PROYECTO: CONSULTOR: ING. JORGE ED FECHA: MARZO 2016 ITEM 1 REPLANTEO Y 2 EXCAVACION 3 EXCAVACION 4 EXCAVACION 5 EXCAVACION 6 RAZANTEO DE 7 8 SUMINISTRO Y 9 GEOTEXTIL PA 10 COLCHON DE 11 RELLENO COM 12 RELLENO COM 13 SUM. E INSTA 14 SUM. E INSTA 15 SUM. E INSTA 16 SUM. E INSTA 17 SUM. E INSTA 18 SUM. E INSTA 19 SUM. E INSTA 20 POZO DE REV 21 POZO DE REV 22 TAPA Y CERCO 23 DESALOJO DE 24 HORMIGON S 25 ENROCADO 26 SUMINISTRO E 27 CAJA DE REVI 28 ENTIBADOS 29 SUMIDERO DE ESTUDIOS Y D DEL CANTÓN TUBERIA PERF

CANTIDADES DE OBRA

Embed Size (px)

DESCRIPTION

CALCULO DE ANEXO DE CANTIDADES DE OBRA DE ALCANTARILLADO

Citation preview

Page 1: CANTIDADES DE OBRA

TABLA DE CANTIDADES Y PRECIOS (RESUMEN)

PROYECTO:

CONSULTOR: ING. JORGE EDUARDO MOGROVEJO RAMIREZ

FECHA: MARZO 2016

ITEM DESCRIPCIONALCANTARILLADO PLUVIAL PORVENIR DEL CARMEN

1 REPLANTEO Y NIVELACION CON EQUIPO TOPOGRAFICO2 EXCAVACION SIN CLASIFICAR A MANO3 EXCAVACION EN ROCA CON EXPLOSIVOS, EQUIPO PIUNJER4 EXCAVACION A MAQUINA 0-2m SUELO5 EXCAVACION A MAQUINA 2.00-4.00 m SUELO6 RAZANTEO DE ZANJA78 SUMINISTRO Y COLOCACION DE MATERIAL GRANULAR PARA DRENES9 GEOTEXTIL PARA DRENES

10 COLCHON DE ARENA11 RELLENO COMPACTADO CON MATERIAL DE EXCAVACION12 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO13 SUM. E INSTALACION TUBERIA NOVAFOR Φ =160 mm14 SUM. E INSTALACION TUBERIA NOVAFOR Φ = 250 mm15 SUM. E INSTALACION TUBERIA NOVAFOR Φ = 315 mm16 SUM. E INSTALACION TUBERIA NOVAFOR Φ = 400 mm17 SUM. E INSTALACION TUBERIA NOVAFOR Φ = 525 mm18 SUM. E INSTALACION TUBERIA NOVAFOR Φ = 640 mm19 SUM. E INSTALACION TUBERIA NOVAFOR Φ = 790 mm20 POZO DE REVISION H=0.00 - H=2.0021 POZO DE REVISION H=0.00 - H=4.0022 TAPA Y CERCO DE POZO23 DESALOJO DE MATERIAL24 HORMIGON SIMPLE CLASE A f'c=210kg/cm2 SUPERESTRUCTURA 25 ENROCADO26 SUMINISTRO E INSTALACION TUBERIA PERFILADA PARA ALCANTARILLADO Ø=160mm27 CAJA DE REVISION f´c= 210 Kg/cm² de 1,00x1,00 m28 ENTIBADOS29 SUMIDERO DE CALZADA DE AGUAS LLUVIAS + REJILLA HF

ESTUDIOS Y DISEÑOS DEFINITIVOS DEL SISTEMA DE ALCANTARILLADO PLUVIAL DE LA PARROQUIA EL PORVENIR DEL CARMEN DEL CANTÓN PALANDA.

TUBERIA PERFORADA PARA DRENES

Page 2: CANTIDADES DE OBRA

TABLA DE CANTIDADES Y PRECIOS (RESUMEN)

ING. JORGE EDUARDO MOGROVEJO RAMIREZ

MARZO 2016

DESCRIPCIONALCANTARILLADO PLUVIAL PORVENIR DEL CARMEN

REPLANTEO Y NIVELACION CON EQUIPO TOPOGRAFICOEXCAVACION SIN CLASIFICAR A MANOEXCAVACION EN ROCA CON EXPLOSIVOS, EQUIPO PIUNJEREXCAVACION A MAQUINA 0-2m SUELOEXCAVACION A MAQUINA 2.00-4.00 m SUELORAZANTEO DE ZANJA

SUMINISTRO Y COLOCACION DE MATERIAL GRANULAR PARA DRENESGEOTEXTIL PARA DRENESCOLCHON DE ARENARELLENO COMPACTADO CON MATERIAL DE EXCAVACIONRELLENO COMPACTADO CON MATERIAL DE PRESTAMOSUM. E INSTALACION TUBERIA NOVAFOR Φ =160 mmSUM. E INSTALACION TUBERIA NOVAFOR Φ = 250 mmSUM. E INSTALACION TUBERIA NOVAFOR Φ = 315 mmSUM. E INSTALACION TUBERIA NOVAFOR Φ = 400 mmSUM. E INSTALACION TUBERIA NOVAFOR Φ = 525 mmSUM. E INSTALACION TUBERIA NOVAFOR Φ = 640 mmSUM. E INSTALACION TUBERIA NOVAFOR Φ = 790 mmPOZO DE REVISION H=0.00 - H=2.00POZO DE REVISION H=0.00 - H=4.00TAPA Y CERCO DE POZODESALOJO DE MATERIALHORMIGON SIMPLE CLASE A f'c=210kg/cm2 SUPERESTRUCTURA

SUMINISTRO E INSTALACION TUBERIA PERFILADA PARA ALCANTARILLADO Ø=160mmCAJA DE REVISION f´c= 210 Kg/cm² de 1,00x1,00 m

SUMIDERO DE CALZADA DE AGUAS LLUVIAS + REJILLA HF

ESTUDIOS Y DISEÑOS DEFINITIVOS DEL SISTEMA DE ALCANTARILLADO PLUVIAL DE LA PARROQUIA EL PORVENIR DEL CARMEN DEL CANTÓN PALANDA.

TUBERIA PERFORADA PARA DRENES =160mm

Page 3: CANTIDADES DE OBRA

TABLA DE CANTIDADES Y PRECIOS (RESUMEN)

UNIDAD CANTIDADALCANTARILLADO PLUVIAL PORVENIR DEL CARMEN

Km 3.12m3 276.05m3 0.00m3 5814.49m3 530.66m2 2730.70m 709.69

m3 444.56m2 2696.82m3 216.70m3 4424.59m3 1000.33Ml 1409.43ml 975.69ml 900.38ml 402.76ml 226.74ml 244.40ml 429.04U 23.00U 16.00u 39.00

m3 2183.52m3 28.83m3 13.60m 1409.43u 111.00m 3120.89U 92.00

ESTUDIOS Y DISEÑOS DEFINITIVOS DEL SISTEMA DE ALCANTARILLADO PLUVIAL DE LA PARROQUIA EL PORVENIR DEL CARMEN

Page 4: CANTIDADES DE OBRA

CANTIDADES DE OBRA

Err:509 ESTUDIOS Y DISEÑOS DEFINITIVOS DEL SISTEMA DE ALCANTARILLADO PLUVIAL DE LA PARROQUIA EL PORVENIR DEL CARMEN DEL CANTÓN PALANDA.

Rubro Nro. 1 REPLANTEO Y NIVELACION CON EQUIPO TOPOGRAFICO

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

PORVENIR DEL CARMEN1 496.321 241.251 364.481 565.661 136.751 80.681 111.691 141.081 373.471 321.741 287.77

TOTAL: REPLANTEO Y NIVELACION CON EQUIPO TOPOGRAFICO

Rubro Nro. 2 EXCAVACION SIN CLASIFICAR A MANO

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

CAJAS CONEXIONES DOMICILIARIASCAJAS CONEXIONES DOMICILIARIAS 111.00 1.00 1.00

PORVENIR DEL CARMEN1 496.32 0.601 241.25 0.601 364.48 0.601 565.66 0.601 136.75 0.601 80.68 0.601 111.69 0.601 141.08 0.601 373.47 0.601 321.74 0.601 287.77 0.60

TOTAL: EXCAVACION SIN CLASIFICAR A MANO

Rubro Nro. 3 EXCAVACION EN ROCA CON EXPLOSIVOS, EQUIPO PIUNJER

Page 5: CANTIDADES DE OBRA

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

PORVENIR DEL CARMEN

TOTAL: EXCAVACION EN ROCA CON EXPLOSIVOS, EQUIPO PIUNJER

Rubro Nro. 4 EXCAVACION A MAQUINA 0-2m SUELO

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

CONEXIONES DOMICILIARIASTUBERIA DIAM=160mm 1.00 1409.43 0.40

SUMIDEROS DE CALZADASUMIDERO DE CALZADA 92.00 0.60 0.60TUBERIA DIAM=200mm 92.00 8.00 0.40

POZOS ALCANTARILLADO PLUVIAL1 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.00

Page 6: CANTIDADES DE OBRA

1 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.00

EXCAVACION DRENES

DESCRIPCIÓN CANT. ABS. INICIAL ABS. FINAL

TRAMO 1-2 1 53.04 1.00TRAMO 3-4 1 62.75 1.00TRAMO 5-6 1 61.20 1.00TRAMO 7-8 1 66.20 1.00TRAMO 9-10 1 104.80 1.00TRAMO 11-12 1 88.40 1.00TRAMO 13-14 1 66.80 1.00TRAMO 15-16 1 99.20 1.00TRAMO 17-18 1 66.90 1.00TRAMO 19-20 1 40.40 1.00

EXCAVACION ESTRUCTURAS DE ENTRADA EMBAULADOSENTRADA TIPO I 2 2.40 3.90ENTRADA TIPO II 1 1.50 3.40

EXCAVACION RED ALCANTARILLADOP 9 1 0.00 10.00

1 10.00 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 60.001 60.00 70.001 70.00 74.82

P 10 1 74.82 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 120.001 120.00 130.001 130.00 140.001 140.00 150.001 150.00 151.90

Page 7: CANTIDADES DE OBRA

P 16 1 151.90 160.001 160.00 170.001 170.00 180.001 180.00 190.001 190.00 200.001 200.00 210.001 210.00 220.001 220.00 227.16

P 23 1 227.16 230.001 230.00 240.001 240.00 250.001 250.00 260.001 260.00 270.001 270.00 280.001 280.00 290.001 290.00 300.001 300.00 310.001 310.00 320.001 320.00 327.18

P 37 1 327.18 330.001 330.00 340.001 340.00 350.001 350.00 360.001 360.00 370.001 370.00 380.001 380.00 390.001 390.00 400.001 400.00 410.001 410.00 412.80

P 33 1 412.80 420.001 420.00 430.001 430.00 440.001 440.00 450.001 450.00 460.001 460.00 470.001 470.00 480.001 480.00 490.001 490.00 496.32

P 11 1 0.00 10.001 10.00 20.001 20.00 30.00

P 12 1 30.00 40.001 40.00 50.001 50.00 60.001 60.00 70.001 70.00 71.14

Page 8: CANTIDADES DE OBRA

P 13 1 71.14 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 120.001 120.00 130.001 130.00 140.001 140.00 144.68

P 14 1 144.68 150.001 150.00 160.001 160.00 170.001 170.00 180.001 180.00 190.001 190.00 200.001 200.00 210.001 210.00 216.40

P 15 1 216.40 220.001 220.00 230.001 230.00 240.001 240.00 250.001 250.00 260.001 260.00 270.001 270.00 280.001 280.00 287.77

P 18 1 0.00 10.001 10.00 15.67

P 19 1 15.67 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 60.001 60.00 65.67

P 20 1 65.67 70.001 70.00 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 120.001 120.00 130.001 130.00 138.05

P 21 1 138.05 140.001 140.00 150.001 150.00 160.001 160.00 170.001 170.00 180.001 180.00 190.00

Page 9: CANTIDADES DE OBRA

1 190.00 200.001 200.00 210.001 210.00 210.71

P 22 1 210.71 220.001 220.00 230.001 230.00 240.001 240.00 250.001 250.00 260.001 260.00 270.001 270.00 280.001 280.00 283.63

P 23 1 283.63 290.001 290.00 300.001 300.00 310.001 310.00 320.001 320.00 330.001 330.00 331.66

P 38 1 331.66 340.001 340.00 350.001 350.00 360.001 360.00 370.001 370.00 373.47

P 25 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 43.00

P 26 1 43.00 50.001 50.00 60.001 60.00 66.24

P 27 1 66.24 70.001 70.00 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 120.001 120.00 130.001 130.00 140.001 140.00 141.08

