112
PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS

ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL

ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS

Page 2: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL

ANNEX NÚM. 1 : SERVEIS EXISTENTS I AFECTATS

A continuació enumerem els contactes establerts amb les diferents companyies per sol·licitar

informació per a la redacció del Projecte d’Urbanització del Sector SUD – 1 al terme municipal de

la Seu d’Urgell:

ELECTRICITAT: PRODUCTORA ELÉCTRICA URGELENSE, S.A (PEUSA)

Passeig Joan Brudieu, 17

25700 la Seu d’Urgell (Alt Urgell)

Tlf: 973 35 00 44

GAS : GASBADIA-INSMAGAS

Sr. José Luis Pardo

E-mail: [email protected]

TELEFONIA: TELEFÓNICA

Unitat d’informació de serveis i Afeccions a Xarxa

E-mail: [email protected]

RECS AGRÍCOLES: COMUNITAT DE REGANTS DE L’EUCATA I DELS FRARES.

Sr. Ramon Ganyet

Tlf: 973.352.525

SANEJAMENT: SERVEIS MUNICIPALS

Ajuntament de La Seu d’Urgell

Plaça dels Oms, s/n

25700 la Seu d’Urgell

Sr. Josep Pubill

E-mail: [email protected]

AIGUA POTABLE: SERVEIS MUNICIPALS

Ajuntament de La Seu d’Urgell

Plaça dels Oms, s/n

25700 la Seu d’Urgell

Sr. Joan Farras

E-mail: [email protected]

TELECOMUNICACIONS: SERVEIS MUNICIPALS

Ajuntament de La Seu d’Urgell

Plaça dels Oms, s/n

25700 la Seu d’Urgell

ENLLUMENAT: SERVEIS MUNICIPALS

Ajuntament de La Seu d’Urgell

Plaça dels Oms, s/n

Page 3: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL

25700 la Seu d’Urgell

Sr. Joan Farras

E-mail: [email protected]

ESPAIS VERDS: SERVEIS MUNICIPALS.

Ajuntament de La Seu d’Urgell

Plaça dels Oms, s/n

25700 la Seu d’Urgell

MINISTERIO DE FOMENTO: COMPETÈNCIA DE LA N-260

Cap de Zona

Sr. Miquel

Tlf: 666 483 340

AGÈNCIA CATALANA DE L’AIGUA (LLEIDA)

Av. Alcalde Areny, 24

25002 Lleida (Segrià)

Tel. 973 28 96 20

Sr. Orlando Bencomo

Page 4: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL

ELECTRICITAT: PRODUCTORA ELÉCTRICA

URGELENSE, S.A (PEUSA)

Page 5: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

1

Anna Rodriguez (AT)

De: Oriol Betran [[email protected]]Enviado el: viernes, 13 de julio de 2012 12:19Para: 'Anna Rodriguez (AT)'Asunto: RE: RE: Punts de connexió xarxa mitja tensió

De: Joan Farràs [mailto:[email protected]] Enviado el: viernes, 13 de julio de 2012 8:15 Para: Toni León Asunto: Fwd: RE: Punts de connexió xarxa mitja tensió �

Bon dia Toni; Et reevio el correu de PEUSA, a on ens marquen els dos punts de connexió, ja veuras que un esta a tocar de sector SUD-1 pro l'altre punt de connexió, està bastant apartat de sector, de totes maneres, ells diuen que tenen les canalitzacions fins davant del edifici del Laboratori Municipal, aprop de la rotonda de davant de Bombers

Salutacions, Joan Farràs

-------- Missatge original -------- Assumpte: RE: Punts de connexió xarxa mitja tensió

Data:Thu, 12 Jul 2012 11:47:18 +0200 De:Marcel Dorna <[email protected]>A:'Joan Farràs' <[email protected]>

CC: LLUÍS CASCANTE -PEUSA- <[email protected]>

Bon dia, Joan.�

T’envio el plànol on es detalla els dos punts de connexió de la urbanització SUD-1 a la xarxa de distribució de MT de PEUSA. Tal com hem comentat, actualment disposem d’una canalització subterrània lliure que va des del CT-151 fins a davant del laboratori municipal, en el seu interior s’hi podrà instal·lar la línia de MT que connectarà la urbanització SUD-1 al CT-151.�

Salutacions�

Marcel Dorna �

De: Joan Farràs [mailto:[email protected]]Enviado el: lunes, 09 de julio de 2012 12:15 Para: Marcel Dorna Asunto: Fwd: Punts de connexió xarxa mitja tensió���

�Bon dia Marcel ; Segons la Enginyeria que ha fet el projecte d'urbanització del SUD-1, els fa falta coneixer el segon punt de connexió de la linia de mitja tensió, amb la major brevetat posible ja que es la unica questio que falte per tancar el projecte d'urbanització

2

Salutacions Joan Farràs

-------- Missatge original -------- �Assumpte:Punts de connexió xarxa mitja tensió

Data:Mon, 9 Jul 2012 11:06:32 +0200�De:Oriol Betran <[email protected]>A:<[email protected]>�

CC:<[email protected]>, "'Roger Badia'" <[email protected]>

Bon dia;��Soc Oriol Betran, l’enginyer que esta dimensionant la part elèctrica el projecte d’urbanització del sector SUD-1.��En referència al document enviat per PEUSA amb data de 5 de juliol de 2.012, comentar que estem a la expectativa que se’ns indiqui el segon punt de connexió a la xarxa de mitja tensió per tancar el projecte d’urbanització del sector SUD-1.��Agrairia que se’ns facilites aquest segon punt de connexió amb la major brevetat possible per tal de tancar i entregar el projecte d’urbanització.��Salutacions i gracies.��Atentament, Oriol Betran� �Alfa Tecnologies, Sl.�C/Orient, 78-84, Planta 4a, Despatx 2o�08172 Sant Cugat del Vallès�Tel: 93 675 60 27�Fax: 93 675 60 28�Mobil: 618 139 624�[email protected]���

� Abans d’imprimir pensi en la seva responsabilitat i compromís amb el MEDI AMBIENT!

���

"Aquest correu electrònic i, en el seu cas, qualsevol fitxer annex, conté informació de caràcter confidencial exclusivament dirigida al seu destinatari/s. Queda prohibida la seva divulgació, copia o distribució a tercers sense la prèvia autorització escrita de Alfa Tecnologies S.L. Si vostè ha rebut aquest correu electrònic per error, li preguem notifiqui immediatament aquesta circumstancia mitjançant reenviament a l’adreça electrònica del remitent. �

De conformitat amb el que estableix la LOPD l’entitat responsable del fitxer, Alfa Tecnologies S.L. garanteix l’adopció de les mesures necessàries per tal d’assegurar el tractament confidencial de les dades de caràcter personal. �

Així mateix li informem de la inclusió de les seves dades a un fitxer amb la finalitat de gestionar la prestació dels serveis propis de l’entitat, i de la possibilitat d’exercitar els drets d’accés, rectificació, cancel·lació i oposició, mitjançant escrit, adreçat a la següent adreça: Alfa Tecnologies S.L., c/ Orient 78-84 4º Desp.2 08172 Sant Cugat del Vallès”. �

��

Page 6: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS
Page 7: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS
Page 8: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS
Page 9: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL

TELEFÒNICA

Page 10: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

Telefónica de España

Direcció Operatiu EstGerència Planta Externa Est

Av. Madrid 20208014- BARCELONATel: 934839468Fax: 934839008

Barcelona 12-05-2009N/Referència: 44266

S/Referència:

ALFA TECNOLOGIES

C/ ORIENT, 78-84 PLTA. 4, DESP. 2

08190 SANT CUGAT VALLES

Assumpte: Registre de Serveis

Senyors:

Em plau trametre-us la informació que ens vau sol·licitar referent a l'obra situada a:

URB. SECTOR SUD-1 DE LA SEU D´URGELL

Us hem de comunicar que, atès que es tracta d'una informació aproximada, en casque els nostres serveis siguin danyats no es podrà eludir cap responsabilitatal·legant que l'esmentada informació és defectuosa, ja que s'ha de tenir en compteque les dades, els plànols i les acotacions son orientatives, degut a que les nostresinstal·lacions i el seu entorn geogràfic estan sotmesos a modificacions constants.Per a qualsevol aclariment o per ampliar la informació, podeu adreçar-vos al:

correu electrnnic: [email protected]

Atentament el saluda

Xavier Francès i Farré

Responsable Grup Estable Registres

(BARCELONA)

Si calgués la modificació de les instal·lacions telefòniques, ho hauràn de sol·licitar per escrit al fax del Centre de Control: 934839104 o bé a la adreça de correu electrònic: [email protected]

Page 11: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

CARRETERA NACIONAL DOS-CENTS SEIXANTA

BARRI SANT ANTONI

CALLE MARIA AURELIA CAPMANY

CALLE CAMI RAL DE LA CERDANYA

PASSATGE REC DELS FRARES

CALLE CAMI RAL DE LA CERDANYA

CALLE

MAR

IA A

URELIA

CAP

MAN

Y

CALLE CAMI RAL DE LA CERDANYA

CARRETERA NACIONAL DOS-CENTS SEIXANTA

CARRETERA NACIONAL DOS-CENTS SEIXANTA

CALLE CAMI RAL DE LA CERDANYA

42

46

24

L A S E U D ' U R G E L LL A S E U D ' U R G E L L

6c. PVC 110 mm - 228 m

4c. PVC 110 mm - 76 m

6c. PVC 110 mm - 60 m

4c. PVC 110 mm

- 43 m

2c. PVC 63 mm - 47 m

CR 222gBR H-II

CR 223gBR H-II

NOTA IMPORTANT:LA SITUACIÓ I FONDÀRIA DE LESINSTALACIONS REFLECTIDES ENAQUEST DOCUMENT NOMÉSTENEN UN VALOR ORIENTATIU. REGISTRE CANALITZACIÓ

DIRECCIÓ CREACIÓ DE XARXA DE CATALUNYAPLANTA EXTERIOR I

FECHA NOMBREEDIC.

DIBUJADO DISENADO~PLANO N

PROYECTO N

N

o

o

o-

-

-

HOJA DE

APROBADO

REG. S.G.I.

ESCALA :

HOJA DE REGISTRO

Leyenda

Armario, Arm Interc Pares

Armario, Cajas Empalme de FO

Armario, Armario de Red

Armario, Caja Interc Pares

Central Telefonica

Poste hormigon

Arqueta Grande

Poste de Madera

Arqueta Mediana

Camara de registro

PedestalCanalizacion

1

44266

Page 12: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL

ANNEX NÚM. 2: PLA D’OBRA

Page 13: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

Id Nombre de tarea

1 EXECUCIÓ OBRES

2 INICI D'OBRES I TRAMITACIÓ DE PERMISOS

3 ENDERROCS I MOVIMENT DE TERRES

4 PARAMENTS VERTICALS

5 PAVIMENTACIÓ

6 SANEJAMENT

7 CANALITZACIÓ TORRENT

8 XARXES DE SERVEIS

9 ENLLUMENAT PÚBLIC

10 PLACETA JOCS INFANTILS

11 SENYALITZACIÓ

12 JARDINERIA I REG

13 MOBILIARI URBÀ

14 SEGURETAT I SALUT

15 CONTROL DE QUALITAT

14 días

37 días

19 días

49 días

40 días

33 días

53 días

15 días

20 días

10 días

39 días

8 días

240 días

240 días

S-2 S-1 S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S30 S31 S32 S33 S34 S35 S36 S37 S38 S39 S40 S41 S42 S43 S44 S45 S46 S47 S48 S49 S50 S51mes 1 mes 2 mes 3 mes 4 mes 5 mes 6 mes 7 mes 8 mes 9 mes 10 mes 11 mes 12

Tarea

Progreso

Hito

Resumen

Tarea resumida

Hito resumido

Progreso resumido

División

Tareas externas

Resumen del proyecto

Agrupar por síntesis

Fecha límite

PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL

PROGRAMA D'OBRA Página 1

SECTOR SUD-1. LA SEU D’URGELL

Page 14: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL

ANNEX NÚM. 3: JUSTIFICACIÓ DE PREUS

Page 15: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 1

MÀ D'OBRA

CODI UA DESCRIPCIÓ PREU

€21,00h Cap de collaA0112000

€18,07h Oficial 1a (con las cargas sociales incluídas) (MO400)A0120400

€21,99H OFICIAL 1AA0121000

€19,83H OFICIAL 1A PALETAA0122000

€19,83H OFICIAL 1A ENCOFRADORA0123000

€21,99H OFICIAL 1A FERRALLISTAA0124000

€20,16H OFICIAL 1A SOLDADORA0125000

€19,83H OFICIAL 1A COL.LOCADORA0127000

€20,49H OFICIAL 1A ELECTRICISTAA012H000

€20,49H OFICIAL 1A MUNTADORA012M000

€21,99H OFICIAL 1A D'OBRA PÚBLICAA012N000

€19,83H OFICIAL 1A JARDINERA012P000

€17,61H AJUDANT ENCOFRADORA0133000

€19,53H AJUDANT FERRALLISTAA0134000

€17,68H AJUDANT SOLDADORA0135000

€17,61H AJUDANT COL.LOCADORA0137000

€19,68H AJUDANT FUSTERA013A000

€17,58H AJUDANT ELECTRICISTAA013H000

€17,61H AJUDANT MUNTADORA013M000

€17,61H AJUDANT OBRA PÚBLICAA013N000

€17,61H AJUDANT JARDINERA013P000

€17,61h AjudantA013U001

€18,39H MANOBREA0140000

€19,03H MANOBRE ESPECIALISTAA0150000

€17,01H PEÓ JARDINERA016P000

€14,69H Oficial 1eraO0121000

€12,30H ManobreO0140000

€15,03H Tècnic acreditat supervisió mandrilatO0150000

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 2

MAQUINÀRIA

CODI UA DESCRIPCIÓ PREU

€16,28H COMPRESSOR AMB DOS MARTELLS PNEUMÀTICSC1101200

€19,72H COMPRESSOR AMB TRES MARTELLS PNEUMÀTICSC1101300

€67,07H RETROEXCAVADORA AMB MARTELL TRENCADORC1105A00

€62,84h Retroexcavadora de 95 hp, amb martell de 800 kg a 1500 kgC110U025

€105,53h fresadora de pavimentC110U085

€54,50H PALA CARREGADORA MITJANA, SOBRE PNEUMÀTICSC1311120

€76,30H PALA CARREGADORA MITJANA SOBRE ERUGUES, DE119 KW

C1311270

€41,12H RETROEXCAVADORA PETITAC1315010

€58,74H RETROEXCAVADORA MITJANAC1315020

€105,73H RETROEXCAVADORA GRANC1315030

€44,55H MINICARREGADORA SOBRE PNEUMÀTICS, AMBACCESSORI RETROEXCAVADOR DE 40 A 60 CMD'AMPLÀRIA

C13161E0

€75,13h Excavadora oruga Hidr. 130-150 CV, 1-1.5 m³ (MQ104)C131Q104

€53,56h Pala carregadora de 110 hp, tipus CAT-926 o equivalentC131U000

€58,54h Pala carregadora de 170 hp, tipus CAT-950 o equivalentC131U001

€36,00h Retroexcavadora de 50 hp, tipus CAT-416 o equivalentC131U020

€58,54h retroexcavadora de 95 hp, tipus cat-446 o equivalentC131U028

€62,40h Excavadora sobre erugues amb escarificador (D-7)C131U060

€38,57h Retroexcavadora mixtaC131U560

€55,40H MOTOANIVELLADORA PETITAC1331100

€56,60H MOTOANIVELLADORA MITJANAC1331200

€49,07H CORRÓ VIBRATORI AUTOPROPULSAT, DE 8 A 10 TC1335080

€64,40H CORRÓ VIBRATORI AUTOPROPULSAT, DE 12 A 14 TC13350C0

€11,82H PICÓ VIBRANT DÚPLEX DE 1300 KGC133A030

€8,35H PICÓ VIBRANT AMB PLACA DE 60 CMC133A0K0

€42,40H MINICARREGADORA SOBRE PNEUMÀTICS AMBACCESSORI ANIVELLADOR

C133M0Q0

€54,71h Motoanivelladora de 150 hpC133U002

€27,97H CORRO VIBRATORI AUTOPROPULSAT DE 6 A 8 TC133U005

Page 16: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 3

MAQUINÀRIA

CODI UA DESCRIPCIÓ PREU

€63,01h Corró vibratori autopropulsat de 14 a 18 tC133U040

€12,86h picó vibrant dúplex de 1300 kgC133U070

€27,97H CAMIÓ PER A TRANSPORT DE 7 TC1501700

€36,34H CAMIÓ PER A TRANSPORT DE 12 TC1501800

€45,73h Camió de 250 hp, de 20 t (9,6 m3)C15019U0

€46,32H CAMIÓ PER A TRANSPORT DE 24 TC1501A00

€77,52h camió de 400 hp, de 32 t (15,4 m3)C1501U01

€35,83H CAMIÓ CISTERNA DE 6 M3C1502D00

€41,44H CAMIÓ CISTERNA DE 8 M3C1502E00

€35,62h Camió cisterna de 6000 lC1502U10

€39,68H CAMIÓ GRUAC1503000

€41,77H CAMIÓ GRUA DE 5 TC1503500

€33,74H CAMIÓ CISTELLA DE 10 M D'ALÇÀRIA COM A MÀXIMC1504R00

€23,90H DÚMPER D'1,5 T DE CÀRREGA ÚTIL, AMB MECANISMEHIDRÀULIC

C1505120

€42,80H GRUA AUTOPROPULSADA DE 12 TC150G800

€49,87H GRUA AUTOPROPULSADA DE 20 TC150G900

€49,08h Grua autopropulsada de 12 tC150GU10

€0,81H GRUA LLEUGERA DE 5 CVC150S010

€6,00M3 CANON MANTENIMENT ABOCADOR I ABOCAMENT DETERRES I RUNES

C150Z100

€6,00M3 CANON MANTENIMENT ABOCADOR I ABOCAMENT DEMIXTES DE LA CONSTRUCCIO

C150Z200

€130,41h Camió amb bomba de formigonarC1701100

€27,42H CAMIÓ CISTERNA PER A REG ASFÀLTICC1702D00

€1,68H FORMIGONERA DE 165 LC1705600

€2,72H FORMIGONERA DE 250 LC1705700

€75,97H ESTENEDORA PER A PAVIMENTS DE FORMIGÓC1709A00

€57,93h estenedora per a paviments de mescla bituminosaC1709B0U

€41,10h escombradora autopropulsadaC170E00U

€10,15H MÀQUINA TALLAJUNTSC170H000

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 4

MAQUINÀRIA

CODI UA DESCRIPCIÓ PREU

€66,18h piconadora autopropulsada de 14 a 16 tC170U035

€70,02h corró vibratori autopropulsat pneumàticC170U051

€33,32H MÀQUINA PER A PINTAR BANDES DE VIALAUTOPROPULSADA

C1B02A00

€25,48H MÀQUINA PER A PINTAR BANDES DE VIALD'ACCIONAMENT MANUAL

C1B02B00

€36,60H MÀQUINA PER A CLAVAR MUNTANTS METÀL.LICSC1B0A000

€5,07H REMOLINADOR MECÀNICC2003000

€4,67H REGLE VIBRATORIC2005000

€1,00H VIBRADOR D'AGULLAC200D000

€2,77H EQUIP I ELEMENTS AUXILIARS PER A SOLDADURAELÈCTRICA

C200P000

€7,37H EQUIP I ELEMENTS AUXILIARS PER A TALLOXIACETILÈNIC

C200S000

€3,48h Equip i elements auxiliars per a tall oxiacetilenicC200SU00

€0,83H ESBROSSADORA DE CAPÇAL DE SERRA DE 0,42 KW DEPOTÈNCIA

CR113000

€26,26H TRACTOR SOBRE PNEUMÀTICS DE 14,7 A 25,0 KW DEPOTÈNCIA, AMB EQUIP DE FRESATGE I CORRÓCOMPACTADOR I D'UNA AMPLÀRIA DE TREBALL 0,6 A1,19 M

CR261121

€2,99H MOTOSERRACRE23000

€8,16H GRUP ELECTRÒGEN DE 20 A 30 KVACZ112000

€29,55H EQUIP PER A REDUCCIÓ DEL NIVELL FREÀTIC EN 2 M I75 M DE LLARGÀRIA AMB UNA LLANÇA DE SUCCIÓ PERMETRE DE 3 M DE FONDÀRIA AMB BOMBA DE 22 KW I320 M3/H DE CABAL MÀXIM

CZ15C180

€24,64H Retroexcavadora fins a 75 CVM0210030

€2,10H Picadora de granota 105 KGM0220035

€24,04H Camió fins 12 TM0300005

€3,91H Dúmper hidràulic fins 1500 KGM0300060

€2,70M3 Canon d'abocada autoritzadaM0300200

Page 17: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 5

MATERIALS

CODI UA DESCRIPCIÓ PREU

€1,01M3 AIGUAB0111000

€19,25T SORRA DE PEDRERA DE PEDRA GRANÍTICA PER AFORMIGONS

B0312010

€19,68T SORRA DE PEDRERA DE PEDRA GRANÍTICA PER AMORTERS

B0312020

€19,25T SORRA DE PEDRERA DE PEDRA GRANÍTICA, DE 0 A 3,5MM

B0312500

€16,31M3 SAULÓ SENSE GARBELLARB0321000

€11,57m3 Sauló sense garbellar, inclòs cànon per extracció i transporta l'obra

B032U010

€15,70T GRAVA DE PEDRERA DE PEDRA GRANÍTICA, PER ADRENS

B0332020

€18,03T GRAVA DE PEDRERA DE PEDRA GRANÍTICA, DEGRANDÀRIA MÀXIMA 20 MM, PER A FORMIGONS

B0332Q10

€14,85M3 TOT-U ARTIFICIALB0372000

€8,62M3 Terra seleccionadaB03D1000

€5,28M3 TERRA ADEQUADAB03D5000

€3,61M3 TERRA TOLERABLEB03D6000

€3,33m3 terra procedent de préstec, inclòs cànon per extracció itransport a l'obra

B03DU001

€30,50m3 Bloque de piedra calcarea de 400 a 800 kg B044G077

€94,44T CIMENT PÒRTLAND AMB FILLER CALCARI CEM II/B-L32,5 R SEGONS UNE-EN 197-1, EN SACS

B0512401

€69,95T CIMENT PÒRTLAND AMB ESCÒRIA CEM II/B-S 32,5, ENSACS

B0514301

€157,01T CIMENT BLANC DE RAM DE PALETA BL 22,5 X SEGONSUNE 80305, EN SACS

B051E201

€0,09KG CALÇ AÈRIA CL 90B0532310

€0,33KG EMULSIÓ BITUMINOSA ANIÒNICA TIPUS EAR-1B0551120

€0,27KG EMULSIÓ BITUMINOSA CATIÒNICA TIPUS ECR-1B0552420

€0,47KG EMULSIÓ BITUMINOSA CATIÒNICA TIPUS ECIB0552B00

€378,74t betum asfàltic tipus b-60/70B055U001

€58,19M3 FORMIGO DE RESISTENCIA 10 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

B0602210

€35,60M3 FORMIGO DE RESISTENCIA 10 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

B0602220

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 6

MATERIALS

CODI UA DESCRIPCIÓ PREU

€36,43M3 FORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA SECA I GRANDARIA MAXIMA DELGRANULAT 20 MM

B0604120

€59,95M3 FORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

B0604210

€58,19M3 FORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

B0604220

€39,74M3 FORMIGO DE RESISTENCIA 20 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

B0606210

€63,48M3 FORMIGO DE RESISTENCIA 20 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

B0606220

€42,19M3 FORMIGO HA-25, DE CONSISTENCIA PLASTICA IGRANDARIA MAXIMA DEL GRANULAT 20 MM

B0608220

€69,62M3 FORMIGO HA-25, DE CONSISTENCIA TOVA IGRANDARIA MAXIMA DEL GRANULAT 20 MM

B0608320

€72,50m3 FORMIGO HA-30, DE CONSISTENCIA TOVA IGRANDARIA MAXIMA DEL GRANULAT 20 MM

B0608330

€61,42m3 Formigó de 15 N/mm2 de resistència característica a lacompressió, consistència plàstica i granulat màxim 20 mm,inclòs transport a l'obra

B060U110

€70,60m3 Formigó HA-25, consistència fluida i granulat màxim 20 mm,inclòs transport a l'obra

B060U440

€53,63M3 FORMIGÓ HM-20/B/20/I DE CONSISTÈNCIA TOVA,GRANDÀRIA MÀXIMA DEL GRANULAT 20 MM, AMB >=200 KG/M3 DE CIMENT, APTE PER A CLASSED'EXPOSICIÓ I

B0641050

€61,16m3 Formigó HM-20/B/20/I de consistència tova, grandàriamàxima del granulat 20 mm, amb >= 200 kg/m3 de ciment,apte per a classe d'exposició I

B064300B

€58,44M3 FORMIGÓ HM-20/P/40/I DE CONSISTÈNCIA PLÀSTICA,GRANDÀRIA MÀXIMA DEL GRANULAT 40 MM, AMB >=200 KG/M3 DE CIMENT, APTE PER A CLASSED'EXPOSICIÓ I

B064500C

€57,93m3 Formigó HA-25/B/20/IIa de consistència tova, grandàriamàxima del granulat 20 mm, amb >= 275 kg/m3 de ciment,apte per a classe d'exposició IIa

B0652050

€62,68M3 FORMIGO AMB GRANULAT GRANITIC HF-3,5B06BU010

€1,06KG FILFERRO RECUIT DE DIÀMETRE 1,3 MMB0A14200

€1,09KG CLAU ACERB0A31000

€0,60KG ACER EN BARRES CORRUGADES B 500 S DE LÍMITELÀSTIC >= 500 N/MM2

B0B2A000

Page 18: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 7

MATERIALS

CODI UA DESCRIPCIÓ PREU

€1,77M2 MALLA ELECTROSOLDADA DE BARRES CORRUGADESD'ACER ME 15X15 CM, D:5-5 MM, B 500 T, 6X2,2 M,SEGONS UNE 36092

B0B34133

€2,29M2 MALLA ELECTROSOLDADA DE BARRES CORRUGADESD'ACER ME 15X15 CM, D:6-6 MM, B 500 T, 6X2,2 M,SEGONS UNE 36092

B0B34134

€0,40M TAULÓ DE FUSTA DE PI PER A 10 USOSB0D21030

€8,12M3 PUNTAL RODÓ DE FUSTA DE 7 A 9 CM DE DIÀMETRE IDE 2 A 2,5 M D'ALÇÀRIA, PER A 30 USOS

B0D61170

€7,73CU PUNTAL METÀL.LIC I TELESCÒPIC PER A 3 M D'ALÇÀRIAI 150 USOS

B0D625A0

€18,55CU PUNTAL METÀL.LIC I TELESCÒPIC PER A 5 M D'ALÇÀRIAI 150 USOS

B0D629A0

€2,36M2 TAULER ELABORAT AMB FUSTA DE PI, DE 22 MM DEGRUIX, PER A 5 USOS

B0D71120

€2,10M2 PLAFÓ METÀL.LIC DE 50X50 CM PER A 20 USOSB0D81250

€2,58M2 PLAFÓ METÀL.LIC DE 50X250 CM PER A 20 USOSB0D81650

€1,03M2 PLAFÓ METÀL.LIC DE 50X250 CM PER A 50 USOSB0D81680

€1,01U MOTLLE METÀL.LIC PER A ENCOFRAT DE PERICÓD'ENLLUMENAT DE 38X38X55 CM, PER A 150 USOS

B0DF7G0A

€1,44U MOTLLE METÀL.LIC PER A ENCOFRAT DE PERICÓ DEREGISTRE DE 57X57X125 CM, PER A 150 USOS

B0DF8H0A

€6,34m3 Amortització de cindri metàl·licaB0DFU001

€1,91L DESENCOFRANTB0DZA000

€0,29U PART PROPORCIONAL D'ELEMENTS AUXILIARS PER APLAFONS METÀL.LICS, DE 50X100 CM

B0DZP400

€0,43U PART PROPORCIONAL D'ELEMENTS AUXILIARS PER APLAFONS METÀL.LICS, DE 50X250 CM

B0DZP600

€10,98u Part proporcional d'encofrat per a ancortage de canonadaformada per petit mur pantalla armat de 45cm d'ample, 2mde llarg, fins a 4m de profunditat mesurat a partir de lacanonada i massís de formigó armat transmissor de l'esforç

B0DZU600

€0,28U MAÓ MASSÍS D'ELABORACIÓ MECÀNICA, DE290X140X50 MM, PER A REVESTIR, CATEGORIA I, HD,SEGONS LA NORMA UNE-EN 771-1

B0F15251

€0,20U MAÓ CALAT, DE 29X14X10 CM, PER A REVESTIRB0F1D2A1

€6,96M3 DISPOSICIÓ CONTROLADA A MONODIPÒSIT SENSEBÀSCULA, DE RESIDUS INERTS

B2RA3400

€6,73M3 Excavacio en rases i pous sense classificarB3710001

€1,59KG ACER A/42-B (S 275 JR), EN PERFILS LAMINATS SÈRIEIPN, IPE, HEB, HEA, HEM, UPN, TREBALLAT AL TALLER IGALVANITZAT

B44Z501J

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 8

MATERIALS

CODI UA DESCRIPCIÓ PREU

€1,10KG ACER S275JR SEGONS UNE-EN 10025-2, FORMAT PERPEÇA SIMPLE, EN PERFILS LAMINATS EN CALENTSÈRIE L, LD, T, RODÓ, QUADRAT, RECTANGULAR IPLANXA, TREBALLAT AL TALLER PER A COL.LOCARAMB SOLDADURA I AMB UNA CAPA D'IMPRIMACIÓANTIOXIDANT

B44Z502A

€1,41M2 FELTRE DE POLIPROPILÈ PER A LÀMINA SEPARADORAAMB UN PES DE 200 A 250 G/M2

B7B11M00

€0,70m2 MALLA ANTIHERBES AMB UN PES MÍNIM DE 140 G/M2INCLOU ELS GANXOS DE SUBJECCIÓ

B7B1N000

€28,90M PERFIL ELASTOMÈRIC D'ÀNIMA PLANA DE 150 MMD'AMPLÀRIA PER A JUNT DE TREBALL INTERIOR

B7J10234

€49,20M PERFIL ELASTOMÈRIC D'ÀNIMA CIRCULAR DE 200 MMD'AMPLÀRIA PER A JUNT DE DILATACIÓ INTERIOR

B7J10A61

€5,85M PLACA DE POLIESTIRÈ EXPANDIT DE 30 MM DE GRUIX IDENSITAT DE 20Kg/m3

B7J10AE5

€6,80KG PINTURA REFLECTORA PER A SENYALITZACIÓB8ZB1000

€4,01M VORADA RECTA DE FORMIGÓ, MONOCAPA, AMBSECCIÓ NORMALITZADA PER A VIANANTS A3 DE 20X8CM, DE CLASSE CLIMÀTICA B, CLASSE RESISTENT AL'ABRASIÓ H I CLASSE RESISTENT A FLEXIÓ S (R-3,5MPA), SEGONS UNE-EN 1340

B96513C0

€3,58M VORADA RECTA DE FORMIGÓ, MONOCAPA, AMBSECCIÓ NORMALITZADA DE CALÇADA C5 DE 25X15 CM,DE CLASSE CLIMÀTICA B, CLASSE RESISTENT AL'ABRASIÓ H I CLASSE RESISTENT A FLEXIÓ T (R-5MPA), SEGONS UNE-EN 1340

B96517D0

€7,15M VORADA RECTA DE FORMIGÓ AMB RATLLATSUPERIOR, MONOCAPA, AMB SECCIÓ NORMALITZADADE CALÇADA C9 DE 13X25 CM, DE CLASSE CLIMÀTICAB, CLASSE RESISTENT A L'ABRASIÓ H I CLASSERESISTENT A FLEXIÓ T (R-5 MPA), SEGONS UNE-EN1340

B9652AD0

€14,00M VORADA CORBA DE FORMIGÓ, MONOCAPA, AMBSECCIÓ NORMALITZADA DE CALÇADA C5 DE 25X15 CM,DE CLASSE CLIMÀTICA B, CLASSE RESISTENT AL'ABRASIÓ H I CLASSE RESISTENT A FLEXIÓ T (R-5MPA), SEGONS UNE-EN 1340

B96617D0

€22,77M VORADA DE XAPA GALVANITZADA DE 10 MM DE GRUIXI 200 MM D'ALÇÀRIA, INCLÒS ELEMENTS METÀL.LICSD'ANCORATGE SOLDATS A LA XAPA

B96AUG10

€1,53U LLOSETA BLANCA DE MORTER COMPRIMIT DE 30X30X8CMS PER A RIGOLA

B974V002

€115,17M GUAL PER A VEHICLES MODEL 60, DE PEDRAGRANITICA, GRIS QUINTANA, GRIS PIRINEOS OOCHAVO JASPE, GRA FI, AMB LES CARES VISTESFLAMEJADES, DE SECCIO 62X30 CM, INCLOS PARTPROPORCIONAL DE CAPS DE REMAT DE 62X40X30 CMCONFORMATS AMB QUART DE CIRCUMFERENCIA DE40 CM DE RADI

B981U015

Page 19: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 9

MATERIALS

CODI UA DESCRIPCIÓ PREU

€137,27M GUAL PER A VIANANTS MODEL R-120, RECTE DEPEDRA GRANITICA GRIS QUINTANA, GRIS PIRINEOS OOCHAVO JASPE, AMB LES CARES VISTESFLAMEJADES, FORMAT PER RAMPES DE 121.8X40X6CM, INCLOS PART PROPORCIONAL DE CAPS DE REMATI FORATS PER A PAPERERES I SEMAFOR, COL.LOCATSOBRE SOLERA DE FORMIGO DE RESISTENCIA 15N/MM2 DE 10 CM DE GRUIX

B981U025

€109,27U ESCOSSELL DE PLANXA D'ACER GALVANITZAT DE120X120X20 DE 10 MM DE GRUIX

B99ZZ050

€4,80M2 PANOT GRIS DE 20X20X4 CM, CLASSE 1A, PREUSUPERIOR

B9E13101

€9,68M2 PANOT GRIS DE 20X20X8 CM, CLASSE 1A PREUSUPERIOR

B9E14100

€13,72M2 LLAMBORDÍ DE FORMIGÓ DE FORMA RECTANGULARDE 10X20 CM I 8 CM DE GRUIX, PREU SUPERIOR

B9F15100

€494,08T POLS DE QUARS DE COLOR GRISB9GZ1210

€26,17t mescla bituminosa en calent d-12, amb granulat granític,inclòs filler, sense incloure betum, a peu de planta asfàltica

B9H1U512

€25,64t mescla bituminosa en calent s-20, amb granulat granític,inclòs filler, sense incloure betum, a peu de planta asfàltica

B9H1U620

€202,76T BETUM ASFALTIC TIPUS B-60/70B9HZ1000

€38,50M2 PAVIMENT DE CAUTXU RECICLAT DE 45 MM DE GRUIX,COL.LOCAT SOBRE BASE DE FORMIGO. INCLOSREPERCUSIO DE PECES I MITJANS AUXILIARSNECESSARIS PER AL SEU MUNTATGE.

B9P0U020

€163,13M BARANA METÀL.LICA MODULAR URBANA FORMADAPER UN PASSAMA DE RODO D'ACER INOXIDABLE DE63,5 MM DE DIÀMETRE I 2 MM DE GRUIX, AMB SUPORTSDE FOSA AMB IMPRIMACIO EPOXI I PINTURAMETÀL.LICA OXIRON O EQUIVALENT, O SUPORTSD'ACER CROMAT, INCLOSES LES PLAQUESD'ANCORATGE DE FOSA AMB EL MATEIX ACABAT

BB15CV05

€56,51U PLACA TRIANGULAR, DE 70 CM AMB LÀMINAREFLECTORA DE NIVELL 1 D'INTENSITAT

BBM11102

€54,72U PLACA CIRCULAR, DE DIÀMETRE 60 CM AMB LÀMINAREFLECTORA DE NIVELL 1 D'INTENSITAT

BBM12602

€85,72U PLACA OCTOGONAL, DE DIÀMETRE 60 CM AMB LÀMINAREFLECTORA DE NIVELL 1 D'INTENSITAT

BBM13602

€67,20U PLACA INFORMATIVA DE 60X60 CM AMB LÀMINAREFLECTORA DE NIVELL 1 D'INTENSITAT

BBM1AHA2

€3,67KG MICROESFERES DE VIDREBBM1M000

€16,75M BARRERA DE SEGURETAT FLEXIBLE D'ACERGALVANITZAT, FORMADA PER PERFIL LONGITUDINAL,DE SECCIÓ EN DOBLE ONA AMB CARACTERÍSTIQUESAASHO

BBM2AA00

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 10

MATERIALS

CODI UA DESCRIPCIÓ PREU

€8,05M SUPORT DE PERFIL D'ACER GALVANITZAT C-120, PER ABARRERES DE SEGURETAT

BBMZ1210

€58,50U FITA POLIETILE FLEXIBLEBBMZ1653

€7,83U AMORTIDOR DE PERFIL D'ACER GALVANITZAT, DESECCIÓ EN DOBLE ONA, PER A BARRERES DESEGURETAT

BBMZA810

€5,54U CAPTALLUMS PER A BARRERA DE SEGURETATREFLECTOR A DUES CARES

BBMZC010

€5,36M PART PROPORCIONAL D'ELEMENTS DE FIXACIÓ, PER ABARRERES DE SEGURETAT

BBMZP010

€20,58U TERMINAL EN FORMA DE CUA DE PEIX, PER ABARRERES DE SEGURETAT FLEXIBLES

BBMZT010

€29,19M SUPORT FABRICAT EN TUB CILINDRIC ACANALAT ENPERFIL D'ALUMINI, DE 80 MM DE DIAMETRE, GRUIXENTRE 3 I 5 MM, PINTAT AMB PINTURA EN POLS DEPOLIESTER ANODITZAT, INCLOSA BRIDAD'ANCORATGE DE FUNDICIO I ACCESSORIS

BBMZU240

€80,45U REIXA EMBORNAL TEIDE DE FOSA DUCTIL, DE 750 X300 MM

BD1BU040

€63,90U BASTIMENT I REIXA PRACTICABLE DE FOSA DUCTILPER A EMBORNAL DE 70 X 30 CM, TIPUS AJUNTAMENTDE BARCELONA, DE CARREGA DE TRENCAMENTSUPERIOR A 25 T SEGONS LES NORMES UNE 41-300-87I EN-124, RECOBERTA DE PINTURA ASFALTICA

BD5ZV010

€14,23M TUB DE FORMIGÓ ARMAT DE 300 MM DE DIÀMETRECLASSE 3, SEGONS ASTM C 76 AMB UNIÓ DE CAMPANAAMB ANELLA ELASTOMÈRICA

BD78B380

€9,25M Tub de pvc de 300 mm de diàmetre nominal de formacióhelicoïdal amb perfil rígid nervat exteriorment, per anarformigonat amb unió elàstica amb massilla adhesiva depoliuretà

BD7F7570

€216,28M TUB DE POLIETILÈ ALTA DENSITAT D EXT 1200 MMTIPUS ECOPAL O SIMILAR.

BD7FC120

€11,18M TUB DE POLIETILÈ ALTA DENSITAT D EXT 250 MMTIPUS ECOPAL O SIMILAR.

BD7FC250

€16,57M TUB DE POLIETILÈ ALTA DENSITAT D EXT 315 MMTIPUS ECOPAL O SIMILAR.

BD7FC315

€24,18M TUB DE POLIETILÈ ALTA DENSITAT D EXT 400 MMTIPUS ECOPAL O SIMILAR.

BD7FC400

€42,85M TUB DE POLIETILÈ ALTA DENSITAT D EXT 500 MMTIPUS ECOPAL O SIMILAR.

BD7FC500

€100,18ML TUB DE POLIETILÈ ALTA DENSITAT D EXT 800 MMTIPUS ECOPAL O SIMILAR.

BD7FC800

€28,75M ENTRONCAMENT DEL NOU TUB T400 AMB ESCOMESAEDIFICIS MITJANÇANT PEÇA CLIP

BD7FCON4

Page 20: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 11

MATERIALS

CODI UA DESCRIPCIÓ PREU

€3,61U GRAO PER A POU DE REGISTRE DE POLIPROPILÈ DE250X350X250 MM I 3 KG DE PES

BDDZV001

€79,12U BASTIMENT I TAPA DE FOSA DUCTIL TIPUSAJUNTAMENT DE BARCELONA, DE CARREGA DETRENCAMENT SUPERIOR A 40 T SEGONS LES NORMESUNE 41-300-87 I EN-124 I LLUM INTERIOR 600 MM,RECOBERTA DE PINTURA ASFALTICA

BDDZV005

€5.977,80u Separador d'hidrocarburs-Decantador de llots i sorres, ambby-pass integrat, model Aquatesum NSBD36 o similar,fabricat en polyester reforçat amb fibra de vidre PRFV. ambcapacitat de fluxe de 36l/s i pics de fins a 360l/s.

BDE60015

€16.432,56u Separador d'hidrocarburs-Decantador de llots i sorres, ambby-pass integrat, model Aquatesum NSBD110 o similar,fabricat en polyester reforçat amb fibra de vidre PRFV. ambcapacitat de fluxe de 110l/s i pics de fins a 1100l/s.

BDE60110

€79,08U PERICÓ DE REGISTRE DE FORMIGÓ PREFABRICATSENSE FONS, DE 100x100 CM I 80 CM DE FONDÀRIA,PER A INSTAL·LACIONS DE SERVEIS, INCLÒS TAPA.

BDK2UC40

€12,13U BASTIMENT I TAPA PER A PERICÓ DE SERVEIS DEFOSA GRISA DE 420X420X40 MM I DE 25 KG DE PES

BDKZ3150

€35,70U BASTIMENT I TAPA PER A PERICÓ DE SERVEIS DEFOSA GRISA DE 620X620X50 MM I DE 52 KG DE PES

BDKZ3170

€0,65M TUB DE POLIETILÈ DE DENSITAT ALTA, DE 32 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINALSEGONS UNE 53131

BFB16400

€2,55M TUB DE POLIETILÈ DE DESIGNACIÓ PE 100, DE 63 MMDE DIÀMETRE NOMINAL, DE 16 BAR DE PRESSIÓNOMINAL, SÈRIE SDR 11, SEGONS LA NORMA UNE-EN12201-2

BFB19600

€2,46M TUB DE POLIETILÈ DE DESIGNACIÓ PE 100, DE 75 MMDE DIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓNOMINAL, SÈRIE SDR 17, SEGONS LA NORMA UNE-EN12201-2

BFB1A400

€7,32M TUB DE POLIETILÈ DE DENSITAT ALTA, DE 110 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINALSEGONS UNE 53131

BFB1E400

€12,42M CANONADA PEAD DEXT 160I ESPESSOR DE 9,5 MM I PN10

BFB1UB16

€0,17M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 16 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 7,4, SEGONS LA NORMA UNE-EN 12201-2

BFB23400

€0,25M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 25 MM DEDIÀMETRE NOMINAL, DE 6 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 11, SEGONS LA NORMA UNE-EN 12201-2

BFB25300

€1,18M TUB DE POLIETILE 16 MM TIPUS TEC-LINE, AMBGOTEIJADORS C/. 30 CM

BFB26001

€0,39M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 32 MM DEDIÀMETRE NOMINAL, DE 6 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 11, SEGONS LA NORMA UNE-EN 12201-2

BFB26300

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 12

MATERIALS

CODI UA DESCRIPCIÓ PREU

€0,61M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 40 MM DEDIÀMETRE NOMINAL, DE 6 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 11, SEGONS LA NORMA UNE-EN 12201-2

BFB27300

€0,95M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 50 MM DEDIÀMETRE NOMINAL, DE 6 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 11, SEGONS LA NORMA UNE-EN 12201-2

BFB28300

€2,50M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 50 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 7,4, SEGONS LA NORMA UNE-EN 12201-2

BFB28400

€4,00M TUB DE POLIETILÈ DE DENSITAT BAIXA, DE 63 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINALSEGONS UNE 53131

BFB29400

€20,67U DERIVACIÓ MANIPULADA DE POLIETILÈ DE DENSITATALTA DE 110 MM DE DN I 10 BAR DE PRESSIÓ NOMINAL,SEGONS UNE-EN 12201-3 AMB RAMAL A 90° DE 90 MMDE DN, PER A SOLDAR

BFBA1534

€15,49U CON DE REDUCCIÓ, MANIPULAT, DE POLIETILÈ DEDENSITAT ALTA DE 75 MM A 63 MM DE DN DE 10 BARDE PRESSIÓ NOMINAL, SEGONS UNE-EN 12201-3, PERA SOLDAR

BFBC1323

€17,80U CON DE REDUCCIÓ, MANIPULAT, DE POLIETILÈ DEDENSITAT ALTA DE 90 MM A 75 MM DE DN DE 10 BARDE PRESSIÓ NOMINAL, SEGONS UNE-EN 12201-3, PERA SOLDAR

BFBC1433

€21,08U CON DE REDUCCIÓ, MANIPULAT, DE POLIETILÈ DEDENSITAT ALTA DE 110 MM A 90 MM DE DN DE 10 BARDE PRESSIÓ NOMINAL, SEGONS UNE-EN 12201-3, PERA SOLDAR

BFBC1543

€3,29U ACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 32 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

BFWB1605

€27,24U ACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 63 MM DE DIÀMETRE NOMINAL EXTERIOR, 16BAR DE PRESSIÓ NOMINAL, PER A SOLDAR

BFWB1962

€30,50U ACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 75 MM DE DIÀMETRE NOMINAL EXTERIOR, 10BAR DE PRESSIÓ NOMINAL, PER A SOLDAR

BFWB1A42

€44,45U ACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 250 MM DE DIÀMETRE NOMINAL EXTERIOR,10 BAR DE PRESSIÓ NOMINAL, PER A SOLDAR

BFWB1E42

€0,48U PART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

BFWB1E44

€0,97U ACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 16 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

BFWB2305

€1,84U ACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 25 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

BFWB2505

Page 21: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 13

MATERIALS

CODI UA DESCRIPCIÓ PREU

€3,29U ACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 32 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

BFWB2605

€5,10U ACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 40 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

BFWB2705

€5,56U ACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 50 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

BFWB2805

€10,64U ACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 63 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

BFWB2905

€38,50U ACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

BFYB143

€32,55U ACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 315MM DE DIÀMETRE NOMINAL EXTERIOR

BFYB145

€0,02U PART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 32MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

BFYB1605

€0,28U PART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 63MM DE DIÀMETRE NOMINAL EXTERIOR, DE 16 BAR DEPRESSIÓ NOMINAL, SOLDAT

BFYB1962

€0,27U PART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 75MM DE DIÀMETRE NOMINAL EXTERIOR, DE 10 BAR DEPRESSIÓ NOMINAL, SOLDAT

BFYB1A42

€0,48U PART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 250MM DE DIÀMETRE NOMINAL EXTERIOR, DE 10 BAR DEPRESSIÓ NOMINAL, SOLDAT

BFYB1E42

€0,02U PART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 16MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

BFYB2305

€0,04U PART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 25MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

BFYB2505

€0,05U PART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 32MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

BFYB2605

€0,08U PART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 40MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

BFYB2705

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 14

MATERIALS

CODI UA DESCRIPCIÓ PREU

€0,20U PART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 50MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

BFYB2805

€0,19U PART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 63MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

BFYB2905

€0,94U PART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUB DE FORMIGÓ ARMAT PREFABRICAT, DE 300MM DE DIÀMETRE I CLASSE 3 SEGONS ASTM C 76, AMBUNIÓ DE CAMPANA AMB ANELLA ELASTOMÈRICA

BFYG1BF1

€281,98u Caixa general de protecció CGP-11 de 400 A composta perenvolvent aïllant de poliester reforçat amb fibra de vidre,IP-437, contenint fusibles i bases portafusibles tipus H mida2 de 3x400 A, neutre seccionable i borns bimetàl·lics per acable de 240 mm2 de secció, inclòs caixa i tapa per aprotecció de cables

BG110020

€1,25M TUB RÍGID DE PVC, DE 32 MM DE DIÀMETRE NOMINAL,AÏLLANT I NO PROPAGADOR DE LA FLAMA, AMB UNARESISTÈNCIA A L'IMPACTE DE 2 J, RESISTÈNCIA ACOMPRESSIÓ DE 1250 N I UNA RIGIDESA DIELÈCTRICADE 2000 V

BG212910

€0,57M TUB CORBABLE CORRUGAT DE PVC, DE 50 MM DEDIÀMETRE NOMINAL, AÏLLANT I NO PROPAGADOR DELA FLAMA, RESISTÈNCIA A L'IMPACTE DE 3 J,RESISTÈNCIA A COMPRESSIÓ DE 250 N, PER ACANALITZACIONS SOTERRADES

BG22RB10

€1,17M TUB CORBABLE CORRUGAT DE PVC, DE 80 MM DEDIÀMETRE NOMINAL, AÏLLANT I NO PROPAGADOR DELA FLAMA, RESISTÈNCIA A L'IMPACTE DE 6 J,RESISTÈNCIA A COMPRESSIÓ DE 250 N, PER ACANALITZACIONS SOTERRADES

BG22RG10

€1,68M TUB CORBABLE CORRUGAT DE PVC, DE 100 MM DEDIÀMETRE NOMINAL, AÏLLANT I NO PROPAGADOR DELA FLAMA, RESISTÈNCIA A L'IMPACTE DE 12 J,RESISTÈNCIA A COMPRESSIÓ DE 250 N, PER ACANALITZACIONS SOTERRADES

BG22RJ10

€1,02M TUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 63 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 20 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

BG22TD10

€1,88M TUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 110 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 28 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

BG22TK10

Page 22: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 15

MATERIALS

CODI UA DESCRIPCIÓ PREU

€2,46M TUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 125 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 28 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

BG22TL10

€3,24M TUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 160 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 40 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

BG22TP10

€5,05M TUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 200 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 40 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

BG22TQ10

€0,32M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, UNIPOLAR DE SECCIÓ 1X2,5 MM2

BG311300

€0,44M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, BIPOLAR DE SECCIÓ 2X1,5 MM2

BG312200

€0,52M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, BIPOLAR DE SECCIÓ 2X2,5 MM2

BG312300

€0,54M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TRIPOLAR DE SECCIÓ 3X1,5 MM2

BG313200

€0,75M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TRIPOLAR DE SECCIÓ 3X2,5 MM2

BG313300

€0,68M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TETRAPOLAR DE SECCIÓ 4X1,5 MM2

BG314200

€1,17M CONDUCTOR DE COURE NU, UNIPOLAR DE SECCIÓ1X35 MM2

BG380900

€2,13M CONDUCTOR DE COURE DE DESIGNACIO UNE RV 0,6/1KV, AMB AILLAMENT DE POLICLORUR DE VINIL (PVC),COBERTA DE POLIETILE RETICULAT (XLPE) IARMADURA LLEUGERA DE FLEIXOS D'ACER TIPUS F,DE 4 X 6 MM2

BG3ME401

€1,10U TERMINAL PER A CABLE DE COURE DE 35 MM2BG3ZE110

€9,28U CAIXA DE CONNEXIONS I TALLACIRCUITS PER A UNA ODUES LAMPADES

BG46E010

€9,03U PIQUETA DE CONNEXIÓ A TERRA D'ACER IRECOBRIMENT DE COURE, DE 2500 MM DE LLARGÀRIA,DE 18,3 MM DE DIÀMETRE, ESTÀNDARD

BGD14410

€10,78U PLACA PRESA DE TERRA DE 500 X 500 X 3 MMBGD2E010

€1,12U CARTUTX PER A SOLDADURA CADWELDBGDZE020

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 16

MATERIALS

CODI UA DESCRIPCIÓ PREU

€0,61U SALS DE SULFAT DE SODI I MAGNESIBGDZE030

€6.658,90u TRANSFORMADOR TRIFÀSIC REDUCTOR DE TENSIÓ(MT/BT) CONSTRUÏT D'ACORD AMB UNE-EN 60076 I UNE21428, DIELÈCTRIC OLI D'ACORD AMB UNE 21320, DE630 KVA DE POTÈNCIA, TENSIÓ ASSIGNADA 36 KV,TENSIÓ PRIMARI 23,1 KV, TENSIÓ DE SORTIDA DE 420 VENTRE FASES EN BUIT O DE 242/420 V ENTRE FASESEN BUIT, FREQÜÈNCIA 50 HZ, GRUP DE CONNEXIÓ DYN11, REGULACIÓ AL PRIMARI +/- 2,5%, +/- 5%, ,PROTECCIÓ PRÒPIA DEL TRANSFORMADOR AMBTERMÒMETRE, PER INSTAL·LACIÓ INTERIOR OEXTERIOR, CISTERNA D'ALETES, REFRIGERACIÓNATURAL (ONAN), COMMUTADOR DE REGULACIÓMANIOBRABLE SENSE TENSIÓ, PASSATAPES MT DEPORCELLANA, PASSABARRES BT DE PORCELLANA, 2TERMINALS DE TERRA, DISPOSITIU DE BUIDAT I PRESADE MOSTRES, DISPOSITIU D'OMPLIMENT, PLACA DECARACTERÍSTIQUES I PLACA DE SEGURETAT EINSTRUCCIONS DE SERVEI

BGG11AA0

€3.675,56u Cel.la de línia (entrada/sortida), amb tensió assignada de 36kV, de tipus modular, envolvent de xapa d'acer galvanitzat,tall i aïllament íntegre en SF6, intensitat nominal de 630 A/20kA, amb interruptor-seccionador rotatiu tripolar de 2posicions (connectat, seccionat) per aïllar les parts esquerra idreta del mòdul, amb comandament motoritzat, captadorscapacitius per a la detecció de tensió i sistema d'alarmasonora de posada a terra

BGH33626

€3.362,45u CEL·LA DE PROTECCIÓ DEL TRANSFORMADOR AMBFUSIBLES AMB TENSIÓ ASSIGNADA DE 36 KV, DE TIPUSMODULAR, ENVOLVENT DE XAPA D'ACERGALVANITZAT, TALL I AÏLLAMENT ÍNTEGRE EN SF6,INTENSITAT NOMINAL DE 630 A/20 KA, AMBINTERRUPTOR-SECCIONADOR ROTATIU TRIPOLAR DE3 POSICIONS (CONNECTAT, SECCIONAT, POSADA ATERRA) AMB COMANDAMENT MANUAL COMBINAT AMBFUSIBLES FREDS, CAPTADORS CAPACITIUS PER A LADETECCIÓ DE TENSIÓ I SISTEMA D'ALARMA SONORADE POSADA A TERRA.

BGH76316

€5.918,00U EDIFICI DE TRANSFORMACIÓ ORMAZABAL PFU-4 OSIMILAR.

