CAPATAZ (E)HH0.004017.040.07PEON (E)HH0.040011.400.460.53HERRAMIENTAS% M.O.3.00000.530.020.02TOTAL0.55Corte Superficial Manual, e=0.40mRendimiento: 100.00 m2 /daUnidad: m2CAPATAZ (E)HH0.008017.040.14PEON (E)HH0.080011.400.911.05HERRAMIENTAS% M.O.3.00001.050.030.03TOTAL1.08Corte Superficial con Equipo, e=0.20mRendimiento: 1,000.00 m2 /daUnidad: m2CAPATAZ (E)HH0.000817.040.01PEON (E)HH0.016011.400.180.19MOTONIVELADORA 120 HPHM0.0080149.211.191.19TOTAL1.38Corte Superficial con Equipo, e=0.40mRendimiento: 500.00 m2 /daUnidad: m2CAPATAZ (E)HH0.001617.040.03PEON (E)HH0.032011.400.360.39MOTONIVELADORA 120 HPHM0.0160149.212.392.39TOTAL2.78EXCAVACIONESExcavacion Masiva para Stanos con Cargador FrontalRendimiento: 800.00 m3 /daUnidad: m3CAPATAZ (E)HH0.001017.040.02PEON (E)HH0.020011.400.230.25CAMION VOLQUETE 300 HP x 10 M3HM0.0600218.4313.11CARGADOR F. SOBRE ORUGAS 135 HP 2.2 Y3HM0.0100189.181.89HERRAMIENTAS% M.O.3.00000.250.0115.01TOTAL15.26Excavacin Masiva para Stanos con RetroexcavadoraRendimiento: 450.00 m3 /daUnidad: m3CAPATAZ (E)HH0.001817.040.03PEON (E)HH0.035611.400.410.44CAMION VOLQUETE 300 HP x 10 M3HM0.1067218.4323.31RETROEXCAVADORA S/ORUGAS 110 HP 1.3 Y3HM0.0178185.203.30HERRAMIENTAS% M.O.3.00000.440.0126.62TOTAL27.06Excavacin para cimentacion de calzadura con Retroexc.Rendimiento: 180.00 m3 /daUnidad: m3CAPATAZ (E)HH0.004417.040.07PEON (E)HH0.088911.401.011.08RETROEXCAVADORA S/LLANTAS 58 HP 1.O Y3HM0.0444126.355.61HERRAMIENTAS% M.O.3.00001.080.035.64TOTAL6.72Excavacion Manual de Zanjas h=1.00m Material SueltoRendimiento: 4.00 m3 /daUnidad: m3CAPATAZ (E)HH0.200017.043.41PEON (E)HH2.000011.4022.8026.21HERRAMIENTAS% M.O.3.000026.210.790.79TOTAL27.00Excavacion Manual de Zanjas h=1.40m Material SueltoRendimiento: 3.50 m3 /daUnidad: m3CAPATAZ (E)HH0.228617.043.90PEON (E)HH2.285711.4026.0629.96HERRAMIENTAS% M.O.3.000029.960.900.90TOTAL30.86Excavacion Manual de Zanjas h=1.70m Material SueltoRendimiento: 3.00 m3 /daUnidad: m3CAPATAZ (E)HH0.266717.044.54PEON (E)HH2.666711.4030.4034.94HERRAMIENTAS% M.O.3.000034.941.051.05TOTAL35.99Excavacion de Zanjas h=1.00m Roca FracturadaRendimiento: 24.00 m3 /daUnidad: m3OPERARIOH-H0.333314.374.79CAPATAZ (E)HH0.033317.040.57PEON (E)HH4.000011.4045.60OPERADOR DE EQUIPO LIVIANO (E)HH0.666715.8810.5961.55COMPRESORA NEUMATICA 76 HP 125-175 PCMHM0.333352.4517.48MARTILLO MEUMATICO 21-24 KGHM0.66675.223.48HERRAMIENTAS% M.O.5.000061.553.0824.04TOTAL85.59Excavacion de Zanjas h=1.00m Roca FijaRendimiento: 20.00 m3 /daUnidad: m3OPERARIOH-H0.400014.375.75CAPATAZ (E)HH0.040017.040.68PEON (E)HH4.800011.4054.72OPERADOR DE EQUIPO LIVIANO (E)HH0.800015.8812.7073.85COMPRESORA NEUMATICA 76 HP 125-175 PCMHM0.400052.4520.98MARTILLO MEUMATICO 21-24 KGHM0.80005.224.18HERRAMIENTAS% M.O.5.000073.853.6928.85TOTAL102.70Excavacin Manual de Zapatas h=1.00m Material SueltoRendimiento: 3.50 m3 /daUnidad: m3CAPATAZ (E)HH0.228617.043.90PEON (E)HH2.285711.4026.0629.96HERRAMIENTAS% M.O.5.000029.961.501.50TOTAL31.46Excavacin Manual de Zapatas h=1.40m Material SueltoRendimiento: 3.00 m3 /daUnidad: m3CAPATAZ (E)HH0.266717.044.54PEON (E)HH2.666711.4030.4034.94HERRAMIENTAS% M.O.5.000034.941.751.75TOTAL36.69Excavacin Manual de Zapatas h=1.70m Material SueltoRendimiento: 2.50 m3 /daUnidad: m3CAPATAZ (E)HH0.320017.045.45PEON (E)HH3.200011.4036.4841.93HERRAMIENTAS% M.O.5.000041.932.102.10TOTAL44.03Excavacin de Zapata h=1.00m Roca FracturadaRendimiento: 20.00 m3 /daUnidad: m3CAPATAZ (E)HH0.040017.040.68PEON (E)HH4.800011.4054.72OPERADOR DE EQUIPO LIVIANO (E)HH0.800015.8812.7068.10COMPRESORA NEUMATICA 76 HP 125-175 PCMHM0.400052.4520.98MARTILLO MEUMATICO 21-24 KGHM0.80005.224.18HERRAMIENTAS% M.O.5.000068.103.4128.57TOTAL96.67Excavacion de Zapata h=1.00m Roca FijaRendimiento: 17.00 m3 /daUnidad: m3CAPATAZ (E)HH0.047117.040.80PEON (E)HH5.647111.4064.38OPERADOR DE EQUIPO LIVIANO (E)HH0.941215.8814.9580.13COMPRESORA NEUMATICA 76 HP 125-175 PCMHM0.470652.4524.68MARTILLO MEUMATICO 21-24 KGHM0.94125.224.91HERRAMIENTAS% M.O.5.000080.134.0133.60TOTAL113.73RHELLENO Y COMPACTACIONRelleno Compactado, Mat. Propio Pisn ManualRendimiento: 7.00 m3 /daUnidad: m3AGUAM30.12009.001.081.08CAPATAZ (E)HH0.114317.041.95PEON (E)HH1.142911.4013.0314.98HERRAMIENTAS% M.O.5.000014.980.750.75TOTAL16.81Relleno Compactado, Mat. Propio Compactadora 4.0 HPRendimiento: 18.00 m3 /daUnidad: m3AGUAM30.12009.001.081.08CAPATAZ (E)HH0.044417.040.76PEON (E)HH0.888911.4010.13OPERADOR DE EQUIPO LIVIANO (E)HH0.444415.887.0617.95COMPACTADOR VIB. TIPO PLANCHA 4.0 HPHM0.444418.798.35HERRAMIENTAS% M.O.3.000017.950.548.89TOTAL27.92Relleno Compactado, Mat. Propio Compactadora 5,8 HPRendimiento: 30.00 m3 /daUnidad: m3AGUAM30.12009.001.081.08CAPATAZ (E)HH0.026717.040.45PEON (E)HH0.800011.409.12OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2413.81COMPACTADOR VIB. TIPO PLANCHA 5.8 HPHM0.266720.205.39HERRAMIENTAS% M.O.3.000013.810.415.80TOTAL20.69Relleno Compactado, Mat. Propio Compactadora 7,0 HPRendimiento: 50.00 m3 /daUnidad; m3AGUAM30.12009.001.081.08CAPATAZ (E)HH0.048017.040.82PEON (E)HH0.480011.405.47OPERADOR DE EQUIPO LIVIANO (E)HH0.160015.882.548.83COMPACTADOR VIB. TIPO PLANCHA 7.0 HPHM0.160022.873.66HERRAMIENTAS% M.O.3.00008.830.263.92TOTAL13.83Nivelacion, Refine y Compactacion, Pisn ManualRendimiento: 100.00 m2 /daUnidad: m2AGUAM30.05009.000.45PISON MANUALHM0.08002.000.160.61CAPATAZ (E)HH0.080017.041.36OPERARIO (E)HH0.080014.371.15PEON (E)HH0.080011.400.913.42HERRAMIENTAS% M.O.5.00003.420.170.17TOTAL4.20Nivelacion, Refine y Compactacion, Compactadora 5,8 HPRendimiento: 120.00 m2 /daUnidad: m2AGUAM30.05009.000.450.45CAPATAZ (E)HH0.006717.040.11PEON (E)HH0.066711.400.76OPERADOR DE EQUIPO LIVIANO (E)HH0.066715.881.061.93COMPACTADOR VIB. TIPO PLANCHA 5.8 HPHM0.066720.201.35HERRAMIENTAS% M.O.5.00001.930.101.45TOTAL3.83ELIMINACION DE MATERIAL EXCEDENTEElim. Mat. Manual, Dp=30 m.Rendimiento: 6.00 m3 /daUnidad: m3CAPATAZ (E)HH0.133317.042.27PEON (E)HH1.333311.4015.2017.47HERRAMIENTAS% M.O.5.000017.470.870.87TOTAL18.34Elim. Mat. Carg.135HP / Volq.6 m3, D=05 KmRendimiento: 384.00 m3 /daUnidad: m3CAPATAZ (E)HH0.002117.040.04PEON (E)HH0.041711.400.480.52CAMION VOLQUETE 210 HP x 6 M3HM0.0833151.2112.60CARGADOR F. SOBRE ORUGAS 135 HP 2.2 Y3HM0.0208189.183.93HERRAMIENTAS% M.O.3.00000.520.0216.55TOTAL17.07Elim. Mat.Carg.135HP/Volq. 6m3, D=10 Km.Rendimiento: 240.00 m3 /daUnidad: m3CAPATAZ (E)HH0.003317.040.06PEON (E)HH0.066711.400.760.82CAMION VOLQUETE 300 HP x 10 M3HM0.1000218.4321.84CARGADOR F. SOBRE ORUGAS 135 HP 2.2 Y3HM0.0333189.186.30HERRAMIENTAS% M.O.3.00000.820.0228.16TOTAL28.98Elim.Mat Carg. Manual/Volq.4m3 Dm=5 KmRendimiento: 20.00 m3 /daUnidad: m3CAPATAZH-H0.040017.040.68PEONH-H1.600011.4018.2418.92CAMION VOLQUETE 140 HP x 4 M3HM0.4000123.9549.58HERRAMIENTAS% M.O.3.000018.920.5750.15TOTAL69.07Elim.Mat.Carg.Manual/Volq.6m3 D=5 KmRendimiento: 30.00 m3 /daUnidad: m3CAPATAZH-H0.026717.040.45PEONH-H1.600011.4018.2418.69CAMION VOLQUETE 210 HP x 6 M3HM0.2667151.2140.33HERRAMIENTAS% M.O.5.000018.690.9341.26TOTAL59.95Elim.Mat.Carg.Manual/Volq.6m3 D=10 KmRendimiento: 24.00 m3 /daUnidad: m3CAPATAZH-H0.033317.040.57PEONH-H2.000011.4022.8023.37CAMION VOLQUETE 210 HP x 6 M3HM0.3333151.2150.40HERRAMIENTAS% M.O.5.000023.371.1751.57TOTAL74.94CALZADURASConcreto para Calzaduras Ciclpeo 1:6 (C:H) +30%PGRendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19PIEDRA GRANDE PARA ZANJAM30.420025.4210.68CEMENTO PORTLAND TIPO IBOL3.900014.2955.73GASOLINA 84 OCTANOSGLN0.120010.051.21HORMIGONM30.780022.0017.16AGUAM30.13009.001.17GRASA MULTIPLE EPLB0.00805.580.0486.18CAPATAZH-H0.064017.041.09OPERARIOH-H0.640014.379.20OFICIALH-H0.320012.614.04PEONH-H2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0848.59MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.3.000048.591.469.11TOTAL143.88Concreto para Calzaduras Ciclpeo 1:8 (C:H) +30%PGRendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19PIEDRA GRANDE PARA ZANJAM30.420025.4210.68CEMENTO PORTLAND TIPO IBOL3.700014.2952.87GASOLINA 84 OCTANOSGLN0.250010.052.51HORMIGONM30.780022.0017.16AGUAM30.13009.001.17GRASA MULTIPLE EPLB0.00805.580.0484.62CAPATAZ (E)HH0.064017.041.09OPERARIO (E)HH0.640014.379.20OFICIAL (E)HH0.320012.914.13PEON (E)HH2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0848.68MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.5.000048.682.4310.08TOTAL143.38Concreto para Calzaduras Ciclpeo 1:10 (C:H) +30%PGRendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19PIEDRA GRANDE PARA ZANJAM30.420025.4210.68CEMENTO PORTLAND TIPO IBOL2.900014.2941.44GASOLINA 84 OCTANOSGLN0.250010.052.51HORMIGONM30.890022.0019.58AGUAM30.13009.001.17GRASA MULTIPLE