P 30 1 0.00 10.001 10.00 20.001 20.00 30.00

P 31 1 30.00 40.001 40.00 50.001 50.00 60.001 60.00 70.00

Page 10: CANTIDADES DE OBRA

1 70.00 71.93P 32 1 71.93 80.00

1 80.00 90.001 90.00 100.001 100.00 110.001 110.00 111.69

P 35 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 60.001 60.00 70.001 70.00 80.001 80.00 80.68

P 2 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 60.001 60.00 64.59

P 11 1 64.59 70.001 70.00 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 110.00

P 17 1 110.00 120.000 1 120.00 130.000 1 130.00 136.75

P 3 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 41.46

P 4 1 41.46 50.001 50.00 60.001 60.00 70.001 70.00 80.001 80.00 90.001 90.00 100.001 100.00 109.13

P 13 1 109.13 110.001 110.00 120.00

0 1 120.00 130.00

Page 11: CANTIDADES DE OBRA

0 1 130.00 140.000 1 140.00 150.000 1 150.00 160.000 1 160.00 170.000 1 170.00 180.000 1 180.00 181.120 1 181.12 190.000 1 190.00 200.000 1 200.00 210.000 1 210.00 220.000 1 220.00 230.000 1 230.00 240.000 1 240.00 250.000 1 250.00 259.240 1 259.24 260.000 1 260.00 270.000 1 270.00 280.000 1 280.00 285.340 1 285.34 290.000 1 290.00 300.000 1 300.00 310.000 1 310.00 320.000 1 320.00 330.000 1 330.00 340.000 1 340.00 350.000 1 350.00 360.000 1 360.00 370.000 1 370.00 377.560 1 377.56 380.000 1 380.00 390.000 1 390.00 400.000 1 400.00 410.000 1 410.00 420.000 1 420.00 430.000 1 430.00 440.000 1 440.00 450.000 1 450.00 450.630 1 450.63 460.000 1 460.00 470.000 1 470.00 480.000 1 480.00 490.000 1 490.00 500.000 1 500.00 508.140 1 508.14 510.000 1 510.00 520.000 1 520.00 530.00

Page 12: CANTIDADES DE OBRA

0 1 530.00 540.000 1 540.00 550.000 1 550.00 560.000 1 560.00 565.66

P 5 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 51.49

P 6 1 51.49 60.001 60.00 70.001 70.00 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 120.001 120.00 122.35

0 1 122.35 130.000 1 130.00 140.000 1 140.00 150.000 1 150.00 160.000 1 160.00 170.000 1 170.00 180.000 1 180.00 190.000 1 190.00 195.350 1 195.35 200.000 1 200.00 210.000 1 210.00 220.000 1 220.00 230.000 1 230.00 240.000 1 240.00 250.000 1 250.00 257.650 1 257.65 260.000 1 260.00 270.000 1 270.00 280.000 1 280.00 290.000 1 290.00 300.000 1 300.00 310.000 1 310.00 320.000 1 320.00 330.000 1 330.00 340.000 1 340.00 350.000 1 350.00 360.000 1 360.00 364.48

P 7 1 0.00 10.00

Page 13: CANTIDADES DE OBRA

1 10.00 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 50.82

P 8 1 50.82 60.001 60.00 70.001 70.00 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 120.001 120.00 124.79

0 1 124.79 130.000 1 130.00 140.000 1 140.00 150.000 1 150.00 160.000 1 160.00 170.000 1 170.00 180.000 1 180.00 190.000 1 190.00 198.900 1 198.90 200.000 1 200.00 210.000 1 210.00 220.000 1 220.00 230.000 1 230.00 240.000 1 240.00 241.25

P 9 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 60.001 60.00 70.001 70.00 74.82

P 10 1 74.82 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 120.001 120.00 130.00

0 1 130.00 140.000 1 140.00 150.000 1 150.00 151.900 1 151.90 160.000 1 160.00 170.00

Page 14: CANTIDADES DE OBRA

0 1 170.00 180.000 1 180.00 190.000 1 190.00 200.000 1 200.00 210.000 1 210.00 220.000 1 220.00 227.160 1 227.16 230.000 1 230.00 240.000 1 240.00 250.000 1 250.00 260.000 1 260.00 270.000 1 270.00 280.000 1 280.00 290.000 1 290.00 300.000 1 300.00 310.000 1 310.00 320.000 1 320.00 327.180 1 327.18 330.000 1 330.00 340.000 1 340.00 350.000 1 350.00 360.000 1 360.00 370.000 1 370.00 380.000 1 380.00 390.000 1 390.00 400.000 1 400.00 410.000 1 410.00 412.800 1 412.80 420.000 1 420.00 430.000 1 430.00 440.000 1 440.00 450.000 1 450.00 460.000 1 460.00 470.000 1 470.00 480.000 1 480.00 490.000 1 490.00 496.32

TOTAL: EXCAVACION A MAQUINA 0-2m SUELO

Rubro Nro. 5 EXCAVACION A MAQUINA 2.00-4.00 m SUELO

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

EXCAVACION DE POZOS1 2.00 2.001 2.00 2.00

Page 15: CANTIDADES DE OBRA

1 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.001 2.00 2.00

EXCAVACION ALCANTARILLADO

DESCRIPCIÓN CANT. ABS. INICIAL ABS. FINAL

P 9 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 60.00

Page 16: CANTIDADES DE OBRA

1 60.00 70.001 70.00 74.82

P 10 1 74.82 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 120.001 120.00 130.001 130.00 140.001 140.00 150.001 150.00 151.90

P 16 1 151.90 160.001 160.00 170.001 170.00 180.001 180.00 190.001 190.00 200.001 200.00 210.001 210.00 220.001 220.00 227.16

P 23 1 227.16 230.001 230.00 240.001 240.00 250.001 250.00 260.001 260.00 270.001 270.00 280.001 280.00 290.001 290.00 300.001 300.00 310.001 310.00 320.001 320.00 327.18

P 37 1 327.18 330.001 330.00 340.001 340.00 350.001 350.00 360.001 360.00 370.001 370.00 380.001 380.00 390.001 390.00 400.001 400.00 410.001 410.00 412.80

P 33 1 412.80 420.001 420.00 430.001 430.00 440.001 440.00 450.001 450.00 460.001 460.00 470.00

Page 17: CANTIDADES DE OBRA

1 470.00 480.001 480.00 490.001 490.00 496.32

P 11 1 0.00 10.001 10.00 20.001 20.00 30.00

P 12 1 30.00 40.001 40.00 50.001 50.00 60.001 60.00 70.001 70.00 71.14

P 13 1 71.14 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 120.001 120.00 130.001 130.00 140.001 140.00 144.68

P 14 1 144.68 150.001 150.00 160.001 160.00 170.001 170.00 180.001 180.00 190.001 190.00 200.001 200.00 210.001 210.00 216.40

P 15 1 216.40 220.001 220.00 230.001 230.00 240.001 240.00 250.001 250.00 260.001 260.00 270.001 270.00 280.001 280.00 287.77

P 18 1 0.00 10.001 10.00 15.67

P 19 1 15.67 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 60.001 60.00 65.67

P 20 1 65.67 70.001 70.00 80.001 80.00 90.00

Page 18: CANTIDADES DE OBRA

1 90.00 100.001 100.00 110.001 110.00 120.001 120.00 130.001 130.00 138.05

P 21 1 138.05 140.001 140.00 150.001 150.00 160.001 160.00 170.001 170.00 180.001 180.00 190.001 190.00 200.001 200.00 210.001 210.00 210.71

P 22 1 210.71 220.001 220.00 230.001 230.00 240.001 240.00 250.001 250.00 260.001 260.00 270.001 270.00 280.001 280.00 283.63

P 23 1 283.63 290.001 290.00 300.001 300.00 310.001 310.00 320.001 320.00 330.001 330.00 331.66

P 38 1 331.66 340.001 340.00 350.001 350.00 360.001 360.00 370.001 370.00 373.47

P 25 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 43.00

P 26 1 43.00 50.001 50.00 60.001 60.00 66.24

P 27 1 66.24 70.001 70.00 80.001 80.00 90.001 90.00 100.001 100.00 110.00

Page 19: CANTIDADES DE OBRA

1 110.00 120.001 120.00 130.001 130.00 140.001 140.00 141.08

P 30 1 0.00 10.001 10.00 20.001 20.00 30.00

P 31 1 30.00 40.001 40.00 50.001 50.00 60.001 60.00 70.001 70.00 71.93

P 32 1 71.93 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 111.69

P 35 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 60.001 60.00 70.001 70.00 80.001 80.00 80.68

P 2 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 60.001 60.00 64.59

P 11 1 64.59 70.001 70.00 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 110.00

P 17 1 110.00 120.000 1 120.00 130.000 1 130.00 136.75

P 3 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.00

Page 20: CANTIDADES DE OBRA

1 40.00 41.46P 4 1 41.46 50.00

1 50.00 60.001 60.00 70.001 70.00 80.001 80.00 90.001 90.00 100.001 100.00 109.13

P 13 1 109.13 110.001 110.00 120.00

0 1 120.00 130.000 1 130.00 140.000 1 140.00 150.000 1 150.00 160.000 1 160.00 170.000 1 170.00 180.000 1 180.00 181.120 1 181.12 190.000 1 190.00 200.000 1 200.00 210.000 1 210.00 220.000 1 220.00 230.000 1 230.00 240.000 1 240.00 250.000 1 250.00 259.240 1 259.24 260.000 1 260.00 270.000 1 270.00 280.000 1 280.00 285.340 1 285.34 290.000 1 290.00 300.000 1 300.00 310.000 1 310.00 320.000 1 320.00 330.000 1 330.00 340.000 1 340.00 350.000 1 350.00 360.000 1 360.00 370.000 1 370.00 377.560 1 377.56 380.000 1 380.00 390.000 1 390.00 400.000 1 400.00 410.000 1 410.00 420.000 1 420.00 430.000 1 430.00 440.00

Page 21: CANTIDADES DE OBRA

0 1 440.00 450.000 1 450.00 450.630 1 450.63 460.000 1 460.00 470.000 1 470.00 480.000 1 480.00 490.000 1 490.00 500.000 1 500.00 508.140 1 508.14 510.000 1 510.00 520.000 1 520.00 530.000 1 530.00 540.000 1 540.00 550.000 1 550.00 560.000 1 560.00 565.66

P 5 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 51.49

P 6 1 51.49 60.001 60.00 70.001 70.00 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 120.001 120.00 122.35

0 1 122.35 130.000 1 130.00 140.000 1 140.00 150.000 1 150.00 160.000 1 160.00 170.000 1 170.00 180.000 1 180.00 190.000 1 190.00 195.350 1 195.35 200.000 1 200.00 210.000 1 210.00 220.000 1 220.00 230.000 1 230.00 240.000 1 240.00 250.000 1 250.00 257.650 1 257.65 260.000 1 260.00 270.00

Page 22: CANTIDADES DE OBRA

0 1 270.00 280.000 1 280.00 290.000 1 290.00 300.000 1 300.00 310.000 1 310.00 320.000 1 320.00 330.000 1 330.00 340.000 1 340.00 350.000 1 350.00 360.000 1 360.00 364.48

P 7 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 50.82

P 8 1 50.82 60.001 60.00 70.001 70.00 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 120.001 120.00 124.79

0 1 124.79 130.000 1 130.00 140.000 1 140.00 150.000 1 150.00 160.000 1 160.00 170.000 1 170.00 180.000 1 180.00 190.000 1 190.00 198.900 1 198.90 200.000 1 200.00 210.000 1 210.00 220.000 1 220.00 230.000 1 230.00 240.000 1 240.00 241.25

P 9 1 0.00 10.001 10.00 20.001 20.00 30.001 30.00 40.001 40.00 50.001 50.00 60.001 60.00 70.001 70.00 74.82

Page 23: CANTIDADES DE OBRA

P 10 1 74.82 80.001 80.00 90.001 90.00 100.001 100.00 110.001 110.00 120.001 120.00 130.00

0 1 130.00 140.000 1 140.00 150.000 1 150.00 151.900 1 151.90 160.000 1 160.00 170.000 1 170.00 180.000 1 180.00 190.000 1 190.00 200.000 1 200.00 210.000 1 210.00 220.000 1 220.00 227.160 1 227.16 230.000 1 230.00 240.000 1 240.00 250.000 1 250.00 260.000 1 260.00 270.000 1 270.00 280.000 1 280.00 290.000 1 290.00 300.000 1 300.00 310.000 1 310.00 320.000 1 320.00 327.180 1 327.18 330.000 1 330.00 340.000 1 340.00 350.000 1 350.00 360.000 1 360.00 370.000 1 370.00 380.000 1 380.00 390.000 1 390.00 400.000 1 400.00 410.000 1 410.00 412.800 1 412.80 420.000 1 420.00 430.000 1 430.00 440.000 1 440.00 450.000 1 450.00 460.000 1 460.00 470.000 1 470.00 480.000 1 480.00 490.00

