DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
PRELIMINARES
CAMPAMENTO 18 M2 UN 1,635,025 1,662,273 1,639,723 1,627,508 1,647,240 1,641,602 1,645,361 1,652,877 1,667,911 1,638,783
CAMPAMENTO 9 M2 UN 949,867 963,491 952,216 946,108 955,974 953,155 955,034 958,793 966,310 951,746
CERCA EN ALAMBRE DE PUA 4 HILOS ML 11,258 11,258 11,258 11,258 11,258 11,258 11,258 11,258 11,258 11,258
CERCA EN ALAMBRE DE PUA 5 HILOS ML 12,622 12,622 12,622 12,622 12,622 12,622 12,622 12,622 12,622 12,622
CERCA EN ALAMBRE DE PUA 6 HILOS ML 14,592 14,592 14,592 14,592 14,592 14,592 14,592 14,592 14,592 14,592
CERCA EN TABLA H=2.30 M ML 52,636 52,636 52,636 52,636 52,636 52,636 52,636 52,636 52,636 52,636
CERCA EN TEJA DE ZINC H=1.80 M ML 37,380 37,677 37,431 37,298 37,513 37,452 37,493 37,574 37,738 37,421
CERCA EN TELA VERDE H = 2.10 M ML 17,519 17,816 17,571 17,438 17,652 17,591 17,632 17,714 17,878 17,560
DEMOLICIÓN ESCALERAS EN CONCRETO M2 63,831 63,831 63,831 63,831 63,831 63,831 63,831 63,831 63,831 63,831
DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 4,960 4,960 4,960 4,960 4,960 4,960 4,960 4,960 4,960 4,960
DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 7,048 7,048 7,048 7,048 7,048 7,048 7,048 7,048 7,048 7,048
DEMOLICIÓN ENCHAPE MURO M2 5,417 5,417 5,417 5,417 5,417 5,417 5,417 5,417 5,417 5,417
DEMOLICIÓN PAÑETE MURO M2 5,940 5,940 5,940 5,940 5,940 5,940 5,940 5,940 5,940 5,940
DEMOLICIÓN CIELO RASO FALSO M2 7,180 7,180 7,180 7,180 7,180 7,180 7,180 7,180 7,180 7,180
DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427 7,427
DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 10,907 10,907 10,907 10,907 10,907 10,907 10,907 10,907 10,907 10,907
DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 15,018 15,018 15,018 15,018 15,018 15,018 15,018 15,018 15,018 15,018
DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 22,198 22,198 22,198 22,198 22,198 22,198 22,198 22,198 22,198 22,198
DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 32,207 32,207 32,207 32,207 32,207 32,207 32,207 32,207 32,207 32,207
DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 39,823 39,823 39,823 39,823 39,823 39,823 39,823 39,823 39,823 39,823
DEMOLICIÓN PLACA MACIZA 0.15 M M2 32,439 32,439 32,439 32,439 32,439 32,439 32,439 32,439 32,439 32,439
DEMOLICIÓN PLACA MACIZA 0.20 M M2 45,569 45,569 45,569 45,569 45,569 45,569 45,569 45,569 45,569 45,569
DEMOLICIÓN PLACA MACIZA 0.25 M M2 53,965 53,965 53,965 53,965 53,965 53,965 53,965 53,965 53,965 53,965
DEMOLICIÓN PLACA MACIZA 0.30 M M2 66,158 66,158 66,158 66,158 66,158 66,158 66,158 66,158 66,158 66,158
DEMOLICIÓN PLACA PISO 0.05 M M2 7,271 7,271 7,271 7,271 7,271 7,271 7,271 7,271 7,271 7,271
DEMOLICIÓN PLACA PISO 0.10 M M2 11,806 11,806 11,806 11,806 11,806 11,806 11,806 11,806 11,806 11,806
DEMOLICIÓN PLACA PISO 0.15 M M2 17,944 17,944 17,944 17,944 17,944 17,944 17,944 17,944 17,944 17,944
DEMOLICIÓN PLACA PISO 0.20 M M2 29,348 29,348 29,348 29,348 29,348 29,348 29,348 29,348 29,348 29,348
DEMOLICIÓN VIGAS Y COLUMNAS M3 185,832 185,832 185,832 185,832 185,832 185,832 185,832 185,832 185,832 185,832
DESCAPOTE A MAQUINA E=0.20 M M2 1,285 1,285 1,285 1,285 1,285 1,285 1,285 1,285 1,285 1,285
DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,635 4,635 4,635 4,635 4,635 4,635 4,635 4,635 4,635 4,635
DESMONTE APARATOS SANITARIOS UN 16,975 16,975 16,975 16,975 16,975 16,975 16,975 16,975 16,975 16,975
DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 9,359 9,359 9,359 9,359 9,359 9,359 9,359 9,359 9,359 9,359
DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 9,140 9,140 9,140 9,140 9,140 9,140 9,140 9,140 9,140 9,140
DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 8,488 8,488 8,488 8,488 8,488 8,488 8,488 8,488 8,488 8,488
DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,954 7,954 7,954 7,954 7,954 7,954 7,954 7,954 7,954 7,954
DESMONTE MUROS SECOS M2 12,369 12,369 12,369 12,369 12,369 12,369 12,369 12,369 12,369 12,369
DESMONTE MARCOS Y PUERTAS UN 11,103 11,103 11,103 11,103 11,103 11,103 11,103 11,103 11,103 11,103
DESMONTE VENTANAS M2 9,359 9,359 9,359 9,359 9,359 9,359 9,359 9,359 9,359 9,359
LETRINA DE 2.0x1.0 UN 728,674 731,541 728,725 727,855 729,009 728,395 728,804 730,356 731,694 728,784LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
PRESICIÓNM2 8,649 8,649 8,649 8,649 8,649 8,649 8,649 8,649 8,649 8,649
REPLANTEO MANUAL DE CIMIENTOS M2 3,009 3,009 3,009 3,009 3,009 3,009 3,009 3,009 3,009 3,009
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓN1
1.7
1.8
1.9
1.10
1.11
1.12
1.1
1.2
1.3
1.4
1.5
1.6
1.19
1.20
1.21
1.22
1.23
1.24
1.13
1.14
1.15
1.16
1.17
1.18
1.31
1.32
1.33
1.34
1.35
1.36
1.25
1.26
1.27
1.28
1.29
1.30
1.37
1.38
1.39
1.40
1.41
1.42
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNRED ELÉCTRICA PROVISIONAL L=50M UN 2,156,301 2,156,301 2,156,301 2,156,301 2,156,301 2,156,301 2,156,301 2,156,301 2,156,301 2,156,301
RED TELEFÓNICA PROVISIONAL UN 199,195 199,195 199,195 199,195 199,195 199,195 199,195 199,195 199,195 199,195
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 7,755 7,755 7,755 7,755 7,755 7,755 7,755 7,755 7,755 7,755
CIMIENTOS
BASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 73,315 72,022 60,380 73,315 60,380 60,380 60,380 65,554 65,554 69,435
BASE ARENA CEMENTO 1:20 M3 192,629 219,772 197,308 185,141 204,796 199,180 202,925 210,413 225,388 196,373
DEMOLICIÓN CABEZAS DE PILOTES M3 237,827 237,827 237,827 237,827 237,827 237,827 237,827 237,827 237,827 237,827
DEMOLICIÓN CIMIENTO ENTERRADO M3 165,649 165,649 165,649 165,649 165,649 165,649 165,649 165,649 165,649 165,649
IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 17,757 17,757 17,757 17,757 17,757 17,757 17,757 17,757 17,757 17,757
SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 557,468 586,573 562,487 549,440 570,515 564,494 568,508 576,537 592,596 561,482
VIGA DE AMARRE EN CONCRETO 3500 PSI M3 563,158 593,353 568,364 554,829 576,694 570,447 574,611 582,942 599,601 567,323
ZAPATAS EN CONCRETO 3500 PSI M3 524,631 552,905 529,506 516,832 537,305 531,456 535,355 543,156 558,755 528,531