EPLB0.00805.580.0475.61CAPATAZH-H0.064017.041.09OPERARIOH-H0.640014.379.20OFICIALH-H0.320012.614.04PEONH-H2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0848.59MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.102423.922.45HERRAMIENTAS% M.O.5.000048.592.434.88TOTAL129.08Encofrado para Calzaduras NormalRendimiento: 28.00 m2 /daUnidad: m2CLAVOS 2"KG.0.20004.120.82CLAVOS 4"KG.0.20004.120.82MADERA TORNILLO (LARGA)P22.50002.937.33TRIPLAY LUPUNA 4x8x19 MMPL0.041069.502.8511.82CAPATAZ (E)HH0.028617.040.49OPERARIO (E)HH0.285714.374.11OFICIAL (E)HH0.571412.917.38PEON (E)HH0.571411.406.5118.49HERRAMIENTAS% M.O.3.000018.490.550.55TOTAL30.86FALSA ZAPATAConcreto para Falsa Zapata Ciclpeo 1:6 +30% PGRendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19PIEDRA GRANDE PARA ZANJAM30.520025.4213.22CEMENTO PORTLAND TIPO IBOL5.000014.2971.45GASOLINA 84 OCTANOSGLN0.120010.051.21HORMIGON (PLANTA)M31.300022.0028.60AGUAM30.16209.001.46GRASA MULTIPLE EPLB0.00805.580.04116.17CAPATAZ (E)HH0.064017.041.09OPERARIO (E)HH0.640014.379.20OFICIAL (E)HH0.320012.914.13PEON (E)HH2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0848.68MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.3.000048.681.469.11TOTAL173.96CONCRETO SIMPLESOLADOSConcreto para Solados, e=0.10 m. C:H, 1:12Rendimiento: 60.00 m2 /daUnidad: m2ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19CEMENTO PORTLAND TIPO IBOL0.360014.295.14GASOLINA 84 OCTANOSGLN0.240010.052.41HORMIGON (PLANTA)M30.123022.002.71AGUAM30.01209.000.1110.56CAPATAZ (E)HH0.013317.040.23OPERARIO (E)HH0.266714.373.83PEON (E)HH0.800011.409.12OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1215.30MEZCLADORA DE CONCRETO /TAMBOR 7 P3HM0.133314.351.91HERRAMIENTAS% M.O.5.000015.300.772.68TOTAL28.54Concreto para Solados, e=0.15 m. C:H, 1:12Rendimiento: 40.00 m2 /daUnidad: m2ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19CEMENTO PORTLAND TIPO IBOL0.540014.297.72GASOLINA 84 OCTANOSGLN0.240010.052.41HORMIGON (PLANTA)M30.184522.004.06AGUAM30.01809.000.1614.54CAPATAZ (E)HH0.020017.040.34OPERARIO (E)HH0.400014.375.75PEON (E)HH1.200011.4013.68OPERADOR DE EQUIPO LIVIANO (E)HH0.200015.883.1822.95MEZCLADORA DE CONCRETO /TAMBOR 7 P3HM0.200014.352.87HERRAMIENTAS% M.O.5.000022.951.154.02TOTAL41.51Concreto para Solados, e=2". C:H, 1:12Rendimiento: 100.00 m2 /daUnidad: m2ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.001047.910.05CEMENTO PORTLAND TIPO IBOL0.151514.292.16GASOLINA 84 OCTANOSGLN0.030010.050.30HORMIGON (PLANTA)M30.065022.001.43AGUAM30.00819.000.07GRASA MULTIPLE EPLB0.00205.580.014.02OFICIALH-H0.080012.611.01CAPATAZ (E)HH0.016017.040.27OPERARIO (E)HH0.160014.372.30PEON (E)HH0.640011.407.30OPERADOR DE EQUIPO LIVIANO (E)HH0.080015.881.2712.15MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.080023.921.91HERRAMIENTAS% M.O.5.000012.150.612.52TOTAL18.69Concreto para Solados, e=2". C:H, 1:10Rendimiento: 100.00 m2 /daUnidad: m2ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.001047.910.05CEMENTO PORTLAND TIPO IBOL0.190014.292.72GASOLINA 84 OCTANOSGLN0.030010.050.30HORMIGON (PLANTA)M30.065022.001.43AGUAM30.00819.000.07GRASA MULTIPLE EPLB0.00205.580.014.58OFICIALH-H0.080012.611.01CAPATAZ (E)HH0.016017.040.27OPERARIO (E)HH0.160014.372.30PEON (E)HH0.640011.407.30OPERADOR DE EQUIPO LIVIANO (E)HH0.080015.881.2712.15MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.080023.921.91HERRAMIENTAS% M.O.5.000012.150.612.52TOTAL19.25CIMIENTOS CORRIDOSConcreto para Cimientos Ciclpeo 1:6+30% PGRendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19PIEDRA GRANDE PARA ZANJAM30.476025.4212.10CEMENTO PORTLAND TIPO IBOL4.290014.2961.30GASOLINA 84 OCTANOSGLN0.240010.052.41HORMIGONM30.729022.0016.04AGUAM30.14609.001.3193.35CAPATAZ (E)HH0.032017.040.55OPERARIO (E)HH0.640014.379.20OFICIAL (E)HH0.320012.914.13PEON (E)HH2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0848.14MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.3.000048.141.449.09TOTAL150.58Concreto para Cimientos Ciclpeo 1:8+25% PGRendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19PIEDRA GRANDE PARA ZANJAM30.476025.4212.10CEMENTO PORTLAND TIPO IBOL3.476014.2949.67GASOLINA 84 OCTANOSGLN0.240010.052.41HORMIGONM30.787022.0017.31AGUAM30.11809.001.0682.74CAPATAZ (E)HH0.032017.040.55OPERARIO (E)HH0.640014.379.20OFICIAL (E)HH0.320012.914.13PEON (E)HH2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0848.14MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.3.000048.141.449.09TOTAL139.97Concreto para Cimientos Ciclpeo 1:10+30% PGRendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19PIEDRA GRANDE PARA ZANJAM30.480025.4212.20CEMENTO PORTLAND TIPO IBOL2.900014.2941.44GASOLINA 84 OCTANOSGLN0.240010.052.41HORMIGONM30.830022.0018.26AGUAM30.10009.000.9075.40CAPATAZ (E)HH0.032017.040.55OPERARIO (E)HH0.640014.379.20OFICIAL (E)HH0.320012.914.13PEON (E)HH2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0848.14MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.3.000048.141.449.09TOTAL132.63SOBRECIMIENTOSConcreto para Sobrecimento Ciclpeo 1:6+25% PMRendimiento: 12.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19HORMIGON (PLANTA)M30.380019.777.51CEMENTO PORTLAND TIPO IBOL4.500014.2964.31GASOLINA 84 OCTANOSGLN0.250010.052.51PIEDRA MEDIANAm30.380026.279.98HORMIGONM30.900022.0019.80AGUAM30.16209.001.46GRASA MULTIPLE EPLB0.01675.580.09105.85CAPATAZ (E)HH0.133317.042.27OPERARIO (E)HH1.333314.3719.16OFICIAL (E)HH0.666712.918.61PEON (E)HH5.333311.4060.80OPERADOR DE EQUIPO LIVIANO (E)HH0.666715.8810.59101.43MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.666723.9215.95HERRAMIENTAS% M.O.3.0000101.433.0418.99TOTAL226.27Concreto para Sobrecimento Ciclpeo 1:8+25% PMRendimiento: 12.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19HORMIGON (PLANTA)M30.380019.777.51CEMENTO PORTLAND TIPO IBOL3.300014.2947.16GASOLINA 84 OCTANOSGLN0.240010.052.41HORMIGONM30.900022.0019.80AGUAM30.16209.001.4678.53CAPATAZ (E)HH0.066717.041.14OPERARIO (E)HH1.333314.3719.16OFICIAL (E)HH0.666712.918.61PEON (E)HH5.333311.4060.80OPERADOR DE EQUIPO LIVIANO (E)HH0.666715.8810.59100.30MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.666723.9215.95HERRAMIENTAS% M.O.3.0000100.303.0118.96TOTAL197.79Encofrado y Desencofrado Normal para SobrecimientoRendimiento: 16.00 m2 /daUnidad: m2CLAVOS 2"KG0.13004.120.54CLAVOS 3"KG0.26004.121.07MADERA TORNILLO (LARGA)P23.35002.939.8211.43CAPATAZ (E)HH0.050017.040.85OPERARIO (E)HH0.500014.377.19OFICIAL (E)HH0.500012.916.4614.50HERRAMIENTAS% M.O.3.000014.500.440.44Desencofrado de Sobrecimientom21.00005.955.955.95TOTAL32.32GRADAS Y RAMPASConcreto 1:10(C:H) Gradas y RampasRendimiento: 15.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.006747.910.32CEMENTO PORTLAND TIPO IBOL3.800014.2954.30GASOLINA 84 OCTANOSGLN0.200010.052.01HORMIGONM31.300022.0028.60AGUAM30.16209.001.46GRASA MULTIPLE EPLB0.01335.580.0786.76CAPATAZH-H0.106717.041.82OPERARIOH-H1.066714.3715.33OFICIALH-H0.533312.616.72PEONH-H4.266711.4048.64OPERADOR DE EQUIPO LIVIANO (E)HH0.533315.888.4780.98MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.284323.926.80HERRAMIENTAS% M.O.5.000080.984.0510.85TOTAL178.59Concreto f'c=140 Kg/cm2Rendimiento: 15.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.006747.910.32ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL7.000014.29100.03GASOLINA 84 OCTANOSGLN0.200010.052.01AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.01335.580.07147.07CAPATAZH-H0.106717.041.82OPERARIOH-H1.066714.3715.33OFICIALH-H0.533312.616.72PEONH-H4.266711.4048.64OPERADOR DE EQUIPO LIVIANO (E)HH1.066715.8816.9489.45VIBRADOR PARA CONCRETO 4 HP x 2.40"HM0.53334.892.61MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.533323.9212.76HERRAMIENTAS% M.O.5.000089.454.4719.84TOTAL256.36Concreto f'c=175 Kg/cm2Rendimiento: 15.