Page 24: CANTIDADES DE OBRA

0 1 490.00 496.32TOTAL: EXCAVACION A MAQUINA 2.00-4.00 m SUELO

Rubro Nro. 6 RAZANTEO DE ZANJA

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

PORVENIR DEL CARMEN1 496.32 0.601 241.25 0.601 364.48 0.601 565.66 0.601 136.75 0.601 80.68 0.601 111.69 0.601 141.08 0.601 373.47 0.601 321.74 0.601 287.77 0.60

ACOMETIDAS DOMICILIARIAS1 1409.43 0.40

SUMIDEROS DE CALZADA1 736.00 0.40

TOTAL: RAZANTEO DE ZANJA

Rubro Nro. 7 TUBERIA PERFORADA PARA DRENES F=160mm

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

TRAMO 1-2 1 53.04TRAMO 3-4 1 62.75TRAMO 5-6 1 61.20TRAMO 7-8 1 66.20TRAMO 9-10 1 104.80TRAMO 11-12 1 88.40TRAMO 13-14 1 66.80TRAMO 15-16 1 99.20TRAMO 17-18 1 66.90TRAMO 19-20 1 40.40

TOTAL: TUBERIA PERFORADA PARA DRENES F=160mm

Rubro Nro. 8 SUMINISTRO Y COLOCACION DE MATERIAL GRANULAR PARA DRENES

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

Page 25: CANTIDADES DE OBRA

DRENES PERIMETRALESTRAMO 1-2 1 53.04 1.50TRAMO 3-4 1 62.75 1.50TRAMO 5-6 1 61.20 1.50TRAMO 7-8 1 66.20 1.50TRAMO 9-10 1 104.80 1.50TRAMO 11-12 1 88.40 1.50TRAMO 13-14 1 66.80 1.50TRAMO 15-16 1 99.20 1.50TRAMO 17-18 1 66.90 1.50TRAMO 19-20 1 40.40 1.50

ESTRUCTURA DE ENTRADA EMBAULADOSENTRADA TIPO I 2 2.00 2.00ENTRADA TIPO II 1 1.10 2.00

TOTAL: SUMINISTRO Y COLOCACION DE MATERIAL GRANULAR PARA DRENES

Rubro Nro. 9 GEOTEXTIL PARA DRENES

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

DRENES PERIMETRALESTRAMO 1-2 1 53.04 0.40TRAMO 3-4 1 62.75 0.40TRAMO 5-6 1 61.20 0.40TRAMO 7-8 1 66.20 0.40TRAMO 9-10 1 104.80 0.40TRAMO 11-12 1 88.40 0.40TRAMO 13-14 1 66.80 0.40TRAMO 15-16 1 99.20 0.40TRAMO 17-18 1 66.90 0.40TRAMO 19-20 1 40.40 0.40

TOTAL: GEOTEXTIL PARA DRENES

Rubro Nro. 10 COLCHON DE ARENA

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

PORVENIR DEL CARMEN1 496.32 0.601 241.25 0.601 364.48 0.601 565.66 0.601 136.75 0.601 80.68 0.601 111.69 0.601 141.08 0.60

Page 26: CANTIDADES DE OBRA

1 373.47 0.601 321.74 0.601 287.77 0.60

SUMIDEROS DE CALZADA1 736.00 0.40

TOTAL: COLCHON DE ARENA

Rubro Nro. 11 RELLENO COMPACTADO CON MATERIAL DE EXCAVACION

DESCRIPCIÓN CANT. Volumen Ancho (m)

EXCAVACION SIN CLASIFICAR A MANO 1 276.05EXCAVACION A MAQUINA 0-2m SUELO 1 5814.49EXCAVACION A MAQUINA 2.00-4.00 m SUELO 1 530.66COLCHON DE ARENA -1 216.70TUBERIA DIAM=160 -1 28.34TUBERIA DIAM=250 -1 47.89TUBERIA DIAM=315 -1 70.17TUBERIA DIAM=400 -1 50.61TUBERIA DIAM=525 -1 49.08TUBERIA DIAM=640 -1 78.62TUBERIA DIAM=790 -1 210.30MATERIAL GRANULAR DE DRENES -1 444.56RELLENO COMPACTADO CON MATERIAL DE PRESTAMO -1 1000.33

TOTAL:

Rubro Nro. 12 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

ENTRADA TIPO I 2 2.00 1.50ENTRADA TIPO II 1 1.10 1.00AVENIDA PORVENIR DEL CARMEN 1 496.32 0.80CALLE 16 DE JULIO 1 241.25 0.80CALLE HEROES DEL CENEPA 1 364.48 0.80AVDA. CIUDAD DE LOYOLA 1 565.66 0.80CALLE PALANDA 1 136.75 0.80CALLE LOS LAURELES 1 80.68 0.80CALLE LOS CEDRO 1 111.69 0.80CALLE RIO AMAZONAS 1 141.08 0.80CALLE JAIME ROLDOS 1 373.47 0.80CALLE RIO SAN LUIS 1 321.74 0.8012 DE FEBRERO 1 287.77 0.80EXCAVACION EN ROCA CON EXPLOSIVOS, EQUIPO PIUNJER 1 0.00

TOTAL: RELLENO COMPACTADO CON MATERIAL DE PRESTAMO

Page 27: CANTIDADES DE OBRA

Rubro Nro. 14 SUM. E INSTALACION TUBERIA NOVAFOR Φ = 250 mm

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

ALCANTARILLADO PORVENIR DEL CARMEN1 37.161 69.441 74.631 30.001 41.141 73.541 74.111 73.001 62.301 106.831 15.671 41.461 67.671 71.991 64.591 45.411 26.75

TOTAL: SUM. E INSTALACION TUBERIA NOVAFOR Φ = 250 mm

Rubro Nro. 15 SUM. E INSTALACION TUBERIA NOVAFOR Φ = 315 mm

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

ALCANTARILLADO PORVENIR DEL CARMEN1 70.801 71.721 73.971 51.491 70.861 30.001 41.931 39.761 50.001 72.831 78.121 26.101 92.221 73.071 57.51

TOTAL: SUM. E INSTALACION TUBERIA NOVAFOR Φ = 315 mm

Page 28: CANTIDADES DE OBRA

Rubro Nro. 16 SUM. E INSTALACION TUBERIA NOVAFOR Φ = 400 mm

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

ALCANTARILLADO PORVENIR DEL CARMEN1 69.711 80.681 71.371 50.821 72.661 57.52

TOTAL: SUM. E INSTALACION TUBERIA NOVAFOR Φ = 400 mm

Rubro Nro. 17 SUM. E INSTALACION TUBERIA NOVAFOR Φ = 525 mm

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

ALCANTARILLADO PORVENIR DEL CARMEN1 74.841 74.821 77.08

TOTAL: SUM. E INSTALACION TUBERIA NOVAFOR Φ = 525 mm

Rubro Nro. 18 SUM. E INSTALACION TUBERIA NOVAFOR Φ = 640 mm

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

ALCANTARILLADO PORVENIR DEL CARMEN1 75.261 85.621 83.52

TOTAL: SUM. E INSTALACION TUBERIA NOVAFOR Φ = 640 mm

Rubro Nro. 19 SUM. E INSTALACION TUBERIA NOVAFOR Φ = 790 mm

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

ALCANTARILLADO PORVENIR DEL CARMEN1 48.031 41.811 41.811 42.351 43.001 23.241 72.92

Page 29: CANTIDADES DE OBRA

TOTAL: SUM. E INSTALACION TUBERIA NOVAFOR Φ = 790 mm

Rubro Nro. 22 TAPA Y CERCO DE POZO

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

PORVENIR DEL CARMEN1

TOTAL: TAPA Y CERCO DE POZO

Rubro Nro. 23 DESALOJO DE MATERIAL

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

ENTRADA TIPO I 1 1000.33 0.80Volumen de Colchon de Arena 1 216.70ENROCADO 1 13.60

EXCAVACION DRENESTRAMO 1-2 1 53.04 1.00TRAMO 3-4 1 62.75 1.00TRAMO 5-6 1 61.20 1.00TRAMO 7-8 1 66.20 1.00TRAMO 9-10 1 104.80 1.00TRAMO 11-12 1 88.40 1.00TRAMO 13-14 1 66.80 1.00TRAMO 15-16 1 99.20 1.00TRAMO 17-18 1 66.90 1.00TRAMO 19-20 1 40.40 1.00

EXCAVACION ESTRUCTURAS DE ENTRADA EMBAULADOSENTRADA TIPO I 2 2.40 3.90ENTRADA TIPO II 1 1.50 3.40

CAJAS CONEXIONES DOMICILIARIASCAJAS CONEXIONES DOMICILIARIAS 111.00 1.00 1.00

TUBERIA CONEXIONES DOMICILIARIASTUBERIA DIAM=160mm 1409.43

TUBERIA SUMIDEROS DE CALZADASUMIDERO DE CALZADA 92.00 0.60 0.60TUBERIA DIAM=200mm 92.00 8.00

POZO POZOS 39.00

MATERIAL DE PRESTAMOVOLUMEN MATERIAL DE PRESTAMO 1 1000.33

TUBERIAS ALCANTARILLADO PLUVIALTUBERIA DIAM=160 1 47.89TUBERIA DIAM=250 1 70.17

Page 30: CANTIDADES DE OBRA

TUBERIA DIAM=315 1 50.61TUBERIA DIAM=400 1 49.08TUBERIA DIAM=525 1 78.62TUBERIA DIAM=640 1 210.30TUBERIA DIAM=790 1 444.56

TOTAL: DESALOJO DE MATERIAL

Rubro Nro. 24 HORMIGON SIMPLE CLASE A f'c=210kg/cm2 SUPERESTRUCTURA

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

ESTRUCTURAS DE ENTRADA EMBAULADOSENTRADA TIPO I 4 2.00 0.25ENTRADA TIPO I 4 1.50 0.25ENTRADA TIPO I 2 2.00 0.25ENTRADA TIPO II 4 1.10 0.20ENTRADA TIPO II 4 1.00 0.20ENTRADA TIPO II 2 1.00 0.20

ESTRUCTURAS DE SALIDAESTRUCTURA DE SALIDA 1 2.00 0.92MUROS DE ALA 2 2.25 0.92TUBERIA -1 0.15

TOTAL: HORMIGON SIMPLE CLASE A f'c=210kg/cm2 SUPERESTRUCTURA

Rubro Nro. 25 ENROCADO

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

ESTRUCTURAS DE ENTRADA EMBAULADOSENTRADA TIPO I 4 2.00 0.40ENTRADA TIPO II 2 2.00 0.40ESTRUCTURA DE SALIDA 1 6.04 3.00

TOTAL: ENROCADO

Rubro Nro. 26 SUMINISTRO E INSTALACION TUBERIA PERFILADA PARA ALCANTARILLADO Ø=160mm

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

1 8.901 9.201 13.101 30.901 16.10

Page 31: CANTIDADES DE OBRA

1 29.001 10.101 34.401 7.051 11.201 7.401 6.901 10.151 11.901 9.701 9.951 11.301 7.501 11.351 11.531 13.601 14.101 14.001 11.651 12.701 8.001 7.501 7.601 7.001 8.501 7.201 23.201 8.701 11.351 11.001 8.901 10.851 6.801 7.501 8.901 9.301 7.601 7.501 9.001 11.601 10.501 7.751 17.801 21.151 11.601 24.60

Page 32: CANTIDADES DE OBRA

1 27.001 5.351 21.901 15.001 26.701 22.151 15.401 9.601 11.801 11.501 8.551 8.351 7.751 9.301 9.501 5.851 18.201 21.701 24.001 20.601 11.201 12.051 9.201 7.301 14.001 10.401 8.501 32.601 20.001 18.001 12.101 8.901 8.751 8.751 8.901 8.501 9.201 20.001 10.501 16.101 15.601 15.951 12.451 11.101 17.801 10.65

Page 33: CANTIDADES DE OBRA

1 8.601 10.001 9.151 9.001 12.701 10.951 11.401 9.701 10.451 8.651 8.651 23.451 11.651 11.30

TOTAL: SUMINISTRO E INSTALACION TUBERIA PERFILADA PARA ALCANTARILLADO Ø=160mm

Rubro Nro. 27 CAJA DE REVISION f´c= 210 Kg/cm² de 1,00x1,00 m

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

TOTAL: CAJA DE REVISION f´c= 210 Kg/cm² de 1,00x1,00 m

Rubro Nro. 28 ENTIBADOS

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

ALCANTARILLADO PORVENIR DEL CARMEN3120.89

TOTAL: ENTIBADOS

Rubro Nro. 29 SUMIDERO DE CALZADA DE AGUAS LLUVIAS + REJILLA HF

DESCRIPCIÓN CANT. Largo (m) Ancho (m)

ALCANTARILLADO PORVENIR DEL CARMENPOZO 1 0POZO 2 2POZO 3POZO 4 4POZO 5POZO 6 4POZO 7POZO 8 4

Page 34: CANTIDADES DE OBRA

POZO 9POZO 10 4POZO 11 2POZO 12 0POZO 13 4POZO 14 4POZO 15 4POZO 16 4POZO 17 2POZO 18 0POZO 19 0POZO 20 4POZO 21 4POZO 22 6POZO 23 6POZO 24 2POZO 25 2POZO 26POZO 27 6POZO 28 2POZO 29 2POZO 30 2POZO 31POZO 32 2POZO 33 6POZO 34 2POZO 35 2POZO 36 4POZO 37 2POZO 38POZO 39

TOTAL: SUMIDERO DE CALZADA DE AGUAS LLUVIAS + REJILLA HF

Page 35: CANTIDADES DE OBRA

CANTIDADES DE OBRA

ESTUDIOS Y DISEÑOS DEFINITIVOS DEL SISTEMA DE ALCANTARILLADO PLUVIAL DE LA PARROQUIA EL PORVENIR DEL CARMEN DEL CANTÓN PALANDA.