PILOTE DE MADERA D=20 CM ML 40,110 40,110 40,110 40,110 40,110 40,110 40,110 40,110 40,110 40,110PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)ML 123,571 123,571 123,571 123,571 123,571 123,571 123,571 123,571 123,571 123,571
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)ML 154,155 154,155 154,155 154,155 154,155 154,155 154,155 154,155 154,155 154,155
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)ML 191,140 191,140 191,140 191,140 191,140 191,140 191,140 191,140 191,140 191,140
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)ML 240,929 240,929 240,929 240,929 240,929 240,929 240,929 240,929 240,929 240,929
PILOTE HINCADO 25X25 ML 87,072 89,134 87,428 86,504 87,996 87,570 87,854 88,423 89,560 87,357
PILOTE HINCADO 30X30 ML 108,018 111,006 108,533 107,194 109,357 108,739 109,151 109,976 111,624 108,430
DADOS EN CONCRETO 3500PSI M3 513,475 541,748 518,350 505,675 526,149 520,299 524,199 531,999 547,599 517,374MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
MENOR DE 5 KM)ML 73,847 73,847 73,847 73,847 73,847 73,847 73,847 73,847 73,847 73,847
DESAGÜES E INSTALACIONES SUBTERRÁNEAS
SIFÓN PARA DRENAJE EN PVC DE 4" UN 30,900 31,069 30,929 30,854 30,976 30,941 30,964 31,011 31,104 30,923
SIFÓN EN PVC 6" UN 159,417 159,586 159,446 159,371 159,493 159,458 159,481 159,528 159,621 159,441
CAJA DE INSPECCIÓN DE 100X100 UN 380,561 390,812 378,653 377,505 377,268 374,976 376,504 385,644 389,278 379,611
CAJA DE INSPECCIÓN DE 40X40 UN 188,149 191,620 188,438 187,173 189,040 188,307 188,796 190,285 192,030 188,429
CAJA DE INSPECCIÓN DE 60X60 UN 213,624 219,365 214,127 212,010 215,152 213,942 214,748 217,169 220,069 214,102
CAJA DE INSPECCIÓN DE 80X80 UN 284,117 293,949 285,325 281,375 287,479 285,422 286,793 290,342 295,498 285,160
DUCTO ELÉCTRICO PVC 4" ML 83,039 83,029 82,993 83,039 82,940 82,940 82,940 83,013 82,983 83,009
POZO SÉPTICO ETERNIT 1000 LT UN 1,031,521 1,031,422 1,031,061 1,031,521 1,030,526 1,030,526 1,030,526 1,031,259 1,030,961 1,031,223
TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 94,901 96,764 95,222 94,387 95,736 95,351 95,608 96,122 97,150 95,158
TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 59,710 60,693 59,880 59,439 60,151 59,947 60,083 60,354 60,896 59,846
TUBERÍA DRENAJE PVC 110 ML 22,739 23,244 22,826 22,600 22,966 22,861 22,931 23,070 23,348 22,809
TUBERÍA DRENAJE PVC 160 ML 36,415 36,919 36,502 36,275 36,641 36,536 36,606 36,745 37,024 36,484
TUBERÍA DRENAJE PVC 200 ML 47,848 48,554 47,970 47,653 48,165 48,019 48,116 48,311 48,701 47,945
TUBERÍA DRENAJE PVC 250 ML 65,389 66,197 65,529 65,167 65,751 65,584 65,696 65,918 66,364 65,501
TUBERÍA DRENAJE PVC 315 ML 90,168 90,874 90,289 89,973 90,484 90,338 90,436 90,630 91,020 90,265
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
FILTRANTE)UN 776,095 784,169 777,487 773,868 779,714 778,044 779,158 781,385 785,839 777,209
1.43
1.44
1.45
2
2.1
2.8
2.9
2.10
2.11
2.12
2.13
2.2
2.3
2.4
2.5
2.6
2.7
3.1
3.2
3.3
3.4
3.5
3.6
2.14
2.15
2.16
2.17
3
3.13
3.14
3.15
3.16
3.7
3.8
3.9
3.10
3.11
3.12
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNSISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL
FILTRANTE)UN 1,101,784 1,117,932 1,104,568 1,097,330 1,109,023 1,105,682 1,107,909 1,112,364 1,121,272 1,104,012
SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
FILTRANTE)UN 1,445,393 1,477,687 1,450,961 1,436,484 1,459,870 1,453,188 1,457,642 1,466,551 1,484,369 1,449,847
ESTRUCTURAS EN CONCRETO
CASETÓN DE LONA 0.8 X 0.35 M2 33,852 33,852 33,852 33,852 33,852 33,852 33,852 33,852 33,852 33,852
CASETÓN DE LONA 0.80X0.70 M2 44,728 44,728 44,728 44,728 44,728 44,728 44,728 44,728 44,728 44,728
COLUMNAS 3500 PSI M3 689,067 717,341 693,942 681,268 701,742 695,892 699,792 707,592 723,191 692,967
CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 231,781 248,923 234,722 239,799 236,309 232,676 234,262 244,963 254,651 235,880ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA
DE REFUERZO, CONCRETO DE 3500 PSIM2 83,315 86,060 83,788 82,558 84,545 83,977 84,356 85,113 86,628 83,693
ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA
DE REFUERZO, CONCRETO DE 3500 PSIM2 98,380 101,674 98,948 97,471 99,856 99,175 99,629 100,538 102,355 98,834
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 110,598 114,990 111,356 109,387 112,567 111,659 112,264 113,476 115,899 111,204
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 116,749 121,415 117,553 115,461 118,840 117,875 118,519 119,806 122,381 117,392
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 134,470 140,234 135,463 132,879 137,054 135,861 136,656 138,246 141,427 135,265
ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 149,858 156,446 150,994 148,041 152,811 151,448 152,357 154,174 157,809 150,767
ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 166,470 173,881 167,748 164,425 169,792 168,259 169,281 171,326 175,415 167,492
ENTREPISO VIGUETA PLACA M2 80,337 80,803 80,417 80,208 80,546 80,449 80,513 80,642 80,899 80,401
ESCALERA MACIZA 3500 PSI M3 807,407 835,681 812,282 799,608 820,081 814,232 818,131 825,932 841,531 811,307
MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 77,445 77,848 77,514 77,333 77,626 77,542 77,598 77,709 77,932 77,500
ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 68,078 70,905 68,566 67,298 69,345 68,761 69,151 69,931 71,490 68,468
ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 77,012 80,471 77,608 76,058 78,562 77,847 78,324 79,278 81,186 77,489
ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 90,250 94,587 90,997 89,053 92,194 91,296 91,895 93,091 95,484 90,848
MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 608,290 636,564 613,165 600,491 620,964 615,115 619,015 626,815 642,414 612,190
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1
M)UN 40,089 40,961 40,239 39,848 40,480 40,299 40,420 40,660 41,141 40,209
PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 245,514 258,141 247,692 242,031 251,175 248,562 250,304 253,787 260,754 247,256
ACERO FIGURADO 37000 PSI KG 3,218 3,218 3,218 3,218 3,218 3,218 3,218 3,218 3,218 3,218