BGJ14011

€7,54m Cable elèctric de tensió mitja (MT), de designació UNE RHZ118/30 kV, unipolar de 1x240 mm2 de secció, amb conductord'alumini, aïllament de polietilè reticulat (XLPE), pantallametàl.lica de fils de coure de 16 mm2 de secció i cobertaexterior de poliolefina termoplàstica (Z1)

BGK226A0

€0,30U PART PROPORCIONAL D'ACCESSORIS PER ACONDUCTORS DE COURE NUS

BGW38000

€0,11U PART PROPORCIONAL D'ELEMENTS ESPECIALS PER ACONDUCTORS DE COURE NUS

BGY38000

€3,78u Part proporcional d'elements especials per a piquetes deconnexió a terra

BGYD1000

Page 23: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 17

MATERIALS

CODI UA DESCRIPCIÓ PREU

€3.280,15U CENTRE DE COMANDAMENT AMB EQUIPS DECOMPTADORS COMPANYIA ACTIVA-REACTIVA-DOBLETARIFA AMB PROTECCIO I MANIOBRA PER A DUESSORTIDES

BHG2E010

€315,00U COLUMNA CILINDRICA DE 6 METRES BRAÇ EN ACERGALVANITZAT DE 168MM. DE DIAMETRE

BHM1E058

€14,68U CONJUNT DE QUATRE PERNS PER A CIMENTACIOBHMZ1006

€330,00u Lluminaria de la marca GEE model Iberia inclou làmpadad'halogenurs metàl·lics 70W i reactancia electronica

BHN84B70

€138,98U PROJECTOR PFE-400/CBM SAP 150 W GENERALELECTRIC

BHQ0E010

€947,13U FANAL PRIM DE 10 M D'ALÇADA FORMAT PERCOLUMNA DE TUB D'ACER GALVANITZAT O D'ACERINOXIDABLE DE DIAMETRE SUPERIOR 200 MM IINFERIOR DE 77 MM AMB REFORÇ INTERIOR I UNPERFIL CONDUCTOR DE L'AIGUA QUE PUGUI ENTRAR,2 PORTES RECTANGULARS DELS REGISTRES AMBTANCAMENTS PER A CLAU DE TUB TRIANGULAR IPROJECTORS DE REVOLUCIO PARABOLICS OEL.LIPTICS. COL.LOCAT SOBRE PLACA BASE DEFIXACIO DE 400 MM DE DIAMETRE AMB 8 CARTELES IANELL DE REFORÇ PER PERNS D'ANCORATGEENROSCATS EN UN DELS EXTREMS AMB DOBLEROSCA I ARANDELA

BHR02B11

€16,64U LAMPADA DE VAPOR DE SODI DE PRESSIO ALTA DE150 W, PLUS

BHU3E031

€42,12U FILTRE DE PLASTIC AMB ROSCA MASCLE D'1'', PERINTERCALAR A LA TUBERIA, DE 120 MESH, AMB COSDESMUNTABLE PER AL SEU MANTENIMENT, PER A UNCABAL MAXIM DE 5 M3/H

BJ65U020

€51,50U VENTOSA PER A ROSCAR DE 1´´ DE DIÀMETRENOMINAL, DE 16 BAR DE PRESSIÓ DE PROVA, DE FOSA,PREU ALT

BJM33BE0

€354,00U VENTOSA PER A EMBRIDAR DE 50 MM DE DIÀMETRENOMINAL, DE 16 BAR DE PRESSIÓ DE PROVA, DE FOSA,PREU ALT

BJM35BE0

€14,27U Valvules mascleBJS11262

€8,56U Colze mascle femella de 1 1/2'' de llautóBJS11263

€8,56U T de 1 1/2'' de llautóBJS11264

€8,56U Enllaç mixte de 501/2'' mascle de llautóBJS11265

€119,90U By pas mestreBJS11399

€90,00U By pas sectorial de 1''BJS113678

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 18

MATERIALS

CODI UA DESCRIPCIÓ PREU

€21,34U ASPERSOR EMERGENT DE TURBINA LUBRICAT PERAIGUA, AMB ALÇARIA D'ELEVACIÓ DE 9,2 CM, D'UNRADI D'ACCIÓ ENTRE 8,4 I 15 M, DE CERCLE COMPLETO SECTORIAL, AMB CONNEXIÓ ROSCADA FEMELLA DE3/4'', AMB TOBERA INCORPORADA, AMBVÀLVULA-FILTRE ANTIDRENATGE, AMB VELOCITAT DEGIR REGULABLE I MEMÒRIA DEL SECTOR

BJS2U005

€14,22U DIFUSOR EMERGENT AMB UNA ALÇARIA D'ELEVACIÓDE 15 CM, D'UN ABAST ENTRE 2,0 I 4,5 M, AMB ROSCAFEMELLA D'1/2'', AMB VÀLVULA ANTIDRENATGE,EQUIPAT AMB TOBERA STANDARD

BJS4U115

€479,48U PROGRAMADOR ELECTRÒNIC DE TRIPLE PROGRAMA,AMB CONTROL D'APORTACIO D'AIGUA, AMB TEMPS DEPROGRAMACIO DES DE 1 MIN. FINS A 12 H PERESTACIO EN PASSOS D'1 MIN., AMB 24 ESTACIONS,AMB POSSIBILITAT DE 8 ARRENCADES PER DIA IPROGRAMA, AMB TRANSFORMADOR INTERIOR230/26,5 V 50 HZ, AMB BATERIA RECARGABLE DESALVAGUARDA DEL PROGRAMA, AMB CIRCUITD'ARRENCADA DE BOMBA, CARCASSA DE PLASTICESTANCA I PREPARAT PER A MUNTATGE MURALEXTERIOR

BJSAU324

€5,46U Vàlvula manualBJSBCI02

€245,93u HIDRANT SOTERRAT AMB PERICÓ DE REGISTRE, AMBUNA SORTIDA DE 100 MM DE DIÀMETRE I DE 4' DEDIÀMETRE DE CONNEXIÓ A LA CANONADA

BM213620

€1,12u PART PROPORCIONAL D'ELEMENTS ESPECIALS PER AHIDRANTS

BMY21000

€80,15U VALVULA DE COMPORTA DN 50BN116050

€220,24U VÀLVULA DE COMPORTA DN 150 I PN 16BN116328

€189,32U CARRET TELESCÒPIC DE DESMUNTATGE DN 150 I PN16

BN116376

€12,49U VÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 3/4´´, 10 BAR DE PN, DE BRONZE,PREU ALT

BN315320

€36,06U VÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 1´´1/2, 10 BAR DE PN, DE BRONZE,PREU ALT

BN318320

€56,81U VÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 2´´, 10 BAR DE PN, DE BRONZE,PREU ALT

BN319320

€128,70U VÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 2´´1/2, 10 BAR DE PN, DE BRONZE,PREU ALT

BN31A320

€188,27U VÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 3´´, 10 BAR DE PN, DE BRONZE,PREU ALT

BN31B320

Page 24: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 19

MATERIALS

CODI UA DESCRIPCIÓ PREU

€243,09U BANC NEOROMANTIC DE FUSTA D'IROKO TRACTADAAMB OLI I COLLADA ALS SUPORTS AMB CARGOLSD'ACER INOXIDABLE, DE 55 CM DE LLARGARIA, AMBSUPORT DE FOSA DE FERRO GG.20

BQ10U090

€295,04U BANC NEOROMANTIC DE FUSTA D'IROKO TRACTADAAMB OLI I COLLADA ALS SUPORTS AMB CARGOLSD'ACER INOXIDABLE, DE 175 CM DE LLARGARIA, AMBSUPORT DE FOSA DE FERRO GG.20

BQ10U091

€498,34U BANC NEOROMANTIC DE FUSTA D'IROKO TRACTADAAMB OLI I COLLADA ALS SUPORTS AMB CARGOLSD'ACER INOXIDABLE, DE 300 CM DE LLARGARIA, AMBSUPORT DE FOSA DE FERRO GG.20

BQ10U092

€69,04U PAPERERA 70 L FORMADA PER UN TUBULAR D'ACERGALVANITZAT DE 20 MM DE DIAMETRE I 1,5 MM DEGRUIX, UNA PLANXA PERFORADA DE 2 MM DE GRUIX IPERFORACIONS DE 5 MM DE DIAMETRE, UNA PLANXADE BASE DE PAPERERA DE 3 MM DE GRUIX AMB DUESPERFORACIONS DE 8 MM DE DIAMETRE PER ALDESGUAS, 2 EIXOS DE GIR, UN TUBULAR D'ACERGALVANITZAT DE 30 MM DE DIAMETRE I 2 MM DEGRUIX, UN SUPORT DE PAPERERA FORMAT PER UNTUBULAR RODO D'ACER GALVANITZAT DE 40 MM DEDIAMETRE I 2 MM DE GRUIX, 2 PLETINESD'ANCORATGE AMB CARTEL.LES SOLDADES A 6 AMBDUES PERFORACIONS DE 12 MM DE DIAMETRE PERCARGOLAR-LA AL PAVIMENT DE VORERA ISUBJECCIONS FORMADES PER 4 PERNS D'EXPANSIOM8

BQ21U010

€66,37U PILONA BARCELONA NORMAL DE 1000 MM D'ALÇADA,FORMADA PER FUST I REMAT DE FOSA GRIS DE 100MM DE DIAMETRE I ACABAT PINTAT AMB IMPRIMACIOFOSFATANT ANTIOXIDANT I OXIRON NEGRE FERRITIC,ANELLA D'ACER INOXIDABLE DE 84 MM DE DIAMETREEXTERIOR I ACABAT MATITZAT I SENYAL DEL'AJUNTAMENT DE LA CIUTAT EN RELLEU D' 1,5 MM IALÇADA DE 65 MM

BQ42U020

€123,42U PILONA BARCELONA EXTRAIBLE DE 1000 MMD'ALÇADA, FORMADA PER FUST I REMAT DE FOSAGRIS DE 100 MM DE DIAMETRE I ACABAT PINTAT AMBIMPRIMACIO FOSFATANT ANTIOXIDANT I OXIRONNEGRE FERRITIC, ANELLA D'ACER INOXIDABLE DE 84MM DE DIAMETRE EXTERIOR I ACABAT MATITZAT,SENYAL DE L'AJUNTAMENT DE LA CIUTAT EN RELLEUD' 1,5 MM I ALÇADA DE 65 MM, PANY DE BLOQUEIG DELA PILONA EXTRAIBLE, TAPETA I BASE FIXA PER AENCASTAR AL TERRA

BQ42U030

€3.240,70U PONT DE MICO AMB CABLE D'ACER AMB ESTACIÓ DESORTIDA I D'ARRIBADA DE TRONCS DE FUSTATRACTADA, AMB 8 PUNTS D'ANCORATGE

BQA25080

€45,08U APARCAMENT DE BICICLETA D'ACER GALVANITZAT DE75 CM DE LLARGARIA I 75 CM D'ALÇARIA, DE TUB RODODE 50 MM DE DIAMETRE I ANELLA TAPAJUNTS

BQZZV010

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 20

MATERIALS

CODI UA DESCRIPCIÓ PREU

€36,02M3 TERRA VEGETAL ADOBADA, A GRANELBR3P1110

€25,30M3 MULCHING ROLDÓ COMPOSTAT (2002)BR3PUU00

€2,37U CUPRESSUS SEMPERVIRENS (XIPRER) DE 125 A 150CM D'ALÇADA, AMB PA DE TERRA DE TELA METAL.LICA

BR434582

€3,87U JUNIPERUS HORIZONTALIS EN CONTENIDOR DE 3LITRES

BR435495

€186,90U EUCALIPTUS (EUCALIPTUS GLOBULUS) D'ALÇARIA 2 A3 M, EN CONTENIDOR

BR454575

€130,44U ALZINA (QUERCUS ILEX) DE 20 A 25 CM DECIRCUMFERÈNCIA, AMB PA DE TERRA PROTEGIT AMBMALLA METÀL.LICA I GUIX

BR459075

€191,65U ACACIA DEALBATA (MIMOSA) dIÀ,¡METRE 18/20 IPRESENTADA EN CONTENIDOR

BR4503101

€90,10U ACER CAMPESTRE (AURO ARRUGAT) DE 20 A 25 CMDE PERIMETRE, AMB L'ARREL NUA

BR470175

€46,29U ACER NEGUNDO (NEGUNDO) DE 20 A 25 CM DEPERIMETRE, AMB L'ARREL NUA

BR470506

€115,70U ACER PSEUDOPLATANUS (PLATAN FALS) DE 25 A 30CM DE PERIMETRE, AMB L'ARREL NUA

BR470926

€162,10U BETULA PENDULA FASTIGIATA (BEDOLL) DE 25 A 30CM DE PERIMETRE, AMB PA DE TERRA DE TELAMETAL.LICA

BR472128

€133,63U CERCIS SILIQUASTRUM (ARBRE DE L'AMOR) DE 16 A18 CM DE PERIMETRE, AMB PA DE TERRA DE TELAMETAL.LICA

BR472707

€18,33U ELAEAGNUS ANGUSTIFOLIA (ARBRE DEL PARADIS) DE10 A 12 CM DE PERIMETRE, AMB L'ARREL NUA

BR473190

€65,57U FRAXINUS EXCELSIOR (FREIXE DE FULLA GRAN) DE20 A 25 CM DE PERIMETRE, AMB PA DE TERRA DE TELAMETAL.LICA

BR473826

€660,29U JUGLANS REGIA (NOGUERA) DE 50 A 60 CM DEPERIMETRE, AMB PA DE TERRA DE TELA METAL.LICA

BR474190

€61,57U PLATANUS X HISPANICA DE 20 A 25 CM DEPERIMETRE, AMB PA DE TERRA DE TELA METAL.LICA

BR476226

€15,31U ARBUTUS UNEDO (ARBOÇ) EN CONTENIDOR DE 15LITRES

BR4A0253

€17,12U BOIX (BUXUS SEMPERVIRENS) D'ALÇÀRIA 0.6 A 0.8 M,EN CONTENIDOR

BR4A0805

€4,60U CALLISTEMON SPECIOSUS (CAL.LISTEMON) ENCONTENIDOR DE 3 LITRES

BR4A0970

€4,21U DODONAEA EN CONTENIDOR DE 5 LITRESBR4A3325

€41,55U NANDINA DOMESTICA BR4A6240

Page 25: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 21

MATERIALS

CODI UA DESCRIPCIÓ PREU

€3,79U PISTACIA LENTISCUS (LLENTISCLE) EN CONTENIDORDE 3 LITRES

BR4A6690

€6,03U BERBERIS THUNBERGII ATROPURPUREA ENCONTENIDOR DE 5 LITRES

BR4D0270

€16,73U CORNUS FLORIDA BR4D1515

€9,79U HIBISC DE SIRIA (HIBISCUS SYRIACUS) D'ALÇÀRIA 0.8 A1.2 M, EN CONTENIDOR

BR4D2550

€4,60KG BARREJA COMPOSADA PER FESTUCA ARUNDINÀCIA(FESTUCA ELATIOR), FESTUCA ROGENCA (FESTUCARUBRA) I FESTUCA OVINA (FESTUCA OVINA), DEQUALITAT ALTA

BR4U2330

€61,21M TANCA DE FUSTA TRACTADA AL AUTOCLAU MODELANGLES DE 0,80 M D'ALÇARIA, AMB MUNTANTS DEFUSTA PER A ENCASTAR A FONAMENT DE FORMIGÓ,TRAVESSERS HORITZONTALS I TAULONS VERTICALSFIXATS AMB CARGOLS D'ACER INOXIDABLE

BR9TUA80

€14,53U MATERIAL AUXILIAR PER A SUPORT I ANCORATGE D'1M DE TANCA

BR9TUZ10

€3,85M3 Terres d'aportació seleccionades totalment col·locadesP0100000

€17,13M3 Sorra finaP0200010

€47,14M3 Formigó H-150, consistència plàstica amb grandària màximadel granulat 20 mm

P0215000

€0,23UT Cinta de senyalització del servei de 15 cm d'ampladaP0515000

€0,13ML Fil guia per a conductesP0516000

€37,26M3 Formigó H-150, consistència plàstica amb grandària màximadel granulat 20 mm

P0604220

€29,75M2 Protecció de xapa metal·lica galvanitzada per a pedestal d'1MM de gruix de 140x30 CM i costers perfils en z, inclòselements de fixació, segons detall

P0B42000

€1,98ML Tub de polietilè de doble paret d'alta densitat, corrugatexteriorment de 125 mm de diàmetre i llis interior de 107 mmde diàmetre, amb part proporcional de maniguet d'unió

PD618000

€1,71ML Tub de polietilè de doble paret d'alta densitat, corrugatexteriorment de 63 mm de diàmetre exterior, amb partproporcional de maniguet d'unió

PD618001

€7,69UT Obturador estanc per a tub de 125 MMPD621500

€7,69UT Obturador estanc per a conducte de 63 mmPD621502

€1,26ML Banda plàstica de protecció i senyalització del servei enrotllos de 40mx200x2,5mm

PDGZ2000

€108,18UT Pericó de 40x40x55 CM de dimensions interiors amb mòdulsde plàstic d'alta resistència

PDK21000

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 22

MATERIALS

CODI UA DESCRIPCIÓ PREU

€438,14UT Pericó de 70x140x85 cmPDK21130

€39,07UT Marc i tapa de fundició per a pericó de 40x40 CM dedimensions interiors lliures, segons plànol de detall 5

PDK25140

€322,14UT Marc metàl·lic i tapes de fundició per a pericó de 70x140 CMde dimensions interiors lliures, segons plànol de detall 5

PDK25510

€109,80UT Marc i tapa per a per a pedestal de 140x30 CM, segonsplànols de detall 5

PDK25520

€81,49UT Tubs, colzes, maniguets reductors, inloent juntad'estanqueitat

PDK26001

Page 26: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 23

ELEMENTS COMPOSTOS

CODI UA DESCRIPCIÓ PREU

€73,33M3 FORMIGÓ DE 150 KG/M3, AMB UNA PROPORCIÓ ENVOLUM 1:4:8, AMB CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L 32,5 R I GRANULAT DE PEDRAGRANÍTICA DE GRANDÀRIA MÀXIMA 20 MM, ELABORATA L'OBRA AMB FORMIGONERA DE 250 L

D060M0B2 Rend.: 1,000

Unitats Preu Parcial Import€Mà d'obra:

17,12700/R 19,030000,900A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 17,12700 17,12700Maquinària:

1,22400/R 2,720000,450C1705700 =xFORMIGONERA DE 250 LH

Subtotal... 1,22400 1,22400Materials:

0,181801,010000,180B0111000 =xAIGUAM3

12,5125019,250000,650B0312010 =xSORRA DE PEDRERA DE PEDRA GRANÍTICA PER AFORMIGONS

T

27,9465018,030001,550B0332Q10 =xGRAVA DE PEDRERA DE PEDRA GRANÍTICA, DEGRANDÀRIA MÀXIMA 20 MM, PER A FORMIGONS

T

14,1660094,440000,150B0512401 =xCIMENT PÒRTLAND AMB FILLER CALCARI CEM II/B-L32,5 R SEGONS UNE-EN 197-1, EN SACS

T

Subtotal... 54,80680 54,80680Altres:

% 0,1712717,127001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,17127 0,17127

COST DIRECTE 73,32907

73,32907COST EXECUCIÓ MATERIAL

€73,73M3 MORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 200KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:8 I 2 N/MM2 DE RESISTÈNCIA A COMPRESSIÓ,ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

D0701461 Rend.: 1,000

Unitats Preu Parcial Import€Mà d'obra:

19,03000/R 19,030001,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 19,03000 19,03000Maquinària:

1,17600/R 1,680000,700C1705600 =xFORMIGONERA DE 165 LH

Subtotal... 1,17600 1,17600Materials:

0,202001,010000,200B0111000 =xAIGUAM3

34,2432019,680001,740B0312020 =xSORRA DE PEDRERA DE PEDRA GRANÍTICA PER AMORTERS

T

18,8880094,440000,200B0512401 =xCIMENT PÒRTLAND AMB FILLER CALCARI CEM II/B-L32,5 R SEGONS UNE-EN 197-1, EN SACS

T

Subtotal... 53,33320 53,33320

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 24

ELEMENTS COMPOSTOS

CODI UA DESCRIPCIÓ PREUAltres:

% 0,1903019,030001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,19030 0,19030

COST DIRECTE 73,72950

73,72950COST EXECUCIÓ MATERIAL

€76,29M3 MORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 250KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:6, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

D0701641 Rend.: 1,000

Unitats Preu Parcial Import€Mà d'obra:

19,03000/R 19,030001,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 19,03000 19,03000Maquinària:

1,17600/R 1,680000,700C1705600 =xFORMIGONERA DE 165 LH

Subtotal... 1,17600 1,17600Materials:

0,202001,010000,200B0111000 =xAIGUAM3

32,0784019,680001,630B0312020 =xSORRA DE PEDRERA DE PEDRA GRANÍTICA PER AMORTERS

T

23,6100094,440000,250B0512401 =xCIMENT PÒRTLAND AMB FILLER CALCARI CEM II/B-L32,5 R SEGONS UNE-EN 197-1, EN SACS

T

Subtotal... 55,89040 55,89040Altres:

% 0,1903019,030001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,19030 0,19030

COST DIRECTE 76,28670

76,28670COST EXECUCIÓ MATERIAL

€86,40M3 MORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

D0701821 Rend.: 1,000

Unitats Preu Parcial Import€Mà d'obra:

19,03000/R 19,030001,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 19,03000 19,03000Maquinària:

1,17600/R 1,680000,700C1705600 =xFORMIGONERA DE 165 LH

Subtotal... 1,17600 1,17600Materials:

Page 27: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 25

ELEMENTS COMPOSTOS

CODI UA DESCRIPCIÓ PREU0,202001,010000,200B0111000 =xAIGUAM3

29,9136019,680001,520B0312020 =xSORRA DE PEDRERA DE PEDRA GRANÍTICA PER AMORTERS

T

35,8872094,440000,380B0512401 =xCIMENT PÒRTLAND AMB FILLER CALCARI CEM II/B-L32,5 R SEGONS UNE-EN 197-1, EN SACS

T

Subtotal... 66,00280 66,00280Altres:

% 0,1903019,030001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,19030 0,19030

COST DIRECTE 86,39910

86,39910COST EXECUCIÓ MATERIAL

€106,61M3 MORTER MIXT DE CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 200 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:2:10, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

D070A4D1 Rend.: 1,000

Unitats Preu Parcial Import€Mà d'obra:

19,98150/R 19,030001,050A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 19,98150 19,98150Maquinària:

1,22640/R 1,680000,730C1705600 =xFORMIGONERA DE 165 LH

Subtotal... 1,22640 1,22640Materials:

0,202001,010000,200B0111000 =xAIGUAM3

30,1104019,680001,530B0312020 =xSORRA DE PEDRERA DE PEDRA GRANÍTICA PER AMORTERS

T

18,8880094,440000,200B0512401 =xCIMENT PÒRTLAND AMB FILLER CALCARI CEM II/B-L32,5 R SEGONS UNE-EN 197-1, EN SACS

T

36,000000,09000400,000B0532310 =xCALÇ AÈRIA CL 90KG

Subtotal... 85,20040 85,20040Altres:

% 0,1998219,982001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,19982 0,19982

COST DIRECTE 106,60812

106,60812COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 26

ELEMENTS COMPOSTOS

CODI UA DESCRIPCIÓ PREU

€101,76M3 MORTER MIXT DE CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 380 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:0,5:4, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

D070A8B1 Rend.: 1,000

Unitats Preu Parcial Import€Mà d'obra:

19,98150/R 19,030001,050A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 19,98150 19,98150Maquinària:

1,22640/R 1,680000,730C1705600 =xFORMIGONERA DE 165 LH

Subtotal... 1,22640 1,22640Materials:

0,202001,010000,200B0111000 =xAIGUAM3

27,1584019,680001,380B0312020 =xSORRA DE PEDRERA DE PEDRA GRANÍTICA PER AMORTERS

T

35,8872094,440000,380B0512401 =xCIMENT PÒRTLAND AMB FILLER CALCARI CEM II/B-L32,5 R SEGONS UNE-EN 197-1, EN SACS

T

17,100000,09000190,000B0532310 =xCALÇ AÈRIA CL 90KG

Subtotal... 80,34760 80,34760Altres:

% 0,1998219,982001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,19982 0,19982

COST DIRECTE 101,75532

101,75532COST EXECUCIÓ MATERIAL

€1,06KG ACER EN BARRES CORRUGADES ELABORAT A L'OBRA IMANIPULAT A TALLER B 500 S, DE LÍMIT ELÀSTIC >= 500N/MM2

D0B2A100 Rend.: 1,000

Unitats Preu Parcial Import€Mà d'obra:

0,21990/R 21,990000,010A0124000 =xOFICIAL 1A FERRALLISTAH

0,19530/R 19,530000,010A0134000 =xAJUDANT FERRALLISTAH

Subtotal... 0,41520 0,41520Materials:

0,010601,060000,010B0A14200 =xFILFERRO RECUIT DE DIÀMETRE 1,3 MMKG

0,630000,600001,050B0B2A000 =xACER EN BARRES CORRUGADES B 500 S DE LÍMITELÀSTIC >= 500 N/MM2

KG

Subtotal... 0,64060 0,64060Altres:

% 0,004150,415001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00415 0,00415

Page 28: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 27

ELEMENTS COMPOSTOS

CODI UA DESCRIPCIÓ PREU

COST DIRECTE 1,05995

1,05995COST EXECUCIÓ MATERIAL

€2,11M2 MALLA ELECTROSOLDADA DE BARRES CORRUGADESD'ACER, ELABORADA A L'OBRA I MANIPULADA ATALLER ME 15 X 15 CM D: 5 - 5 MM B 500 T 6 X 2,2 M,SEGONS UNE 36092

D0B34135 Rend.: 1,000

Unitats Preu Parcial Import€Mà d'obra:

0,08796/R 21,990000,004A0124000 =xOFICIAL 1A FERRALLISTAH

0,07812/R 19,530000,004A0134000 =xAJUDANT FERRALLISTAH

Subtotal... 0,16608 0,16608Materials:

1,947001,770001,100B0B34133 =xMALLA ELECTROSOLDADA DE BARRES CORRUGADESD'ACER ME 15X15 CM, D:5-5 MM, B 500 T, 6X2,2 M,SEGONS UNE 36092

M2

Subtotal... 1,94700 1,94700Altres:

% 0,001660,166001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00166 0,00166

COST DIRECTE 2,11474

2,11474COST EXECUCIÓ MATERIAL

€2,52M2 MALLA ELECTROSOLDADA DE BARRES CORRUGADESD'ACER, ELABORADA A L'OBRA I MANIPULADA ATALLER ME 15 X 15 CM D: 6 - 6 MM B 500 T 6 X 2,2 M,SEGONS UNE 36092

D0B34136 Rend.: 1,000

Unitats Preu Parcial Import€Mà d'obra:

/R 21,990000,000A0124000 =xOFICIAL 1A FERRALLISTAH

/R 19,530000,000A0134000 =xAJUDANT FERRALLISTAH

Subtotal...Materials:

2,519002,290001,100B0B34134 =xMALLA ELECTROSOLDADA DE BARRES CORRUGADESD'ACER ME 15X15 CM, D:6-6 MM, B 500 T, 6X2,2 M,SEGONS UNE 36092

M2

Subtotal... 2,51900 2,51900Altres:

%1,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal...

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 28

ELEMENTS COMPOSTOS

CODI UA DESCRIPCIÓ PREU

COST DIRECTE 2,51900

2,51900COST EXECUCIÓ MATERIAL

Page 29: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 29

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€53,66U FILTRE DE PLASTIC AMB ROSCA MASCLE D'1'', PERINTERCALAR A LA TUBERIA, DE 120 MESH, AMB COSDESMUNTABLE PER AL SEU MANTENIMENT, PER A UNCABAL MAXIM DE 5 M3/H, MUNTAT EN PERICO DECANALITZACIO SOTERRAT

FJ65U020 Rend.: 1,000

Unitats Preu Parcial Import€Mà d'obra:

6,14700/R 20,490000,300A012M000 =xOFICIAL 1A MUNTADORH

5,28300/R 17,610000,300A013M000 =xAJUDANT MUNTADORH

Subtotal... 11,43000 11,43000Materials:

42,1200042,120001,000BJ65U020 =xFILTRE DE PLASTIC AMB ROSCA MASCLE D'1'', PERINTERCALAR A LA TUBERIA, DE 120 MESH, AMB COSDESMUNTABLE PER AL SEU MANTENIMENT, PER A UNCABAL MAXIM DE 5 M3/H

U

Subtotal... 42,12000 42,12000Altres:

% 0,1143011,430001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,11430 0,11430

COST DIRECTE 53,66430

0,00%DESPESES INDIRECTES

53,66430COST EXECUCIÓ MATERIAL

€22,16U VÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 3/4´´, DE 10 BAR DE PN, DEBRONZE, PREU ALT, MUNTADA EN PERICÓ DECANALITZACIÓ SOTERRADA

FN315324 Rend.: 1,000

Unitats Preu Parcial Import€Mà d'obra:

5,12250/R 20,490000,250A012M000 =xOFICIAL 1A MUNTADORH

4,40250/R 17,610000,250A013M000 =xAJUDANT MUNTADORH

Subtotal... 9,52500 9,52500Materials:

12,4900012,490001,000BN315320 =xVÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 3/4´´, 10 BAR DE PN, DE BRONZE,PREU ALT

U

Subtotal... 12,49000 12,49000Altres:

% 0,142889,525331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,14288 0,14288

COST DIRECTE 22,15788

0,00%DESPESES INDIRECTES

22,15788COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 30

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€44.587,91PA PARTIDA PER LA REALITZACIÓ DELS TREBALLS IMESURES DE PROTECCIÓ PREVISTES AL PROJECTEDE SEGURETAT I SALUT, SEGONS PRESSUPOSTDETALLAT AL MATEIX PROJECTE DE SEGURETAT

E00001SA Rend.: 1,000P- 1

€1.598,00U QUADRE DE BT UNESA O SIMILAR, AMB QUATRESORTIDES AMB FUSIBLES, SORTIDES TRIFÀSIQUESAMB FUSIBLES EN BASES BTVC

EG1AU055 Rend.: 1,000P- 2

€566,00U JOC DE PONTS DE CABLES DE BT, DE SECCIÓ IMATERIAL 1 X 240 Al (Etile-Propilè) SENSE ARMADURA,ACCESSORIS PER A LA S EVA CONNEXIÓ FORMATSPER UN GRUP DE CABLES 4 xFase + 2 xneutre DE 3,0 mDE LONGITUD.

EG1AU065 Rend.: 1,000P- 3

€650,00U SUBMINISTRE I MUNTATGE DEL TERRA EXTERIORPROTECCIÓ TRANSFORMADOR AMB ANELLARECTANGULAR AMB CABLE DE COURE NU DE 14 MMDE DIÀMETRE, 4 PIQUES DE LONGITUD 2 METRES IDIMENSIONS DEL RECTANGLE 5,0 X 2,5 M.

EGD1223E Rend.: 1,000P- 4

€325,00U SUBMINISTRE I MUNTATGE DEL TERRA EXTERIOR DESERVEI O NEUTRE DEL TRANSFORMADOR AMBPIQUETES ALINEADES AMB CABLE DE COURE NU DE14 MM DE DIÀMETRE, 2 PIQUETES DE LONGITUD 2METRES I DISTANCIA ENTRE PIQUETES DE 3 METRES.

EGD1224E Rend.: 1,000P- 5

€3.713,63U Cel.la de línia (entrada/sortida), amb tensió assignada de 36kV, de tipus modular, envolvent de xapa d'acer galvanitzat,tall i aïllament íntegre en SF6, intensitat nominal de 630 A/20kA, amb interruptor-seccionador rotatiu tripolar de 2posicions (connectat, seccionat) per aïllar les parts esquerra idreta del mòdul, amb comandament motoritzat, captadorscapacitius per a la detecció de tensió i sistema d'alarmasonora de posada a terra, col.locada

EGH33646 Rend.: 1,000P- 6

Unitats Preu Parcial Import€Mà d'obra:

20,49000/R 20,490001,000A012H000 =xOFICIAL 1A ELECTRICISTAH

17,58000/R 17,580001,000A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 38,07000 38,07000Materials:

3.675,560003.675,560001,000BGH33626 =xCel.la de línia (entrada/sortida), amb tensió assignada de 36kV, de tipus modular, envolvent de xapa d'acer galvanitzat,tall i aïllament íntegre en SF6, intensitat nominal de 630 A/20kA, amb interruptor-seccionador rotatiu tripolar de 2posicions (connectat, seccionat) per aïllar les parts esquerra idreta del mòdul, amb comandament motoritzat, captadorscapacitius per a la detecció de tensió i sistema d'alarmasonora de posada a terra

u

Subtotal... 3.675,56000 3.675,56000

Page 30: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 31

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 3.713,63000

0,00%DESPESES INDIRECTES

3.713,63000COST EXECUCIÓ MATERIAL

€6.928,20U SUBMINISTRE ,TRANSPORT I MUNTATGE DE EDIFICIPREFABRICAT CONSTITUIT PER UNA ENVOLVENT,ESTRUCTURA MONOBLOC, DE FORMIGÓ ARMAT, TIPUSPFU-4, DE DIMENSIONS 4480 X 2380 X3045 MM

EGJ14011 Rend.: 1,000P- 7

Unitats Preu Parcial Import€Mà d'obra:

245,88000/R 20,4900012,000A012H000 =xOFICIAL 1A ELECTRICISTAH

421,92000/R 17,5800024,000A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 667,80000 667,80000Maquinària:

342,40000/R 42,800008,000C150G800 =xGRUA AUTOPROPULSADA DE 12 TH

Subtotal... 342,40000 342,40000Materials:

5.918,000005.918,000001,000BGJ14011 =xEDIFICI DE TRANSFORMACIÓ ORMAZABAL PFU-4 OSIMILAR.

U

Subtotal... 5.918,00000 5.918,00000

COST DIRECTE 6.928,20000

0,00%DESPESES INDIRECTES

6.928,20000COST EXECUCIÓ MATERIAL

€233,00U PROTECCIÓ METÀL·LICA PER A DEFENSA DELTRANSFORMADOR.

EGJZ1022 Rend.: 1,000P- 8

€480,00U EQUIP DE SEGURETAT I MANIOBRE COMPOSAT PERUNA BANQUETA AILLANT, GUANTSD'AMIANT, EXTINTORD'EFICÀCIA 89 B, PALANCA D'ACCIONAMENT I ARMARIDE PRIMES AUXILIS.

EGJZ1032 Rend.: 1,000P- 9

€978,00PA PARTIDA ALÇADA A JUSTIFICAR PER A PROJECTE ILEGALITZACIÓ DE LÍNIA DE MT

EGJZPL01 Rend.: 1,000P- 10

€1.325,00PA PARTIDA ALÇADA A JUSTIFICAR PER A PROJECTE ILEGALITZACIÓ CENTRE DE TRANSFORMACIÓ

EGJZPL02 Rend.: 1,000P- 11

€811,00PA PARTIDA ALÇADA A JUSTIFICAR PER A PROJECTE ILEGALITZACIÓ DE LÍNIA DE BT

EGJZPL03 Rend.: 1,000P- 12

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 32

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€148,73U SUBMINISTRE I MUNTATGE DE CONJUNT DETERMINACIÓ ENXUFABLE RECOLZADA EN CELDA DEPROTECCIÓ, PER A CABLE DE AL 18/30 KV 240 MM2

EGK22665 Rend.: 1,000P- 13

€15,29M SUBMINISTRAMENT I ESTESA DE CONDUCTORD'ALUMINI SIMPLE 1C BT 0,6/1 KV ,SECCIÓ 3 X 1 X 240MM2 + 1 X 150 MM2 Al, INCLOSA PLACA, CINTES,SORRA DE PROTECCIÓ I PART PROPORCIONALD'EMPALMES.

EGK226B1 Rend.: 1,000P- 14

€15,29M SUBMINISTRAMENT I ESTESA PER TUBULAR DECONDUCTOR D'ALUMINI SIMPLE 1C BT,SECCIÓ 3 X 1 X240 MM2 + 1 X 140 MM2 , INCLOSA PLACA, CINTES,SORRA DE PROTECCIÓ I PART PROPORCIONALD'EMPALMES.

EGK226B3 Rend.: 1,000P- 15

€28,02U CONNEXIÓ CABLEJAT AL DE QUATRE CONDUCTORSAILLANTS SEC 3 X 1X240 + 1 X 150 MM2 Al.

EGK226B7 Rend.: 1,000P- 16

€18,74U CONNEXIÓ CABLEJAT SUPERIOR 3,5 X 25 MM2S-TERMINAL

EGK226B8 Rend.: 1,000P- 17

€30,76M3 ENDERROC DE MUR DE CONTENCIO DE PEDRANATURAL, AMB MARTELL TRENCADOR SOBRERETROEXCAVADORA I CARREGA MECANICA DE RUNASOBRE CAMIO

F213513A Rend.: 1,000P- 18

Unitats Preu Parcial Import€Mà d'obra:

1,91256/R 18,390000,104A0140000 =xMANOBREH

Subtotal... 1,91256 1,91256Maquinària:

23,47450/R 67,070000,350C1105A00 =xRETROEXCAVADORA AMB MARTELL TRENCADORH

5,34560/R 41,120000,130C1315010 =xRETROEXCAVADORA PETITAH

Subtotal... 28,82010 28,82010Altres:

% 0,028691,912671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,02869 0,02869

COST DIRECTE 30,76135

0,00%DESPESES INDIRECTES

30,76135COST EXECUCIÓ MATERIAL

Page 31: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 33

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€485,06M3 CONNEXIÓ DE MARC NOU AL MARC EXISTENT O ACANONADA DE DIMENSIONS EQUIVALENTS. INCLOUENDERROC DE FONAMENT DE FORMIGO ARMAT, AMBMITJANS MECÀNICS O MANUALS, INCLÒS TALLD'ARMADURES,CÀRREGA MANUAL I MECÀNICA DERUNA SOBRE CAMIÓ, I TRASLLAT A L'ABOCADOR.

F213U34C Rend.: 1,000P- 19

Unitats Preu Parcial Import€Mà d'obra:

59,49000/R 19,830003,000A0122000 =xOFICIAL 1A PALETAH

43,98000/R 21,990002,000A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

36,78000/R 18,390002,000A0140000 =xMANOBREH

57,09000/R 19,030003,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 197,34000 197,34000Maquinària:

48,84000/R 16,280003,000C1101200 =xCOMPRESSOR AMB DOS MARTELLS PNEUMÀTICSH

51,40000/R 41,120001,250C1315010 =xRETROEXCAVADORA PETITAH

14,53600/R 36,340000,400C1501800 =xCAMIÓ PER A TRANSPORT DE 12 TH

6,00000/R 6,000001,000C150Z200 =xCANON MANTENIMENT ABOCADOR I ABOCAMENT DEMIXTES DE LA CONSTRUCCIO

M3

65,20500/R 130,410000,500C1701100 =xCamió amb bomba de formigonarh

14,74000/R 7,370002,000C200S000 =xEQUIP I ELEMENTS AUXILIARS PER A TALLOXIACETILÈNIC

H

Subtotal... 200,72100 200,72100Materials:

83,5440069,620001,200B0608320 =xFORMIGO HA-25, DE CONSISTENCIA TOVA IGRANDARIA MAXIMA DEL GRANULAT 20 MM

M3

Subtotal... 83,54400 83,54400Altres:

% 3,45345197,340001,75A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 3,45345 3,45345

COST DIRECTE 485,05845

0,00%DESPESES INDIRECTES

485,05845COST EXECUCIÓ MATERIAL

€52,65M3 ENDERROC D'OBRES DE FABRICA DE MAO MASSIS,DEBLOCS DE FORMIGO O DE PAREDAT, EN OBERTURES,AMB MARTELL PICADOR MANUAL I CARREGA MANUALDE RUNA SOBRE CAMIO O CONTENIDOR

F214005P Rend.: 1,000P- 20

Unitats Preu Parcial Import€Mà d'obra:

5,88480/R 18,390000,320A0140000 =xMANOBREH

30,44800/R 19,030001,600A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 36,33280 36,33280Maquinària:

15,77600/R 19,720000,800C1101300 =xCOMPRESSOR AMB TRES MARTELLS PNEUMÀTICSH

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 34

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 15,77600 15,77600Altres:

% 0,5449936,332671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,54499 0,54499

COST DIRECTE 52,65379

0,00%DESPESES INDIRECTES

52,65379COST EXECUCIÓ MATERIAL

€63,74M3 ENDERROC D'OBRES DE FORMIGO EN MASSA DEQUALSEVOL TIPUS, AMB MARTELL PICADOR MANUAL,APLEC DE LA RUNES AL LLOC DE CARREGA,ICARREGA MECANICA DE RUNA SOBRE CAMIO

F214V01A Rend.: 1,048P- 21

Unitats Preu Parcial Import€Mà d'obra:

38,49580/R 19,030002,120A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 38,49580 38,49580Maquinària:

19,56947/R 19,720001,040C1101300 =xCOMPRESSOR AMB TRES MARTELLS PNEUMÀTICSH

5,10076/R 41,120000,130C1315010 =xRETROEXCAVADORA PETITAH

Subtotal... 24,67023 24,67023Altres:

% 0,5774438,496001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,57744 0,57744

COST DIRECTE 63,74347

0,00%DESPESES INDIRECTES

63,74347COST EXECUCIÓ MATERIAL

€109,92M3 ENDERROC D'OBRES DE FORMIGO ARMAT DEQUALSEVOL TIPUS, AMB MARTELL PICADOR MANUAL,TALL DE LES BARRES,I CARREGA MECANICA DE RUNASOBRE CAMIOA

F214V01B Rend.: 1,020P- 22

Unitats Preu Parcial Import€Mà d'obra:

9,14094/R 21,990000,424A0121000 =xOFICIAL 1AH

59,70196/R 19,030003,200A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 68,84290 68,84290Maquinària:

30,93333/R 19,720001,600C1101300 =xCOMPRESSOR AMB TRES MARTELLS PNEUMÀTICSH

6,04706/R 41,120000,150C1315010 =xRETROEXCAVADORA PETITAH

3,06361/R 7,370000,424C200S000 =xEQUIP I ELEMENTS AUXILIARS PER A TALLOXIACETILÈNIC

H

Page 32: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 35

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 40,04400 40,04400Altres:

% 1,0326468,842671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 1,03264 1,03264

COST DIRECTE 109,91954

0,00%DESPESES INDIRECTES

109,91954COST EXECUCIÓ MATERIAL

€44,38M3 ENDERROC DE PECES TANQUES PREFABRICADES DEFORMIGÓ TIPUS NEW JERSEY' AMB MARTELL PICADORMANUAL, APLEC DE LA RUNES AL LLOC DE CARREGA,ICARREGA MECANICA DE RUNA SOBRE CAMIO

F214V01C Rend.: 1,000P- 23

Unitats Preu Parcial Import€Mà d'obra:

19,03000/R 19,030001,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 19,03000 19,03000Maquinària:

19,72000/R 19,720001,000C1101300 =xCOMPRESSOR AMB TRES MARTELLS PNEUMÀTICSH

5,34560/R 41,120000,130C1315010 =xRETROEXCAVADORA PETITAH

Subtotal... 25,06560 25,06560Altres:

% 0,2854519,030001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,28545 0,28545

COST DIRECTE 44,38105

0,00%DESPESES INDIRECTES

44,38105COST EXECUCIÓ MATERIAL

€2,38M2 DEMOLICIÓ DE PAVIMENT DE MESCLA BITUMINOSA, DEFINS A 15 CM DE GRUIX, AMB COMPRESSOR ICÀRREGA SOBRE CAMIÓ

F219UC0A Rend.: 1,000P- 24

Unitats Preu Parcial Import€Mà d'obra:

0,95150/R 19,030000,050A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 0,95150 0,95150Maquinària:

0,32560/R 16,280000,020C1101200 =xCOMPRESSOR AMB DOS MARTELLS PNEUMÀTICSH

1,09000/R 54,500000,020C1311120 =xPALA CARREGADORA MITJANA, SOBRE PNEUMÀTICSH

Subtotal... 1,41560 1,41560

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 36

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

0,014271,50%DESPESES AUXILIARS

COST DIRECTE 2,38137

0,00%DESPESES INDIRECTES

2,38137COST EXECUCIÓ MATERIAL

€6,02M2 DESMUNTATGE DE REIXA METÀL.LICA DE 2M D'ALÇADAAMB MITJANS MANUALS I CÀRREGA MANUAL SOBRECAMIÓ O CONTENIDOR

F21B3015 Rend.: 1,000P- 25

Unitats Preu Parcial Import€Mà d'obra:

1,00800/R 20,160000,050A0125000 =xOFICIAL 1A SOLDADORH

0,88400/R 17,680000,050A0135000 =xAJUDANT SOLDADORH

3,67800/R 18,390000,200A0140000 =xMANOBREH

Subtotal... 5,57000 5,57000Maquinària:

0,36850/R 7,370000,050C200S000 =xEQUIP I ELEMENTS AUXILIARS PER A TALLOXIACETILÈNIC

H

Subtotal... 0,36850 0,36850Altres:

% 0,083555,570001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,08355 0,08355

COST DIRECTE 6,02205

0,00%DESPESES INDIRECTES

6,02205COST EXECUCIÓ MATERIAL

€7,13M DESMUNTATGE I MUNTATGE DE BIONDA METÀL.LICAD'1 M D'ALCARIA, AMB MARTELL PICADOR MANUAL,AMB TALL DE SUPORTS O ANCORATGES, AMB EQUIPOXIACETILENIC, CARREGA SOBRE CAMIO,TRANSPORT A MAGATZEM SEGONS D.F., I RETORN AOBRA

F21BU052 Rend.: 1,000P- 26

Unitats Preu Parcial Import€Mà d'obra:

0,87960/R 21,990000,040A0121000 =xOFICIAL 1AH

3,12630/R 18,390000,170A0140000 =xMANOBREH

0,95150/R 19,030000,050A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 4,95740 4,95740Maquinària:

0,32560/R 16,280000,020C1101200 =xCOMPRESSOR AMB DOS MARTELLS PNEUMÀTICSH

1,76880/R 7,370000,240C200S000 =xEQUIP I ELEMENTS AUXILIARS PER A TALLOXIACETILÈNIC

H

Subtotal... 2,09440 2,09440Altres:

Page 33: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 37

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU% 0,074364,957331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,07436 0,07436

COST DIRECTE 7,12616

0,00%DESPESES INDIRECTES

7,12616COST EXECUCIÓ MATERIAL

€217,94U ANUL.LACIÓ D'EMBORNAL EXISTENT, A BASE DEREPICAR 60 CM DEL POU EXIXTENT TABICAT DELCLAVEGUERÓ, REBLERT DE SORRA I COL.LOCACIÓ DELLOSA DE FORMIGÓ ARMAT DE 15 CM DE GRUIX

F21DUM01 Rend.: 1,000P- 27

Unitats Preu Parcial Import€Mà d'obra:

88,90777/R 21,990004,0431A0121000 =xOFICIAL 1AH

86,74563/R 18,390004,717A0140000 =xMANOBREH

Subtotal... 175,65340 175,65340Maquinària:

5,48473/R 16,280000,3369C1101200 =xCOMPRESSOR AMB DOS MARTELLS PNEUMÀTICSH

Subtotal... 5,48473 5,48473Materials:

7,9919016,310000,490B0321000 =xSAULÓ SENSE GARBELLARM3

8,9925059,950000,150B0604210 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

M3

8,7285058,190000,150B0604220 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

8,458962,114744,000D0B34135 =xMALLA ELECTROSOLDADA DE BARRES CORRUGADESD'ACER, ELABORADA A L'OBRA I MANIPULADA ATALLER ME 15 X 15 CM D: 5 - 5 MM B 500 T 6 X 2,2 M,SEGONS UNE 36092

M2

Subtotal... 34,17186 34,17186Altres:

% 2,63480175,653331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 2,63480 2,63480

COST DIRECTE 217,94479

0,00%DESPESES INDIRECTES

217,94479COST EXECUCIÓ MATERIAL

€7,38M2 DEMOLICIO DE PAVIMENT DE FORMIGO DE VORERA OCALÇADA, DE 15 A 30 CM DE GRUIX, COM A MAXIM, I DEMES DE 1 M D'AMPLARIA, AMB MARTELL TRENCADORMUNTAT SOBRE RETROEXCAVADORA

F21K4AG4 Rend.: 1,000P- 28

Unitats Preu Parcial Import€Maquinària:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 38

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU7,37770/R 67,070000,110C1105A00 =xRETROEXCAVADORA AMB MARTELL TRENCADORH

Subtotal... 7,37770 7,37770Altres:

%1,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal...

COST DIRECTE 7,37770

0,00%DESPESES INDIRECTES

7,37770COST EXECUCIÓ MATERIAL

€4,45M2 DEMOLICIO DE PAVIMENT DE PANOTS COL.LOCATSSOBRE FORMIGO, DE 10 A 15 CM DE GRUIX, COM AMAXIM, I DE MES DE 1 M D'AMPLARIA, AMB MARTELLTRENCADOR MUNTAT SOBRE RETROEXCAVADORA

F21L4JC4 Rend.: 1,000P- 29

Unitats Preu Parcial Import€Maquinària:

4,45345/R 67,070000,0664C1105A00 =xRETROEXCAVADORA AMB MARTELL TRENCADORH

Subtotal... 4,45345 4,45345Altres:

%1,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal...

COST DIRECTE 4,45345

0,00%DESPESES INDIRECTES

4,45345COST EXECUCIÓ MATERIAL

€9,84M2 DEMOLICIO DE PAVIMENT DE PANOTS COL.LOCATSSOBRE FORMIGO, DE 15 A 30 CM DE GRUIX I 1 MD'AMPLARIA, COM A MAXIM, AMB MARTELL PICADORMANUAL

F21L4JE3 Rend.: 1,000P- 30

Unitats Preu Parcial Import€Mà d'obra:

6,82226/R 19,030000,3585A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 6,82226 6,82226Maquinària:

2,91738/R 16,280000,1792C1101200 =xCOMPRESSOR AMB DOS MARTELLS PNEUMÀTICSH

Subtotal... 2,91738 2,91738Altres:

% 0,102336,822001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,10233 0,10233

Page 34: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 39

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 9,84197

0,00%DESPESES INDIRECTES

9,84197COST EXECUCIÓ MATERIAL

€2,54M DEMOLICIO DE VORADA I BASE DE FORMIGOF21PV045 Rend.: 1,000P- 31

Unitats Preu Parcial Import€Mà d'obra:

1,76218/R 19,030000,0926A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 1,76218 1,76218Maquinària:

0,75376/R 16,280000,0463C1101200 =xCOMPRESSOR AMB DOS MARTELLS PNEUMÀTICSH

Subtotal... 0,75376 0,75376Altres:

% 0,026431,762001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,02643 0,02643

COST DIRECTE 2,54237

0,00%DESPESES INDIRECTES

2,54237COST EXECUCIÓ MATERIAL

€4,27U DESMUNTATGE DE QUALSEVOL ELEMENT DEMOBILIARI URBÀ I CÀRREGA SOBRE CAMIÓ.

F21QCV05 Rend.: 1,000P- 32

Unitats Preu Parcial Import€Mà d'obra:

0,87960/R 21,990000,040A0121000 =xOFICIAL 1AH

3,31020/R 18,390000,180A0140000 =xMANOBREH

Subtotal... 4,18980 4,18980Altres:

% 0,083804,190002,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,08380 0,08380

COST DIRECTE 4,27360

0,00%DESPESES INDIRECTES

4,27360COST EXECUCIÓ MATERIAL

€4,27U DESMUNTATGE DE QUALSEVOL SENYAL I CÀRREGASOBRE CAMIÓ.

F21QCV07 Rend.: 1,000P- 33

Unitats Preu Parcial Import€Mà d'obra:

0,87960/R 21,990000,040A0121000 =xOFICIAL 1AH

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 40

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU3,31020/R 18,390000,180A0140000 =xMANOBREH

Subtotal... 4,18980 4,18980Altres:

% 0,083804,190002,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,08380 0,08380

COST DIRECTE 4,27360

0,00%DESPESES INDIRECTES

4,27360COST EXECUCIÓ MATERIAL

€92,89U DESMUNTATGE I TRASLLAT A NOVA UBICACIÓ DEQUALSEVOL SENYAL DE TRANSIT EXISTENT. INCLOSDEMOLICIÓ DE FONAMENTACIÓ I CÀRREGA SOBRECAMIÓ.

F21QCV0V Rend.: 1,000P- 34

Unitats Preu Parcial Import€Mà d'obra:

2,19900/R 21,990000,100A0121000 =xOFICIAL 1AH

3,67800/R 18,390000,200A0140000 =xMANOBREH

Subtotal... 5,87700 5,87700Maquinària:

26,82800/R 67,070000,400C1105A00 =xRETROEXCAVADORA AMB MARTELL TRENCADORH

19,84000/R 39,680000,500C1503000 =xCAMIÓ GRUAH

Subtotal... 46,66800 46,66800Materials:

40,2225053,630000,750B0641050 =xFORMIGÓ HM-20/B/20/I DE CONSISTÈNCIA TOVA,GRANDÀRIA MÀXIMA DEL GRANULAT 20 MM, AMB >=200 KG/M3 DE CIMENT, APTE PER A CLASSED'EXPOSICIÓ I

M3

Subtotal... 40,22250 40,22250Altres:

% 0,117545,877002,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,11754 0,11754

COST DIRECTE 92,88504

0,00%DESPESES INDIRECTES

92,88504COST EXECUCIÓ MATERIAL

€54,98U DESMUNTATGE DE PAL DE FUSTA I RETIRADA AMAGATZEM A COMPANYIA O AVOCADOR

F21SU005 Rend.: 1,000P- 35

€1.650,00U DESMUNTATGE DE TORRE METÀL·LICA ELÈCTRICA,RETIRADA A MAGATZEM A COMPANYIA O ABOCADOR

F21SU006 Rend.: 1,000P- 36

Page 35: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 41

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€2,98M ARRANCAMENT CABLE EXISTENT BT RZ 3 x 95 MM PERRECOLZAMENTS DE FUSTA.

F21SU007 Rend.: 1,000P- 37

€17,18U DESCONEXIÓ I CONECCIÓ CIRCUIT PONT MT O BTF21SU008 Rend.: 1,000P- 38

€2.069,47U CONVERSIÓ AÈRIA-SOTERRAT 1C AMB INTERRUPTORSECCIONADOR.

F21SU009 Rend.: 1,000P- 39

€778,91U EMPALME DE LINIA SOTERRADA AL-AL, AMBTERMORETRÀCTIL 3 X 1 X 240 MM2

F21SU010 Rend.: 1,000P- 40

€2.183,00U PROJECTE I LEGALITZACIÓ DE NOVA LÍNIA DE BTF21SU011 Rend.: 1,000P- 41

€4.000,00PA PARTIDA ALÇADA A JUSTIFICAR EN CONCEPTE DEPOSSIBLES MODIFICACIONS ET EXISTENT PER ACONECTAR NOVA LÍNIA DE BT

F21SU012 Rend.: 1,000P- 42

€185,00U DESMUNTATGE I RETIRADA DE CASETESMETÀL.LIQUES O DIPÒSTS D'ACER A MAGATZEMMUNICIPAL O ON INDIQUI LA D.F.

F21SUBA4 Rend.: 1,000P- 43

€0,55M2 NETEJA I ESBROSSADA DEL TERRENY, AMB MITJANSMECÀNICS I CÀRREGA

F2211020 Rend.: 1,000P- 44

Unitats Preu Parcial Import€Maquinària:

0,54500/R 54,500000,010C1311120 =xPALA CARREGADORA MITJANA, SOBRE PNEUMÀTICSH

Subtotal... 0,54500 0,54500

COST DIRECTE 0,54500

0,00%DESPESES INDIRECTES

0,54500COST EXECUCIÓ MATERIAL

€14,76M3 EXCAVACIÓ PER A ESPLANACIÓ EN ROCA, AMBMARTELL TRENCADOR MUNTAT SOBRERETROEXCAVADORA

F2213870 Rend.: 1,000P- 45

Unitats Preu Parcial Import€Maquinària:

14,75540/R 67,070000,220C1105A00 =xRETROEXCAVADORA AMB MARTELL TRENCADORH

Subtotal... 14,75540 14,75540

COST DIRECTE 14,75540

0,00%DESPESES INDIRECTES

14,75540COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 42

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€4,00M3 EXCAVACIÓ, CÀRREGA DE TERRA PER A ESPLANACIÓEN TERRENY COMPACTE AMB MITJANS MECÀNICS IREFINAT DE CAIXA EN ZONA DE DESMUNT

F221A420 Rend.: 1,000P- 46

Unitats Preu Parcial Import€Mà d'obra:

0,18390/R 18,390000,010A0140000 =xMANOBREH

Subtotal... 0,18390 0,18390Maquinària:

3,81500/R 76,300000,050C1311270 =xPALA CARREGADORA MITJANA SOBRE ERUGUES, DE119 KW

H

Subtotal... 3,81500 3,81500Altres:

% 0,002760,184001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00276 0,00276

COST DIRECTE 4,00166

0,00%DESPESES INDIRECTES

4,00166COST EXECUCIÓ MATERIAL

€7,25M3 EXCAVACIÓ DE RASA DE FINS A 4 M DE FONDÀRIA IFINS A 2 M D'AMPLÀRIA, EN TERRENY NO CLASSIFICAT,AMB MITJANS MECÀNICS I CÀRREGA MECÀNICA DELMATERIAL EXCAVAT

F2225A22 Rend.: 1,160P- 47

Unitats Preu Parcial Import€Mà d'obra:

0,15853/R 18,390000,010A0140000 =xMANOBREH

Subtotal... 0,15853 0,15853Maquinària:

7,08931/R 58,740000,140C1315020 =xRETROEXCAVADORA MITJANAH

Subtotal... 7,08931 7,08931Altres:

% 0,002380,158671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00238 0,00238

COST DIRECTE 7,25022

0,00%DESPESES INDIRECTES

7,25022COST EXECUCIÓ MATERIAL

€13,11M3 EXCAVACIÓ DE RASA EN ROCA AMB MITJANSMECÀNICS I CÀRREGA MECÀNICA DEL MATERIALEXCAVAT

F2225A26 Rend.: 1,000P- 48

Unitats Preu Parcial Import€Mà d'obra:

Page 36: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 43

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU0,18390/R 18,390000,010A0140000 =xMANOBREH

Subtotal... 0,18390 0,18390Maquinària:

12,92280/R 58,740000,220C1315020 =xRETROEXCAVADORA MITJANAH

Subtotal... 12,92280 12,92280Altres:

% 0,002760,184001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00276 0,00276

COST DIRECTE 13,10946

0,00%DESPESES INDIRECTES

13,10946COST EXECUCIÓ MATERIAL

€7,15M3 EXCAVACIÓ DE RASA , EN TERRENY NO CLASSIFICAT,AMB MITJANS MECÀNICS I CÀRREGA MECÀNICA DELMATERIAL EXCAVAT

F2225A2C Rend.: 1,111P- 49

Unitats Preu Parcial Import€Mà d'obra:

0,16553/R 18,390000,010A0140000 =xMANOBREH

Subtotal... 0,16553 0,16553Maquinària:

6,97901/R 58,740000,132C1315020 =xRETROEXCAVADORA MITJANAH

Subtotal... 6,97901 6,97901Altres:

% 0,002480,165331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00248 0,00248

COST DIRECTE 7,14702

0,00%DESPESES INDIRECTES

7,14702COST EXECUCIÓ MATERIAL

€175,50U CATA LOCALITZACIÓ SERVEI BT I MT DE FECSAENDESA

F222CA01 Rend.: 1,000P- 50

€16,68M3 EXCAVACIO DE PERICÓ AILLAT DE SECCIO FINS A 1 M2I DE 4 M DE FONDARIA COM A MAXIM, EN TERRES, AMBMITJANS MANUALS, INCLOSES LES FEINESD'EXTRACCIO I CARREGA MANUAL. , AMIDAMENTSOBRE PERFIL I EN PRESENCIA DE SERVEIS

F222S004 Rend.: 1,000P- 51

Unitats Preu Parcial Import€Mà d'obra:

6,62040/R 18,390000,360A0140000 =xMANOBREH

6,85080/R 19,030000,360A0150000 =xMANOBRE ESPECIALISTAH

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 44

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 13,47120 13,47120Maquinària:

2,93040/R 16,280000,180C1101200 =xCOMPRESSOR AMB DOS MARTELLS PNEUMÀTICSH

0,14580/R 0,810000,180C150S010 =xGRUA LLEUGERA DE 5 CVH

Subtotal... 3,07620 3,07620Altres:

% 0,1347113,471001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,13471 0,13471

COST DIRECTE 16,68211

0,00%DESPESES INDIRECTES

16,68211COST EXECUCIÓ MATERIAL

€13,39M3 EXCAVACIO DE POU AILLAT EN TERRES, AMB MITJANSMANUALS I MECÀNICS, INCLOSES LES FEINESD'EXTRACCIO I CARREGA MANUAL. , AMIDAMENTSOBRE PERFIL I EN PRESENCIA DE SERVEIS

F222S00V Rend.: 1,000P- 52

Unitats Preu Parcial Import€Mà d'obra:

5,51700/R 18,390000,300A0140000 =xMANOBREH

5,70900/R 19,030000,300A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 11,22600 11,22600Maquinària:

1,95360/R 16,280000,120C1101200 =xCOMPRESSOR AMB DOS MARTELLS PNEUMÀTICSH

0,09720/R 0,810000,120C150S010 =xGRUA LLEUGERA DE 5 CVH

Subtotal... 2,05080 2,05080Altres:

% 0,1122611,226001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,11226 0,11226

COST DIRECTE 13,38906

0,00%DESPESES INDIRECTES

13,38906COST EXECUCIÓ MATERIAL

€14,19M3 EXCAVACIO DE POU AILLAT DE SECCIO SUPERIOR A 1M2 I DE 4 M DE FONDARIA, COM A MAXIM, EN TERRES,AMB MITJANS MANUALS, INCLOSES LES FEINESD'EXTRACCIO I CARREGA MANUAL. , AMIDAMENTSOBRE PERFIL I EN PRESENCIA DE SERVEIS

F222S020 Rend.: 1,000P- 53

Unitats Preu Parcial Import€Mà d'obra:

5,62918/R 18,390000,3061A0140000 =xMANOBREH

5,82508/R 19,030000,3061A0150000 =xMANOBRE ESPECIALISTAH

Page 37: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 45

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 11,45426 11,45426Maquinària:

2,49247/R 16,280000,1531C1101200 =xCOMPRESSOR AMB DOS MARTELLS PNEUMÀTICSH

0,12401/R 0,810000,1531C150S010 =xGRUA LLEUGERA DE 5 CVH

Subtotal... 2,61648 2,61648Altres:

% 0,1145411,454001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,11454 0,11454

COST DIRECTE 14,18528

0,00%DESPESES INDIRECTES

14,18528COST EXECUCIÓ MATERIAL

€86,49M3 EXCAVACIO MANUAL PER A ZONA DE CONNEXIONATF222V011 Rend.: 1,000P- 54

Unitats Preu Parcial Import€Mà d'obra:

85,63500/R 19,030004,500A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 85,63500 85,63500Altres:

% 0,8563585,635001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,85635 0,85635

COST DIRECTE 86,49135

0,00%DESPESES INDIRECTES

86,49135COST EXECUCIÓ MATERIAL

€850,00U PROVA DE PRESSIÓ I ESTANQUEITAT DE LA XARXA DECANONADES SEGONS ESPECIFICACIONS DE LACOMPANYIA D'AIGÜES, INCLÒS JORNADAD'INSPECTOR.