Alto (m) H1TOTAL

U OBSERVACIONES(m)

PORVENIR DEL CARMEN496.32 AVENIDA PORVENIR DEL CARMEN241.25 CALLE 16 DE JULIO364.48 CALLE HEROES DEL CENEPA565.66 AVDA. CIUDAD DE LOYOLA136.75 CALLE PALANDA80.68 CALLE LOS LAURELES111.69 CALLE LOS CEDRO141.08 CALLE RIO AMAZONAS373.47 CALLE JAIME ROLDOS321.74 CALLE RIO SAN LUIS287.77 12 DE FEBRERO

TOTAL: REPLANTEO Y NIVELACION CON EQUIPO TOPOGRAFICO 3,120.89 m

Alto (m) H1TOTAL

U OBSERVACIONES(m)

CAJAS CONEXIONES DOMICILIARIAS0.80 88.80

PORVENIR DEL CARMEN0.10 29.78 AVENIDA PORVENIR DEL CARMEN0.10 14.48 CALLE 16 DE JULIO0.10 21.87 CALLE HEROES DEL CENEPA0.10 33.94 AVDA. CIUDAD DE LOYOLA0.10 8.21 CALLE PALANDA0.10 4.84 CALLE LOS LAURELES0.10 6.70 CALLE LOS CEDRO0.10 8.46 CALLE RIO AMAZONAS0.10 22.41 CALLE JAIME ROLDOS0.10 19.30 CALLE RIO SAN LUIS0.10 17.27 12 DE FEBRERO

TOTAL: EXCAVACION SIN CLASIFICAR A MANO 276.05 m3

EXCAVACION EN ROCA CON EXPLOSIVOS, EQUIPO PIUNJER

Page 36: CANTIDADES DE OBRA

Alto (m) H1TOTAL

U OBSERVACIONES(m)

PORVENIR DEL CARMEN0.000.000.00

TOTAL: EXCAVACION EN ROCA CON EXPLOSIVOS, EQUIPO PIUNJER - m3

Alto (m) H1TOTAL

U OBSERVACIONES(m3)

CONEXIONES DOMICILIARIAS1.30 732.90

SUMIDEROS DE CALZADA1.30 43.061.00 294.40

POZOS ALCANTARILLADO PLUVIAL1.50 6.00 POZO 11.50 6.00 POZO 21.50 6.00 POZO 32.00 8.00 POZO 41.50 6.00 POZO 51.80 7.20 POZO 61.50 6.00 POZO 70.05 0.20 POZO 81.00 4.00 POZO 91.25 5.00 POZO 102.00 8.00 POZO 112.00 8.00 POZO 121.50 6.00 POZO 131.50 6.00 POZO 141.50 6.00 POZO 151.00 4.00 POZO 162.00 8.00 POZO 172.00 8.00 POZO 182.00 8.00 POZO 191.50 6.00 POZO 201.50 6.00 POZO 211.00 4.00 POZO 221.75 7.00 POZO 231.50 6.00 POZO 241.50 6.00 POZO 251.50 6.00 POZO 261.50 6.00 POZO 27

Page 37: CANTIDADES DE OBRA

1.00 4.00 POZO 281.50 6.00 POZO 291.50 6.00 POZO 301.50 6.00 POZO 311.50 6.00 POZO 321.75 7.00 POZO 331.50 6.00 POZO 341.50 6.00 POZO 351.50 6.00 POZO 362.00 8.00 POZO 371.00 4.00 POZO 381.00 4.00 POZO 39

EXCAVACION DRENES

ALT. INICIAL ALT. FINAL ANCHOTOTAL

U OBSERVACIONES(m3)

0.40 21.220.40 25.10 CALLE PALANDA0.40 24.48 AVDA. CIUDAD DE LOYOLA0.40 26.48 AVDA. CIUDAD DE LOYOLA0.40 41.92 AVDA. CIUDAD DE LOYOLA0.40 35.36 AVDA. CIUDAD DE LOYOLA0.40 26.72 AVDA. CIUDAD DE LOYOLA0.40 39.68 AVDA. CIUDAD DE LOYOLA0.40 26.76 CALLE HEROES DEL CENEPA0.40 16.16 CALLE 16 DE JULIO

EXCAVACION ESTRUCTURAS DE ENTRADA EMBAULADOS2.20 41.181.45 7.40

EXCAVACION RED ALCANTARILLADO1.00 2.00 0.80 12.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 7.712.00 2.00 0.80 8.292.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 3.04

Page 38: CANTIDADES DE OBRA

2.00 2.00 0.80 12.962.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 11.462.00 2.00 0.80 4.542.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 1.76 0.80 15.041.76 1.50 0.80 9.361.50 1.47 0.80 3.351.47 1.14 0.80 10.441.14 1.33 0.80 9.881.33 1.23 0.80 10.241.23 1.23 0.80 9.841.23 1.34 0.80 10.281.34 1.41 0.80 11.001.41 1.44 0.80 11.401.44 1.45 0.80 11.561.45 1.50 0.80 3.301.50 1.32 0.80 8.121.32 1.12 0.80 9.761.12 1.22 0.80 9.361.22 1.16 0.80 9.521.16 1.17 0.80 9.321.17 1.31 0.80 9.921.31 1.48 0.80 11.161.48 1.54 0.80 12.081.54 1.50 0.80 7.692.00 2.00 0.80 16.002.00 2.00 0.80 16.001.93 2.00 0.80 15.722.00 2.00 0.80 16.001.59 1.26 0.80 11.401.26 1.30 0.80 10.241.30 1.43 0.80 10.921.43 1.50 0.80 1.34

Page 39: CANTIDADES DE OBRA

1.50 1.60 0.80 10.991.60 1.56 0.80 12.641.56 1.53 0.80 12.361.53 1.52 0.80 12.201.52 1.47 0.80 11.961.47 1.37 0.80 11.361.37 1.30 0.80 10.681.30 1.50 0.80 5.241.50 1.49 0.80 6.361.49 0.94 0.80 9.720.94 0.82 0.80 7.040.82 1.05 0.80 7.481.05 1.24 0.80 9.161.24 1.39 0.80 10.521.39 1.34 0.80 10.921.34 1.50 0.80 7.271.50 1.45 0.80 4.251.45 1.17 0.80 10.481.17 1.08 0.80 9.001.08 1.04 0.80 8.481.04 1.29 0.80 9.321.29 1.19 0.80 9.921.19 1.19 0.80 9.521.19 1.50 0.80 8.362.00 1.05 0.80 12.201.05 2.00 0.80 6.922.00 1.54 0.80 6.131.54 1.28 0.80 11.281.28 1.16 0.80 9.761.16 1.03 0.80 8.761.03 1.13 0.80 8.641.13 1.50 0.80 5.961.50 1.60 0.80 5.371.60 1.43 0.80 12.121.43 1.69 0.80 12.481.69 1.81 0.80 14.001.81 1.90 0.80 14.841.90 1.89 0.80 15.161.89 1.76 0.80 14.601.76 1.50 0.80 10.501.50 1.64 0.80 2.451.64 2.00 0.80 14.562.00 2.00 0.80 16.002.00 1.90 0.80 15.601.90 1.13 0.80 12.121.13 1.18 0.80 9.24

Page 40: CANTIDADES DE OBRA

1.18 1.19 0.80 9.481.19 1.92 0.80 12.441.92 2.00 0.80 1.112.00 1.72 0.80 13.821.72 1.10 0.80 11.281.10 0.90 0.80 8.000.90 1.23 0.80 8.521.23 1.58 0.80 11.241.58 1.73 0.80 13.241.73 2.00 0.80 14.922.00 2.00 0.80 5.812.00 2.00 0.80 10.192.00 2.00 0.80 16.002.00 1.21 0.80 12.841.21 0.87 0.80 8.320.87 1.25 0.80 8.481.25 1.50 0.80 1.831.50 1.26 0.80 9.211.26 0.08 0.80 5.360.08 1.47 0.80 6.201.47 2.00 0.80 13.882.00 2.00 0.80 5.551.50 1.90 0.80 13.601.90 0.97 0.80 11.480.97 1.45 0.80 9.681.45 1.47 0.80 11.681.47 1.50 0.80 3.561.50 1.37 0.80 8.041.37 1.14 0.80 10.041.14 1.50 0.80 6.591.50 1.61 0.80 4.681.61 1.77 0.80 13.521.77 1.96 0.80 14.921.96 1.89 0.80 15.401.89 1.83 0.80 14.881.83 1.82 0.80 14.601.82 1.71 0.80 14.121.71 1.51 0.80 12.881.51 1.50 0.80 1.301.50 1.57 0.80 12.281.57 0.91 0.80 9.920.91 1.50 0.80 9.641.50 1.10 0.80 10.401.10 1.22 0.80 9.281.22 1.39 0.80 10.441.39 1.47 0.80 11.44

Page 41: CANTIDADES DE OBRA

1.47 1.50 0.80 2.291.50 1.57 0.80 9.911.57 1.48 0.80 12.201.48 1.29 0.80 11.081.29 1.37 0.80 10.641.37 1.50 0.80 1.941.50 2.00 0.80 14.002.00 1.50 0.80 14.001.50 1.45 0.80 11.801.45 1.43 0.80 11.521.43 1.48 0.80 11.641.48 1.62 0.80 12.401.62 1.52 0.80 12.561.52 1.38 0.80 11.601.38 1.33 0.80 0.741.50 1.27 0.80 11.081.27 0.62 0.80 7.560.62 0.40 0.80 4.080.40 0.84 0.80 4.960.84 1.33 0.80 8.681.33 1.77 0.80 12.401.77 1.50 0.80 6.001.50 1.19 0.80 5.821.19 1.25 0.80 9.761.25 1.31 0.80 10.241.31 1.37 0.80 10.721.37 1.52 0.80 11.561.52 2.00 0.80 0.002.00 1.43 0.80 13.721.43 0.74 0.80 8.680.74 2.00 0.80 7.401.50 1.82 0.80 13.281.82 1.78 0.80 14.401.78 1.65 0.80 13.721.65 1.55 0.80 12.801.55 2.00 0.80 2.072.00 2.00 0.80 13.662.00 1.70 0.80 14.801.70 1.67 0.80 13.481.67 1.71 0.80 13.521.71 1.61 0.80 13.281.61 1.60 0.80 12.841.60 1.50 0.80 11.321.50 1.53 0.80 1.051.53 1.77 0.80 13.201.77 1.57 0.80 13.36

Page 42: CANTIDADES DE OBRA

1.57 1.38 0.80 11.801.38 1.25 0.80 10.521.25 1.28 0.80 10.121.28 1.29 0.80 10.281.29 1.47 0.80 11.041.47 1.50 0.80 1.331.50 1.53 0.80 10.761.53 1.79 0.80 13.281.79 1.80 0.80 14.361.80 1.79 0.80 14.361.79 1.63 0.80 13.681.63 1.53 0.80 12.641.53 1.51 0.80 12.161.51 1.50 0.80 11.121.50 1.47 0.80 0.901.47 1.41 0.80 11.521.41 1.41 0.80 11.281.41 1.50 0.80 6.221.50 1.60 0.80 5.781.60 1.76 0.80 13.441.76 1.69 0.80 13.801.69 1.51 0.80 12.801.51 1.34 0.80 11.401.34 1.50 0.80 11.361.50 1.83 0.80 13.321.83 1.78 0.80 14.441.78 1.48 0.80 13.041.48 1.50 0.80 9.011.50 1.65 0.80 3.071.65 1.49 0.80 12.561.49 1.35 0.80 11.361.35 1.23 0.80 10.321.23 1.20 0.80 9.721.20 1.35 0.80 10.201.35 1.55 0.80 11.601.55 1.45 0.80 12.001.45 1.50 0.80 0.741.50 1.45 0.80 11.061.45 1.38 0.80 11.321.38 1.37 0.80 11.001.37 1.61 0.80 11.921.61 1.56 0.80 12.681.56 1.50 0.80 9.961.50 1.44 0.80 2.191.44 1.16 0.80 10.401.16 1.15 0.80 9.24