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.006747.910.32ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL8.400014.29120.04GASOLINA 84 OCTANOSGLN0.200010.052.01AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.01335.580.07167.08CAPATAZH-H0.106717.041.82OPERARIOH-H1.066714.3715.33OFICIALH-H0.533312.616.72PEONH-H4.266711.4048.64OPERADOR DE EQUIPO LIVIANO (E)HH1.066715.8816.9489.45VIBRADOR PARA CONCRETO 4 HP x 2.40"HM0.53334.892.61MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.533323.9212.76HERRAMIENTAS% M.O.5.000089.454.4719.84TOTAL276.37Encofrado y Desencofrado Gradas y RampasRendimiento: 6.00 m2 /daUnidad: m2CLAVOS 2"KG.0.20004.120.82ALAMBRE NEGRO N 8KG.0.10004.120.41MADERA TORNILLO (LARGA)P22.12002.936.217.44CAPATAZH-H0.133317.042.27OPERARIOH-H1.333314.3719.16OFICIALH-H1.333312.6116.8138.24HERRAMIENTAS% M.O.5.000038.241.911.91TOTAL47.59FALSO PISOConcreto para Falso Piso e=3" Mezcla 1:6 C:HRendimiento: 125.00 m2 /daUnidad: m2ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.000847.910.04CEMENTO PORTLAND TIPO IBOL0.471014.296.73GASOLINA 84 OCTANOSGLN0.024010.050.24HORMIGONM30.097522.002.15AGUAM30.01229.000.11REGLA DE MADERAp20.06005.470.33GRASA MULTIPLE EPLB0.00165.580.019.61CAPATAZ (E)HH0.012817.040.22OPERARIO (E)HH0.128014.371.84OFICIAL (E)HH0.064012.910.83PEON (E)HH0.384011.404.38OPERADOR DE EQUIPO LIVIANO (E)HH0.064015.881.028.29MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.064023.921.53HERRAMIENTAS% M.O.5.00008.290.411.94TOTAL19.84Concreto para Falso Piso e=3" Mezcla 1:8 C:HRendimiento: 125.00 m2 /daUnidad: m2ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.000847.910.04CEMENTO PORTLAND TIPO IBOL0.365314.295.22GASOLINA 84 OCTANOSGLN0.024010.050.24HORMIGONM30.097522.002.15AGUAM30.01229.000.11REGLA DE MADERAp20.06005.470.33GRASA MULTIPLE EPLB0.00165.580.018.10CAPATAZ (E)HH0.012817.040.22OPERARIO (E)HH0.128014.371.84OFICIAL (E)HH0.064012.910.83PEON (E)HH0.384011.404.38OPERADOR DE EQUIPO LIVIANO (E)HH0.064015.881.028.29MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.064023.921.53HERRAMIENTAS% M.O.5.00008.290.411.94TOTAL18.33Concreto para Falso Piso e=4" Mezcla 1:6 C:HRendimiento: 110.00 m2 /daUnidad: m2ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.000947.910.04CEMENTO PORTLAND TIPO IBOL0.628014.298.97GASOLINA 84 OCTANOSGLN0.027310.050.27HORMIGONM30.130022.002.86AGUAM30.01629.000.1512.29CAPATAZ (E)HH0.014517.040.25OPERARIO (E)HH0.145514.372.09OFICIAL (E)HH0.072712.910.94PEON (E)HH0.436411.404.97OPERADOR DE EQUIPO LIVIANO (E)HH0.072715.881.159.40MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.072723.921.74HERRAMIENTAS% M.O.5.00009.400.472.21TOTAL23.90Concreto para Falso Piso e=4" Mezcla 1:8 C:HRendimiento: 110.00 m2 /daUnidad; m2ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19CEMENTO PORTLAND TIPO IBOL0.483014.296.90GASOLINA 84 OCTANOSGLN0.027310.050.27HORMIGONM30.145022.003.19AGUAM30.01609.000.14REGLA DE MADERAp20.06005.470.33GRASA MULTIPLE EPLB0.00185.580.0111.03CAPATAZ (E)HH0.014517.040.25OPERARIO (E)HH0.145514.372.09OFICIAL (E)HH0.072712.910.94PEON (E)HH0.436411.404.97OPERADOR DE EQUIPO LIVIANO (E)HH0.072715.881.159.40MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.072723.921.74HERRAMIENTAS% M.O.5.00009.400.472.21TOTAL22.64CONCRETO ARMADOHABILITACION Y COLOCACION DE ARMADURAHabilitacin y colocacin de Armadura Rend. 200 kg/daRendimiento: 200.00 kg /daUnidad: kgALAMBRE NEGRO N 16KG.0.02004.120.08ACERO CORRUGADO 3/4" SIDER PERUKG1.05002.852.99DOBLADURAHM0.01003.480.033.10CAPATAZ (E)HH0.004017.040.07OPERARIO (E)HH0.040014.370.57OFICIAL (E)HH0.040012.910.521.16CIZALLAS PARA CORTAR FIERRO DE 30"UND0.00044.90HERRAMIENTAS% M.O.5.00001.160.060.06TOTAL4.32Habilitacin y colocacin de Armadura Rend. 250 kg/daRendimiento: 250.00 kg /daUnidad: kGALAMBRE NEGRO N 16KG.0.02004.120.08ACERO CORRUGADO 3/4" SIDER PERUKG1.05002.852.99DOBLADURAHM0.01003.480.033.10CAPATAZ (E)HH0.003217.040.05OPERARIO (E)HH0.032014.370.46OFICIAL (E)HH0.032012.910.410.92CIZALLAS PARA CORTAR FIERRO DE 30"UND0.00034.90HERRAMIENTAS% M.O.5.00000.920.050.05TOTAL4.07Habilitacin y colocacin de Armadura Rend. 300 kg/daRendimiento: 300.00 kg /daUnidad: kgALAMBRE NEGRO N 16KG.0.02004.120.08ACERO CORRUGADO 3/4" SIDER PERUKG1.05002.852.99DOBLADURAHM0.01003.480.033.10CAPATAZ (E)HH0.002717.040.05OPERARIO (E)HH0.026714.370.38OFICIAL (E)HH0.026712.910.340.77CIZALLAS PARA CORTAR FIERRO DE 30"UND0.00034.90HERRAMIENTAS% M.O.5.00000.770.040.04TOTAL3.91Habilitacin y colocacin de Armadura Rend. 350 kg/daRendimiento: 350.00 kg /daUnidad: kgALAMBRE NEGRO N 16KG.0.02004.120.08ACERO CORRUGADO 3/4" SIDER PERUKG1.05002.852.99DOBLADURAHM0.01003.480.033.10CAPATAZ (E)HH0.002317.040.04OPERARIO (E)HH0.022914.370.33OFICIAL (E)HH0.022912.910.300.67CIZALLAS PARA CORTAR FIERRO DE 30"UND0.00024.90HERRAMIENTAS% M.O.5.00000.670.030.03TOTAL3.80CIMIENTOS REFORZADOSConcreto para Cimiento Reforzado fc=140 kg/cm2Rendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL7.000014.29100.03GASOLINA 84 OCTANOSGLN0.120010.051.21AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.00805.580.04146.11CAPATAZ (E)HH0.064017.041.09OPERARIO (E)HH0.640014.379.20OFICIAL (E)HH0.320012.914.13PEON (E)HH2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.640015.8810.1653.76VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.5.000053.762.6911.85TOTAL211.72Concreto para Cimiento Reforzado fc=175 kg/cm2Rendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL8.400014.29120.04GASOLINA 84 OCTANOSGLN0.300010.053.02AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.00805.580.04167.93CAPATAZ (E)HH0.064017.041.09OPERARIO (E)HH0.640014.379.20OFICIAL (E)HH0.320012.914.13PEON (E)HH2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.640015.8810.1653.76VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.5.000053.762.6911.85TOTAL233.54Concreto para Cimiento Reforzado fc=210 kg/cm2Rendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL9.200014.29131.47GASOLINA 84 OCTANOSGLN0.120010.051.21AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.00805.580.04177.55CAPATAZ (E)HH0.064017.041.09OPERARIO (E)HH0.640014.379.20OFICIAL (E)HH0.320012.914.13PEON (E)HH2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.640015.8810.1653.76VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.5.000053.762.6911.85TOTAL243.16Encofrado/ Desencofrado Normal, Cimiento ReforzadoRendimiento: 20.00 m2 /daUnidad: m2CLAVOS 3"KG.0.20004.120.82CLAVOS 4"KG.0.10004.120.41MADERA TORNILLO (LARGA)P22.50002.937.338.56CAPATAZ (E)HH0.040017.040.68OPERARIO (E)HH0.400014.375.75OFICIAL (E)HH0.400012.915.1611.59HERRAMIENTAS% M.O.3.000011.590.350.35Desencofrado de Cimientom21.00009.209.209.20TOTAL29.70ZAPATASConcreto para Zapatas fc=140 kg/cm2Rendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL7.000014.29100.03GASOLINA 84 OCTANOSGLN0.300010.053.02AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.00805.580.04147.92CAPATAZ (E)HH0.064017.041.09OPERARIO (E)HH0.640014.379.20OFICIAL (E)HH0.640012.918.26PEON (E)HH2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.640015.8810.1657.89VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.3.000057.891.7410.90TOTAL216.71Concreto para Zapatas fc=175 kg/cm2Rendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL8.400014.29120.04GASOLINA 84 OCTANOSGLN0.300010.053.02AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.00805.580.04167.93CAPATAZ (E)HH0.064017.041.09OPERARIO (E)HH0.640014.379.20OFICIAL (E)HH0.640012.918.26PEON (E)HH2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.640015.8810.1657.89VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.3.000057.891.7410.90TOTAL236.72Concreto para Zapatas fc=210 kg/cm2Rendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL9.200014.29131.47GASOLINA 84 OCTANOSGLN0.300010.053.02AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.00805.580.04179.36CAPATAZ (E)HH0.064017.041.09OPERARIO (E)HH0.640014.379.20OFICIAL (E)HH0.640012.918.26PEON (E)HH2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.640015.8810.1657.89VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.3.000057.891.7410.90TOTAL248.15Concreto para Zapatas fc=245 kg/cm2Rendimiento: 25.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL11.500014.29164.34GASOLINA 84 OCTANOSGLN0.300010.053.02AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.00805.580.04212.23CAPATAZ (E)HH0.064017.041.09OPERARIO (E)HH0.640014.379.20OFICIAL (E)HH0.640012.918.26PEON (E)HH2.560011.4029.18OPERADOR DE EQUIPO LIVIANO (E)HH0.640015.8810.1657.89VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.320023.927.65HERRAMIENTAS% M.O.3.000057.891.7410.90TOTAL281.02Encofrado/ Desencofrado Normal, ZapataRendimiento: 14.00 m2 /daUnidad: m2CLAVOS 3"KG0.15004.120.62MADERA TORNILLO (LARGA)P24.03002.9311.8112.43CAPATAZ (E)HH0.057117.040.97OPERARIO (E)HH0.571414.378.21OFICIAL (E)HH0.571412.917.3816.56HERRAMIENTAS% M.O.3.000016.560.500.50Desencofrado de Zapatam21.00009.209.209.20TOTAL38.69VIGAS DE CIMENTACIONConcreto para Vigas de Cimentacin fc=140 kg/cm2Rendimiento: 20.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL7.000014.29100.03GASOLINA 84 OCTANOSGLN0.300010.053.02AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.01005.580.06147.94CAPATAZ (E)HH0.080017.041.36OPERARIO (E)HH0.800014.3711.50OFICIAL (E)HH0.800012.9110.33PEON (E)HH3.200011.4036.48OPERADOR DE EQUIPO LIVIANO (E)HH0.800015.8812.7072.37VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.40004.711.88MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.400023.929.57HERRAMIENTAS% M.O.3.000072.372.1713.62TOTAL233.93Concreto para Vigas de Cimentacin fc=175 kg/cm2Rendimiento: 20.