ACERO FIGURADO 60000 PSI KG 3,380 3,380 3,380 3,380 3,380 3,380 3,380 3,380 3,380 3,380
REFUERZO MALLA ELECTROSOLDADA KG 4,929 4,929 4,929 4,929 4,929 4,929 4,929 4,929 4,929 4,929
TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 724,580 752,853 729,455 716,780 737,254 731,404 735,304 743,104 758,703 728,479
TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 668,576 699,520 673,912 660,041 682,448 676,046 680,314 688,850 705,923 672,844
VIGA AÉREA 3500 PSI M3 721,345 749,619 726,220 713,546 734,019 728,170 732,069 739,870 755,469 725,245
VIGA CINTA 3500 PSI M3 705,519 733,793 710,394 697,720 718,194 712,344 716,244 724,044 739,643 709,419
VIGA CANAL EN CONCRETO 3500 PSI M3 871,668 899,942 876,543 863,869 884,343 878,493 882,393 890,193 905,792 875,568
BASE EN CONCRETO POBRE 1500 PSI M3 294,708 325,893 300,085 286,106 308,688 302,236 306,537 315,140 332,345 299,010
MAMPOSTERÍA
ALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 24,539 25,289 24,669 24,333 24,876 24,720 24,824 25,031 25,444 24,643
3.17
3.18
4.5
4.6
4.7
4.8
4.9
4.10
4
4.1
4.2
4.3
4.4
4.17
4.18
4.19
4.20
4.21
4.22
4.11
4.12
4.13
4.14
4.15
4.16
4.29
5
5.1
4.23
4.24
4.25
4.26
4.27
4.28
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 40,621 41,371 40,750 40,414 40,957 40,802 40,905 41,112 41,526 40,724
ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 28,243 28,412 28,272 28,197 28,319 28,284 28,307 28,354 28,447 28,267
ARCOS EN LADRILLO PRENSADO ML 131,377 131,714 131,435 131,283 131,528 131,458 131,504 131,597 131,783 131,423
DINTELES CONCRETO DE 2500 PSI 15x20 ML 35,980 36,852 36,130 35,739 36,371 36,190 36,310 36,551 37,032 36,100
DINTELES EN BLOQUE 0.15 M ML 22,029 22,433 22,099 21,918 22,210 22,127 22,182 22,294 22,516 22,085
ENCHAPES LADRILLO PRENSADO M2 80,783 81,458 80,900 80,597 81,086 80,946 81,039 81,225 81,597 80,876
MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 75,730 78,636 76,231 74,928 77,033 76,431 76,832 77,634 79,238 76,131
MURO DRYWALL DOBLE CARA 0.12 M M2 73,195 73,195 73,195 73,195 73,195 73,195 73,195 73,195 73,195 73,195
MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 42,845 42,845 42,845 42,845 42,845 42,845 42,845 42,845 42,845 42,845
MURO DRYWALL DOBLE CARA 0.10 M M2 70,472 70,472 70,472 70,472 70,472 70,472 70,472 70,472 70,472 70,472
MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 41,483 41,483 41,483 41,483 41,483 41,483 41,483 41,483 41,483 41,483
MURO SUPERBOARD DOBLE CARA 0.10 M M2 81,851 81,851 81,851 81,851 81,851 81,851 81,851 81,851 81,851 81,851
MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 48,215 48,215 48,215 48,215 48,215 48,215 48,215 48,215 48,215 48,215
MURO SUPERBOARD DOBLE CARA 0.12 M M2 91,095 91,095 91,095 91,095 91,095 91,095 91,095 91,095 91,095 91,095
MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 52,837 52,837 52,837 52,837 52,837 52,837 52,837 52,837 52,837 52,837
MURO EN BLOQUE Nº 5 E=0.12 M M2 33,340 33,678 33,398 33,246 33,492 33,421 33,468 33,562 33,749 33,386
MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 20,071 20,241 20,100 20,024 20,147 20,112 20,135 20,182 20,276 20,095
MURO EN BLOQUE DE CONCRETO 0.10 M M2 43,075 43,301 43,114 43,012 43,176 43,129 43,161 43,223 43,347 43,106
MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 25,779 25,892 25,798 25,748 25,830 25,806 25,822 25,853 25,915 25,795
MURO EN BLOQUE DE CONCRETO 0.12 M M2 48,384 48,610 48,423 48,322 48,486 48,439 48,470 48,532 48,657 48,416
MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 28,965 29,078 28,984 28,934 29,015 28,992 29,008 29,039 29,101 28,980
MURO EN BLOQUE DE CONCRETO 0.20 M M2 81,989 83,118 82,183 81,677 82,495 82,261 82,417 82,729 83,352 82,144
MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 48,153 48,718 48,250 47,997 48,406 48,289 48,367 48,523 48,835 48,231
MURO EN BLOQUE Nº 4 E= 0.10 M M2 30,366 30,592 30,405 30,303 30,467 30,420 30,451 30,514 30,638 30,397
MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 18,322 18,435 18,341 18,290 18,372 18,349 18,365 18,396 18,458 18,337
MURO EN BLOQUE Nº 5 E=0.23 M M2 60,490 60,942 60,568 60,366 60,693 60,599 60,662 60,786 61,036 60,553
MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 36,286 36,512 36,325 36,224 36,387 36,341 36,372 36,434 36,559 36,317
MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 71,733 72,137 71,803 71,622 71,914 71,831 71,887 71,998 72,221 71,789
MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 43,230 43,432 43,265 43,174 43,320 43,279 43,307 43,362 43,474 43,258
MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 149,666 151,248 149,939 149,230 150,375 150,048 150,266 150,702 151,575 149,884
MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 89,337 90,127 89,473 89,118 89,691 89,527 89,636 89,855 90,291 89,446
MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 73,567 74,331 73,699 73,356 73,910 73,751 73,857 74,068 74,489 73,672
MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 44,147 44,529 44,213 44,041 44,318 44,239 44,292 44,397 44,608 44,199
MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 38,618 39,124 38,705 38,478 38,845 38,740 38,810 38,949 39,228 38,688
MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 23,329 23,582 23,373 23,259 23,442 23,390 23,425 23,495 23,634 23,364
MURO TOLETE COMÚN 0.06 M M2 27,554 27,780 27,593 27,492 27,656 27,609 27,640 27,702 27,827 27,586
MURO TOLETE COMÚN 0.06 M (LINEAL) ML 16,699 16,812 16,719 16,668 16,750 16,726 16,742 16,773 16,836 16,715
MURO TOLETE COMÚN 0.12 M M2 41,967 42,419 42,045 41,843 42,170 42,076 42,139 42,263 42,513 42,030
MURO TOLETE COMÚN 0.12 M (LINEAL) ML 25,542 25,768 25,581 25,480 25,643 25,596 25,628 25,690 25,815 25,573
MURO TOLETE COMÚN 0.25 M M2 80,597 81,275 80,714 80,410 80,901 80,761 80,854 81,041 81,415 80,691
MURO TOLETE COMÚN 0.25 M (LINEAL) ML 48,774 49,112 48,832 48,680 48,925 48,855 48,902 48,996 49,182 48,820
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 58,675 59,127 58,753 58,551 58,878 58,784 58,847 58,971 59,221 58,738
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 35,249 35,475 35,288 35,187 35,351 35,304 35,335 35,397 35,522 35,280