Page 43: CANTIDADES DE OBRA

1.15 1.04 0.80 8.761.04 0.94 0.80 7.920.94 1.09 0.80 8.121.09 1.50 0.80 5.861.50 1.83 0.80 13.321.83 2.00 0.80 15.322.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 1.79 0.80 15.161.79 1.50 0.80 1.961.50 1.51 0.80 10.251.51 1.39 0.80 11.601.39 1.26 0.80 10.601.26 0.96 0.80 8.880.96 0.91 0.80 7.480.91 1.07 0.80 7.921.07 1.41 0.80 9.921.41 1.50 0.80 2.741.50 1.66 0.80 9.671.66 1.47 0.80 12.521.47 1.13 0.80 10.401.13 0.92 0.80 8.200.92 0.88 0.80 7.200.88 1.03 0.80 7.641.03 1.37 0.80 9.601.37 1.50 0.80 6.141.50 1.67 0.80 5.901.67 1.71 0.80 13.521.71 1.67 0.80 13.521.67 1.60 0.80 13.081.60 1.52 0.80 12.481.52 1.03 0.80 10.201.03 1.50 0.80 7.741.50 1.57 0.80 2.891.57 2.00 0.80 14.282.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 1.87 0.80 15.481.87 1.67 0.80 14.161.67 2.00 0.80 14.682.00 2.00 0.80 16.002.00 1.50 0.80 6.271.50 1.78 0.80 13.12

Page 44: CANTIDADES DE OBRA

1.78 1.85 0.80 14.521.85 2.00 0.80 15.402.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 1.50 0.80 1.151.50 1.58 0.80 11.311.58 1.66 0.80 12.961.66 1.52 0.80 12.721.52 1.53 0.80 12.201.53 1.53 0.80 12.241.53 1.54 0.80 12.281.54 1.40 0.80 11.761.40 1.50 0.80 5.561.50 1.78 0.80 6.841.78 1.77 0.80 14.201.77 1.93 0.80 14.801.93 1.96 0.80 15.561.96 1.92 0.80 15.521.92 1.69 0.80 14.441.69 1.58 0.80 13.081.58 2.00 0.80 12.742.00 2.00 0.80 1.762.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 2.001.00 2.00 0.80 12.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 7.712.00 2.00 0.80 8.292.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 3.042.00 2.00 0.80 12.962.00 2.00 0.80 16.00

Page 45: CANTIDADES DE OBRA

2.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 11.462.00 2.00 0.80 4.542.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 2.00 0.80 16.002.00 1.76 0.80 15.041.76 1.50 0.80 9.361.50 1.47 0.80 3.351.47 1.14 0.80 10.441.14 1.33 0.80 9.881.33 1.23 0.80 10.241.23 1.23 0.80 9.841.23 1.34 0.80 10.281.34 1.41 0.80 11.001.41 1.44 0.80 11.401.44 1.45 0.80 11.561.45 1.50 0.80 3.301.50 1.32 0.80 8.121.32 1.12 0.80 9.761.12 1.22 0.80 9.361.22 1.16 0.80 9.521.16 1.17 0.80 9.321.17 1.31 0.80 9.921.31 1.48 0.80 11.161.48 1.54 0.80 12.081.54 1.50 0.80 7.69

TOTAL: EXCAVACION A MAQUINA 0-2m SUELO 5,814.49 m3

Alto (m)TOTAL

U OBSERVACIONES(m3)

EXCAVACION DE POZOS0.00 0.00 00.00 0.00 0

Page 46: CANTIDADES DE OBRA

0.00 0.00 00.00 0.00 00.00 0.00 00.00 0.00 00.00 0.00 00.05 0.20 POZO 80.00 0.00 01.25 5.00 POZO 100.00 0.00 00.00 0.00 00.00 0.00 00.00 0.00 00.00 0.00 01.00 4.00 POZO 160.00 0.00 00.00 0.00 00.00 0.00 00.00 0.00 00.00 0.00 01.00 4.00 POZO 221.75 7.00 POZO 230.00 0.00 00.00 0.00 00.00 0.00 00.00 0.00 01.00 4.00 POZO 280.00 0.00 00.00 0.00 00.00 0.00 00.00 0.00 01.75 7.00 POZO 330.00 0.00 00.00 0.00 00.00 0.00 00.00 0.00 01.00 4.00 POZO 381.00 4.00 POZO 39

EXCAVACION ALCANTARILLADO

ALT. INICIAL ALT. FINAL ANCHOTOTAL

U OBSERVACIONES(m3)

0.00 0.04 0.80 0.160.04 0.37 0.80 1.640.37 0.35 0.80 2.880.35 0.43 0.80 3.120.43 0.60 0.80 4.120.60 0.96 0.80 6.24

Page 47: CANTIDADES DE OBRA

0.96 1.22 0.80 8.721.22 1.25 0.80 4.761.25 1.34 0.80 5.371.34 1.23 0.80 10.281.23 1.12 0.80 9.401.12 1.01 0.80 8.521.01 0.94 0.80 7.800.94 0.90 0.80 7.360.90 1.01 0.80 7.641.01 1.01 0.80 8.081.01 1.00 0.80 1.531.00 1.02 0.80 6.541.02 0.83 0.80 7.400.83 0.81 0.80 6.560.81 0.77 0.80 6.320.77 0.49 0.80 5.040.49 0.17 0.80 2.640.17 0.06 0.80 0.920.06 1.75 0.80 5.181.75 1.80 0.80 4.031.80 1.48 0.80 13.121.48 1.26 0.80 10.961.26 1.18 0.80 9.761.18 1.11 0.80 9.161.11 0.90 0.80 8.040.90 0.64 0.80 6.160.64 0.48 0.80 4.480.48 0.20 0.80 2.720.20 0.00 0.80 0.800.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.00

Page 48: CANTIDADES DE OBRA

0.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.34 0.80 1.360.34 0.00 0.80 1.360.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.00

Page 49: CANTIDADES DE OBRA

0.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.18 0.80 0.720.18 0.37 0.80 2.200.37 0.00 0.80 1.480.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.02 0.80 0.080.02 1.75 0.80 2.571.75 2.01 0.80 9.582.01 0.58 0.80 10.360.58 0.00 0.80 2.320.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.10 0.80 0.400.10 0.00 0.80 0.140.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.00

Page 50: CANTIDADES DE OBRA

0.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.00

Page 51: CANTIDADES DE OBRA

0.00 0.00 0.80 0.000.00 0.02 0.80 0.070.02 0.00 0.80 0.080.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.00

Page 52: CANTIDADES DE OBRA

0.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.06 0.80 0.240.06 0.17 0.80 0.920.17 0.26 0.80 1.720.26 0.00 0.80 1.040.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.04 0.80 0.16

Page 53: CANTIDADES DE OBRA

0.04 0.42 0.80 1.840.42 0.46 0.80 3.520.46 0.36 0.80 3.280.36 0.39 0.80 3.000.39 0.18 0.80 2.280.18 0.00 0.80 0.720.00 0.00 0.80 0.000.00 0.10 0.80 0.400.10 0.04 0.80 0.560.04 0.00 0.80 0.070.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.04 0.80 0.160.04 0.21 0.80 1.000.21 0.09 0.80 1.200.09 0.00 0.80 0.030.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 1.00 0.80 3.561.00 0.90 0.80 0.840.90 0.38 0.80 5.120.38 0.17 0.80 2.200.17 0.53 0.80 2.800.53 1.01 0.80 6.161.01 1.00 0.80 1.010.00 0.04 0.80 0.160.04 0.37 0.80 1.640.37 0.35 0.80 2.880.35 0.43 0.80 3.120.43 0.60 0.80 4.120.60 0.96 0.80 6.240.96 1.22 0.80 8.721.22 1.25 0.80 4.76

Page 54: CANTIDADES DE OBRA

1.25 1.34 0.80 5.371.34 1.23 0.80 10.281.23 1.12 0.80 9.401.12 1.01 0.80 8.521.01 0.94 0.80 7.800.94 0.90 0.80 7.360.90 1.01 0.80 7.641.01 1.01 0.80 8.081.01 1.00 0.80 1.531.00 1.02 0.80 6.541.02 0.83 0.80 7.400.83 0.81 0.80 6.560.81 0.77 0.80 6.320.77 0.49 0.80 5.040.49 0.17 0.80 2.640.17 0.06 0.80 0.920.06 1.75 0.80 5.181.75 1.80 0.80 4.031.80 1.48 0.80 13.121.48 1.26 0.80 10.961.26 1.18 0.80 9.761.18 1.11 0.80 9.161.11 0.90 0.80 8.040.90 0.64 0.80 6.160.64 0.48 0.80 4.480.48 0.20 0.80 2.720.20 0.00 0.80 0.800.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.000.00 0.00 0.80 0.00

Page 55: CANTIDADES DE OBRA

0.00 0.00 0.80 0.00TOTAL: EXCAVACION A MAQUINA 2.00-4.00 m SUELO 530.66 m3

Alto (m) H1TOTAL

U OBSERVACIONES(m)

PORVENIR DEL CARMEN1.00 297.79 AVENIDA PORVENIR DEL CARMEN1.00 144.75 CALLE 16 DE JULIO1.00 218.69 CALLE HEROES DEL CENEPA1.00 339.40 AVDA. CIUDAD DE LOYOLA1.00 82.05 CALLE PALANDA1.00 48.41 CALLE LOS LAURELES1.00 67.01 CALLE LOS CEDRO1.00 84.65 CALLE RIO AMAZONAS1.00 224.08 CALLE JAIME ROLDOS1.00 193.04 CALLE RIO SAN LUIS1.00 172.66 12 DE FEBRERO

ACOMETIDAS DOMICILIARIAS1.00 563.77 TUB. ACOMETIDA DOMICILIARIA

SUMIDEROS DE CALZADA1.00 294.40 TUB. CONEXION SUMIDEROS

TOTAL: RAZANTEO DE ZANJA 2,730.70 m2

Alto (m) H1TOTAL

U OBSERVACIONES(m)

53.0462.75 CALLE PALANDA61.20 AVDA. CIUDAD DE LOYOLA66.20 AVDA. CIUDAD DE LOYOLA104.80 AVDA. CIUDAD DE LOYOLA88.40 AVDA. CIUDAD DE LOYOLA66.80 AVDA. CIUDAD DE LOYOLA99.20 AVDA. CIUDAD DE LOYOLA66.90 CALLE HEROES DEL CENEPA40.40 CALLE 16 DE JULIO

TOTAL: TUBERIA PERFORADA PARA DRENES F=160mm 709.69 m2

SUMINISTRO Y COLOCACION DE MATERIAL GRANULAR PARA DRENES

Alto (m) H1TOTAL

U OBSERVACIONES(m)

Page 56: CANTIDADES DE OBRA

DRENES PERIMETRALES0.40 31.820.40 37.65 CALLE PALANDA0.40 36.72 AVDA. CIUDAD DE LOYOLA0.40 39.72 AVDA. CIUDAD DE LOYOLA0.40 62.88 AVDA. CIUDAD DE LOYOLA0.40 53.04 AVDA. CIUDAD DE LOYOLA0.40 40.08 AVDA. CIUDAD DE LOYOLA0.40 59.52 AVDA. CIUDAD DE LOYOLA0.40 40.14 CALLE HEROES DEL CENEPA0.40 24.24 CALLE 16 DE JULIO

ESTRUCTURA DE ENTRADA EMBAULADOS2.00 16.001.25 2.75

TOTAL: SUMINISTRO Y COLOCACION DE MATERIAL GRANULAR PARA DRENES 444.56 m

Alto (m) H1TOTAL

U OBSERVACIONES(m)

DRENES PERIMETRALES1.50 201.551.50 238.45 CALLE PALANDA1.50 232.56 AVDA. CIUDAD DE LOYOLA1.50 251.56 AVDA. CIUDAD DE LOYOLA1.50 398.24 AVDA. CIUDAD DE LOYOLA1.50 335.92 AVDA. CIUDAD DE LOYOLA1.50 253.84 AVDA. CIUDAD DE LOYOLA1.50 376.96 AVDA. CIUDAD DE LOYOLA1.50 254.22 CALLE HEROES DEL CENEPA1.50 153.52 CALLE 16 DE JULIO

TOTAL: GEOTEXTIL PARA DRENES 2,696.82 m2

Alto (m) H1TOTAL

U OBSERVACIONES(m)

