CALCULO DE FLETE 01.01.02 FLETE DE MATERIALES, HERRAMIENTAS PUCALLPA - CURIMANA DESCRIPCION DE INSUMO UND PESO UNIT CANTIDAD MATERIALES : ALAMBRE NEGRO RECOCIDO # 8 kg 593.8675 1.0000 593.87 CLAVOS PARA MADERA C/C 3" kg 1,333.3538 1.0000 1,333.35 CLAVOS PARA MADERA C/C 1" kg 0.5000 1.0000 0.50 ALAMBRE NEGRO N°16 kg 6,738.0420 1.0000 6,738.04 ALAMBRE NEGRO N°8 kg 1,167.3700 1.0000 1,167.37 ALAMBRE NEGRO N° 12 kg 338.2134 1.0000 338.21 ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 kg 120,063.0062 1.0000 120,063.01 ACERO LISO DE D =3/4" kg 5,918.7345 1.0000 5,918.73 REJILLA DE ACERO (0.80 x 0.52) Und 36.0000 20.0000 720.00 ASFALTO RC-250 gln 1,121.6029 4.0000 4,486.41 CEMENTO PORTLAND TIPO I (42.5KG) BOL 45,228.7670 42.5000 1,922,222.60 TACHOS DE BASURAS Und 8.0000 10.0000 80.00 YESO EN BOLSAS DE 25 KG. BOL 255.8187 25.0000 6,395.47 WATER STOP DE 6" Ml 550.2000 1.0000 550.20 TECKNOPORT (1.20 x 2.40 x 10 MM) pln 198.3040 1.0000 198.30 ADITIVO PARA CONCRETO (MEMBRANIL) gln 926.8932 4.0000 3,707.57 MADERA NACIONAL P/ENCOFRADO Y CARPINTERIA p2 39,138.0800 2.0000 78,276.16 ESTACA DE MADERA p2 1,445.7300 2.0000 2,891.46 PINTURA ESMALTE gln 24.0954 4.0000 96.38 PINTURA DE TRAFICO COLOR BLANCO gln 33.7544 4.0000 135.02 TUBO PVC SAP 1" Ml 1,691.0670 0.2500 422.77 OTROS MATERIALES KG 1,000.00 1.00 1,000.00 PESO TOTAL (KG) 2,157,335.43 COSTO TRANSPORTE: Camion Plataforma de 4x2 178-210 HP de 19 Tn : Alquiler por Hora S/. 150.00 Total de horas de Pucallpa - Neshuya - Via Pavimentada Distancia 60 Km 1.50 hr Total de horas de Neshuya - Curimana - Via Afirmada Distancia 38 Km 1.90 hr '======== Total de horas 3.40 hr Transporte de materiales a Obra x Tn = 150 x 3.40 S/. 26.84 Estibaje x Tn S/. 10.00 ========== Costo por tonelaje S/. S/. 36.84 Total costo 2,157.34 x 36.84 S/. = 79,476.41 Proyecto : “CONSTRUCCION DE PAVIMENTO DEL JR. BARBARAN SHARFF Y DOS DE MAYO (ENTRE JR. CURIMANA Y JORGE CHAVEZ) Y LOS JR. ANDRES AVELINO CACERES, JR. NESHUYA, JR. FANCISCO BOLOGNESI Y JR. MICAELA BASTIDAS (ENTRE JR. BARBARAN SHARFF Y JR. DOS DE MAYO) - CURIMANA - PADRE ABAD - UCAYALI" PUCALLPA - CURIMANA

Calculo Transporte de Materiales

Embed Size (px)