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL8.400014.29120.04GASOLINA 84 OCTANOSGLN0.300010.053.02AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.01005.580.06167.95CAPATAZ (E)HH0.080017.041.36OPERARIO (E)HH0.800014.3711.50OFICIAL (E)HH0.800012.9110.33PEON (E)HH3.200011.4036.48OPERADOR DE EQUIPO LIVIANO (E)HH0.800015.8812.7072.37VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.40004.711.88MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.400023.929.57HERRAMIENTAS% M.O.3.000072.372.1713.62TOTAL253.94Concreto para Vigas de Cimentacin fc=210 kg/cm2Rendimiento: 20.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.004047.910.19ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL9.200014.29131.47GASOLINA 84 OCTANOSGLN0.300010.053.02AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.01005.580.06179.38CAPATAZ (E)HH0.080017.041.36OPERARIO (E)HH0.800014.3711.50OFICIAL (E)HH0.800012.9110.33PEON (E)HH3.200011.4036.48OPERADOR DE EQUIPO LIVIANO (E)HH0.800015.8812.7072.37VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.40004.711.88MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.400023.929.57HERRAMIENTAS% M.O.3.000072.372.1713.62TOTAL265.37Encofrado/ Desencofrado Normal, Vigas de CimentacinRendimiento: 10.00 m2 /daUnidad: m2CLAVOS 2"KG0.15004.120.62CLAVOS 3"KG0.30004.121.24MADERA TORNILLO (LARGA)P22.18002.936.398.25CAPATAZ (E)HH0.080017.041.36OPERARIO (E)HH0.800014.3711.50OFICIAL (E)HH0.800012.9110.3323.19HERRAMIENTAS% M.O.3.000023.190.700.70Desencofrado de Viga de Cimentacionm21.00008.408.408.40TOTAL40.54CIMIENTOS REFORZADOSConcreto para Sobrecimientos Reforzados fc=140 kg/cm2Rendimiento: 12.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.008347.910.40ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL7.000014.29100.03GASOLINA 84 OCTANOSGLN0.300010.053.02AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.01675.580.09148.18CAPATAZ (E)HH0.066717.041.14OPERARIO (E)HH1.333314.3719.16OFICIAL (E)HH0.666712.918.61PEON (E)HH5.333311.4060.80OPERADOR DE EQUIPO LIVIANO (E)HH1.333315.8821.17110.88VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.66674.713.14MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.666723.9215.95HERRAMIENTAS% M.O.3.0000110.883.3322.42TOTAL281.48Concreto para Sobrecimientos Reforzados fc=175 kg/cm2Rendimiento: 12.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.008347.910.40ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL8.400014.29120.04GASOLINA 84 OCTANOSGLN0.300010.053.02AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.01675.580.09168.19CAPATAZ (E)HH0.066717.041.14OPERARIO (E)HH1.333314.3719.16OFICIAL (E)HH0.666712.918.61PEON (E)HH5.333311.4060.80OPERADOR DE EQUIPO LIVIANO (E)HH1.333315.8821.17110.88VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.66674.713.14MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.666723.9215.95HERRAMIENTAS% M.O.3.0000110.883.3322.42TOTAL301.49Concreto para Sobrecimientos Reforzados fc=210 kg/cm2Rendimiento: 12.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.008347.910.40ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL9.200014.29131.47GASOLINA 84 OCTANOSGLN0.300010.053.02AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.01675.580.09179.62CAPATAZ (E)HH0.066717.041.14OPERARIO (E)HH1.333314.3719.16OFICIAL (E)HH0.666712.918.61PEON (E)HH5.333311.4060.80OPERADOR DE EQUIPO LIVIANO (E)HH1.333315.8821.17110.88VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.66674.713.14MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.666723.9215.95HERRAMIENTAS% M.O.3.0000110.883.3322.42TOTAL312.92Concreto para Sobrecimientos Reforzados fc=245 kg/cm2Rendimiento: 12.00 m3 /daUnidad: m3ACEITE MOTOR GASOLINERO MULTIGRADOGAL0.008347.910.40ARENA GRUESAM30.500027.7313.87PIEDRA CHANCADA DE 1/2"M30.800036.4429.15CEMENTO PORTLAND TIPO IBOL11.500014.29164.34GASOLINA 84 OCTANOSGLN0.300010.053.02AGUAM30.18009.001.62GRASA MULTIPLE EPLB0.01675.580.09212.49CAPATAZ (E)HH0.066717.041.14OPERARIO (E)HH1.333314.3719.16OFICIAL (E)HH0.666712.918.61PEON (E)HH5.333311.4060.80OPERADOR DE EQUIPO LIVIANO (E)HH1.333315.8821.17110.88VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.66674.713.14MEZCLADORA DE CONCRETO /TAMBOR 12 P3HM0.666723.9215.95HERRAMIENTAS% M.O.3.0000110.883.3322.42TOTAL345.79Encofrado y Desencofrado Normal, Sobrecimientos ReforzadoRendimiento: 16.00 m2 /daUnidad: m2CLAVOS 2"KG0.13004.120.54CLAVOS 3"KG0.26004.121.07MADERA TORNILLO (LARGA)P23.35002.939.8211.43CAPATAZ (E)HH0.050017.040.85OPERARIO (E)HH0.500014.377.19OFICIAL (E)HH0.500012.916.4614.50HERRAMIENTAS% M.O.3.000014.500.440.44Desencofrado de Sobrecimientom21.00005.955.955.95TOTAL32.32Concreto Premezclado fc=175 kg/cm2 - Cimiento ReforzadoRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=175 KG/CM2M31.0200202.50206.55206.55CAPATAZH-H0.013317.040.23OPERARIOH-H0.266714.373.83OFICIALH-H0.133312.611.68PEONH-H0.533311.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL221.54Concreto Premezclado fc=210 kg/cm2 - Cimiento ReforzadoRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=210 KG/CM2M31.0200208.00212.16212.16CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL227.15Concreto Premezclado fc= 245 kg/cm2 - Cimiento ReforzadoRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=245 KG/CM2M31.0200221.50225.93225.93CAPATAZH-H0.013317.040.23OPERARIOH-H0.266714.373.83OFICIALH-H0.133312.611.68PEONH-H0.533311.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL240.92Concreto Premezclado fc=280 kg/cm2 - Cimiento ReforzadoRedimiento: 60.00 m3 /daUnidad: m3CONCRETO PTREMEZCLADO F'C=280 KG/CM2M31.0200229.00233.58233.58CAPATAZH-H0.013317.040.23OPERARIOH-H0.266714.373.83OFICIALH-H0.133312.611.68PEONH-H0.533311.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL248.57Concreto Premezclado fc= 315 kg/cm2 - Cimiento ReforzadoRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=315 KG/CM2M31.0200242.00246.84246.84CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL261.83Concreto Premezacldo fc=350 kg/cm2 - Cimiento ReforzadoRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=350 KG/CM2M31.0200255.50260.61260.61CAPATAZH-H0.013317.040.23OPERARIOH-H0.266714.373.83OFICIALH-H0.133312.611.68PEONH-H0.533311.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL275.60Concreto Premezclado fc=420 kg/cm2 - Cimiento ReforzadoRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=420 KG/CM2M31.0200278.00283.56283.56CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL298.55Concreto Premezclado fc= 175 kg/cm2 - Viga de CimentacinRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=175 KG/CM2M31.0200202.50206.55206.55CAPATAZH-H0.013317.040.23OPERARIOH-H0.266714.373.83OFICIALH-H0.133312.611.68PEONH-H0.533311.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL221.54Concreto Premezclado fc=210 kg/cm2 - Viga de CimentacinRndimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=210 KG/CM2M31.0200208.00212.16212.16CAPATAZH-H0.013317.040.23OPERARIOH-H0.266714.373.83OFICIALH-H0.133312.611.68PEONH-H0.533311.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL227.15Concreto Premezclado fc=245 kg/cm2 - Viga de CimentacinRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=245 KG/CM2M31.0200221.50225.93225.93CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL240.92Concreto Premezclado fc=280 kg/cm2 - Viga de CimetacinRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PTREMEZCLADO F'C=280 KG/CM2M31.0200229.00233.58233.58CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL248.57Concreto Premezclado fc=315 kg/cm2 - Viga de CimenatcinRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=315 KG/CM2M31.0200242.00246.84246.84CAPATAZH-H0.013317.040.23OPERARIOH-H0.266714.373.83OFICIALH-H0.133312.611.68PEONH-H0.533311.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL261.83Concreto Premezclado fc=350 kg/cm2 - Viga de CimentacinRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=350 KG/CM2M31.0200255.50260.61260.61CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL275.60Concreto Premezclado fc=420 kg/cm2 - Viga de CimentacinRendimiento: 60.01 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=420 KG/CM2M31.0200278.00283.56283.56CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL298.55Concreto Premezclado fc=175 kg/cm2 - Losa de CimentacinRendimiento: 65.