PORVENIR DEL CARMEN0.10 29.78 AVENIDA PORVENIR DEL CARMEN0.10 14.48 CALLE 16 DE JULIO0.10 21.87 CALLE HEROES DEL CENEPA0.10 33.94 AVDA. CIUDAD DE LOYOLA0.10 8.21 CALLE PALANDA0.10 4.84 CALLE LOS LAURELES0.10 6.70 CALLE LOS CEDRO0.10 8.46 CALLE RIO AMAZONAS

Page 57: CANTIDADES DE OBRA

0.10 22.41 CALLE JAIME ROLDOS0.10 19.30 CALLE RIO SAN LUIS0.10 17.27 12 DE FEBRERO

SUMIDEROS DE CALZADA0.10 29.44

TOTAL: COLCHON DE ARENA 216.70 m

RELLENO COMPACTADO CON MATERIAL DE EXCAVACION

Alto (m)TOTAL

U OBSERVACIONES

0.00 276.050.00 5814.490.00 530.66

-216.70-28.34-47.89-70.17-50.61-49.08-78.62-210.30-444.56

0.00 -1000.33TOTAL: 4,424.59

Alto (m)TOTAL

U OBSERVACIONES

0.40 1.200.40 0.440.40 158.820.40 77.200.40 116.630.40 181.010.40 43.760.40 25.820.40 35.740.40 45.150.40 119.510.40 102.960.40 92.090.00 0.00

TOTAL: RELLENO COMPACTADO CON MATERIAL DE PRESTAMO 1,000.33

(m²)

(m²)

Page 58: CANTIDADES DE OBRA

Alto (m) H1TOTAL

U OBSERVACIONES(m)

ALCANTARILLADO PORVENIR DEL CARMEN37.16 TRAMO 1-269.44 TRAMO 2-474.63 TRAMO 4-630.00 TRAMO 11-1241.14 TRAMO 12-1373.54 TRAMO 13-1474.11 TRAMO 15-2273.00 TRAMO 14-2162.30 TRAMO 21-27106.83 TRAMO 27-2915.67 TRAMO 18-1941.46 TRAMO 3-467.67 TRAMO 4-1371.99 TRAMO 13-2064.59 TRAMO 2-1145.41 TRAMO 11-1726.75 TRAMO 17-18

TOTAL: SUM. E INSTALACION TUBERIA NOVAFOR Φ = 250 mm 975.69 m

Alto (m) H1TOTAL

U OBSERVACIONES(m)

ALCANTARILLADO PORVENIR DEL CARMEN70.80 TRAMO 6-871.72 TRAMO 14-1573.97 TRAMO 8-1551.49 TRAMO 5-670.86 TRAMO 6-1430.00 TRAMO 30-3141.93 TRAMO 31-3239.76 TRAMO 32-3350.00 TRAMO 19-2072.83 TRAMO 20-2178.12 TRAMO 20-2426.10 TRAMO 24-2592.22 TRAMO 25-2973.07 TRAMO 29-3057.51 TRAMO 30-34

TOTAL: SUM. E INSTALACION TUBERIA NOVAFOR Φ = 315 mm 900.38 m

Page 59: CANTIDADES DE OBRA

Alto (m) H1TOTAL

U OBSERVACIONES(m)

ALCANTARILLADO PORVENIR DEL CARMEN69.71 TRAMO 8-1080.68 TRAMO 35-3671.37 TRAMO 15-1650.82 TRAMO 7-872.66 TRAMO 21-2257.52 TRAMO 34-35

TOTAL: SUM. E INSTALACION TUBERIA NOVAFOR Φ = 400 mm 402.76 m

Alto (m) H1TOTAL

U OBSERVACIONES(m)

ALCANTARILLADO PORVENIR DEL CARMEN74.84 TRAMO 27-2874.82 TRAMO 9-1077.08 TRAMO 10-16

TOTAL: SUM. E INSTALACION TUBERIA NOVAFOR Φ = 525 mm 226.74 m

Alto (m) H1TOTAL

U OBSERVACIONES(m)

ALCANTARILLADO PORVENIR DEL CARMEN75.26 TRAMO 16-2385.62 TRAMO 37-3383.52 TRAMO 33-36

TOTAL: SUM. E INSTALACION TUBERIA NOVAFOR Φ = 640 mm 244.40 m

Alto (m) H1TOTAL

U OBSERVACIONES(m)

ALCANTARILLADO PORVENIR DEL CARMEN48.03 TRAMO 23-3841.81 TRAMO 37-38100.02 TRAMO 37-23100.02 TRAMO 28-2243.00 TRAMO 25-2623.24 TRAMO 26-2772.92 TRAMO 22-23

Page 60: CANTIDADES DE OBRA

TOTAL: SUM. E INSTALACION TUBERIA NOVAFOR Φ = 790 mm 429.04 m

Alto (m) H1TOTAL

U OBSERVACIONES(m)

PORVENIR DEL CARMEN39.00

TOTAL: TAPA Y CERCO DE POZO 39.00 u

Alto (m)TOTAL

U OBSERVACIONES

0.50 400.13216.7013.60

EXCAVACION DRENES0.40 21.220.40 25.10 CALLE PALANDA0.40 24.48 AVDA. CIUDAD DE LOYOLA0.40 26.48 AVDA. CIUDAD DE LOYOLA0.40 41.92 AVDA. CIUDAD DE LOYOLA0.40 35.36 AVDA. CIUDAD DE LOYOLA0.40 26.72 AVDA. CIUDAD DE LOYOLA0.40 39.68 AVDA. CIUDAD DE LOYOLA0.40 26.76 CALLE HEROES DEL CENEPA0.40 16.16 CALLE 16 DE JULIO

EXCAVACION ESTRUCTURAS DE ENTRADA EMBAULADOS2.20 41.181.45 7.40

CAJAS CONEXIONES DOMICILIARIAS0.80 88.80

TUBERIA CONEXIONES DOMICILIARIAS28.34

TUBERIA SUMIDEROS DE CALZADA1.30 43.06

23.12

POZO 86.07

MATERIAL DE PRESTAMO

TUBERIAS ALCANTARILLADO PLUVIAL47.8970.17

(m²)

Page 61: CANTIDADES DE OBRA

50.6149.0878.62210.30444.56

TOTAL: DESALOJO DE MATERIAL 2,183.52

HORMIGON SIMPLE CLASE A f'c=210kg/cm2 SUPERESTRUCTURA

Alto (m)TOTAL

U OBSERVACIONES

ESTRUCTURAS DE ENTRADA EMBAULADOS2.00 4.002.00 3.001.50 1.501.25 1.101.25 1.001.10 0.44

ESTRUCTURAS DE SALIDA3.00 5.523.00 12.42

-0.15TOTAL: HORMIGON SIMPLE CLASE A f'c=210kg/cm2 SUPERESTRUCTURA 28.83

Alto (m)TOTAL

U OBSERVACIONES

ESTRUCTURAS DE ENTRADA EMBAULADOS2.00 6.401.10 1.760.30 5.44

TOTAL: ENROCADO 13.60

SUMINISTRO E INSTALACION TUBERIA PERFILADA PARA ALCANTARILLADO Ø=160mm

Alto (m)TOTAL

U OBSERVACIONES(U)

8.90 PORVENIR DEL CARMEN9.2013.1030.9016.10

(m²)

(m²)

Page 62: CANTIDADES DE OBRA

29.0010.1034.407.0511.207.406.9010.1511.909.709.9511.307.5011.3511.5313.6014.1014.0011.6512.708.007.50 CALLE 16 DE JULIO7.607.008.507.2023.208.7011.3511.008.9010.856.80 CALLE HEROES DEL CENEPA7.508.909.307.607.509.0011.6010.507.7517.80 AVDA CIUDAD DE LOYOLA21.1511.6024.60

Page 63: CANTIDADES DE OBRA

27.005.3521.9015.0026.7022.1515.409.6011.8011.508.558.357.759.309.505.8518.20 CALLE PALANDA21.7024.00 CALLE LOS LAURELES20.6011.20 CALLE LOS CEDROS12.05 CALLE RIO AMAZONAS9.207.30 CALLE JAIME ROLDOS14.0010.408.5032.6020.0018.0012.10 CALLE 12 DE FEBRERO8.908.758.758.908.509.2020.0010.5016.1015.6015.9512.4511.1017.8010.65 CALLE RIO SAN LUIS

Page 64: CANTIDADES DE OBRA

8.6010.009.159.0012.7010.9511.409.7010.458.658.6523.4511.6511.30

TOTAL: SUMINISTRO E INSTALACION TUBERIA PERFILADA PARA ALCANTARILLADO Ø=160mm 1,409.43 m

Alto (m)TOTAL

U OBSERVACIONES(U)

111.00TOTAL: CAJA DE REVISION f´c= 210 Kg/cm² de 1,00x1,00 m 111.00 u

Alto (m)TOTAL

U OBSERVACIONES

ALCANTARILLADO PORVENIR DEL CARMEN3120.89

TOTAL: ENTIBADOS 3,120.89 m

SUMIDERO DE CALZADA DE AGUAS LLUVIAS + REJILLA HF

Alto (m)TOTAL

U OBSERVACIONES

ALCANTARILLADO PORVENIR DEL CARMEN0.00 02.000.004.000.004.000.004.00

(m)

(m²)

Page 65: CANTIDADES DE OBRA

0.004.002.000.004.004.004.004.002.000.000.004.004.006.006.002.002.000.006.002.002.002.000.002.006.002.002.004.002.000.000.00

TOTAL: SUMIDERO DE CALZADA DE AGUAS LLUVIAS + REJILLA HF 92.00 U

Page 66: CANTIDADES DE OBRA

CANTIDADES DE OBRA

ESTUDIOS Y DISEÑOS DEFINITIVOS DEL SISTEMA DE ALCANTARILLADO PLUVIAL DE LA PARROQUIA EL PORVENIR DEL CARMEN DEL CANTÓN PALANDA.

OBSERVACIONES

PORVENIR DEL CARMENAVENIDA PORVENIR DEL CARMENCALLE 16 DE JULIOCALLE HEROES DEL CENEPAAVDA. CIUDAD DE LOYOLACALLE PALANDACALLE LOS LAURELESCALLE LOS CEDROCALLE RIO AMAZONASCALLE JAIME ROLDOSCALLE RIO SAN LUIS12 DE FEBRERO

OBSERVACIONES

CAJAS CONEXIONES DOMICILIARIAS

PORVENIR DEL CARMENAVENIDA PORVENIR DEL CARMENCALLE 16 DE JULIOCALLE HEROES DEL CENEPAAVDA. CIUDAD DE LOYOLACALLE PALANDACALLE LOS LAURELESCALLE LOS CEDROCALLE RIO AMAZONASCALLE JAIME ROLDOSCALLE RIO SAN LUIS12 DE FEBRERO

Page 67: CANTIDADES DE OBRA

OBSERVACIONES

PORVENIR DEL CARMEN

OBSERVACIONES

CONEXIONES DOMICILIARIAS

SUMIDEROS DE CALZADA

POZOS ALCANTARILLADO PLUVIALPOZO 1POZO 2POZO 3POZO 4POZO 5POZO 6POZO 7POZO 8POZO 9POZO 10POZO 11POZO 12POZO 13POZO 14POZO 15POZO 16POZO 17POZO 18POZO 19POZO 20POZO 21POZO 22POZO 23POZO 24POZO 25POZO 26POZO 27

Page 68: CANTIDADES DE OBRA

POZO 28POZO 29POZO 30POZO 31POZO 32POZO 33POZO 34POZO 35POZO 36POZO 37POZO 38POZO 39

EXCAVACION DRENES

OBSERVACIONES

CALLE PALANDAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLA

CALLE HEROES DEL CENEPACALLE 16 DE JULIO

EXCAVACION ESTRUCTURAS DE ENTRADA EMBAULADOS

EXCAVACION RED ALCANTARILLADO

Page 69: CANTIDADES DE OBRA
Page 70: CANTIDADES DE OBRA
Page 71: CANTIDADES DE OBRA
Page 72: CANTIDADES DE OBRA
Page 73: CANTIDADES DE OBRA
Page 74: CANTIDADES DE OBRA
Page 75: CANTIDADES DE OBRA
Page 76: CANTIDADES DE OBRA

OBSERVACIONES

EXCAVACION DE POZOS00

Page 77: CANTIDADES DE OBRA

00000POZO 80POZO 1000000POZO 1600000POZO 22POZO 230000POZO 280000POZO 330000POZO 38POZO 39

EXCAVACION ALCANTARILLADO

OBSERVACIONES

Page 78: CANTIDADES DE OBRA
Page 79: CANTIDADES DE OBRA
Page 80: CANTIDADES DE OBRA
Page 81: CANTIDADES DE OBRA
Page 82: CANTIDADES DE OBRA
Page 83: CANTIDADES DE OBRA
Page 84: CANTIDADES DE OBRA
Page 85: CANTIDADES DE OBRA
Page 86: CANTIDADES DE OBRA

OBSERVACIONES

PORVENIR DEL CARMENAVENIDA PORVENIR DEL CARMENCALLE 16 DE JULIOCALLE HEROES DEL CENEPAAVDA. CIUDAD DE LOYOLACALLE PALANDACALLE LOS LAURELESCALLE LOS CEDROCALLE RIO AMAZONASCALLE JAIME ROLDOSCALLE RIO SAN LUIS12 DE FEBRERO

ACOMETIDAS DOMICILIARIASTUB. ACOMETIDA DOMICILIARIA

SUMIDEROS DE CALZADATUB. CONEXION SUMIDEROS

OBSERVACIONES

CALLE PALANDAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLA

CALLE HEROES DEL CENEPACALLE 16 DE JULIO

OBSERVACIONES

Page 87: CANTIDADES DE OBRA

DRENES PERIMETRALES

CALLE PALANDAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLA

CALLE HEROES DEL CENEPACALLE 16 DE JULIO

ESTRUCTURA DE ENTRADA EMBAULADOS

OBSERVACIONES

DRENES PERIMETRALES

CALLE PALANDAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLA

CALLE HEROES DEL CENEPACALLE 16 DE JULIO

OBSERVACIONES

PORVENIR DEL CARMENAVENIDA PORVENIR DEL CARMENCALLE 16 DE JULIOCALLE HEROES DEL CENEPAAVDA. CIUDAD DE LOYOLACALLE PALANDACALLE LOS LAURELESCALLE LOS CEDROCALLE RIO AMAZONAS

Page 88: CANTIDADES DE OBRA

CALLE JAIME ROLDOSCALLE RIO SAN LUIS12 DE FEBRERO

SUMIDEROS DE CALZADA

OBSERVACIONES

OBSERVACIONES

Page 89: CANTIDADES DE OBRA

OBSERVACIONES

ALCANTARILLADO PORVENIR DEL CARMENTRAMO 1-2TRAMO 2-4TRAMO 4-6TRAMO 11-12TRAMO 12-13TRAMO 13-14TRAMO 15-22TRAMO 14-21TRAMO 21-27TRAMO 27-29TRAMO 18-19TRAMO 3-4TRAMO 4-13TRAMO 13-20TRAMO 2-11TRAMO 11-17TRAMO 17-18

OBSERVACIONES

ALCANTARILLADO PORVENIR DEL CARMENTRAMO 6-8TRAMO 14-15TRAMO 8-15TRAMO 5-6TRAMO 6-14TRAMO 30-31TRAMO 31-32TRAMO 32-33TRAMO 19-20TRAMO 20-21TRAMO 20-24TRAMO 24-25TRAMO 25-29TRAMO 29-30TRAMO 30-34

Page 90: CANTIDADES DE OBRA

OBSERVACIONES

ALCANTARILLADO PORVENIR DEL CARMENTRAMO 8-10TRAMO 35-36TRAMO 15-16TRAMO 7-8TRAMO 21-22TRAMO 34-35

OBSERVACIONES

ALCANTARILLADO PORVENIR DEL CARMENTRAMO 27-28TRAMO 9-10TRAMO 10-16

OBSERVACIONES

ALCANTARILLADO PORVENIR DEL CARMENTRAMO 16-23TRAMO 37-33TRAMO 33-36

OBSERVACIONES

ALCANTARILLADO PORVENIR DEL CARMENTRAMO 23-38TRAMO 37-38TRAMO 37-23TRAMO 28-22TRAMO 25-26TRAMO 26-27TRAMO 22-23

Page 91: CANTIDADES DE OBRA

OBSERVACIONES

PORVENIR DEL CARMEN

OBSERVACIONES

EXCAVACION DRENES

CALLE PALANDAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLAAVDA. CIUDAD DE LOYOLA