DESCRIPTION

oihu

Citation preview

Page 1: Calculo Transporte de Materiales

CALCULO DE FLETE

01.01.02 FLETE DE MATERIALES, HERRAMIENTAS PUCALLPA - CURIMANA

DESCRIPCION DE INSUMO UND PESO UNIT CANTIDAD

MATERIALES :ALAMBRE NEGRO RECOCIDO # 8 kg 593.8675 1.0000CLAVOS PARA MADERA C/C 3" kg 1,333.3538 1.0000CLAVOS PARA MADERA C/C 1" kg 0.5000 1.0000ALAMBRE NEGRO N°16 kg 6,738.0420 1.0000ALAMBRE NEGRO N°8 kg 1,167.3700 1.0000ALAMBRE NEGRO N° 12 kg 338.2134 1.0000ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 kg 120,063.0062 1.0000ACERO LISO DE D =3/4" kg 5,918.7345 1.0000REJILLA DE ACERO (0.80 x 0.52) Und 36.0000 20.0000ASFALTO RC-250 gln 1,121.6029 4.0000CEMENTO PORTLAND TIPO I (42.5KG) BOL 45,228.7670 42.5000TACHOS DE BASURAS Und 8.0000 10.0000YESO EN BOLSAS DE 25 KG. BOL 255.8187 25.0000WATER STOP DE 6" Ml 550.2000 1.0000TECKNOPORT (1.20 x 2.40 x 10 MM) pln 198.3040 1.0000ADITIVO PARA CONCRETO (MEMBRANIL) gln 926.8932 4.0000MADERA NACIONAL P/ENCOFRADO Y CARPINTERIA p2 39,138.0800 2.0000ESTACA DE MADERA p2 1,445.7300 2.0000PINTURA ESMALTE gln 24.0954 4.0000PINTURA DE TRAFICO COLOR BLANCO gln 33.7544 4.0000TUBO PVC SAP 1" Ml 1,691.0670 0.2500

OTROS MATERIALES KG 1,000.00 1.00PESO TOTAL (KG)

COSTO TRANSPORTE:

Camion Plataforma de 4x2 178-210 HP de 19 Tn : Alquiler por Hora S/. 150.00

Total de horas de Pucallpa - Neshuya - Via Pavimentada Distancia 60 Km. 1.50Total de horas de Neshuya - Curimana - Via Afirmada Distancia 38 Km. 1.90

'========Total de horas 3.40

Transporte de materiales a Obra x Tn = 150 x 3.40 / 19 S/. 26.84Estibaje x Tn S/. 10.00

==========Costo por tonelaje S/. S/. 36.84

Total costo 2,157.34 x 36.84 S/. =

Proyecto : “CONSTRUCCION DE PAVIMENTO DEL JR. BARBARAN SHARFF Y DOS DE MAYO (ENTRE JR. CURIMANA Y JORGE CHAVEZ) Y LOS JR. ANDRES AVELINO CACERES, JR. NESHUYA, JR. FANCISCO BOLOGNESI Y JR. MICAELA BASTIDAS

(ENTRE JR. BARBARAN SHARFF Y JR. DOS DE MAYO) - CURIMANA - PADRE ABAD - UCAYALI"

Page 2: Calculo Transporte de Materiales

Estibaje : SUB TOTAL (I) S/. 10 POR TN

Camion Plataforma de 4x2 178-210 HP de 19 Tn : Alquiler por Hora S/. 150.00

Total de horas de Pucallpa - Neshuya Distancia 60 Km. 1.50Total de horas de Neshuya - Curimana Distancia 38 Km. 1.90Total de horas 3.40

Transporte de materiales a Obra x Tn =SUB TOTAL (II) S/. 26.84

SUB TOTAL COSTO POR TN ( I + II) S/. 36.84

Costo Total S/. SUB TOTAL ( I + II)

Page 3: Calculo Transporte de Materiales

CALCULO DE FLETE

593.871,333.35

0.506,738.041,167.37

338.21120,063.01

5,918.73720.00

4,486.411,922,222.60

80.006,395.47

550.20198.30

3,707.5778,276.16

2,891.4696.38

135.02422.77

1,000.002,157,335.43

hrhr

'========hr

==========

79,476.41

: “CONSTRUCCION DE PAVIMENTO DEL JR. BARBARAN SHARFF Y DOS DE MAYO (ENTRE JR. CURIMANA Y JORGE CHAVEZ) Y LOS JR. ANDRES AVELINO CACERES, JR. NESHUYA, JR. FANCISCO BOLOGNESI Y JR. MICAELA BASTIDAS

(ENTRE JR. BARBARAN SHARFF Y JR. DOS DE MAYO) - CURIMANA - PADRE ABAD - UCAYALI"