F222X005 Rend.: 1,000P- 55

€885,00PA CONNEXIO A XARXA EXISTENT EN SECTOR PROPER ALSECTOR DE PROJECTE. INCLOU TOTA LACANALITZACIÓ ( TANT OBRA CIVIL COM MECÀNICA ),ELS TREBALLS VARIS D'ENCREUAMENTD'INFRAESTRUCTURES POSSIBLES, ELS PERMISOS,ELS ACCESSORIS NECESSARIS PER A DEIXAR LAXARXA DE GAS CONNECTADA I TOT ALLO NECESSARIPER TENIR LA XARXA EN FUNCIONAMENT.

F222X00J Rend.: 1,000P- 56

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 46

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€485,65UT CONNEXIO A XARXA EXISTENT EN SECTOR PROPERDES DEL FINAL DEL SECTOR DE PROJECTE. INCLOUTOTA LA CANALITZACIÓ ( TANT OBRA CIVIL COMMECÀNICA ), ELS TREBALLS VARIS D'ENCREUAMENTD'INFRAESTRUCTURES POSSIBLES, ELS PERMISOS,ELS ACCESSORIS NECESSARIS PER A DEIXAR LAXARXA CONNECTADA I TOT ALLO NECESSARI PERTENIR LA XARXA EN FUNCIONAMENT.

F222X00K Rend.: 1,000P- 57

€850,00U PROVA DE PRESSIÓ I ESTANQUEITAT DE LA XARXA DEREG SEGONS ESPECIFICACIONS DE LA NORMATIVAVIGENT, INCLÒS JORNADA D'INSPECTOR.

F222X05A Rend.: 1,000P- 58

€3,42M3 TERRAPLENAT I ANIVELLAMENT DE TERRES AMB SÒLDE LA PRÒPIA OBRA O PROCEDENT DE PRÉSTEC,REFINAT DE LA SUPERFÍCIE AMB MAQUINESAUTOMOTRIUS, ESTESA I COMPACTACIÓ DEL 98% DELPM, AMIDAMENT SOBRE PERFIL

F226V01C Rend.: 2,224P- 59

Unitats Preu Parcial Import€Mà d'obra:

0,52206/R 21,990000,0528A0121000 =xOFICIAL 1AH

0,20904/R 17,610000,0264A013N000 =xAJUDANT OBRA PÚBLICAH

0,36383/R 18,390000,044A0140000 =xMANOBREH

Subtotal... 1,09493 1,09493Maquinària:

0,56115/R 62,400000,020C131U060 =xExcavadora sobre erugues amb escarificador (D-7)h

0,67187/R 56,600000,0264C1331200 =xMOTOANIVELLADORA MITJANAH

0,58249/R 49,070000,0264C1335080 =xCORRÓ VIBRATORI AUTOPROPULSAT, DE 8 A 10 TH

0,49191/R 41,440000,0264C1502E00 =xCAMIÓ CISTERNA DE 8 M3H

Subtotal... 2,30742 2,30742Altres:

% 0,016421,094671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,01642 0,01642

COST DIRECTE 3,41877

0,00%DESPESES INDIRECTES

3,41877COST EXECUCIÓ MATERIAL

€2,37M2 REPÀS I PICONATGE DE SÒL DE RASA DE MÉS DE 0,6 IMENYS D'1,5 M D'AMPLÀRIA, AMB COMPACTACIÓ DEL95% PM

F227A00F Rend.: 1,000P- 60

Unitats Preu Parcial Import€Mà d'obra:

1,10340/R 18,390000,060A0140000 =xMANOBREH

0,76120/R 19,030000,040A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 1,86460 1,86460

Page 38: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 47

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMaquinària:

0,47280/R 11,820000,040C133A030 =xPICÓ VIBRANT DÚPLEX DE 1300 KGH

Subtotal... 0,47280 0,47280Altres:

% 0,027971,864671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,02797 0,02797

COST DIRECTE 2,36537

0,00%DESPESES INDIRECTES

2,36537COST EXECUCIÓ MATERIAL

€1,44M2 REPÀS I PICONATGE DE SÒL DE RASA DE FINS 1 MD'AMPLÀRIA, AMB COMPACTACIÓ DEL 95% PM

F227A08F Rend.: 0,985P- 61

Unitats Preu Parcial Import€Mà d'obra:

0,56010/R 18,390000,030A0140000 =xMANOBREH

0,38640/R 19,030000,020A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 0,94650 0,94650Maquinària:

0,48000/R 11,820000,040C133A030 =xPICÓ VIBRANT DÚPLEX DE 1300 KGH

Subtotal... 0,48000 0,48000Altres:

% 0,014200,946671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,01420 0,01420

COST DIRECTE 1,44070

0,00%DESPESES INDIRECTES

1,44070COST EXECUCIÓ MATERIAL

€1,26M2 REPÀS I PICONATGE DE CAIXA DE PAVIMENT, AMBCOMPACTACIÓ DEL 95% PM

F227T00F Rend.: 1,000P- 62

Unitats Preu Parcial Import€Maquinària:

0,55400/R 55,400000,010C1331100 =xMOTOANIVELLADORA PETITAH

0,70840/R 64,400000,011C13350C0 =xCORRÓ VIBRATORI AUTOPROPULSAT, DE 12 A 14 TH

Subtotal... 1,26240 1,26240

COST DIRECTE 1,26240

0,00%DESPESES INDIRECTES

1,26240COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 48

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€21,50M3 SUBMINISTRAMENT, ESTESA I PICONATGE DE SORRA0/5MM O SAULÓ GARBELLAT, PER ASSENTAMENT IPROTECCIÓ DE TUB FINS A 20CM DE LA GENERATRIUSUPERIOR DEL MATEIX, INCLÒS LA COMPACTACIÓMANUAL AL 98% DEL PM MESURAT SEGONS SECCIONSDE PROJECTE I METRATGE REALMENT COL·LOCAT. ELPREU INCLOU EL SUBMINISTRAMENT A OBRA, ELPICONAT, MITJANÇANT PICAT AMB BARRA I REG AMBAIGUA.

F228510A Rend.: 2,332P- 63

Unitats Preu Parcial Import€Mà d'obra:

4,08019/R 19,030000,500A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 4,08019 4,08019Maquinària:

2,51887/R 58,740000,100C1315020 =xRETROEXCAVADORA MITJANAH

1,79031/R 8,350000,500C133A0K0 =xPICÓ VIBRANT AMB PLACA DE 60 CMH

Subtotal... 4,30918 4,30918Materials:

13,0480016,310000,800B0321000 =xSAULÓ SENSE GARBELLARM3

Subtotal... 13,04800 13,04800Altres:

% 0,061204,080001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,06120 0,06120

COST DIRECTE 21,49857

0,00%DESPESES INDIRECTES

21,49857COST EXECUCIÓ MATERIAL

€12,10M3 REBLIMENT I PICONATGE DE RASA D'AMPLÀRIA MÉSDE 0,6 I FINS A 1,5 M, AMB MATERIAL TOLERABLE DE LAPRÒPIA EXCAVACIÓ O DE PRÉSTEC EN TONGADES DEGRUIX FINS A 25 CM, UTILITZANT PICÓ VIBRANT, AMBCOMPACTACIÓ DEL 95% PM

F228A11A Rend.: 1,000P- 64

Unitats Preu Parcial Import€Mà d'obra:

3,80600/R 19,030000,200A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 3,80600 3,80600Maquinària:

5,87400/R 58,740000,100C1315020 =xRETROEXCAVADORA MITJANAH

2,36400/R 11,820000,200C133A030 =xPICÓ VIBRANT DÚPLEX DE 1300 KGH

Subtotal... 8,23800 8,23800Altres:

% 0,057093,806001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,05709 0,05709

Page 39: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 49

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 12,10109

0,00%DESPESES INDIRECTES

12,10109COST EXECUCIÓ MATERIAL

€8,47M3 REBLIMENT I PICONATGE AMB MATERIAL TOLERABLEDE LA PRÒPIA EXCAVACIÓ O DE PRÉSTEC ENTONGADES DE GRUIX FINS A 25 CM, UTILITZANT PICÓVIBRANT, AMB COMPACTACIÓ DEL 95% PM

F228A21B Rend.: 1,201P- 65

Unitats Preu Parcial Import€Mà d'obra:

1,58451/R 19,030000,100A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 1,58451 1,58451Maquinària:

4,89092/R 58,740000,100C1315020 =xRETROEXCAVADORA MITJANAH

1,96836/R 11,820000,200C133A030 =xPICÓ VIBRANT DÚPLEX DE 1300 KGH

Subtotal... 6,85928 6,85928Altres:

% 0,023771,584671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,02377 0,02377

COST DIRECTE 8,46756

0,00%DESPESES INDIRECTES

8,46756COST EXECUCIÓ MATERIAL

€14,18M2 APUNTALAMENT I ESTREBADA DE RASES I POUS, PERA UNA PROTECCIÓ DEL 30%

F231550B Rend.: 1,000P- 66

Unitats Preu Parcial Import€Mà d'obra:

6,81690/R 21,990000,310A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

5,70090/R 18,390000,310A0140000 =xMANOBREH

Subtotal... 12,51780 12,51780Materials:

0,076301,090000,070B0A31000 =xCLAU ACERKG

1,188000,400002,970B0D21030 =xTAULÓ DE FUSTA DE PI PER A 10 USOSM

0,081208,120000,010B0D61170 =xPUNTAL RODÓ DE FUSTA DE 7 A 9 CM DE DIÀMETRE IDE 2 A 2,5 M D'ALÇÀRIA, PER A 30 USOS

M3

Subtotal... 1,34550 1,34550Altres:

% 0,3129512,518002,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,31295 0,31295

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 50

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 14,17625

0,00%DESPESES INDIRECTES

14,17625COST EXECUCIÓ MATERIAL

€1.450,00U SUBMINISTRE I MUNTATGE, AMB PERFILERIAMETÀL·LICA HEB 300 D'ESTINTOLAMENT, DE SERVEISEXISTENTS PER A UNA LONGITUD MÀXIMA DE 10METRES, INCLÒS CABLEJAT, PERNS I ALTRESELEMENTS NECESSARIS PER A LA SUSTENTACIÓ DELSSERVEIS.

F231V999 Rend.: 1,000P- 67

€4,78M3 TRANSPORT DE TERRES DINS DE L'OBRA, CARREGATAMB MITJANS MECÀNICS I TEMPS D'ESPERA PER A LACÀRREGA, AMB DÚMPER

F2411224 Rend.: 1,000P- 68

Unitats Preu Parcial Import€Maquinària:

4,78000/R 23,900000,200C1505120 =xDÚMPER D'1,5 T DE CÀRREGA ÚTIL, AMB MECANISMEHIDRÀULIC

H

Subtotal... 4,78000 4,78000

COST DIRECTE 4,78000

0,00%DESPESES INDIRECTES

4,78000COST EXECUCIÓ MATERIAL

€2,87M3 TRANSPORT DE TERRES DINS DE L'OBRA , CARREGATAMB MITJANS MECÀNICS I TEMPS D'ESPERA PER A LACÀRREGA, AMB DÚMPER

F2411225 Rend.: 1,666P- 69

Unitats Preu Parcial Import€Maquinària:

2,86915/R 23,900000,200C1505120 =xDÚMPER D'1,5 T DE CÀRREGA ÚTIL, AMB MECANISMEHIDRÀULIC

H

Subtotal... 2,86915 2,86915

COST DIRECTE 2,86915

0,00%DESPESES INDIRECTES

2,86915COST EXECUCIÓ MATERIAL

€17,99M3 TRANSPORT DE TERRES O RUNA AMB CAMIO DE 12 T,FINS ABOCADOR DE TERRES O RUNES, AUTORITZAT,INCLOS CANON D'ABOCAMENT I MANTENIMENT DEL'ABOCADOR

F241U103 Rend.: 1,000P- 70

Unitats Preu Parcial Import€Maquinària:

11,99220/R 36,340000,330C1501800 =xCAMIÓ PER A TRANSPORT DE 12 TH

Page 40: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 51

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU6,00000/R 6,000001,000C150Z100 =xCANON MANTENIMENT ABOCADOR I ABOCAMENT DE

TERRES I RUNESM3

Subtotal... 17,99220 17,99220Altres:

%1,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal...

COST DIRECTE 17,99220

0,00%DESPESES INDIRECTES

17,99220COST EXECUCIÓ MATERIAL

€8,86M3 TRANSPORT DE TERRES, RUNES O RESIDUS DE LACONSTRUCCIÓ AMB CAMIO DE 12 T, FINS AABOCADOR MIXTE, AUTORITZAT, INCLOS CANOND'ABOCAMENT I MANTENIMENT DE L'ABOCADOR

F242R268 Rend.: 1,682P- 71

Unitats Preu Parcial Import€Maquinària:

0,97206/R 54,500000,030C1311120 =xPALA CARREGADORA MITJANA, SOBRE PNEUMÀTICSH

4,32105/R 36,340000,200C1501800 =xCAMIÓ PER A TRANSPORT DE 12 TH

3,56718/R 6,000001,000C150Z200 =xCANON MANTENIMENT ABOCADOR I ABOCAMENT DEMIXTES DE LA CONSTRUCCIO

M3

Subtotal... 8,86029 8,86029Altres:

%1,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal...

COST DIRECTE 8,86029

0,00%DESPESES INDIRECTES

8,86029COST EXECUCIÓ MATERIAL

€1,30M3 REDUCCIO DE NIVELL FREATIC EN 2 M AMB UN EQUIPDE 75 M DE LLARGARIA AMB UNA LLANÇA DE SUCCIOPER METRE DE 3 M DE FONDARIA AMB BOMBA DE 22KW I 320 M3/H DE CABAL MAXIM EN TERRENY DEPERMEABILITAT DE 1E-04 M/S

F263C382 Rend.: 1,000P- 72

Unitats Preu Parcial Import€Maquinària:

1,30020/R 29,550000,044CZ15C180 =xEQUIP PER A REDUCCIÓ DEL NIVELL FREÀTIC EN 2 M I75 M DE LLARGÀRIA AMB UNA LLANÇA DE SUCCIÓ PERMETRE DE 3 M DE FONDÀRIA AMB BOMBA DE 22 KW I320 M3/H DE CABAL MÀXIM

H

Subtotal... 1,30020 1,30020

0,000002,50%DESPESES AUXILIARS

COST DIRECTE 1,30020

0,00%DESPESES INDIRECTES

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 52

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

1,30020COST EXECUCIÓ MATERIAL

€2.199,95U DESPLAÇAMENT, MUNTATGE I DESMUNTATGE A OBRAD'EQUIP DE REDUCCIO DE NIVELL FREATIC EN 2 M DE75 M DE LLARGARIA

F26Z2500 Rend.: 1,000P- 73

Unitats Preu Parcial Import€Mà d'obra:

1.014,33600/R 17,6100057,600A013M000 =xAJUDANT MUNTADORH

Subtotal... 1.014,33600 1.014,33600Maquinària:

592,89600/R 46,3200012,800C1501A00 =xCAMIÓ PER A TRANSPORT DE 24 TH

567,36000/R 29,5500019,200CZ15C180 =xEQUIP PER A REDUCCIÓ DEL NIVELL FREÀTIC EN 2 M I75 M DE LLARGÀRIA AMB UNA LLANÇA DE SUCCIÓ PERMETRE DE 3 M DE FONDÀRIA AMB BOMBA DE 22 KW I320 M3/H DE CABAL MÀXIM

H

Subtotal... 1.160,25600 1.160,25600Altres:

% 25,358401.014,336002,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 25,35840 25,35840

COST DIRECTE 2.199,95040

0,00%DESPESES INDIRECTES

2.199,95040COST EXECUCIÓ MATERIAL

€8,70M3 SUBMINISTRAMENT DE TERRA SELECCIONADAD'APORTACIÓ TIPUS 3 PER A FORMACIÓ D'ESPLANADAE2, FORMACIÓ DE LA CORONACIÓ DE L'ESPLANADASEGONS CONDICIONS DEL PLEC DE PRESCRIPCIONSTÈCNIQUES, EN CORONACIÓ DE TERRAPLENS OSOBRE DESMUNT, ESTESA I COMPACTADA AL 100%DEL PM, MESURAT SOBRE PERFIL TEÒRIC.

F2A11000 Rend.: 13,967P- 74

Unitats Preu Parcial Import€Mà d'obra:

0,00271/R 21,000000,0018A0112000 =xCap de collah

0,00658/R 18,390000,005A0140000 =xMANOBREH

Subtotal... 0,00929 0,00929Maquinària:

0,02690/R 75,130000,005C131Q104 =xExcavadora oruga Hidr. 130-150 CV, 1-1.5 m³ (MQ104)h

0,00979/R 54,710000,0025C133U002 =xMotoanivelladora de 150 hph

0,02256/R 63,010000,005C133U040 =xCorró vibratori autopropulsat de 14 a 18 th

0,00641/R 35,830000,0025C1502D00 =xCAMIÓ CISTERNA DE 6 M3H

Subtotal... 0,06566 0,06566Materials:

0,005051,010000,005B0111000 =xAIGUAM3

8,620008,620001,000B03D1000 =xTerra seleccionadaM3

Page 41: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 53

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 8,62505 8,62505

COST DIRECTE 8,70000

0,00%DESPESES INDIRECTES

8,70000COST EXECUCIÓ MATERIAL

€5,28M3 SUBMINISTRAMENT DE TERRA ADEQUADAD'APORTACIÓ

F2A15000 Rend.: 1,000P- 75

Unitats Preu Parcial Import€Materials:

5,280005,280001,000B03D5000 =xTERRA ADEQUADAM3

Subtotal... 5,28000 5,28000

COST DIRECTE 5,28000

0,00%DESPESES INDIRECTES

5,28000COST EXECUCIÓ MATERIAL

€3,61M3 SUBMINISTRAMENT DE TERRA TOLERABLED'APORTACIÓ

F2A16000 Rend.: 1,000P- 76

Unitats Preu Parcial Import€Materials:

3,610003,610001,000B03D6000 =xTERRA TOLERABLEM3

Subtotal... 3,61000 3,61000

COST DIRECTE 3,61000

0,00%DESPESES INDIRECTES

3,61000COST EXECUCIÓ MATERIAL

€1,30KG ACER AEH 500 S (B 500 S) DE LIMIT ELASTIC >= 5100KP/CM2 EN BARRES CORRUGADES, COL.LOCAT

F30B3000 Rend.: 1,810P- 77

Unitats Preu Parcial Import€Mà d'obra:

0,12149/R 21,990000,010A0124000 =xOFICIAL 1A FERRALLISTAH

0,10790/R 19,530000,010A0134000 =xAJUDANT FERRALLISTAH

Subtotal... 0,22939 0,22939Materials:

0,010601,060000,010B0A14200 =xFILFERRO RECUIT DE DIÀMETRE 1,3 MMKG

1,059951,059951,000D0B2A100 =xACER EN BARRES CORRUGADES ELABORAT A L'OBRA IMANIPULAT A TALLER B 500 S, DE LÍMIT ELÀSTIC >= 500N/MM2

KG

Subtotal... 1,07055 1,07055Altres:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 54

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU% 0,002290,229001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00229 0,00229

COST DIRECTE 1,30223

0,00%DESPESES INDIRECTES

1,30223COST EXECUCIÓ MATERIAL

€82,78M3 FORMIGÓ HA-25 PER A ALÇATS, PILES I TAULES,INCLOS COL.LOCACIÓ, VIBRAT I CURAT.

F325U6J4 Rend.: 1,000P- 78

Unitats Preu Parcial Import€Mà d'obra:

1,18980/R 19,830000,060A0122000 =xOFICIAL 1A PALETAH

4,41360/R 18,390000,240A0140000 =xMANOBREH

Subtotal... 5,60340 5,60340Maquinària:

6,52050/R 130,410000,050C1701100 =xCamió amb bomba de formigonarh

Subtotal... 6,52050 6,52050Materials:

70,6000070,600001,000B060U440 =xFormigó HA-25, consistència fluida i granulat màxim 20 mm,inclòs transport a l'obra

m3

Subtotal... 70,60000 70,60000Altres:

% 0,056035,603001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,05603 0,05603

COST DIRECTE 82,77993

0,00%DESPESES INDIRECTES

82,77993COST EXECUCIÓ MATERIAL

€85,79M3 FORMIGO, PER A ALÇATS,HA-30 DE CONSISTENCIATOVA I GRANDARIA MAXIMA DEL GRANULAT 20 MM,ABOCAT AMB BOMBA

F325U7C Rend.: 1,000P- 79

Unitats Preu Parcial Import€Mà d'obra:

1,18980/R 19,830000,060A0122000 =xOFICIAL 1A PALETAH

5,51700/R 18,390000,300A0140000 =xMANOBREH

Subtotal... 6,70680 6,70680Maquinària:

6,52050/R 130,410000,050C1701100 =xCamió amb bomba de formigonarh

Subtotal... 6,52050 6,52050Materials:

72,5000072,500001,000B0608330 =xFORMIGO HA-30, DE CONSISTENCIA TOVA IGRANDARIA MAXIMA DEL GRANULAT 20 MM

m3

Page 42: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 55

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 72,50000 72,50000Altres:

% 0,067076,707001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,06707 0,06707

COST DIRECTE 85,79437

0,00%DESPESES INDIRECTES

85,79437COST EXECUCIÓ MATERIAL

€22,75M2 MUNTATGE I DESMUNTATGE D'UNA CARA D'ENCOFRATAMB PLAFÓ METÀL.LIC

F32D1107 Rend.: 1,000P- 80

Unitats Preu Parcial Import€Mà d'obra:

9,91500/R 19,830000,500A0123000 =xOFICIAL 1A ENCOFRADORH

9,68550/R 17,610000,550A0133000 =xAJUDANT ENCOFRADORH

Subtotal... 19,60050 19,60050Materials:

0,109001,090000,100B0A31000 =xCLAU ACERKG

0,800000,400002,000B0D21030 =xTAULÓ DE FUSTA DE PI PER A 10 USOSM

0,077307,730000,010B0D625A0 =xPUNTAL METÀL.LIC I TELESCÒPIC PER A 3 M D'ALÇÀRIAI 150 USOS

CU

0,1855018,550000,010B0D629A0 =xPUNTAL METÀL.LIC I TELESCÒPIC PER A 5 M D'ALÇÀRIAI 150 USOS

CU

1,102101,030001,070B0D81680 =xPLAFÓ METÀL.LIC DE 50X250 CM PER A 50 USOSM2

0,152801,910000,080B0DZA000 =xDESENCOFRANTL

0,430000,430001,000B0DZP600 =xPART PROPORCIONAL D'ELEMENTS AUXILIARS PER APLAFONS METÀL.LICS, DE 50X250 CM

U

Subtotal... 2,85670 2,85670Altres:

% 0,2940119,600671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,29401 0,29401

COST DIRECTE 22,75121

0,00%DESPESES INDIRECTES

22,75121COST EXECUCIÓ MATERIAL

€32,90M2 MUNTATGE I DESMUNTATGE D'UNA CARA D'ENCOFRATAMB PLAFÓ METÀL.LIC DE 250X50 CM,PER A DEIXAR ELFORMIGÓ VIST

F32D1125 Rend.: 1,000P- 81

Unitats Preu Parcial Import€Mà d'obra:

14,87250/R 19,830000,750A0123000 =xOFICIAL 1A ENCOFRADORH

13,20750/R 17,610000,750A0133000 =xAJUDANT ENCOFRADORH

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 56

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 28,08000 28,08000Materials:

0,109001,090000,100B0A31000 =xCLAU ACERKG

0,600000,400001,500B0D21030 =xTAULÓ DE FUSTA DE PI PER A 10 USOSM

0,077307,730000,010B0D625A0 =xPUNTAL METÀL.LIC I TELESCÒPIC PER A 3 M D'ALÇÀRIAI 150 USOS

CU

2,992802,580001,160B0D81650 =xPLAFÓ METÀL.LIC DE 50X250 CM PER A 20 USOSM2

0,191001,910000,100B0DZA000 =xDESENCOFRANTL

0,430000,430001,000B0DZP600 =xPART PROPORCIONAL D'ELEMENTS AUXILIARS PER APLAFONS METÀL.LICS, DE 50X250 CM

U

Subtotal... 4,40010 4,40010Altres:

% 0,4212028,080001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,42120 0,42120

COST DIRECTE 32,90130

0,00%DESPESES INDIRECTES

32,90130COST EXECUCIÓ MATERIAL

€50,49M3 ESCOLLERA AMB BLOCS DE PEDRA GRANÍTICA 400-800KG,PALA CARREGADORA . ELECCIÓ DE CARA VISTA.

F3J227AB Rend.: 1,406P- 82

Unitats Preu Parcial Import€Mà d'obra:

1,79929/R 18,070000,140A0120400 =xOficial 1a (con las cargas sociales incluídas) (MO400)h

Subtotal... 1,79929 1,79929Maquinària:

12,03186/R 105,730000,160C1315030 =xRETROEXCAVADORA GRANH

Subtotal... 12,03186 12,03186Materials:

36,6000030,500001,200B044G077 =xBloque de piedra calcarea de 400 a 800 kg m3

Subtotal... 36,60000 36,60000Altres:

% 0,053981,799333,00A%AUXM =S/Medios auxiliares (MA02)%

Subtotal... 0,05398 0,05398

COST DIRECTE 50,48513

0,00%DESPESES INDIRECTES

50,48513COST EXECUCIÓ MATERIAL

Page 43: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 57

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€1,86M2 MALLA ELECTROSOLDADA DE FILFERROSCORRUGATS D'ACER AEH 500 T (B 500 T) DE LIMITELASTIC >= 5100 KP/CM2 PER A L'ARMADURA AMBELEMENTS RESISTENTS, DE 15X15 CM, DE 6 MM I 6 MMDE D, RESPECTIVAMENT

F4B0DA88 Rend.: 1,000P- 83

Unitats Preu Parcial Import€Mà d'obra:

0,43980/R 21,990000,020A0124000 =xOFICIAL 1A FERRALLISTAH

0,39060/R 19,530000,020A0134000 =xAJUDANT FERRALLISTAH

Subtotal... 0,83040 0,83040Materials:

0,010601,060000,010B0A14200 =xFILFERRO RECUIT DE DIÀMETRE 1,3 MMKG

1,007602,519000,400D0B34136 =xMALLA ELECTROSOLDADA DE BARRES CORRUGADESD'ACER, ELABORADA A L'OBRA I MANIPULADA ATALLER ME 15 X 15 CM D: 6 - 6 MM B 500 T 6 X 2,2 M,SEGONS UNE 36092

M2

Subtotal... 1,01820 1,01820Altres:

% 0,008300,830001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00830 0,00830

COST DIRECTE 1,85690

0,00%DESPESES INDIRECTES

1,85690COST EXECUCIÓ MATERIAL

€3,88M2 MALLA ELECTROSOLDADA DE FILFERROSCORRUGATS D'ACER AEH 500 T (B 500 T) DE LIMITELASTIC >= 5100 KP/CM2 PER A L'ARMADURA AMBELEMENTS RESISTENTS, DE 15X15 CM, DE 6 MM I 6 MMDE D, RESPECTIVAMENT

F4B0DA99 Rend.: 0,293P- 84

Unitats Preu Parcial Import€Mà d'obra:

1,50102/R 21,990000,020A0124000 =xOFICIAL 1A FERRALLISTAH

1,33311/R 19,530000,020A0134000 =xAJUDANT FERRALLISTAH

Subtotal... 2,83413 2,83413Materials:

0,010601,060000,010B0A14200 =xFILFERRO RECUIT DE DIÀMETRE 1,3 MMKG

1,007602,519000,400D0B34136 =xMALLA ELECTROSOLDADA DE BARRES CORRUGADESD'ACER, ELABORADA A L'OBRA I MANIPULADA ATALLER ME 15 X 15 CM D: 6 - 6 MM B 500 T 6 X 2,2 M,SEGONS UNE 36092

M2

Subtotal... 1,01820 1,01820Altres:

% 0,028342,834001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,02834 0,02834

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 58

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 3,88067

0,00%DESPESES INDIRECTES

3,88067COST EXECUCIÓ MATERIAL

€12,62M2 MUNTATGE I DESMUNTATGE D'ENCOFRATHORITZONTALS AMB TAULER DE FUSTA.

F4D0U506 Rend.: 1,000P- 85

Unitats Preu Parcial Import€Mà d'obra:

5,94900/R 19,830000,300A0123000 =xOFICIAL 1A ENCOFRADORH

5,28300/R 17,610000,300A0133000 =xAJUDANT ENCOFRADORH

Subtotal... 11,23200 11,23200Materials:

0,109001,090000,100B0A31000 =xCLAU ACERKG

0,480000,400001,200B0D21030 =xTAULÓ DE FUSTA DE PI PER A 10 USOSM

0,077307,730000,010B0D625A0 =xPUNTAL METÀL.LIC I TELESCÒPIC PER A 3 M D'ALÇÀRIAI 150 USOS

CU

0,152801,910000,080B0DZA000 =xDESENCOFRANTL

0,290000,290001,000B0DZP400 =xPART PROPORCIONAL D'ELEMENTS AUXILIARS PER APLAFONS METÀL.LICS, DE 50X100 CM

U

Subtotal... 1,10910 1,10910Altres:

% 0,2808011,232002,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,28080 0,28080

COST DIRECTE 12,62190

0,00%DESPESES INDIRECTES

12,62190COST EXECUCIÓ MATERIAL

€5,91M2 PINTAT SOBRE FORMIGÓ EN PARAMENT VERTICALAMB 2 KG/M2 D'EMULSIÓ BITUMINOSA CATIÒNICATIPUS ECR-1

F7811100 Rend.: 1,000P- 86

Unitats Preu Parcial Import€Mà d'obra:

2,52885/R 21,990000,115A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

2,75850/R 18,390000,150A0140000 =xMANOBREH

Subtotal... 5,28735 5,28735Materials:

0,540000,270002,000B0552420 =xEMULSIÓ BITUMINOSA CATIÒNICA TIPUS ECR-1KG

Subtotal... 0,54000 0,54000

0,079311,50%DESPESES AUXILIARS

COST DIRECTE 5,90666

0,00%DESPESES INDIRECTES

Page 44: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 59

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

5,90666COST EXECUCIÓ MATERIAL

€3,44M2 IMPERMEABILITZACIÓ DE PARAMENTS VERTICALS IHORITZONTALS DE FORMIGÓ AMB 2 KG/M2 D'EMULSIOBITUMINOSA CATIONICA TIPUS ECR-1

F781U101 Rend.: 1,000P- 87

Unitats Preu Parcial Import€Mà d'obra:

2,83206/R 18,390000,154A0140000 =xMANOBREH

Subtotal... 2,83206 2,83206Materials:

0,540000,270002,000B0552420 =xEMULSIÓ BITUMINOSA CATIÒNICA TIPUS ECR-1KG

Subtotal... 0,54000 0,54000Altres:

% 0,070802,832002,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,07080 0,07080

COST DIRECTE 3,44286

0,00%DESPESES INDIRECTES

3,44286COST EXECUCIÓ MATERIAL

€7,00M2 PINTAT SOBRE FORMIGO EN PARAMENTSHORITZONTALS AMB 1 KG/M2 D'EMULSIO BITUMINOSACATIONICA TIPUS ECR-1 I 6 KG/M2 DE BETUM ASFALTICTIPUS B-60/70

F782U110 Rend.: 1,000P- 88

Unitats Preu Parcial Import€Mà d'obra:

2,93127/R 21,990000,1333A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

2,45139/R 18,390000,1333A0140000 =xMANOBREH

Subtotal... 5,38266 5,38266Materials:

0,270000,270001,000B0552420 =xEMULSIÓ BITUMINOSA CATIÒNICA TIPUS ECR-1KG

1,21656202,760000,006B9HZ1000 =xBETUM ASFALTIC TIPUS B-60/70T

Subtotal... 1,48656 1,48656

0,134572,50%DESPESES AUXILIARS

COST DIRECTE 7,00379

0,00%DESPESES INDIRECTES

7,00379COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 60

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€2,08M2 SUBMINISTRAMENT I COL·LOCACIÓ DE MALLAANTIHERBES NEGRE AMB UN PES MÍNIM DE 110 G/M2INCLOSOS GANXOS DE FIXACIÓ, RETALLS PERADEQUACIÓ AL PERIMETRE PARTERRE, TALLS PERPLANTACIÓ I SOLAPAMENTS ENTRE LÀMINES D'UN15%..

F7B1MAH0 Rend.: 1,000P- 89

Unitats Preu Parcial Import€Mà d'obra:

0,79320/R 19,830000,040A0127000 =xOFICIAL 1A COL.LOCADORH

0,52830/R 17,610000,030A0137000 =xAJUDANT COL.LOCADORH

Subtotal... 1,32150 1,32150Materials:

0,735000,700001,050B7B1N000 =xMALLA ANTIHERBES AMB UN PES MÍNIM DE 140 G/M2INCLOU ELS GANXOS DE SUBJECCIÓ

m2

Subtotal... 0,73500 0,73500Altres:

% 0,019821,321331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,01982 0,01982

COST DIRECTE 2,07632

0,00%DESPESES INDIRECTES

2,07632COST EXECUCIÓ MATERIAL

€2,71M2 LAMINA SEPARADORA DE FELTRE DE POLIPROPILEAMB UN PES MINIM DE 200 G/M2, COL.LOCADA NOADHERIDA

F7B1UH0L Rend.: 1,000P- 90

Unitats Preu Parcial Import€Mà d'obra:

0,79320/R 19,830000,040A0127000 =xOFICIAL 1A COL.LOCADORH

0,35220/R 17,610000,020A0137000 =xAJUDANT COL.LOCADORH

Subtotal... 1,14540 1,14540Materials:

1,551001,410001,100B7B11M00 =xFELTRE DE POLIPROPILÈ PER A LÀMINA SEPARADORAAMB UN PES DE 200 A 250 G/M2

M2

Subtotal... 1,55100 1,55100Altres:

% 0,017181,145331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,01718 0,01718

COST DIRECTE 2,71358

0,00%DESPESES INDIRECTES

2,71358COST EXECUCIÓ MATERIAL

Page 45: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 61

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€54,58M FORMACIO DE JUNT DE DILATACIO, EN PECESFORMIGONADES 'IN SITU', AMB PERFIL ELASTOMERICD'ANIMA CIRCULAR, DE 200 MM D'AMPLARIA,COL·LOCAT A L'INTERIOR

F7J1AA6A Rend.: 1,000P- 91

Unitats Preu Parcial Import€Mà d'obra:

1,98300/R 19,830000,100A0123000 =xOFICIAL 1A ENCOFRADORH

0,88050/R 17,610000,050A0133000 =xAJUDANT ENCOFRADORH

Subtotal... 2,86350 2,86350Materials:

51,6600049,200001,050B7J10A61 =xPERFIL ELASTOMÈRIC D'ÀNIMA CIRCULAR DE 200 MMD'AMPLÀRIA PER A JUNT DE DILATACIÓ INTERIOR

M

Subtotal... 51,66000 51,66000

0,057272,00%DESPESES AUXILIARS

COST DIRECTE 54,58077

0,00%DESPESES INDIRECTES

54,58077COST EXECUCIÓ MATERIAL

€8,05M FORMACIO DE JUNT DE DILATACIO, AMB PLACA DEPOLIESTIRÈ EXPANDIT DE 30 MM DE GRUIX I DENSITATNORMAL 20 Kg/m3, COL.LOCADA A L'INTERIOR ENPECES FORMIGONADES 'IN SITU'.

F7J1AAEF Rend.: 1,000P- 92

Unitats Preu Parcial Import€Mà d'obra:

0,99150/R 19,830000,050A0123000 =xOFICIAL 1A ENCOFRADORH

0,88050/R 17,610000,050A0133000 =xAJUDANT ENCOFRADORH

Subtotal... 1,87200 1,87200Materials:

6,142505,850001,050B7J10AE5 =xPLACA DE POLIESTIRÈ EXPANDIT DE 30 MM DE GRUIX IDENSITAT DE 20Kg/m3

M

Subtotal... 6,14250 6,14250Altres:

% 0,037441,872002,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,03744 0,03744

COST DIRECTE 8,05194

0,00%DESPESES INDIRECTES

8,05194COST EXECUCIÓ MATERIAL

€33,27M FORMACIO DE JUNT DE TREBALL, EN PECESFORMIGONADES 'IN SITU', AMB PERFIL ELASTOMERICD'ANIMA PLANA, DE 150 MM D'AMPLARIA, COL·LOCAT AL'INTERIOR

F7J1B23A Rend.: 1,000P- 93

Unitats Preu Parcial Import€Mà d'obra:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 62

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU1,98300/R 19,830000,100A0123000 =xOFICIAL 1A ENCOFRADORH

0,88050/R 17,610000,050A0133000 =xAJUDANT ENCOFRADORH

Subtotal... 2,86350 2,86350Materials:

30,3450028,900001,050B7J10234 =xPERFIL ELASTOMÈRIC D'ÀNIMA PLANA DE 150 MMD'AMPLÀRIA PER A JUNT DE TREBALL INTERIOR

M

Subtotal... 30,34500 30,34500

0,057272,00%DESPESES AUXILIARS

COST DIRECTE 33,26577

0,00%DESPESES INDIRECTES

33,26577COST EXECUCIÓ MATERIAL

€17,54M3 BASE DE TOT-U ARTIFICIAL, AMB ESTESA I PICONATGEDEL MATERIAL AL 98% DEL PM

F931201J Rend.: 3,423P- 94

Unitats Preu Parcial Import€Mà d'obra:

0,18804/R 18,390000,035A0140000 =xMANOBREH

Subtotal... 0,18804 0,18804Maquinària:

0,64739/R 55,400000,040C1331100 =xMOTOANIVELLADORA PETITAH

0,75256/R 64,400000,040C13350C0 =xCORRÓ VIBRATORI AUTOPROPULSAT, DE 12 A 14 TH

0,30266/R 41,440000,025C1502E00 =xCAMIÓ CISTERNA DE 8 M3H

Subtotal... 1,70261 1,70261Materials:

0,050501,010000,050B0111000 =xAIGUAM3

15,5925014,850001,050B0372000 =xTOT-U ARTIFICIALM3

Subtotal... 15,64300 15,64300Altres:

% 0,001880,188001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00188 0,00188

COST DIRECTE 17,53553

0,00%DESPESES INDIRECTES

17,53553COST EXECUCIÓ MATERIAL

€60,42M3 BASE DE FORMIGÓ HM-20/B/20/I, DE CONSISTÈNCIATOVA I GRANDÀRIA MÀXIMA DEL GRANULAT 20 MM,ABOCAT DES DE CAMIÓ AMB ESTESA I VIBRATGEMANUAL, AMB ACABAT REGLEJAT

F9365H23 Rend.: 3,028P- 95

Unitats Preu Parcial Import€Mà d'obra:

1,08933/R 21,990000,150A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

2,73299/R 18,390000,450A0140000 =xMANOBREH

Page 46: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 63

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 3,82232 3,82232Maquinària:

0,23134/R 4,670000,150C2005000 =xREGLE VIBRATORIH

Subtotal... 0,23134 0,23134Materials:

56,3115053,630001,050B0641050 =xFORMIGÓ HM-20/B/20/I DE CONSISTÈNCIA TOVA,GRANDÀRIA MÀXIMA DEL GRANULAT 20 MM, AMB >=200 KG/M3 DE CIMENT, APTE PER A CLASSED'EXPOSICIÓ I

M3

Subtotal... 56,31150 56,31150Altres:

% 0,057333,822001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,05733 0,05733

COST DIRECTE 60,42249

0,00%DESPESES INDIRECTES

60,42249COST EXECUCIÓ MATERIAL

€68,76M3 BASE DE FORMIGÓ HM-20/B/20/I, DE CONSISTÈNCIATOVA I GRANDÀRIA MÀXIMA DEL GRANULAT 20 MM,ABOCAT DES DE CAMIÓ AMB ESTESA I VIBRATGEMANUAL, AMB ACABAT REGLEJAT

F9365H24 Rend.: 1,000P- 96

Unitats Preu Parcial Import€Mà d'obra:

3,29850/R 21,990000,150A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

8,27550/R 18,390000,450A0140000 =xMANOBREH

Subtotal... 11,57400 11,57400Maquinària:

0,70050/R 4,670000,150C2005000 =xREGLE VIBRATORIH

Subtotal... 0,70050 0,70050Materials:

56,3115053,630001,050B0641050 =xFORMIGÓ HM-20/B/20/I DE CONSISTÈNCIA TOVA,GRANDÀRIA MÀXIMA DEL GRANULAT 20 MM, AMB >=200 KG/M3 DE CIMENT, APTE PER A CLASSED'EXPOSICIÓ I

M3

Subtotal... 56,31150 56,31150Altres:

% 0,1736111,574001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,17361 0,17361

COST DIRECTE 68,75961

0,00%DESPESES INDIRECTES

68,75961COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 64

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€84,18M3 BASE DE FORMIGÓ HM-20/B/20/I, DE CONSISTÈNCIATOVA I GRANDÀRIA MÀXIMA DEL GRANULAT 20 MM,ABOCAT AMB TRANSPORT INTERIOR MECÀNIC AMBESTESA I VIBRATGE MANUAL, AMB ACABAT REGLEJAT

F9365H51 Rend.: 1,000P- 97

Unitats Preu Parcial Import€Mà d'obra:

3,51840/R 21,990000,160A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

8,82720/R 18,390000,480A0140000 =xMANOBREH

3,04480/R 19,030000,160A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 15,39040 15,39040Maquinària:

3,82400/R 23,900000,160C1505120 =xDÚMPER D'1,5 T DE CÀRREGA ÚTIL, AMB MECANISMEHIDRÀULIC

H

0,74720/R 4,670000,160C2005000 =xREGLE VIBRATORIH

Subtotal... 4,57120 4,57120Materials:

64,2180061,160001,050B064300B =xFormigó HM-20/B/20/I de consistència tova, grandàriamàxima del granulat 20 mm, amb >= 200 kg/m3 de ciment,apte per a classe d'exposició I

m3

Subtotal... 64,21800 64,21800

COST DIRECTE 84,17960

0,00%DESPESES INDIRECTES

84,17960COST EXECUCIÓ MATERIAL

€15,09M VORADA RECTA JARDÍ TIPUS FIOL DE FORMIGO A3, DE8X20 CM, COL.LOCADA AMB FONAMENT DE FORMIGO

F965U01A Rend.: 1,000P- 98

Unitats Preu Parcial Import€Mà d'obra:

2,45628/R 21,990000,1117A0121000 =xOFICIAL 1AH

4,25130/R 19,030000,2234A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 6,70758 6,70758Materials:

3,4914058,190000,060B0602210 =xFORMIGO DE RESISTENCIA 10 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

M3

4,010004,010001,000B96513C0 =xVORADA RECTA DE FORMIGÓ, MONOCAPA, AMBSECCIÓ NORMALITZADA PER A VIANANTS A3 DE 20X8CM, DE CLASSE CLIMÀTICA B, CLASSE RESISTENT AL'ABRASIÓ H I CLASSE RESISTENT A FLEXIÓ S (R-3,5MPA), SEGONS UNE-EN 1340

M

0,7775986,399100,009D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 8,27899 8,27899Altres:

% 0,100616,707331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Page 47: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 65

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 0,10061 0,10061

COST DIRECTE 15,08718

0,00%DESPESES INDIRECTES

15,08718COST EXECUCIÓ MATERIAL

€15,27M VORADA RECTA TIPUS TAULO DE FORMIGO A3, DE8X20 CM, COL.LOCADA AMB FONAMENT DE FORMIGO

F965U01B Rend.: 1,000P- 99

Unitats Preu Parcial Import€Mà d'obra:

2,63880/R 21,990000,120A0121000 =xOFICIAL 1AH

4,25130/R 19,030000,2234A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 6,89010 6,89010Materials:

3,4914058,190000,060B0602210 =xFORMIGO DE RESISTENCIA 10 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

M3

4,010004,010001,000B96513C0 =xVORADA RECTA DE FORMIGÓ, MONOCAPA, AMBSECCIÓ NORMALITZADA PER A VIANANTS A3 DE 20X8CM, DE CLASSE CLIMÀTICA B, CLASSE RESISTENT AL'ABRASIÓ H I CLASSE RESISTENT A FLEXIÓ S (R-3,5MPA), SEGONS UNE-EN 1340

M

0,7775986,399100,009D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 8,27899 8,27899Altres:

% 0,103356,890001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,10335 0,10335

COST DIRECTE 15,27244

0,00%DESPESES INDIRECTES

15,27244COST EXECUCIÓ MATERIAL

€14,15M VORADA RECTA DE FORMIGO C5, DE 15X25 CM,COL.LOCADA AMB FONAMENT DE FORMIGO

F965U210 Rend.: 1,000P- 100

Unitats Preu Parcial Import€Mà d'obra:

2,27157/R 21,990000,1033A0121000 =xOFICIAL 1AH

3,93160/R 19,030000,2066A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 6,20317 6,20317Materials:

3,4914058,190000,060B0602210 =xFORMIGO DE RESISTENCIA 10 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

M3

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 66

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU3,580003,580001,000B96517D0 =xVORADA RECTA DE FORMIGÓ, MONOCAPA, AMB

SECCIÓ NORMALITZADA DE CALÇADA C5 DE 25X15 CM,DE CLASSE CLIMÀTICA B, CLASSE RESISTENT AL'ABRASIÓ H I CLASSE RESISTENT A FLEXIÓ T (R-5MPA), SEGONS UNE-EN 1340

M

0,7775986,399100,009D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 7,84899 7,84899Altres:

% 0,093056,203331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,09305 0,09305

COST DIRECTE 14,14521

0,00%DESPESES INDIRECTES

14,14521COST EXECUCIÓ MATERIAL

€17,02M VORADA RECTA TIPUS AMERICÀ DE FORMIGO C9, AMBRATLLAT SUPERIOR, DE 25X13 CM, COL.LOCADA AMBFONAMENT DE FORMIGO

F965U41A Rend.: 1,000P- 101

Unitats Preu Parcial Import€Mà d'obra:

2,02088/R 21,990000,0919A0121000 =xOFICIAL 1AH

3,49771/R 19,030000,1838A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 5,51859 5,51859Materials:

3,4914058,190000,060B0602210 =xFORMIGO DE RESISTENCIA 10 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

M3

7,150007,150001,000B9652AD0 =xVORADA RECTA DE FORMIGÓ AMB RATLLATSUPERIOR, MONOCAPA, AMB SECCIÓ NORMALITZADADE CALÇADA C9 DE 13X25 CM, DE CLASSE CLIMÀTICAB, CLASSE RESISTENT A L'ABRASIÓ H I CLASSERESISTENT A FLEXIÓ T (R-5 MPA), SEGONS UNE-EN1340

M

0,7775986,399100,009D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 11,41899 11,41899Altres:

% 0,082785,518671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,08278 0,08278

COST DIRECTE 17,02036

0,00%DESPESES INDIRECTES

Page 48: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 67

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

17,02036COST EXECUCIÓ MATERIAL

€26,47M VORADA CORBA DE FORMIGO C5, DE 15X25 CM,COL.LOCADA AMB FONAMENT DE FORMIGO

F966U210 Rend.: 1,000P- 102

Unitats Preu Parcial Import€Mà d'obra:

2,95766/R 21,990000,1345A0121000 =xOFICIAL 1AH

5,11907/R 19,030000,269A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 8,07673 8,07673Materials:

3,4914058,190000,060B0602210 =xFORMIGO DE RESISTENCIA 10 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

M3

14,0000014,000001,000B96617D0 =xVORADA CORBA DE FORMIGÓ, MONOCAPA, AMBSECCIÓ NORMALITZADA DE CALÇADA C5 DE 25X15 CM,DE CLASSE CLIMÀTICA B, CLASSE RESISTENT AL'ABRASIÓ H I CLASSE RESISTENT A FLEXIÓ T (R-5MPA), SEGONS UNE-EN 1340

M

0,7775986,399100,009D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 18,26899 18,26899Altres:

% 0,121158,076671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,12115 0,12115

COST DIRECTE 26,46687

0,00%DESPESES INDIRECTES

26,46687COST EXECUCIÓ MATERIAL

€30,52M VORADA DE XAPA GALVANITZADA DE 10 MM DE GRUIXI 200 MM D'ALÇADA, INCLOS ELEMENTS METAL.LICSD'ANCORATGE SOLDATS A LA XAPA, COL.LOCADASOBRE BASE DE FORMIGO DE RESISTENCIA DE15N/MM2

F96AUM10 Rend.: 1,000P- 103

Unitats Preu Parcial Import€Mà d'obra:

3,29850/R 21,990000,150A0121000 =xOFICIAL 1AH

2,75850/R 18,390000,150A0140000 =xMANOBREH

Subtotal... 6,05700 6,05700Materials:

1,6020035,600000,045B0602220 =xFORMIGO DE RESISTENCIA 10 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

22,7700022,770001,000B96AUG10 =xVORADA DE XAPA GALVANITZADA DE 10 MM DE GRUIXI 200 MM D'ALÇÀRIA, INCLÒS ELEMENTS METÀL.LICSD'ANCORATGE SOLDATS A LA XAPA

M

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 68

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 24,37200 24,37200Altres:

% 0,090866,057331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,09086 0,09086

COST DIRECTE 30,51986

0,00%DESPESES INDIRECTES

30,51986COST EXECUCIÓ MATERIAL

€15,36M RIGOLA DE 30 CM D'AMPLARIA AMB PECES DEMORTER DE CIMENT DE COLOR BLANC, DE 30X30X8CM, COL.LOCADES AMB FONAMENT DE FORMIGO IMORTER DE CIMENT 1:4 ELABORAT A L'OBRA AMBFORMIGONERA.