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=175 KG/CM2M31.0200202.50206.55206.55CAPATAZH-H0.012317.040.21OPERARIOH-H0.246214.373.54OFICIALH-H0.123112.611.55PEONH-H0.492411.405.61OPERADOR DE EQUIPO LIVIANO (E)HH0.123115.881.9512.86VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.12314.710.58HERRAMIENTAS% M.O.3.000012.860.390.97TOTAL220.38Concreto Premezclado fc=210 kg/cm2 - Losa de CimentacinRendimiento: 65.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=210 KG/CM2M31.0200208.00212.16212.16CAPATAZH-H0.012317.040.21OPERARIOH-H0.246214.373.54OFICIALH-H0.123112.611.55PEONH-H0.492311.405.61OPERADOR DE EQUIPO LIVIANO (E)HH0.123115.881.9512.86VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.12314.710.58HERRAMIENTAS% M.O.3.000012.860.390.97TOTAL225.99Concreto Premezclado fc =245 kg/cm2 - Losa de CimentacinRendimiento: 65.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=245 KG/CM2M31.0200221.50225.93225.93CAPATAZH-H0.012317.040.21OPERARIOH-H0.246214.373.54OFICIALH-H0.123112.611.55PEONH-H0.492311.405.61OPERADOR DE EQUIPO LIVIANO (E)HH0.123115.881.9512.86VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.12314.710.58HERRAMIENTAS% M.O.3.000012.860.390.97TOTAL239.76Concreto Premezclado fc=280 kg/cm2 - Losa de CimentacinRendimiento: 65.00 m3 /daUnidad: m3CONCRETO PTREMEZCLADO F'C=280 KG/CM2M31.0200229.00233.58233.58CAPATAZH-H0.012317.040.21OPERARIOH-H0.246214.373.54OFICIALH-H0.123112.611.55PEONH-H0.492411.405.61OPERADOR DE EQUIPO LIVIANO (E)HH0.123115.881.9512.86VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.12314.710.58HERRAMIENTAS% M.O.3.000012.860.390.97TOTAL247.41Concreto Premezclado fc=315 kg/cm2 - Losa de CimentacinRendimiento: 65.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=315 KG/CM2M31.0200242.00246.84246.84CAPATAZH-H0.012317.040.21OPERARIOH-H0.246214.373.54OFICIALH-H0.123112.611.55PEONH-H0.492311.405.61OPERADOR DE EQUIPO LIVIANO (E)HH0.123115.881.9512.86VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.12314.710.58HERRAMIENTAS% M.O.3.000012.860.390.97TOTAL260.67Concreto Premezclado fc=350 kg/cm2 - Losa de CimentacinRendimiento: 65.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=350 KG/CM2M31.0200255.50260.61260.61CAPATAZH-H0.012317.040.21OPERARIOH-H0.246214.373.54OFICIALH-H0.123112.611.55PEONH-H0.492311.405.61OPERADOR DE EQUIPO LIVIANO (E)HH0.123115.881.9512.86VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.12314.710.58HERRAMIENTAS% M.O.3.000012.860.390.97TOTAL274.44Concreto Premezclado fc=420 kg/cm2 - Losa de CimentacinRendimiento: 65.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=420 KG/CM2M31.0200278.00283.56283.56CAPATAZH-H0.012317.040.21OPERARIOH-H0.246214.373.54OFICIALH-H0.123112.611.55PEONH-H0.492311.405.61OPERADOR DE EQUIPO LIVIANO (E)HH0.123115.881.9512.86VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.12314.710.58HERRAMIENTAS% M.O.3.000012.860.390.97TOTAL297.39Concreto Premezclado fc= 175 kg/cm2 - Sobrecimiento ReforzadoRendimiento: 35.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=175 KG/CM2M31.0200202.50206.55206.55CAPATAZH-H0.022917.040.39OPERARIOH-H0.457314.376.57OFICIALH-H0.228612.612.88PEONH-H1.143211.4013.03OPERADOR DE EQUIPO LIVIANO (E)HH0.228615.883.6326.50VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.22864.711.08HERRAMIENTAS% M.O.3.000026.500.801.88TOTAL234.93Concreto Premezclado fc=210 kg/cm2 - Sobrecimiento ReforzadoRendimiento: 35.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=210 KG/CM2M31.0200208.00212.16212.16CAPATAZH-H0.022917.040.39OPERARIOH-H0.457114.376.57OFICIALH-H0.228612.612.88PEONH-H1.142911.4013.03OPERADOR DE EQUIPO LIVIANO (E)HH0.228615.883.6326.50VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.22864.711.08HERRAMIENTAS% M.O.3.000026.500.801.88TOTAL240.54Concreto Premezclado fc=245 kg/cm2 - Sobrecimiento ReforzadoRendimiento: 35.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=245 KG/CM2M31.0200221.50225.93225.93CAPATAZH-H0.022917.040.39OPERARIOH-H0.457114.376.57OFICIALH-H0.228612.612.88PEONH-H1.142911.4013.03OPERADOR DE EQUIPO LIVIANO (E)HH0.228615.883.6326.50VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.22864.711.08HERRAMIENTAS% M.O.3.000026.500.801.88TOTAL254.31Concreto Premezclado fc=280 kg/cm2 - Sobrecimiento ReforzadoRendimiento: 35.00 m3 /daUnidad: m3CONCRETO PTREMEZCLADO F'C=280 KG/CM2M31.0200229.00233.58233.58CAPATAZH-H0.022917.040.39OPERARIOH-H0.457114.376.57OFICIALH-H0.228612.612.88PEONH-H1.142911.4013.03OPERADOR DE EQUIPO LIVIANO (E)HH0.228615.883.6326.50VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.22864.711.08HERRAMIENTAS% M.O.3.000026.500.801.88TOTAL261.96Concreto Premezclado fc=315 kg/cm2 - Sobrecimiento ReforzadoRendimiento: 35.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=315 KG/CM2M31.0200242.00246.84246.84CAPATAZH-H0.022917.040.39OPERARIOH-H0.457114.376.57OFICIALH-H0.228612.612.88PEONH-H1.142911.4013.03OPERADOR DE EQUIPO LIVIANO (E)HH0.228615.883.6326.50VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.22864.711.08HERRAMIENTAS% M.O.3.000026.500.801.88TOTAL275.22Concreto Premezclado fc=350 kg/cm2 - Sobrecimiento ReforzadoRendimiento: 35.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=350 KG/CM2M31.0200255.50260.61260.61OPERARIOH-H0.457114.376.57OFICIALH-H0.228612.612.88PEONH-H1.142911.4013.03OPERADOR DE EQUIPO LIVIANO (E)HH0.228615.883.6326.11VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.22864.711.08HERRAMIENTAS% M.O.3.000026.110.781.86TOTAL288.58Concreto Premezclado fc=420 kg/cm2 - Sobrecimiento ReforzadoRendimiento: 35.00 m3 /daUlnidad: m3CONCRETO PREMEZCLADO F'C=420 KG/CM2M31.0200278.00283.56283.56CAPATAZH-H0.022917.040.39OPERARIOH-H0.457114.376.57OFICIALH-H0.228612.612.88PEONH-H1.142911.4013.03OPERADOR DE EQUIPO LIVIANO (E)HH0.228615.883.6326.50VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.22864.711.08HERRAMIENTAS% M.O.3.000026.500.801.88TOTAL311.94Concreto Premezclado fc=175 kg/cm2 - Muros y TabiquesRendimiento: 25.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=175 KG/CM2M31.0200202.50206.55SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00239.55CAPATAZH-H0.032017.040.55OPERARIOH-H0.640014.379.20OFICIALH-H0.320012.614.04PEONH-H1.280011.4014.59OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0833.46VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51HERRAMIENTAS% M.O.3.000033.461.002.51TOTAL275.52Concreto Premezclado fc=210 kg/cm2 - Muros y TabiquesRendimiento: 25.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=210 KG/CM2M31.0200208.00212.16SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00245.16CAPATAZH-H0.032017.040.55OPERARIOH-H0.640014.379.20OFICIALH-H0.320012.614.04PEONH-H1.280011.4014.59OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0833.46VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51HERRAMIENTAS% M.O.3.000033.461.002.51TOTAL281.13Concreto Premezclado fc=245 kg/cm2 - Muros y TabiquesRendimiento: 25.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=245 KG/CM2M31.0200221.50225.93SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00258.93CAPATAZH-H0.032017.040.55OPERARIOH-H0.640014.379.20OFICIALH-H0.320012.614.04PEONH-H1.280011.4014.59OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0833.46VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51HERRAMIENTAS% M.O.3.000033.461.002.51TOTAL294.90Concreto Premezclado fc= 280 kg/cm2 - Muros y TabiquesRendimiento: 25.00 m3 /daUnidad: m3CONCRETO PTREMEZCLADO F'C=280 KG/CM2M31.0200229.00233.58SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00266.58CAPATAZH-H0.032017.040.55OPERARIOH-H0.640014.379.20OFICIALH-H0.320012.614.04PEONH-H1.280011.4014.59OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0833.46VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51HERRAMIENTAS% M.O.3.000033.461.002.51TOTAL302.55Concreto Premezclado fc= 315 kg/cm2 - Muros y TabiquesRendimiento: 25.00 m3/daUnidad: m3CONCRETO PREMEZCLADO F'C=315 KG/CM2M31.0200242.00246.84SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00279.84CAPATAZH-H0.032017.040.55OPERARIOH-H0.640014.379.20OFICIALH-H0.320012.614.04PEONH-H1.280011.4014.59OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0833.46VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51HERRAMIENTAS% M.O.3.000033.461.002.51TOTAL315.81Concreto Premezclado fc=350 kg/cm2 - Muros y TabiquesRendimiento: 25.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=350 KG/CM2M31.0200255.50260.61SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00293.61CAPATAZH-H0.032017.040.55OPERARIOH-H0.640014.379.20OFICIALH-H0.320012.614.04PEONH-H1.280011.4014.59OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0833.46VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51HERRAMIENTAS% M.O.3.000033.461.002.51TOTAL329.58Concreto Premezclado fc=420 kg/cm2 - Muros y TabiquesRendimiento: 25.