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 124,792 126,373 125,064 124,355 125,500 125,173 125,391 125,828 126,700 125,010
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 75,338 76,129 75,475 75,120 75,693 75,529 75,638 75,856 76,293 75,447
5.2
5.3
5.10
5.11
5.12
5.13
5.14
5.15
5.4
5.5
5.6
5.7
5.8
5.9
5.22
5.23
5.24
5.25
5.26
5.27
5.16
5.17
5.18
5.19
5.20
5.21
5.34
5.35
5.36
5.37
5.38
5.39
5.28
5.29
5.30
5.31
5.32
5.33
5.46
5.40
5.41
5.42
5.43
5.44
5.45
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNREMATES LADRILLO PRENSADO ML 25,774 25,942 25,803 25,727 25,849 25,814 25,838 25,884 25,977 25,797
SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 30,436 30,986 30,531 30,284 30,682 30,569 30,644 30,796 31,099 30,512
SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 51,081 51,814 51,208 50,879 51,410 51,258 51,359 51,562 51,966 51,182
LAVADA DE FACHADA M2 4,149 4,149 4,149 4,149 4,149 4,149 4,149 4,149 4,149 4,149
PASAMANOS EN CONCRETO 2500 PSI ML 40,908 41,658 41,038 40,701 41,244 41,089 41,193 41,400 41,813 41,012
DOVELA, GROUTING 3000 PSI ML 8,389 8,389 8,389 8,389 8,389 8,389 8,389 8,389 8,389 8,389
ANCLAJE 3/8" L=30CM UN 11,045 11,045 11,045 11,045 11,045 11,045 11,045 11,045 11,045 11,045
ANCLAJE 1/2" L=50CM UN 14,370 14,370 14,370 14,370 14,370 14,370 14,370 14,370 14,370 14,370
ANCLAJE 5/8" L=70CM UN 20,116 20,116 20,116 20,116 20,116 20,116 20,116 20,116 20,116 20,116
ANCLAJE 3/4" L=70CM UN 29,939 29,939 29,939 29,939 29,939 29,939 29,939 29,939 29,939 29,939
ANCLAJE 1" L= 70CM UN 4,249 4,460 4,285 4,191 4,343 4,300 4,329 4,387 4,503 4,278
PAÑETES, REVOQUES Y REPELLOS
ENTRAMADO MADERA CIELO RASO M2 12,797 12,797 12,797 12,797 12,797 12,797 12,797 12,797 12,797 12,797
FILOS O DILATACIONES B/PLACA ML 4,826 4,995 4,855 4,779 4,902 4,867 4,890 4,936 5,029 4,849
FILOS O DILATACIONES S/MURO ML 5,761 5,930 5,790 5,714 5,837 5,802 5,825 5,871 5,964 5,784
GOTERA EN MORTERO 1:4 ML 6,875 7,043 6,904 6,828 6,950 6,916 6,939 6,985 7,078 6,898
IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 5,473 5,473 5,473 5,473 5,473 5,473 5,473 5,473 5,473 5,473
MALLA BAJO ENTRAMADO M2 10,883 10,883 10,883 10,883 10,883 10,883 10,883 10,883 10,883 10,883
PAÑETE BAJO GUADUA 1:5, E=2 CM M2 20,255 20,790 20,347 20,108 20,495 20,384 20,458 20,606 20,901 20,329
PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 12,173 12,440 12,219 12,099 12,293 12,238 12,274 12,348 12,496 12,210
PAÑETE BAJO MALLA 1:4, E=2 CM M2 17,797 18,271 17,878 17,666 18,009 17,911 17,977 18,107 18,369 17,862
PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,699 10,936 10,740 10,634 10,805 10,756 10,789 10,855 10,985 10,732
PAÑETE BAJO MALLA 1:5, E=2 CM M2 17,187 17,722 17,279 17,040 17,427 17,316 17,390 17,538 17,833 17,261
PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 10,394 10,662 10,441 10,321 10,514 10,459 10,496 10,570 10,717 10,431
PAÑETE CULATAS 1:4, E=2 CM M2 17,797 18,271 17,878 17,666 18,009 17,911 17,977 18,107 18,369 17,862
PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,699 10,936 10,740 10,634 10,805 10,756 10,789 10,855 10,985 10,732
PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 18,027 18,408 18,092 17,921 18,197 18,119 18,171 18,276 18,487 18,079
PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 10,813 11,004 10,846 10,761 10,899 10,859 10,885 10,938 11,043 10,839
PAÑETE LISO MUROS 1:4, E=1.5 CM M2 14,728 15,090 14,790 14,628 14,890 14,815 14,865 14,965 15,164 14,778
PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,937 9,118 8,969 8,888 9,018 8,981 9,006 9,056 9,156 8,962
PAÑETE LISO MUROS 1:5, E=1.5 CM M2 14,264 14,671 14,334 14,151 14,446 14,362 14,418 14,531 14,756 14,320
PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,705 8,909 8,740 8,649 8,797 8,754 8,783 8,839 8,951 8,733
PAÑETE LISO PLACAS 1:4, E=2 CM M2 18,410 18,885 18,492 18,279 18,623 18,525 18,590 18,721 18,983 18,476
PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,990 11,227 11,031 10,925 11,096 11,047 11,080 11,146 11,276 11,023
PAÑETE LISO PLACAS 1:5, E=2 CM M2 17,801 18,336 17,893 17,653 18,041 17,930 18,004 18,151 18,446 17,875
PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,685 10,953 10,732 10,612 10,805 10,750 10,787 10,861 11,008 10,722
PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 14,745 15,153 14,815 14,633 14,928 14,843 14,900 15,012 15,237 14,801
PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,932 9,136 8,967 8,876 9,023 8,981 9,009 9,065 9,178 8,960
PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 18,502 19,037 18,594 18,355 18,742 18,631 18,705 18,853 19,148 18,576
PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 11,355 11,622 11,401 11,281 11,475 11,419 11,456 11,530 11,678 11,392
CUBIERTAS
AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 22,794 23,472 22,911 22,607 23,098 22,958 23,051 23,238 23,612 22,888
5.47
5.48
5.49
5.50
5.51
6
6.1
6.2
6.3
6.4
5.52
5.53
5.54
5.55
5.56
5.57
6.11
6.12
6.13
6.14
6.15
6.16
6.5
6.6
6.7
6.8
6.9
6.10
6.23
6.24
6.25
6.26
6.27
6.28
6.17
6.18
6.19
6.20
6.21
6.22
7
7.1
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNAFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
(INCLUYE TELA IMPERMEABLE)M2 68,685 70,138 68,936 68,284 69,337 69,036 69,236 69,637 70,439 68,886
BAJANTE PVC (AMAZONAS, RAINGO) ML 44,458 44,458 44,458 44,458 44,458 44,458 44,458 44,458 44,458 44,458
BAJANTE PVC AGUAS LLUVIAS D=3" ML 17,710 17,710 17,710 17,710 17,710 17,710 17,710 17,710 17,710 17,710
BAJANTE PVC AGUAS LLUVIAS D=4" ML 27,812 27,812 27,812 27,812 27,812 27,812 27,812 27,812 27,812 27,812
CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 64,969 64,969 64,969 64,969 64,969 64,969 64,969 64,969 64,969 64,969
CABALLETE FIJO TEJA FIBROCEMENTO ML 50,872 50,872 50,872 50,872 50,872 50,872 50,872 50,872 50,872 50,872
CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 29,581 29,581 29,581 29,581 29,581 29,581 29,581 29,581 29,581 29,581
CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 68,089 68,089 68,089 68,089 68,089 68,089 68,089 68,089 68,089 68,089
CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 81,307 81,307 81,307 81,307 81,307 81,307 81,307 81,307 81,307 81,307
CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 119,497 119,497 119,497 119,497 119,497 119,497 119,497 119,497 119,497 119,497
CABALLETE CUBIERTA TERMOACÚSTICA ML 47,194 47,194 47,194 47,194 47,194 47,194 47,194 47,194 47,194 47,194
CANAL PVC AMAZONAS ML 65,568 65,568 65,568 65,568 65,568 65,568 65,568 65,568 65,568 65,568
CANAL PVC RAINGO ML 59,607 59,607 59,607 59,607 59,607 59,607 59,607 59,607 59,607 59,607
TEJA CANALETA 43 FIBROCEMENTO L=6M M2 105,830 105,830 105,830 105,830 105,830 105,830 105,830 105,830 105,830 105,830
TEJA CANALETA 90 FIBROCEMENTO L=6M M2 61,811 61,811 61,811 61,811 61,811 61,811 61,811 61,811 61,811 61,811
TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 45,403 45,403 45,403 45,403 45,403 45,403 45,403 45,403 45,403 45,403
CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 25,853 25,853 25,853 25,853 25,853 25,853 25,853 25,853 25,853 25,853
TEJA DE BARRO M2 48,864 49,707 49,009 48,631 49,242 49,067 49,183 49,416 49,881 48,980
TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 37,850 37,850 37,850 37,850 37,850 37,850 37,850 37,850 37,850 37,850
TEJA EN LÁMINA GALVANIZADA CAL 26 M2 34,698 34,698 34,698 34,698 34,698 34,698 34,698 34,698 34,698 34,698
TEJA FIBROCEMENTO Nº4 M2 29,267 29,267 29,267 29,267 29,267 29,267 29,267 29,267 29,267 29,267
TEJA FIBROCEMENTO No. 6 M2 28,657 28,657 28,657 28,657 28,657 28,657 28,657 28,657 28,657 28,657
TEJA FIBROCEMENTO No. 8 M2 28,873 28,873 28,873 28,873 28,873 28,873 28,873 28,873 28,873 28,873
TEJA TERMOACÚSTICA M2 40,640 40,640 40,640 40,640 40,640 40,640 40,640 40,640 40,640 40,640
TEJA PLÁSTICA No.6 M2 35,730 35,730 35,730 35,730 35,730 35,730 35,730 35,730 35,730 35,730
TEJA ESPAÑOLA ETERNIT M2 65,392 65,392 65,392 65,392 65,392 65,392 65,392 65,392 65,392 65,392
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 120,749 120,749 120,749 120,749 120,749 120,749 120,749 120,749 120,749 120,749
TEJA SIN TRASLAPO M2 54,281 54,281 54,281 54,281 54,281 54,281 54,281 54,281 54,281 54,281
ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 34,019 34,019 34,019 34,019 34,019 34,019 34,019 34,019 34,019 34,019
ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 26,657 26,657 26,657 26,657 26,657 26,657 26,657 26,657 26,657 26,657ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO
ESTRUCTURAL ABIERTO 4"x2", 15 MM)M2 46,497 46,497 46,497 46,497 46,497 46,497 46,497 46,497 46,497 46,497
FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 15,993 15,993 15,993 15,993 15,993 15,993 15,993 15,993 15,993 15,993
FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 19,243 19,243 19,243 19,243 19,243 19,243 19,243 19,243 19,243 19,243
MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 20,851 20,851 20,851 20,851 20,851 20,851 20,851 20,851 20,851 20,851
MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 26,850 26,850 26,850 26,850 26,850 26,850 26,850 26,850 26,850 26,850
BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 17,723 17,723 17,723 17,723 17,723 17,723 17,723 17,723 17,723 17,723
CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 41,727 41,727 41,727 41,727 41,727 41,727 41,727 41,727 41,727 41,727
DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 286,115 286,115 286,115 286,115 286,115 286,115 286,115 286,115 286,115 286,115
CUBIERTA EN POLICARBONATO ALVEOLAR M2 327,688 327,688 327,688 327,688 327,688 327,688 327,688 327,688 327,688 327,688
CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 217,341 217,341 217,341 217,341 217,341 217,341 217,341 217,341 217,341 217,341
CORTASOL CELOSIA C-23 EN ALUZINC M2 232,232 232,232 232,232 232,232 232,232 232,232 232,232 232,232 232,232 232,232
MORTEROS Y CONCRETOS
7.5
7.6
7.7
7.8
7.9
7.10
7.2
7.3
7.4
7.17
7.18
7.19
7.20
7.21
7.22
7.11
7.12
7.13
7.14
7.15
7.16
7.29
7.30
7.31
7.32
7.33
7.34
7.23
7.24
7.25
7.26
7.27
7.28
7.41
7.42
8
7.35
7.36
7.37
7.38
7.39
7.40
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNCONCRETO 4000 PSI M3 414,224 444,097 419,375 405,984 427,615 421,435 425,555 433,796 450,277 418,345
CONCRETO 3500 PSI M3 361,868 389,318 366,601 354,296 374,173 368,494 372,280 379,853 394,998 365,654
CONCRETO 3000 PSI M3 359,240 387,497 364,112 351,445 371,907 366,061 369,958 377,753 393,344 363,137
CONCRETO 2500 PSI M3 321,532 350,597 326,543 313,514 334,561 328,547 332,556 340,574 356,610 325,541
CONCRETO 2000 PSI M3 300,741 330,411 305,856 292,556 314,041 307,902 311,995 320,180 336,550 304,833
CONCRETO 1500 PSI M3 274,210 304,486 279,430 265,858 287,782 281,518 285,694 294,046 310,750 278,386
MORTERO SECO 1:10 M3 226,350 249,615 230,360 219,931 236,778 231,965 235,175 241,593 254,429 229,558
MORTERO 1:4 ARENA LAVADA DE PEÑA M3 409,169 431,760 413,063 402,936 419,295 414,621 417,738 423,970 436,434 412,284
MORTERO 1:5 ARENA LAVADA DE PEÑA M3 380,146 405,619 384,539 373,120 391,565 386,296 389,808 396,836 410,890 383,660
MORTERO 1:3 ARENA LAVADA DE PEÑA M3 433,700 457,524 437,808 427,129 444,380 439,451 442,736 449,309 462,453 436,986
MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 615,320 639,144 619,428 608,749 626,000 621,071 624,356 630,929 644,073 618,606
CARPINTERÍA EN MADERA
BARANDA EN MADERA CEDRO MACHO ML 98,829 98,829 98,829 98,829 98,829 98,829 98,829 98,829 98,829 98,829
CHAZOS PARA CARPINTERÍA EN MADERA UN 3,358 3,527 3,387 3,312 3,434 3,399 3,422 3,469 3,562 3,382
DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 110,567 110,567 110,567 110,567 110,567 110,567 110,567 110,567 110,567 110,567
DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 135,430 135,430 135,430 135,430 135,430 135,430 135,430 135,430 135,430 135,430
MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 196,968 196,968 196,968 196,968 196,968 196,968 196,968 196,968 196,968 196,968
MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 219,236 219,236 219,236 219,236 219,236 219,236 219,236 219,236 219,236 219,236
MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 241,529 241,529 241,529 241,529 241,529 241,529 241,529 241,529 241,529 241,529