CALLE HEROES DEL CENEPACALLE 16 DE JULIO

EXCAVACION ESTRUCTURAS DE ENTRADA EMBAULADOS

CAJAS CONEXIONES DOMICILIARIAS

TUBERIA CONEXIONES DOMICILIARIAS

TUBERIA SUMIDEROS DE CALZADA

POZO

MATERIAL DE PRESTAMO

TUBERIAS ALCANTARILLADO PLUVIAL

Page 92: CANTIDADES DE OBRA

OBSERVACIONES

ESTRUCTURAS DE ENTRADA EMBAULADOS

ESTRUCTURAS DE SALIDA

OBSERVACIONES

ESTRUCTURAS DE ENTRADA EMBAULADOS

OBSERVACIONES

PORVENIR DEL CARMEN

Page 93: CANTIDADES DE OBRA

CALLE 16 DE JULIO

CALLE HEROES DEL CENEPA

AVDA CIUDAD DE LOYOLA

Page 94: CANTIDADES DE OBRA

CALLE PALANDA

CALLE LOS LAURELES

CALLE LOS CEDROSCALLE RIO AMAZONAS

CALLE JAIME ROLDOS

CALLE 12 DE FEBRERO

CALLE RIO SAN LUIS

Page 95: CANTIDADES DE OBRA

OBSERVACIONES

OBSERVACIONES

ALCANTARILLADO PORVENIR DEL CARMEN

OBSERVACIONES

ALCANTARILLADO PORVENIR DEL CARMEN

Page 96: CANTIDADES DE OBRA
Page 97: CANTIDADES DE OBRA

POZO PARCIAL ACUMULADA COTA CORTE

P 9 0.00 0+000.00 1,453.05 1.00

10.00 0+010.00 1,453.04 2.04

10.00 0+020.00 1,453.03 2.37

10.00 0+030.00 1,453.02 2.35

10.00 0+040.00 1,453.01 2.43

10.00 0+050.00 1,453.00 2.60

10.00 0+060.00 1,452.99 2.96

10.00 0+070.00 1,452.98 3.22

P 10 4.82 0+074.82 1,452.99 3.25

5.18 0+080.00 1,452.92 3.34

10.00 0+090.00 1,452.78 3.23

10.00 0+100.00 1,452.64 3.12

10.00 0+110.00 1,452.50 3.01

10.00 0+120.00 1,452.36 2.94

10.00 0+130.00 1,452.22 2.90

10.00 0+140.00 1,452.08 3.01

10.00 0+150.00 1,451.94 3.01

P 16 1.90 0+151.90 1,451.91 3.00

8.10 0+160.00 1,451.76 3.02

10.00 0+170.00 1,451.57 2.83

10.00 0+180.00 1,451.38 2.81

10.00 0+190.00 1,451.19 2.77

10.00 0+200.00 1,451.00 2.49

10.00 0+210.00 1,450.81 2.17

10.00 0+220.00 1,450.62 2.06

P 23 7.16 0+227.16 1,448.76 3.75

2.84 0+230.00 1,448.85 3.80

10.00 0+240.00 1,449.18 3.48

10.00 0+250.00 1,449.51 3.26

10.00 0+260.00 1,449.84 3.18

10.00 0+270.00 1,450.17 3.11

10.00 0+280.00 1,450.50 2.90

10.00 0+290.00 1,450.83 2.64

10.00 0+300.00 1,451.16 2.48

10.00 0+310.00 1,451.49 2.20

10.00 0+320.00 1,451.82 1.76

P 37 7.18 0+327.18 1,452.09 1.50

2.82 0+330.00 1,452.12 1.47

10.00 0+340.00 1,452.21 1.14

10.00 0+350.00 1,452.30 1.33

Page 98: CANTIDADES DE OBRA

10.00 0+360.00 1,452.39 1.23

10.00 0+370.00 1,452.48 1.23

10.00 0+380.00 1,452.57 1.34

10.00 0+390.00 1,452.66 1.41

10.00 0+400.00 1,452.75 1.44

10.00 0+410.00 1,452.84 1.45

P 33 2.80 0+412.80 1,452.90 1.50

7.20 0+420.00 1,453.08 1.32

10.00 0+430.00 1,453.33 1.12

10.00 0+440.00 1,453.58 1.22

10.00 0+450.00 1,453.83 1.16

10.00 0+460.00 1,454.08 1.17

10.00 0+470.00 1,454.33 1.31

10.00 0+480.00 1,454.58 1.48

10.00 0+490.00 1,454.83 1.54

P 36 6.32 0+496.32 1,455.02 1.50

P 11 0.00 0+000.00 1,487.55 2.00

10.00 0+010.00 1,485.39 2.34

10.00 0+020.00 1,483.23 1.93

P 12 10.00 0+030.00 1,481.07 2.00

10.00 0+040.00 1,479.87 1.59

10.00 0+050.00 1,478.67 1.26

10.00 0+060.00 1,477.47 1.30

10.00 0+070.00 1,476.27 1.43

P 13 1.14 0+071.14 1,476.12 1.50

8.86 0+080.00 1,475.27 1.60

10.00 0+090.00 1,474.31 1.56

10.00 0+100.00 1,473.35 1.53

10.00 0+110.00 1,472.39 1.52

10.00 0+120.00 1,471.43 1.47

10.00 0+130.00 1,470.47 1.37

10.00 0+140.00 1,469.51 1.30

P 14 4.68 0+144.68 1,469.08 1.50

5.32 0+150.00 1,468.45 1.49

10.00 0+160.00 1,467.27 0.94

10.00 0+170.00 1,466.09 0.82

10.00 0+180.00 1,464.91 1.05

10.00 0+190.00 1,463.73 1.24

10.00 0+200.00 1,462.55 1.39

10.00 0+210.00 1,461.37 1.34

Page 99: CANTIDADES DE OBRA

P 15 6.40 0+216.40 1,460.60 1.50

3.60 0+220.00 1,460.24 1.45

10.00 0+230.00 1,459.23 1.17

10.00 0+240.00 1,458.22 1.08

10.00 0+250.00 1,457.21 1.04

10.00 0+260.00 1,456.20 1.29

10.00 0+270.00 1,455.19 1.19

10.00 0+280.00 1,454.18 1.19

P 16 7.77 0+287.77 1,453.41 1.50

P 18 0.00 0+000.00 1,483.77 2.00

10.00 0+010.00 1,479.89 1.05

P 19 5.67 0+015.67 1,477.69 2.00

4.33 0+020.00 1,477.24 1.54

10.00 0+030.00 1,476.21 1.28

10.00 0+040.00 1,475.18 1.16

10.00 0+050.00 1,474.15 1.03

10.00 0+060.00 1,473.12 1.13

P 20 5.67 0+065.67 1,472.55 1.50

4.33 0+070.00 1,472.17 1.60

10.00 0+080.00 1,471.30 1.43

10.00 0+090.00 1,470.43 1.69

10.00 0+100.00 1,469.56 1.81

10.00 0+110.00 1,468.69 1.90

10.00 0+120.00 1,467.82 1.89

10.00 0+130.00 1,466.95 1.76

P 21 8.05 0+138.05 1,466.27 1.50

1.95 0+140.00 1,465.98 1.64

10.00 0+150.00 1,464.49 2.18

10.00 0+160.00 1,463.00 2.37

10.00 0+170.00 1,461.51 1.90

10.00 0+180.00 1,460.02 1.13

10.00 0+190.00 1,458.53 1.18

10.00 0+200.00 1,457.04 1.19

10.00 0+210.00 1,455.55 1.92

P 22 0.71 0+210.71 1,455.43 2.00

9.29 0+220.00 1,454.74 1.72

10.00 0+230.00 1,454.00 1.10

10.00 0+240.00 1,453.26 0.90

10.00 0+250.00 1,452.52 1.23

10.00 0+260.00 1,451.78 1.58

Page 100: CANTIDADES DE OBRA

10.00 0+270.00 1,451.04 1.73

10.00 0+280.00 1,450.30 2.02

P 23 3.63 0+283.63 1,448.76 3.75

6.37 0+290.00 1,447.50 4.01

10.00 0+300.00 1,445.53 2.58

10.00 0+310.00 1,443.56 1.21

10.00 0+320.00 1,441.59 0.87

10.00 0+330.00 1,439.62 1.25

P 38 1.66 0+331.66 1,439.29 1.50

8.34 0+340.00 1,438.99 1.26

10.00 0+350.00 1,438.64 0.08

10.00 0+360.00 1,438.29 1.47

10.00 0+370.00 1,437.94 2.10

P 39 3.47 0+373.47 1,437.81 2.00

P 25 0.00 0+000.00 1,470.54 1.50

10.00 0+010.00 1,469.31 1.90

10.00 0+020.00 1,468.08 0.97

10.00 0+030.00 1,466.85 1.45

10.00 0+040.00 1,465.62 1.47

P 26 3.00 0+043.00 1,465.27 1.50

7.00 0+050.00 1,464.44 1.37

10.00 0+060.00 1,463.25 1.14

P 27 6.24 0+066.24 1,462.51 1.50

3.76 0+070.00 1,462.23 1.61

10.00 0+080.00 1,461.49 1.77

10.00 0+090.00 1,460.75 1.96

10.00 0+100.00 1,460.01 1.89

10.00 0+110.00 1,459.27 1.83

10.00 0+120.00 1,458.53 1.82

10.00 0+130.00 1,457.79 1.71

10.00 0+140.00 1,457.05 1.51

P 28 1.08 0+141.08 1,456.95 1.50

P 30 0.00 0+000.00 1,463.86 1.50

10.00 0+010.00 1,461.94 1.57

10.00 0+020.00 1,460.02 0.91

P 31 10.00 0+030.00 1,458.10 1.50

10.00 0+040.00 1,457.41 1.10

10.00 0+050.00 1,456.72 1.22

10.00 0+060.00 1,456.03 1.39

Page 101: CANTIDADES DE OBRA

10.00 0+070.00 1,455.34 1.47

P 32 1.93 0+071.93 1,455.21 1.50

8.07 0+080.00 1,454.74 1.57

10.00 0+090.00 1,454.16 1.48

10.00 0+100.00 1,453.58 1.29

10.00 0+110.00 1,453.00 1.37

P 33 1.69 0+111.69 1,452.90 1.50

P 35 0.00 0+000.00 1,459.61 1.50

10.00 0+010.00 1,459.04 1.45

10.00 0+020.00 1,458.47 1.43

10.00 0+030.00 1,457.90 1.48

10.00 0+040.00 1,457.33 1.62

10.00 0+050.00 1,456.76 1.52

10.00 0+060.00 1,456.19 1.38

10.00 0+070.00 1,455.62 1.33

10.00 0+080.00 1,455.05 1.51

P 36 0.68 0+080.68 1,455.02 1.50

P 2 0.00 0+000.00 1,492.86 1.50

10.00 0+010.00 1,492.12 1.27

10.00 0+020.00 1,491.38 0.62

10.00 0+030.00 1,490.64 0.40

10.00 0+040.00 1,489.90 0.84

10.00 0+050.00 1,489.16 1.33

10.00 0+060.00 1,488.42 1.77

P 11 4.59 0+064.59 1,488.05 1.50

5.41 0+070.00 1,487.80 1.19

10.00 0+080.00 1,487.34 1.25

10.00 0+090.00 1,486.88 1.31

10.00 0+100.00 1,486.42 1.37

10.00 0+110.00 1,485.96 1.52

P 17 0.00 0+110.00 1,485.48 2.00

10.00 0+120.00 1,484.84 1.43

10.00 0+130.00 1,484.20 0.74

6.75 0+136.75 1,483.77 2.00

P 3 0.00 0+000.00 1,480.74 1.50

10.00 0+010.00 1,480.62 1.82

10.00 0+020.00 1,480.50 1.78

10.00 0+030.00 1,480.38 1.65

Page 102: CANTIDADES DE OBRA

10.00 0+040.00 1,480.26 1.55

P 4 1.46 0+041.46 1,479.76 2.00

8.54 0+050.00 1,479.30 2.02

10.00 0+060.00 1,478.76 1.70

10.00 0+070.00 1,478.22 1.67

10.00 0+080.00 1,477.68 1.71

10.00 0+090.00 1,477.14 1.61

10.00 0+100.00 1,476.60 1.60

P 13 9.13 0+109.13 1,476.12 1.50

0.87 0+110.00 1,476.08 1.53

10.00 0+120.00 1,475.58 1.77

10.00 0+130.00 1,475.08 1.57

10.00 0+140.00 1,474.58 1.38

10.00 0+150.00 1,474.08 1.25

10.00 0+160.00 1,473.58 1.28

10.00 0+170.00 1,473.08 1.29

10.00 0+180.00 1,472.58 1.47

1.12 0+181.12 1,472.55 1.50

8.88 0+190.00 1,472.37 1.53

10.00 0+200.00 1,472.17 1.79

10.00 0+210.00 1,471.97 1.80

10.00 0+220.00 1,471.77 1.79

10.00 0+230.00 1,471.57 1.63

10.00 0+240.00 1,471.37 1.53

10.00 0+250.00 1,471.17 1.51

9.24 0+259.24 1,471.01 1.50

0.76 0+260.00 1,471.00 1.47

10.00 0+270.00 1,470.82 1.41

10.00 0+280.00 1,470.64 1.41

5.34 0+285.34 1,470.54 1.50

4.66 0+290.00 1,470.41 1.60

10.00 0+300.00 1,470.13 1.76

10.00 0+310.00 1,469.85 1.69

10.00 0+320.00 1,469.57 1.51

10.00 0+330.00 1,469.29 1.34

10.00 0+340.00 1,469.01 1.50

10.00 0+350.00 1,468.73 1.83

10.00 0+360.00 1,468.45 1.78

10.00 0+370.00 1,468.17 1.48

7.56 0+377.56 1,467.98 1.50

2.44 0+380.00 1,467.84 1.65

Page 103: CANTIDADES DE OBRA

10.00 0+390.00 1,467.28 1.49

10.00 0+400.00 1,466.72 1.35

10.00 0+410.00 1,466.16 1.23

10.00 0+420.00 1,465.60 1.20

10.00 0+430.00 1,465.04 1.35

10.00 0+440.00 1,464.48 1.55

10.00 0+450.00 1,463.92 1.45

0.63 0+450.63 1,463.86 1.50

9.37 0+460.00 1,463.36 1.45

10.00 0+470.00 1,462.82 1.38

10.00 0+480.00 1,462.28 1.37

10.00 0+490.00 1,461.74 1.61

10.00 0+500.00 1,461.20 1.56

8.14 0+508.14 1,460.77 1.50

1.86 0+510.00 1,460.73 1.44

10.00 0+520.00 1,460.53 1.16

10.00 0+530.00 1,460.33 1.15

10.00 0+540.00 1,460.13 1.04

10.00 0+550.00 1,459.93 0.94

10.00 0+560.00 1,459.73 1.09

5.66 0+565.66 1,459.61 1.50

P 5 0.00 0+000.00 1,471.10 1.50

10.00 0+010.00 1,471.08 1.83

10.00 0+020.00 1,471.06 2.06

10.00 0+030.00 1,471.04 2.17

10.00 0+040.00 1,471.02 2.26

10.00 0+050.00 1,471.00 1.79

P 6 1.49 0+051.49 1,471.28 1.50

8.51 0+060.00 1,471.02 1.51

10.00 0+070.00 1,470.71 1.39

10.00 0+080.00 1,470.40 1.26

10.00 0+090.00 1,470.09 0.96

10.00 0+100.00 1,469.78 0.91

10.00 0+110.00 1,469.47 1.07

10.00 0+120.00 1,469.16 1.41

2.35 0+122.35 1,469.08 1.50

7.65 0+130.00 1,468.79 1.66

10.00 0+140.00 1,468.41 1.47

10.00 0+150.00 1,468.03 1.13

10.00 0+160.00 1,467.65 0.92

Page 104: CANTIDADES DE OBRA

10.00 0+170.00 1,467.27 0.88

10.00 0+180.00 1,466.89 1.03

10.00 0+190.00 1,466.51 1.37

5.35 0+195.35 1,466.27 1.50

4.65 0+200.00 1,465.99 1.67

10.00 0+210.00 1,465.39 1.71

10.00 0+220.00 1,464.79 1.67

10.00 0+230.00 1,464.19 1.60

10.00 0+240.00 1,463.59 1.52

10.00 0+250.00 1,462.99 1.03

7.65 0+257.65 1,462.51 1.50

2.35 0+260.00 1,462.63 1.57

10.00 0+270.00 1,463.14 2.04

10.00 0+280.00 1,463.65 2.42

10.00 0+290.00 1,464.16 2.46

10.00 0+300.00 1,464.67 2.36

10.00 0+310.00 1,465.18 2.39

10.00 0+320.00 1,465.69 2.18

10.00 0+330.00 1,466.20 1.87

10.00 0+340.00 1,466.71 1.67

10.00 0+350.00 1,467.22 2.10

10.00 0+360.00 1,467.73 2.04

4.48 0+364.48 1,467.98 1.50

P 7 0.00 0+000.00 1,461.83 1.50

10.00 0+010.00 1,461.81 1.78

10.00 0+020.00 1,461.79 1.85

10.00 0+030.00 1,461.77 2.04

10.00 0+040.00 1,461.75 2.21

10.00 0+050.00 1,461.73 2.09

P 8 0.82 0+050.82 1,462.30 1.50

9.18 0+060.00 1,462.09 1.58

10.00 0+070.00 1,461.86 1.66

10.00 0+080.00 1,461.63 1.52

10.00 0+090.00 1,461.40 1.53

10.00 0+100.00 1,461.17 1.53

10.00 0+110.00 1,460.94 1.54

10.00 0+120.00 1,460.71 1.40

4.79 0+124.79 1,460.60 1.50

5.21 0+130.00 1,460.27 1.78

10.00 0+140.00 1,459.64 1.77

Page 105: CANTIDADES DE OBRA

10.00 0+150.00 1,459.01 1.93

10.00 0+160.00 1,458.38 1.96

10.00 0+170.00 1,457.75 1.92

10.00 0+180.00 1,457.12 1.69

10.00 0+190.00 1,456.49 1.58

8.90 0+198.90 1,454.43 3.00

1.10 0+200.00 1,454.46 2.90

10.00 0+210.00 1,454.70 2.38

10.00 0+220.00 1,454.94 2.17

10.00 0+230.00 1,455.18 2.53

10.00 0+240.00 1,455.42 3.01

1.25 0+241.25 1,455.45 3.00

P 9 0.00 0+000.00 1,453.05 1.00

10.00 0+010.00 1,453.04 2.04

10.00 0+020.00 1,453.03 2.37

10.00 0+030.00 1,453.02 2.35

10.00 0+040.00 1,453.01 2.43

10.00 0+050.00 1,453.00 2.60

10.00 0+060.00 1,452.99 2.96

10.00 0+070.00 1,452.98 3.22

P 10 4.82 0+074.82 1,452.99 3.25

5.18 0+080.00 1,452.92 3.34

10.00 0+090.00 1,452.78 3.23

10.00 0+100.00 1,452.64 3.12

10.00 0+110.00 1,452.50 3.01

10.00 0+120.00 1,452.36 2.94

10.00 0+130.00 1,452.22 2.90

10.00 0+140.00 1,452.08 3.01

10.00 0+150.00 1,451.94 3.01

1.90 0+151.90 1,451.91 3.00

8.10 0+160.00 1,451.76 3.02

10.00 0+170.00 1,451.57 2.83

10.00 0+180.00 1,451.38 2.81

10.00 0+190.00 1,451.19 2.77

10.00 0+200.00 1,451.00 2.49

10.00 0+210.00 1,450.81 2.17

10.00 0+220.00 1,450.62 2.06

7.16 0+227.16 1,448.76 3.75

2.84 0+230.00 1,448.85 3.80

10.00 0+240.00 1,449.18 3.48

Page 106: CANTIDADES DE OBRA

10.00 0+250.00 1,449.51 3.26

10.00 0+260.00 1,449.84 3.18

10.00 0+270.00 1,450.17 3.11

10.00 0+280.00 1,450.50 2.90

10.00 0+290.00 1,450.83 2.64

10.00 0+300.00 1,451.16 2.48

10.00 0+310.00 1,451.49 2.20

10.00 0+320.00 1,451.82 1.76

7.18 0+327.18 1,452.09 1.50

2.82 0+330.00 1,452.12 1.47

10.00 0+340.00 1,452.21 1.14

10.00 0+350.00 1,452.30 1.33

10.00 0+360.00 1,452.39 1.23

10.00 0+370.00 1,452.48 1.23

10.00 0+380.00 1,452.57 1.34

10.00 0+390.00 1,452.66 1.41

10.00 0+400.00 1,452.75 1.44

10.00 0+410.00 1,452.84 1.45

2.80 0+412.80 1,452.90 1.50

7.20 0+420.00 1,453.08 1.32

10.00 0+430.00 1,453.33 1.12

10.00 0+440.00 1,453.58 1.22

10.00 0+450.00 1,453.83 1.16

10.00 0+460.00 1,454.08 1.17

10.00 0+470.00 1,454.33 1.31

10.00 0+480.00 1,454.58 1.48

10.00 0+490.00 1,454.83 1.54

6.32 0+496.32 1,455.02 1.50

Page 107: CANTIDADES DE OBRA

1.00 1.502.00 1.503.00 1.504.00 2.005.00 1.506.00 1.807.00 1.508.00 2.059.00 1.00

10.00 3.2511.00 2.0012.00 2.0013.00 1.5014.00 1.5015.00 1.5016.00 3.0017.00 2.0018.00 2.0019.00 2.0020.00 1.5021.00 1.5022.00 3.0023.00 3.7524.00 1.5025.00 1.5026.00 1.5027.00 1.5028.00 3.0029.00 1.5030.00 1.5031.00 1.5032.00 1.5033.00 3.7534.00 1.5035.00 1.5036.00 1.5037.00 2.0038.00 3.0039.00 3.00

76.10