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=420 KG/CM2M31.0200278.00283.56SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00316.56CAPATAZH-H0.032017.040.55OPERARIOH-H0.640014.379.20OFICIALH-H0.320012.614.04PEONH-H1.280011.4014.59OPERADOR DE EQUIPO LIVIANO (E)HH0.320015.885.0833.46VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.32004.711.51HERRAMIENTAS% M.O.3.000033.461.002.51TOTAL352.53Concreto Premezclado fc=175 kg/cm2 - ColumnasRendimiento: 30.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=175 KG/CM2M31.0200202.50206.55SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00239.55CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL269.52Concreto Premezclado fc=210 kg/cm2 - ColumnasRendimiento: 30.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=210 KG/CM2M31.0200208.00212.16SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00245.16CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL275.13Concreto Premezclado fc=245 kg/cm2 - ColumnasRendimiento: 30.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=245 KG/CM2M31.0200221.50225.93SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00258.93CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL288.90Concreto Premezclado fc=280 kg/cm2 - ColumnasRendimiento: 30.00 m3 /daUnidad: m3CONCRETO PTREMEZCLADO F'C=280 KG/CM2M31.0200229.00233.58SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00266.58CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL296.55Concreto Premezclado fc=315 kg/cm2 - ColumnasRendimiento: 30.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=315 KG/CM2M31.0200242.00246.84SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00279.84CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL309.81Concreto Premezclado fc=350 kg/cm2 - ColumnasRendimiento: 30.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=350 KG/CM2M31.0200255.50260.61SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00293.61CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL323.58Concreto Premezclado fc= 420 kg/cm2 - ColumnasRendimiento: 30.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=420 KG/CM2M31.0200278.00283.56SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00316.56CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL346.53Concreto Premezclado fc=175 kg/cm2 - VigasRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=175 KG/CM2M31.0200202.50206.55SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00239.55CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL254.54Concreto Premezclado fc= 210 kg/cm2 - VigasRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=210 KG/CM2M31.0200208.00212.16SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00245.16CAPATAZH-H0.013317.040.23OPERARIOH-H0.266714.373.83OFICIALH-H0.133312.611.68PEONH-H0.533311.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL260.15Concreto Premezclado fc=245 kg/cm2 - VigasRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=245 KG/CM2M31.0200221.50225.93SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00258.93CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL273.92Concreto Premezclado fc=280 kg/cm2 - VigasRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PTREMEZCLADO F'C=280 KG/CM2M31.0200229.00233.58SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00266.58CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL281.57Concreto Premezclado fc= 315 kg/cm2 - VigasRendimiento: 60.00 m3/daUnidad: m3CONCRETO PREMEZCLADO F'C=315 KG/CM2M31.0200242.00246.84SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00279.84CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL294.83Concreto Premezclado fc=350 kg/m2 - VigasRendimiento: 60.01 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=350 KG/CM2M31.0200255.50260.61SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00293.61CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL308.60Concreto Premezclado fc= 420 kd/cm2 - VigasRendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=420 KG/CM2M31.0200278.00283.56SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00316.56CAPATAZH-H0.013317.040.23OPERARIOH-H0.266714.373.83OFICIALH-H0.133312.611.68PEONH-H0.533311.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL331.55Concreto Premezclado Loza Maciza fc=175 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=175 KG/CM2M31.0200202.50206.55SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00239.55CAPATAZH-H0.013317.040.23OPERARIOH-H0.266714.373.83OFICIALH-H0.133312.611.68PEONH-H0.533311.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL254.54Concreto Premezclado Losa Maciza fc=210 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=210 KG/CM2M31.0200208.00212.16SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00245.16CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL260.15Concreto Premezclado Losa Maciza fc=245 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=245 KG/CM2M31.0200221.50225.93SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00258.93CAPATAZH-H0.013317.040.23OPERARIOH-H0.266714.373.83OFICIALH-H0.133312.611.68PEONH-H0.533311.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL273.92Concreto Premezclado Losa Maciza fc=280 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PTREMEZCLADO F'C=280 KG/CM2M31.0200229.00233.58SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00266.58CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL281.57Concreto Premezclado Losa Maciza fc=315 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=315 KG/CM2M31.0000242.00242.00SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00275.00CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL289.99Concreto Premezclado Losa Maciza fc=350 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=350 KG/CM2M31.0200255.50260.61SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00293.61CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL308.60Concreto Premezclado Losa Maciza fc=420 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=420 KG/CM2M31.0200278.00283.56SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00316.56CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL331.55Concreto premezclado Losa Aligerada fc=175 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=175 KG/CM2M31.0200202.50206.55SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00239.55CAPATAZH-H0.013317.040.23OPERARIOH-H0.266714.373.83OFICIALH-H0.133312.611.68PEONH-H0.533311.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL254.54Concreto Premezclado Losa Aligerada fc=210 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=210 KG/CM2M31.0200208.00212.16SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00245.16CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL260.15Concreto Premezclado Losa Aligerada fc=245 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=245 KG/CM2M31.0200221.50225.93SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00258.93CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL273.92Concreto Premezclado Losa Aligerada fc=280 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PTREMEZCLADO F'C=280 KG/CM2M31.0200229.00233.58SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00266.58CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL281.57Concreto Premezclado Losa Aligerada fc=315 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=315 KG/CM2M31.0200242.00246.84SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00279.84CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL294.83Concreto Premezclado Losa Aligerada fc=350 kg/cm2Rendimiento: 60.01 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=350 KG/CM2M31.0200255.50260.61SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00293.61CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL308.60Concreto Premezclado Losa Aligerada fc=420 kg/cm2Rendimiento: 60.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=420 KG/CM2M31.0200278.00283.56SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00316.56CAPATAZH-H0.013317.040.23OPERARIOH-H0.266614.373.83OFICIALH-H0.133312.611.68PEONH-H0.533211.406.08OPERADOR DE EQUIPO LIVIANO (E)HH0.133315.882.1213.94VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.13334.710.63HERRAMIENTAS% M.O.3.000013.940.421.05TOTAL331.55Concreto Premezclado Escalera fc=175 kg/cm2Rendimiento: 30.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=175 KG/CM2M31.0200202.50206.55SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00239.55CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL269.52Concreto Premezclado Escalera fc=210 kg/cm2Rendimiento: 30.