F974V010 Rend.: 1,478P- 104

Unitats Preu Parcial Import€Mà d'obra:

2,82686/R 21,990000,190A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

0,74655/R 18,390000,060A0140000 =xMANOBREH

Subtotal... 3,57341 3,57341Materials:

0,15701157,010000,001B051E201 =xCIMENT BLANC DE RAM DE PALETA BL 22,5 X SEGONSUNE 80305, EN SACS

T

5,7026258,190000,098B0602210 =xFORMIGO DE RESISTENCIA 10 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

M3

5,099491,530003,333B974V002 =xLLOSETA BLANCA DE MORTER COMPRIMIT DE 30X30X8CMS PER A RIGOLA

U

0,7775986,399100,009D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 11,73671 11,73671Altres:

% 0,053603,573331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,05360 0,05360

COST DIRECTE 15,36372

0,00%DESPESES INDIRECTES

15,36372COST EXECUCIÓ MATERIAL

€10,86M GUAL DEPRIMIT PER A VIANANTS DE FORMIGO, DE14X28 CM, MODEL ICA O SIMILAR, AMB UNA PENDENTMÀXIMA DEL 12 %, COL.LOCAT SOBRE SOLERA DEFORMIGO DE RESISTENCIA 20 N/MM2 DE 15 CM DEGRUIX

F981F04 Rend.: 1,000P- 105

Page 49: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 69

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€163,26M GUAL PER A VEHICLES MODEL 60, DE PEDRAGRANITICA GRIS QUINTANA, GRIS PIRINEOS OOCHAVO JASPE, GRA FI, AMB LES CARES VISTESFLAMEJADES, DE SECCIO 62X30 CM, INCLOS PARTPROPORCIONAL DE CAPS DE REMAT DE 62X40X30 CMCONFORMATS AMB QUART DE CIRCUMFERENCIA DE40 CM DE RADI, COL.LOCAT SOBRE SOLERA DEFORMIGO DE RESISTENCIA DE 15N/MM2 DE 20 CM DEGRUIX

F981U015 Rend.: 1,000P- 106

Unitats Preu Parcial Import€Mà d'obra:

8,79600/R 21,990000,400A0121000 =xOFICIAL 1AH

30,44800/R 19,030001,600A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 39,24400 39,24400Materials:

7,2155658,190000,124B0604220 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

115,17000115,170001,000B981U015 =xGUAL PER A VEHICLES MODEL 60, DE PEDRAGRANITICA, GRIS QUINTANA, GRIS PIRINEOS OOCHAVO JASPE, GRA FI, AMB LES CARES VISTESFLAMEJADES, DE SECCIO 62X30 CM, INCLOS PARTPROPORCIONAL DE CAPS DE REMAT DE 62X40X30 CMCONFORMATS AMB QUART DE CIRCUMFERENCIA DE40 CM DE RADI

M

1,0367986,399100,012D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 123,42235 123,42235Altres:

% 0,5886639,244001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,58866 0,58866

COST DIRECTE 163,25501

0,00%DESPESES INDIRECTES

163,25501COST EXECUCIÓ MATERIAL

€194,49M GUAL PER A VIANANTS MODEL R-120, RECTE, DEPEDRA GRANITICA GRIS QUINTANA, GRIS PIRINEOS OOCHAVO JASPE, AMB LES CARES VISTESFLAMEJADES, FORMAT PER RAMPES DE 121.8X40X6CM, INCLOS PART PROPORCIONAL DE CAPS DE REMATI FORATS PER A PAPERERES I SEMAFOR, COL.LOCATSOBRE SOLERA DE FORMIGO DE RESISTENCIA 15N/MM2 DE 10 CM DE GRUIX

F981U025 Rend.: 1,000P- 107

Unitats Preu Parcial Import€Mà d'obra:

13,19400/R 21,990000,600A0121000 =xOFICIAL 1AH

34,25400/R 19,030001,800A0150000 =xMANOBRE ESPECIALISTAH

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 70

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 47,44800 47,44800Materials:

6,9828058,190000,120B0604220 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

137,27000137,270001,000B981U025 =xGUAL PER A VIANANTS MODEL R-120, RECTE DEPEDRA GRANITICA GRIS QUINTANA, GRIS PIRINEOS OOCHAVO JASPE, AMB LES CARES VISTESFLAMEJADES, FORMAT PER RAMPES DE 121.8X40X6CM, INCLOS PART PROPORCIONAL DE CAPS DE REMATI FORATS PER A PAPERERES I SEMAFOR, COL.LOCATSOBRE SOLERA DE FORMIGO DE RESISTENCIA 15N/MM2 DE 10 CM DE GRUIX

M

2,0735886,399100,024D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 146,32638 146,32638Altres:

% 0,7117247,448001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,71172 0,71172

COST DIRECTE 194,48610

0,00%DESPESES INDIRECTES

194,48610COST EXECUCIÓ MATERIAL

€124,53U ESCOSSELL QUADRAT DE PLANXA D'ACERGALVANITZAT DE 90x120x20 DE 10 MM DE GRUIX,FONAMENT I ANELLAT DE FORMIGO DE RESISTENCIADE 15N/MM2

F991Z05B Rend.: 1,000P- 108

Unitats Preu Parcial Import€Mà d'obra:

5,49750/R 21,990000,250A0121000 =xOFICIAL 1AH

4,59750/R 18,390000,250A0140000 =xMANOBREH

Subtotal... 10,09500 10,09500Materials:

10,4742058,190000,180B0604220 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

103,80650109,270000,950B99ZZ050 =xESCOSSELL DE PLANXA D'ACER GALVANITZAT DE120X120X20 DE 10 MM DE GRUIX

U

Subtotal... 114,28070 114,28070Altres:

% 0,1514310,095331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,15143 0,15143

COST DIRECTE 124,52713

0,00%DESPESES INDIRECTES

Page 50: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 71

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

124,52713COST EXECUCIÓ MATERIAL

€20,20M2 PAVIMENT DE LLOSA ABUIXARDADA NEGRE PER AVORERA DE 30X30X4 CM, CLASSE 1A TIPUS 1,COL.LOCAT A TRUC DE MACETA AMB MORTER MIXT1:2:10, ELABORAT A L´OBRA AMB FORMIGONERA DE165 L I BEURADA DE CIMENT PÒRTLAND

F9E1323G Rend.: 2,782P- 109

Unitats Preu Parcial Import€Mà d'obra:

2,76653/R 21,990000,350A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

2,31362/R 18,390000,350A0140000 =xMANOBREH

Subtotal... 5,08015 5,08015Materials:

0,050501,010000,050B0111000 =xAIGUAM3

1,3990069,950000,020B0514301 =xCIMENT PÒRTLAND AMB ESCÒRIA CEM II/B-S 32,5, ENSACS

T

9,600004,800002,000B9E13101 =xPANOT GRIS DE 20X20X4 CM, CLASSE 1A, PREUSUPERIOR

M2

4,07021101,755320,040D070A8B1 =xMORTER MIXT DE CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 380 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:0,5:4, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

M3

Subtotal... 15,11971 15,11971

COST DIRECTE 20,19986

0,00%DESPESES INDIRECTES

20,19986COST EXECUCIÓ MATERIAL

€30,27M2 PAVIMENT DE LLOSA ABUIXARDADA NEGRE PER AVORERA DE 30X30X4 CM, CLASSE 1A TIPUS 1,COL.LOCAT A TRUC DE MACETA AMB MORTER MIXT1:2:10, ELABORAT A L´OBRA AMB FORMIGONERA DE165 L I BEURADA DE CIMENT PÒRTLAND

F9E132BG Rend.: 1,000P- 110

Unitats Preu Parcial Import€Mà d'obra:

7,69650/R 21,990000,350A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

6,43650/R 18,390000,350A0140000 =xMANOBREH

Subtotal... 14,13300 14,13300Materials:

0,050501,010000,050B0111000 =xAIGUAM3

1,3990069,950000,020B0514301 =xCIMENT PÒRTLAND AMB ESCÒRIA CEM II/B-S 32,5, ENSACS

T

9,600004,800002,000B9E13101 =xPANOT GRIS DE 20X20X4 CM, CLASSE 1A, PREUSUPERIOR

M2

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 72

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU5,08777101,755320,050D070A8B1 =xMORTER MIXT DE CIMENT PÒRTLAND AMB FILLER

CALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 380 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:0,5:4, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

M3

Subtotal... 16,13727 16,13727

COST DIRECTE 30,27027

0,00%DESPESES INDIRECTES

30,27027COST EXECUCIÓ MATERIAL

€34,17M2 PAVIMENT DE LLOSA ABUIXARDADA NEGRE PER AVORERA DE 30X30X8 CM, CLASSE 1A TIPUS 1,COL.LOCAT A TRUC DE MACETA AMB MORTER MIXT1:2:10, ELABORAT A L´OBRA AMB FORMIGONERA DE165 L I BEURADA DE CIMENT PÒRTLAND

F9E132G Rend.: 1,000P- 111

Unitats Preu Parcial Import€Mà d'obra:

7,69650/R 21,990000,350A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

6,43650/R 18,390000,350A0140000 =xMANOBREH

Subtotal... 14,13300 14,13300Materials:

0,050501,010000,050B0111000 =xAIGUAM3

1,3990069,950000,020B0514301 =xCIMENT PÒRTLAND AMB ESCÒRIA CEM II/B-S 32,5, ENSACS

T

14,520009,680001,500B9E14100 =xPANOT GRIS DE 20X20X8 CM, CLASSE 1A PREUSUPERIOR

M2

4,07021101,755320,040D070A8B1 =xMORTER MIXT DE CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 380 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:0,5:4, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

M3

Subtotal... 20,03971 20,03971

COST DIRECTE 34,17271

0,00%DESPESES INDIRECTES

34,17271COST EXECUCIÓ MATERIAL

€33,90M2 PAVIMENT DE PANOT ESTRIAT NEGRE DE 30X30X4CM,COL.LOCAT A TRUC DE MACETA AMB MORTER MIXT1:0,5:4, ELABORAT A L'OBRA AMB FORMIGONERA DE165 L I BEURADA DE CIMENT PORTLAND

F9E1413N Rend.: 1,000P- 112

Unitats Preu Parcial Import€Mà d'obra:

13,85370/R 21,990000,630A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

6,80430/R 18,390000,370A0140000 =xMANOBREH

Subtotal... 20,65800 20,65800

Page 51: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 73

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMaterials:

0,010101,010000,010B0111000 =xAIGUAM3

0,0944494,440000,001B0512401 =xCIMENT PÒRTLAND AMB FILLER CALCARI CEM II/B-L32,5 R SEGONS UNE-EN 197-1, EN SACS

T

9,873609,680001,020B9E14100 =xPANOT GRIS DE 20X20X8 CM, CLASSE 1A PREUSUPERIOR

M2

3,05266101,755320,030D070A8B1 =xMORTER MIXT DE CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 380 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:0,5:4, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

M3

Subtotal... 13,03080 13,03080Altres:

% 0,2065820,658001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,20658 0,20658

COST DIRECTE 33,89538

0,00%DESPESES INDIRECTES

33,89538COST EXECUCIÓ MATERIAL

€48,92M2 PAVIMENT DE LLAMBORDINS DE FORMIGÓ DE FORMARECTANGULAR DE 10X20 CM I 8 CM DE GRUIX, PREUSUPERIOR, COL.LOCATS AMB MORTER DE CIMENT 1:6,ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L IBEURADA DE CIMENT. INCLOU BASE DE FORMIGÓ.

F9F15102 Rend.: 1,000P- 113

Unitats Preu Parcial Import€Mà d'obra:

19,35120/R 21,990000,880A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

5,24115/R 18,390000,285A0140000 =xMANOBREH

Subtotal... 24,59235 24,59235Materials:

0,010101,010000,010B0111000 =xAIGUAM3

0,2927694,440000,0031B0512401 =xCIMENT PÒRTLAND AMB FILLER CALCARI CEM II/B-L32,5 R SEGONS UNE-EN 197-1, EN SACS

T

5,8190058,190000,100B0602210 =xFORMIGO DE RESISTENCIA 10 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

M3

13,9944013,720001,020B9F15100 =xLLAMBORDÍ DE FORMIGÓ DE FORMA RECTANGULARDE 10X20 CM I 8 CM DE GRUIX, PREU SUPERIOR

M2

3,8448576,286700,0504D0701641 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 250KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:6, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 23,96111 23,96111Altres:

% 0,3688924,592671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,36889 0,36889

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 74

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 48,92235

0,00%DESPESES INDIRECTES

48,92235COST EXECUCIÓ MATERIAL

€87,84M3 PAVIMENT DE FORMIGO COLOREJAT A L'OXID, AMBGRANULAT GRANITIC HP-35 (PG-3), ESCAMPAT DES DECAMIO, ESTESA I VIBRATGE MECANIC, REMOLINATMECANIC,

F9G3A04B Rend.: 1,000P- 114

Unitats Preu Parcial Import€Mà d'obra:

2,57283/R 21,990000,117A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

3,67800/R 18,390000,200A0140000 =xMANOBREH

3,04480/R 19,030000,160A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 9,29563 9,29563Maquinària:

2,50701/R 75,970000,033C1709A00 =xESTENEDORA PER A PAVIMENTS DE FORMIGÓH

0,25350/R 5,070000,050C2003000 =xREMOLINADOR MECÀNICH

Subtotal... 2,76051 2,76051Materials:

65,8140062,680001,050B06BU010 =xFORMIGO AMB GRANULAT GRANITIC HF-3,5M3

9,88160494,080000,020B9GZ1210 =xPOLS DE QUARS DE COLOR GRIST

Subtotal... 75,69560 75,69560Altres:

% 0,092969,296001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,09296 0,09296

COST DIRECTE 87,84470

0,00%DESPESES INDIRECTES

87,84470COST EXECUCIÓ MATERIAL

€0,71M2 REG D'IMPRIMACIÓ AMB EMULSIÓ BITUMINOSACATIÒNICA ECI, AMB DOTACIÓ 1,5 KG/M2

F9J12X54 Rend.: 1,000P- 115

Unitats Preu Parcial Import€Mà d'obra:

/R 19,030000,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal...Maquinària:

/R 27,420000,000C1702D00 =xCAMIÓ CISTERNA PER A REG ASFÀLTICH

Subtotal...Materials:

0,705000,470001,500B0552B00 =xEMULSIÓ BITUMINOSA CATIÒNICA TIPUS ECIKG

Page 52: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 75

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 0,70500 0,70500Altres:

%1,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal...

COST DIRECTE 0,70500

0,00%DESPESES INDIRECTES

0,70500COST EXECUCIÓ MATERIAL

€0,47M2 REG D'ADHERÈNCIA AMB EMULSIÓ BITUMINOSAANIÒNICA EAR-1, AMB DOTACIÓ 1 KG/M2

F9J13K40 Rend.: 1,000P- 116

Unitats Preu Parcial Import€Mà d'obra:

0,05709/R 19,030000,003A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 0,05709 0,05709Maquinària:

0,08226/R 27,420000,003C1702D00 =xCAMIÓ CISTERNA PER A REG ASFÀLTICH

Subtotal... 0,08226 0,08226Materials:

0,330000,330001,000B0551120 =xEMULSIÓ BITUMINOSA ANIÒNICA TIPUS EAR-1KG

Subtotal... 0,33000 0,33000Altres:

% 0,000860,057331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00086 0,00086

COST DIRECTE 0,47021

0,00%DESPESES INDIRECTES

0,47021COST EXECUCIÓ MATERIAL

€72,35M2 PAVIMENT DE CAUTXU RECICLAT DIFERENTS COLORSDE 45 MM DE GRUIX, COL.LOCAT SOBRE SOLERADEFORMIGO DE INCLOS REPERCUSSIO DE PECES IMITJANS AUXILIARS NECESSARIS PER AL SEUMUNTATGE.

F9P0U02A Rend.: 1,000P- 117

Unitats Preu Parcial Import€Mà d'obra:

10,99500/R 21,990000,500A0121000 =xOFICIAL 1AH

9,19500/R 18,390000,500A0140000 =xMANOBREH

9,51500/R 19,030000,500A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 29,70500 29,70500Materials:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 76

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU42,3500038,500001,100B9P0U020 =xPAVIMENT DE CAUTXU RECICLAT DE 45 MM DE GRUIX,

COL.LOCAT SOBRE BASE DE FORMIGO. INCLOSREPERCUSIO DE PECES I MITJANS AUXILIARSNECESSARIS PER AL SEU MUNTATGE.

M2

Subtotal... 42,35000 42,35000Altres:

% 0,2970529,705001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,29705 0,29705

COST DIRECTE 72,35205

0,00%DESPESES INDIRECTES

72,35205COST EXECUCIÓ MATERIAL

€69,88U DESMUNTATGE I COL.LOCACIO PER SITUAR A NOVARASANT DE MARC I TAPA DE POUS DE CLAVEGUERESO ALTRES SERVEIS, EN OBRES DE RECOBRIMENTASFALTIC

F9WZV010 Rend.: 1,000P- 118

Unitats Preu Parcial Import€Mà d'obra:

34,68483/R 21,990001,5773A0121000 =xOFICIAL 1AH

30,01602/R 19,030001,5773A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 64,70085 64,70085Materials:

2,800000,2800010,000B0F15251 =xMAÓ MASSÍS D'ELABORACIÓ MECÀNICA, DE290X140X50 MM, PER A REVESTIR, CATEGORIA I, HD,SEGONS LA NORMA UNE-EN 771-1

U

1,7279886,399100,020D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 4,52798 4,52798Altres:

% 0,6470164,701001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,64701 0,64701

COST DIRECTE 69,87584

0,00%DESPESES INDIRECTES

69,87584COST EXECUCIÓ MATERIAL

€1,47M TALL DE PAVIMENTS DE QUALSEVOL TIPUS AMB DISCDE DIAMANT

F9Z1V010 Rend.: 1,000P- 119

Unitats Preu Parcial Import€Mà d'obra:

0,95150/R 19,030000,050A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 0,95150 0,95150

Page 53: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 77

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMaquinària:

0,50750/R 10,150000,050C170H000 =xMÀQUINA TALLAJUNTSH

Subtotal... 0,50750 0,50750Altres:

% 0,009520,952001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00952 0,00952

COST DIRECTE 1,46852

0,00%DESPESES INDIRECTES

1,46852COST EXECUCIÓ MATERIAL

€128,84M BARANA DE PROTECCIÓ DE VIANANTS FORMADA PERMODULS DE 1,975 X 093 M. INCORPORANT REIXATRENADA REF. SV 68 125 25 35, AMB BASTIDOR DEPLETINA DE 50 X 8 mm 'VIERTEAGUAS EN ANGULAR' ISUPORT PER PASSAMANS DE FOSA A 85 cm. DESOLERA. INCLOU PEUS ANCLATGE, PASSAMÀCONTINU DE FUSTA, CARGOLERIA, TOT GALVANITZATI IMPRIMACIÓ D'ANGLATGE SHOP PRIMER I LACAT AMBPOLIURETÀ LIQUID LLIS O FERROTEXTURAT. TAMBÉINCLOU COL·LOCACIÓ INSTAL·LACIÓ EN OBRA.

FB15CV0B Rend.: 1,000P- 120

Unitats Preu Parcial Import€Mà d'obra:

14,29350/R 21,990000,650A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

11,95350/R 18,390000,650A0140000 =xMANOBREH

Subtotal... 26,24700 26,24700Materials:

97,87800163,130000,600BB15CV05 =xBARANA METÀL.LICA MODULAR URBANA FORMADAPER UN PASSAMA DE RODO D'ACER INOXIDABLE DE63,5 MM DE DIÀMETRE I 2 MM DE GRUIX, AMB SUPORTSDE FOSA AMB IMPRIMACIO EPOXI I PINTURAMETÀL.LICA OXIRON O EQUIVALENT, O SUPORTSD'ACER CROMAT, INCLOSES LES PLAQUESD'ANCORATGE DE FOSA AMB EL MATEIX ACABAT

M

4,3199686,399100,050D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 102,19796 102,19796Altres:

% 0,3937126,247331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,39371 0,39371

COST DIRECTE 128,83867

0,00%DESPESES INDIRECTES

128,83867COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 78

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€30,02M PERFIL LONGITUDINAL FLEXIBLE D'ACER GALVANITZATDE SECCIO DE DOBLE ONA AMB CARACTERISTIQUESAASHO, PER A BARRERES DE SEGURETAT, COL.LOCATSOBRE SUPORT

FB2AV005 Rend.: 1,000P- 121

Unitats Preu Parcial Import€Mà d'obra:

4,39800/R 21,990000,200A0121000 =xOFICIAL 1AH

7,35600/R 18,390000,400A0140000 =xMANOBREH

Subtotal... 11,75400 11,75400Materials:

16,7500016,750001,000BBM2AA00 =xBARRERA DE SEGURETAT FLEXIBLE D'ACERGALVANITZAT, FORMADA PER PERFIL LONGITUDINAL,DE SECCIÓ EN DOBLE ONA AMB CARACTERÍSTIQUESAASHO

M

1,340005,360000,250BBMZP010 =xPART PROPORCIONAL D'ELEMENTS DE FIXACIÓ, PER ABARRERES DE SEGURETAT

M

Subtotal... 18,09000 18,09000Altres:

% 0,1763111,754001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,17631 0,17631

COST DIRECTE 30,02031

0,00%DESPESES INDIRECTES

30,02031COST EXECUCIÓ MATERIAL

€20,86M FALDILLA LONGITUDINAL FLEXIBLE D'ACERGALVANITZAT DE SECCIO PLANA AMBCARACTERISTIQUES AASHO, PER A BARRERES DESEGURETAT, COL.LOCAT SOBRE SUPORT

FB2AV00B Rend.: 4,300P- 122

Unitats Preu Parcial Import€Mà d'obra:

1,02279/R 21,990000,200A0121000 =xOFICIAL 1AH

1,71070/R 18,390000,400A0140000 =xMANOBREH

Subtotal... 2,73349 2,73349Materials:

16,7500016,750001,000BBM2AA00 =xBARRERA DE SEGURETAT FLEXIBLE D'ACERGALVANITZAT, FORMADA PER PERFIL LONGITUDINAL,DE SECCIÓ EN DOBLE ONA AMB CARACTERÍSTIQUESAASHO

M

1,340005,360000,250BBMZP010 =xPART PROPORCIONAL D'ELEMENTS DE FIXACIÓ, PER ABARRERES DE SEGURETAT

M

Subtotal... 18,09000 18,09000Altres:

% 0,041002,733331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,04100 0,04100

Page 54: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 79

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 20,86449

0,00%DESPESES INDIRECTES

20,86449COST EXECUCIÓ MATERIAL

€31,75U SUPORT DE PERFIL IPN-120 PER A BARRERA DESEGURETAT FLEXIBLE, ENTRE 0,75 I 1,00 M DELONGITUD, AMB UN AMORTIDOR, COL.LOCAT SOLDAT

FB2B2123 Rend.: 1,000P- 123

Unitats Preu Parcial Import€Mà d'obra:

0,32985/R 21,990000,015A0121000 =xOFICIAL 1AH

1,41120/R 20,160000,070A0125000 =xOFICIAL 1A SOLDADORH

11,49200/R 17,680000,650A0135000 =xAJUDANT SOLDADORH

0,91950/R 18,390000,050A0140000 =xMANOBREH

Subtotal... 14,15255 14,15255Maquinària:

0,27700/R 2,770000,100C200P000 =xEQUIP I ELEMENTS AUXILIARS PER A SOLDADURAELÈCTRICA

H

0,81600/R 8,160000,100CZ112000 =xGRUP ELECTRÒGEN DE 20 A 30 KVAH

Subtotal... 1,09300 1,09300Materials:

1,375001,100001,250B44Z502A =xACER S275JR SEGONS UNE-EN 10025-2, FORMAT PERPEÇA SIMPLE, EN PERFILS LAMINATS EN CALENTSÈRIE L, LD, T, RODÓ, QUADRAT, RECTANGULAR IPLANXA, TREBALLAT AL TALLER PER A COL.LOCARAMB SOLDADURA I AMB UNA CAPA D'IMPRIMACIÓANTIOXIDANT

KG

7,084008,050000,880BBMZ1210 =xSUPORT DE PERFIL D'ACER GALVANITZAT C-120, PER ABARRERES DE SEGURETAT

M

7,830007,830001,000BBMZA810 =xAMORTIDOR DE PERFIL D'ACER GALVANITZAT, DESECCIÓ EN DOBLE ONA, PER A BARRERES DESEGURETAT

U

Subtotal... 16,28900 16,28900Altres:

% 0,2122914,152671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,21229 0,21229

COST DIRECTE 31,74684

0,00%DESPESES INDIRECTES

31,74684COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 80

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€959,19U ENREIXAT FORMAT PER BARRES CORRUGADES 8MMD'ACER SOLDADES FORMANT QUADRATS DE 10X10CM.DE LLUM ENTRE BARRES. ANCORADES A FORMIGÓARMAT O ROCA AMB TACS EXPANSIUS. INCLOSACARGOLERIA D'ACER INOXIDABLE AISI 316. S'INCLOUPORTA D'ACCÉS AMB PANY FABRICADA AMB MATEIXCRITERI.

FB2B213B Rend.: 1,000P- 124

Unitats Preu Parcial Import€Mà d'obra:

175,92000/R 21,990008,000A0121000 =xOFICIAL 1AH

161,28000/R 20,160008,000A0125000 =xOFICIAL 1A SOLDADORH

141,44000/R 17,680008,000A0135000 =xAJUDANT SOLDADORH

147,12000/R 18,390008,000A0140000 =xMANOBREH

Subtotal... 625,76000 625,76000Maquinària:

22,16000/R 2,770008,000C200P000 =xEQUIP I ELEMENTS AUXILIARS PER A SOLDADURAELÈCTRICA

H

65,28000/R 8,160008,000CZ112000 =xGRUP ELECTRÒGEN DE 20 A 30 KVAH

Subtotal... 87,44000 87,44000Materials:

110,000001,10000100,000B44Z502A =xACER S275JR SEGONS UNE-EN 10025-2, FORMAT PERPEÇA SIMPLE, EN PERFILS LAMINATS EN CALENTSÈRIE L, LD, T, RODÓ, QUADRAT, RECTANGULAR IPLANXA, TREBALLAT AL TALLER PER A COL.LOCARAMB SOLDADURA I AMB UNA CAPA D'IMPRIMACIÓANTIOXIDANT

KG

48,300008,050006,000BBMZ1210 =xSUPORT DE PERFIL D'ACER GALVANITZAT C-120, PER ABARRERES DE SEGURETAT

M

78,300007,8300010,000BBMZA810 =xAMORTIDOR DE PERFIL D'ACER GALVANITZAT, DESECCIÓ EN DOBLE ONA, PER A BARRERES DESEGURETAT

U

Subtotal... 236,60000 236,60000Altres:

% 9,38640625,760001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 9,38640 9,38640

COST DIRECTE 959,18640

0,00%DESPESES INDIRECTES

959,18640COST EXECUCIÓ MATERIAL

€9,39U PEÇA REFLECTORA A DUES CARES PER A BARRERESDE SEGURETAT, FIXADA A LA BANDA

FB2Z400A Rend.: 1,000P- 125

Unitats Preu Parcial Import€Mà d'obra:

3,79386/R 18,390000,2063A0140000 =xMANOBREH

Subtotal... 3,79386 3,79386Materials:

Page 55: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 81

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU5,540005,540001,000BBMZC010 =xCAPTALLUMS PER A BARRERA DE SEGURETAT

REFLECTOR A DUES CARESU

Subtotal... 5,54000 5,54000Altres:

% 0,056913,794001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,05691 0,05691

COST DIRECTE 9,39077

0,00%DESPESES INDIRECTES

9,39077COST EXECUCIÓ MATERIAL

€53,63U TERMINAL EN FORMA DE CUA DE PEIX PER ABARRERES DE SEGURETAT FLEXIBLES, FIXAT AMBAMORTIDOR

FB2ZU002 Rend.: 1,000P- 126

Unitats Preu Parcial Import€Mà d'obra:

7,32267/R 21,990000,333A0121000 =xOFICIAL 1AH

12,24774/R 18,390000,666A0140000 =xMANOBREH

Subtotal... 19,57041 19,57041Materials:

7,830007,830001,000BBMZA810 =xAMORTIDOR DE PERFIL D'ACER GALVANITZAT, DESECCIÓ EN DOBLE ONA, PER A BARRERES DESEGURETAT

U

5,360005,360001,000BBMZP010 =xPART PROPORCIONAL D'ELEMENTS DE FIXACIÓ, PER ABARRERES DE SEGURETAT

M

20,5800020,580001,000BBMZT010 =xTERMINAL EN FORMA DE CUA DE PEIX, PER ABARRERES DE SEGURETAT FLEXIBLES

U

Subtotal... 33,77000 33,77000Altres:

% 0,2935619,570671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,29356 0,29356

COST DIRECTE 53,63397

0,00%DESPESES INDIRECTES

53,63397COST EXECUCIÓ MATERIAL

€0,40M PINTAT SOBRE PAVIMENT D'UNA FAIXA DISCONTÍNUADE 10 CM 5/12, AMB PINTURA REFLECTORA IMICROESFERES DE VIDRE, AMB MÀQUINAAUTOPROPULSADA

FBA11113 Rend.: 1,000P- 127

Unitats Preu Parcial Import€Mà d'obra:

0,21990/R 21,990000,010A0121000 =xOFICIAL 1AH

/R 18,390000,000A0140000 =xMANOBREH

Subtotal... 0,21990 0,21990

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 82

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMaquinària:

/R 33,320000,000C1B02A00 =xMÀQUINA PER A PINTAR BANDES DE VIALAUTOPROPULSADA

H

Subtotal...Materials:

0,136006,800000,020B8ZB1000 =xPINTURA REFLECTORA PER A SENYALITZACIÓKG

0,036703,670000,010BBM1M000 =xMICROESFERES DE VIDREKG

Subtotal... 0,17270 0,17270Altres:

% 0,003300,220001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00330 0,00330

COST DIRECTE 0,39590

0,00%DESPESES INDIRECTES

0,39590COST EXECUCIÓ MATERIAL

€0,67M PINTAT SOBRE PAVIMENT D'UNA FAIXA CONTÍNUA DE10 CM, AMB PINTURA REFLECTORA I MICROESFERESDE VIDRE, AMB MÀQUINA AUTOPROPULSADA.INCLÒSPREMARCATGE I TOTALMENT FINALITZAT.

FBA1G110 Rend.: 1,000P- 128

Unitats Preu Parcial Import€Mà d'obra:

0,21990/R 21,990000,010A0121000 =xOFICIAL 1AH

/R 18,390000,000A0140000 =xMANOBREH

Subtotal... 0,21990 0,21990Maquinària:

/R 33,320000,000C1B02A00 =xMÀQUINA PER A PINTAR BANDES DE VIALAUTOPROPULSADA

H

Subtotal...Materials:

0,340006,800000,050B8ZB1000 =xPINTURA REFLECTORA PER A SENYALITZACIÓKG

0,110103,670000,030BBM1M000 =xMICROESFERES DE VIDREKG

Subtotal... 0,45010 0,45010Altres:

% 0,003300,220001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00330 0,00330

COST DIRECTE 0,67330

0,00%DESPESES INDIRECTES

0,67330COST EXECUCIÓ MATERIAL

Page 56: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 83

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€4,17M PINTAT SOBRE PAVIMENT D'UNA FAIXA CONTÍNUA DE40 CM, AMB PINTURA REFLECTORA I MICROESFERESDE VIDRE, AMB MÀQUINA AUTOPROPULSADA

FBA1G150 Rend.: 1,000P- 129

Unitats Preu Parcial Import€Mà d'obra:

3,07860/R 21,990000,140A0121000 =xOFICIAL 1AH

/R 18,390000,000A0140000 =xMANOBREH

Subtotal... 3,07860 3,07860Maquinària:

/R 33,320000,000C1B02A00 =xMÀQUINA PER A PINTAR BANDES DE VIALAUTOPROPULSADA

H

Subtotal...Materials:

0,680006,800000,100B8ZB1000 =xPINTURA REFLECTORA PER A SENYALITZACIÓKG

0,367003,670000,100BBM1M000 =xMICROESFERES DE VIDREKG

Subtotal... 1,04700 1,04700Altres:

% 0,046183,078671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,04618 0,04618

COST DIRECTE 4,17178

0,00%DESPESES INDIRECTES

4,17178COST EXECUCIÓ MATERIAL

€4,38M PINTAT SOBRE PAVIMENT DE FAIXA TRANSVERSALCONTÍNUA DE 40 CM, AMB PINTURA REFLECTORA IMICROESFERES DE VIDRE, AMB MÀQUINAD'ACCIONAMENT MANUAL. INCLÒS PREMARCATGE ITOTALMENT FINALITZAT

FBA22411 Rend.: 1,000P- 130

Unitats Preu Parcial Import€Mà d'obra:

0,43980/R 21,990000,020A0121000 =xOFICIAL 1AH

0,91950/R 18,390000,050A0140000 =xMANOBREH

Subtotal... 1,35930 1,35930Maquinària:

1,27400/R 25,480000,050C1B02B00 =xMÀQUINA PER A PINTAR BANDES DE VIALD'ACCIONAMENT MANUAL

H

Subtotal... 1,27400 1,27400Materials:

1,360006,800000,200B8ZB1000 =xPINTURA REFLECTORA PER A SENYALITZACIÓKG

0,367003,670000,100BBM1M000 =xMICROESFERES DE VIDREKG

Subtotal... 1,72700 1,72700Altres:

% 0,020391,359331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,02039 0,02039

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 84

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 4,38069

0,00%DESPESES INDIRECTES

4,38069COST EXECUCIÓ MATERIAL

€30,52U PINTAT SOBRE PAVIMENT DE FLETXES SUPERFICIALSRECTA I L'ESQUERRA MODEL E-41, AMB PINTURAREFLECTORA I MICROESFERES DE VIDRE, AMBMÀQUINA D'ACCIONAMENT MANUAL

FBA31129 Rend.: 1,000P- 131

Unitats Preu Parcial Import€Mà d'obra:

8,79600/R 21,990000,400A0121000 =xOFICIAL 1AH

11,03400/R 18,390000,600A0140000 =xMANOBREH

Subtotal... 19,83000 19,83000Maquinària:

5,09600/R 25,480000,200C1B02B00 =xMÀQUINA PER A PINTAR BANDES DE VIALD'ACCIONAMENT MANUAL

H

Subtotal... 5,09600 5,09600Materials:

3,400006,800000,500B8ZB1000 =xPINTURA REFLECTORA PER A SENYALITZACIÓKG

1,835003,670000,500BBM1M000 =xMICROESFERES DE VIDREKG

Subtotal... 5,23500 5,23500Altres:

% 0,3569419,830001,80A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,35694 0,35694

COST DIRECTE 30,51794

0,00%DESPESES INDIRECTES

30,51794COST EXECUCIÓ MATERIAL

€30,52U PINTAT SOBRE PAVIMENT DE FLETXES SUPERFICIALSRECTA I DRETA MODEL E-41, AMB PINTURAREFLECTORA I MICROESFERES DE VIDRE, AMBMÀQUINA D'ACCIONAMENT MANUAL

FBA3112A Rend.: 1,000P- 132

Unitats Preu Parcial Import€Mà d'obra:

8,79600/R 21,990000,400A0121000 =xOFICIAL 1AH

11,03400/R 18,390000,600A0140000 =xMANOBREH

Subtotal... 19,83000 19,83000Maquinària:

5,09600/R 25,480000,200C1B02B00 =xMÀQUINA PER A PINTAR BANDES DE VIALD'ACCIONAMENT MANUAL

H

Subtotal... 5,09600 5,09600Materials:

Page 57: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 85

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU3,400006,800000,500B8ZB1000 =xPINTURA REFLECTORA PER A SENYALITZACIÓKG

1,835003,670000,500BBM1M000 =xMICROESFERES DE VIDREKG

Subtotal... 5,23500 5,23500Altres:

% 0,3569419,830001,80A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,35694 0,35694

COST DIRECTE 30,51794

0,00%DESPESES INDIRECTES

30,51794COST EXECUCIÓ MATERIAL

€17,98U PINTAT SOBRE PAVIMENT DE FLETXES SUPERFICIALSINDIVIDUALS RECTA O DRETA O ESQUERRA , AMBPINTURA REFLECTORA I MICROESFERES DE VIDRE,AMB MÀQUINA D'ACCIONAMENT MANUAL

FBA3112B Rend.: 1,000P- 133

Unitats Preu Parcial Import€Mà d'obra:

5,49750/R 21,990000,250A0121000 =xOFICIAL 1AH

5,88480/R 18,390000,320A0140000 =xMANOBREH

Subtotal... 11,38230 11,38230Maquinària:

4,33160/R 25,480000,170C1B02B00 =xMÀQUINA PER A PINTAR BANDES DE VIALD'ACCIONAMENT MANUAL

H

Subtotal... 4,33160 4,33160Materials:

1,360006,800000,200B8ZB1000 =xPINTURA REFLECTORA PER A SENYALITZACIÓKG

0,734003,670000,200BBM1M000 =xMICROESFERES DE VIDREKG

Subtotal... 2,09400 2,09400Altres:

% 0,1707311,382001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,17073 0,17073

COST DIRECTE 17,97863

0,00%DESPESES INDIRECTES

17,97863COST EXECUCIÓ MATERIAL

€36,77U PINTAT SOBRE PAVIMENT DE FLETXES SUPERFICIALSRECTA I DRETA I ESQUERRA, AMB PINTURAREFLECTORA I MICROESFERES DE VIDRE, AMBMÀQUINA D'ACCIONAMENT MANUAL

FBA3112C Rend.: 1,000P- 134

Unitats Preu Parcial Import€Mà d'obra:

9,89550/R 21,990000,450A0121000 =xOFICIAL 1AH

13,79250/R 18,390000,750A0140000 =xMANOBREH

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 86

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 23,68800 23,68800Maquinària:

6,37000/R 25,480000,250C1B02B00 =xMÀQUINA PER A PINTAR BANDES DE VIALD'ACCIONAMENT MANUAL

H

Subtotal... 6,37000 6,37000Materials:

4,080006,800000,600B8ZB1000 =xPINTURA REFLECTORA PER A SENYALITZACIÓKG

2,202003,670000,600BBM1M000 =xMICROESFERES DE VIDREKG

Subtotal... 6,28200 6,28200Altres:

% 0,4263823,687781,80A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,42638 0,42638

COST DIRECTE 36,76638

0,00%DESPESES INDIRECTES

36,76638COST EXECUCIÓ MATERIAL

€18,55U PINTAT SOBRE PAVIMENT DE SENYAL CEDIU EL PAS OSTOP DE 3, 6 M DE LLARGÀRIA, AMB PINTURAREFLECTORA I MICROESFERES DE VIDRE, AMBMÀQUINA D'ACCIONAMENT MANUAL

FBA31155 Rend.: 1,000P- 135

Unitats Preu Parcial Import€Mà d'obra:

4,39800/R 21,990000,200A0121000 =xOFICIAL 1AH

3,67800/R 18,390000,200A0140000 =xMANOBREH

Subtotal... 8,07600 8,07600Maquinària:

5,09600/R 25,480000,200C1B02B00 =xMÀQUINA PER A PINTAR BANDES DE VIALD'ACCIONAMENT MANUAL

H

Subtotal... 5,09600 5,09600Materials:

3,400006,800000,500B8ZB1000 =xPINTURA REFLECTORA PER A SENYALITZACIÓKG

1,835003,670000,500BBM1M000 =xMICROESFERES DE VIDREKG

Subtotal... 5,23500 5,23500Altres:

% 0,145378,076111,80A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,14537 0,14537

COST DIRECTE 18,55237

0,00%DESPESES INDIRECTES

18,55237COST EXECUCIÓ MATERIAL

Page 58: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 87

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€33,73U PINTAT SOBRE PAVIMENT DE SENYAL BICICLETES DE3, 6 M DE LLARGÀRIA, AMB PINTURA REFLECTORA IMICROESFERES DE VIDRE, AMB MÀQUINAD'ACCIONAMENT MANUAL

FBA3115D Rend.: 1,000P- 136

Unitats Preu Parcial Import€Mà d'obra:

10,99500/R 21,990000,500A0121000 =xOFICIAL 1AH

9,19500/R 18,390000,500A0140000 =xMANOBREH

Subtotal... 20,19000 20,19000Maquinària:

6,37000/R 25,480000,250C1B02B00 =xMÀQUINA PER A PINTAR BANDES DE VIALD'ACCIONAMENT MANUAL

H

Subtotal... 6,37000 6,37000Materials:

4,420006,800000,650B8ZB1000 =xPINTURA REFLECTORA PER A SENYALITZACIÓKG

2,385503,670000,650BBM1M000 =xMICROESFERES DE VIDREKG

Subtotal... 6,80550 6,80550Altres:

% 0,3634220,190001,80A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,36342 0,36342

COST DIRECTE 33,72892

0,00%DESPESES INDIRECTES

33,72892COST EXECUCIÓ MATERIAL

€47,38U PINTAT SOBRE PAVIMENT DE SENYAL LIMITACIÓVELOCITAT A 40KM/H DE 3, 6 M DE LLARGÀRIA, AMBPINTURA REFLECTORA I MICROESFERES DE VIDRE,AMB MÀQUINA D'ACCIONAMENT MANUAL

FBA3115E Rend.: 1,000P- 137

Unitats Preu Parcial Import€Mà d'obra:

14,29350/R 21,990000,650A0121000 =xOFICIAL 1AH

11,95350/R 18,390000,650A0140000 =xMANOBREH

Subtotal... 26,24700 26,24700Maquinària:

10,19200/R 25,480000,400C1B02B00 =xMÀQUINA PER A PINTAR BANDES DE VIALD'ACCIONAMENT MANUAL

H

Subtotal... 10,19200 10,19200Materials:

6,800006,800001,000B8ZB1000 =xPINTURA REFLECTORA PER A SENYALITZACIÓKG

3,670003,670001,000BBM1M000 =xMICROESFERES DE VIDREKG

Subtotal... 10,47000 10,47000Altres:

% 0,4724526,247221,80A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,47245 0,47245

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 88

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 47,38145

0,00%DESPESES INDIRECTES

47,38145COST EXECUCIÓ MATERIAL

€37,06U PINTAT SOBRE PAVIMENT DE SENYAL MINUSVÀLIDSDE 3, 6 M DE LLARGÀRIA, AMB PINTURA REFLECTORA IMICROESFERES DE VIDRE, AMB MÀQUINAD'ACCIONAMENT MANUAL

FBA3115F Rend.: 1,000P- 138

Unitats Preu Parcial Import€Mà d'obra:

12,09450/R 21,990000,550A0121000 =xOFICIAL 1AH

10,11450/R 18,390000,550A0140000 =xMANOBREH

Subtotal... 22,20900 22,20900Maquinària:

7,64400/R 25,480000,300C1B02B00 =xMÀQUINA PER A PINTAR BANDES DE VIALD'ACCIONAMENT MANUAL

H

Subtotal... 7,64400 7,64400Materials:

4,420006,800000,650B8ZB1000 =xPINTURA REFLECTORA PER A SENYALITZACIÓKG

2,385503,670000,650BBM1M000 =xMICROESFERES DE VIDREKG

Subtotal... 6,80550 6,80550Altres:

% 0,3997622,208891,80A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,39976 0,39976

COST DIRECTE 37,05826

0,00%DESPESES INDIRECTES

37,05826COST EXECUCIÓ MATERIAL

€71,44U PLACA AMB LÀMINA REFLECTORA DE NIVELL 1D'INTENSITAT, TRIANGULAR, DE 70 CM DE COSTAT,PER A SENYALS DE TRÀNSIT, INCLÒS MUNTATGE ALSEU SUPORT

FBB11112 Rend.: 1,000P- 139

Unitats Preu Parcial Import€Mà d'obra:

14,71200/R 18,390000,800A0140000 =xMANOBREH

Subtotal... 14,71200 14,71200Materials:

56,5100056,510001,000BBM11102 =xPLACA TRIANGULAR, DE 70 CM AMB LÀMINAREFLECTORA DE NIVELL 1 D'INTENSITAT

U

Subtotal... 56,51000 56,51000Altres:

% 0,2206814,712001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Page 59: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 89

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 0,22068 0,22068

COST DIRECTE 71,44268

0,00%DESPESES INDIRECTES

71,44268COST EXECUCIÓ MATERIAL

€69,65U PLACA AMB LÀMINA REFLECTORA DE NIVELL 1D'INTENSITAT, CIRCULAR DE 60 CM DE DIÀMETRE, PERA SENYALS DE TRÀNSIT, INCLÒS MUNTATGE AL SEUSUPORT

FBB11252 Rend.: 1,000P- 140

Unitats Preu Parcial Import€Mà d'obra:

14,71200/R 18,390000,800A0140000 =xMANOBREH

Subtotal... 14,71200 14,71200Materials:

54,7200054,720001,000BBM12602 =xPLACA CIRCULAR, DE DIÀMETRE 60 CM AMB LÀMINAREFLECTORA DE NIVELL 1 D'INTENSITAT

U

Subtotal... 54,72000 54,72000Altres:

% 0,2206814,712001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,22068 0,22068

COST DIRECTE 69,65268

0,00%DESPESES INDIRECTES

69,65268COST EXECUCIÓ MATERIAL

€100,65U PLACA AMB LÀMINA REFLECTORA DE NIVELL 1D'INTENSITAT, OCTOGONAL DE 60 CM DE DIÀMETRE,PER A SENYALS DE TRÀNSIT, INCLÒS MUNTATGE ALSEU SUPORT

FBB11352 Rend.: 1,000P- 141

Unitats Preu Parcial Import€Mà d'obra:

14,71200/R 18,390000,800A0140000 =xMANOBREH

Subtotal... 14,71200 14,71200Materials:

85,7200085,720001,000BBM13602 =xPLACA OCTOGONAL, DE DIÀMETRE 60 CM AMB LÀMINAREFLECTORA DE NIVELL 1 D'INTENSITAT

U

Subtotal... 85,72000 85,72000Altres:

% 0,2206814,712001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,22068 0,22068

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 90

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 100,65268

0,00%DESPESES INDIRECTES

100,65268COST EXECUCIÓ MATERIAL

€82,13U PLACA AMB LÀMINA REFLECTORA DE NIVELL 1D'INTENSITAT DE 60X60 CM, PER A SENYALS DETRÀNSIT, INCLÒS MUNTATGE AL SEU SUPORT

FBB21202 Rend.: 1,000P- 142

Unitats Preu Parcial Import€Mà d'obra:

14,71200/R 18,390000,800A0140000 =xMANOBREH

Subtotal... 14,71200 14,71200Materials:

67,2000067,200001,000BBM1AHA2 =xPLACA INFORMATIVA DE 60X60 CM AMB LÀMINAREFLECTORA DE NIVELL 1 D'INTENSITAT

U

Subtotal... 67,20000 67,20000Altres:

% 0,2206814,712001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,22068 0,22068

COST DIRECTE 82,13268

0,00%DESPESES INDIRECTES

82,13268COST EXECUCIÓ MATERIAL

€108,10U SUMMINISTRE I COL.LOCACIÓ DE SUPORT FABRICATEN TUB CILINDRIC ACANALAT EN PERFIL D'ALUMINI, DE60MM DE DIAMETRE, GRUIX DE 5 MM, PINTAT AMBPINTURA EN POLS DE POLIESTER ANODITZAT,INCLOSA BRIDA D'ANCORATGE DE FUNDICIO IACCESSORIS, FINS A 3,5 M DE LLUM, SENSECORREDERA TELESCOPICA EXCAVACIO DEFONAMENT, FORMIGONAMENT, PLETINAD'ANCORATGE AMB ESPARRECS GALVANITZATS.

FBBZU241 Rend.: 1,000P- 143

Unitats Preu Parcial Import€Mà d'obra:

10,99500/R 21,990000,500A0121000 =xOFICIAL 1AH

9,19500/R 18,390000,500A0140000 =xMANOBREH

Subtotal... 20,19000 20,19000Maquinària:

0,32560/R 16,280000,020C1101200 =xCOMPRESSOR AMB DOS MARTELLS PNEUMÀTICSH

Subtotal... 0,32560 0,32560Materials:

1,6876042,190000,040B0608220 =xFORMIGO HA-25, DE CONSISTENCIA PLASTICA IGRANDARIA MAXIMA DEL GRANULAT 20 MM

M3

Page 60: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 91

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU12,720001,590008,000B44Z501J =xACER A/42-B (S 275 JR), EN PERFILS LAMINATS SÈRIE

IPN, IPE, HEB, HEA, HEM, UPN, TREBALLAT AL TALLER IGALVANITZAT

KG

72,9750029,190002,500BBMZU240 =xSUPORT FABRICAT EN TUB CILINDRIC ACANALAT ENPERFIL D'ALUMINI, DE 80 MM DE DIAMETRE, GRUIXENTRE 3 I 5 MM, PINTAT AMB PINTURA EN POLS DEPOLIESTER ANODITZAT, INCLOSA BRIDAD'ANCORATGE DE FUNDICIO I ACCESSORIS

M

Subtotal... 87,38260 87,38260Altres:

% 0,2019020,190001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,20190 0,20190

COST DIRECTE 108,10010

0,00%DESPESES INDIRECTES

108,10010COST EXECUCIÓ MATERIAL

€900,00PA PARTIDA ALÇADA A JUSTIFICAR EN CONCEPTED'ESCOMESA ELÈCTRICA

FBT00014 Rend.: 1,000P- 144

€3.500,00PA PARTIDA ALÇADA A JUSTIFICAR EN CONCEPTED'ESCOMESA DE BOQUES DE REG PER 10 M3/H.INCLOENT TOTS ELS ELEMENTS DE MESURA,CONTROL I SEGURETAT DEL PLEC.

FBT0001B Rend.: 1,000P- 145

€4.500,00PA PARTIDA ALÇADA A JUSTIFICAR EN CONCEPTED'ESCOMESA DE REG PER 20 M3/H. INCLOENT TOTSELS ELEMENTS DE MESURA, CONTROL I SEGURETATDEL PLEC.

FBT0001R Rend.: 1,000P- 146

€198,00U ADAPTACIÓ DE TAPA DE POU EXISTENT AMB MARC,INCLOENT RECRESCUT I ADAPTACIO DE LA BASEANTIGA I RECTIFICACIONS DE L'INTERIOR DEL POUPER A CONNEXIONS, MILLORA DE LA BAIXADA, PATES IRECOL·LOCACIÓ A COTA NOVA DE RASANT DELCARRER, TOTALMENT ACABAT.

FD1A002Y Rend.: 1,000P- 147

€120,00U RECRESCRUT DE QUALSEVOL TIPUS D'ELEMENT DEREGISTRE DE SERVEIS. ADAPTACIÓ DE TAPA DE POUEXISTENT AMB MARC, INCLOENT RECRESCUT IADAPTACIO DE LA BASE ANTIGA I RECTIFICACIONS DEL'INTERIOR DEL POU PER A CONNEXIONS, MILLORA DELA BAIXADA, PATES I RECOL·LOCACIÓ A COTA NOVADE RASANT DEL CARRER, TOTALMENT ACABAT.

FD1A002Z Rend.: 1,000P- 148

€135,20U BASTIMENT I TAPA DE FOSA DUCTIL , DE CARREGA DETRENCAMENT SUPERIOR A 40 T SEGONS LES NORMESUNE 36-118 I UNE 41-300 I DE LLUM INTERIOR 600 MM,RECOBERTA DE PINTURA ASFALTICA

FD1AV019 Rend.: 1,000P- 149

Unitats Preu Parcial Import€Mà d'obra:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 92

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU24,18900/R 21,990001,100A0121000 =xOFICIAL 1AH

19,37100/R 17,610001,100A013N000 =xAJUDANT OBRA PÚBLICAH

Subtotal... 43,56000 43,56000Materials:

90,9880079,120001,150BDDZV005 =xBASTIMENT I TAPA DE FOSA DUCTIL TIPUSAJUNTAMENT DE BARCELONA, DE CARREGA DETRENCAMENT SUPERIOR A 40 T SEGONS LES NORMESUNE 41-300-87 I EN-124 I LLUM INTERIOR 600 MM,RECOBERTA DE PINTURA ASFALTICA

U

Subtotal... 90,98800 90,98800Altres:

% 0,6534043,560001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,65340 0,65340

COST DIRECTE 135,20140

0,00%DESPESES INDIRECTES

135,20140COST EXECUCIÓ MATERIAL

€82,18U BASTIMENT I REIXA TIPUS AJUNTAMENT DEBARCELONA, DE FOSA DUCTIL PER A EMBORNAL DE 70X 30 CM, DE CARREGA DE TRENCAMENT SUPERIOR A25 T SEGONS LES NORMES UNE 41-300-87 I EN-124,RECOBERTA DE PINTURA ASFALTICA I COL.LOCADAAMB MORTER

FD1BS010 Rend.: 1,000P- 150

Unitats Preu Parcial Import€Mà d'obra:

9,23580/R 21,990000,420A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

7,72380/R 18,390000,420A0140000 =xMANOBREH

Subtotal... 16,95960 16,95960Materials:

63,9000063,900001,000BD5ZV010 =xBASTIMENT I REIXA PRACTICABLE DE FOSA DUCTILPER A EMBORNAL DE 70 X 30 CM, TIPUS AJUNTAMENTDE BARCELONA, DE CARREGA DE TRENCAMENTSUPERIOR A 25 T SEGONS LES NORMES UNE 41-300-87I EN-124, RECOBERTA DE PINTURA ASFALTICA

U

1,06608106,608120,010D070A4D1 =xMORTER MIXT DE CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 200 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:2:10, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

M3

Subtotal... 64,96608 64,96608Altres:

% 0,2543916,959331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,25439 0,25439

COST DIRECTE 82,18007

0,00%DESPESES INDIRECTES

Page 61: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 93

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

82,18007COST EXECUCIÓ MATERIAL

€135,96U SUBMINISTRAMENT I MUNTATGE ESTRUCTURA DETRAMEX 1m X 1m, EN ACER GALVANITZAT DE 30 MMDE GRUIX, QUADRATS DE 38 X 38 MM AMB SUPERFICIEANTILLISCANT, INCLÒS PERFILERIA EN L INVERTIDA ICARGOLERIA D'ACER INOXIDABLE AISI 316.

FD1BU04A Rend.: 1,000P- 151

Unitats Preu Parcial Import€Mà d'obra:

9,89550/R 21,990000,450A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

8,27550/R 18,390000,450A0140000 =xMANOBREH

Subtotal... 18,17100 18,17100Materials:

116,6525080,450001,450BD1BU040 =xREIXA EMBORNAL TEIDE DE FOSA DUCTIL, DE 750 X300 MM

U

0,8639986,399100,010D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 117,51649 117,51649Altres:

% 0,2725718,171331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,27257 0,27257

COST DIRECTE 135,96006

0,00%DESPESES INDIRECTES

135,96006COST EXECUCIÓ MATERIAL

€166,24U SUBMINISTRAMENT I MUNTATGE ESTRUCTURA DETRAMEX AMB MIDES VARIABLES EN ACERGALVANITZAT DE 30 MM DE GRUIX, QUADRATS DE 38 X38 MM AMB SUPERFICIE ANTILLISCANT, INCLÒSPERFILERIA EN L INVERTIDA I CARGOLERIA D'ACERINOXIDABLE AISI 316.

FD1BU04B Rend.: 1,000P- 152

Unitats Preu Parcial Import€Mà d'obra:

13,19400/R 21,990000,600A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

11,03400/R 18,390000,600A0140000 =xMANOBREH

Subtotal... 24,22800 24,22800Materials:

140,7875080,450001,750BD1BU040 =xREIXA EMBORNAL TEIDE DE FOSA DUCTIL, DE 750 X300 MM

U

0,8639986,399100,010D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 141,65149 141,65149

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 94

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUAltres:

% 0,3634224,228001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,36342 0,36342

COST DIRECTE 166,24291

0,00%DESPESES INDIRECTES

166,24291COST EXECUCIÓ MATERIAL

€3.148,04U REIXA LONGITUDINAL PER A DESBAST DE GRUIXOS DELA CASA COUTEX O SIMILAR.INCLOU SOLDADURA IMUNTTAGE.

FD1BUKF4 Rend.: 1,000P- 153

€146,44U CONNEXIO ESCOMESA RESIDUALS A CLAVEGUERADEXT 400 I DEXT 315 MM . INCLOU PARTPROPORCIONAL DE JUNTS ISEGELLAT

FD1ZV014 Rend.: 1,250P- 154

Unitats Preu Parcial Import€Mà d'obra:

42,22080/R 21,990002,400A0121000 =xOFICIAL 1AH

60,89600/R 19,030004,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 103,11680 103,11680Maquinària:

13,02400/R 16,280001,000C1101200 =xCOMPRESSOR AMB DOS MARTELLS PNEUMÀTICSH

Subtotal... 13,02400 13,02400Materials:

28,7500028,750001,000BD7FCON4 =xENTRONCAMENT DEL NOU TUB T400 AMB ESCOMESAEDIFICIS MITJANÇANT PEÇA CLIP

M

Subtotal... 28,75000 28,75000Altres:

% 1,54675103,116671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 1,54675 1,54675

COST DIRECTE 146,43755

0,00%DESPESES INDIRECTES

146,43755COST EXECUCIÓ MATERIAL

€139,30U CONNEXIO ESCOMESA PLUVIALS A COL·LECTOR.INCLOU PART PROPORCIONAL DE JUNTS I SEGELLAT

FD1ZV016 Rend.: 1,250P- 155

Unitats Preu Parcial Import€Mà d'obra:

35,18400/R 21,990002,000A0121000 =xOFICIAL 1AH

60,89600/R 19,030004,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 96,08000 96,08000Maquinària:

Page 62: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 95

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU13,02400/R 16,280001,000C1101200 =xCOMPRESSOR AMB DOS MARTELLS PNEUMÀTICSH

Subtotal... 13,02400 13,02400Materials:

28,7500028,750001,000BD7FCON4 =xENTRONCAMENT DEL NOU TUB T400 AMB ESCOMESAEDIFICIS MITJANÇANT PEÇA CLIP

M

Subtotal... 28,75000 28,75000Altres:

% 1,4412096,080001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 1,44120 1,44120

COST DIRECTE 139,29520

0,00%DESPESES INDIRECTES

139,29520COST EXECUCIÓ MATERIAL

€21,69M CUNETA FORMACIÓ RECTANGULAR TIPUS C-13. DE30X12 CM, REVESTIDA DE FORMIGÓ AMB UN GRUIX >=10 CM, INCLÒS EXCAVACIÓ DE TERRENY NOCLASSIFICAT, REFINAT, CÀRREGA I TRANSPORT AL´ABOCADOR, INCLÒS CAPA DE 15 CM. DE FORMIGÓHM15.

