    Quantity Surveyor (Civil), Teejan, Om

    1. UNITS OF MEASUREMENTS

    SL.NO

    ITEMSUNIT

    FORLABOUR

    WORK

    UNIT

    FOR COMPLETEDITEM

    (MATERIAL+LABOUR)

    01 Excavation cum / cft cum / cft

    02 Ba ck filling /

    soling

    cum / cft cum / cft

    03 Footing

    (Concreting)

    No. cum / cft

    04 P.C.C sqm / sft cum / cft

    05 Column /

    Beam /

    LintelConcreting

    rm / rft cum / cft

    06 Slab

    concreting

    sqm / sft cum / cft

    07 Pardi /

    Chajja / Loft

    Concreting

    sqm / sft cum / cft

    08 Staircase

    Concreting

    No. (per step) cum / cft

    09 Brick

    masonry

    10cm to

    15cm thick

    sqm / sft sqm / sft

    10 Brick

    masonry

    23cm thick

    sqm / sft cum / cft

    11 Brick

    masonry

    35cm thick

    cum / cft cum / cft

    12 U.C.R.

    masonry

    cum / cft cum / cft

    13 Plastering / sqm / sft sqm / sft

    BASIC CONCEPT OF Q.S.

    http://manirengineerdiary.blogspot.com/2012/04/useful-data-for-estimation-of.htmlhttp://manirengineerdiary.blogspot.com/2012/04/useful-data-for-estimation-of.html
  • 7/25/2019 BASICO CONCEPTOS

    2/13

    11/30/2015 BASIC CONCEPT OF Q.S.

    http://manirengineerdiary.blogspot.in/2012/04/useful-data-for-estimation-of.html 2

    Pointing

    14 Flooring /

    Tiling

    sqm / sft sqm / sft

    15 Skirting /

    Steps

    rm / rft rm / rft

    16 Sill Patti rm / rft rm / rft

    17 Kitchen otta No. or rm / rft rm / rft

    18 Painting sqm / sft sqm / sft19 Doors /

    Windows

    No. or sqm /

    sft

    sqm / sft

    20 Plumbing

    pipes

    rm / rft rm / rft

    21 Plumbing

    fitting /

    sanitary

    ware

    No. No.

    22 Water tanks ltr. ltr.

    23 Septic tanks ltr. No. of users

    24 Road work

    (asphalting)

    sqm / sft sqm / sft

    25 Electrical

    cabling /

    Wiring

    rm / rft rm / rft

    26 Electrical

    points

    No. No.

    27 Water-

    proofing to

    terrace

    sqm / sft sqm / sft

    28 Water-

    proofing of

    W.C

    No. sqm / sft

    29 Gardening

    (lawn)

    sqm / sft sqm / sft

    30 Gardening

    (trees /

    bushes)

    No. No.

    2. CONVERSION TABLE

    SR.NO UNIT EQUIVALENT UNITS

    01 1 meter 100 centimeter

    02 1 meter 3.28 feet

    04 1 centimeter 0.393 inch

    05 1 foot 0.305 meter

    07 1 inch 2.54 centimeter/ 25.4 mm

    08 1 tone 1000 kg

    09 1 kg 1000 grams

  • 7/25/2019 BASICO CONCEPTOS

    3/13

    11/30/2015 BASIC CONCEPT OF Q.S.

    http://manirengineerdiary.blogspot.in/2012/04/useful-data-for-estimation-of.html 3

    10 1 kg 0.001 tone

    11 1 gram 0.001 kg

    13 1 sq meter 10.76 sq feet

    14 1 brass 100 sq feet

    15 1 brass 9.29 sq meter

    16 1 cu meter 35.28 cu feet

    17 1 cu meter 1000 liters

    18 1 cu feet 28.315 liters

    19 1 brass 100 cu feet

    20 1 cu feet 0.0283 cu meter

    21 1 liter 0.001 cu meter

    22 1 liter 0.0353 cu feet

    23 1 cu feet 0.01 brass

    24 1 cu meter 0.35 brass

    3. WEIGHTS OF BUILDING MATERIAL

    SR.NO MATERIAL THEORETICAL WEIGHT INKg/cum01 Cement 1440

    02 Steel 7850

    03 Dry sand 1600

    04 River sand 1840

    05 Stone 2850 to 2960

    06 Water 1000

    07 P.C.C 2240

    08 R.C.C. (2% steel) 2420

    09 Bricks 1600 to 1920

    10 Brick masonry 1920

    11 Soil 1760

    12 Cement concrete block (solid) 1800

    13 Cement mortar 2080

    14 Lime mortar 1760

    15 Lime 640

    16 Glass 2530

    17 Teak wood 670 to 830

    18 Sal wood 990

    19 Marble stone 2620

    20 Granite stone 2460 to280021 Cuddappa 2720

    22 Bitumen 1040

    RATE

    ANALYSIS

  • 7/25/2019 BASICO CONCEPTOS

    4/13

    11/30/2015 BASIC CONCEPT OF Q.S.

    http://manirengineerdiary.blogspot.in/2012/04/useful-data-for-estimation-of.html 4

    1. P.C.C. FOOTING (1:3:6)

    Consider 10 cum volume.