PUCALLPA - CURIMANA

A4
EvoCodeName:
Page 4: Calculo Transporte de Materiales

21,573.35

57,902.73

79,476.09

Page 5: Calculo Transporte de Materiales

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

01.01.03 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS

DESCRIPCION DE INSUMO UND PESO UNIT CANTIDAD

EQUIPOSRODILLO LISO VIBR AUTOP 101-135HP 10-12T Und 11,100.00 1.00TRACTOR DE ORUGAS DE 190-240 HP Und 38,000.00 1.00CARGADOR FRONTAL CAT- 930 Und 18,585.00 1.00RETROEXCAVADORA 225 H.P. Und 9,000.00 1.00MOTONIVELADORA DE 125 HP Und 11,515.00 1.00GRUA HIDRAULICA AUTOP. 127HP 18TON-9M. Und 15,000.00 0.00CAMION GRUA (BRAZO ARTICULADO) Und 20,000.00 0.00MEZCLADORA DE CONCRETO DE 9 -11P3 Und 500.00 2.00

PESO TOTAL (KG)MOVILIZACION Y DESMOVILIZACION

COSTO TRANSPORTE:Total de horas de Pucallpa - Neshuya - Via Pavimentada Distancia 60 Km. 1.50Total de horas de Neshuya - Curimana - Via Afirmada Distancia 38 Km. 1.90

=========Total de horas Pucallpa - Curimana 3.40

Total de horas por viaje (ida y vuelta) 6.80

Camion Semitrailer 6x4 330 HP de 60Tn Alquiler por Hora S/. 180.00

Transporte de maquinaria a Obra x Tn = 180 x 3.40 / 60 S/. 20.40

Camion Plataforma de 4x2 178-210 HP de 19 Tn : Alquiler por Hora S/. 150.00

Transporte de maquinaria a Obra x Tn = 150 x 3.40 / 19 S/. 53.68

Costo Total S/.

Pare el efecto de Pago se divide el monto según las Partidas especificas como sigue:

TRABAJOS PRELIMINARESPart. 01.01.03 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS S/.

Proyecto : “CONSTRUCCION DE PAVIMENTO DEL JR. BARBARAN SHARFF Y DOS DE MAYO (ENTRE JR. CURIMANA Y JORGE CHAVEZ) Y LOS JR. ANDRES AVELINO CACERES, JR. NESHUYA, JR. FANCISCO BOLOGNESI Y JR. MICAELA BASTIDAS (ENTRE

JR. BARBARAN SHARFF Y JR. DOS DE MAYO) - CURIMANA - PADRE ABAD - UCAYALI"

Page 6: Calculo Transporte de Materiales

COSTO TRANSPORTE:Total de horas de Pucallpa - Neshuya Distancia 60 Km. 1.50Total de horas de Neshuya - Curimana Distancia 38 Km. 1.90Total de horas 3.40

Camion Semitrailer 6x4 330 HP de 40Tn Alquiler por Hora S/. 180.00

Transporte de maquinaria a Obra x Tn = S/. 10.20

Camion Plataforma de 4x2 178-210 HP de 19 Tn : Alquiler por Hora S/. 150.00

Transporte de maquinaria a Obra x Tn = S/. 26.84

Costo Total S/.

Pare el efecto de Pago se divide el monto según las Partidas especificas como sigue:

TRABAJOS PRELIMINARESPart. 01.01.04 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS S/.

Page 7: Calculo Transporte de Materiales

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

11,100.0038,000.00

18,585.009,000.00

11,515.000.00

0.001,000.00

51,200.00 38,000.00102,400.00 76,000.00

hrhr

=========hr

hr

1,550.40

5,496.83

7,047.23

7,047.23

: “CONSTRUCCION DE PAVIMENTO DEL JR. BARBARAN SHARFF Y DOS DE MAYO (ENTRE JR. CURIMANA Y JORGE CHAVEZ) Y LOS JR. ANDRES AVELINO CACERES, JR. NESHUYA, JR. FANCISCO BOLOGNESI Y JR. MICAELA BASTIDAS (ENTRE

JR. BARBARAN SHARFF Y JR. DOS DE MAYO) - CURIMANA - PADRE ABAD - UCAYALI"

Camion Plataforma19

Tn

Camion Semitrailer 40

Tn

A4
EvoCodeName:
Page 8: Calculo Transporte de Materiales

775.20

2,748.42

3,523.62

3,523.62