FD57U01D Rend.: 0,723P- 156

Unitats Preu Parcial Import€Mà d'obra:

2,73734/R 21,990000,090A0121000 =xOFICIAL 1AH

2,19212/R 17,610000,090A0133000 =xAJUDANT ENCOFRADORH

2,28921/R 18,390000,090A0140000 =xMANOBREH

Subtotal... 7,21867 7,21867Maquinària:

2,03112/R 58,740000,025C1315020 =xRETROEXCAVADORA MITJANAH

0,63411/R 56,600000,0081C1331200 =xMOTOANIVELLADORA MITJANAH

0,94716/R 42,800000,016C150G800 =xGRUA AUTOPROPULSADA DE 12 TH

Subtotal... 3,61239 3,61239Materials:

5,3400035,600000,150B0602220 =xFORMIGO DE RESISTENCIA 10 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

4,7359036,430000,130B0604120 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA SECA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

0,023321,060000,022B0A14200 =xFILFERRO RECUIT DE DIÀMETRE 1,3 MMKG

0,054501,090000,050B0A31000 =xCLAU ACERKG

0,200000,400000,500B0D21030 =xTAULÓ DE FUSTA DE PI PER A 10 USOSM

0,354002,360000,150B0D71120 =xTAULER ELABORAT AMB FUSTA DE PI, DE 22 MM DEGRUIX, PER A 5 USOS

M2

0,038201,910000,020B0DZA000 =xDESENCOFRANTL

Subtotal... 10,74592 10,74592Altres:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 96

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU% 0,108287,218671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,10828 0,10828

COST DIRECTE 21,68526

0,00%DESPESES INDIRECTES

21,68526COST EXECUCIÓ MATERIAL

€59,22M CUNETA FORMACIÓ TRAPEZOIDAL TIPUS C-40 DE 62 X41 CM, REVESTIDA DE FORMIGÓ AMB UN GRUIX >= 10CM, INCLÒS EXCAVACIÓ DE TERRENY NOCLASSIFICAT, REFINAT, CÀRREGA I TRANSPORT AL´ABOCADOR, INCLÒS CAPA DE 20 CM. DE FORMIGÓHM15

FD57U01U Rend.: 0,407P- 157

Unitats Preu Parcial Import€Mà d'obra:

5,40295/R 21,990000,100A0121000 =xOFICIAL 1AH

4,32678/R 17,610000,100A0133000 =xAJUDANT ENCOFRADORH

4,51843/R 18,390000,100A0140000 =xMANOBREH

Subtotal... 14,24816 14,24816Maquinària:

1,07114/R 67,070000,0065C1105A00 =xRETROEXCAVADORA AMB MARTELL TRENCADORH

7,21622/R 58,740000,050C1315020 =xRETROEXCAVADORA MITJANAH

1,39066/R 56,600000,010C1331200 =xMOTOANIVELLADORA MITJANAH

10,51597/R 42,800000,100C150G800 =xGRUA AUTOPROPULSADA DE 12 TH

Subtotal... 20,19399 20,19399Materials:

8,9000035,600000,250B0602220 =xFORMIGO DE RESISTENCIA 10 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

14,5720036,430000,400B0604120 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA SECA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

0,023321,060000,022B0A14200 =xFILFERRO RECUIT DE DIÀMETRE 1,3 MMKG

0,054501,090000,050B0A31000 =xCLAU ACERKG

0,266800,400000,667B0D21030 =xTAULÓ DE FUSTA DE PI PER A 10 USOSM

0,708002,360000,300B0D71120 =xTAULER ELABORAT AMB FUSTA DE PI, DE 22 MM DEGRUIX, PER A 5 USOS

M2

0,038201,910000,020B0DZA000 =xDESENCOFRANTL

Subtotal... 24,56282 24,56282Altres:

% 0,2137214,248001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,21372 0,21372

COST DIRECTE 59,21869

0,00%DESPESES INDIRECTES

Page 63: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 97

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

59,21869COST EXECUCIÓ MATERIAL

€52,52M POU EMBORNAL PER A AIGUES PLUVIALS DE FORMIGOPREFABRICAT O MAÓ MASSÍS, DE 70X30 CM DESECCIO INTERIOR I AMB SOLERA DE FORMIGÓHM-20/B/20/IIA

FD5JV010 Rend.: 1,000P- 158

Unitats Preu Parcial Import€Mà d'obra:

14,07360/R 21,990000,640A0121000 =xOFICIAL 1AH

5,88480/R 18,390000,320A0140000 =xMANOBREH

6,08960/R 19,030000,320A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 26,04800 26,04800Maquinària:

0,02000/R 1,000000,020C200D000 =xVIBRADOR D'AGULLAH

Subtotal... 0,02000 0,02000Materials:

21,8570039,740000,550B0606210 =xFORMIGO DE RESISTENCIA 20 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

M3

4,200002,100002,000B0D81250 =xPLAFÓ METÀL.LIC DE 50X50 CM PER A 20 USOSM2

Subtotal... 26,05700 26,05700Altres:

% 0,3907226,048001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,39072 0,39072

COST DIRECTE 52,51572

0,00%DESPESES INDIRECTES

52,51572COST EXECUCIÓ MATERIAL

€10,90U SOLERA PER EMBORNAL, AMB FORMIGÓ DERESISTÈNCIA DE 15 N/MM2 DE 20 CM DE GRUIX MÍNIM IPLANTA D'1,00X0,70 M I 15 CM DE GRUIX

FD5JV011 Rend.: 1,000P- 159

€23,80U SOLERA DE FORMIGÓ HM 20/P/IIA DE 20 CM DE GRUIXFD5JV015 Rend.: 1,000P- 160

€23,78M TUB DE FORMIGÓ ARMAT DE 300 MM DE DIÀMETRENOMINAL CLASSE 3, SEGONS ASTM C 76 AMB UNIÓ DECAMPANA AMB ANELLA ELASTOMÈRICA, COL·LOCATAL FONS DE LA RASA

FD78B385 Rend.: 1,000P- 161

Unitats Preu Parcial Import€Mà d'obra:

1,80312/R 20,490000,088A012M000 =xOFICIAL 1A MUNTADORH

3,23664/R 18,390000,176A0140000 =xMANOBREH

Subtotal... 5,03976 5,03976Maquinària:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 98

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU3,49184/R 39,680000,088C1503000 =xCAMIÓ GRUAH

Subtotal... 3,49184 3,49184Materials:

14,2300014,230001,000BD78B380 =xTUB DE FORMIGÓ ARMAT DE 300 MM DE DIÀMETRECLASSE 3, SEGONS ASTM C 76 AMB UNIÓ DE CAMPANAAMB ANELLA ELASTOMÈRICA

M

0,940000,940001,000BFYG1BF1 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUB DE FORMIGÓ ARMAT PREFABRICAT, DE 300MM DE DIÀMETRE I CLASSE 3 SEGONS ASTM C 76, AMBUNIÓ DE CAMPANA AMB ANELLA ELASTOMÈRICA

U

Subtotal... 15,17000 15,17000Altres:

% 0,075605,040001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,07560 0,07560

COST DIRECTE 23,77720

0,00%DESPESES INDIRECTES

23,77720COST EXECUCIÓ MATERIAL

€228,59M TUB DE POLIETILÈ DE 1200MM DE DIÀMETREEXTERIOR , DE DOBLE PARET, CORRUGATEXTERIORMENT I LLIS INTERIORMENT, ALTA DENSITATI RIGIDESA CIRCUMFERENCIAL CLASSE 8 TIPUSECOPAL O SIMILAR, UNIÓ AMB MANIGUET I JUNT DEGOMA I COL.LOCAT AL FONS DE RASA, SEGELLAT ICONNEXIÓ EMBORNAL POU.

FD7FC120 Rend.: 8,650P- 162

Unitats Preu Parcial Import€Mà d'obra:

1,18439/R 20,490000,500A012M000 =xOFICIAL 1A MUNTADORH

1,01792/R 17,610000,500A013M000 =xAJUDANT MUNTADORH

Subtotal... 2,20231 2,20231Maquinària:

1,49898/R 49,870000,260C150G900 =xGRUA AUTOPROPULSADA DE 20 TH

Subtotal... 1,49898 1,49898Materials:

216,28000216,280001,000BD7FC120 =xTUB DE POLIETILÈ ALTA DENSITAT D EXT 1200 MMTIPUS ECOPAL O SIMILAR.

M

0,912000,480001,900BFWB1E44 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

U

7,7000038,500000,200BFYB143 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

U

Subtotal... 224,89200 224,89200

COST DIRECTE 228,59329

0,00%DESPESES INDIRECTES

Page 64: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 99

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

228,59329COST EXECUCIÓ MATERIAL

€24,93M TUB DE POLIETILÈ DE 315MM DE DIÀMETRE EXTERIORI 271M. INTERIOR, DE DOBLE PARET, CORRUGATEXTERIORMENT I LLIS INTERIORMENT, ALTA DENSITATI RIGIDESA CIRCUMFERENCIAL CLASSE 8 TIPUSECOPAL O SIMILAR, UNIÓ AMB MANIGUET I JUNT DEGOMA I COL.LOCAT AL FONS DE RASA, SEGELLAT ICONNEXIÓ EMBORNAL POU.

FD7FC315 Rend.: 6,057P- 163

Unitats Preu Parcial Import€Mà d'obra:

0,33829/R 20,490000,100A012M000 =xOFICIAL 1A MUNTADORH

0,29074/R 17,610000,100A013M000 =xAJUDANT MUNTADORH

Subtotal... 0,62903 0,62903Maquinària:

0,74101/R 49,870000,090C150G900 =xGRUA AUTOPROPULSADA DE 20 TH

Subtotal... 0,74101 0,74101Materials:

16,5700016,570001,000BD7FC315 =xTUB DE POLIETILÈ ALTA DENSITAT D EXT 315 MMTIPUS ECOPAL O SIMILAR.

M

0,480000,480001,000BFWB1E44 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

U

6,5100032,550000,200BFYB145 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 315MM DE DIÀMETRE NOMINAL EXTERIOR

U

Subtotal... 23,56000 23,56000

COST DIRECTE 24,93004

0,00%DESPESES INDIRECTES

24,93004COST EXECUCIÓ MATERIAL

€17,68M TUB DE POLIETILÈ DE 250MM DE DIÀMETRE EXTERIOR, DE DOBLE PARET, CORRUGAT EXTERIORMENT I LLISINTERIORMENT, ALTA DENSITAT I RIGIDESACIRCUMFERENCIAL CLASSE 8 TIPUS ECOPAL OSIMILAR, UNIÓ AMB MANIGUET I JUNT DE GOMA ICOL.LOCAT AL FONS DE RASA, SEGELLAT I CONNEXIÓEMBORNAL POU.

FD7FC31B Rend.: 1,355P- 164

Unitats Preu Parcial Import€Mà d'obra:

1,51218/R 20,490000,100A012M000 =xOFICIAL 1A MUNTADORH

1,29963/R 17,610000,100A013M000 =xAJUDANT MUNTADORH

Subtotal... 2,81181 2,81181Materials:

11,1800011,180001,000BD7FC250 =xTUB DE POLIETILÈ ALTA DENSITAT D EXT 250 MMTIPUS ECOPAL O SIMILAR.

M

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 100

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU0,432000,480000,900BFWB1E44 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGE

PER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

U

3,2550032,550000,100BFYB145 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 315MM DE DIÀMETRE NOMINAL EXTERIOR

U

Subtotal... 14,86700 14,86700

COST DIRECTE 17,67881

0,00%DESPESES INDIRECTES

17,67881COST EXECUCIÓ MATERIAL

€35,70M TUB DE POLIETILÈ DE 400MM DE DIÀMETRE EXTERIORI 347.6M. INTERIOR, DE DOBLE PARET, CORRUGATEXTERIORMENT I LLIS INTERIORMENT, ALTA DENSITATI RIGIDESA CIRCUMFERENCIAL CLASSE 8 TIPUSECOPAL O SIMILAR, UNIÓ AMB MANIGUET I JUNT DEGOMA I COL.LOCAT AL FONS DE RASA, SEGELLAT ICONNEXIÓ EMBORNAL POU.

FD7FC405 Rend.: 3,052P- 165

Unitats Preu Parcial Import€Mà d'obra:

1,00704/R 20,490000,150A012M000 =xOFICIAL 1A MUNTADORH

0,86550/R 17,610000,150A013M000 =xAJUDANT MUNTADORH

Subtotal... 1,87254 1,87254Maquinària:

1,47061/R 49,870000,090C150G900 =xGRUA AUTOPROPULSADA DE 20 TH

Subtotal... 1,47061 1,47061Materials:

24,1800024,180001,000BD7FC400 =xTUB DE POLIETILÈ ALTA DENSITAT D EXT 400 MMTIPUS ECOPAL O SIMILAR.

M

0,480000,480001,000BFWB1E44 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

U

7,7000038,500000,200BFYB143 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

U

Subtotal... 32,36000 32,36000

COST DIRECTE 35,70315

0,00%DESPESES INDIRECTES

35,70315COST EXECUCIÓ MATERIAL

€53,53M TUB DE POLIETILÈ DE 500MM DE DIÀMETRE EXTERIOR, DE DOBLE PARET, CORRUGAT EXTERIORMENT I LLISINTERIORMENT, ALTA DENSITAT I RIGIDESACIRCUMFERENCIAL CLASSE 8 TIPUS ECOPAL OSIMILAR, UNIÓ AMB MANIGUET I JUNT DE GOMA ICOL.LOCAT AL FONS DE RASA, SEGELLAT I CONNEXIÓEMBORNAL POU.

FD7FC40B Rend.: 8,650P- 166

Unitats Preu Parcial Import€

Page 65: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 101

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMà d'obra:

0,71064/R 20,490000,300A012M000 =xOFICIAL 1A MUNTADORH

0,61075/R 17,610000,300A013M000 =xAJUDANT MUNTADORH

Subtotal... 1,32139 1,32139Maquinària:

0,74949/R 49,870000,130C150G900 =xGRUA AUTOPROPULSADA DE 20 TH

Subtotal... 0,74949 0,74949Materials:

42,8500042,850001,000BD7FC500 =xTUB DE POLIETILÈ ALTA DENSITAT D EXT 500 MMTIPUS ECOPAL O SIMILAR.

M

0,912000,480001,900BFWB1E44 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

U

7,7000038,500000,200BFYB143 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

U

Subtotal... 51,46200 51,46200

COST DIRECTE 53,53288

0,00%DESPESES INDIRECTES

53,53288COST EXECUCIÓ MATERIAL

€55,70M TUB DE POLIETILÈ DE 630MM DE DIÀMETRE EXTERIOR, DE DOBLE PARET, CORRUGAT EXTERIORMENT I LLISINTERIORMENT, ALTA DENSITAT I RIGIDESACIRCUMFERENCIAL CLASSE 8TIPUS ECOPAL OSIMILAR, UNIÓ AMB MANIGUET I JUNT DE GOMA ICOL.LOCAT AL FONS DE RASA, SEGELLAT I CONNEXIÓEMBORNAL POU.

FD7FC60B Rend.: 1,000P- 167

Unitats Preu Parcial Import€Mà d'obra:

8,19600/R 20,490000,400A012M000 =xOFICIAL 1A MUNTADORH

7,92450/R 17,610000,450A013M000 =xAJUDANT MUNTADORH

Subtotal... 16,12050 16,12050Maquinària:

6,98180/R 49,870000,140C150G900 =xGRUA AUTOPROPULSADA DE 20 TH

Subtotal... 6,98180 6,98180Materials:

24,1800024,180001,000BD7FC400 =xTUB DE POLIETILÈ ALTA DENSITAT D EXT 400 MMTIPUS ECOPAL O SIMILAR.

M

0,720000,480001,500BFWB1E44 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

U

7,7000038,500000,200BFYB143 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

U

Subtotal... 32,60000 32,60000

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 102

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 55,70230

0,00%DESPESES INDIRECTES

55,70230COST EXECUCIÓ MATERIAL

€112,49M TUB DE POLIETILÈ DE 800MM DE DIÀMETRE EXTERIOR, DE DOBLE PARET, CORRUGAT EXTERIORMENT I LLISINTERIORMENT, ALTA DENSITAT I RIGIDESACIRCUMFERENCIAL CLASSE 8TIPUS ECOPAL OSIMILAR, UNIÓ AMB MANIGUET I JUNT DE GOMA ICOL.LOCAT AL FONS DE RASA, SEGELLAT I CONNEXIÓEMBORNAL POU.

FD7FC80B Rend.: 8,650P- 168

Unitats Preu Parcial Import€Mà d'obra:

1,18439/R 20,490000,500A012M000 =xOFICIAL 1A MUNTADORH

1,01792/R 17,610000,500A013M000 =xAJUDANT MUNTADORH

Subtotal... 2,20231 2,20231Maquinària:

1,49898/R 49,870000,260C150G900 =xGRUA AUTOPROPULSADA DE 20 TH

Subtotal... 1,49898 1,49898Materials:

100,18000100,180001,000BD7FC800 =xTUB DE POLIETILÈ ALTA DENSITAT D EXT 800 MMTIPUS ECOPAL O SIMILAR.

ML

0,912000,480001,900BFWB1E44 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

U

7,7000038,500000,200BFYB143 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 400MM DE DIÀMETRE NOMINAL EXTERIOR

U

Subtotal... 108,79200 108,79200

COST DIRECTE 112,49329

0,00%DESPESES INDIRECTES

112,49329COST EXECUCIÓ MATERIAL

€140,34U FORMACIÓ DE FINESTRA DE SUPERFCIE INFERIOR A 5M2 EN ESTRUCTURA DE FORMIGÓ ARMAT PERCONNEXIÓ DE CLAVEGUERA

FD7ZUC03 Rend.: 1,000P- 169

Unitats Preu Parcial Import€Mà d'obra:

18,14400/R 20,160000,900A0125000 =xOFICIAL 1A SOLDADORH

44,13600/R 18,390002,400A0140000 =xMANOBREH

Subtotal... 62,28000 62,28000Maquinària:

70,48800/R 58,740001,200C1315020 =xRETROEXCAVADORA MITJANAH

6,63300/R 7,370000,900C200S000 =xEQUIP I ELEMENTS AUXILIARS PER A TALLOXIACETILÈNIC

H

Page 66: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 103

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 77,12100 77,12100Altres:

% 0,9342062,280001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,93420 0,93420

COST DIRECTE 140,33520

0,00%DESPESES INDIRECTES

140,33520COST EXECUCIÓ MATERIAL

€265,50U SUBMINISTRAMENT I COL·LOCACIÓ DE POU DEREGISTRE D'ALÇADA MÀXIMA 3M. DE SECCIÓ 100CMDE DIÀMETRE, AMB PARET PER A POU CIRCULAR DED=100 CM DE PECES DE FORMIGÓ PREFABRICAT, AMBREDUCTOR PREFABRICAT DE 100/60 CM, INCLÓSPATES DE POLIPROPILE I ENTRONCAMENT AMB LACANALITZACIÓ

FDB1X009 Rend.: 1,000P- 170

€355,00U SUBMINISTRAMENT I COL·LOCACIÓ DE POU DEREGISTRE D'ALÇADA > 3M. DE SECCIÓ 100CM DEDIÀMETRE, AMB PARET PER A POU CIRCULAR DED=100 CM DE PECES DE FORMIGÓ PREFABRICAT, AMBREDUCTOR PREFABRICAT DE 100/60 CM, INCLÓSPATES DE POLIPROPILE I ENTRONCAMENT AMB LACANALITZACIÓ

FDB1X00A Rend.: 1,000P- 171

€12,57U GRAO PER A POU DE REGISTRE DE POLIPROPILÈARMAT, DE 250X350X250 MM I 3 KG DE PES,COL.LOCAT AMB MORTER CIMENT 1:6, ELABORAT AL'OBRA AMB FORMIGONERA DE 165 L

FDDZS005 Rend.: 1,000P- 172

Unitats Preu Parcial Import€Mà d'obra:

4,39800/R 21,990000,200A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

3,67800/R 18,390000,200A0140000 =xMANOBREH

Subtotal... 8,07600 8,07600Materials:

3,610003,610001,000BDDZV001 =xGRAO PER A POU DE REGISTRE DE POLIPROPILÈ DE250X350X250 MM I 3 KG DE PES

U

0,7628776,286700,010D0701641 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 250KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:6, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 4,37287 4,37287Altres:

% 0,121148,076001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,12114 0,12114

COST DIRECTE 12,57001

0,00%DESPESES INDIRECTES

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 104

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

12,57001COST EXECUCIÓ MATERIAL

€6.640,70u Separador d'hidrocarburs-Decantador de llots i sorres, ambby-pass integrat, model Aquatesum NSB36 o similar, fabricaten polyester reforçat amb fibra de vidre PRFV. amb capacitatde fluxe de 36l/s S'inclou transport ,col·locació a ubicació definitiva, iinstal·lació i connexió a xarxa.

FDE60350 Rend.: 1,000P- 173

Unitats Preu Parcial Import€Mà d'obra:

59,49000/R 19,830003,000A0127000 =xOFICIAL 1A COL.LOCADORH

52,83000/R 17,610003,000A0137000 =xAJUDANT COL.LOCADORH

57,09000/R 19,030003,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 169,41000 169,41000Maquinària:

363,40000/R 36,3400010,000C1501800 =xCAMIÓ PER A TRANSPORT DE 12 TH

128,40000/R 42,800003,000C150G800 =xGRUA AUTOPROPULSADA DE 12 TH

Subtotal... 491,80000 491,80000Materials:

5.977,800005.977,800001,000BDE60015 =xSeparador d'hidrocarburs-Decantador de llots i sorres, ambby-pass integrat, model Aquatesum NSBD36 o similar,fabricat en polyester reforçat amb fibra de vidre PRFV. ambcapacitat de fluxe de 36l/s i pics de fins a 360l/s.

u

Subtotal... 5.977,80000 5.977,80000

1,694101,00%DESPESES AUXILIARS

COST DIRECTE 6.640,70410

0,00%DESPESES INDIRECTES

6.640,70410COST EXECUCIÓ MATERIAL

€17.383,46u Separador d'hidrocarburs-Decantador de llots i sorres, ambby-pass integrat, model Aquatesum NSBD110 o similar,fabricat en polyester reforçat amb fibra de vidre PRFV. ambcapacitat de fluxe de 110l/s i pics de fins a 1.100l/s.S'inclou transport ,col·locació a ubicació definitiva, iinstal·lació i connexió a xarxa.

FDE60598 Rend.: 1,000P- 174

Unitats Preu Parcial Import€Mà d'obra:

79,32000/R 19,830004,000A0127000 =xOFICIAL 1A COL.LOCADORH

70,44000/R 17,610004,000A0137000 =xAJUDANT COL.LOCADORH

76,12000/R 19,030004,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 225,88000 225,88000Maquinària:

508,76000/R 36,3400014,000C1501800 =xCAMIÓ PER A TRANSPORT DE 12 TH

214,00000/R 42,800005,000C150G800 =xGRUA AUTOPROPULSADA DE 12 TH

Subtotal... 722,76000 722,76000Materials:

Page 67: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 105

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU16.432,5600016.432,560001,000BDE60110 =xSeparador d'hidrocarburs-Decantador de llots i sorres, amb

by-pass integrat, model Aquatesum NSBD110 o similar,fabricat en polyester reforçat amb fibra de vidre PRFV. ambcapacitat de fluxe de 110l/s i pics de fins a 1100l/s.

u

Subtotal... 16.432,56000 16.432,56000

2,258801,00%DESPESES AUXILIARS

COST DIRECTE 17.383,45880

0,00%DESPESES INDIRECTES

17.383,45880COST EXECUCIÓ MATERIAL

€27,63UD BANCADA DE FORMIGÓ HM-20/B/40/I PER A BASED'ARMARIS PREFABRICATS AMB PORTA METÀL.LICA

FDG3CV09 Rend.: 1,000P- 175

Unitats Preu Parcial Import€Mà d'obra:

0,43980/R 21,990000,020A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

0,36780/R 18,390000,020A0140000 =xMANOBREH

Subtotal... 0,80760 0,80760Materials:

26,8150053,630000,500B0641050 =xFORMIGÓ HM-20/B/20/I DE CONSISTÈNCIA TOVA,GRANDÀRIA MÀXIMA DEL GRANULAT 20 MM, AMB >=200 KG/M3 DE CIMENT, APTE PER A CLASSED'EXPOSICIÓ I

M3

Subtotal... 26,81500 26,81500Altres:

% 0,008080,808001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00808 0,00808

COST DIRECTE 27,63068

0,00%DESPESES INDIRECTES

27,63068COST EXECUCIÓ MATERIAL

€0,24M SUBMINISTRAMENT I COL.LOCACIÓ DE BANDA DESENYALITZACIÓ DE MATERIAL PLÀSTIC PER AENLLUMENAT

FDG3U170 Rend.: 1,000P- 176

€0,24M SUBMINISTRAMENT I COL.LOCACIÓ DE BANDA DESENYALITZACIÓ PER A AIGUA POTABLE

FDG3U17B Rend.: 1,000P- 177

€6,58M CANALITZACIÓ PTE, FORMADA PER 1 TUB DE D 63 MMDE POLIETILÈ CORRUGAT EXTERIOR I LLIS INTERIORAMB GUIES DE PLÀSTIC, REBLIMENT AMB FORMIGÓ DERESISTÈNCIA 15 N/MM2, SEPARADORS, MANIGUETSD'UNIÓ, TAPS I COL·LOCACIÓ DE DUES BANDES DEPROTECCIÓ I AVÍS DE PLÀSTIC A LA PART SUPERIORDE LA RASA, INCLÒS MANDRINAT DE TUBS

FDG5EV1A Rend.: 1,000P- 178

Unitats Preu Parcial Import€

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 106

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMà d'obra:

2,19900/R 21,990000,100A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

1,83900/R 18,390000,100A0140000 =xMANOBREH

Subtotal... 4,03800 4,03800Materials:

1,4572036,430000,040B0604120 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA SECA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

1,020001,020001,000BG22TD10 =xTUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 63 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 20 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

M

Subtotal... 2,47720 2,47720Altres:

% 0,060574,038001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,06057 0,06057

COST DIRECTE 6,57577

0,00%DESPESES INDIRECTES

6,57577COST EXECUCIÓ MATERIAL

€8,62M CANALITZACIÓ PTE, FORMADA PER 1 TUB DE D 110 MMDE POLIETILÈ CORRUGAT EXTERIOR I LLIS INTERIORAMB GUIES DE PLÀSTIC, REBLIMENT AMB FORMIGÓ DERESISTÈNCIA 15 N/MM2, SEPARADORS, MANIGUETSD'UNIÓ, TAPS I COL·LOCACIÓ DE DUES BANDES DEPROTECCIÓ I AVÍS DE PLÀSTIC A LA PART SUPERIORDE LA RASA, INCLÒS MANDRINAT DE TUBS

FDG5EV1B Rend.: 1,000P- 179

Unitats Preu Parcial Import€Mà d'obra:

2,63880/R 21,990000,120A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

2,20680/R 18,390000,120A0140000 =xMANOBREH

Subtotal... 4,84560 4,84560Materials:

1,8215036,430000,050B0604120 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA SECA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

1,880001,880001,000BG22TK10 =xTUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 110 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 28 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

M

Subtotal... 3,70150 3,70150Altres:

% 0,072684,845331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,07268 0,07268

Page 68: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 107

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 8,61978

0,00%DESPESES INDIRECTES

8,61978COST EXECUCIÓ MATERIAL

€13,38M CANALITZACIÓ PTE, FORMADA PER 1 TUB DE D 200 MMDE POLIETILÈ CORRUGAT EXTERIOR I LLIS INTERIORAMB GUIES DE PLÀSTIC, REBLIMENT AMB FORMIGÓ DERESISTÈNCIA 15 N/MM2, SEPARADORS, MANIGUETSD'UNIÓ, TAPS I COL·LOCACIÓ DE DUES BANDES DEPROTECCIÓ I AVÍS DE PLÀSTIC A LA PART SUPERIORDE LA RASA, INCLÒS MANDRINAT DE TUBS

FDG5EV1C Rend.: 1,000P- 180

Unitats Preu Parcial Import€Mà d'obra:

3,29850/R 21,990000,150A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

2,75850/R 18,390000,150A0140000 =xMANOBREH

Subtotal... 6,05700 6,05700Materials:

2,1858036,430000,060B0604120 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA SECA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

5,050005,050001,000BG22TQ10 =xTUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 200 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 40 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

M

Subtotal... 7,23580 7,23580Altres:

% 0,090866,057331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,09086 0,09086

COST DIRECTE 13,38366

0,00%DESPESES INDIRECTES

13,38366COST EXECUCIÓ MATERIAL

€9,61M CANALITZACIÓ PTE, FORMADA PER 1 TUB DE D 125 MMDE POLIETILÈ CORRUGAT EXTERIOR I LLIS INTERIORAMB GUIES DE PLÀSTIC, REBLIMENT AMB FORMIGÓ DERESISTÈNCIA 15 N/MM2, SEPARADORS, MANIGUETSD'UNIÓ, TAPS I COL·LOCACIÓ DE DUES BANDES DEPROTECCIÓ I AVÍS DE PLÀSTIC A LA PART SUPERIORDE LA RASA, INCLÒS MANDRINAT DE TUBS

FDG5EV1D Rend.: 1,000P- 181

Unitats Preu Parcial Import€Mà d'obra:

2,85870/R 21,990000,130A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

2,39070/R 18,390000,130A0140000 =xMANOBREH

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 108

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 5,24940 5,24940Materials:

1,8215036,430000,050B0604120 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA SECA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

2,460002,460001,000BG22TL10 =xTUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 125 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 28 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

M

Subtotal... 4,28150 4,28150Altres:

% 0,078745,249331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,07874 0,07874

COST DIRECTE 9,60964

0,00%DESPESES INDIRECTES

9,60964COST EXECUCIÓ MATERIAL

€11,21M CANALITZACIÓ PTE, FORMADA PER 1 TUB DE D 160 MMDE POLIETILÈ CORRUGAT EXTERIOR I LLIS INTERIORAMB GUIES DE PLÀSTIC, REBLIMENT AMB FORMIGÓ DERESISTÈNCIA 15 N/MM2, SEPARADORS, MANIGUETSD'UNIÓ, TAPS I COL·LOCACIÓ DE DUES BANDES DEPROTECCIÓ I AVÍS DE PLÀSTIC A LA PART SUPERIORDE LA RASA, INCLÒS MANDRINAT DE TUBS

FDG5EV1E Rend.: 1,000P- 182

Unitats Preu Parcial Import€Mà d'obra:

3,29850/R 21,990000,150A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

2,75850/R 18,390000,150A0140000 =xMANOBREH

Subtotal... 6,05700 6,05700Materials:

1,8215036,430000,050B0604120 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA SECA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

3,240003,240001,000BG22TP10 =xTUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 160 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 40 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

M

Subtotal... 5,06150 5,06150Altres:

% 0,090866,057331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,09086 0,09086

Page 69: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 109

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 11,20936

0,00%DESPESES INDIRECTES

11,20936COST EXECUCIÓ MATERIAL

€42,32U PERICO DE 38X38X55 CM, AMB PARETS DE 10 CM DEGRUIX DE FORMIGO DE RESISTENCIA DE 15N/MM2 ISOLERA DE MAO CALAT SOBRE LLIT DE SORRA

FDK254D3 Rend.: 1,000P- 183

Unitats Preu Parcial Import€Mà d'obra:

16,27700/R 21,990000,7402A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

13,61228/R 18,390000,7402A0140000 =xMANOBREH

Subtotal... 29,88928 29,88928Materials:

0,2310019,250000,012B0312500 =xSORRA DE PEDRERA DE PEDRA GRANÍTICA, DE 0 A 3,5MM

T

9,8923058,190000,170B0604220 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

1,010001,010001,000B0DF7G0A =xMOTLLE METÀL.LIC PER A ENCOFRAT DE PERICÓD'ENLLUMENAT DE 38X38X55 CM, PER A 150 USOS

U

1,000000,200005,000B0F1D2A1 =xMAÓ CALAT, DE 29X14X10 CM, PER A REVESTIRU

Subtotal... 12,13330 12,13330Altres:

% 0,2988929,889001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,29889 0,29889

COST DIRECTE 42,32147

0,00%DESPESES INDIRECTES

42,32147COST EXECUCIÓ MATERIAL

€59,50U PERICO DE 57X57X125 CM, AMB PARETS DE 10 CM DEGRUIX DE FORMIGO DE RESISTENCIA DE 15N/MM2 ISOLERA DE MAO CALAT SOBRE LLIT DE SORRA

FDK2A4D3 Rend.: 1,000P- 184

Unitats Preu Parcial Import€Mà d'obra:

18,37704/R 21,990000,8357A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

15,36852/R 18,390000,8357A0140000 =xMANOBREH

Subtotal... 33,74556 33,74556Materials:

0,4620019,250000,024B0312500 =xSORRA DE PEDRERA DE PEDRA GRANÍTICA, DE 0 A 3,5MM

T

22,1122058,190000,380B0604220 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 110

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU1,440001,440001,000B0DF8H0A =xMOTLLE METÀL.LIC PER A ENCOFRAT DE PERICÓ DE

REGISTRE DE 57X57X125 CM, PER A 150 USOSU

1,400000,200007,000B0F1D2A1 =xMAÓ CALAT, DE 29X14X10 CM, PER A REVESTIRU

Subtotal... 25,41420 25,41420Altres:

% 0,3374633,746001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,33746 0,33746

COST DIRECTE 59,49722

0,00%DESPESES INDIRECTES

59,49722COST EXECUCIÓ MATERIAL

€178,00U PERICO COMPTADOR DE 60X40X120 CM, AMB PARETSDE 15 CM DE GRUIX DE FORMIGO DE RESISTENCIA DE20N/MM2 I SOLERA DE MAO CALAT SOBRE LLIT DESORRA INCLOSA LA TAPA I MARC DE FOSA

FDK2A4D4 Rend.: 1,000P- 185

€90,07U PERICO QUADRAT PER A CANALITZACIO DE SERVEISDE 45X 45 X 100 CM, AMB PARETS DE 14 CM DE GUIXDE MAO CALAT DE 10 X 14 X 29 CM ARREBOSSADESPER DINS AMB MORTER DE CIMENT 1:2:10 ELABORAT AL'OBRA AMB FORMIGONERA DE 165L, AMB LLITDRENANT DE GRAVA DE PEDRA DE PEDRERAGRANITICA DE 10 CM DE GRUIX

FDK2U030 Rend.: 1,000P- 186

Unitats Preu Parcial Import€Mà d'obra:

29,68650/R 21,990001,350A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

27,58500/R 18,390001,500A0140000 =xMANOBREH

Subtotal... 57,27150 57,27150Materials:

1,2560015,700000,080B0332020 =xGRAVA DE PEDRERA DE PEDRA GRANÍTICA, PER ADRENS

T

11,6380058,190000,200B0604220 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

14,000000,2000070,000B0F1D2A1 =xMAÓ CALAT, DE 29X14X10 CM, PER A REVESTIRU

5,33041106,608120,050D070A4D1 =xMORTER MIXT DE CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 200 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:2:10, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

M3

Subtotal... 32,22441 32,22441Altres:

% 0,5727257,272001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,57272 0,57272

Page 70: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 111

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 90,06863

0,00%DESPESES INDIRECTES

90,06863COST EXECUCIÓ MATERIAL

€258,37U ARQUETA SOBRE BOCA D'HOME, D'OBRA DE FÀBRICA ,INCLOU AQUESTA UNITAT LA BASE DEL POU,L'ARREBOSSAT I LLISCAT , MARC I TAPA, SEGONSPLÀNOLS DE DETALL. TOT INCLÒS COMPLETAMETACABAT.

FDK2U031 Rend.: 1,000P- 187

Unitats Preu Parcial Import€Mà d'obra:

109,95000/R 21,990005,000A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

91,95000/R 18,390005,000A0140000 =xMANOBREH

Subtotal... 201,90000 201,90000Materials:

1,5700015,700000,100B0332020 =xGRAVA DE PEDRERA DE PEDRA GRANÍTICA, PER ADRENS

T

14,5475058,190000,250B0604220 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

33,000000,20000165,000B0F1D2A1 =xMAÓ CALAT, DE 29X14X10 CM, PER A REVESTIRU

5,33041106,608120,050D070A4D1 =xMORTER MIXT DE CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 200 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:2:10, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

M3

Subtotal... 54,44791 54,44791Altres:

% 2,01900201,900001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 2,01900 2,01900

COST DIRECTE 258,36691

0,00%DESPESES INDIRECTES

258,36691COST EXECUCIÓ MATERIAL

€139,65U PERICÓ DE REGISTRE PER BY PASS MESTRE DE 0,60 X0,60 X 0.80 M DE MIDES ÚTILS AMB PARET DE 15 CM DEMAÓ CALAT DE 29 X 14 X 10 CM. ASENTADA SOBRELLIT DE SORRA, INCLOSA LA TAPA I MARC DE FOSASEGONS COMPANYIA

FDK2U104 Rend.: 1,000P- 188

€155,00U PERICÓ DE REGISTRE PER REG DE 0,80 X 0,80 X 0.80 MDE MIDES ÚTILS AMB PARET DE 15 CM DE MAÓ CALATDE 29 X 14 X 10 CM. ASENTADA SOBRE LLIT DE SORRA,INCLOSA LA TAPA I MARC DE FOSA

FDK2U10B Rend.: 1,000P- 189

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 112

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€119,57U PERICÓ DE DESCÀRREGA PER REG DE 0,40 X 0,40 X0.50 M DE MIDES ÚTILS AMB PARET DE 15 CM DE MAÓCALAT DE 29 X 14 X 10 CM. ASENTADA SOBRE LLIT DESORRA, INCLOSA LA TAPA I MARC DE FOSA

FDK2U10X Rend.: 1,000P- 190

€185,67U PERICÓ SIFÒNIC REGISTRABLE DE 0,60 X 0,60 X 100CM DE MIDES ÚTILS AMB PARET DE 15 CM DE MAÓCALAT DE 29 X 14 X 10 CM. ASENTADA SOBRE LLIT DESORRA, INCLOSA LA TAPA, MARC DE FOSA IENTRONCAMENT AMB LA NOVA CANALITZACIÓ.

FDK2U114 Rend.: 1,000P- 191

€127,53U PERICÓ DE REGISTRE PER BY PASS SECTORIALSIMPLE DE 0,50 X 0,50 X 0.50 M DE MIDES ÚTILS AMBPARET DE 15 CM DE MAÓ CALAT DE 29 X 14 X 10 CM.ASENTADA SOBRE LLIT DE SORRA, INCLOSA LA TAPA IMARC DE FOSA SEGONS COMPANYIA

FDK2U128 Rend.: 1,000P- 192

€121,45U PERICÓ DE REGISTRE PER CREUAMENT DE CALÇADADE 0,60 X 0,60 X 0.60 M DE MIDES ÚTILS AMB PARET DE15 CM DE MAÓ CALAT DE 29 X 14 X 10 CM. ASENTADASOBRE LLIT DE SORRA, INCLOSA LA TAPA I MARC DEFOSA SEGONS COMPANYIA

FDK2U129 Rend.: 1,000P- 193

€195,00U PERICÓ DE REGISTRE PER REG DE 0,70 X 0,70 X 0.60 MDE MIDES ÚTILS AMB PARET DE 15 CM DE MAÓ CALATDE 29 X 14 X 10 CM. ASENTADA SOBRE LLIT DE SORRA,INCLOSA LA TAPA I MARC DE FOSA

FDK2U1A2 Rend.: 1,000P- 194

€238,45U POU DESSORRADOR DE 1,0 X 1,0 X 1,2 M DE MIDESÙTILS AMB PARET DE 15 CM DE MAÓ CALAT DE 29 X14X10 CM. ASENTADA SOBRE LLIT DE FORMIGÓ, INCLOSALA TAPA I MARC DE FOSA

FDK2U1BB Rend.: 1,000P- 195

€116,32U PERICÓ DE REGISTRE DE FORMIGÓ PREFABRICATSENSE FONS, DE 100x100 CM I 80 CM DE FONDÀRIA,PER A INSTAL·LACIONS DE SERVEIS, COL·LOCADASOBRE SOLERA DE FORMIGÓ HM-20/P/40/I DE 5 CM DEGRUIX I 120x120CM. I REBLERT LATERAL AMB TERRESDE L'EXCAVACIÓ, INCLÒS TAPA.

FDK2UC40 Rend.: 1,000P- 196

Unitats Preu Parcial Import€Mà d'obra:

9,89550/R 21,990000,450A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

16,55100/R 18,390000,900A0140000 =xMANOBREH

Subtotal... 26,44650 26,44650Maquinària:

6,58688/R 39,680000,166C1503000 =xCAMIÓ GRUAH

Subtotal... 6,58688 6,58688Materials:

4,2076858,440000,072B064500C =xFORMIGÓ HM-20/P/40/I DE CONSISTÈNCIA PLÀSTICA,GRANDÀRIA MÀXIMA DEL GRANULAT 40 MM, AMB >=200 KG/M3 DE CIMENT, APTE PER A CLASSED'EXPOSICIÓ I

M3

Page 71: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 113

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU79,0800079,080001,000BDK2UC40 =xPERICÓ DE REGISTRE DE FORMIGÓ PREFABRICAT

SENSE FONS, DE 100x100 CM I 80 CM DE FONDÀRIA,PER A INSTAL·LACIONS DE SERVEIS, INCLÒS TAPA.

U

Subtotal... 83,28768 83,28768

COST DIRECTE 116,32106

0,00%DESPESES INDIRECTES

116,32106COST EXECUCIÓ MATERIAL

€535,00U DESGUÀS EN PERICÓ 50 X50 cm AMB CANONADA DEPOLIETILÈ PEAD DEXT 90 I PN 10 FORMAT PER UNA TDE POLIETILÈ 160/160/90 ,COLZE DE 90º DE POLIETILÈDEXT 90, VÀLVULA DE COMPORTA AVK DE DN 80 PN 10A I VALVULA ANTIRETORN, CONNECTAR AL POU DEREGISTRE. TOTALMENT INSTAL.LAT I MUNTAT.

FDK2I033C Rend.: 1,000P- 197

€507,08U PERICO RECTANGULAR PER A CANALITZACIO DESERVEIS DE 100 X 100 X 300 CM, AMB PARETS DE 14CM DE GUIX DE MAO CALAT DE 10 X 14 X 29 CMARREBOSSADES PER DINS AMB MORTER DE CIMENT1:2:10 ELABORAT A L'OBRA AMB FORMIGONERA DE165L,

FDK3U06A Rend.: 1,000P- 198

Unitats Preu Parcial Import€Mà d'obra:

192,19260/R 21,990008,740A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

167,42624/R 18,390009,1042A0140000 =xMANOBREH

Subtotal... 359,61884 359,61884Materials:

48,8796058,190000,840B0604220 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

63,000000,20000315,000B0F1D2A1 =xMAÓ CALAT, DE 29X14X10 CM, PER A REVESTIRU

31,98244106,608120,300D070A4D1 =xMORTER MIXT DE CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 200 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:2:10, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

M3

Subtotal... 143,86204 143,86204Altres:

% 3,59619359,619001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 3,59619 3,59619

COST DIRECTE 507,07707

0,00%DESPESES INDIRECTES

507,07707COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 114

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€28,54U BASTIMENT I TAPA PER A PERICÓ DE SERVEIS DEFOSA GRISA DE 420X420X40 MM I DE 25 KG DE PES,COL·LOCAT AMB MORTER MIXT 1:2:10, ELABORAT AL'OBRA AMB FORMIGONERA DE 165 L

FDKZ3155 Rend.: 1,000P- 199

Unitats Preu Parcial Import€Mà d'obra:

7,69650/R 21,990000,350A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

6,43650/R 18,390000,350A0140000 =xMANOBREH

Subtotal... 14,13300 14,13300Materials:

12,1300012,130001,000BDKZ3150 =xBASTIMENT I TAPA PER A PERICÓ DE SERVEIS DEFOSA GRISA DE 420X420X40 MM I DE 25 KG DE PES

U

2,13216106,608120,020D070A4D1 =xMORTER MIXT DE CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 200 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:2:10, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

M3

Subtotal... 14,26216 14,26216Altres:

% 0,1413314,133001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,14133 0,14133

COST DIRECTE 28,53649

0,00%DESPESES INDIRECTES

28,53649COST EXECUCIÓ MATERIAL

€32,61U BASTIMENT I TAPA PER A PERICÓ DE SERVEIS DEFOSA GRISA DE 450X450X40 MM I DE 25 KG DE PES,COL·LOCAT AMB MORTER MIXT 1:2:10, ELABORAT AL'OBRA AMB FORMIGONERA DE 165 L

FDKZ3156 Rend.: 1,000P- 200

Unitats Preu Parcial Import€Mà d'obra:

9,89550/R 21,990000,450A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

8,27550/R 18,390000,450A0140000 =xMANOBREH

Subtotal... 18,17100 18,17100Materials:

12,1300012,130001,000BDKZ3150 =xBASTIMENT I TAPA PER A PERICÓ DE SERVEIS DEFOSA GRISA DE 420X420X40 MM I DE 25 KG DE PES

U

2,13216106,608120,020D070A4D1 =xMORTER MIXT DE CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 200 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:2:10, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

M3

Subtotal... 14,26216 14,26216Altres:

% 0,1817118,171001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,18171 0,18171

Page 72: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 115

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 32,61487

0,00%DESPESES INDIRECTES

32,61487COST EXECUCIÓ MATERIAL

€57,25U BASTIMENT I TAPA PER A PERICÓ DE SERVEIS DEFOSA GRISA DE 620X620X50 MM I DE 52 KG DE PES,COL·LOCAT AMB MORTER MIXT 1:2:10, ELABORAT AL'OBRA AMB FORMIGONERA DE 165 L

FDKZ3175 Rend.: 1,000P- 201

Unitats Preu Parcial Import€Mà d'obra:

9,89550/R 21,990000,450A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

8,27550/R 18,390000,450A0140000 =xMANOBREH

Subtotal... 18,17100 18,17100Materials:

35,7000035,700001,000BDKZ3170 =xBASTIMENT I TAPA PER A PERICÓ DE SERVEIS DEFOSA GRISA DE 620X620X50 MM I DE 52 KG DE PES

U

3,19824106,608120,030D070A4D1 =xMORTER MIXT DE CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L, CALÇ I SORRA DE PEDRAGRANÍTICA AMB 200 KG/M3 DE CIMENT, AMB UNAPROPORCIÓ EN VOLUM 1:2:10, ELABORAT A L'OBRAAMB FORMIGONERA DE 165 L

M3

Subtotal... 38,89824 38,89824Altres:

% 0,1817118,171001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,18171 0,18171

COST DIRECTE 57,25095

0,00%DESPESES INDIRECTES

57,25095COST EXECUCIÓ MATERIAL

€13,50U VERIFICACIO, POSTA EN SERVEI I CONTROL DE PUNTDE LLUM INSTAL·LAT I FITXA INFORMATICA

FE100A01 Rend.: 1,000P- 202

€12,04U ANELLA PER DEGOTEIG TIPUS TEC-LINE AMB TUB DEPOLIETILE DE 16 MM DE DIAMETRE NOMINAL, AMBGOTEJADORS CADA 30 CM. SEGONS UNE 53-131-90,CONNECTAT A XARXA DE REG, AMB GRAU DEDIFICULTAT MITJA I PER A COL.LOCAR SOTERRAT.INCLOU L'EXCAVACIÓ MANUAL.

FFB00001 Rend.: 0,441P- 203

Unitats Preu Parcial Import€Mà d'obra:

4,64626/R 20,490000,100A012M000 =xOFICIAL 1A MUNTADORH

3,99320/R 17,610000,100A013M000 =xAJUDANT MUNTADORH

Subtotal... 8,63946 8,63946Materials:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 116

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU2,360001,180002,000BFB26001 =xTUB DE POLIETILE 16 MM TIPUS TEC-LINE, AMB

GOTEIJADORS C/. 30 CMM

0,987003,290000,300BFWB2605 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 32 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

U

0,050000,050001,000BFYB2605 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 32MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

U

Subtotal... 3,39700 3,39700

COST DIRECTE 12,03646

0,00%DESPESES INDIRECTES

12,03646COST EXECUCIÓ MATERIAL

€7,86M SUMMINISTRE I MUNTATGE DE CANONADA PEAD DEXT32 MM I PN 10 COL.LOCAT AL FONS DE LA RASA ICONNEXIÓ A FUTURCOMPTADOR.

FFB16455 Rend.: 1,000P- 204

Unitats Preu Parcial Import€Mà d'obra:

3,27840/R 20,490000,160A012M000 =xOFICIAL 1A MUNTADORH

2,81760/R 17,610000,160A013M000 =xAJUDANT MUNTADORH

Subtotal... 6,09600 6,09600Materials:

0,663000,650001,020BFB16400 =xTUB DE POLIETILÈ DE DENSITAT ALTA, DE 32 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINALSEGONS UNE 53131

M

0,987003,290000,300BFWB1605 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 32 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

U

0,020000,020001,000BFYB1605 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 32MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

U

Subtotal... 1,67000 1,67000Altres:

% 0,091446,096001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,09144 0,09144

COST DIRECTE 7,85744

0,00%DESPESES INDIRECTES

7,85744COST EXECUCIÓ MATERIAL

Page 73: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 117

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€19,56M TUB DE POLIETILÈ DE DESIGNACIÓ PE 100, DE 63 MMDE DIÀMETRE NOMINAL, DE 16 BAR DE PRESSIÓNOMINAL, SÈRIE SDR 11, UNE-EN 12201-2, SOLDAT,AMB GRAU DE DIFICULTAT MITJÀ I COL.LOCAT AL FONSDE LA RASA

FFB19625 Rend.: 1,000P- 205

Unitats Preu Parcial Import€Mà d'obra:

4,50780/R 20,490000,220A012M000 =xOFICIAL 1A MUNTADORH

3,87420/R 17,610000,220A013M000 =xAJUDANT MUNTADORH

Subtotal... 8,38200 8,38200Materials:

2,601002,550001,020BFB19600 =xTUB DE POLIETILÈ DE DESIGNACIÓ PE 100, DE 63 MMDE DIÀMETRE NOMINAL, DE 16 BAR DE PRESSIÓNOMINAL, SÈRIE SDR 11, SEGONS LA NORMA UNE-EN12201-2

M

8,1720027,240000,300BFWB1962 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 63 MM DE DIÀMETRE NOMINAL EXTERIOR, 16BAR DE PRESSIÓ NOMINAL, PER A SOLDAR

U

0,280000,280001,000BFYB1962 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 63MM DE DIÀMETRE NOMINAL EXTERIOR, DE 16 BAR DEPRESSIÓ NOMINAL, SOLDAT

U

Subtotal... 11,05300 11,05300Altres:

% 0,125738,382001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,12573 0,12573

COST DIRECTE 19,56073

0,00%DESPESES INDIRECTES

19,56073COST EXECUCIÓ MATERIAL

€20,05M TUB DE POLIETILÈ DE DESIGNACIÓ PE 100, DE 75 MMDE DIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓNOMINAL, SÈRIE SDR 17, UNE-EN 12201-2, SOLDAT,AMB GRAU DE DIFICULTAT MITJÀ I COL.LOCAT AL FONSDE LA RASA

FFB1A425 Rend.: 1,000P- 206

Unitats Preu Parcial Import€Mà d'obra:

4,30290/R 20,490000,210A012M000 =xOFICIAL 1A MUNTADORH

3,69810/R 17,610000,210A013M000 =xAJUDANT MUNTADORH

Subtotal... 8,00100 8,00100Materials:

2,509202,460001,020BFB1A400 =xTUB DE POLIETILÈ DE DESIGNACIÓ PE 100, DE 75 MMDE DIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓNOMINAL, SÈRIE SDR 17, SEGONS LA NORMA UNE-EN12201-2

M

9,1500030,500000,300BFWB1A42 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 75 MM DE DIÀMETRE NOMINAL EXTERIOR, 10BAR DE PRESSIÓ NOMINAL, PER A SOLDAR

U

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 118

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU0,270000,270001,000BFYB1A42 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGE

PER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 75MM DE DIÀMETRE NOMINAL EXTERIOR, DE 10 BAR DEPRESSIÓ NOMINAL, SOLDAT

U

Subtotal... 11,92920 11,92920Altres:

% 0,120028,001331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,12002 0,12002

COST DIRECTE 20,05022

0,00%DESPESES INDIRECTES

20,05022COST EXECUCIÓ MATERIAL

€0,06M SUBMINISTRE I COL.LOCACIÓ DE BANDASENYALITZADORA DE LINIA DE GAS CANALITZAT

FFB1E288 Rend.: 1,000P- 207

€33,27M TUB DE POLIETILÈ DE DESIGNACIÓ PE 100, DE 110 MMDE DIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓNOMINAL, SÈRIE SDR 17, UNE-EN 12201-2, SOLDAT,AMB GRAU DE DIFICULTAT MITJÀ I COL.LOCAT AL FONSDE LA RASA

FFB1E425 Rend.: 1,000P- 208

Unitats Preu Parcial Import€Mà d'obra:

6,35190/R 20,490000,310A012M000 =xOFICIAL 1A MUNTADORH

5,45910/R 17,610000,310A013M000 =xAJUDANT MUNTADORH

Subtotal... 11,81100 11,81100Materials:

7,466407,320001,020BFB1E400 =xTUB DE POLIETILÈ DE DENSITAT ALTA, DE 110 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINALSEGONS UNE 53131

M

13,3350044,450000,300BFWB1E42 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 250 MM DE DIÀMETRE NOMINAL EXTERIOR, 10BAR DE PRESSIÓ NOMINAL, PER A SOLDAR

U

0,480000,480001,000BFYB1E42 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 250MM DE DIÀMETRE NOMINAL EXTERIOR, DE 10 BAR DEPRESSIÓ NOMINAL, SOLDAT

U

Subtotal... 21,28140 21,28140Altres:

% 0,1771711,811331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,17717 0,17717

COST DIRECTE 33,26957

0,00%DESPESES INDIRECTES

33,26957COST EXECUCIÓ MATERIAL

Page 74: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 119

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€25,08M SUBMINISTRAMENT I COL.LOCACIÓ DE TUB DEPOLIETILÈ DE DENSITAT ALTA PE 100, DE 160 MM DEDIÀMETRE NOMINAL EXTERIOR, 10 BAR DE PRESSIÓNOMINAL, SEGONS NORMA UNE EN 12201, SOLDAT,INCLOU PART PROPORCIONAL DE PECES ESPECIALSPEL MUNTATGE, ACCESSORIS (COLZES, T DEDERIVACIÓ) PER A CANVIS DE DIRECCIÓ EN PLANTAELECTROSOLDADURA I COL.LOCAT AL FONS DE LARASA

FFB1E529 Rend.: 1,000P- 209

Unitats Preu Parcial Import€Mà d'obra:

4,09800/R 20,490000,200A012M000 =xOFICIAL 1A MUNTADORH

3,52200/R 17,610000,200A013M000 =xAJUDANT MUNTADORH

Subtotal... 7,62000 7,62000Materials:

12,4200012,420001,000BFB1UB16 =xCANONADA PEAD DEXT 160I ESPESSOR DE 9,5 MM I PN10

M

4,4450044,450000,100BFWB1E42 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATALTA, DE 250 MM DE DIÀMETRE NOMINAL EXTERIOR, 10BAR DE PRESSIÓ NOMINAL, PER A SOLDAR

U

0,480000,480001,000BFYB1E42 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT ALTA, DE 250MM DE DIÀMETRE NOMINAL EXTERIOR, DE 10 BAR DEPRESSIÓ NOMINAL, SOLDAT

U

Subtotal... 17,34500 17,34500Altres:

% 0,114307,620001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,11430 0,11430

COST DIRECTE 25,07930

0,00%DESPESES INDIRECTES

25,07930COST EXECUCIÓ MATERIAL

€39,80M SUBMINISTRAMENT I COL.LOCACIÓ DE TUB CAMPANADE FORMIGÓ ARMAT AMB JUNT ELASTIC DN300,TOTALMENT INSTAL.LAT I PROVAT. FABRICAT SEGONSNORMA ASTM C-76 M CLASE IV.