    Volume of dry concrete = 15.2 cum. (Adding 50 to 52% for compaction, wastages etc)

    Proportion (1:3:6) = 1+3+6 = 10

    Volume of cement = 15.2/10 = 1.52 cum.

    = 1.52/0.035 = 43.4 bags ~ 44 bags.

    Volume of sand = 1.52 X 3 = 4.56 cum.

    Volume of metal = 1.52 X 6 = 9.12 cum.

    MATERIAL QTY RATE PER AMOUNT

    CEMENT 44 265 Rs. Bag 11660.00

    SAND 4.56 1270 Rs. Cum 5791.20

    METAL 9.12 900 Rs. Cum 8208.00

    LABOURS NO. RATE PER AMOUNT

    HEAD MASON 02 400 Rs. Day 800.00

    MASON 04 250 Rs. Day 1000.00

    MALE COOLIE 16 200 Rs. Day 3200.00

    FEMALE COOLIE 07 150Rs. Day 1050.00

    TOTAL = 3170 9.2

    TOOLS & PLANTS L.S. 1% = 317.092

    TOTAL=31709.2+317.092 = 32026.292

    WATER & ELECTRIC CHARGES 2% = 640.52

    TOTAL=32026.292+640.52 = 32666.818

    CONTRACTORS PROFIT 25% = 8166 .705

    GRANT TOTAL= 3266.818+8166.705 = 40833.505

  • 7/25/2019 BASICO CONCEPTOS

    5/13

    11/30/2015 BASIC CONCEPT OF Q.S.

    http://manirengineerdiary.blogspot.in/2012/04/useful-data-for-estimation-of.html 5

    RATE FOR 10 CU.M = 40833.505 Rs.

    RATE FOR PER CU.M = 4083 .350 Rs.

    2. BRICK WORK

    Considering 1:4 ratios for cement mortar in 150mm thick brickwork.

    Calculation of quantity for 5 cu.m volume in brickwork as follows:

    Size of brick = 19 cm x9 cm x9 cm.

    Vol. of brick = (0.19 x 0.09 x 0.09) cu.m

    = 0.00154cu.m.

    Vol. of brick with cement mortar

    = (0.2 x 0.1 x 0.1) cu.m

    = 0.002 cu.m.

    No. of bricks in 5 cu.m

    = 5 (vol. of one brick with mortar).

    = 5 0.002

    = 2500

    Vol. of 2500 bricks = 2500 x vol. of one brick without mortar.

    =2500 x 0.00154

    = 3.85cu.m.

    Vol. of mortar = 5 3.85 = 1.15 cu.m.

    Add 15% (Bulkage + wastage)

    Vol. of wet mortar = 1.15 + {1.15 x (15 100)}

    = 1.323cu.m

    Vol. of dry mortar = 1.323 + 33% in wet mortars for interlocking =1.759cu.m

  • 7/25/2019 BASICO CONCEPTOS

    6/13

    11/30/2015 BASIC CONCEPT OF Q.S.

    http://manirengineerdiary.blogspot.in/2012/04/useful-data-for-estimation-of.html 6

    Vol. of cement = 1.759 (1+4) =0.352cu.m

    No. of cement bags = 0.352 0.035

    =10.057bags.

    10.00bags

    Vol. of sand = 0.352 x 4

    = 1.408cu.m.

    ITEM DESCRIPTION QUANTITY RATE RS. AMOUNT RS.

    a. Material

    Cement

    Sand

    Bricks

    10 bags

    1.408 cu.m

    2500 Nos.

    250/bag

    1270/cu.m

    4/no.

    2500.00

    1788.16

    10000.00

    Mason

    Head Mason

    Male coolie

    4

    1

    10

    250/day

    400/day

    200/day

    1000.00

    400.00

    2000.00

    Total 17688.16

    c. Tools & Plants 1% 0f total 176.88

    Total 17865.04

    d. Water charges 2% Of total 357.30

    Total 18222.34

    e. Supervisor, Overhead & 25% Of the total 4555.58

  • 7/25/2019 BASICO CONCEPTOS

    7/13

    11/30/2015 BASIC CONCEPT OF Q.S.

    http://manirengineerdiary.blogspot.in/2012/04/useful-data-for-estimation-of.html 7

    Profit

    Total 22777.92

    RATE FOR 5 CU.M = 22777.92 Rs.