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=210 KG/CM2M31.0200208.00212.16SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00245.16CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL275.13Concreto Premezclado Escalera fc=245 kg/cm2Rendimiento: 30.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=245 KG/CM2M31.0200221.50225.93SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00258.93CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL288.90Concreto Premezclado Escalera fc=280 kg/cm2Rendimiento: 30.00 m3 /daUnidad: m3CONCRETO PTREMEZCLADO F'C=280 KG/CM2M31.0200229.00233.58SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00266.58CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL296.55Concreto Premezclado Escalera fc=315 kg/cm2Rendimiento: 30.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=315 KG/CM2M31.0200242.00246.84SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00279.84CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL309.81Concreto Premezclado Escalera fc=350 kg/cm2Rendimiento: 30.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=350 KG/CM2M31.0200255.50260.61SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00293.61CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL323.58Concreto Premezclado Escalera fc=420 kg/cm2Rendimiento: 30.00 m3 /daUnidad: m3CONCRETO PREMEZCLADO F'C=420 KG/CM2M31.0200278.00283.56SERVICIO DE BOMBA DE CONCRETOM31.000033.0033.00316.56CAPATAZH-H0.026717.040.45OPERARIOH-H0.533314.377.66OFICIALH-H0.266712.613.36PEONH-H1.066711.4012.16OPERADOR DE EQUIPO LIVIANO (E)HH0.266715.884.2427.87VIBRADOR PARA CONCRETO 4 HP x 1.50"HM0.26674.711.26HERRAMIENTAS% M.O.3.000027.870.842.10TOTAL346.53ALBAILERIAMUROS DE LADRILLO KING KONG DE ARCILLAMuro de Ladrillo KK de arcilla, N-Cab. Mezcla 1:5Rendimiento: 6.45 m2 /daUnidad: m3CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.064431.092.00LADRILLO KING KONG 18H 9X13X23MLL0.0690557.1438.44CEMENTO PORTLAND TIPO IBOL0.453614.296.48AGUAM30.01419.000.13MADERA TORNILLO (LARGA)P20.40302.931.1848.32CAPATAZ (E)HH0.124017.042.11OPERARIO (E)HH1.240314.3717.82PEON (E)HH0.620211.407.0727.00HERRAMIENTAS% M.O.3.000027.000.810.81TOTAL76.13Muro de Ladrillo KK de arcilla, N-Sog. Mezcla 1:5Rendimiento: 9.46 m2 /daUnidad: m3CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.028931.090.90LADRILLO KING KONG 18H 9X13X23MLL0.0390557.1421.73CEMENTO PORTLAND TIPO IBOL0.203914.292.91AGUAM30.00759.000.07MADERA TORNILLO (LARGA)P20.40302.931.1826.88CAPATAZ (E)HH0.084617.041.44OPERARIO (E)HH0.845714.3712.15PEON (E)HH0.422811.404.8218.41HERRAMIENTAS% M.O.3.000018.410.550.55TOTAL45.84Muro de Ladrillo KK de arcilla, N-Can. Mezcla 1:5Rendimiento: 11.00 m2 /daUnidad: m3CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.016631.090.52LADRILLO KING KONG 18H 9X13X23MLL0.0290557.1416.16CEMENTO PORTLAND TIPO IBOL0.117114.291.67AGUAM30.00399.000.04MADERA TORNILLO (LARGA)P20.40302.931.1819.66CAPATAZ (E)HH0.072717.041.24OPERARIO (E)HH0.727314.3710.45PEON (E)HH0.363611.404.1515.84HERRAMIENTAS% M.O.3.000015.840.480.48TOTAL35.98Muro de Ladrillo KK de arcilla, N-Cab. Mezcla 1:4Rendimiento: 6.45 m2 /daUnidad: m3CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.061331.091.91LADRILLO KING KONG 18H 9X13X23MLL0.0690557.1438.44CEMENTO PORTLAND TIPO IBOL0.545514.297.80AGUAM30.01439.000.13MADERA TORNILLO (LARGA)P20.40302.931.1849.55CAPATAZ (E)HH0.124017.042.11OPERARIO (E)HH1.240314.3717.82PEON (E)HH0.620211.407.0727.00HERRAMIENTAS% M.O.3.000027.000.810.81TOTAL77.36Muro de Ladrillo KK de arcilla, N-Sog. Mezcla 1:4Rendimiento: 9.46 m2 /daUnidad: m3CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.027531.090.85LADRILLO KING KONG 18H 9X13X23MLL0.0390557.1421.73CEMENTO PORTLAND TIPO IBOL0.245214.293.50AGUAM30.00769.000.07MADERA TORNILLO (LARGA)P20.40302.931.1827.42CAPATAZ (E)HH0.084617.041.44OPERARIO (E)HH0.845714.3712.15PEON (E)HH0.422811.404.8218.41HERRAMIENTAS% M.O.3.000018.410.550.55TOTAL46.38Muro de Ladrillo KK de arcilla, N-Can. Mezcla 1:4Rendimiento: 11.00 m2 /daUnidad: m3CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.015831.090.49LADRILLO KING KONG 18H 9X13X23MLL0.0290557.1416.16CEMENTO PORTLAND TIPO IBOL0.140914.292.01AGUAM30.00399.000.04MADERA TORNILLO (LARGA)P20.40302.931.1819.97CAPATAZ (E)HH0.072717.041.24OPERARIO (E)HH0.727314.3710.45PEON (E)HH0.363611.404.1515.84HERRAMIENTAS% M.O.3.000015.840.480.48TOTAL36.29Muro de Ladrillo KK de arcilla, CV-Cab. Mezcla 1:5Rendimiento: 5.00 m2 /daUnidad: m3CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.064431.092.00LADRILLO KING KONG 18H 9X13X23MLL0.0790557.1444.01CEMENTO PORTLAND TIPO IBOL0.338814.294.84AGUAM30.01009.000.09MADERA TORNILLO (LARGA)P20.40302.931.1852.21CAPATAZ (E)HH0.160017.042.73OPERARIO (E)HH1.600014.3722.99PEON (E)HH0.800011.409.1234.84HERRAMIENTAS% M.O.3.000034.841.051.05TOTAL88.10Muro de Ladrillo KK de arcilla, CV-Sog. Mezcla 1 :5Rendimiento: 7.00 m2 /daUnidad: m3CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.021431.090.67LADRILLO KING KONG 18H 9X13X23MLL0.0440557.1424.51CEMENTO PORTLAND TIPO IBOL0.151114.292.16AGUAM30.00519.000.05MADERA TORNILLO (LARGA)P20.40302.931.1828.66CAPATAZ (E)HH0.114317.041.95OPERARIO (E)HH1.142914.3716.42PEON (E)HH0.571411.406.5124.88HERRAMIENTAS% M.O.3.000024.880.750.75TOTAL54.29Muro de Ladrillo KK de arcilla, CV-Can.Mezcla 1:5Rendimiento: 9.00 m2 /daUnidad: m3CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.012131.090.38LADRILLO KING KONG 18H 9X13X23MLL0.0320557.1417.83CEMENTO PORTLAND TIPO IBOL0.085014.291.21AGUAM30.00239.000.02MADERA TORNILLO (LARGA)P20.40302.931.1820.71CAPATAZ (E)HH0.088917.041.51OPERARIO (E)HH0.888914.3712.77PEON (E)HH0.444411.405.0719.35HERRAMIENTAS% M.O.3.000019.350.580.58TOTAL40.64Muro de Ladrillo KK de arcilla, CV-Cab. Mezcla 1:4Rendimiento: 5.00 m2 /daUnidad: m3CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.045831.091.42LADRILLO KING KONG 18H 9X13X23MLL0.0790557.1444.01CEMENTO PORTLAND TIPO IBOL0.407514.295.82AGUAM30.01029.000.09MADERA TORNILLO (LARGA)P20.40302.931.1852.61CAPATAZ (E)HH0.160017.042.73OPERARIO (E)HH1.600014.3722.99PEON (E)HH0.800011.409.1234.84HERRAMIENTAS% M.O.3.000034.841.051.05TOTAL88.50Muro de Ladrillo KK de arcilla, CV-Sog. Mezcla 1:4Rendimiento: 7.00 m2 /daUnidad: m3CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.020431.090.63LADRILLO KING KONG 18H 9X13X23MLL0.0440557.1424.51CEMENTO PORTLAND TIPO IBOL0.181714.292.60AGUAM30.00529.000.05MADERA TORNILLO (LARGA)P20.40302.931.1829.06CAPATAZ (E)HH0.114317.041.95OPERARIO (E)HH1.142914.3716.42PEON (E)HH0.571411.406.5124.88HERRAMIENTAS% M.O.3.000024.880.750.75TOTAL54.69Muro de Ladrillo KK de arcilla, CV-Can. Mezcla 1:4Rendimiento: 9.00 m2 /daUnidad: m3CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.011531.090.36LADRILLO KING KONG 18H 9X13X23MLL0.0320557.1417.83CEMENTO PORTLAND TIPO IBOL0.102314.291.46AGUAM30.00239.000.02MADERA TORNILLO (LARGA)P20.40302.931.1820.94CAPATAZ (E)HH0.088917.041.51OPERARIO (E)HH0.888914.3712.77PEON (E)HH0.444411.405.0719.35HERRAMIENTAS% M.O.3.000019.350.580.58TOTAL40.87ALBAILERIAMUROS DE LADRILLO CORRIENTE DE ARCILLAMuro de Lad. Corriente arcilla, N-Cabeza, Mezcla 1:5Rendimiento: 5.55 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.080531.092.50LADRILLO CORRIENTE 6X12X25MLL0.1040678.9970.61CEMENTO PORTLAND TIPO IBOL0.567314.298.11AGUAM30.01859.000.17MADERA TORNILLO (LARGA)P20.40302.931.1882.66CAPATAZ (E)HH0.144117.042.46OPERARIO (E)HH1.441414.3720.71PEON (E)HH0.720711.408.2231.39HERRAMIENTAS% M.O.3.000031.390.940.94TOTAL114.99Muro de Lad. Corriente arcilla, N-Soga, Mezcla 1:5Rendimiento: 6.92 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.034431.091.07LADRILLO CORRIENTE 6X12X25MLL0.0550678.9937.34CEMENTO PORTLAND TIPO IBOL0.203914.292.91AGUAM30.00819.000.07MADERA TORNILLO (LARGA)P20.40302.931.1842.66CAPATAZ (E)HH0.115617.041.97OPERARIO (E)HH1.156114.3716.61PEON (E)HH0.578011.406.5925.17HERRAMIENTAS% M.O.3.000025.170.760.76TOTAL68.59Muro de Lad. Corriente arcilla, N-Canto, Mezcla 1:5Rendimiento: 8.00 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.011531.090.36LADRILLO CORRIENTE 6X12X25MLL0.0310678.9921.05CEMENTO PORTLAND TIPO IBOL0.081314.291.16AGUAM30.00279.000.02MADERA TORNILLO (LARGA)P20.40302.931.1823.86CAPATAZ (E)HH0.100017.041.70OPERARIO (E)HH1.000014.3714.37PEON (E)HH0.500011.405.7021.77HERRAMIENTAS% M.O.3.000021.770.650.65TOTAL46.28Muro de Lad. Corriente arcilla, N-Cabeza, Mecla 1:4Rendimiento: 5.55 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.076731.092.38LADRILLO CORRIENTE 6X12X25MLL0.1040678.9970.61CEMENTO PORTLAND TIPO IBOL0.682314.299.75AGUAM30.01859.000.17MADERA TORNILLO (LARGA)P20.40302.931.1884.18CAPATAZ (E)HH0.144117.042.46OPERARIO (E)HH1.441414.3720.71PEON (E)HH0.720711.408.2231.39HERRAMIENTAS% M.O.3.000031.390.940.94TOTAL116.51Muro de Lad. Corriente arcilla, N-Soga, Mezcla 1:4Rendimiento: 6.92 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.032731.091.02LADRILLO CORRIENTE 6X12X25MLL0.0550678.9937.34CEMENTO PORTLAND TIPO IBOL0.291414.294.16AGUAM30.00819.000.07MADERA TORNILLO (LARGA)P20.40302.931.1843.86CAPATAZ (E)HH0.115617.041.97OPERARIO (E)HH1.156114.3716.61PEON (E)HH0.578011.406.5925.17HERRAMIENTAS% M.O.3.000025.170.760.76TOTAL69.79Muro de Lad. Corriente arcilla, N-Canto, Mezcla 1:4Rendimiento: 8.00 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.011031.090.34LADRILLO CORRIENTE 6X12X25MLL0.0310678.9921.05CEMENTO PORTLAND TIPO IBOL0.097814.291.40AGUAM30.00279.000.02MADERA TORNILLO (LARGA)P20.40302.931.1824.08CAPATAZ (E)HH0.100017.041.70OPERARIO (E)HH1.000014.3714.37PEON (E)HH0.500011.405.7021.77HERRAMIENTAS% M.O.3.000021.770.650.65TOTAL46.50Muro de Lad. Corriente arcilla, CV-Cabeza, Mezcla 1:5Rendimiento: 4.00 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.060831.091.89LADRILLO CORRIENTE 6X12X25MLL0.1210678.9982.16CEMENTO PORTLAND TIPO IBOL0.428714.296.13AGUAM30.01349.000.12MADERA TORNILLO (LARGA)P20.40302.931.1891.57CAPATAZ (E)HH0.200017.043.41OPERARIO (E)HH2.000014.3728.74PEON (E)HH1.000011.4011.4043.55HERRAMIENTAS% M.O.3.000043.551.311.31TOTAL136.43Muro de Lad. Corriente arcilla, CV-Soga, Mezcla 1:5Rendimiento: 5.50 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.025831.090.80LADRILLO CORRIENTE 6X12X25MLL0.0630678.9942.78CEMENTO PORTLAND TIPO IBOL0.182114.292.60AGUAM30.00589.000.05MADERA TORNILLO (LARGA)P20.40302.931.1847.50CAPATAZ (E)HH0.145517.042.48OPERARIO (E)HH1.454514.3720.90PEON (E)HH0.727311.408.2931.67HERRAMIENTAS% M.O.3.000031.670.950.95TOTAL80.12Muro de Lad. Corriente arcilla, CV-Canto, Mezcla1:5Rendimiento: 7.00 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.008331.090.26LADRILLO CORRIENTE 6X12X25MLL0.0340678.9923.09CEMENTO PORTLAND TIPO IBOL0.058614.290.84AGUAM30.00179.000.02MADERA TORNILLO (LARGA)P20.40302.931.1825.48CAPATAZ (E)HH0.114317.041.95OPERARIO (E)HH1.142914.3716.42PEON (E)HH0.571411.406.5124.88HERRAMIENTAS% M.O.3.000024.880.750.75TOTAL51.11Muro de Lad. Corriente arcilla, CV-Cabeza, Mezcla 1:4Rendimiento: 4.00 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.057931.091.80LADRILLO CORRIENTE 6X12X25MLL0.1210678.9982.16CEMENTO PORTLAND TIPO IBOL0.515614.297.37AGUAM30.01349.000.12MADERA TORNILLO (LARGA)P20.40302.931.1892.72CAPATAZ (E)HH0.200017.043.41OPERARIO (E)HH2.000014.3728.74PEON (E)HH1.000011.4011.4043.55HERRAMIENTAS% M.O.3.000043.551.311.31TOTAL137.58Muro de Lad. Corriente arcilla, CV-Soga, Mezcla 1:4Rendimiento: 5.50 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.024631.090.76LADRILLO CORRIENTE 6X12X25MLL0.0630678.9942.78CEMENTO PORTLAND TIPO IBOL0.219014.293.13AGUAM30.00589.000.05MADERA TORNILLO (LARGA)P20.40302.931.1847.99CAPATAZ (E)HH0.145517.042.48OPERARIO (E)HH1.454514.3720.90PEON (E)HH0.727311.408.2931.67HERRAMIENTAS% M.O.3.000031.670.950.95TOTAL80.61Muro de Lad. Corriente arcilla, CV-Canto, Mezcla 1:4Rendimiento: 7.00 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.007931.090.25LADRILLO CORRIENTE 6X12X25MLL0.0340678.9923.09CEMENTO PORTLAND TIPO IBOL0.070514.291.01AGUAM30.00179.000.02MADERA TORNILLO (LARGA)P20.40302.931.1825.64CAPATAZ (E)HH0.114317.041.95OPERARIO (E)HH1.142914.3716.42PEON (E)HH0.571411.406.5124.88HERRAMIENTAS% M.O.3.000024.880.750.75TOTAL51.27MUROS DE LADRILLO PANDERETA DE ARCILLAMuro Lad. Pand. de cabeza C:A 1:5 p/tarrajearRendimiento: 5.50 m2 /daUnidad: m2ARENA GRUESAM30.070031.092.18LADRILLO PANDERETA 10X12X25MLL0.0700445.3831.18CEMENTO PORTLAND TIPO IBOL0.470014.296.72AGUAM30.01009.000.09MADERA TORNILLO (LARGA)P20.40002.931.1741.34CAPATAZH-H0.145517.042.48OPERARIOH-H1.454514.3720.90PEONH-H0.727311.408.2931.67HERRAMIENTAS% M.O.5.000031.671.581.58TOTAL74.59Muro Ladr.Pandereta de soga C:A 1:5 p/tarrajearRendimiento: 9.00 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.030031.090.93LADRILLO PANDERETA 10X12X25MLL0.0400445.3817.82CEMENTO PORTLAND TIPO IBOL0.190014.292.72AGUAM30.01009.000.09MADERA TORNILLO (LARGA)P20.40002.931.1722.82CAPATAZH-H0.088917.041.51OPERARIOH-H0.888914.3712.77PEONH-H0.444411.405.0719.35HERRAMIENTAS% M.O.5.000019.350.970.97TOTAL43.14Muro Lad. Pandereta de canto C.A.1:5 p/tarrajearRendimiento: 11.50 m2 /daUnidad: m2CLAVOS 3"KG.0.02204.120.09ARENA GRUESAM30.020031.090.62LADRILLO PANDERETA 10X12X25MLL0.0300445.3813.36CEMENTO PORTLAND TIPO IBOL0.120014.291.71AGUAM30.01009.000.09MADERA TORNILLO (LARGA)P20.40002.931.1717.04CAPATAZH-H0.069617.041.19OPERARIOH-H0.695714.3710.00PEONH-H0.347811.403.9615.15HERRAMIENTAS% M.O.5.000015.150.760.76TOTAL32.95Muro Lad. Pandereta de cabeza C:A 1:4 p/tarrajearRendimiento: 5.50 m2 /daUnidad: m2ARENA GRUESAM30.060031.091.87LADRILLO PANDERETA 10X12X25MLL0.0700445.3831.18CEMENTO PORTLAND TIPO IBOL0.560014.298.00AGUAM30.02009.000.18MADERA TORNILLO (LARGA)P20.40002.931.1742.40CAPATAZH-H0.145517.042.48OPERARIOH-H1.454514.3720.90PEONH-H0.727311.408.2931.67HERRAMIENTAS% M.O.5.000031.671.581.58TOTAL75.65Muro Lad. Pandereta de soga C:A 1:4 p/tarrajearRendimiento: 9.00 m2 /daUnidad: m2ARENA GRUESAM30.030031.090.93LADRILLO PANDERETA 10X12X25MLL0.0400445.3817.82CEMENTO PORTLAND TIPO IBOL0.230014.293.29AGUAM30.01009.000.09MADERA TORNILLO (LARGA)P20.40002.931.1723.30CAPATAZH-H0.088917.041.51OPERARIOH-H0.888914.3712.77PEONH-H0.444411.405.0719.35HERRAMIENTAS% M.O.5.000019.350.970.97TOTAL43.62Muro Lad. Pandereta de canto C:A 1:4 p/tarrajearRendimiento: 11.50 m2 /daUnidad: m2ARENA GRUESAM30.150031.094.66LADRILLO PANDERETA 10X12X25MLL0.0300445.3813.36CEMENTO PORTLAND TIPO IBOL0.150014.292.14AGUAM30.01009.000.09MADERA TORNILLO (LARGA)P20.40002.931.1721.42CAPATAZH-H0.069617.041.19OPERARIOH-H0.695714.3710.00PEONH-H0.347811.403.9615.15HERRAMIENTAS% M.O.5.000015.150.760.76TOTAL37.33Muro Lad Pandereta de cab. C:C:A 1:2:9 p/tarrajearRendimiento: 5.50 m2 /daUnidad: m2ARENA GRUESAM30.060031.091.87LADRILLO PANDERETA 10X12X25MLL0.0700445.3831.18CEMENTO PORTLAND TIPO IBOL0.220014.293.14CAL HIDRAT. INDUSTRIAL ITINTEC (30 KG.)BOL0.220013.002.86AGUAM30.01009.000.09MADERA TORNILLO (LARGA)P20.07002.930.2139.35CAPATAZH-H0.145517.042.48OPERARIOH-H1.454514.3720.90PEONH-H0.727311.408.2931.67HERRAMIENTAS% M.O.5.000031.671.581.58TOTAL72.60Muro Lad.Pandereta de soga C.C.A. 1:2:9 p /tarrajearRendimiento: 9.00 m2 /daUnidad: m2ARENA GRUESAM30.020031.090.62LADRILLO PANDERETA 10X12X25MLL0.0400445.3817.82CEMENTO PORTLAND TIPO IBOL0.090014.291.29CAL HIDRAT. INDUSTRIAL ITINTEC (30 KG.)BOL0.090013.001.17AGUAM30.01009.000.09MADERA TORNILLO (LARGA)P20.40002.931.1722.16CAPATAZH-H0.088917.041.51OPERARIOH-H0.888914.3712.77PEONH-H0.444411.405.0719.35HERRAMIENTAS% M.O.5.000019.350.970.97TOTAL42.48Muro Lad.Pandereta de canto C:C:A 1:2:9 p/tarrajearRendimiento: 11.50 m2 /daUnidad: m2ARENA GRUESAM30.020031.090.62LADRILLO PANDERETA 10X12X25MLL0.0300445.3813.36CEMENTO PORTLAND TIPO IBOL0.060014.290.86CAL HIDRAT. INDUSTRIAL ITINTEC (30 KG.)BOL0.060013.000.78AGUAM30.01009.000.09MADERA TORNILLO (LARGA)P20.40002.931.1716.88CAPATAZH-H0.069617.041.19OPERARIOH-H0.695714.3710.00PEONH-H0.347811.403.9615.15HERRAMIENTAS% M.O.5.000015.150.760.76TOTAL32.79MUROS DE LADRILLO SILICO CALCAREOMuro Lad. Sil. Calc. KK Normal 14x24x29 Soga SolaqueadoRendimiento: 8.00 m2 /daUnidad: m2ARENA GRUESAM30.017831.090.55LADRILLO S.C. TIPO V K.K.NORMAL 14X24X9MLL0.0412567.0023.36CEMENTO PORTLAND TIPO IBOL0.156214.292.23CAL HIDRAULICA (30 KG.)BOL0.039913.000.52MADERA TORNILLO (LARGA)P20.40302.931.1827.84CAPATAZ (E)HH0.100017.041.70OPERARIO (E)HH1.000014.3714.37PEON (E)HH0.500011.405.7021.77HERRAMIENTAS% M.O.3.000021.770.650.65TOTAL50.26Muro Lad. Sil. Calc. KK Modulado 14x29x9 Soga SolaqueadoRendimiento: 10.00 m2/daUnidad: m2ARENA GRUESAM30.017031.090.53LADRILLO S.C. TIPO V K.K. MOD. 14X29XX9MLL0.0343685.0023.50CEMENTO PORTLAND TIPO IBOL0.149614.292.14CAL HIDRAULICA (30 KG.)BOL0.038213.000.50MADERA TORNILLO (LARGA)P20.40302.931.1827.85CAPATAZ (E)HH0.080017.041.36OPERARIO (E)HH0.800014.3711.50PEON (E)HH0.400011.404.5617.42HERRAMIENTAS% M.O.3.000017.420.520.52TOTAL45.79Muro Lad. Sil. Calc. Estandar 12x29x9 Soaga SolaqueadoRendimiento: 10.00 m2 /daUnidad: m2ARENA GRUESAM30.014631.090.45LADRILLO S.C. TIPO V ESTANDAR 12X29X9MLL0.0343577.5019.81CEMENTO PORTLAND TIPO IBOL0.128314.291.83CAL HIDRAULICA (30 KG.)BOL0.032813.000.43MADERA TORNILLO (LARGA)P20.40302.931.1823.70CAPATAZ (E)HH0.080017.041.36OPERARIO (E)HH0.800014.3711.50PEON (E)HH0.400011.404.5617.42HERRAMIENTAS% M.O.3.000017.420.520.52TOTAL41