FFB1E628 Rend.: 1,000P- 210

€2,71M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 16 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 7,4, UNE-EN 12201-2, CONNECTAT APRESSIÓ, AMB GRAU DE DIFICULTAT MIG I COL.LOCATAL FONS DE LA RASA. INCLOU L'EXCAVACIÓ MANUALDE RASES

FFB23455 Rend.: 1,000P- 211

Unitats Preu Parcial Import€Mà d'obra:

1,22940/R 20,490000,060A012M000 =xOFICIAL 1A MUNTADORH

1,05660/R 17,610000,060A013M000 =xAJUDANT MUNTADORH

Subtotal... 2,28600 2,28600

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 120

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMaterials:

0,173400,170001,020BFB23400 =xTUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 16 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 7,4, SEGONS LA NORMA UNE-EN 12201-2

M

0,194000,970000,200BFWB2305 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 16 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

U

0,020000,020001,000BFYB2305 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 16MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

U

Subtotal... 0,38740 0,38740Altres:

% 0,034292,286001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,03429 0,03429

COST DIRECTE 2,70769

0,00%DESPESES INDIRECTES

2,70769COST EXECUCIÓ MATERIAL

€3,09M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 16 MM DEDIÀMETRE NOMINAL AUTOCOMPENSABLES, DE 10 BARDE PRESSIÓ NOMINAL, SÈRIE SDR 7,4, UNE-EN 12201-2,PER A UN CABAL DE 2,3 L/H, AMB UNA SEPARACIÓENTRE GOTEJADORS DE 30 CM,CONNECTAT APRESSIÓ, AMB GRAU DE DIFICULTAT MIG I COL.LOCATAL FONS DE LA RASA. INCLOU L'EXCAVACIÓ MANUALDE RASES

FFB2345B Rend.: 1,000P- 212

Unitats Preu Parcial Import€Mà d'obra:

1,43430/R 20,490000,070A012M000 =xOFICIAL 1A MUNTADORH

1,23270/R 17,610000,070A013M000 =xAJUDANT MUNTADORH

Subtotal... 2,66700 2,66700Materials:

0,173400,170001,020BFB23400 =xTUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 16 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 7,4, SEGONS LA NORMA UNE-EN 12201-2

M

0,194000,970000,200BFWB2305 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 16 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

U

0,020000,020001,000BFYB2305 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 16MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

U

Subtotal... 0,38740 0,38740Altres:

% 0,040012,667331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,04001 0,04001

Page 75: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 121

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 3,09441

0,00%DESPESES INDIRECTES

3,09441COST EXECUCIÓ MATERIAL

€3,17M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 25 MM DEDIÀMETRE NOMINAL, DE 6 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 11, UNE-EN 12201-2, CONNECTAT APRESSIÓ, AMB GRAU DE DIFICULTAT MIG I COL.LOCATAL FONS DE LA RASA

FFB25355 Rend.: 1,000P- 213

Unitats Preu Parcial Import€Mà d'obra:

1,22940/R 20,490000,060A012M000 =xOFICIAL 1A MUNTADORH

1,05660/R 17,610000,060A013M000 =xAJUDANT MUNTADORH

Subtotal... 2,28600 2,28600Materials:

0,255000,250001,020BFB25300 =xTUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 25 MM DEDIÀMETRE NOMINAL, DE 6 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 11, SEGONS LA NORMA UNE-EN 12201-2

M

0,552001,840000,300BFWB2505 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 25 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

U

0,040000,040001,000BFYB2505 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 25MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

U

Subtotal... 0,84700 0,84700Altres:

% 0,034292,286001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,03429 0,03429

COST DIRECTE 3,16729

0,00%DESPESES INDIRECTES

3,16729COST EXECUCIÓ MATERIAL

€4,14M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 32 MM DEDIÀMETRE NOMINAL, DE 6 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 11, UNE-EN 12201-2, CONNECTAT APRESSIÓ, AMB GRAU DE DIFICULTAT MIG I COL.LOCATAL FONS DE LA RASA

FFB26355 Rend.: 1,000P- 214

Unitats Preu Parcial Import€Mà d'obra:

1,43430/R 20,490000,070A012M000 =xOFICIAL 1A MUNTADORH

1,23270/R 17,610000,070A013M000 =xAJUDANT MUNTADORH

Subtotal... 2,66700 2,66700Materials:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 122

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU0,397800,390001,020BFB26300 =xTUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 32 MM DE

DIÀMETRE NOMINAL, DE 6 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 11, SEGONS LA NORMA UNE-EN 12201-2

M

0,987003,290000,300BFWB2605 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 32 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

U

0,050000,050001,000BFYB2605 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 32MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

U

Subtotal... 1,43480 1,43480Altres:

% 0,040012,667331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,04001 0,04001

COST DIRECTE 4,14181

0,00%DESPESES INDIRECTES

4,14181COST EXECUCIÓ MATERIAL

€5,33M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 40 MM DEDIÀMETRE NOMINAL, DE 6 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 11, UNE-EN 12201-2, CONNECTAT APRESSIÓ, AMB GRAU DE DIFICULTAT MIG I COL.LOCATAL FONS DE LA RASA

FFB27355 Rend.: 1,000P- 215

Unitats Preu Parcial Import€Mà d'obra:

1,63920/R 20,490000,080A012M000 =xOFICIAL 1A MUNTADORH

1,40880/R 17,610000,080A013M000 =xAJUDANT MUNTADORH

Subtotal... 3,04800 3,04800Materials:

0,622200,610001,020BFB27300 =xTUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 40 MM DEDIÀMETRE NOMINAL, DE 6 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 11, SEGONS LA NORMA UNE-EN 12201-2

M

1,530005,100000,300BFWB2705 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 40 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

U

0,080000,080001,000BFYB2705 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 40MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

U

Subtotal... 2,23220 2,23220Altres:

% 0,045723,048001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,04572 0,04572

COST DIRECTE 5,32592

0,00%DESPESES INDIRECTES

Page 76: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 123

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

5,32592COST EXECUCIÓ MATERIAL

€6,32M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 50 MM DEDIÀMETRE NOMINAL, DE 6 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 11, UNE-EN 12201-2, CONNECTAT APRESSIÓ, AMB GRAU DE DIFICULTAT MIG I COL.LOCATAL FONS DE LA RASA

FFB28355 Rend.: 1,000P- 216

Unitats Preu Parcial Import€Mà d'obra:

1,84410/R 20,490000,090A012M000 =xOFICIAL 1A MUNTADORH

1,58490/R 17,610000,090A013M000 =xAJUDANT MUNTADORH

Subtotal... 3,42900 3,42900Materials:

0,969000,950001,020BFB28300 =xTUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 50 MM DEDIÀMETRE NOMINAL, DE 6 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 11, SEGONS LA NORMA UNE-EN 12201-2

M

1,668005,560000,300BFWB2805 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 50 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

U

0,200000,200001,000BFYB2805 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 50MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

U

Subtotal... 2,83700 2,83700Altres:

% 0,051443,429331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,05144 0,05144

COST DIRECTE 6,31744

0,00%DESPESES INDIRECTES

6,31744COST EXECUCIÓ MATERIAL

€7,90M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 50 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 7,4, UNE-EN 12201-2, CONNECTAT APRESSIÓ, AMB GRAU DE DIFICULTAT MIG I COL.LOCATAL FONS DE LA RASA

FFB28455 Rend.: 1,000P- 217

Unitats Preu Parcial Import€Mà d'obra:

1,84410/R 20,490000,090A012M000 =xOFICIAL 1A MUNTADORH

1,58490/R 17,610000,090A013M000 =xAJUDANT MUNTADORH

Subtotal... 3,42900 3,42900Materials:

2,550002,500001,020BFB28400 =xTUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 50 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 7,4, SEGONS LA NORMA UNE-EN 12201-2

M

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 124

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU1,668005,560000,300BFWB2805 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITAT

BAIXA, DE 50 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

U

0,200000,200001,000BFYB2805 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 50MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

U

Subtotal... 4,41800 4,41800Altres:

% 0,051443,429331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,05144 0,05144

COST DIRECTE 7,89844

0,00%DESPESES INDIRECTES

7,89844COST EXECUCIÓ MATERIAL

€11,33M TUB DE POLIETILÈ DE DESIGNACIÓ PE 40, DE 63 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINAL,SÈRIE SDR 7,4, UNE-EN 12201-2, CONNECTAT APRESSIÓ, AMB GRAU DE DIFICULTAT MIG I COL.LOCATAL FONS DE LA RASA

FFB29455 Rend.: 1,000P- 218

Unitats Preu Parcial Import€Mà d'obra:

2,04900/R 20,490000,100A012M000 =xOFICIAL 1A MUNTADORH

1,76100/R 17,610000,100A013M000 =xAJUDANT MUNTADORH

Subtotal... 3,81000 3,81000Materials:

4,080004,000001,020BFB29400 =xTUB DE POLIETILÈ DE DENSITAT BAIXA, DE 63 MM DEDIÀMETRE NOMINAL, DE 10 BAR DE PRESSIÓ NOMINALSEGONS UNE 53131

M

3,1920010,640000,300BFWB2905 =xACCESSORI PER A TUBS DE POLIETILÈ DE DENSITATBAIXA, DE 63 MM DE DIÀMETRE NOMINAL EXTERIOR,PER A CONNECTAR A PRESSIÓ

U

0,190000,190001,000BFYB2905 =xPART PROPORCIONAL D'ELEMENTS DE MUNTATGEPER A TUBS DE POLIETILÈ DE DENSITAT BAIXA, DE 63MM DE DIÀMETRE NOMINAL EXTERIOR, CONNECTAT APRESSIÓ

U

Subtotal... 7,46200 7,46200Altres:

% 0,057153,810001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,05715 0,05715

COST DIRECTE 11,32915

0,00%DESPESES INDIRECTES

11,32915COST EXECUCIÓ MATERIAL

Page 77: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 125

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€165,00u SUBMINISTRE I MUNTATGE DE BOCA DE REGCOMPACTA, AMB RACORD BARCELONA DE 45 MM,INCLÒS CONNEXIONAT I FIXACIÓ, TOTALMENT ACABATSEGONS COMPANYIA

FFB2REG1 Rend.: 1,000P- 219

€36,83U DERIVACIO MANIPULADA DE POLIETILE DE DENSITATALTA DE 110 MM DE DN I 10 BAR DE PRESSIO NOMINAL,SEGONS UNE 53-131-90, AMB RAMAL A 90º DE 90 MMDE DN, SOLDADA I COL.LOCADA AL FONS DE LA RASA

FFBA1534 Rend.: 1,000P- 220

Unitats Preu Parcial Import€Mà d'obra:

8,60580/R 20,490000,420A012M000 =xOFICIAL 1A MUNTADORH

7,39620/R 17,610000,420A013M000 =xAJUDANT MUNTADORH

Subtotal... 16,00200 16,00200Materials:

20,6700020,670001,000BFBA1534 =xDERIVACIÓ MANIPULADA DE POLIETILÈ DE DENSITATALTA DE 110 MM DE DN I 10 BAR DE PRESSIÓ NOMINAL,SEGONS UNE-EN 12201-3 AMB RAMAL A 90° DE 90 MMDE DN, PER A SOLDAR

U

Subtotal... 20,67000 20,67000Altres:

% 0,1600216,002001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,16002 0,16002

COST DIRECTE 36,83202

0,00%DESPESES INDIRECTES

36,83202COST EXECUCIÓ MATERIAL

€45,58U COLLARÍ DE POLIETILÈ DE 160-1.1/4''FFBAC078 Rend.: 1,000P- 221

€23,96U CON DE REDUCCIO, MANIPULAT, DE POLIETILE DEDENSITAT ALTA DE 75 MM DE DN A 63 MM DE DN DE 1OBAR DE PRESSIO NOMINAL, SEGONS UNE 53-131-90,SOLDAT I COL.LOCAT AL FONS DE LA RASA

FFBC1323 Rend.: 1,000P- 222

Unitats Preu Parcial Import€Mà d'obra:

4,50780/R 20,490000,220A012M000 =xOFICIAL 1A MUNTADORH

3,87420/R 17,610000,220A013M000 =xAJUDANT MUNTADORH

Subtotal... 8,38200 8,38200Materials:

15,4900015,490001,000BFBC1323 =xCON DE REDUCCIÓ, MANIPULAT, DE POLIETILÈ DEDENSITAT ALTA DE 75 MM A 63 MM DE DN DE 10 BARDE PRESSIÓ NOMINAL, SEGONS UNE-EN 12201-3, PERA SOLDAR

U

Subtotal... 15,49000 15,49000Altres:

% 0,083828,382001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 126

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 0,08382 0,08382

COST DIRECTE 23,95582

0,00%DESPESES INDIRECTES

23,95582COST EXECUCIÓ MATERIAL

€29,00U CON DE REDUCCIO, MANIPULAT, DE POLIETILE DEDENSITAT ALTA DE 90 MM DE DN A 75 MM DE DN DE 1OBAR DE PRESSIO NOMINAL, SEGONS UNE 53-131-90,SOLDAT I COL.LOCAT AL FONS DE LA RASA

FFBC1433 Rend.: 1,000P- 223

Unitats Preu Parcial Import€Mà d'obra:

5,96259/R 20,490000,291A012M000 =xOFICIAL 1A MUNTADORH

5,12451/R 17,610000,291A013M000 =xAJUDANT MUNTADORH

Subtotal... 11,08710 11,08710Materials:

17,8000017,800001,000BFBC1433 =xCON DE REDUCCIÓ, MANIPULAT, DE POLIETILÈ DEDENSITAT ALTA DE 90 MM A 75 MM DE DN DE 10 BARDE PRESSIÓ NOMINAL, SEGONS UNE-EN 12201-3, PERA SOLDAR

U

Subtotal... 17,80000 17,80000Altres:

% 0,1108711,087001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,11087 0,11087

COST DIRECTE 28,99797

0,00%DESPESES INDIRECTES

28,99797COST EXECUCIÓ MATERIAL

€35,93U CON DE REDUCCIO, MANIPULAT, DE POLIETILE DEDENSITAT ALTA DE 110 MM DE DN A 90 MM DE DN DE1O BAR DE PRESSIO NOMINAL, SEGONS UNE 53-131-90,SOLDAT I COL.LOCAT AL FONS DE LA RASA

FFBC1543 Rend.: 1,000P- 224

Unitats Preu Parcial Import€Mà d'obra:

7,90914/R 20,490000,386A012M000 =xOFICIAL 1A MUNTADORH

6,79746/R 17,610000,386A013M000 =xAJUDANT MUNTADORH

Subtotal... 14,70660 14,70660Materials:

21,0800021,080001,000BFBC1543 =xCON DE REDUCCIÓ, MANIPULAT, DE POLIETILÈ DEDENSITAT ALTA DE 110 MM A 90 MM DE DN DE 10 BARDE PRESSIÓ NOMINAL, SEGONS UNE-EN 12201-3, PERA SOLDAR

U

Subtotal... 21,08000 21,08000Altres:

Page 78: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 127

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU% 0,1470714,707001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,14707 0,14707

COST DIRECTE 35,93367

0,00%DESPESES INDIRECTES

35,93367COST EXECUCIÓ MATERIAL

€80,24U SUBMINISTRE I MUNTATGE DE CAIXA DESECCIONAMENT ES Q. 9/250 A LSBT, SEGONS NORMACOMPANYIA.

FG121503 Rend.: 1,000P- 225

€115,64U SUBMINISTRE I MUNTATGE DE CAIXA DEDISTRIBUCIÓNURBANA (CDU), PROTEGIDA FINS A 400A I DOBLE SORTIDA TRIFÀSICA A ABONAT, SEGONSNORMA COMAPNYIA

FG121D03 Rend.: 1,000P- 226

€2,75U CONNEXIÓ ESTANCA TIPUS TORPEDO PERCONDUCTORS DE 1.5MM2. INCLOU TOTES LES PECESNECESSARIES PER DEIXAR LA CONNEXIÓ ESTANCAACABADA..

FG12C0AB Rend.: 1,000P- 227

€2,89U CONNEXIÓ ESTANCA TIPUS TORPEDO PERCONDUCTORS DE 2.5MM2. INCLOU TOTES LES PECESNECESSARIES PER DEIXAR LA CONNEXIÓ ESTANCAACABADA..

FG12C0AC Rend.: 1,000P- 228

€410,74U SUBMINISTRE I MUNTATGE D'ARMARI PREFABRICATDE FORMIGÓ MONOBLOC, AMB PORTA METÀL·LICAPER A CAIXA DE DISTRIBUCIÓ EN URBANITZACIONSAMB TANCAMENT TRIANGULAR.

FG1AF001 Rend.: 1,000P- 229

€355,19U SUBMINISTRE I MUNTATGE D'ARMARI PREFABRICATDE FORMIGÓ , AMB PORTA METÀL·LICA PER A CAIXADE SECCIONAMENT I CAIXA G DE PROTECCIÓ, AMBTANCAMENT TRIANGULAR

FG1AF002 Rend.: 1,000P- 230

€1,46M TUB CORBABLE CORRUGAT DE PVC, DE 40 MM DEDIÀMETRE NOMINAL, AÏLLANT I NO PROPAGADOR DELA FLAMA, RESISTÈNCIA A L'IMPACTE DE 3 J,RESISTÈNCIA A COMPRESSIÓ DE 250 N, MUNTAT COMA CANALITZACIÓ SOTERRADA

FG22RBAK Rend.: 1,000P- 231

Unitats Preu Parcial Import€Mà d'obra:

0,51225/R 20,490000,025A012H000 =xOFICIAL 1A ELECTRICISTAH

0,35160/R 17,580000,020A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 0,86385 0,86385Materials:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 128

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU0,581400,570001,020BG22RB10 =xTUB CORBABLE CORRUGAT DE PVC, DE 50 MM DE

DIÀMETRE NOMINAL, AÏLLANT I NO PROPAGADOR DELA FLAMA, RESISTÈNCIA A L'IMPACTE DE 3 J,RESISTÈNCIA A COMPRESSIÓ DE 250 N, PER ACANALITZACIONS SOTERRADES

M

Subtotal... 0,58140 0,58140Altres:

% 0,012960,864001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,01296 0,01296

COST DIRECTE 1,45821

0,00%DESPESES INDIRECTES

1,45821COST EXECUCIÓ MATERIAL

€2,24M TUB CORBABLE CORRUGAT DE PVC, DE 63 MM DEDIÀMETRE NOMINAL, AÏLLANT I NO PROPAGADOR DELA FLAMA, RESISTÈNCIA A L'IMPACTE DE 6 J,RESISTÈNCIA A COMPRESSIÓ DE 250 N, MUNTAT COMA CANALITZACIÓ SOTERRADA

FG22RGAK Rend.: 1,000P- 232

Unitats Preu Parcial Import€Mà d'obra:

0,67617/R 20,490000,033A012H000 =xOFICIAL 1A ELECTRICISTAH

0,35160/R 17,580000,020A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 1,02777 1,02777Materials:

1,193401,170001,020BG22RG10 =xTUB CORBABLE CORRUGAT DE PVC, DE 80 MM DEDIÀMETRE NOMINAL, AÏLLANT I NO PROPAGADOR DELA FLAMA, RESISTÈNCIA A L'IMPACTE DE 6 J,RESISTÈNCIA A COMPRESSIÓ DE 250 N, PER ACANALITZACIONS SOTERRADES

M

Subtotal... 1,19340 1,19340Altres:

% 0,015421,028001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,01542 0,01542

COST DIRECTE 2,23659

0,00%DESPESES INDIRECTES

2,23659COST EXECUCIÓ MATERIAL

€3,26M TUB CORBABLE CORRUGAT DE PVC, DE 90 MM DEDIÀMETRE NOMINAL, AÏLLANT I NO PROPAGADOR DELA FLAMA, RESISTÈNCIA A L'IMPACTE DE 12 J,RESISTÈNCIA A COMPRESSIÓ DE 250 N, MUNTAT COMA CANALITZACIÓ SOTERRADA

FG22RJ3K Rend.: 1,000P- 233

Unitats Preu Parcial Import€Mà d'obra:

Page 79: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 129

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU0,81960/R 20,490000,040A012H000 =xOFICIAL 1A ELECTRICISTAH

0,70320/R 17,580000,040A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 1,52280 1,52280Materials:

1,713601,680001,020BG22RJ10 =xTUB CORBABLE CORRUGAT DE PVC, DE 100 MM DEDIÀMETRE NOMINAL, AÏLLANT I NO PROPAGADOR DELA FLAMA, RESISTÈNCIA A L'IMPACTE DE 12 J,RESISTÈNCIA A COMPRESSIÓ DE 250 N, PER ACANALITZACIONS SOTERRADES

M

Subtotal... 1,71360 1,71360Altres:

% 0,022841,522671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,02284 0,02284

COST DIRECTE 3,25924

0,00%DESPESES INDIRECTES

3,25924COST EXECUCIÓ MATERIAL

€4,52M TUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 160 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA, RESISTÈNCIA AL'IMPACTE DE 40 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, MUNTAT COM A CANALITZACIÓ SOTERRADA

FG22TP1K Rend.: 1,000P- 234

Unitats Preu Parcial Import€Mà d'obra:

0,86058/R 20,490000,042A012H000 =xOFICIAL 1A ELECTRICISTAH

0,35160/R 17,580000,020A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 1,21218 1,21218Materials:

3,304803,240001,020BG22TP10 =xTUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 160 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 40 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

M

Subtotal... 3,30480 3,30480

COST DIRECTE 4,51698

0,00%DESPESES INDIRECTES

4,51698COST EXECUCIÓ MATERIAL

€0,49M SENYALITZACIÓ DE LES LÍNIES AMB PLACA DE PPCFG2B1112 Rend.: 1,000P- 235

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 130

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€0,35M SUBMINISTRE I COL.LOCACIÓ DE BANDA DESENYALITZACIÓ

FG2B1113 Rend.: 1,000P- 236

€0,91M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, UNIPOLAR DE SECCIÓ 1X2,5 MM2, COL.LOCATEN TUB

FG311306 Rend.: 1,000P- 237

Unitats Preu Parcial Import€Mà d'obra:

0,30735/R 20,490000,015A012H000 =xOFICIAL 1A ELECTRICISTAH

0,26370/R 17,580000,015A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 0,57105 0,57105Materials:

0,326400,320001,020BG311300 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, UNIPOLAR DE SECCIÓ 1X2,5 MM2

M

Subtotal... 0,32640 0,32640Altres:

% 0,008570,571331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00857 0,00857

COST DIRECTE 0,90602

0,00%DESPESES INDIRECTES

0,90602COST EXECUCIÓ MATERIAL

€1,03M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, BIPOLAR DE SECCIÓ 2X1,5 MM2, COL.LOCATEN TUB

FG312206 Rend.: 1,000P- 238

Unitats Preu Parcial Import€Mà d'obra:

0,30735/R 20,490000,015A012H000 =xOFICIAL 1A ELECTRICISTAH

0,26370/R 17,580000,015A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 0,57105 0,57105Materials:

0,448800,440001,020BG312200 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, BIPOLAR DE SECCIÓ 2X1,5 MM2

M

Subtotal... 0,44880 0,44880Altres:

% 0,005710,571001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00571 0,00571

COST DIRECTE 1,02556

0,00%DESPESES INDIRECTES

1,02556COST EXECUCIÓ MATERIAL

Page 80: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 131

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€0,88M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, BIPOLAR DE SECCIÓ 1X1,5 MM2, COL.LOCATEN TUB

FG31220A Rend.: 1,000P- 239

Unitats Preu Parcial Import€Mà d'obra:

0,30735/R 20,490000,015A012H000 =xOFICIAL 1A ELECTRICISTAH

0,26370/R 17,580000,015A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 0,57105 0,57105Materials:

0,308000,440000,700BG312200 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, BIPOLAR DE SECCIÓ 2X1,5 MM2

M

Subtotal... 0,30800 0,30800Altres:

% 0,005710,571001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00571 0,00571

COST DIRECTE 0,88476

0,00%DESPESES INDIRECTES

0,88476COST EXECUCIÓ MATERIAL

€1,11M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, BIPOLAR DE SECCIÓ 2X2,5 MM2, COL.LOCATEN TUB

FG312306 Rend.: 1,000P- 240

Unitats Preu Parcial Import€Mà d'obra:

0,30735/R 20,490000,015A012H000 =xOFICIAL 1A ELECTRICISTAH

0,26370/R 17,580000,015A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 0,57105 0,57105Materials:

0,530400,520001,020BG312300 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, BIPOLAR DE SECCIÓ 2X2,5 MM2

M

Subtotal... 0,53040 0,53040Altres:

% 0,008570,571331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00857 0,00857

COST DIRECTE 1,11002

0,00%DESPESES INDIRECTES

1,11002COST EXECUCIÓ MATERIAL

€1,34M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TRIPOLAR DE SECCIÓ 3X2,5 MM2, COL.LOCATEN TUB

FG313306 Rend.: 1,000P- 241

Unitats Preu Parcial Import€

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 132

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMà d'obra:

0,30735/R 20,490000,015A012H000 =xOFICIAL 1A ELECTRICISTAH

0,26370/R 17,580000,015A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 0,57105 0,57105Materials:

0,765000,750001,020BG313300 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TRIPOLAR DE SECCIÓ 3X2,5 MM2

M

Subtotal... 0,76500 0,76500Altres:

% 0,008570,571331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00857 0,00857

COST DIRECTE 1,34462

0,00%DESPESES INDIRECTES

1,34462COST EXECUCIÓ MATERIAL

€1,85M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TRIPOLAR DE SECCIÓ 5X2,5 MM2, COL.LOCATEN TUB

FG31520B Rend.: 1,000P- 242

Unitats Preu Parcial Import€Mà d'obra:

0,30735/R 20,490000,015A012H000 =xOFICIAL 1A ELECTRICISTAH

0,26370/R 17,580000,015A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 0,57105 0,57105Materials:

0,520000,520001,000BG312300 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, BIPOLAR DE SECCIÓ 2X2,5 MM2

M

0,750000,750001,000BG313300 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TRIPOLAR DE SECCIÓ 3X2,5 MM2

M

Subtotal... 1,27000 1,27000Altres:

% 0,008570,571331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00857 0,00857

COST DIRECTE 1,84962

0,00%DESPESES INDIRECTES

1,84962COST EXECUCIÓ MATERIAL

€1,71M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TRIPOLAR DE SECCIÓ 6X1,5 MM2, COL.LOCATEN TUB

FG316206 Rend.: 1,000P- 243

Unitats Preu Parcial Import€Mà d'obra:

0,32784/R 20,490000,016A012H000 =xOFICIAL 1A ELECTRICISTAH

Page 81: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 133

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU0,28128/R 17,580000,016A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 0,60912 0,60912Materials:

1,090800,540002,020BG313200 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TRIPOLAR DE SECCIÓ 3X1,5 MM2

M

Subtotal... 1,09080 1,09080Altres:

% 0,009140,609331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00914 0,00914

COST DIRECTE 1,70906

0,00%DESPESES INDIRECTES

1,70906COST EXECUCIÓ MATERIAL

€2,13M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TRIPOLAR DE SECCIÓ 6X2,5 MM2, COL.LOCATEN TUB

FG31620B Rend.: 1,000P- 244

Unitats Preu Parcial Import€Mà d'obra:

0,32784/R 20,490000,016A012H000 =xOFICIAL 1A ELECTRICISTAH

0,28128/R 17,580000,016A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 0,60912 0,60912Materials:

1,515000,750002,020BG313300 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TRIPOLAR DE SECCIÓ 3X2,5 MM2

M

Subtotal... 1,51500 1,51500Altres:

% 0,009140,609331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00914 0,00914

COST DIRECTE 2,13326

0,00%DESPESES INDIRECTES

2,13326COST EXECUCIÓ MATERIAL

€1,82M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TRIPOLAR DE SECCIÓ 7X1,5 MM2, COL.LOCATEN TUB

FG317206 Rend.: 1,000P- 245

Unitats Preu Parcial Import€Mà d'obra:

0,30735/R 20,490000,015A012H000 =xOFICIAL 1A ELECTRICISTAH

0,26370/R 17,580000,015A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 0,57105 0,57105Materials:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 134

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU0,550800,540001,020BG313200 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K

0,6/1 KV, TRIPOLAR DE SECCIÓ 3X1,5 MM2M

0,693600,680001,020BG314200 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TETRAPOLAR DE SECCIÓ 4X1,5 MM2

M

Subtotal... 1,24440 1,24440Altres:

% 0,008570,571331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00857 0,00857

COST DIRECTE 1,82402

0,00%DESPESES INDIRECTES

1,82402COST EXECUCIÓ MATERIAL

€1,95M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TETRAPOLAR DE SECCIÓ 8X1,5 MM2,COL.LOCAT EN TUB

FG318206 Rend.: 1,000P- 246

Unitats Preu Parcial Import€Mà d'obra:

0,30735/R 20,490000,015A012H000 =xOFICIAL 1A ELECTRICISTAH

0,26370/R 17,580000,015A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 0,57105 0,57105Materials:

1,373600,680002,020BG314200 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TETRAPOLAR DE SECCIÓ 4X1,5 MM2

M

Subtotal... 1,37360 1,37360Altres:

% 0,008570,571331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00857 0,00857

COST DIRECTE 1,95322

0,00%DESPESES INDIRECTES

1,95322COST EXECUCIÓ MATERIAL

€2,44M CONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, TETRAPOLAR DE SECCIÓ 10X1,5 MM2,COL.LOCAT EN TUB

FG31820B Rend.: 1,000P- 247

Unitats Preu Parcial Import€Mà d'obra:

0,32784/R 20,490000,016A012H000 =xOFICIAL 1A ELECTRICISTAH

0,28128/R 17,580000,016A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 0,60912 0,60912Materials:

0,448800,440001,020BG312200 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K0,6/1 KV, BIPOLAR DE SECCIÓ 2X1,5 MM2

M

Page 82: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 135

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU1,373600,680002,020BG314200 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K

0,6/1 KV, TETRAPOLAR DE SECCIÓ 4X1,5 MM2M

Subtotal... 1,82240 1,82240Altres:

% 0,009140,609331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00914 0,00914

COST DIRECTE 2,44066

0,00%DESPESES INDIRECTES

2,44066COST EXECUCIÓ MATERIAL

€15,29M SUBMINISTRAMENT I ESTESA DE CONDUCTORD'ALUMINI PER A LÍNIA DE BT RV 0,6 /1 KV, SECCIÓ 3 X1 X 240 - 1 X 150 MM2, INCLOSA PLACA, CINTES, SORRADE PROTECCIÓ I PART PROPORCIONAL D'EMPALMES.

FG31S001 Rend.: 1,000P- 248

€4,66M CONDUCTOR DE COURE NU, UNIPOLAR D'1X35 MM2 IMUNTAT EN MALLA DE CONNEXIO A TERRA

FG38E355 Rend.: 1,000P- 249

Unitats Preu Parcial Import€Mà d'obra:

1,63920/R 20,490000,080A012H000 =xOFICIAL 1A ELECTRICISTAH

1,40640/R 17,580000,080A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 3,04560 3,04560Materials:

1,170001,170001,000BG380900 =xCONDUCTOR DE COURE NU, UNIPOLAR DE SECCIÓ1X35 MM2

M

0,300000,300001,000BGW38000 =xPART PROPORCIONAL D'ACCESSORIS PER ACONDUCTORS DE COURE NUS

U

0,110000,110001,000BGY38000 =xPART PROPORCIONAL D'ELEMENTS ESPECIALS PER ACONDUCTORS DE COURE NUS

U

Subtotal... 1,58000 1,58000Altres:

% 0,030463,046001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,03046 0,03046

COST DIRECTE 4,65606

0,00%DESPESES INDIRECTES

4,65606COST EXECUCIÓ MATERIAL

€3,65M CONDUCTOR DE COURE DE DESIGNACIO UNE RFV0,6/1 KV, TETRAPOLAR DE 4X6 MM2 I COL.LOCAT ENTUB

FG3ME41A Rend.: 1,000P- 250

Unitats Preu Parcial Import€Mà d'obra:

0,81960/R 20,490000,040A012H000 =xOFICIAL 1A ELECTRICISTAH

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 136

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU0,70320/R 17,580000,040A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 1,52280 1,52280Materials:

2,130002,130001,000BG3ME401 =xCONDUCTOR DE COURE DE DESIGNACIO UNE RV 0,6/1KV, AMB AILLAMENT DE POLICLORUR DE VINIL (PVC),COBERTA DE POLIETILE RETICULAT (XLPE) IARMADURA LLEUGERA DE FLEIXOS D'ACER TIPUS F,DE 4 X 6 MM2

M

Subtotal... 2,13000 2,13000

COST DIRECTE 3,65280

0,00%DESPESES INDIRECTES

3,65280COST EXECUCIÓ MATERIAL

€23,09U PIQUETA DE CONNEXIÓ A TERRA D'ACER, AMBRECOBRIMENT DE COURE DE GRUIX ESTÀNDARD, DE2500 MM DE LLARGÀRIA I DE 18,3 MM DE DIÀMETRE,CLAVADA A TERRA

FGD1441E Rend.: 1,000P- 251

Unitats Preu Parcial Import€Mà d'obra:

5,45034/R 20,490000,266A012H000 =xOFICIAL 1A ELECTRICISTAH

4,67628/R 17,580000,266A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 10,12662 10,12662Materials:

9,030009,030001,000BGD14410 =xPIQUETA DE CONNEXIÓ A TERRA D'ACER IRECOBRIMENT DE COURE, DE 2500 MM DE LLARGÀRIA,DE 18,3 MM DE DIÀMETRE, ESTÀNDARD

U

3,780003,780001,000BGYD1000 =xPart proporcional d'elements especials per a piquetes deconnexió a terra

u

Subtotal... 12,81000 12,81000Altres:

% 0,1519010,126671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,15190 0,15190

COST DIRECTE 23,08852

0,00%DESPESES INDIRECTES

23,08852COST EXECUCIÓ MATERIAL

€28,27U SUBMINISTRE I MUNTATGE DEL TERRA PER AQUADRE DE BT O CAIXA DE SECCIONAMENT, AMB UNAPIQUETA DE Ac-Cu DE 2 METRES, CABLE DE COURE NUDE 50 MM2 FINS A 5 METRES DE LONGITUD.

FGD1448E Rend.: 1,000P- 252

Unitats Preu Parcial Import€Mà d'obra:

8,19600/R 20,490000,400A012H000 =xOFICIAL 1A ELECTRICISTAH

7,03200/R 17,580000,400A013H000 =xAJUDANT ELECTRICISTAH

Page 83: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 137

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 15,22800 15,22800Materials:

9,030009,030001,000BGD14410 =xPIQUETA DE CONNEXIÓ A TERRA D'ACER IRECOBRIMENT DE COURE, DE 2500 MM DE LLARGÀRIA,DE 18,3 MM DE DIÀMETRE, ESTÀNDARD

U

3,780003,780001,000BGYD1000 =xPart proporcional d'elements especials per a piquetes deconnexió a terra

u

Subtotal... 12,81000 12,81000Altres:

% 0,2284215,228001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,22842 0,22842

COST DIRECTE 28,26642

0,00%DESPESES INDIRECTES

28,26642COST EXECUCIÓ MATERIAL

€26,35U PLACA DE CONNEXIO A TERRA DE 500 X 500 X 3 MMFGD2E011 Rend.: 1,000P- 253

Unitats Preu Parcial Import€Mà d'obra:

7,37640/R 20,490000,360A012H000 =xOFICIAL 1A ELECTRICISTAH

6,32880/R 17,580000,360A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 13,70520 13,70520Materials:

10,7800010,780001,000BGD2E010 =xPLACA PRESA DE TERRA DE 500 X 500 X 3 MMU

1,120001,120001,000BGDZE020 =xCARTUTX PER A SOLDADURA CADWELDU

0,610000,610001,000BGDZE030 =xSALS DE SULFAT DE SODI I MAGNESIU

Subtotal... 12,51000 12,51000Altres:

% 0,1370513,705001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,13705 0,13705

COST DIRECTE 26,35225

0,00%DESPESES INDIRECTES

26,35225COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 138

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€6.896,78u TRANSFORMADOR TRIFÀSIC REDUCTOR DE TENSIÓ(MT/BT) CONSTRUÏT D'ACORD AMB UNE-EN 60076 I UNE21428, DIELÈCTRIC OLI D'ACORD AMB UNE 21320, DE630 KVA DE POTÈNCIA, TENSIÓ ASSIGNADA 36 KV,TENSIÓ PRIMARI 23,1 KV, TENSIÓ DE SORTIDA DE 420 VENTRE FASES EN BUIT O DE 242/420 V ENTRE FASESEN BUIT, FREQÜÈNCIA 50 HZ, GRUP DE CONNEXIÓ DYN11, REGULACIÓ AL PRIMARI +/- 2,5%, +/- 5%,PROTECCIÓ PRÒPIA DEL TRANSFORMADOR AMBTERMÒMETRE, PER INSTAL·LACIÓ INTERIOR OEXTERIOR, CISTERNA D'ALETES, REFRIGERACIÓNATURAL (ONAN), COMMUTADOR DE REGULACIÓMANIOBRABLE SENSE TENSIÓ, PASSATAPES MT DEPORCELLANA, PASSABARRES BT DE PORCELLANA, 2TERMINALS DE TERRA, DISPOSITIU DE BUIDAT I PRESADE MOSTRES, DISPOSITIU D'OMPLIMENT, PLACA DECARACTERÍSTIQUES I PLACA DE SEGURETAT EINSTRUCCIONS DE SERVEI, COL·LOCAT

FGG11AA0 Rend.: 1,000P- 254

Unitats Preu Parcial Import€Mà d'obra:

81,96000/R 20,490004,000A012H000 =xOFICIAL 1A ELECTRICISTAH

70,32000/R 17,580004,000A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 152,28000 152,28000Maquinària:

85,60000/R 42,800002,000C150G800 =xGRUA AUTOPROPULSADA DE 12 TH

Subtotal... 85,60000 85,60000Materials:

6.658,900006.658,900001,000BGG11AA0 =xTRANSFORMADOR TRIFÀSIC REDUCTOR DE TENSIÓ(MT/BT) CONSTRUÏT D'ACORD AMB UNE-EN 60076 I UNE21428, DIELÈCTRIC OLI D'ACORD AMB UNE 21320, DE630 KVA DE POTÈNCIA, TENSIÓ ASSIGNADA 36 KV,TENSIÓ PRIMARI 23,1 KV, TENSIÓ DE SORTIDA DE 420 VENTRE FASES EN BUIT O DE 242/420 V ENTRE FASESEN BUIT, FREQÜÈNCIA 50 HZ, GRUP DE CONNEXIÓ DYN11, REGULACIÓ AL PRIMARI +/- 2,5%, +/- 5%, ,PROTECCIÓ PRÒPIA DEL TRANSFORMADOR AMBTERMÒMETRE, PER INSTAL·LACIÓ INTERIOR OEXTERIOR, CISTERNA D'ALETES, REFRIGERACIÓNATURAL (ONAN), COMMUTADOR DE REGULACIÓMANIOBRABLE SENSE TENSIÓ, PASSATAPES MT DEPORCELLANA, PASSABARRES BT DE PORCELLANA, 2TERMINALS DE TERRA, DISPOSITIU DE BUIDAT I PRESADE MOSTRES, DISPOSITIU D'OMPLIMENT, PLACA DECARACTERÍSTIQUES I PLACA DE SEGURETAT EINSTRUCCIONS DE SERVEI

u

Subtotal... 6.658,90000 6.658,90000

COST DIRECTE 6.896,78000

0,00%DESPESES INDIRECTES

6.896,78000COST EXECUCIÓ MATERIAL

Page 84: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 139

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€3.400,52u CEL·LA DE PROTECCIÓ DEL TRANSFORMADOR AMBFUSIBLE AMB TENSIÓ ASSIGNADA DE 36 KV, DE TIPUSMODULAR, ENVOLVENT DE XAPA D'ACERGALVANITZAT, TALL I AÏLLAMENT ÍNTEGRE EN SF6,INTENSITAT NOMINAL DE 630 A/20 KA, AMBINTERRUPTOR-SECCIONADOR ROTATIU TRIPOLAR DE3 POSICIONS (CONNECTAT, SECCIONAT, POSADA ATERRA) AMB COMANDAMENT MANUAL COMBINAT AMBFUSIBLES FREDS, CAPTADORS CAPACITIUS PER A LADETECCIÓ DE TENSIÓ I SISTEMA D'ALARMA SONORADE POSADA A TERRA, COL·LOCADA.

FGH76316 Rend.: 1,000P- 255

Unitats Preu Parcial Import€Mà d'obra:

20,49000/R 20,490001,000A012H000 =xOFICIAL 1A ELECTRICISTAH

17,58000/R 17,580001,000A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 38,07000 38,07000Materials:

3.362,450003.362,450001,000BGH76316 =xCEL·LA DE PROTECCIÓ DEL TRANSFORMADOR AMBFUSIBLES AMB TENSIÓ ASSIGNADA DE 36 KV, DE TIPUSMODULAR, ENVOLVENT DE XAPA D'ACERGALVANITZAT, TALL I AÏLLAMENT ÍNTEGRE EN SF6,INTENSITAT NOMINAL DE 630 A/20 KA, AMBINTERRUPTOR-SECCIONADOR ROTATIU TRIPOLAR DE3 POSICIONS (CONNECTAT, SECCIONAT, POSADA ATERRA) AMB COMANDAMENT MANUAL COMBINAT AMBFUSIBLES FREDS, CAPTADORS CAPACITIUS PER A LADETECCIÓ DE TENSIÓ I SISTEMA D'ALARMA SONORADE POSADA A TERRA.

u

Subtotal... 3.362,45000 3.362,45000

COST DIRECTE 3.400,52000

0,00%DESPESES INDIRECTES

3.400,52000COST EXECUCIÓ MATERIAL

€10,55M CABLE ELÈCTRIC DE TENSIÓ MITJA (MT), DEDESIGNACIÓ UNE RHZ1 18/30 KV, UNIPOLAR DE 1X240MM2 DE SECCIÓ, AMB CONDUCTOR D'ALUMINI,AÏLLAMENT DE POLIETILÈ RETICULAT (XLPE),PANTALLA METÀL·LICA DE FILS DE COURE DE 16 MM2DE SECCIÓ I COBERTA EXTERIOR DE POLIOLEFINATERMOPLÀSTICA (Z1), SOTERRAT

FGK226A3 Rend.: 1,000P- 256

Unitats Preu Parcial Import€Mà d'obra:

1,53675/R 20,490000,075A012H000 =xOFICIAL 1A ELECTRICISTAH

1,31850/R 17,580000,075A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 2,85525 2,85525Materials:

7,690807,540001,020BGK226A0 =xCable elèctric de tensió mitja (MT), de designació UNE RHZ118/30 kV, unipolar de 1x240 mm2 de secció, amb conductord'alumini, aïllament de polietilè reticulat (XLPE), pantallametàl.lica de fils de coure de 16 mm2 de secció i cobertaexterior de poliolefina termoplàstica (Z1)

m

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 140

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 7,69080 7,69080

COST DIRECTE 10,54605

0,00%DESPESES INDIRECTES

10,54605COST EXECUCIÓ MATERIAL

€3.612,16U SUBMINISTRAMENT, COL.LOCACIO I CONNEXIONAT DECENTRE DE COMANDAMENT PREPARAT PER A DOSCIRCUITS DE SORTIDA, CONSTITUIT PER ARMARID'ACER INOXIDABLE EQUIPAT AMB COMPTADORS DEDOBLE TARIFA, CONTROL CENTRALITZAT VIA RADIOAMB ANTENA INTEGRADA I EQUIPS COMPACTES DEPROTECCIO, PER A UNA POTENCIA DE CONTRACTACIODE FINS A 15 KW

FHGAE020 Rend.: 1,000P- 257

Unitats Preu Parcial Import€Mà d'obra:

163,92000/R 20,490008,000A012H000 =xOFICIAL 1A ELECTRICISTAH

140,64000/R 17,580008,000A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 304,56000 304,56000Maquinària:

19,84000/R 39,680000,500C1503000 =xCAMIÓ GRUAH

Subtotal... 19,84000 19,84000Materials:

3.280,150003.280,150001,000BHG2E010 =xCENTRE DE COMANDAMENT AMB EQUIPS DECOMPTADORS COMPANYIA ACTIVA-REACTIVA-DOBLETARIFA AMB PROTECCIO I MANIOBRA PER A DUESSORTIDES

U

Subtotal... 3.280,15000 3.280,15000Altres:

% 7,61400304,560002,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 7,61400 7,61400

COST DIRECTE 3.612,16400

0,00%DESPESES INDIRECTES

3.612,16400COST EXECUCIÓ MATERIAL

€1.553,35U SUBMINISTRAMENT, COL.LOCACIO I CONNEXIONAT DEREGULADOR DE FLUXE TRIFASIC TIPUS RFTCT0600 OSIMILAR AMB UNA TENSÓ DE 380V + N I POTENCIA DE6,00kVA AMB DIMENSIONS 500 x 500 x 300 mm.

FHGAE02B Rend.: 1,000P- 258

Unitats Preu Parcial Import€Mà d'obra:

40,98000/R 20,490002,000A012H000 =xOFICIAL 1A ELECTRICISTAH

35,16000/R 17,580002,000A013H000 =xAJUDANT ELECTRICISTAH

Subtotal... 76,14000 76,14000

Page 85: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 141

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMaterials:

1.476,067503.280,150000,450BHG2E010 =xCENTRE DE COMANDAMENT AMB EQUIPS DECOMPTADORS COMPANYIA ACTIVA-REACTIVA-DOBLETARIFA AMB PROTECCIO I MANIOBRA PER A DUESSORTIDES

U

Subtotal... 1.476,06750 1.476,06750Altres:

% 1,1421076,140001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 1,14210 1,14210

COST DIRECTE 1.553,34960

0,00%DESPESES INDIRECTES

1.553,34960COST EXECUCIÓ MATERIAL

€859,10U PUNT DE LLUM CANONP6 DE GENERAL ELECTRIC OSIMILAR, FORMAT PER SUPORT CILINDRIC DE 168mmDE SECCIÓ I 6m D'ALÇADA, AMB ACABAMENT DE PEÇADECORATIVA EN FIBRA DE VIDRE I ACOPLAMENT PERLLUMINÀRIA IBERIA/E/VT EN FOSA D'ALUMINI, BLOCÒPTIC IP66 PROVISTA EN EL SEU INTERIOR D'EQUIPDE SAP100w. INCLOSA L'EXECUCIO DE LA CIMENTACIO,GRUAMENT, ANIVELLAMENT, INSTAL.LACIO DE PRESADE TERRA, INSTAL.LACIO ELECTRICA COMPLETA DEL'INTERIOR DEL SUPORT I TRANSPORT DE TERRESSOBRANTS A L'ABOCADOR.

FHM1E05A Rend.: 1,000P- 259

Unitats Preu Parcial Import€Mà d'obra:

18,44100/R 20,490000,900A012H000 =xOFICIAL 1A ELECTRICISTAH

20,89050/R 21,990000,950A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

17,58000/R 17,580001,000A013H000 =xAJUDANT ELECTRICISTAH

18,39000/R 18,390001,000A0140000 =xMANOBREH

Subtotal... 75,30150 75,30150Maquinària:

4,93440/R 41,120000,120C1315010 =xRETROEXCAVADORA PETITAH

2,79700/R 27,970000,100C1501700 =xCAMIÓ PER A TRANSPORT DE 7 TH

35,71200/R 39,680000,900C1503000 =xCAMIÓ GRUAH

Subtotal... 43,44340 43,44340Materials:

25,3140042,190000,600B0608220 =xFORMIGO HA-25, DE CONSISTENCIA PLASTICA IGRANDARIA MAXIMA DEL GRANULAT 20 MM

M3

0,750001,250000,600BG212910 =xTUB RÍGID DE PVC, DE 32 MM DE DIÀMETRE NOMINAL,AÏLLANT I NO PROPAGADOR DE LA FLAMA, AMB UNARESISTÈNCIA A L'IMPACTE DE 2 J, RESISTÈNCIA ACOMPRESSIÓ DE 1250 N I UNA RIGIDESA DIELÈCTRICADE 2000 V

M

2,016001,680001,200BG22RJ10 =xTUB CORBABLE CORRUGAT DE PVC, DE 100 MM DEDIÀMETRE NOMINAL, AÏLLANT I NO PROPAGADOR DELA FLAMA, RESISTÈNCIA A L'IMPACTE DE 12 J,RESISTÈNCIA A COMPRESSIÓ DE 250 N, PER ACANALITZACIONS SOTERRADES

M

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 142

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU3,640000,520007,000BG312300 =xCONDUCTOR DE COURE DE DESIGNACIÓ UNE RV-K

0,6/1 KV, BIPOLAR DE SECCIÓ 2X2,5 MM2M

2,200001,100002,000BG3ZE110 =xTERMINAL PER A CABLE DE COURE DE 35 MM2U

9,280009,280001,000BG46E010 =xCAIXA DE CONNEXIONS I TALLACIRCUITS PER A UNA ODUES LAMPADES

U

1,120001,120001,000BGDZE020 =xCARTUTX PER A SOLDADURA CADWELDU

0,610000,610001,000BGDZE030 =xSALS DE SULFAT DE SODI I MAGNESIU

349,99650315,000001,1111BHM1E058 =xCOLUMNA CILINDRICA DE 6 METRES BRAÇ EN ACERGALVANITZAT DE 168MM. DE DIAMETRE

U

14,6800014,680001,000BHMZ1006 =xCONJUNT DE QUATRE PERNS PER A CIMENTACIOU

330,00000330,000001,000BHN84B70 =xLluminaria de la marca GEE model Iberia inclou làmpadad'halogenurs metàl·lics 70W i reactancia electronica

u

Subtotal... 739,60650 739,60650Altres:

% 0,7530275,302001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,75302 0,75302

COST DIRECTE 859,10442

0,00%DESPESES INDIRECTES

859,10442COST EXECUCIÓ MATERIAL

€1.955,28U PUNT DE LLUM PRIM DE 10 M D´ALÇADA AMB 4PROJECTORS PFE-400/CBM SAP 150 W DE GENERALELECTRIC O SIMILAR.

FHR02B1B Rend.: 1,000P- 260

Unitats Preu Parcial Import€Mà d'obra:

12,29400/R 20,490000,600A012H000 =xOFICIAL 1A ELECTRICISTAH

43,98000/R 21,990002,000A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

10,54800/R 17,580000,600A013H000 =xAJUDANT ELECTRICISTAH

36,78000/R 18,390002,000A0140000 =xMANOBREH

Subtotal... 103,60200 103,60200Maquinària:

19,38420/R 58,740000,330C1315020 =xRETROEXCAVADORA MITJANAH

25,17300/R 27,970000,900C1501700 =xCAMIÓ PER A TRANSPORT DE 7 TH

19,84000/R 39,680000,500C1503000 =xCAMIÓ GRUAH

11,80900/R 33,740000,350C1504R00 =xCAMIÓ CISTELLA DE 10 M D'ALÇÀRIA COM A MÀXIMH

Subtotal... 76,20620 76,20620Materials:

168,7600042,190004,000B0608220 =xFORMIGO HA-25, DE CONSISTENCIA PLASTICA IGRANDARIA MAXIMA DEL GRANULAT 20 MM

M3

1,250001,250001,000BG212910 =xTUB RÍGID DE PVC, DE 32 MM DE DIÀMETRE NOMINAL,AÏLLANT I NO PROPAGADOR DE LA FLAMA, AMB UNARESISTÈNCIA A L'IMPACTE DE 2 J, RESISTÈNCIA ACOMPRESSIÓ DE 1250 N I UNA RIGIDESA DIELÈCTRICADE 2000 V

M

Page 86: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 143

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU2,520001,680001,500BG22RJ10 =xTUB CORBABLE CORRUGAT DE PVC, DE 100 MM DE

DIÀMETRE NOMINAL, AÏLLANT I NO PROPAGADOR DELA FLAMA, RESISTÈNCIA A L'IMPACTE DE 12 J,RESISTÈNCIA A COMPRESSIÓ DE 250 N, PER ACANALITZACIONS SOTERRADES

M

3,510001,170003,000BG380900 =xCONDUCTOR DE COURE NU, UNIPOLAR DE SECCIÓ1X35 MM2

M

2,200001,100002,000BG3ZE110 =xTERMINAL PER A CABLE DE COURE DE 35 MM2U

10,7800010,780001,000BGD2E010 =xPLACA PRESA DE TERRA DE 500 X 500 X 3 MMU

0,610000,610001,000BGDZE030 =xSALS DE SULFAT DE SODI I MAGNESIU

14,6800014,680001,000BHMZ1006 =xCONJUNT DE QUATRE PERNS PER A CIMENTACIOU

555,92000138,980004,000BHQ0E010 =xPROJECTOR PFE-400/CBM SAP 150 W GENERALELECTRIC

U

947,13000947,130001,000BHR02B11 =xFANAL PRIM DE 10 M D'ALÇADA FORMAT PERCOLUMNA DE TUB D'ACER GALVANITZAT O D'ACERINOXIDABLE DE DIAMETRE SUPERIOR 200 MM IINFERIOR DE 77 MM AMB REFORÇ INTERIOR I UNPERFIL CONDUCTOR DE L'AIGUA QUE PUGUI ENTRAR,2 PORTES RECTANGULARS DELS REGISTRES AMBTANCAMENTS PER A CLAU DE TUB TRIANGULAR IPROJECTORS DE REVOLUCIO PARABOLICS OEL.LIPTICS. COL.LOCAT SOBRE PLACA BASE DEFIXACIO DE 400 MM DE DIAMETRE AMB 8 CARTELES IANELL DE REFORÇ PER PERNS D'ANCORATGEENROSCATS EN UN DELS EXTREMS AMB DOBLEROSCA I ARANDELA

U

66,5600016,640004,000BHU3E031 =xLAMPADA DE VAPOR DE SODI DE PRESSIO ALTA DE150 W, PLUS

U

Subtotal... 1.773,92000 1.773,92000Altres:

% 1,55403103,602001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 1,55403 1,55403

COST DIRECTE 1.955,28223

0,00%DESPESES INDIRECTES

1.955,28223COST EXECUCIÓ MATERIAL

€677,21U TRASLLAT DE COLUMNA DE TUB D'ACER H>10m.FIXACIÓ AMB DAU DE FORMIGÓ I INTAL·LACIÓ A LANOVA UBICACIÓ. INCLOU CONNEXIÓ A LA XARXA IVERIFICACIÓ AMB POSTA EN SERVEI.