    RATE FOR PER CU.M = 4555.58 Rs.

    3. R.C.C. COLUMN

    Consider 10 cum volume.

    Grade of concrete M 40

    Proportion (1: 1.808:1.616) 1+1.808+1.616= 4.424 {as per mix design}

    Volume of dry concrete = 15.2 cum. (52% for compaction & wastages)

    Volume of Cement = 15.2/4.424 = 3.435 cum.

    Cement bags = 3.435/0.035 = 98.12 ~ 99 Bags.

    Sand = 3.435 X 1.808 = 6.21 cum.

    Metal = 3.435 X 1.616= 5.55 cum.

    MATERIAL QTY RATE PER AMOUNT

    CEMENT 99 265 Rs. Bag 26235.00

    SAND 6.21 1270 Rs. Cum 7886.70

    METAL 5.55 900 Rs. Cum 4995.00

    LABOURS NO. RATE PER AMOUNT

    HEAD MASON 1 400 Rs. Day 400.00

  • 7/25/2019 BASICO CONCEPTOS

    8/13

    11/30/2015 BASIC CONCEPT OF Q.S.

    http://manirengineerdiary.blogspot.in/2012/04/useful-data-for-estimation-of.html 8

    MASON 3 250 Rs. Day 750.00

    MALE COOLIE 16 200 Rs. Day 3200.00

    BHISTI 7 150 Rs. Day 1050.00

    CARPENTER 4 200 Rs. Day 800.00

    HELPER 8 125 Rs. Day 1000.00

    TOTAL = 4631 6.7

    Tools & Plants charges 1% = 463.167

    TOTAL=46316.7+463.167 = 46779.86

    Water charges 2% = 935.59

    TOTAL=46779.86+935.59 = 47715.45

    Contractors profit 25% = 11928.8

    TOTAL = 47715.45+11928.8 = 59644.31

    RATE FOR 10 CUM = RS. 59644.31/-

    RATE FOR PER CU.M = RS. 5964.43/-

    4. INTERNAL PLASTER

    12mm thick internal plaster

    Considering 100sqm area

    Proportion of C:M = 1:4

    Summation of proportion =5

    Quantity of one cement bag = 0.035cum

  • 7/25/2019 BASICO CONCEPTOS

    9/13

    11/30/2015 BASIC CONCEPT OF Q.S.

    http://manirengineerdiary.blogspot.in/2012/04/useful-data-for-estimation-of.html 9

    Quantity of wet mortar = 0.012 x 100 = 1.2cum

    Adding 15% wastage = 1.2 + (1.2 x 0.15) =1.38cum

    Volume of dry mix = 1.38 + (1.38 x 1/3) =1.84cum

    Volume of cement = (dry volume / 5) x 1

    = (1.84 /5) x 1

    = 0.368cum

    = 0.368 / 0.035

    =10.5 bags

    Volume of sand = (dry volume / 5) x 4

    = (1.84 /5) x 4

    = 1.472 cum

    MATERIALS QUANTITY RATE (RS) AMOUNT (RS)

    Sand 1.472cum 1300 /cum 1913

    Cement 10.5bags 250 / bag 2625

    Scaffolding L.S 550 550

    LABOURS QUANTITY RATE (RS) AMOUNT (RS)

    Mason 8nos 200 1600

    Helper 12nos 90 1080

    Total 7768

    Tools & Plants 1% 0f total 77.68

    Total 7845.68

    Water charges 2% Of total 156.91

    Total 8002.59

    Supervisor, Overhead &

    Profit

    25% Of the total 2000.65

    Total 10003.23

  • 7/25/2019 BASICO CONCEPTOS

    10/13

    11/30/2015 BASIC CONCEPT OF Q.S.

    http://manirengineerdiary.blogspot.in/2012/04/useful-data-for-estimation-of.html 10

    RATE FOR 100m = 10003.23Rs.

    RATE FOR 1m = 100.03 Rs.

    5. EXTERNAL PLASTER20mm thick external plaster

    Considering 100sqm area.

    Proportion for mix C:M = 1:4.

    Summation of proportion = 5.

    Quantity of one cement bag = 0.035cum.

    Quantity of wet mortar = 0.02 x 100 = 2cum.

    Adding 20% wastage = 2 +( 2 x 0.2 ) = 2.4cum.Volume of dry mix = 2.4 + (2.4 x 1/3) = 3.2cum.

    Volume of cement = (dry volume / 5) x 1

    = (3.2 /5) x 1

    = 0.64cum

    = 0.64 / 0.035

    = 18.3 bags

    = 19 bags

    Volume of sand = (dry mix / 5) x 4

    = (3.2 /5) x 4

    = 2.56cum.