FHR02C3A Rend.: 1,000P- 261

Unitats Preu Parcial Import€Mà d'obra:

51,22500/R 20,490002,500A012H000 =xOFICIAL 1A ELECTRICISTAH

54,97500/R 21,990002,500A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

43,95000/R 17,580002,500A013H000 =xAJUDANT ELECTRICISTAH

45,97500/R 18,390002,500A0140000 =xMANOBREH

Subtotal... 196,12500 196,12500Maquinària:

88,11000/R 58,740001,500C1315020 =xRETROEXCAVADORA MITJANAH

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 144

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU8,39100/R 27,970000,300C1501700 =xCAMIÓ PER A TRANSPORT DE 7 TH

119,04000/R 39,680003,000C1503000 =xCAMIÓ GRUAH

Subtotal... 215,54100 215,54100Materials:

210,9500042,190005,000B0608220 =xFORMIGO HA-25, DE CONSISTENCIA PLASTICA IGRANDARIA MAXIMA DEL GRANULAT 20 MM

M3

1,500001,250001,200BG212910 =xTUB RÍGID DE PVC, DE 32 MM DE DIÀMETRE NOMINAL,AÏLLANT I NO PROPAGADOR DE LA FLAMA, AMB UNARESISTÈNCIA A L'IMPACTE DE 2 J, RESISTÈNCIA ACOMPRESSIÓ DE 1250 N I UNA RIGIDESA DIELÈCTRICADE 2000 V

M

2,520001,680001,500BG22RJ10 =xTUB CORBABLE CORRUGAT DE PVC, DE 100 MM DEDIÀMETRE NOMINAL, AÏLLANT I NO PROPAGADOR DELA FLAMA, RESISTÈNCIA A L'IMPACTE DE 12 J,RESISTÈNCIA A COMPRESSIÓ DE 250 N, PER ACANALITZACIONS SOTERRADES

M

4,680001,170004,000BG380900 =xCONDUCTOR DE COURE NU, UNIPOLAR DE SECCIÓ1X35 MM2

M

2,200001,100002,000BG3ZE110 =xTERMINAL PER A CABLE DE COURE DE 35 MM2U

10,7800010,780001,000BGD2E010 =xPLACA PRESA DE TERRA DE 500 X 500 X 3 MMU

0,610000,610001,000BGDZE030 =xSALS DE SULFAT DE SODI I MAGNESIU

29,3600014,680002,000BHMZ1006 =xCONJUNT DE QUATRE PERNS PER A CIMENTACIOU

Subtotal... 262,60000 262,60000Altres:

% 2,94188196,125331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 2,94188 2,94188

COST DIRECTE 677,20788

0,00%DESPESES INDIRECTES

677,20788COST EXECUCIÓ MATERIAL

€745,25U ESCOMESA I COMPTADOR D'AIGUA DE 30 MM, CABAL6,3 M3/H, RAMAL DE 40 MM. EN PERICÓ DE 50 X 50

FJM1U02C Rend.: 1,000P- 262

€63,10U VENTOSA ROSCADA DE DIÀMETRE NOMINAL 1´´, DE 16BAR DE PRESSIÓ DE PROVA, DE FOSA, PREU ALT IMUNTADA EN PERICÓ DE CANALITZACIÓ SOTERRADA

FJM33BE4 Rend.: 1,000P- 263

Unitats Preu Parcial Import€Mà d'obra:

6,14700/R 20,490000,300A012M000 =xOFICIAL 1A MUNTADORH

5,28300/R 17,610000,300A013M000 =xAJUDANT MUNTADORH

Subtotal... 11,43000 11,43000Materials:

51,5000051,500001,000BJM33BE0 =xVENTOSA PER A ROSCAR DE 1´´ DE DIÀMETRENOMINAL, DE 16 BAR DE PRESSIÓ DE PROVA, DE FOSA,PREU ALT

U

Subtotal... 51,50000 51,50000Altres:

Page 87: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 145

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU% 0,1714511,430001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,17145 0,17145

COST DIRECTE 63,10145

0,00%DESPESES INDIRECTES

63,10145COST EXECUCIÓ MATERIAL

€455,03U SUBMINISTRAMENT I COL.LOCACIÓ DE VENTOSATRIFUNCIONAL EMBRIDADA DE DIÀMETRE NOMINAL 50MM, DE 12 BAR DE PRESSIÓ DE PROVA, DE LA CASAMINIBARAK O SIMILAR COL.LOCADA SOBRE VALVULADE COMPORTA DN 50 .INCLOU VÀLVULA DECOMPORTA

FJM35BE6 Rend.: 1,000P- 264

Unitats Preu Parcial Import€Mà d'obra:

11,06460/R 20,490000,540A012M000 =xOFICIAL 1A MUNTADORH

9,50940/R 17,610000,540A013M000 =xAJUDANT MUNTADORH

Subtotal... 20,57400 20,57400Materials:

354,00000354,000001,000BJM35BE0 =xVENTOSA PER A EMBRIDAR DE 50 MM DE DIÀMETRENOMINAL, DE 16 BAR DE PRESSIÓ DE PROVA, DE FOSA,PREU ALT

U

80,1500080,150001,000BN116050 =xVALVULA DE COMPORTA DN 50U

Subtotal... 434,15000 434,15000Altres:

% 0,3086120,574001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,30861 0,30861

COST DIRECTE 455,03261

0,00%DESPESES INDIRECTES

455,03261COST EXECUCIÓ MATERIAL

€30,42U ASPERSOR EMERGENT DE TURBINA LUBRICAT PERAIGUA, AMB ALÇARIA D'ELEVACIO DE 9,2 CM, D'UNRADI D'ACCIO ENTRE 4.5 I 10 M, DE CERCLE COMPLETO SECTORIAL, AMB TOBERA INCORPORADA, AMBVALVULA-FILTRE ANTIDRENATGE, AMB VELOCITAT DEGIR REGULABLE I MEMORIA DEL SECTOR, TOTALMENTCOL.LOCAT, INCLOSA L'EXCAVACIO DEL POU, LESUNIONS AMB LA CANONADA, LA FIXACIO AMB MORTERDE CIMENT I EL REBLERT DEL FORAT FINS A LARASANT PREVISTA

FJS2U11B Rend.: 1,000P- 265

Unitats Preu Parcial Import€Mà d'obra:

2,04900/R 20,490000,100A012M000 =xOFICIAL 1A MUNTADORH

1,76100/R 17,610000,100A013M000 =xAJUDANT MUNTADORH

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 146

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU4,04580/R 18,390000,220A0140000 =xMANOBREH

Subtotal... 7,85580 7,85580Materials:

21,3400021,340001,000BJS2U005 =xASPERSOR EMERGENT DE TURBINA LUBRICAT PERAIGUA, AMB ALÇARIA D'ELEVACIÓ DE 9,2 CM, D'UN RADID'ACCIÓ ENTRE 8,4 I 15 M, DE CERCLE COMPLET OSECTORIAL, AMB CONNEXIÓ ROSCADA FEMELLA DE3/4'', AMB TOBERA INCORPORADA, AMBVÀLVULA-FILTRE ANTIDRENATGE, AMB VELOCITAT DEGIR REGULABLE I MEMÒRIA DEL SECTOR

U

1,1059473,729500,015D0701461 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 200KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:8 I 2 N/MM2 DE RESISTÈNCIA A COMPRESSIÓ,ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 22,44594 22,44594Altres:

% 0,117847,856001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,11784 0,11784

COST DIRECTE 30,41958

0,00%DESPESES INDIRECTES

30,41958COST EXECUCIÓ MATERIAL

€23,67U DIFUSOR EMERGENT AMB UNA ALÇARIA D'ELEVACIODE 15 CM, D'UN ABAST ENTRE 2,0 I 5 M, AMB ROSCAFEMELLA DE 1/2'', AMB VALVULA ANTIDRENATGE,EQUIPAT AMB TOBERA STANDARD, TOTALMENTCOL.LOCAT, INCLOSA L'EXCAVACIO DEL POU, LESUNIONS AMB LA CANONADA, LA FIXACIO AMB MORTERDE CIMENT I EL REBLERT DEL FORAT FINS A LARASANT PREVISTA

FJS4U11A Rend.: 1,000P- 266

Unitats Preu Parcial Import€Mà d'obra:

2,04900/R 20,490000,100A012M000 =xOFICIAL 1A MUNTADORH

1,76100/R 17,610000,100A013M000 =xAJUDANT MUNTADORH

4,04580/R 18,390000,220A0140000 =xMANOBREH

Subtotal... 7,85580 7,85580Materials:

14,2200014,220001,000BJS4U115 =xDIFUSOR EMERGENT AMB UNA ALÇARIA D'ELEVACIÓDE 15 CM, D'UN ABAST ENTRE 2,0 I 4,5 M, AMB ROSCAFEMELLA D'1/2'', AMB VÀLVULA ANTIDRENATGE,EQUIPAT AMB TOBERA STANDARD

U

1,4745973,729500,020D0701461 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 200KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:8 I 2 N/MM2 DE RESISTÈNCIA A COMPRESSIÓ,ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 15,69459 15,69459Altres:

Page 88: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 147

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU% 0,117847,856001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,11784 0,11784

COST DIRECTE 23,66823

0,00%DESPESES INDIRECTES

23,66823COST EXECUCIÓ MATERIAL

€930,66U PROGRAMADOR ELECTRONIC TIPUS ICC-800M. OSIMILAR , AMB CONTROL D'APORTACIO D'AIGUA, AMBTEMPS DE PROGRAMACIO DES DE 1 MIN. FINS A 12 HPER ESTACIO EN PASSOS D'1 MIN., AMB 8 ESTACIONS,AMPLIABLE PER MODULS FINS A 48 ESTACINS, AMBPOSSIBILITAT DE 8 ARRENCADES PER DIA IPROGRAMA, AMB TRANSFORMADOR INTERIOR230/26,5 V 50 HZ, AMB BATERIA RECARGABLE DESALVAGUARDA DEL PROGRAMA, AMB CIRCUITD'ARRENCADA DE BOMBA, CARCASSA DE PLASTICESTANCA I PREPARAT PER A MUNTATGE MURALEXTERIOR, TOTALMENT COL.LOCAT, INCLOSES TOTESLES CONNEXIONS ELECTRIQUES, TANT DEL CIRCUITD'ALIMENTACIO DEL PROGRAMADOR, COM DELSELEMENTS GOVERNATS PER AQUEST PROGRAMADOR

FJSAUC2A Rend.: 1,000P- 267

Unitats Preu Parcial Import€Mà d'obra:

30,73500/R 20,490001,500A012M000 =xOFICIAL 1A MUNTADORH

26,41500/R 17,610001,500A013M000 =xAJUDANT MUNTADORH

Subtotal... 57,15000 57,15000Materials:

872,65360479,480001,820BJSAU324 =xPROGRAMADOR ELECTRÒNIC DE TRIPLE PROGRAMA,AMB CONTROL D'APORTACIO D'AIGUA, AMB TEMPS DEPROGRAMACIO DES DE 1 MIN. FINS A 12 H PERESTACIO EN PASSOS D'1 MIN., AMB 24 ESTACIONS,AMB POSSIBILITAT DE 8 ARRENCADES PER DIA IPROGRAMA, AMB TRANSFORMADOR INTERIOR 230/26,5V 50 HZ, AMB BATERIA RECARGABLE DESALVAGUARDA DEL PROGRAMA, AMB CIRCUITD'ARRENCADA DE BOMBA, CARCASSA DE PLASTICESTANCA I PREPARAT PER A MUNTATGE MURALEXTERIOR

U

Subtotal... 872,65360 872,65360Altres:

% 0,8572557,150001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,85725 0,85725

COST DIRECTE 930,66085

0,00%DESPESES INDIRECTES

930,66085COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 148

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€172,69U MODUL D'AMPLIACIÓ DE PROGRAMADOR EN 8ESTACIONS. TIPUS ICM-800. O SIMILAR

FJSAUC2B Rend.: 1,000P- 268

Unitats Preu Parcial Import€Mà d'obra:

5,12250/R 20,490000,250A012M000 =xOFICIAL 1A MUNTADORH

4,40250/R 17,610000,250A013M000 =xAJUDANT MUNTADORH

Subtotal... 9,52500 9,52500Materials:

163,02320479,480000,340BJSAU324 =xPROGRAMADOR ELECTRÒNIC DE TRIPLE PROGRAMA,AMB CONTROL D'APORTACIO D'AIGUA, AMB TEMPS DEPROGRAMACIO DES DE 1 MIN. FINS A 12 H PERESTACIO EN PASSOS D'1 MIN., AMB 24 ESTACIONS,AMB POSSIBILITAT DE 8 ARRENCADES PER DIA IPROGRAMA, AMB TRANSFORMADOR INTERIOR 230/26,5V 50 HZ, AMB BATERIA RECARGABLE DESALVAGUARDA DEL PROGRAMA, AMB CIRCUITD'ARRENCADA DE BOMBA, CARCASSA DE PLASTICESTANCA I PREPARAT PER A MUNTATGE MURALEXTERIOR

U

Subtotal... 163,02320 163,02320Altres:

% 0,142889,525331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,14288 0,14288

COST DIRECTE 172,69108

0,00%DESPESES INDIRECTES

172,69108COST EXECUCIÓ MATERIAL

€327,91U BY-PASS SECTORIAL SIMPLE AMB ELECTROVÀLVULADE 1 PULSADA EN PERICÓ DE 50 X 50 CM, INCLOSFILTRE DE MALLA 300 MICRESI REDUCTOR DEPRESSIÓ DE 10 A 0,5 atm. AMB MANOMETRE

FJSBCI0B Rend.: 1,000P- 269

Unitats Preu Parcial Import€Mà d'obra:

43,98000/R 21,990002,000A0121000 =xOFICIAL 1AH

36,78000/R 18,390002,000A0140000 =xMANOBREH

Subtotal... 80,76000 80,76000Materials:

42,8100014,270003,000BJS11262 =xValvules mascleU

12,840008,560001,500BJS11263 =xColze mascle femella de 1 1/2'' de llautóU

12,840008,560001,500BJS11264 =xT de 1 1/2'' de llautóU

12,840008,560001,500BJS11265 =xEnllaç mixte de 501/2'' mascle de llautóU

90,0000090,000001,000BJS113678 =xBy pas sectorial de 1''U

Subtotal... 171,33000 171,33000Partides d'obra:

Page 89: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 149

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU53,6643053,664301,000FJ65U020 =xFILTRE DE PLASTIC AMB ROSCA MASCLE D'1'', PER

INTERCALAR A LA TUBERIA, DE 120 MESH, AMB COSDESMUNTABLE PER AL SEU MANTENIMENT, PER A UNCABAL MAXIM DE 5 M3/H, MUNTAT EN PERICO DECANALITZACIO SOTERRAT

U

22,1578822,157881,000FN315324 =xVÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 3/4´´, DE 10 BAR DE PN, DEBRONZE, PREU ALT, MUNTADA EN PERICÓ DECANALITZACIÓ SOTERRADA

U

Subtotal... 75,82218 75,82218

COST DIRECTE 327,91218

0,00%DESPESES INDIRECTES

327,91218COST EXECUCIÓ MATERIAL

€392,57U BY-PASS SECTORIAL AMB ELECTROVÀLVULA DE 1 1/2PULSADA EN PERICÓ DE 60 X 60 CM, INCLOS FILTREDE MALLA 300 MICRESI REDUCTOR DE PRESSIÓ DE 10A 0,5 atm. AMB MANOMETRE

FJSBCI0C Rend.: 1,000P- 270

Unitats Preu Parcial Import€Mà d'obra:

49,47750/R 21,990002,250A0121000 =xOFICIAL 1AH

41,37750/R 18,390002,250A0140000 =xMANOBREH

Subtotal... 90,85500 90,85500Materials:

42,8100014,270003,000BJS11262 =xValvules mascleU

17,120008,560002,000BJS11263 =xColze mascle femella de 1 1/2'' de llautóU

17,120008,560002,000BJS11264 =xT de 1 1/2'' de llautóU

25,680008,560003,000BJS11265 =xEnllaç mixte de 501/2'' mascle de llautóU

108,0000090,000001,200BJS113678 =xBy pas sectorial de 1''U

Subtotal... 210,73000 210,73000Partides d'obra:

64,3971653,664301,200FJ65U020 =xFILTRE DE PLASTIC AMB ROSCA MASCLE D'1'', PERINTERCALAR A LA TUBERIA, DE 120 MESH, AMB COSDESMUNTABLE PER AL SEU MANTENIMENT, PER A UNCABAL MAXIM DE 5 M3/H, MUNTAT EN PERICO DECANALITZACIO SOTERRAT

U

26,5894622,157881,200FN315324 =xVÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 3/4´´, DE 10 BAR DE PN, DEBRONZE, PREU ALT, MUNTADA EN PERICÓ DECANALITZACIÓ SOTERRADA

U

Subtotal... 90,98662 90,98662

COST DIRECTE 392,57162

0,00%DESPESES INDIRECTES

392,57162COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 150

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€282,69U BY-PASS SECTORIAL SIMPLE AMB ELECTROVÀLVULADE 1 1/2 PULSADES, EN PERICÓ DE 60 X 60 CM,

FJSBCI0Y Rend.: 1,000P- 271

Unitats Preu Parcial Import€Mà d'obra:

46,17900/R 21,990002,100A0121000 =xOFICIAL 1AH

38,61900/R 18,390002,100A0140000 =xMANOBREH

Subtotal... 84,79800 84,79800Materials:

42,8100014,270003,000BJS11262 =xValvules mascleU

17,120008,560002,000BJS11263 =xColze mascle femella de 1 1/2'' de llautóU

17,120008,560002,000BJS11264 =xT de 1 1/2'' de llautóU

12,840008,560001,500BJS11265 =xEnllaç mixte de 501/2'' mascle de llautóU

108,0000090,000001,200BJS113678 =xBy pas sectorial de 1''U

Subtotal... 197,89000 197,89000

COST DIRECTE 282,68800

0,00%DESPESES INDIRECTES

282,68800COST EXECUCIÓ MATERIAL

€314,33U BY-PASS METRE AMB ELECTROVÀLVULA DE 2''COL·LOCAT EN PERICÓ

FJSBCI1Z Rend.: 1,000P- 272

Unitats Preu Parcial Import€Mà d'obra:

48,37800/R 21,990002,200A0121000 =xOFICIAL 1AH

40,45800/R 18,390002,200A0140000 =xMANOBREH

Subtotal... 88,83600 88,83600Materials:

28,5400014,270002,000BJS11262 =xValvules mascleU

12,840008,560001,500BJS11263 =xColze mascle femella de 1 1/2'' de llautóU

17,120008,560002,000BJS11264 =xT de 1 1/2'' de llautóU

17,120008,560002,000BJS11265 =xEnllaç mixte de 501/2'' mascle de llautóU

149,87500119,900001,250BJS11399 =xBy pas mestreU

Subtotal... 225,49500 225,49500

COST DIRECTE 314,33100

0,00%DESPESES INDIRECTES

314,33100COST EXECUCIÓ MATERIAL

€93,78U SUBMINISTRE I MUNTATGE DE VÀLVULA DE DESGUÀSMANUAL EN PERICÓ DE 40 X 40 CM I CONNEXIÓ AXARXA DE PLUVIALS

FJSBCI48 Rend.: 1,000P- 273

Unitats Preu Parcial Import€Mà d'obra:

Page 90: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 151

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU20,49000/R 20,490001,000A012M000 =xOFICIAL 1A MUNTADORH

17,61000/R 17,610001,000A013M000 =xAJUDANT MUNTADORH

18,39000/R 18,390001,000A0140000 =xMANOBREH

Subtotal... 56,49000 56,49000Materials:

8,620008,620001,000B03D1000 =xTerra seleccionadaM3

4,711006,730000,700B3710001 =xExcavacio en rases i pous sense classificarM3

18,500009,250002,000BD7F7570 =xTub de pvc de 300 mm de diàmetre nominal de formacióhelicoïdal amb perfil rígid nervat exteriorment, per anarformigonat amb unió elàstica amb massilla adhesiva depoliuretà

M

5,460005,460001,000BJSBCI02 =xVàlvula manualU

Subtotal... 37,29100 37,29100

COST DIRECTE 93,78100

0,00%DESPESES INDIRECTES

93,78100COST EXECUCIÓ MATERIAL

€244,86U CONNEXIÓ DE XARXA DE REG A XARXA EXISTENTFJSZU002 Rend.: 1,000P- 274

€649,18U ARMARI PER PROGRAMADOR DE POLIÈSTER DE850X465X320 MM. AMB PLACA DE MUNTATGE AÏLLANT,JUNTES D'ESTANQUEITAT I TANCA AMB CLAU 405,COLLAT SOBRE SÒCOL DE FORMIGÓ AMB TUBULARSPER A CONNEXIÓ A ESCOMESA ELÈCTRICA

FJSZU003 Rend.: 1,000P- 275

€138,45U CONNEXIÓ ELÈCTRICA ENTRE PROGRAMADOR IESCOMESA, PER A UNA POTÈNCIA DE 100W A 220VAMB ICPM DE PROTECCIÓ DE 5A INSTAL.LAT SEGONSDISPOSICIONS DE LA UNITAT OPERATIVAD'ENLLUMENAT PÚBLIC, XARXA DE CABLE DE COURE2X6 MM2 VFV100 ENTUBAT

FJSZU004 Rend.: 1,000P- 276

€595,20U HIDRANT SOTERRAT AMB PERICÓ DE REGISTRE, AMBDUES SORTIDES DE 70 MM DE D I DE 4' DE D DECONNEXIÓ A LA CANONADA, MUNTAT A L'EXTERIOR,SEGONS PRESCRIPCIONS DE L'AJUNTAMENT I/O DELSBOMBERS ENCARREGATS DEL SERVEI D'EXTINCIO DELMUNICIPI. ADAPTAT A LA NORMATIVA VIGENT. INCLOUEL PERICO DEGUDAMENT ARREBOSSAT I LLISCAT, LABASE DE FORMIGO I DAU SUPORT DE FORMIGO,BASTIMENT I TAPA DE FOSA DE 145KG AMBL'ANAGRAMA DE L'AJUNTAMENT, LA INSCRIPCIO DELSERVEI, I EL COLOR SEGONS DETERMINACIONS DEL'AUTORITAT COMPATENT, CONNEXIONATDEGUDAMENT PER DONAR EL CABAL QUE MARCA LANORMATIVA VIGENT. TOTALMENT COL.LOCAT ICONNEXIONAT A LA XARXA GENERAL, PREPERAT PERAL SEU FUNCIONAMENT.

FM21N629 Rend.: 1,000P- 277

Unitats Preu Parcial Import€

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 152

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMà d'obra:

61,47000/R 20,490003,000A012M000 =xOFICIAL 1A MUNTADORH

52,83000/R 17,610003,000A013M000 =xAJUDANT MUNTADORH

Subtotal... 114,30000 114,30000Materials:

368,89500245,930001,500BM213620 =xHIDRANT SOTERRAT AMB PERICÓ DE REGISTRE, AMBUNA SORTIDA DE 100 MM DE DIÀMETRE I DE 4' DEDIÀMETRE DE CONNEXIÓ A LA CANONADA

u

112,000001,12000100,000BMY21000 =xPART PROPORCIONAL D'ELEMENTS ESPECIALS PER AHIDRANTS

u

Subtotal... 480,89500 480,89500

COST DIRECTE 595,19500

0,00%DESPESES INDIRECTES

595,19500COST EXECUCIÓ MATERIAL

€244,83U SUBMINISTRE I MUNTATGE DE CARRET TELESCÒPICDE DESMUNTATGE DN 150 I PN 16, MARCA BELGICASTO SIMILAR

FN11160 Rend.: 0,209P- 278

Unitats Preu Parcial Import€Mà d'obra:

29,41148/R 20,490000,300A012M000 =xOFICIAL 1A MUNTADORH

25,27751/R 17,610000,300A013M000 =xAJUDANT MUNTADORH

Subtotal... 54,68899 54,68899Materials:

189,32000189,320001,000BN116376 =xCARRET TELESCÒPIC DE DESMUNTATGE DN 150 I PN16

U

Subtotal... 189,32000 189,32000Altres:

% 0,8203354,688671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,82033 0,82033

COST DIRECTE 244,82932

0,00%DESPESES INDIRECTES

244,82932COST EXECUCIÓ MATERIAL

€275,75U SUBMINISTRE I MUNTATGE DE VÀLVULA DECOMPORTA DN 150 I PN 16, MARCA BELGICAST TIPUSF4 O SIMILAR, AMB TANCAMENT ELÀSTIC

FN116160 Rend.: 0,209P- 279

Unitats Preu Parcial Import€Mà d'obra:

29,41148/R 20,490000,300A012M000 =xOFICIAL 1A MUNTADORH

25,27751/R 17,610000,300A013M000 =xAJUDANT MUNTADORH

Subtotal... 54,68899 54,68899

Page 91: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 153

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMaterials:

220,24000220,240001,000BN116328 =xVÀLVULA DE COMPORTA DN 150 I PN 16U

Subtotal... 220,24000 220,24000Altres:

% 0,8203354,688671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,82033 0,82033

COST DIRECTE 275,74932

0,00%DESPESES INDIRECTES

275,74932COST EXECUCIÓ MATERIAL

€50,56U VÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 1´´1/2, DE 10 BAR DE PN, DEBRONZE, PREU ALT, MUNTADA EN PERICÓ DECANALITZACIÓ SOTERRADA

FN318324 Rend.: 1,000P- 280

Unitats Preu Parcial Import€Mà d'obra:

7,68375/R 20,490000,375A012M000 =xOFICIAL 1A MUNTADORH

6,60375/R 17,610000,375A013M000 =xAJUDANT MUNTADORH

Subtotal... 14,28750 14,28750Materials:

36,0600036,060001,000BN318320 =xVÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 1´´1/2, 10 BAR DE PN, DE BRONZE,PREU ALT

U

Subtotal... 36,06000 36,06000Altres:

% 0,2143114,287331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,21431 0,21431

COST DIRECTE 50,56181

0,00%DESPESES INDIRECTES

50,56181COST EXECUCIÓ MATERIAL

€74,21U VÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 2´´, DE 10 BAR DE PN, DE BRONZE,PREU ALT, MUNTADA EN PERICÓ DE CANALITZACIÓSOTERRADA

FN319324 Rend.: 1,000P- 281

Unitats Preu Parcial Import€Mà d'obra:

9,22050/R 20,490000,450A012M000 =xOFICIAL 1A MUNTADORH

7,92450/R 17,610000,450A013M000 =xAJUDANT MUNTADORH

Subtotal... 17,14500 17,14500Materials:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 154

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU56,8100056,810001,000BN319320 =xVÀLVULA D'ESFERA MANUAL AMB ROSCA, DE

DIÀMETRE NOMINAL 2´´, 10 BAR DE PN, DE BRONZE,PREU ALT

U

Subtotal... 56,81000 56,81000Altres:

% 0,2571817,145331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,25718 0,25718

COST DIRECTE 74,21218

0,00%DESPESES INDIRECTES

74,21218COST EXECUCIÓ MATERIAL

€150,36U VÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 2´´1/2, DE 10 BAR DE PN, DEBRONZE, PREU ALT, MUNTADA EN PERICÓ DECANALITZACIÓ SOTERRADA

FN31A324 Rend.: 1,000P- 282

Unitats Preu Parcial Import€Mà d'obra:

11,47440/R 20,490000,560A012M000 =xOFICIAL 1A MUNTADORH

9,86160/R 17,610000,560A013M000 =xAJUDANT MUNTADORH

Subtotal... 21,33600 21,33600Materials:

128,70000128,700001,000BN31A320 =xVÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 2´´1/2, 10 BAR DE PN, DE BRONZE,PREU ALT

U

Subtotal... 128,70000 128,70000Altres:

% 0,3200421,336001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,32004 0,32004

COST DIRECTE 150,35604

0,00%DESPESES INDIRECTES

150,35604COST EXECUCIÓ MATERIAL

€224,62U VÀLVULA D'ESFERA MANUAL AMB ROSCA, DEDIÀMETRE NOMINAL 3´´, DE 10 BAR DE PN, DE BRONZE,PREU ALT, MUNTADA EN PERICÓ DE CANALITZACIÓSOTERRADA

FN31B324 Rend.: 1,000P- 283

Unitats Preu Parcial Import€Mà d'obra:

19,26060/R 20,490000,940A012M000 =xOFICIAL 1A MUNTADORH

16,55340/R 17,610000,940A013M000 =xAJUDANT MUNTADORH

Subtotal... 35,81400 35,81400Materials:

Page 92: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 155

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU188,27000188,270001,000BN31B320 =xVÀLVULA D'ESFERA MANUAL AMB ROSCA, DE

DIÀMETRE NOMINAL 3´´, 10 BAR DE PN, DE BRONZE,PREU ALT

U

Subtotal... 188,27000 188,27000Altres:

% 0,5372135,814001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,53721 0,53721

COST DIRECTE 224,62121

0,00%DESPESES INDIRECTES

224,62121COST EXECUCIÓ MATERIAL

€248,70U BANC NEOROMANTIC DE FUSTA D'IROKO TRACTADAAMB OLI I COLLADA ALS SUPORTS AMB CARGOLSD'ACER INOXIDABLE, DE 55 CM DE LLARGARIA, AMBSUPORT DE FOSA DE FERRO GG.20

FQ10U090 Rend.: 1,000P- 284

Unitats Preu Parcial Import€Mà d'obra:

5,49750/R 21,990000,250A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

Subtotal... 5,49750 5,49750Materials:

243,09000243,090001,000BQ10U090 =xBANC NEOROMANTIC DE FUSTA D'IROKO TRACTADAAMB OLI I COLLADA ALS SUPORTS AMB CARGOLSD'ACER INOXIDABLE, DE 55 CM DE LLARGARIA, AMBSUPORT DE FOSA DE FERRO GG.20

U

Subtotal... 243,09000 243,09000Altres:

% 0,109955,497502,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,10995 0,10995

COST DIRECTE 248,69745

0,00%DESPESES INDIRECTES

248,69745COST EXECUCIÓ MATERIAL

€299,73U BANC NEOROMANTIC DE FUSTA D'IROKO TRACTADAAMB OLI I COLLADA ALS SUPORTS AMB CARGOLSD'ACER INOXIDABLE, DE 175 CM DE LLARGARIA, AMBSUPORT DE FOSA DE FERRO GG.20

FQ10U091 Rend.: 1,000P- 285

Unitats Preu Parcial Import€Mà d'obra:

4,59750/R 18,390000,250A0140000 =xMANOBREH

Subtotal... 4,59750 4,59750Materials:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 156

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU295,04000295,040001,000BQ10U091 =xBANC NEOROMANTIC DE FUSTA D'IROKO TRACTADA

AMB OLI I COLLADA ALS SUPORTS AMB CARGOLSD'ACER INOXIDABLE, DE 175 CM DE LLARGARIA, AMBSUPORT DE FOSA DE FERRO GG.20

U

Subtotal... 295,04000 295,04000Altres:

% 0,091954,597502,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,09195 0,09195

COST DIRECTE 299,72945

0,00%DESPESES INDIRECTES

299,72945COST EXECUCIÓ MATERIAL

€509,55U BANC NEOROMANTIC DE FUSTA D'IROKO TRACTADAAMB OLI I COLLADA ALS SUPORTS AMB CARGOLSD'ACER INOXIDABLE, DE 300 CM DE LLARGARIA, AMBSUPORT DE FOSA DE FERRO GG.20

FQ10U092 Rend.: 1,000P- 286

Unitats Preu Parcial Import€Mà d'obra:

10,99500/R 21,990000,500A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

Subtotal... 10,99500 10,99500Materials:

498,34000498,340001,000BQ10U092 =xBANC NEOROMANTIC DE FUSTA D'IROKO TRACTADAAMB OLI I COLLADA ALS SUPORTS AMB CARGOLSD'ACER INOXIDABLE, DE 300 CM DE LLARGARIA, AMBSUPORT DE FOSA DE FERRO GG.20

U

Subtotal... 498,34000 498,34000Altres:

% 0,2199010,995002,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,21990 0,21990

COST DIRECTE 509,55490

0,00%DESPESES INDIRECTES

509,55490COST EXECUCIÓ MATERIAL

€86,14U PAPERERA TRABUCABLE DE 45 CM DE DIÀMETRE, DEXAPA PERFORADA D'1 MM DE GRUIX AMB ESCUTTRONQUELAT PER LES DUES CARES, ANCORADA AMBDOS DAUS DE FORMIGÓ DE 30 X 30 X30 CM.ESPECIFICACIONS EN ELS PLÀNOLS DE PROJECTE.

FQ21U011 Rend.: 1,000P- 287

Unitats Preu Parcial Import€Mà d'obra:

5,49750/R 21,990000,250A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

4,59750/R 18,390000,250A0140000 =xMANOBREH

Subtotal... 10,09500 10,09500

Page 93: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 157

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMaterials:

75,9440069,040001,100BQ21U010 =xPAPERERA 70 L FORMADA PER UN TUBULAR D'ACERGALVANITZAT DE 20 MM DE DIAMETRE I 1,5 MM DEGRUIX, UNA PLANXA PERFORADA DE 2 MM DE GRUIX IPERFORACIONS DE 5 MM DE DIAMETRE, UNA PLANXADE BASE DE PAPERERA DE 3 MM DE GRUIX AMB DUESPERFORACIONS DE 8 MM DE DIAMETRE PER ALDESGUAS, 2 EIXOS DE GIR, UN TUBULAR D'ACERGALVANITZAT DE 30 MM DE DIAMETRE I 2 MM DEGRUIX, UN SUPORT DE PAPERERA FORMAT PER UNTUBULAR RODO D'ACER GALVANITZAT DE 40 MM DEDIAMETRE I 2 MM DE GRUIX, 2 PLETINESD'ANCORATGE AMB CARTEL.LES SOLDADES A 6 AMBDUES PERFORACIONS DE 12 MM DE DIAMETRE PERCARGOLAR-LA AL PAVIMENT DE VORERA ISUBJECCIONS FORMADES PER 4 PERNS D'EXPANSIOM8

U

Subtotal... 75,94400 75,94400Altres:

% 0,1009510,095001,00A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,10095 0,10095

COST DIRECTE 86,13995

0,00%DESPESES INDIRECTES

86,13995COST EXECUCIÓ MATERIAL

€400,74U EXPENDIDOR BOSSES RESIDUS CANINS.TIPUSKIOSKAN O SIMILAR. INCLOU INSTALACIÓ

FQ21U01B Rend.: 0,361P- 288

Unitats Preu Parcial Import€Mà d'obra:

18,27424/R 21,990000,300A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

15,28255/R 18,390000,300A0140000 =xMANOBREH

Subtotal... 33,55679 33,55679Materials:

1,2696063,480000,020B0606220 =xFORMIGO DE RESISTENCIA 20 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 20 MM

M3

365,9120069,040005,300BQ21U010 =xPAPERERA 70 L FORMADA PER UN TUBULAR D'ACERGALVANITZAT DE 20 MM DE DIAMETRE I 1,5 MM DEGRUIX, UNA PLANXA PERFORADA DE 2 MM DE GRUIX IPERFORACIONS DE 5 MM DE DIAMETRE, UNA PLANXADE BASE DE PAPERERA DE 3 MM DE GRUIX AMB DUESPERFORACIONS DE 8 MM DE DIAMETRE PER ALDESGUAS, 2 EIXOS DE GIR, UN TUBULAR D'ACERGALVANITZAT DE 30 MM DE DIAMETRE I 2 MM DEGRUIX, UN SUPORT DE PAPERERA FORMAT PER UNTUBULAR RODO D'ACER GALVANITZAT DE 40 MM DEDIAMETRE I 2 MM DE GRUIX, 2 PLETINESD'ANCORATGE AMB CARTEL.LES SOLDADES A 6 AMBDUES PERFORACIONS DE 12 MM DE DIAMETRE PERCARGOLAR-LA AL PAVIMENT DE VORERA ISUBJECCIONS FORMADES PER 4 PERNS D'EXPANSIOM8

U

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 158

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 367,18160 367,18160

COST DIRECTE 400,73839

0,00%DESPESES INDIRECTES

400,73839COST EXECUCIÓ MATERIAL

€615,00U FONT PER A EXTERIORS D'ACER, AMB PROTECCIÓANTIOXIDANT I PINTURA DE PARTÍCULESMETÀL·LIQUES, DE SECCIÓ QUADRADA, DE 16X16 CM I100 CM D'ALÇÀRIA DE MIDES APROXIMADES, AMBAIXETA TEMPORITZADA I REIXA DE DESGUÀSDAVANTERA, ANCORADA AMB DAU DE FORMIGÓ

FQ31C110 Rend.: 1,000P- 289

€79,33U PILONA BARCELONA NORMAL DE 1000 MM D'ALÇADA,FORMADA PER FUST I REMAT DE FOSA GRIS DE 100MM DE DIAMETRE I ACABAT PINTAT AMB IMPRIMACIOFOSFATANT ANTIOXIDANT I OXIRON NEGRE FERRITIC,ANELLA D'ACER INOXIDABLE DE 84 MM DE DIAMETREEXTERIOR I ACABAT MATITZAT I SENYAL DEL'AJUNTAMENT DE LA CIUTAT EN RELLEU D' 1,5 MM IALÇADA DE 65 MM, COL.LOCADA AMB MORTER 1:4

FQ42U020 Rend.: 1,000P- 290

Unitats Preu Parcial Import€Mà d'obra:

8,79600/R 21,990000,400A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

3,67800/R 18,390000,200A0140000 =xMANOBREH

Subtotal... 12,47400 12,47400Materials:

66,3700066,370001,000BQ42U020 =xPILONA BARCELONA NORMAL DE 1000 MM D'ALÇADA,FORMADA PER FUST I REMAT DE FOSA GRIS DE 100MM DE DIAMETRE I ACABAT PINTAT AMB IMPRIMACIOFOSFATANT ANTIOXIDANT I OXIRON NEGRE FERRITIC,ANELLA D'ACER INOXIDABLE DE 84 MM DE DIAMETREEXTERIOR I ACABAT MATITZAT I SENYAL DEL'AJUNTAMENT DE LA CIUTAT EN RELLEU D' 1,5 MM IALÇADA DE 65 MM

U

0,1728086,399100,002D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 66,54280 66,54280Altres:

% 0,3118512,474002,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,31185 0,31185

COST DIRECTE 79,32865

0,00%DESPESES INDIRECTES

79,32865COST EXECUCIÓ MATERIAL

Page 94: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 159

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€139,58U PILONA BARCELONA EXTRAIBLE DE 1000 MMD'ALÇADA, FORMADA PER FUST I REMAT DE FOSAGRIS DE 100 MM DE DIAMETRE I ACABAT PINTAT AMBIMPRIMACIO FOSFATANT ANTIOXIDANT I OXIRONNEGRE FERRITIC, ANELLA D'ACER INOXIDABLE DE 84MM DE DIAMETRE EXTERIOR I ACABAT MATITZAT,SENYAL DE L'AJUNTAMENT DE LA CIUTAT EN RELLEUD' 1,5 MM I ALÇADA DE 65 MM, PANY DE BLOQUEIG DELA PILONA EXTRAIBLE, TAPETA I BASE FIXAENCASTADA AMB MORTER 1:4

FQ42U030 Rend.: 1,000P- 291

Unitats Preu Parcial Import€Mà d'obra:

10,99500/R 21,990000,500A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

4,59750/R 18,390000,250A0140000 =xMANOBREH

Subtotal... 15,59250 15,59250Materials:

123,42000123,420001,000BQ42U030 =xPILONA BARCELONA EXTRAIBLE DE 1000 MMD'ALÇADA, FORMADA PER FUST I REMAT DE FOSAGRIS DE 100 MM DE DIAMETRE I ACABAT PINTAT AMBIMPRIMACIO FOSFATANT ANTIOXIDANT I OXIRONNEGRE FERRITIC, ANELLA D'ACER INOXIDABLE DE 84MM DE DIAMETRE EXTERIOR I ACABAT MATITZAT,SENYAL DE L'AJUNTAMENT DE LA CIUTAT EN RELLEUD' 1,5 MM I ALÇADA DE 65 MM, PANY DE BLOQUEIG DELA PILONA EXTRAIBLE, TAPETA I BASE FIXA PER AENCASTAR AL TERRA

U

0,1728086,399100,002D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 123,59280 123,59280Altres:

% 0,3898115,592402,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,38981 0,38981

COST DIRECTE 139,57511

0,00%DESPESES INDIRECTES

139,57511COST EXECUCIÓ MATERIAL

€13.367,25U SUBMINISTRE E INSTAL·LACIÓ DE JOC INFANTIL TIPUSAFRYKOS DE HAGS O SIMILAR, DAUS D'ANCORATGEDE FORMIGÓ DE 40X40X40 CM

FQA250AB Rend.: 1,000P- 292

Unitats Preu Parcial Import€Mà d'obra:

175,92000/R 21,990008,000A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

147,12000/R 18,390008,000A0140000 =xMANOBREH

Subtotal... 323,04000 323,04000Materials:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 160

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU12.962,800003.240,700004,000BQA25080 =xPONT DE MICO AMB CABLE D'ACER AMB ESTACIÓ DE

SORTIDA I D'ARRIBADA DE TRONCS DE FUSTATRACTADA, AMB 8 PUNTS D'ANCORATGE

U

73,3290773,329071,000D060M0B2 =xFORMIGÓ DE 150 KG/M3, AMB UNA PROPORCIÓ ENVOLUM 1:4:8, AMB CIMENT PÒRTLAND AMB FILLERCALCARI CEM II/B-L 32,5 R I GRANULAT DE PEDRAGRANÍTICA DE GRANDÀRIA MÀXIMA 20 MM, ELABORATA L'OBRA AMB FORMIGONERA DE 250 L

M3

Subtotal... 13.036,12907 13.036,12907Altres:

% 8,07600323,040002,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 8,07600 8,07600

COST DIRECTE 13.367,24507

0,00%DESPESES INDIRECTES

13.367,24507COST EXECUCIÓ MATERIAL

€68,24U APARCAMENT DE BICICLETA D'ACER GALVANITZAT DE75 CM DE LLARGARIA I 75 CM D'ALÇARIA, DE TUB RODODE 50 MM DE DIAMETRE, MODEL TIPUS U INVERTIDA,COL.LOCAT ANCORAT AMB MORTER I AMB ANELLATAPAJUNTS

FQZZUM8A Rend.: 1,000P- 293

Unitats Preu Parcial Import€Mà d'obra:

13,19400/R 21,990000,600A012N000 =xOFICIAL 1A D'OBRA PÚBLICAH

9,19500/R 18,390000,500A0140000 =xMANOBREH

Subtotal... 22,38900 22,38900Materials:

45,0800045,080001,000BQZZV010 =xAPARCAMENT DE BICICLETA D'ACER GALVANITZAT DE75 CM DE LLARGARIA I 75 CM D'ALÇARIA, DE TUB RODODE 50 MM DE DIAMETRE I ANELLA TAPAJUNTS

U

0,4320086,399100,005D0701821 =xMORTER DE CIMENT PÒRTLAND AMB FILLER CALCARICEM II/B-L I SORRA DE PEDRA GRANÍTICA AMB 380KG/M3 DE CIMENT, AMB UNA PROPORCIÓ EN VOLUM1:4, ELABORAT A L'OBRA AMB FORMIGONERA DE 165 L

M3

Subtotal... 45,51200 45,51200Altres:

% 0,3358422,389331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,33584 0,33584

COST DIRECTE 68,23684

0,00%DESPESES INDIRECTES

68,23684COST EXECUCIÓ MATERIAL

Page 95: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 161

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€0,36M2 ESBROSSADA DEL TERRENY AMB ESBROSSADORA DECAPÇAL DE SERRA, PER A UNA ALÇÀRIA DE BROSSADE 40 A 70 CM, I UN PENDENT INFERIOR AL 25 %

FR115021 Rend.: 1,000P- 294

Unitats Preu Parcial Import€Mà d'obra:

0,34020/R 17,010000,020A016P000 =xPEÓ JARDINERH

Subtotal... 0,34020 0,34020Maquinària:

0,01245/R 0,830000,015CR113000 =xESBROSSADORA DE CAPÇAL DE SERRA DE 0,42 KW DEPOTÈNCIA

H

Subtotal... 0,01245 0,01245Altres:

% 0,005100,340001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00510 0,00510

COST DIRECTE 0,35775

0,00%DESPESES INDIRECTES

0,35775COST EXECUCIÓ MATERIAL

€0,26M2 FRESATGE DE TERRENY COMPACTE A UNA FONDÀRIADE 0,2 M, AMB MITJANS MECÀNICS, AMB TRACTORSOBRE PNEUMÀTICS DE 14,7 A 25,0 KW I EQUIP DEFRESATGE D'UNA AMPLÀRIA DE TREBALL DE 0,6 A 1,19M AMB CORRÓ COMPACTADOR, PER A UN PENDENTINFERIOR AL 25 %

FR262451 Rend.: 1,000P- 295

Unitats Preu Parcial Import€Maquinària:

0,26260/R 26,260000,010CR261121 =xTRACTOR SOBRE PNEUMÀTICS DE 14,7 A 25,0 KW DEPOTÈNCIA, AMB EQUIP DE FRESATGE I CORRÓCOMPACTADOR I D'UNA AMPLÀRIA DE TREBALL 0,6 A1,19 M

H

Subtotal... 0,26260 0,26260

COST DIRECTE 0,26260

0,00%DESPESES INDIRECTES

0,26260COST EXECUCIÓ MATERIAL

€1,91M2 ANIVELLAMENT I REPASSADA DEL TERRENY PER AOBTENIR EL PERFIL D'ACABAT, AMB MITJANSMANUALS, PER A UN PENDENT SUPERIOR AL 25 %

FR2B110A Rend.: 1,000P- 296

Unitats Preu Parcial Import€Mà d'obra:

1,88385/R 19,830000,095A012P000 =xOFICIAL 1A JARDINERH

Subtotal... 1,88385 1,88385Altres:

% 0,028261,884001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 162

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 0,02826 0,02826

COST DIRECTE 1,91211

0,00%DESPESES INDIRECTES

1,91211COST EXECUCIÓ MATERIAL

€11,14U EXCAVACIÓ DE CLOT DE PLANTACIÓ DE DIMENSIONS1X1X1 M, AMB MINICARREGADORA SOBREPNEUMÀTICS AMB ACCESSORI RETROEXCAVADOR DE40 A 60 CM D'AMPLÀRIA DE TREBALL I CÀRREGA DELES TERRES SOBRANTS MECÀNICA SOBRE CAMIÓ, ENUN PENDENT INFERIOR AL 25 %

FR2G8B31 Rend.: 1,000P- 297

Unitats Preu Parcial Import€Maquinària:

11,13750/R 44,550000,250C13161E0 =xMINICARREGADORA SOBRE PNEUMÀTICS, AMBACCESSORI RETROEXCAVADOR DE 40 A 60 CMD'AMPLÀRIA

H

Subtotal... 11,13750 11,13750

COST DIRECTE 11,13750

0,00%DESPESES INDIRECTES

11,13750COST EXECUCIÓ MATERIAL

€38,34M3 APORTACIÓ I INCORPORACIÓ DE TERRA PER AJARDINERIA VEGETAL ADOBADA, A GRANEL, AMBMINICARREGADORA PER A ANIVELLAMENT SOBREPNEUMÀTICS AMB ACCESSORI ANIVELLADOR

FR3P1113 Rend.: 1,000P- 298

Unitats Preu Parcial Import€Mà d'obra:

0,19830/R 19,830000,010A012P000 =xOFICIAL 1A JARDINERH

Subtotal... 0,19830 0,19830Maquinària:

2,12000/R 42,400000,050C133M0Q0 =xMINICARREGADORA SOBRE PNEUMÀTICS AMBACCESSORI ANIVELLADOR

H

Subtotal... 2,12000 2,12000Materials:

36,0200036,020001,000BR3P1110 =xTERRA VEGETAL ADOBADA, A GRANELM3

Subtotal... 36,02000 36,02000Altres:

% 0,002970,198001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00297 0,00297

COST DIRECTE 38,34127

0,00%DESPESES INDIRECTES

Page 96: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 163

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

38,34127COST EXECUCIÓ MATERIAL

€33,86M3 APORTACIÓ I ESTESA DE MULCHING ROLDÓCOMPOSTAT.

FR3PU000 Rend.: 1,000P- 299

Unitats Preu Parcial Import€Mà d'obra:

1,38810/R 19,830000,070A012P000 =xOFICIAL 1A JARDINERH

7,04400/R 17,610000,400A013P000 =xAJUDANT JARDINERH

Subtotal... 8,43210 8,43210Materials:

25,3000025,300001,000BR3PUU00 =xMULCHING ROLDÓ COMPOSTAT (2002)M3

Subtotal... 25,30000 25,30000Altres:

% 0,126488,432001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,12648 0,12648

COST DIRECTE 33,85858

0,00%DESPESES INDIRECTES

33,85858COST EXECUCIÓ MATERIAL

€2,61U SUBMINISTRAMENT CUPRESSUS SEMPERVIRENS(XIPRER) DE 125 A 150 CM D'ALÇADA, AMB PA DETERRA DE TELA METAL.LICA

FR434582 Rend.: 1,000P- 300

Unitats Preu Parcial Import€Materials:

2,607002,370001,100BR434582 =xCUPRESSUS SEMPERVIRENS (XIPRER) DE 125 A 150CM D'ALÇADA, AMB PA DE TERRA DE TELA METAL.LICA

U

Subtotal... 2,60700 2,60700

COST DIRECTE 2,60700

0,00%DESPESES INDIRECTES

2,60700COST EXECUCIÓ MATERIAL

€4,64U SUBMINISTRAMENT JUNIPERUS COMMUNIS DE40/60CM. D'ALÇADA EN CONTENIDOR

FR43549R Rend.: 1,000P- 301

Unitats Preu Parcial Import€Materials:

4,644003,870001,200BR435495 =xJUNIPERUS HORIZONTALIS EN CONTENIDOR DE 3LITRES

U

Subtotal... 4,64400 4,64400

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 164

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 4,64400

0,00%DESPESES INDIRECTES

4,64400COST EXECUCIÓ MATERIAL

€186,90U SUBMINISTRAMENT QUERCUS PYRENAICA DE20-25CM. DE CIRCUNFERÈNCIA, AMB PA DE TERRAPROTEGIT AMB MALLA METÀL.LICA I GUIX

FR45457H Rend.: 1,000P- 302

Unitats Preu Parcial Import€Materials:

186,90000186,900001,000BR454575 =xEUCALIPTUS (EUCALIPTUS GLOBULUS) D'ALÇARIA 2 A 3M, EN CONTENIDOR

U

Subtotal... 186,90000 186,90000

COST DIRECTE 186,90000

0,00%DESPESES INDIRECTES

186,90000COST EXECUCIÓ MATERIAL

€130,44U SUBMINISTRAMENT ALZINA (QUERCUS ILEX) DE 20 A 25CM DE CIRCUMFERÈNCIA, AMB PA DE TERRAPROTEGIT AMB MALLA METÀL.LICA I GUIX

FR459075 Rend.: 1,000P- 303

Unitats Preu Parcial Import€Materials:

130,44000130,440001,000BR459075 =xALZINA (QUERCUS ILEX) DE 20 A 25 CM DECIRCUMFERÈNCIA, AMB PA DE TERRA PROTEGIT AMBMALLA METÀL.LICA I GUIX

U

Subtotal... 130,44000 130,44000

COST DIRECTE 130,44000

0,00%DESPESES INDIRECTES

130,44000COST EXECUCIÓ MATERIAL

€191,65U SUBMINISTRAMENT QUERCUS PUBESCENS (HUMILIS)DE 20 A 25 CM DE CIRCUMFERÈNCIA, AMB PA DETERRA PROTEGIT AMB MALLA METÀL.LICA I GUIX

FR45907G Rend.: 1,000P- 304

Unitats Preu Parcial Import€Materials:

191,65000191,650001,000BR4503101 =xACACIA DEALBATA (MIMOSA) dIÀ,¡METRE 18/20 IPRESENTADA EN CONTENIDOR

U

Subtotal... 191,65000 191,65000

COST DIRECTE 191,65000

0,00%DESPESES INDIRECTES

Page 97: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 165

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

191,65000COST EXECUCIÓ MATERIAL

€90,10U SUBMINISTRAMENT ACER CAMPESTRE DE 20 A 25 CMDE PERIMETRE, AMB L'ARREL NUA

FR47017I Rend.: 1,000P- 305

Unitats Preu Parcial Import€Materials:

90,1000090,100001,000BR470175 =xACER CAMPESTRE (AURO ARRUGAT) DE 20 A 25 CMDE PERIMETRE, AMB L'ARREL NUA

U

Subtotal... 90,10000 90,10000

COST DIRECTE 90,10000

0,00%DESPESES INDIRECTES

90,10000COST EXECUCIÓ MATERIAL

€46,29U SUBMINISTRAMENT DE CORYLUS AVELLANA(AVELLANER) H=200-250CM. D'ALÇADA, ENCONTENIDOR.

FR47050F Rend.: 1,000P- 306

Unitats Preu Parcial Import€Materials:

46,2900046,290001,000BR470506 =xACER NEGUNDO (NEGUNDO) DE 20 A 25 CM DEPERIMETRE, AMB L'ARREL NUA

U

Subtotal... 46,29000 46,29000

COST DIRECTE 46,29000

0,00%DESPESES INDIRECTES

46,29000COST EXECUCIÓ MATERIAL

€115,70U SUBMINISTRAMENT ACER PSEUDOPLATANUS(PLATAN FALS) DE 20 A 25 CM DE PERIMETRE, AMBL'ARREL NUA

FR47092A Rend.: 1,000P- 307

Unitats Preu Parcial Import€Materials:

115,70000115,700001,000BR470926 =xACER PSEUDOPLATANUS (PLATAN FALS) DE 25 A 30CM DE PERIMETRE, AMB L'ARREL NUA

U

Subtotal... 115,70000 115,70000

COST DIRECTE 115,70000

0,00%DESPESES INDIRECTES

115,70000COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 166

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€162,10U SUBMINISTRAMENT BETULA PENDULA FASTIGIATA(BEDOLL) DE 25 A 30 CM DE PERIMETRE, AMB PA DETERRA DE TELA METAL.LICA

FR47212B Rend.: 1,000P- 308

Unitats Preu Parcial Import€Materials:

162,10000162,100001,000BR472128 =xBETULA PENDULA FASTIGIATA (BEDOLL) DE 25 A 30CM DE PERIMETRE, AMB PA DE TERRA DE TELAMETAL.LICA

U

Subtotal... 162,10000 162,10000

COST DIRECTE 162,10000

0,00%DESPESES INDIRECTES

162,10000COST EXECUCIÓ MATERIAL

€162,10U SUBMINISTRAMENT ACER OPALUS DE 18 A 20 CM DEPERIMETRE, AMB PA DE TERRA DE TELA METAL.LICA

FR4721XB Rend.: 1,000P- 309

Unitats Preu Parcial Import€Materials:

162,10000162,100001,000BR472128 =xBETULA PENDULA FASTIGIATA (BEDOLL) DE 25 A 30CM DE PERIMETRE, AMB PA DE TERRA DE TELAMETAL.LICA

U

Subtotal... 162,10000 162,10000

COST DIRECTE 162,10000

0,00%DESPESES INDIRECTES

162,10000COST EXECUCIÓ MATERIAL

€140,31U SUBMINISTRAMENT CERCIS SILIQUASTRUM (ARBREDE L'AMOR) DE 16 A 18 CM DE PERIMETRE, AMB PA DETERRA DE TELA METAL.LICA

FR47270A Rend.: 1,000P- 310

Unitats Preu Parcial Import€Materials:

140,31150133,630001,050BR472707 =xCERCIS SILIQUASTRUM (ARBRE DE L'AMOR) DE 16 A18 CM DE PERIMETRE, AMB PA DE TERRA DE TELAMETAL.LICA

U

Subtotal... 140,31150 140,31150

COST DIRECTE 140,31150

0,00%DESPESES INDIRECTES

140,31150COST EXECUCIÓ MATERIAL

€18,33U SUBMINISTRAMENT DE ZIZIPHUS JUJUVA (GINGOL) DE80 A 100 CM ALÇADA EN CONTENIDOR

FR47319X Rend.: 1,000P- 311

Unitats Preu Parcial Import€

Page 98: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 167

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMaterials:

18,3300018,330001,000BR473190 =xELAEAGNUS ANGUSTIFOLIA (ARBRE DEL PARADIS) DE10 A 12 CM DE PERIMETRE, AMB L'ARREL NUA

U

Subtotal... 18,33000 18,33000

COST DIRECTE 18,33000

0,00%DESPESES INDIRECTES

18,33000COST EXECUCIÓ MATERIAL

€65,57U SUBMINISTRAMENT FRAXINUS EXCELSIOR (FREIXE DEFULLA GRAN) DE 20 A 25 CM DE PERIMETRE, AMB PADE TERRA DE TELA METAL.LICA

FR47382E Rend.: 1,000P- 312

Unitats Preu Parcial Import€Materials:

65,5700065,570001,000BR473826 =xFRAXINUS EXCELSIOR (FREIXE DE FULLA GRAN) DE20 A 25 CM DE PERIMETRE, AMB PA DE TERRA DE TELAMETAL.LICA

U

Subtotal... 65,57000 65,57000

COST DIRECTE 65,57000

0,00%DESPESES INDIRECTES

65,57000COST EXECUCIÓ MATERIAL

€85,84U SUBMINISTRAMENT JUGLANS REGIA (NOGUERA) DE25 A 30 CM DE PERIMETRE, AMB PA DE TERRA DE TELAMETAL.LICA

FR47419K Rend.: 1,000P- 313

Unitats Preu Parcial Import€Materials:

85,83770660,290000,130BR474190 =xJUGLANS REGIA (NOGUERA) DE 50 A 60 CM DEPERIMETRE, AMB PA DE TERRA DE TELA METAL.LICA

U

Subtotal... 85,83770 85,83770

COST DIRECTE 85,83770

0,00%DESPESES INDIRECTES

85,83770COST EXECUCIÓ MATERIAL

€61,57U SUBMINISTRAMENT PLATANUS X HISPANICA DE 20 A 25CM DE PERIMETRE, AMB PA DE TERRA DE TELAMETAL.LICA

FR476226 Rend.: 1,000P- 314

Unitats Preu Parcial Import€Materials:

61,5700061,570001,000BR476226 =xPLATANUS X HISPANICA DE 20 A 25 CM DEPERIMETRE, AMB PA DE TERRA DE TELA METAL.LICA

U

Subtotal... 61,57000 61,57000

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 168

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 61,57000

0,00%DESPESES INDIRECTES

61,57000COST EXECUCIÓ MATERIAL

€72,72U SUBMINISTRAMENT ARBUTUS UNEDO (ARBRE) , DE175-200CM D'ALÇADA EN CONTENIDOR.

FR4A025J Rend.: 1,000P- 315

Unitats Preu Parcial Import€Materials:

72,7225015,310004,750BR4A0253 =xARBUTUS UNEDO (ARBOÇ) EN CONTENIDOR DE 15LITRES

U

Subtotal... 72,72250 72,72250

COST DIRECTE 72,72250

0,00%DESPESES INDIRECTES

72,72250COST EXECUCIÓ MATERIAL

€4,62U SUBMINISTRAMENT BOIX (BUXUS SEMPERVIRENS)D'ALÇÀRIA 0.4 M, EN CONTENIDOR 3ltrs

FR4A0805 Rend.: 1,000P- 316

Unitats Preu Parcial Import€Materials:

4,6224017,120000,270BR4A0805 =xBOIX (BUXUS SEMPERVIRENS) D'ALÇÀRIA 0.6 A 0.8 M,EN CONTENIDOR

U

Subtotal... 4,62240 4,62240

COST DIRECTE 4,62240

0,00%DESPESES INDIRECTES

4,62240COST EXECUCIÓ MATERIAL

€11,50U SUBMINISTRAMENT CRATAEGUS MONOGYNA DE80/100CM. ALÇADA EN CONTENIDOR DE 10 LITRES

FR4A097L Rend.: 1,000P- 317

Unitats Preu Parcial Import€Materials:

11,500004,600002,500BR4A0970 =xCALLISTEMON SPECIOSUS (CAL.LISTEMON) ENCONTENIDOR DE 3 LITRES

U

Subtotal... 11,50000 11,50000

COST DIRECTE 11,50000

0,00%DESPESES INDIRECTES

11,50000COST EXECUCIÓ MATERIAL

Page 99: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 169

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€2,53U SUBMINISTRAMENT CYTISSUS EN CONTENIDOR C-3LFR4A332S Rend.: 1,000P- 318

Unitats Preu Parcial Import€Materials:

2,526004,210000,600BR4A3325 =xDODONAEA EN CONTENIDOR DE 5 LITRESU

Subtotal... 2,52600 2,52600

COST DIRECTE 2,52600

0,00%DESPESES INDIRECTES

2,52600COST EXECUCIÓ MATERIAL

€29,09U SUBMINISTRAMENT ILEX AQUIFOLIUM DE 100/120 CMALÇADA. EN CONTENIDOR

FR4A624Q Rend.: 1,000P- 319

Unitats Preu Parcial Import€Materials:

29,0850041,550000,700BR4A6240 =xNANDINA DOMESTICA U

Subtotal... 29,08500 29,08500

COST DIRECTE 29,08500

0,00%DESPESES INDIRECTES

29,08500COST EXECUCIÓ MATERIAL

€3,79U SUBMINISTRAMENT PISTACIA LENTISCUS(LLENTISCLE) EN CONTENIDOR DE 3 LITRES

FR4A6690 Rend.: 1,000P- 320

Unitats Preu Parcial Import€Materials:

3,790003,790001,000BR4A6690 =xPISTACIA LENTISCUS (LLENTISCLE) EN CONTENIDORDE 3 LITRES

U

Subtotal... 3,79000 3,79000

COST DIRECTE 3,79000

0,00%DESPESES INDIRECTES

3,79000COST EXECUCIÓ MATERIAL

€4,22U SUBMINISTRAMENT BERBERIS EN CONTENIDOR DE 3LITRES

FR4D027P Rend.: 1,000P- 321

Unitats Preu Parcial Import€Materials:

4,221006,030000,700BR4D0270 =xBERBERIS THUNBERGII ATROPURPUREA ENCONTENIDOR DE 5 LITRES

U

Subtotal... 4,22100 4,22100

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 170

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 4,22100

0,00%DESPESES INDIRECTES

4,22100COST EXECUCIÓ MATERIAL

€3,35U SUBMINISTRAMENT CORNUS SANGUINEA ENCONTENIDOR 3 LITRES

FR4D151Y Rend.: 1,000P- 322

Unitats Preu Parcial Import€Materials:

3,3460016,730000,200BR4D1515 =xCORNUS FLORIDA U

Subtotal... 3,34600 3,34600

COST DIRECTE 3,34600

0,00%DESPESES INDIRECTES

3,34600COST EXECUCIÓ MATERIAL

€3,92U SUBMINISTRAMENT PRUNUS SPINOSA (ARBUST)D'ALÇÀRIA 0.6 M, EN CONTENIDOR C-3L

FR4D255M Rend.: 1,000P- 323

Unitats Preu Parcial Import€Materials:

3,916009,790000,400BR4D2550 =xHIBISC DE SIRIA (HIBISCUS SYRIACUS) D'ALÇÀRIA 0.8 A1.2 M, EN CONTENIDOR

U

Subtotal... 3,91600 3,91600

COST DIRECTE 3,91600

0,00%DESPESES INDIRECTES

3,91600COST EXECUCIÓ MATERIAL

€4,60KG SUBMINISTRAMENT DE BARREJA DE FESTUCAARUNDINÀCIA (FESTUCA ELATIOR), FESTUCAROGENCA (FESTUCA RUBRA) I FESTUCA OVINA(FESTUCA OVINA), DE QUALITAT ALTA

FR4U2330 Rend.: 1,000P- 324

Unitats Preu Parcial Import€Materials:

4,600004,600001,000BR4U2330 =xBARREJA COMPOSADA PER FESTUCA ARUNDINÀCIA(FESTUCA ELATIOR), FESTUCA ROGENCA (FESTUCARUBRA) I FESTUCA OVINA (FESTUCA OVINA), DEQUALITAT ALTA

KG

Subtotal... 4,60000 4,60000

COST DIRECTE 4,60000

0,00%DESPESES INDIRECTES

Page 100: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 171

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

4,60000COST EXECUCIÓ MATERIAL

€1,89U EXTRACCIÓ I RETIRADA D'ARBUST EN MAL ESTATSENSE APROFITAMENT, INCLOSA LA RECOLLIDA DEBRANQUES, CÀRREGA SOBRE CAMIÓ, TRANSPORT AABOCADOR AUTORITZAT I CÀNON D'ABOCAMENT

FR57U020 Rend.: 1,000P- 325

Unitats Preu Parcial Import€Mà d'obra:

0,29745/R 19,830000,015A012P000 =xOFICIAL 1A JARDINERH

0,26415/R 17,610000,015A013P000 =xAJUDANT JARDINERH

Subtotal... 0,56160 0,56160Maquinària:

0,62655/R 41,770000,015C1503500 =xCAMIÓ GRUA DE 5 TH

Subtotal... 0,62655 0,62655Materials:

0,696006,960000,100B2RA3400 =xDISPOSICIÓ CONTROLADA A MONODIPÒSIT SENSEBÀSCULA, DE RESIDUS INERTS

M3

Subtotal... 0,69600 0,69600Altres:

% 0,008420,561331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00842 0,00842

COST DIRECTE 1,89257

0,00%DESPESES INDIRECTES

1,89257COST EXECUCIÓ MATERIAL

€27,18U EXTRACCIÓ I RETIRADA D'ARBRE PETIT H<=2.5M. oPERÍMETRE TRONC<35CM. SENSE APROFITAMENT,INCLOSA EXTRACIÓ D'ARRELS, LA RECOLLIDA DEBRANQUES, CÀRREGA SOBRE CAMIÓ, TRANSPORT AABOCADOR AUTORITZAT I CÀNON D'ABOCAMENT

FR57U04B Rend.: 1,000P- 326

Unitats Preu Parcial Import€Mà d'obra:

2,97450/R 19,830000,150A012P000 =xOFICIAL 1A JARDINERH

3,52200/R 17,610000,200A013P000 =xAJUDANT JARDINERH

Subtotal... 6,49650 6,49650Maquinària:

12,33600/R 41,120000,300C1315010 =xRETROEXCAVADORA PETITAH

4,17700/R 41,770000,100C1503500 =xCAMIÓ GRUA DE 5 TH

0,59800/R 2,990000,200CRE23000 =xMOTOSERRAH

Subtotal... 17,11100 17,11100Materials:

3,480006,960000,500B2RA3400 =xDISPOSICIÓ CONTROLADA A MONODIPÒSIT SENSEBÀSCULA, DE RESIDUS INERTS

M3

Subtotal... 3,48000 3,48000

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 172

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUAltres:

% 0,097456,496671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,09745 0,09745

COST DIRECTE 27,18495

0,00%DESPESES INDIRECTES

27,18495COST EXECUCIÓ MATERIAL

€42,89U EXTRACCIÓ I RETIRADA D'ARBRE PETIT H>=2.5M. oPERÍMETRE TRONC<35CM. SENSE APROFITAMENT,INCLOSA EXTRACIÓ D'ARRELS, LA RECOLLIDA DEBRANQUES, CÀRREGA SOBRE CAMIÓ, TRANSPORT AABOCADOR AUTORITZAT I CÀNON D'ABOCAMENT

FR57U04C Rend.: 1,000P- 327

Unitats Preu Parcial Import€Mà d'obra:

2,97450/R 19,830000,150A012P000 =xOFICIAL 1A JARDINERH

6,16350/R 17,610000,350A013P000 =xAJUDANT JARDINERH

Subtotal... 9,13800 9,13800Maquinària:

18,50400/R 41,120000,450C1315010 =xRETROEXCAVADORA PETITAH

7,10090/R 41,770000,170C1503500 =xCAMIÓ GRUA DE 5 TH

1,04650/R 2,990000,350CRE23000 =xMOTOSERRAH

Subtotal... 26,65140 26,65140Materials:

6,960006,960001,000B2RA3400 =xDISPOSICIÓ CONTROLADA A MONODIPÒSIT SENSEBÀSCULA, DE RESIDUS INERTS

M3

Subtotal... 6,96000 6,96000Altres:

% 0,137079,138001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,13707 0,13707

COST DIRECTE 42,88647

0,00%DESPESES INDIRECTES

42,88647COST EXECUCIÓ MATERIAL

€75,28U EXTRACCIÓ I RETIRADA D'ARBRE MITJÀ AMBPERÍMETRE TRONC 35-80CM. SENSE APROFITAMENT,INCLOSA EXTRACIÓ D'ARRELS, LA RECOLLIDA DEBRANQUES, CÀRREGA SOBRE CAMIÓ, TRANSPORT AABOCADOR AUTORITZAT I CÀNON D'ABOCAMENT

FR57U04D Rend.: 1,000P- 328

Unitats Preu Parcial Import€Mà d'obra:

11,89800/R 19,830000,600A012P000 =xOFICIAL 1A JARDINERH

17,61000/R 17,610001,000A013P000 =xAJUDANT JARDINERH

Page 101: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 173

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 29,50800 29,50800Maquinària:

20,56000/R 41,120000,500C1315010 =xRETROEXCAVADORA PETITAH

12,53100/R 41,770000,300C1503500 =xCAMIÓ GRUA DE 5 TH

1,79400/R 2,990000,600CRE23000 =xMOTOSERRAH

Subtotal... 34,88500 34,88500Materials:

10,440006,960001,500B2RA3400 =xDISPOSICIÓ CONTROLADA A MONODIPÒSIT SENSEBÀSCULA, DE RESIDUS INERTS

M3

Subtotal... 10,44000 10,44000Altres:

% 0,4426229,508001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,44262 0,44262

COST DIRECTE 75,27562

0,00%DESPESES INDIRECTES

75,27562COST EXECUCIÓ MATERIAL

€277,19U EXTRACCIÓ I RETIRADA D'ARBRE GRAN PERÍMETRETRONC 80-150CM. SENSE APROFITAMENT, INCLOSAEXTRACIÓ D'ARRELS, LA RECOLLIDA DE BRANQUES,CÀRREGA SOBRE CAMIÓ, TRANSPORT A ABOCADORAUTORITZAT I CÀNON D'ABOCAMENT

FR57U04E Rend.: 1,000P- 329

Unitats Preu Parcial Import€Mà d'obra:

49,57500/R 19,830002,500A012P000 =xOFICIAL 1A JARDINERH

52,83000/R 17,610003,000A013P000 =xAJUDANT JARDINERH

Subtotal... 102,40500 102,40500Maquinària:

82,24000/R 41,120002,000C1315010 =xRETROEXCAVADORA PETITAH

62,65500/R 41,770001,500C1503500 =xCAMIÓ GRUA DE 5 TH

7,47500/R 2,990002,500CRE23000 =xMOTOSERRAH

Subtotal... 152,37000 152,37000Materials:

20,880006,960003,000B2RA3400 =xDISPOSICIÓ CONTROLADA A MONODIPÒSIT SENSEBÀSCULA, DE RESIDUS INERTS

M3

Subtotal... 20,88000 20,88000Altres:

% 1,53608102,405331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 1,53608 1,53608

COST DIRECTE 277,19108

0,00%DESPESES INDIRECTES

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 174

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

277,19108COST EXECUCIÓ MATERIAL

€500,30U EXTRACCIÓ I RETIRADA D'ARBRE GRAN PERÍMETRETRONC >150CM. SENSE APROFITAMENT, INCLOSAEXTRACIÓ D'ARRELS, LA RECOLLIDA DE BRANQUES,CÀRREGA SOBRE CAMIÓ, TRANSPORT A ABOCADORAUTORITZAT I CÀNON D'ABOCAMENT

FR57U04F Rend.: 1,000P- 330

Unitats Preu Parcial Import€Mà d'obra:

79,32000/R 19,830004,000A012P000 =xOFICIAL 1A JARDINERH

70,44000/R 17,610004,000A013P000 =xAJUDANT JARDINERH

Subtotal... 149,76000 149,76000Maquinària:

176,22000/R 58,740003,000C1315020 =xRETROEXCAVADORA MITJANAH

125,31000/R 41,770003,000C1503500 =xCAMIÓ GRUA DE 5 TH

11,96000/R 2,990004,000CRE23000 =xMOTOSERRAH

Subtotal... 313,49000 313,49000Materials:

34,800006,960005,000B2RA3400 =xDISPOSICIÓ CONTROLADA A MONODIPÒSIT SENSEBÀSCULA, DE RESIDUS INERTS

M3

Subtotal... 34,80000 34,80000Altres:

% 2,24640149,760001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 2,24640 2,24640

COST DIRECTE 500,29640

0,00%DESPESES INDIRECTES

500,29640COST EXECUCIÓ MATERIAL

€29,83U PLANTACIÓ D'ARBRE 16 A 25 CM DE CIRCUMFERÈNCIA, AMB GRUA AUTOPROPULSADA DE 12 T.

FR632J7T Rend.: 1,000P- 331

Unitats Preu Parcial Import€Mà d'obra:

6,94050/R 19,830000,350A012P000 =xOFICIAL 1A JARDINERH

11,90700/R 17,010000,700A016P000 =xPEÓ JARDINERH

Subtotal... 18,84750 18,84750Maquinària:

10,70000/R 42,800000,250C150G800 =xGRUA AUTOPROPULSADA DE 12 TH

Subtotal... 10,70000 10,70000Altres:

% 0,2827118,847331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,28271 0,28271

Page 102: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 175

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 29,83021

0,00%DESPESES INDIRECTES

29,83021COST EXECUCIÓ MATERIAL

€34,70U PLANTACIÓ D'ARBRE 25 A 30 CM DE CIRCUMFERÈNCIA, AMB GRUA AUTOPROPULSADA DE 12 T.

FR632J7U Rend.: 1,000P- 332

Unitats Preu Parcial Import€Mà d'obra:

7,93200/R 19,830000,400A012P000 =xOFICIAL 1A JARDINERH

13,60800/R 17,010000,800A016P000 =xPEÓ JARDINERH

Subtotal... 21,54000 21,54000Maquinària:

12,84000/R 42,800000,300C150G800 =xGRUA AUTOPROPULSADA DE 12 TH

Subtotal... 12,84000 12,84000Altres:

% 0,3231021,540001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,32310 0,32310

COST DIRECTE 34,70310

0,00%DESPESES INDIRECTES

34,70310COST EXECUCIÓ MATERIAL

€14,11U PLANTACIÓ D'ARBUST D'ALÇÀRIA ENTRE 100-200 CM,AMB MITJANS MANUALS, EN UN PENDENT INFERIOR AL25 %,NCLOU OBERTURA DE SOT DE 0,8X0,8 M IRETIRADA DE TERRES A ABOCADOR AUTORITZAT

FR66141W Rend.: 1,000P- 333

Unitats Preu Parcial Import€Mà d'obra:

1,78470/R 19,830000,090A012P000 =xOFICIAL 1A JARDINERH

6,16350/R 17,610000,350A013P000 =xAJUDANT JARDINERH

5,95350/R 17,010000,350A016P000 =xPEÓ JARDINERH

Subtotal... 13,90170 13,90170Altres:

% 0,2085313,902001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,20853 0,20853

COST DIRECTE 14,11023

0,00%DESPESES INDIRECTES

14,11023COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 176

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€2,72U PLANTACIÓ D'ARBUST EN CONTENIDOR DE 3 A 5LITRES, INCLOU OBERTURA DE SOT DE 0,40X0,40 M IRETIRADA DE TERRES A ABOCADOR AUTORITZAT

FR66U005 Rend.: 1,000P- 334

Unitats Preu Parcial Import€Mà d'obra:

0,19830/R 19,830000,010A012P000 =xOFICIAL 1A JARDINERH

0,35220/R 17,610000,020A013P000 =xAJUDANT JARDINERH

2,12625/R 17,010000,125A016P000 =xPEÓ JARDINERH

Subtotal... 2,67675 2,67675Altres:

% 0,040152,676671,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,04015 0,04015

COST DIRECTE 2,71690

0,00%DESPESES INDIRECTES

2,71690COST EXECUCIÓ MATERIAL

€3,43U PLANTACIÓ D'ARBUST EN CONTENIDOR ENTRE 10 I 12LITRES, INCLOU OBERTURA DE SOT DE 0,40X0,40 M IRETIRADA DE TERRES A ABOCADOR AUTORITZAT

FR66U010 Rend.: 1,000P- 335

Unitats Preu Parcial Import€Mà d'obra:

0,20227/R 19,830000,0102A012P000 =xOFICIAL 1A JARDINERH

0,35748/R 17,610000,0203A013P000 =xAJUDANT JARDINERH

2,82026/R 17,010000,1658A016P000 =xPEÓ JARDINERH

Subtotal... 3,38001 3,38001Altres:

% 0,050703,380001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,05070 0,05070

COST DIRECTE 3,43071

0,00%DESPESES INDIRECTES

3,43071COST EXECUCIÓ MATERIAL

€18,50UT SISTEMA D'ASPRATGE FORMAT PER DOS PALSTORNEJATS AMB PUNTA DE FUSTA TRACTADA AL'AUTOCLAU, DE SECCIÓ CIRCULAR DE 8 CM DEDIÀMETRE I 2,5 M DE LLARGÀRIA, ENTERRATS 1 M,AMB DOS LLIGAMS DE 2,5 CM D'AMPLADA DE GOMA NOABRASIVA, INCLOU SUBMINISTRAMENT, TRANSPORT,COL.LOCACIÓ I MUNTATGE EN EL MOMENT DE LAPLANTACIÓ DE L'ARBRE. TOT COMPLETAMENTACABAT.

FR6C0007 Rend.: 1,000P- 336

Page 103: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 177

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€1,84M2 SEMBRA DE BARREJA DE PLANTES HERBÀCIES, AMBMITJANS MANUALS, EN UN PENDENT INFERIOR AL 25 %

FR716011 Rend.: 1,000P- 337

Unitats Preu Parcial Import€Mà d'obra:

0,19830/R 19,830000,010A012P000 =xOFICIAL 1A JARDINERH

1,61595/R 17,010000,095A016P000 =xPEÓ JARDINERH

Subtotal... 1,81425 1,81425Altres:

% 0,027211,814001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,02721 0,02721

COST DIRECTE 1,84146

0,00%DESPESES INDIRECTES

1,84146COST EXECUCIÓ MATERIAL

€103,17M TANCA DE FUSTA TRACTADA AL AUTOCLAU MODELANGLES DE 0,80 M D'ALÇARIA,TRAVESSERSHORITZONTALS I TAULONS VERTICALS FIXATS AMBCARGOLS D'ACER INOXIDABLE, FIXADA AMBMUNTANTS DE FUSTA ENCASTATS EN DAU DEFORMIGÓ CADA 2 M

FR93UA80 Rend.: 1,000P- 338

Unitats Preu Parcial Import€Mà d'obra:

9,89550/R 21,990000,450A0121000 =xOFICIAL 1AH

8,85600/R 19,680000,450A013A000 =xAJUDANT FUSTERH

8,27550/R 18,390000,450A0140000 =xMANOBREH

Subtotal... 27,02700 27,02700Materials:

61,2100061,210001,000BR9TUA80 =xTANCA DE FUSTA TRACTADA AL AUTOCLAU MODELANGLES DE 0,80 M D'ALÇARIA, AMB MUNTANTS DEFUSTA PER A ENCASTAR A FONAMENT DE FORMIGÓ,TRAVESSERS HORITZONTALS I TAULONS VERTICALSFIXATS AMB CARGOLS D'ACER INOXIDABLE

M

14,5300014,530001,000BR9TUZ10 =xMATERIAL AUXILIAR PER A SUPORT I ANCORATGE D'1M DE TANCA

U

Subtotal... 75,74000 75,74000Altres:

% 0,4054127,027331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,40541 0,40541

COST DIRECTE 103,17241

0,00%DESPESES INDIRECTES

103,17241COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 178

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€746,92M TAULA PICNIC 2.5X1m. AMB DOS BANCS . FUSTA DE PITRACTAT A L'AUTOCLAU NIVELL IV. INCLOUSUBMINISTRE I COLLOCACIÓ AMB SOLERA FORMIGÓAMB MALLA ELECTROSOLDADA INCLOSA.

FR93UA8B Rend.: 0,041P- 339

Unitats Preu Parcial Import€Mà d'obra:

241,35366/R 21,990000,450A0121000 =xOFICIAL 1AH

216,00000/R 19,680000,450A013A000 =xAJUDANT FUSTERH

201,84146/R 18,390000,450A0140000 =xMANOBREH

Subtotal... 659,19512 659,19512Materials:

2,0982559,950000,035B0604210 =xFORMIGO DE RESISTENCIA 15 N/MM2, DECONSISTENCIA PLASTICA I GRANDARIA MAXIMA DELGRANULAT 12 MM

M3

61,2100061,210001,000BR9TUA80 =xTANCA DE FUSTA TRACTADA AL AUTOCLAU MODELANGLES DE 0,80 M D'ALÇARIA, AMB MUNTANTS DEFUSTA PER A ENCASTAR A FONAMENT DE FORMIGÓ,TRAVESSERS HORITZONTALS I TAULONS VERTICALSFIXATS AMB CARGOLS D'ACER INOXIDABLE

M

14,5300014,530001,000BR9TUZ10 =xMATERIAL AUXILIAR PER A SUPORT I ANCORATGE D'1M DE TANCA

U

Subtotal... 77,83825 77,83825Altres:

% 9,88793659,195331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 9,88793 9,88793

COST DIRECTE 746,92130

0,00%DESPESES INDIRECTES

746,92130COST EXECUCIÓ MATERIAL

€0,52U REG MANUAL PER A ARBRES, AMB CAMIÓ CISTERNADE 8 M3, I UNA DOTACIÓ DE 50 L PER ESCOSSELL

FRF1114A Rend.: 1,000P- 340

Unitats Preu Parcial Import€Mà d'obra:

0,13608/R 17,010000,008A016P000 =xPEÓ JARDINERH

Subtotal... 0,13608 0,13608Maquinària:

0,33152/R 41,440000,008C1502E00 =xCAMIÓ CISTERNA DE 8 M3H

Subtotal... 0,33152 0,33152Materials:

0,050501,010000,050B0111000 =xAIGUAM3

Subtotal... 0,05050 0,05050Altres:

% 0,002040,136001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00204 0,00204

Page 104: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 179

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 0,52014

0,00%DESPESES INDIRECTES

0,52014COST EXECUCIÓ MATERIAL

€0,19M2 REG MANUAL PER A ARBUSTS, AMB CAMIÓ CISTERNADE 8 M3, I UNA DOTACIÓ DE 10 L/M2

FRF11543 Rend.: 1,000P- 341

Unitats Preu Parcial Import€Mà d'obra:

0,05103/R 17,010000,003A016P000 =xPEÓ JARDINERH

Subtotal... 0,05103 0,05103Maquinària:

0,12432/R 41,440000,003C1502E00 =xCAMIÓ CISTERNA DE 8 M3H

Subtotal... 0,12432 0,12432Materials:

0,010101,010000,010B0111000 =xAIGUAM3

Subtotal... 0,01010 0,01010Altres:

% 0,000770,051331,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,00077 0,00077

COST DIRECTE 0,18622

0,00%DESPESES INDIRECTES

0,18622COST EXECUCIÓ MATERIAL

€14,82M3 ENDERROC D'ESTRUCTURES I EDIFICACIONSEXISTENTS, MESURAT EN VOLUM APARENT, INCLOSALA COBERTA, SOLERA I MASSÍS, CÀRREGA ITRANSPORT DE SOBRANTS A L'ABOCADOR AMBCAMIÓ DE 20 TN I CANON D'ABOCAMENT.

G214U011 Rend.: 1,000P- 342

Unitats Preu Parcial Import€Mà d'obra:

1,09950/R 21,990000,050A0121000 =xOFICIAL 1AH

0,95150/R 19,030000,050A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 2,05100 2,05100Maquinària:

3,14200/R 62,840000,050C110U025 =xRetroexcavadora de 95 hp, amb martell de 800 kg a 1500 kgh

1,17080/R 58,540000,020C131U001 =xPala carregadora de 170 hp, tipus CAT-950 o equivalenth

2,28650/R 45,730000,050C15019U0 =xCamió de 250 hp, de 20 t (9,6 m3)h

6,00000/R 6,000001,000C150Z200 =xCANON MANTENIMENT ABOCADOR I ABOCAMENT DEMIXTES DE LA CONSTRUCCIO

M3

0,17400/R 3,480000,050C200SU00 =xEquip i elements auxiliars per a tall oxiacetilenich

Subtotal... 12,77330 12,77330

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 180

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 14,82430

0,00%DESPESES INDIRECTES

14,82430COST EXECUCIÓ MATERIAL

€2,50M2 FRESAT DE FINS A 15 CM DE GRUIX DE PAVIMENT DEMESCLES BITUMINOSES, INCLÒS CÀRREGA MECÀNICAO MANUAL I TRANSPORT DELS MATERIALSRESULTANTS A LA CENTRAL PER A RECICLAT DE LAMESCLA, INCLOSA LA NETEJA DE LA SUPERFÍCIE

G219U20A Rend.: 200,000P- 343

Unitats Preu Parcial Import€Mà d'obra:

0,03150/R 21,000000,300A0112000 =xCap de collah

0,10995/R 21,990001,000A0121000 =xOFICIAL 1AH

0,19030/R 19,030002,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 0,33175 0,33175Maquinària:

0,52765/R 105,530001,000C110U085 =xfresadora de pavimenth

0,26780/R 53,560001,000C131U000 =xPala carregadora de 110 hp, tipus CAT-926 o equivalenth

1,16280/R 77,520003,000C1501U01 =xcamió de 400 hp, de 32 t (15,4 m3)h

0,20550/R 41,100001,000C170E00U =xescombradora autopropulsadah

Subtotal... 2,16375 2,16375

COST DIRECTE 2,49550

0,00%DESPESES INDIRECTES

2,49550COST EXECUCIÓ MATERIAL

€2,30M3 EXCAVACIÓ DE TERRA VEGETAL, INCLOSA CÀRREGA,TRANSPORT A L'ABOCADOR, APLEC O LLOC D'ÚS IMANTENIMENT FINS LA SEVA UTILITZACIÓ, INCLÒSCÀNON D'ABOCAMENT I MANTENIMENT DEL'ABOCADOR

G221U010 Rend.: 73,000P- 344

Unitats Preu Parcial Import€Mà d'obra:

0,05753/R 21,000000,200A0112000 =xCap de collah

0,26068/R 19,030001,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 0,31821 0,31821Maquinària:

0,73370/R 53,560001,000C131U000 =xPala carregadora de 110 hp, tipus CAT-926 o equivalenth

1,25288/R 45,730002,000C15019U0 =xCamió de 250 hp, de 20 t (9,6 m3)h

Subtotal... 1,98658 1,98658

Page 105: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 181

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 2,30479

0,00%DESPESES INDIRECTES

2,30479COST EXECUCIÓ MATERIAL

€7,34M3 REBLIMENT AL DARRERA D'ALÇATS DE MURS IESTREPS DE FORMIGÓ, AMB MATERIAL PROCEDENTDE PRÉSTEC, ESTESA I COMPACTACIÓ SEGONSCONDICIONS DEL PLEC DE PRESCRIPCIONSTÈCNIQUES, MESURAT SOBRE PERFIL TEÒRIC

G228U022 Rend.: 45,893P- 345

Unitats Preu Parcial Import€Mà d'obra:

0,13819/R 21,000000,302A0112000 =xCap de collah

0,82891/R 19,030001,999A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 0,96710 0,96710Maquinària:

1,27813/R 58,540001,002C131U028 =xretroexcavadora de 95 hp, tipus cat-446 o equivalenth

0,61068/R 27,970001,002C133U005 =xCORRO VIBRATORI AUTOPROPULSAT DE 6 A 8 TH

0,28078/R 12,860001,002C133U070 =xpicó vibrant dúplex de 1300 kgh

0,15678/R 35,620000,202C1502U10 =xCamió cisterna de 6000 lh

Subtotal... 2,32637 2,32637Materials:

0,050501,010000,050B0111000 =xAIGUAM3

3,996003,330001,200B03DU001 =xterra procedent de préstec, inclòs cànon per extracció itransport a l'obra

m3

Subtotal... 4,04650 4,04650

COST DIRECTE 7,33997

0,00%DESPESES INDIRECTES

7,33997COST EXECUCIÓ MATERIAL

€8,39M2 CAPA DE NETEJA I ANIVELLACIÓ DE 10 CM DEFORMIGÓ HM-20/P/40/I, DE CONSISTÈNCIA PLASTICA IGRANDARIA MÀXIMA DEL GRANULAT 40MM, ABOCATDES DE CAMIÓ.

G3Z1U011 Rend.: 50,000P- 346

Unitats Preu Parcial Import€Mà d'obra:

0,10500/R 21,000000,250A0112000 =xCap de collah

0,43980/R 21,990001,000A0121000 =xOFICIAL 1AH

0,35220/R 17,610001,000A013U001 =xAjudanth

0,73560/R 18,390002,000A0140000 =xMANOBREH

Subtotal... 1,63260 1,63260Materials:

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 182

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU6,7562061,420000,110B060U110 =xFormigó de 15 N/mm2 de resistència característica a la

compressió, consistència plàstica i granulat màxim 20 mm,inclòs transport a l'obra

m3

Subtotal... 6,75620 6,75620

COST DIRECTE 8,38880

0,00%DESPESES INDIRECTES

8,38880COST EXECUCIÓ MATERIAL

€12,56M3 SUBMINISTRAMENT,MUNTATGE I DESMUNTATGE DECINDRI, INCLOSA LA PREPARACIÓ DE LA BASE.

G4DEU01B Rend.: 39,407P- 347

Unitats Preu Parcial Import€Mà d'obra:

0,53290/R 21,000001,000A0112000 =xCap de collah

2,23209/R 21,990004,000A0121000 =xOFICIAL 1AH

1,34062/R 17,610003,000A013U001 =xAjudanth

0,96582/R 19,030002,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 5,07143 5,07143Maquinària:

0,11876/R 36,000000,130C131U020 =xRetroexcavadora de 50 hp, tipus CAT-416 o equivalenth

0,62273/R 49,080000,500C150GU10 =xGrua autopropulsada de 12 th

Subtotal... 0,74149 0,74149Materials:

0,3471011,570000,030B032U010 =xSauló sense garbellar, inclòs cànon per extracció i transporta l'obra

m3

0,060000,400000,150B0D21030 =xTAULÓ DE FUSTA DE PI PER A 10 USOSM

6,340006,340001,000B0DFU001 =xAmortització de cindri metàl·licam3

Subtotal... 6,74710 6,74710

COST DIRECTE 12,56002

0,00%DESPESES INDIRECTES

12,56002COST EXECUCIÓ MATERIAL

€34,50T MESCLA BITUMINOSA EN CALENT AC 16 SURF B60/70,AMB GRANULAT GRANÍTIC, INCLÒS FILLER, ESTESA ICOMPACTADA, SENSE INCLOURE BETUM

G9H1U51A Rend.: 105,387P- 348

Unitats Preu Parcial Import€Mà d'obra:

0,19927/R 21,000001,000A0112000 =xCap de collah

0,41732/R 21,990002,000A0121000 =xOFICIAL 1AH

0,72229/R 19,030004,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 1,33888 1,33888Maquinària:

Page 106: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 183

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU5,14902/R 77,520007,000C1501U01 =xcamió de 400 hp, de 32 t (15,4 m3)h

0,54969/R 57,930001,000C1709B0U =xestenedora per a paviments de mescla bituminosah

0,62797/R 66,180001,000C170U035 =xpiconadora autopropulsada de 14 a 16 th

0,66441/R 70,020001,000C170U051 =xcorró vibratori autopropulsat pneumàtich

Subtotal... 6,99109 6,99109Materials:

26,1700026,170001,000B9H1U512 =xmescla bituminosa en calent d-12, amb granulat granític,inclòs filler, sense incloure betum, a peu de planta asfàltica

t

Subtotal... 26,17000 26,17000

COST DIRECTE 34,49997

0,00%DESPESES INDIRECTES

34,49997COST EXECUCIÓ MATERIAL

€31,69T MESCLA BITUMINOSA EN CALENT AC 22 BASE B60/70,AMB GRANULAT GRANÍTIC, INCLÒS FILLER, ESTESA ICOMPACTADA, SENSE INCLOURE BETUM

G9H1U62A Rend.: 145,000P- 349

Unitats Preu Parcial Import€Mà d'obra:

0,14483/R 21,000001,000A0112000 =xCap de collah

0,30331/R 21,990002,000A0121000 =xOFICIAL 1AH

0,52497/R 19,030004,000A0150000 =xMANOBRE ESPECIALISTAH

Subtotal... 0,97311 0,97311Maquinària:

3,74234/R 77,520007,000C1501U01 =xcamió de 400 hp, de 32 t (15,4 m3)h

0,39952/R 57,930001,000C1709B0U =xestenedora per a paviments de mescla bituminosah

0,45641/R 66,180001,000C170U035 =xpiconadora autopropulsada de 14 a 16 th

0,48290/R 70,020001,000C170U051 =xcorró vibratori autopropulsat pneumàtich

Subtotal... 5,08117 5,08117Materials:

25,6400025,640001,000B9H1U620 =xmescla bituminosa en calent s-20, amb granulat granític,inclòs filler, sense incloure betum, a peu de planta asfàltica

t

Subtotal... 25,64000 25,64000

COST DIRECTE 31,69428

0,00%DESPESES INDIRECTES

31,69428COST EXECUCIÓ MATERIAL

€378,74T BETUM ASFÀLTIC TIPUS B-60/70, PER A MESCLESBITUMINOSES

G9HA0010 Rend.: 1,000P- 350

Unitats Preu Parcial Import€Materials:

378,74000378,740001,000B055U001 =xbetum asfàltic tipus b-60/70t

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 184

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 378,74000 378,74000

COST DIRECTE 378,74000

0,00%DESPESES INDIRECTES

378,74000COST EXECUCIÓ MATERIAL

€165,25U FORMACIÓ DE MASSISSAT AMB FORMIGÓ ARMATHA-25/P/20/IIa PER ANCORATGE DE COLZE DE LACANONADA DN 250, INCLOENT SOBREEXCAVACIÓ ENQUALSEVOL TIPUS DE TERRENY, CÀRREGA DELSPRODUCTES SOBRANTS DE L'EXCAVACIÓ SOBRECAMIÓ, TRANSPORT A ABOCADOR, CÀNOND'ABOCAMENT, ARMADURA SEGONS DESCRIPCIÓ DEPLÀNOLS, ENCOFRAT I DESENCOFRAT

GFZAU012 Rend.: 7,057P- 351

Unitats Preu Parcial Import€Mà d'obra:

1,55803/R 21,990000,500A0121000 =xOFICIAL 1AH

5,21185/R 18,390002,000A0140000 =xMANOBREH

Subtotal... 6,76988 6,76988Maquinària:

1,63965/R 38,570000,300C131U560 =xRetroexcavadora mixtah

Subtotal... 1,63965 1,63965Materials:

115,8600057,930002,000B0652050 =xFormigó HA-25/B/20/IIa de consistència tova, grandàriamàxima del granulat 20 mm, amb >= 275 kg/m3 de ciment,apte per a classe d'exposició IIa

m3

30,000000,6000050,000B0B2A000 =xACER EN BARRES CORRUGADES B 500 S DE LÍMITELÀSTIC >= 500 N/MM2

KG

10,9800010,980001,000B0DZU600 =xPart proporcional d'encofrat per a ancortage de canonadaformada per petit mur pantalla armat de 45cm d'ample, 2mde llarg, fins a 4m de profunditat mesurat a partir de lacanonada i massís de formigó armat transmissor de l'esforç

u

Subtotal... 156,84000 156,84000

COST DIRECTE 165,24953

0,00%DESPESES INDIRECTES

165,24953COST EXECUCIÓ MATERIAL

€323,68u Caixa general de protecció CGP-11 de 400 A amb aïllamentde poliester reforçat IP-437, amb bases portafusibles tipus Hmida 1 de 6x250 A, neutre seccionable i borns bimetal·licsper a cable de 240 mm2 de secció, amb caixa i tapa per aprotecció de cables, segons especificacions i normativa de lacompanyia subministradora, inclòs transport a obra,muntatge, fixació i connexionat.

GG110020 Rend.: 1,000P- 352

Unitats Preu Parcial Import€Mà d'obra:

Page 107: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 185

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU2,10000/R 21,000000,100A0112000 =xCap de collah

21,99000/R 21,990001,000A0121000 =xOFICIAL 1AH

17,61000/R 17,610001,000A013U001 =xAjudanth

Subtotal... 41,70000 41,70000Materials:

281,98000281,980001,000BG110020 =xCaixa general de protecció CGP-11 de 400 A composta perenvolvent aïllant de poliester reforçat amb fibra de vidre,IP-437, contenint fusibles i bases portafusibles tipus H mida2 de 3x400 A, neutre seccionable i borns bimetàl·lics per acable de 240 mm2 de secció, inclòs caixa i tapa per aprotecció de cables

u

Subtotal... 281,98000 281,98000

COST DIRECTE 323,68000

0,00%DESPESES INDIRECTES

323,68000COST EXECUCIÓ MATERIAL

€66,26U SUBMINISTRE I COL·LOCACIÓ DE FITA DE POLIETILÈFLEXIBLE DE DIÀMETRE 20 CM I UNA ALTURA DE75CM, INCLOU ENDERROC DE PAVIMENT, TRANSPORTDE RUNA I REPOSICIÓ. TOTALMENT INSTAL·LAT

HB2B8316 Rend.: 1,000P- 353

Unitats Preu Parcial Import€Mà d'obra:

2,19900/R 21,990000,100A0121000 =xOFICIAL 1AH

1,83900/R 18,390000,100A0140000 =xMANOBREH

Subtotal... 4,03800 4,03800Maquinària:

3,66000/R 36,600000,100C1B0A000 =xMÀQUINA PER A CLAVAR MUNTANTS METÀL.LICSH

Subtotal... 3,66000 3,66000Materials:

58,5000058,500001,000BBMZ1653 =xFITA POLIETILE FLEXIBLEU

Subtotal... 58,50000 58,50000Altres:

% 0,060574,038001,50A%AUX001 =S/DESPESES AUXILIARS SOBRE LA MÀ D'OBRA%

Subtotal... 0,06057 0,06057

COST DIRECTE 66,25857

0,00%DESPESES INDIRECTES

66,25857COST EXECUCIÓ MATERIAL

€26.000,00PA PARTIDA ALÇADA A JUSTIFICAR EN CONCEPTED'IMPREVISTOS

I0000001 Rend.: 1,000P- 354

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 186

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€19,12ML Construcció de secció tipus 00-02-00 en vorera, formada per:Excavació de rasa de 77 cm de fons per 40 cm d´ampladacom a mínim; repàs i compactació, del fons de la rasa. Càrrega i transport de terres sobrants de l'excavació ambcamió fins a abocador autoritzat, inclós cànon d'abocament.Execució de prisma tubular format per 2 conductes de 63mm de diàmetre exterior, amb tub de polietilè d'alta densitatamb lubrificant interior, protegit amb un dau de sorra fina.Col·locació de cinta de senyalització, fils guia en cadaconducte, banda de protecció i maniguets d'unió.Rebliment i piconatge de rasa, amb material granularseleccionat d´aportació, en tongades de 25 cm com a màxim,amb compactació del 95 % del pm.Inclós certificat de mandrilat de conductes emés perlaboratori homologat.Totalment executat i acabat segons detalls de canalització.

L1000200V Rend.: 1,014P- 355

Unitats Preu Parcial Import€Mà d'obra:

0,72436/R 14,690000,050O0121000 =xOficial 1eraH

3,63905/R 12,300000,300O0140000 =xManobreH

0,74112/R 15,030000,050O0150000 =xTècnic acreditat supervisió mandrilatH

Subtotal... 5,10453 5,10453Maquinària:

2,91598/R 24,640000,120M0210030 =xRetroexcavadora fins a 75 CVH

0,16568/R 2,100000,080M0220035 =xPicadora de granota 105 KGH

1,65957/R 24,040000,070M0300005 =xCamió fins 12 TH

1,15680/R 3,910000,300M0300060 =xDúmper hidràulic fins 1500 KGH

0,82544/R 2,700000,310M0300200 =xCanon d'abocada autoritzadaM3

Subtotal... 6,72347 6,72347Materials:

0,924003,850000,240P0100000 =xTerres d'aportació seleccionades totalment col·locadesM3

1,1991017,130000,070P0200010 =xSorra finaM3

0,230000,230001,000P0515000 =xCinta de senyalització del servei de 15 cm d'ampladaUT

0,260000,130002,000P0516000 =xFil guia per a conductesML

3,420001,710002,000PD618001 =xTub de polietilè de doble paret d'alta densitat, corrugatexteriorment de 63 mm de diàmetre exterior, amb partproporcional de maniguet d'unió

ML

1,260001,260001,000PDGZ2000 =xBanda plàstica de protecció i senyalització del servei enrotllos de 40mx200x2,5mm

ML

Subtotal... 7,29310 7,29310

COST DIRECTE 19,12110

0,00%DESPESES INDIRECTES

19,12110COST EXECUCIÓ MATERIAL

Page 108: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 187

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€25,44ML Construcció de secció tipus 00-04-00 en vorera, formada per:Excavació de rasa de 77 cm de fons per 40 cm d´ampladacom a mínim; repàs i compactació, del fons de la rasa. Càrrega i transport de terres sobrants de l'excavació ambcamió fins a abocador autoritzat, inclós cànon d'abocament.Execució de prisma tubular format per 4 conductes de 63mm de diàmetre exterior, amb tub de polietilè d'alta densitatamb lubrificant interior, protegit amb un dau de sorra fina.Col·locació de cinta de senyalització, fils guia en cadaconducte, banda de protecció i maniguets d'unió.Rebliment i piconatge de rasa, amb material granularseleccionat d´aportació, en tongades de 25 cm com a màxim,amb compactació del 95 % del pm.Inclós certificat de mandrilat de conductes emés perlaboratori homologat.Totalment executat i acabat segons detalls de canalització.

L1000400V Rend.: 1,013P- 356

Unitats Preu Parcial Import€Mà d'obra:

1,01510/R 14,690000,070O0121000 =xOficial 1eraH

4,85686/R 12,300000,400O0140000 =xManobreH

1,48371/R 15,030000,100O0150000 =xTècnic acreditat supervisió mandrilatH

Subtotal... 7,35567 7,35567Maquinària:

2,91885/R 24,640000,120M0210030 =xRetroexcavadora fins a 75 CVH

0,16584/R 2,100000,080M0220035 =xPicadora de granota 105 KGH

1,66120/R 24,040000,070M0300005 =xCamió fins 12 TH

1,54393/R 3,910000,400M0300060 =xDúmper hidràulic fins 1500 KGH

0,82626/R 2,700000,310M0300200 =xCanon d'abocada autoritzadaM3

Subtotal... 7,11608 7,11608Materials:

0,924003,850000,240P0100000 =xTerres d'aportació seleccionades totalment col·locadesM3

1,1991017,130000,070P0200010 =xSorra finaM3

0,230000,230001,000P0515000 =xCinta de senyalització del servei de 15 cm d'ampladaUT

0,520000,130004,000P0516000 =xFil guia per a conductesML

6,840001,710004,000PD618001 =xTub de polietilè de doble paret d'alta densitat, corrugatexteriorment de 63 mm de diàmetre exterior, amb partproporcional de maniguet d'unió

ML

1,260001,260001,000PDGZ2000 =xBanda plàstica de protecció i senyalització del servei enrotllos de 40mx200x2,5mm

ML

Subtotal... 10,97310 10,97310

COST DIRECTE 25,44485

0,00%DESPESES INDIRECTES

25,44485COST EXECUCIÓ MATERIAL

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 188

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€22,53ML Construcció de secció tipus 02-00-00 en vorera, formada per:Excavació de rasa de 87 cm de fons per 40 cm d´ampladacom a mínim; repàs i compactació, del fons de la rasa. Càrrega i transport de terres sobrants de l'excavació ambcamió fins a abocador autoritzat, inclós cànon d'abocament.Execució de prisma tubular format per 2 conductes de 125mm de diàmetre exterior, amb tub de polietilè d'alta densitatamb lubrificant interior, protegit amb un dau de formigóH-175.Col·locació de cinta de senyalització, fils guia en cadaconducte, banda de protecció i maniguets d'unió.Rebliment i piconatge de rasa, amb material granularseleccionat d´aportació, en tongades de 25 cm com a màxim,amb compactació del 95 % del pm.Inclós certificat de mandrilat de conductes emés perlaboratori homologat.Totalment executat i acabat segons detalls de canalització.

L1020000V Rend.: 0,998P- 357

Unitats Preu Parcial Import€Mà d'obra:

0,73597/R 14,690000,050O0121000 =xOficial 1eraH

3,69739/R 12,300000,300O0140000 =xManobreH

0,75301/R 15,030000,050O0150000 =xTècnic acreditat supervisió mandrilatH

Subtotal... 5,18637 5,18637Maquinària:

2,96273/R 24,640000,120M0210030 =xRetroexcavadora fins a 75 CVH

0,16834/R 2,100000,080M0220035 =xPicadora de granota 105 KGH

1,68617/R 24,040000,070M0300005 =xCamió fins 12 TH

1,17535/R 3,910000,300M0300060 =xDúmper hidràulic fins 1500 KGH

0,94689/R 2,700000,350M0300200 =xCanon d'abocada autoritzadaM3

Subtotal... 6,93948 6,93948Materials:

0,924003,850000,240P0100000 =xTerres d'aportació seleccionades totalment col·locadesM3

17,130000,000P0200010 =xSorra finaM3

3,7712047,140000,080P0215000 =xFormigó H-150, consistència plàstica amb grandària màximadel granulat 20 mm

M3

0,230000,230001,000P0515000 =xCinta de senyalització del servei de 15 cm d'ampladaUT

0,260000,130002,000P0516000 =xFil guia per a conductesML

3,960001,980002,000PD618000 =xTub de polietilè de doble paret d'alta densitat, corrugatexteriorment de 125 mm de diàmetre i llis interior de 107 mmde diàmetre, amb part proporcional de maniguet d'unió

ML

1,260001,260001,000PDGZ2000 =xBanda plàstica de protecció i senyalització del servei enrotllos de 40mx200x2,5mm

ML

Subtotal... 10,40520 10,40520

COST DIRECTE 22,53105

0,00%DESPESES INDIRECTES

22,53105COST EXECUCIÓ MATERIAL

Page 109: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 189

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€22,33ML Construcció de secció tipus 02-00-00 en vorera, formada per:Excavació de rasa de 87 cm de fons per 40 cm d´ampladacom a mínim; repàs i compactació, del fons de la rasa. Càrrega i transport de terres sobrants de l'excavació ambcamió fins a abocador autoritzat, inclós cànon d'abocament.Execució de prisma tubular format per 2 conductes de 110mm de diàmetre exterior, amb tub de polietilè d'alta densitatamb lubrificant interior, protegit amb un dau de formigóH-175.Col·locació de cinta de senyalització, fils guia en cadaconducte, banda de protecció i maniguets d'unió.Rebliment i piconatge de rasa, amb material granularseleccionat d´aportació, en tongades de 25 cm com a màxim,amb compactació del 95 % del pm.Inclós certificat de mandrilat de conductes emés perlaboratori homologat.Totalment executat i acabat segons detalls de canalització.

L102000AV Rend.: 0,998P- 358

Unitats Preu Parcial Import€Mà d'obra:

0,73597/R 14,690000,050O0121000 =xOficial 1eraH

3,69739/R 12,300000,300O0140000 =xManobreH

0,75301/R 15,030000,050O0150000 =xTècnic acreditat supervisió mandrilatH

Subtotal... 5,18637 5,18637Maquinària:

2,96273/R 24,640000,120M0210030 =xRetroexcavadora fins a 75 CVH

0,16834/R 2,100000,080M0220035 =xPicadora de granota 105 KGH

1,68617/R 24,040000,070M0300005 =xCamió fins 12 TH

1,17535/R 3,910000,300M0300060 =xDúmper hidràulic fins 1500 KGH

0,94689/R 2,700000,350M0300200 =xCanon d'abocada autoritzadaM3

Subtotal... 6,93948 6,93948Materials:

3,760001,880002,000BG22TK10 =xTUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 110 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 28 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

M

0,924003,850000,240P0100000 =xTerres d'aportació seleccionades totalment col·locadesM3

17,130000,000P0200010 =xSorra finaM3

3,7712047,140000,080P0215000 =xFormigó H-150, consistència plàstica amb grandària màximadel granulat 20 mm

M3

0,230000,230001,000P0515000 =xCinta de senyalització del servei de 15 cm d'ampladaUT

0,260000,130002,000P0516000 =xFil guia per a conductesML

1,260001,260001,000PDGZ2000 =xBanda plàstica de protecció i senyalització del servei enrotllos de 40mx200x2,5mm

ML

Subtotal... 10,20520 10,20520

COST DIRECTE 22,33105

0,00%DESPESES INDIRECTES

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 190

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

22,33105COST EXECUCIÓ MATERIAL

€29,57ML Construcció en vorera, formada per:Excavació de rasa de 100 cm de fons per 40 cm d´ampladacom a mínim; repàs i compactació, del fons de la rasa. Càrrega i transport de terres sobrants de l'excavació ambcamió fins a abocador autoritzat, inclós cànon d'abocament.Execució de prisma tubular format per 4 conductes de 110mm de diàmetre exterior, amb tub de polietilè d'alta densitatamb lubrificant interior, protegit amb un dau de formigóH-175.Col·locació de cinta de senyalització, fils guia en cadaconducte, banda de protecció i maniguets d'unió.Rebliment i piconatge de rasa, amb material granularseleccionat d´aportació, en tongades de 25 cm com a màxim,amb compactació del 95 % del pm.Inclós certificat de mandrilat de conductes emés perlaboratori homologat.Totalment executat i acabat segons detalls de canalització.

L102000BV Rend.: 0,998P- 359

Unitats Preu Parcial Import€Mà d'obra:

1,47194/R 14,690000,100O0121000 =xOficial 1eraH

4,31363/R 12,300000,350O0140000 =xManobreH

1,50601/R 15,030000,100O0150000 =xTècnic acreditat supervisió mandrilatH

Subtotal... 7,29158 7,29158Maquinària:

2,96273/R 24,640000,120M0210030 =xRetroexcavadora fins a 75 CVH

0,16834/R 2,100000,080M0220035 =xPicadora de granota 105 KGH

1,68617/R 24,040000,070M0300005 =xCamió fins 12 TH

1,17535/R 3,910000,300M0300060 =xDúmper hidràulic fins 1500 KGH

0,94689/R 2,700000,350M0300200 =xCanon d'abocada autoritzadaM3

Subtotal... 6,93948 6,93948Materials:

7,520001,880004,000BG22TK10 =xTUB CORBABLE CORRUGAT DE POLIETILÈ, DE DOBLECAPA, LLISA LA INTERIOR I CORRUGADA L'EXTERIOR,DE 110 MM DE DIÀMETRE NOMINAL, AÏLLANT I NOPROPAGADOR DE LA FLAMA , RESISTÈNCIA AL'IMPACTE DE 28 J, RESISTÈNCIA A COMPRESSIÓ DE450 N, PER A CANALITZACIONS SOTERRADES

M

0,924003,850000,240P0100000 =xTerres d'aportació seleccionades totalment col·locadesM3

0,1713017,130000,010P0200010 =xSorra finaM3

4,7140047,140000,100P0215000 =xFormigó H-150, consistència plàstica amb grandària màximadel granulat 20 mm

M3

0,230000,230001,000P0515000 =xCinta de senyalització del servei de 15 cm d'ampladaUT

0,520000,130004,000P0516000 =xFil guia per a conductesML

1,260001,260001,000PDGZ2000 =xBanda plàstica de protecció i senyalització del servei enrotllos de 40mx200x2,5mm

ML

Subtotal... 15,33930 15,33930

Page 110: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 191

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 29,57036

0,00%DESPESES INDIRECTES

29,57036COST EXECUCIÓ MATERIAL

€28,66ML Construcció de secció tipus 02-02-00 en vorera, formada per:Excavació de rasa de 99 cm de fons per 40 cm d´ampladacom a mínim; repàs i compactació, del fons de la rasa. Càrrega i transport de terres sobrants de l'excavació ambcamió fins a abocador autoritzat, inclós cànon d'abocament.Execució de prisma tubular format per 2 conductes de 63mm de diàmetre exterior, protegit amb dau de formigó H-175,i 3 conductes de 40 mm de diàmetre exterior, amb tub depolietilè d'alta densitat amb lubrificant interior, protegit ambun dau de sorra fina.Col·locació de cinta de senyalització, fils guia en cadaconducte, banda de protecció i maniguets d'unió.Rebliment i piconatge de rasa, amb material granularseleccionat d´aportació, en tongades de 25 cm com a màxim,amb compactació del 95 % del pm.Inclós certificat de mandrilat de conductes emés perlaboratori homologat.Totalment executat i acabat segons detalls de canalització.

L102020AV Rend.: 1,003P- 360

Unitats Preu Parcial Import€Mà d'obra:

1,02522/R 14,690000,070O0121000 =xOficial 1eraH

4,90528/R 12,300000,400O0140000 =xManobreH

1,49850/R 15,030000,100O0150000 =xTècnic acreditat supervisió mandrilatH

Subtotal... 7,42900 7,42900Maquinària:

2,94796/R 24,640000,120M0210030 =xRetroexcavadora fins a 75 CVH

0,16750/R 2,100000,080M0220035 =xPicadora de granota 105 KGH

1,67777/R 24,040000,070M0300005 =xCamió fins 12 TH

1,55932/R 3,910000,400M0300060 =xDúmper hidràulic fins 1500 KGH

1,07677/R 2,700000,400M0300200 =xCanon d'abocada autoritzadaM3

Subtotal... 7,42932 7,42932Materials:

0,924003,850000,240P0100000 =xTerres d'aportació seleccionades totalment col·locadesM3

1,1991017,130000,070P0200010 =xSorra finaM3

2,8284047,140000,060P0215000 =xFormigó H-150, consistència plàstica amb grandària màximadel granulat 20 mm

M3

0,230000,230001,000P0515000 =xCinta de senyalització del servei de 15 cm d'ampladaUT

0,520000,130004,000P0516000 =xFil guia per a conductesML

6,840001,710004,000PD618001 =xTub de polietilè de doble paret d'alta densitat, corrugatexteriorment de 63 mm de diàmetre exterior, amb partproporcional de maniguet d'unió

ML

1,260001,260001,000PDGZ2000 =xBanda plàstica de protecció i senyalització del servei enrotllos de 40mx200x2,5mm

ML

Subtotal... 13,80150 13,80150

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 192

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

COST DIRECTE 28,65982

0,00%DESPESES INDIRECTES

28,65982COST EXECUCIÓ MATERIAL

€8,67UT Instal·lació d'obturador estanc per a tub de 125 mmLP001510 Rend.: 1,000P- 361

Unitats Preu Parcial Import€Mà d'obra:

0,98400/R 12,300000,080O0140000 =xManobreH

Subtotal... 0,98400 0,98400Materials:

7,690007,690001,000PD621500 =xObturador estanc per a tub de 125 MMUT

Subtotal... 7,69000 7,69000

COST DIRECTE 8,67400

0,00%DESPESES INDIRECTES

8,67400COST EXECUCIÓ MATERIAL

€8,67UT Instal.lació d'obturador estanc per a conducte de 63 mmLP001512 Rend.: 1,000P- 362

Unitats Preu Parcial Import€Mà d'obra:

0,98400/R 12,300000,080O0140000 =xManobreH

Subtotal... 0,98400 0,98400Materials:

7,690007,690001,000PD621502 =xObturador estanc per a conducte de 63 mmUT

Subtotal... 7,69000 7,69000

COST DIRECTE 8,67400

0,00%DESPESES INDIRECTES

8,67400COST EXECUCIÓ MATERIAL

€174,39UT Subministre i instal·lació o construcció en el seu cas, depericó de 40x40x55 cm de dimensions interiors, prefabricatsde formigó, homologats amb solera de formigó de 10 cm degruix, inclòs marc i tapa de fundició dúctil, excavació de pou itransport de terres a abocador autoritzat, totalment acabat.

LP001600 Rend.: 1,000P- 363

Unitats Preu Parcial Import€Mà d'obra:

4,40700/R 14,690000,300O0121000 =xOficial 1eraH

12,30000/R 12,300001,000O0140000 =xManobreH

Subtotal... 16,70700 16,70700

Page 111: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 193

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREUMaterials:

10,4328037,260000,280P0604220 =xFormigó H-150, consistència plàstica amb grandària màximadel granulat 20 mm

M3

108,18000108,180001,000PDK21000 =xPericó de 40x40x55 CM de dimensions interiors amb mòdulsde plàstic d'alta resistència

UT

39,0700039,070001,000PDK25140 =xMarc i tapa de fundició per a pericó de 40x40 CM dedimensions interiors lliures, segons plànol de detall 5

UT

Subtotal... 157,68280 157,68280

COST DIRECTE 174,38980

0,00%DESPESES INDIRECTES

174,38980COST EXECUCIÓ MATERIAL

€858,25UT Subministre i instal·lació d'arqueta tipus 'MD'de 70x140x100cm de dimensions interiors, de formigó prefabricat, ambsolera de formigó de 10 cm de gruix, inclòs marc i tapes defundició dúctil, excavació de pou i transport de terres aabocador autoritzat, perfileria i altres segons plànols,totalment acabat.

LP00165A Rend.: 1,001P- 364

Unitats Preu Parcial Import€Mà d'obra:

23,48052/R 14,690001,600O0121000 =xOficial 1eraH

49,15085/R 12,300004,000O0140000 =xManobreH

Subtotal... 72,63137 72,63137Materials:

25,3368037,260000,680P0604220 =xFormigó H-150, consistència plàstica amb grandària màximadel granulat 20 mm

M3

438,14000438,140001,000PDK21130 =xPericó de 70x140x85 cmUT

322,14000322,140001,000PDK25510 =xMarc metàl·lic i tapes de fundició per a pericó de 70x140 CMde dimensions interiors lliures, segons plànol de detall 5

UT

Subtotal... 785,61680 785,61680

COST DIRECTE 858,24817

0,00%DESPESES INDIRECTES

858,24817COST EXECUCIÓ MATERIAL

€1.172,86UT Subministre i instal·lació d'arqueta tipus 'MD'de 120x140x100cm de dimensions interiors, de formigó prefabricat, ambsolera de formigó de 10 cm de gruix, inclòs marc i tapes defundició dúctil, excavació de pou i transport de terres aabocador autoritzat, perfileria i altres segons plànols,totalment acabat.

LP00165B Rend.: 1,001P- 365

Unitats Preu Parcial Import€Mà d'obra:

29,35065/R 14,690002,000O0121000 =xOficial 1eraH

79,87013/R 12,300006,500O0140000 =xManobreH

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 194

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

Subtotal... 109,22078 109,22078Materials:

37,2600037,260001,000P0604220 =xFormigó H-150, consistència plàstica amb grandària màximadel granulat 20 mm

M3

591,48900438,140001,350PDK21130 =xPericó de 70x140x85 cmUT

434,88900322,140001,350PDK25510 =xMarc metàl·lic i tapes de fundició per a pericó de 70x140 CMde dimensions interiors lliures, segons plànol de detall 5

UT

Subtotal... 1.063,63800 1.063,63800

COST DIRECTE 1.172,85878

0,00%DESPESES INDIRECTES

1.172,85878COST EXECUCIÓ MATERIAL

€249,97UT Formació de pericó amb pedestal per armaris de distribucióde telecomunicacions de 28x59,6x92 cm, construit in situamb formigó h-150 amb plantilla segons detall de plànols;inclou excavació, encofrat, formigonat, col·locació de tubs imarc per pedestal format per angulars, de dimensions17,6x49,6x4,0 i cargols soldats, segons detall de plànols,totalment acabat.

LP001660 Rend.: 1,000P- 366

Unitats Preu Parcial Import€Mà d'obra:

11,75200/R 14,690000,800O0121000 =xOficial 1eraH

24,60000/R 12,300002,000O0140000 =xManobreH

Subtotal... 36,35200 36,35200Materials:

7,4520037,260000,200P0604220 =xFormigó H-150, consistència plàstica amb grandària màximadel granulat 20 mm

M3

14,8750029,750000,500P0B42000 =xProtecció de xapa metal·lica galvanitzada per a pedestal d'1MM de gruix de 140x30 CM i costers perfils en z, inclòselements de fixació, segons detall

M2

109,80000109,800001,000PDK25520 =xMarc i tapa per a per a pedestal de 140x30 CM, segonsplànols de detall 5

UT

81,4900081,490001,000PDK26001 =xTubs, colzes, maniguets reductors, inloent juntad'estanqueitat

UT

Subtotal... 213,61700 213,61700

COST DIRECTE 249,96900

0,00%DESPESES INDIRECTES

249,96900COST EXECUCIÓ MATERIAL

€160,00U CATA PER A LA LOCALITZACIO DE SERVEIS AMB MEDISMECANICS I MANUALS

S2CCG01A Rend.: 1,000P- 367

Page 112: ANNEX NÚM. 1: SERVEIS EXISTENTS I AFECTATS · 2015. 6. 25. · PROJECTE D’URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D’URGELL ANNEX NÚM. 1 : SERVEIS EXISTENTS

PROJECTE D´URBANITZACIÓ DEL SECTOR SUD-1 AL TERME MUNICIPAL DE LA SEU D´URGELL

JUSTIFICACIÓ DE PREUS Pàg.: 195

PARTIDES D'OBRA

NÚM CODI UA DESCRIPCIÓ PREU

€5.400,00U PARTIDA ALÇADA A JUSTIFICAR PELS TREBALLS DESOTERRAMENT I DESVIAMENT DE LA LÍNIA AERIA DETELEFONIA EXISTENT AL SECTOR SUD-1

SE3V000A Rend.: 1,000P- 368

€45,77M SUBMINISTRAMENT DE TUB DE POLIETILE DEDENSITAT ALTA, DE 300 MM DE DIAMETRE NOMINAL,DE 10 BAR DE PRESSIO NOMINAL, SEGONS UNE 53-131,APTE PER A US ALIMENTARI, PER A SOLDAR

SFFBSA30 Rend.: 1,000P- 369

€485,65U CONNEXIO A XARXA EXISTENT AFECTADA ENPARCEL·LA PRIVATIVA DES DEL FINAL DEL SECTORDE PROJECTE. INCLOU TOTA LA CANALITZACIÓ ( TANTOBRA CIVIL COM MECÀNICA ), ELS TREBALLS VARISD'ENCREUAMENT D'INFRAESTRUCTURES POSSIBLES,ELS PERMISOS, ELS ACCESSORIS NECESSARIS PER ADEIXAR LA XARXA CONNECTADA I TOT ALLONECESSARI PER TENIR LA XARXA EN FUNCIONAMENT.

SFNZ010A Rend.: 1,000P- 370

€116,54U SUMINISTRAMENT I MUNTATGE DE PORTABRIDESMANIPULAT DE PEAD DEXT 160 ,PN 10 AMB BRIDA BOJAAMB TRACTAMENT SUPERFICIAL CROMAT I ZINCATINCLÒS PART PROPORCIONAL DE JUNTS I ELEMENTSAUXILIARS NECESSARIS PER LA SEVA CORRECTAEXECUCIÓ. TOTALMENT INSTAL.LAT

SRF1D160 Rend.: 1,000P- 371