    PARTICULAR QUANTITY RATE(RS) AMOUNT(RS)

    Materials

    Sand 2.56cum 1300 3328

    Cement 19bags 250 4750

    Scaffolding L.S. 550 550

    Labors

    Mason 8nos 200 1600

    Helper 12nos 90 1080

    Total 11708.5

    Tools & Plants 1% 0f total 117.08

  • 7/25/2019 BASICO CONCEPTOS

    11/13

    11/30/2015 BASIC CONCEPT OF Q.S.

    http://manirengineerdiary.blogspot.in/2012/04/useful-data-for-estimation-of.html 1

    Total 11825.60

    Water charges 2% Of total 236.512

    Total 12062.112

    Supervisor, Overhead &

    Profit

    25% Of the total 3015.53

    Grand Total 15077.64

    RATE FOR 100m = 15077.64Rs.

    RATE FOR 1m =150.77 Rs.

    USEFULL DATA FOR ESTIMATION[] Mixer Machine Capacity:

    [http://www.blogger.com/blogger.g?

    blog ID=105991757 0796 814997]

    Sr. No: Capacity Dry volume in

    cumWet volumein cum

    Output perhour

    Petrol consumptionper hour in litre

    Remarks

    1 6' / '4' 0.170 0.113 2.266 1.000Each batch of concreterequires about 3 minuteof mixing

    2 7' / '5' 0.198 0.142 2.832 1.400

    3 10' / '7' 0.283 0.198 3.965 1.700

    Cement Mortar:

    Sr. No: Ratio Cement in Kg Cement inbag

    Sand in'cum'.

    Remarks

    1 1 : 1' 1054 21.08 0.73

    Water may begenerally taken as140 litres per 'cum'.

    50 kg. cement bag size i(400mm x 350mm x250mm internallyVolume per is = 0.035'cum'.

    2 1 : 2' 686 13.72 0.96

    3 1 : 3' 491 9.82 1.02

    1 1 : 4' 380 7.60 1.05

    5 1 : 6' 253 5.06 1.05

    6 1 : 8' 192 3.84 1.06

    http://www.blogger.com/blogger.g?blogID=1059917570796814997
  • 7/25/2019 BASICO CONCEPTOS

    12/13

    11/30/2015 BASIC CONCEPT OF Q.S.

    http://manirengineerdiary.blogspot.in/2012/04/useful-data-for-estimation-of.html 12

    Cement Concrete:

    Sr. No: Ratio Cement in Kg Cement inbag

    Sand in'cum'.

    Aggregate in 'cum'. Remarks

    11 : 4 : 8'

    NominalMix

    161 3.22 0.45 0.89

    2

    1 : 3 : 6'

    NominalMix 212 4.24 0.44 0.88

    3 1 : 2 : 4'

    M15 317 6.34 0.44 0.88

    4 1 : 1.5 : 3'

    M20 403 8.06 0.42 0.84

    5 1 : 1 : 2'

    M25 555 11.10 0.385 0.77

    Remarks

    Considering dry density of concrete is 1.54 'cum'.

    Aggregate may be used 60% : 40% ratio of 20mm and 10mm down respectively.

    Water required for concrete varies from 28 to 35 litres per bag of (50kg) cement depending on the mix andproportion.

    Reinforcement (Steel) works:

    Reinforcement usually required in various situation is asfollows:

    Culvert and foundaion = 0.5% to 1%

    Slab and landing = 0.5% to 1.5%

    Arch, wal, floor and flate roof = 1% to 2%

    Column and brace = 2 % to 3%

    Column and brace = 2 % to 3%

    Pile = 2% to 5%

    Remarks

    Binding or tying wire for reinforcement may be taken as 0.9 to 1.3 kg per quintal of reinforcement.

    One 50 kg. bag of cement will make approximately following volume of concrete:

    The equivalent size of a box for 50 kg. cement bag is 400mmx350mmx250mminternally.

    0.133 'cum' of 1 : 1.5 : 3 concrete.

    0.166 'cum' of 1 : 2 : 4 concrete.

  • 7/25/2019 BASICO CONCEPTOS

    13/13

    11/30/2015 BASIC CONCEPT OF Q.S.

    0.140 'cum' of 1: 1 : 2 concrete.

    0.250 'cum' of 1: 3 : 6 concrete.

    0.333 'cum' of 1: 4 : 8 concrete.

    0.400 'cum' of 1: 5 : 10 concrete.

    0.500 'cum' of 1: 6 : 12 concrete.

    Posted 22nd April 2012 by Manirul Islam

    Enter your comment...

    Comment as: Google Accou

    Publish

    Preview

    0 Add a comment

    https://plus.google.com/107355645824202541041