HOJA PUERTA FORTEC 0.81 UN 160,412 160,412 160,412 160,412 160,412 160,412 160,412 160,412 160,412 160,412
HOJA PUERTA FORTEC 0.91 UN 181,860 181,860 181,860 181,860 181,860 181,860 181,860 181,860 181,860 181,860
HOJA PUERTA FORTEC 1.50 UN 267,652 267,652 267,652 267,652 267,652 267,652 267,652 267,652 267,652 267,652
HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 101,430 101,430 101,430 101,430 101,430 101,430 101,430 101,430 101,430 101,430
HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 134,674 134,674 134,674 134,674 134,674 134,674 134,674 134,674 134,674 134,674
HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 149,688 149,688 149,688 149,688 149,688 149,688 149,688 149,688 149,688 149,688
HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 381,326 381,326 381,326 381,326 381,326 381,326 381,326 381,326 381,326 381,326
PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 33,762 33,762 33,762 33,762 33,762 33,762 33,762 33,762 33,762 33,762
PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 21,014 21,014 21,014 21,014 21,014 21,014 21,014 21,014 21,014 21,014
VENTANERÍA EN MADERA CEDRO MACHO M2 79,815 79,815 79,815 79,815 79,815 79,815 79,815 79,815 79,815 79,815
CERRADURA DE ENTRADA PRINCIPAL UN 97,539 97,539 97,539 97,539 97,539 97,539 97,539 97,539 97,539 97,539
SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 75,769 75,769 75,769 75,769 75,769 75,769 75,769 75,769 75,769 75,769
SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 23,479 23,479 23,479 23,479 23,479 23,479 23,479 23,479 23,479 23,479
SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 23,479 23,479 23,479 23,479 23,479 23,479 23,479 23,479 23,479 23,479
SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 22,256 22,256 22,256 22,256 22,256 22,256 22,256 22,256 22,256 22,256
ESPEJO INCOLORO 3 MM SIN BISELAR M2 34,035 34,035 34,035 34,035 34,035 34,035 34,035 34,035 34,035 34,035
ESPEJO BISELADO INCOLORO 4 MM M2 42,158 42,158 42,158 42,158 42,158 42,158 42,158 42,158 42,158 42,158
VIDRIO ESMERILADO INCOLORO 4 MM M2 50,823 50,823 50,823 50,823 50,823 50,823 50,823 50,823 50,823 50,823
VIDRIO ESMERILADO INCOLORO 5 MM M2 61,113 61,113 61,113 61,113 61,113 61,113 61,113 61,113 61,113 61,113
VIDRIO TEMPLADO PULIDO 10 MM M2 287,962 287,962 287,962 287,962 287,962 287,962 287,962 287,962 287,962 287,962
VIDRIO TEMPLADO PULIDO 8 MM M2 201,312 201,312 201,312 201,312 201,312 201,312 201,312 201,312 201,312 201,312
VIDRIO TRANSPARENTE 3 MM M2 26,994 26,994 26,994 26,994 26,994 26,994 26,994 26,994 26,994 26,994
VIDRIO TRANSPARENTE 4 MM M2 34,576 34,576 34,576 34,576 34,576 34,576 34,576 34,576 34,576 34,576
VIDRIO TRANSPARENTE 5 MM M2 42,158 42,158 42,158 42,158 42,158 42,158 42,158 42,158 42,158 42,158
VIDRIO TRANSPARENTE 6 MM M2 52,989 52,989 52,989 52,989 52,989 52,989 52,989 52,989 52,989 52,989
8.1
8.2
8.9
8.10
8.11
9
9.1
8.3
8.4
8.5
8.6
8.7
8.8
9.8
9.9
9.10
9.11
9.12
9.13
9.2
9.3
9.4
9.5
9.6
9.7
9.20
9.21
9.22
9.23
9.24
9.25
9.14
9.15
9.16
9.17
9.18
9.19
9.32
9.26
9.27
9.28
9.29
9.30
9.31
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNCARPINTERÍA METÁLICA
CAJA CONTADOR DE AGUA UN 61,034 61,034 61,034 61,034 61,034 61,034 61,034 61,034 61,034 61,034
CELOSÍA ALUMINIO 100CM X 60 CM M2 169,953 169,953 169,953 169,953 169,953 169,953 169,953 169,953 169,953 169,953ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
(INCLUYE ANTICORROSIVO)ML 64,595 64,595 64,595 64,595 64,595 64,595 64,595 64,595 64,595 64,595
MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 115,514 115,514 115,514 115,514 115,514 115,514 115,514 115,514 115,514 115,514
MARCO TAPA CAJA DE INSPECCIÓN UN 108,340 108,340 108,340 108,340 108,340 108,340 108,340 108,340 108,340 108,340
MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 71,905 71,905 71,905 71,905 71,905 71,905 71,905 71,905 71,905 71,905
PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 169,507 169,507 169,507 169,507 169,507 169,507 169,507 169,507 169,507 169,507
PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 88,271 88,271 88,271 88,271 88,271 88,271 88,271 88,271 88,271 88,271
CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 5,294 5,294 5,294 5,294 5,294 5,294 5,294 5,294 5,294 5,294CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN
TUBO ESTRUCTURAL GALVANIZADO 2")M2 79,634 79,634 79,634 79,634 79,634 79,634 79,634 79,634 79,634 79,634
CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 32,791 32,791 32,791 32,791 32,791 32,791 32,791 32,791 32,791 32,791
DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 433,422 433,422 433,422 433,422 433,422 433,422 433,422 433,422 433,422 433,422
DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 155,818 155,818 155,818 155,818 155,818 155,818 155,818 155,818 155,818 155,818
PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA
ELECTROSTÁTICAM2 174,756 174,756 174,756 174,756 174,756 174,756 174,756 174,756 174,756 174,756
DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE
PUERTAS Y ACCESORIOS)M2 395,126 395,126 395,126 395,126 395,126 395,126 395,126 395,126 395,126 395,126
REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 102,813 102,813 102,813 102,813 102,813 102,813 102,813 102,813 102,813 102,813
PUERTA CORTINA INCLUYE ESMALTE M2 316,113 316,113 316,113 316,113 316,113 316,113 316,113 316,113 316,113 316,113
SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,837 4,837 4,837 4,837 4,837 4,837 4,837 4,837 4,837 4,837
VENTANA EN ALUMINIO CORREDIZA M2 222,245 222,245 222,245 222,245 222,245 222,245 222,245 222,245 222,245 222,245
VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 97,896 97,896 97,896 97,896 97,896 97,896 97,896 97,896 97,896 97,896
REJILLA PISO 0.30 M M2 67,697 67,697 67,697 67,697 67,697 67,697 67,697 67,697 67,697 67,697
TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 71,406 71,406 71,406 71,406 71,406 71,406 71,406 71,406 71,406 71,406CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE:
CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE
AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.
CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE
KG 8,498 8,498 8,498 8,498 8,498 8,498 8,498 8,498 8,498 8,498
CELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA
TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE
KG 9,428 9,428 9,428 9,428 9,428 9,428 9,428 9,428 9,428 9,428
ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,
COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y
PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y
MONTAJE
KG 7,498 7,498 7,498 7,498 7,498 7,498 7,498 7,498 7,498 7,498
INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO
10
10.1
10.2
10.3
10.10
10.11
10.12
10.13
10.14
10.15
10.4
10.5
10.6
10.7
10.8
10.9
10.22
10.23
10.24
10.25
11
10.16
10.17
10.18
10.19
10.20
10.21
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNACOMETIDA EN PVC 1/2" 5M UN 177,002 177,002 177,002 177,002 177,002 177,002 177,002 177,002 177,002 177,002
ACOMETIDA EN PVC 3/4" 5M UN 213,594 213,594 213,594 213,594 213,594 213,594 213,594 213,594 213,594 213,594
BAJANTE AGUAS LLUVIAS PVC 3" ML 17,710 17,710 17,710 17,710 17,710 17,710 17,710 17,710 17,710 17,710
BAJANTE AGUAS LLUVIAS PVC 4" ML 27,812 27,812 27,812 27,812 27,812 27,812 27,812 27,812 27,812 27,812
BAJANTE AGUAS RESIDUALES PVC 3" ML 26,671 26,671 26,671 26,671 26,671 26,671 26,671 26,671 26,671 26,671
BAJANTE AGUAS RESIDUALES PVC 4" ML 34,203 34,203 34,203 34,203 34,203 34,203 34,203 34,203 34,203 34,203
BAJANTE AGUAS RESIDUALES PVC 6" ML 70,548 70,548 70,548 70,548 70,548 70,548 70,548 70,548 70,548 70,548
CONEXIÓN TANQUE ELEVADO PVC UN 178,093 178,093 178,093 178,093 178,093 178,093 178,093 178,093 178,093 178,093
INSTALACIÓN APARATO SANITARIO UN 34,938 34,938 34,938 34,938 34,938 34,938 34,938 34,938 34,938 34,938
INSTALACIÓN BOMBAS AGUA UN 485,978 485,978 485,978 485,978 485,978 485,978 485,978 485,978 485,978 485,978
INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543
LLAVE MANGUERA UN 28,062 28,062 28,062 28,062 28,062 28,062 28,062 28,062 28,062 28,062
NIPLE PASAMURO 2" UN 53,321 53,321 53,321 53,321 53,321 53,321 53,321 53,321 53,321 53,321
NIPLE PASAMURO 4" UN 79,698 79,698 79,698 79,698 79,698 79,698 79,698 79,698 79,698 79,698
PUNTO AGUA CALIENTE CPVC UN 67,313 67,313 67,313 67,313 67,313 67,313 67,313 67,313 67,313 67,313
PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 49,040 49,040 49,040 49,040 49,040 49,040 49,040 49,040 49,040 49,040
PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 52,178 52,178 52,178 52,178 52,178 52,178 52,178 52,178 52,178 52,178
PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 65,939 65,939 65,939 65,939 65,939 65,939 65,939 65,939 65,939 65,939
SALIDA SANITARIA PVC-S/PARAL 2" UN 53,186 53,186 53,186 53,186 53,186 53,186 53,186 53,186 53,186 53,186
SALIDA SANITARIA PVC-S/PARAL 3" UN 66,584 66,584 66,584 66,584 66,584 66,584 66,584 66,584 66,584 66,584
SALIDA SANITARIA PVC-S/PARAL 4" UN 71,226 71,226 71,226 71,226 71,226 71,226 71,226 71,226 71,226 71,226
SALIDA SANITARIA PVC-S/SIFON 3" UN 59,080 59,080 59,080 59,080 59,080 59,080 59,080 59,080 59,080 59,080
RED SUMINISTRO CPVC 1/2" ML 10,008 10,008 10,008 10,008 10,008 10,008 10,008 10,008 10,008 10,008
RED SUMINISTRO CPVC 3/4" ML 14,097 14,097 14,097 14,097 14,097 14,097 14,097 14,097 14,097 14,097
RED SUMINISTRO PVC 1 1/2" ML 18,404 18,404 18,404 18,404 18,404 18,404 18,404 18,404 18,404 18,404
RED SUMINISTRO PVC 1" ML 11,364 11,364 11,364 11,364 11,364 11,364 11,364 11,364 11,364 11,364
RED SUMINISTRO PVC 1/2" ML 6,786 6,786 6,786 6,786 6,786 6,786 6,786 6,786 6,786 6,786
RED SUMINISTRO PVC 2 1/2" ML 41,013 41,013 41,013 41,013 41,013 41,013 41,013 41,013 41,013 41,013
RED SUMINISTRO PVC 2" ML 26,230 26,230 26,230 26,230 26,230 26,230 26,230 26,230 26,230 26,230
RED SUMINISTRO PVC 3/4" ML 8,499 8,499 8,499 8,499 8,499 8,499 8,499 8,499 8,499 8,499
RED SANITARIA PVC-S 2" ML 20,255 20,255 20,255 20,255 20,255 20,255 20,255 20,255 20,255 20,255
RED SANITARIA PVC-S 3" ML 28,107 28,107 28,107 28,107 28,107 28,107 28,107 28,107 28,107 28,107
RED SANITARIA PVC-S 4" ML 38,146 38,146 38,146 38,146 38,146 38,146 38,146 38,146 38,146 38,146
RED SANITARIA PVC-S 6" ML 71,343 71,343 71,343 71,343 71,343 71,343 71,343 71,343 71,343 71,343
REGISTRO 1" UN 86,608 86,608 86,608 86,608 86,608 86,608 86,608 86,608 86,608 86,608
REGISTRO 1/2" UN 48,277 48,277 48,277 48,277 48,277 48,277 48,277 48,277 48,277 48,277
REGISTRO 3/4" UN 61,489 61,489 61,489 61,489 61,489 61,489 61,489 61,489 61,489 61,489
REGISTRO 1 1/2" UN 148,593 148,593 148,593 148,593 148,593 148,593 148,593 148,593 148,593 148,593
REGISTRO 2 1/2" UN 306,520 306,520 306,520 306,520 306,520 306,520 306,520 306,520 306,520 306,520
REGISTRO 2" UN 226,429 226,429 226,429 226,429 226,429 226,429 226,429 226,429 226,429 226,429
REVENTILACIÓN 2" ML 14,118 14,118 14,118 14,118 14,118 14,118 14,118 14,118 14,118 14,118
REVENTILACIÓN 3" ML 17,819 17,819 17,819 17,819 17,819 17,819 17,819 17,819 17,819 17,819
TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E
INSTALACIÓN)UN 138,610 138,610 138,610 138,610 138,610 138,610 138,610 138,610 138,610 138,610
11.7
11.8
11.9
11.10
11.11
11.12
11.1
11.2
11.3
11.4
11.5
11.6
11.19
11.20
11.21
11.22
11.23
11.24
11.13
11.14
11.15
11.16
11.17
11.18
11.31
11.32
11.33
11.34
11.35
11.36
11.25
11.26
11.27
11.28
11.29
11.30
11.43
11.37
11.38
11.39
11.40
11.41
11.42
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNTANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E
ISNTALACIÓN)UN 225,707 225,707 225,707 225,707 225,707 225,707 225,707 225,707 225,707 225,707
TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E
INSTALACIÓN)UN 375,666 375,666 375,666 375,666 375,666 375,666 375,666 375,666 375,666 375,666
TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 32,746 32,746 32,746 32,746 32,746 32,746 32,746 32,746 32,746 32,746
TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE
ACCESORIOS Y SOPORTES)ML 38,571 38,571 38,571 38,571 38,571 38,571 38,571 38,571 38,571 38,571
TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 49,678 49,678 49,678 49,678 49,678 49,678 49,678 49,678 49,678 49,678
TUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS
Y SOPORTES)ML 56,215 56,215 56,215 56,215 56,215 56,215 56,215 56,215 56,215 56,215
TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE
ACCESORIOS Y SOPORTES)ML 72,310 72,310 72,310 72,310 72,310 72,310 72,310 72,310 72,310 72,310
TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS
Y SOPORTES)ML 84,384 84,384 84,384 84,384 84,384 84,384 84,384 84,384 84,384 84,384
TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS
Y SOPORTES)ML 124,366 124,366 124,366 124,366 124,366 124,366 124,366 124,366 124,366 124,366
PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 50,022 50,022 50,022 50,022 50,022 50,022 50,022 50,022 50,022 50,022
PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 50,225 50,225 50,225 50,225 50,225 50,225 50,225 50,225 50,225 50,225
ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 32,604 32,604 32,604 32,604 32,604 32,604 32,604 32,604 32,604 32,604
ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 40,068 40,068 40,068 40,068 40,068 40,068 40,068 40,068 40,068 40,068
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA
2"ML 3,415 3,415 3,415 3,415 3,415 3,415 3,415 3,415 3,415 3,415
PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A
2"ML 5,350 5,350 5,350 5,350 5,350 5,350 5,350 5,350 5,350 5,350
GABINETE TIPO III UN 826,610 826,610 826,610 826,610 826,610 826,610 826,610 826,610 826,610 826,610
GABINETE TIPO I UN 633,792 633,792 633,792 633,792 633,792 633,792 633,792 633,792 633,792 633,792
SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 2,097,722 2,097,722 2,097,722 2,097,722 2,097,722 2,097,722 2,097,722 2,097,722 2,097,722 2,097,722
SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 1,748,909 1,748,909 1,748,909 1,748,909 1,748,909 1,748,909 1,748,909 1,748,909 1,748,909 1,748,909
VÁLVULA MARIPOSA 3" UN 509,853 509,853 509,853 509,853 509,853 509,853 509,853 509,853 509,853 509,853
VÁLVULA MARIPOSA 4" UN 659,131 659,131 659,131 659,131 659,131 659,131 659,131 659,131 659,131 659,131
VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 253,171 253,171 253,171 253,171 253,171 253,171 253,171 253,171 253,171 253,171
INSTALACIONES ELÉCTRICAS
ACOMETIDA AÉREA 10 M. PVC UN 292,136 292,136 292,136 292,136 292,136 292,136 292,136 292,136 292,136 292,136
SALIDA LÁMPARA TOMA PVC COMPLETA UN 46,419 46,419 46,419 46,419 46,419 46,419 46,419 46,419 46,419 46,419
SALIDA LÁMPARA TOMA EMT COMPLETA UN 54,954 54,954 54,954 54,954 54,954 54,954 54,954 54,954 54,954 54,954
SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 61,011 61,011 61,011 61,011 61,011 61,011 61,011 61,011 61,011 61,011
SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 71,864 71,864 71,864 71,864 71,864 71,864 71,864 71,864 71,864 71,864
SALIDA TELÉFONO PVC COMPLETA UN 43,634 43,634 43,634 43,634 43,634 43,634 43,634 43,634 43,634 43,634
SALIDA TIMBRE PVC COMPLETA UN 49,742 49,742 49,742 49,742 49,742 49,742 49,742 49,742 49,742 49,742
STRIP TELEFÓNICO 10 PARES UN 114,786 114,786 114,786 114,786 114,786 114,786 114,786 114,786 114,786 114,786
SALIDA TOMA DOBLE PVC COMPLETA UN 44,810 44,810 44,810 44,810 44,810 44,810 44,810 44,810 44,810 44,810
SALIDA TRIFÁSICA PVC COMPLETA UN 102,990 102,990 102,990 102,990 102,990 102,990 102,990 102,990 102,990 102,990
11.44
11.45
11.46
11.47
11.48
11.55
11.56
11.57
11.58
11.59
11.60
11.49
11.50
11.51
11.52
11.53
11.54
12
12.1
12.2
12.3
12.4
12.5
11.61
11.62
11.63
11.64
11.65
12.6
12.7
12.8
12.9
12.10
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNSALIDA T.V PVC COMPLETA. UN 61,583 61,583 61,583 61,583 61,583 61,583 61,583 61,583 61,583 61,583
SALIDA BIFÁSICA C.N. UN 36,518 36,518 36,518 36,518 36,518 36,518 36,518 36,518 36,518 36,518
TABLERO PARCIAL 4 CIRCUITOS UN 76,950 76,950 76,950 76,950 76,950 76,950 76,950 76,950 76,950 76,950
TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 328,546 328,546 328,546 328,546 328,546 328,546 328,546 328,546 328,546 328,546
TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 437,658 437,658 437,658 437,658 437,658 437,658 437,658 437,658 437,658 437,658
TUBERÍA PVC CONDUIT 1/2" ML 2,834 2,834 2,834 2,834 2,834 2,834 2,834 2,834 2,834 2,834
TUBERÍA PVC CONDUIT 3/4" ML 3,742 3,742 3,742 3,742 3,742 3,742 3,742 3,742 3,742 3,742
TUBERÍA PVC CONDUIT 1" ML 5,823 5,823 5,823 5,823 5,823 5,823 5,823 5,823 5,823 5,823
TUBERÍA PVC CONDUIT 1 1/2" ML 10,414 10,414 10,414 10,414 10,414 10,414 10,414 10,414 10,414 10,414
LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 218,844 218,844 218,844 218,844 218,844 218,844 218,844 218,844 218,844 218,844
LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 61,820 61,820 61,820 61,820 61,820 61,820 61,820 61,820 61,820 61,820
LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 83,717 83,717 83,717 83,717 83,717 83,717 83,717 83,717 83,717 83,717
LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 34,118 34,118 34,118 34,118 34,118 34,118 34,118 34,118 34,118 34,118
POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,122,285 1,122,285 1,122,285 1,122,285 1,122,285 1,122,285 1,122,285 1,122,285 1,122,285 1,122,285
POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 831,897 831,897 831,897 831,897 831,897 831,897 831,897 831,897 831,897 831,897
POSTE METÁLICO 6M UN 1,043,580 1,043,580 1,043,580 1,043,580 1,043,580 1,043,580 1,043,580 1,043,580 1,043,580 1,043,580
FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 484,119 484,119 484,119 484,119 484,119 484,119 484,119 484,119 484,119 484,119
APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 88,324 88,324 88,324 88,324 88,324 88,324 88,324 88,324 88,324 88,324
LUMINARIA 70W SODIO UN 406,198 406,198 406,198 406,198 406,198 406,198 406,198 406,198 406,198 406,198
LUMINARIA 150W SODIO UN 508,211 508,211 508,211 508,211 508,211 508,211 508,211 508,211 508,211 508,211
REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,342,458 1,342,458 1,342,458 1,342,458 1,342,458 1,342,458 1,342,458 1,342,458 1,342,458 1,342,458
REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 988,566 988,566 988,566 988,566 988,566 988,566 988,566 988,566 988,566 988,566
PISOS BASES
ALISTADO ENDURECIDO 1:3, E=0.04 M2 33,935 34,851 34,093 33,682 34,345 34,156 34,282 34,535 35,040 34,061
ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 33,747 34,663 33,905 33,494 34,157 33,968 34,094 34,347 34,852 33,873
ALISTADO PARA LISTÓN M2 12,024 12,208 12,056 11,974 12,107 12,069 12,094 12,145 12,246 12,050
ALISTADO PISOS 1:3, E=0.04 M2 25,524 27,357 25,840 25,018 26,345 25,966 26,219 26,725 27,736 25,777
ALISTADO TERRAZAS 1:3, E= 0.08 M2 72,487 74,320 72,803 71,982 73,309 72,930 73,183 73,688 74,699 72,740
CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 22,016 22,609 22,118 21,852 22,282 22,159 22,241 22,404 22,732 22,097
CONCRETO BASE GRADAS 2500 PSI M2 50,124 53,031 50,625 49,322 51,427 50,826 51,227 52,028 53,632 50,525
CONCRETO ESTRIADO RAMPAS 2500 PSI M2 70,400 75,051 71,202 69,118 72,485 71,523 72,164 73,447 76,013 71,042
MANTO FIBERGLASS 600X1 M2 24,437 24,437 24,437 24,437 24,437 24,437 24,437 24,437 24,437 24,437
PEGANTE MORTERO-CONCRETO M2 18,508 18,508 18,508 18,508 18,508 18,508 18,508 18,508 18,508 18,508
PERMA PLY 2 CAPAS M2 21,640 21,640 21,640 21,640 21,640 21,640 21,640 21,640 21,640 21,640
PLACA BASE CONCRETO 0.08 2500 PSI M2 41,152 43,768 41,603 40,430 42,324 41,783 42,144 42,866 44,309 41,513
PLACA BASE CONCRETO 0.10 2500 PSI M2 48,404 51,601 48,955 47,522 49,837 49,175 49,616 50,498 52,262 48,845
PLACA BASE CONCRETO 0.15 2500 PSI M2 70,607 75,548 71,458 69,243 72,821 71,799 72,481 73,844 76,570 71,288
TRITURADO FINO 1/2 M3 94,596 115,385 98,180 88,861 103,915 99,614 102,482 108,217 119,687 97,463
TRITURADO GRUESO 3/4 M3 97,129 114,493 98,351 92,229 101,111 97,436 99,886 107,718 116,324 98,385
PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 46,810 47,177 46,873 46,709 46,974 46,899 46,949 47,050 47,252 46,861
BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 27,878 28,062 27,910 27,828 27,961 27,923 27,948 27,998 28,100 27,904
12.12
12.13
12.14
12.15
12.16
12.17
12.11
12.24
12.25
12.26
12.27
12.28
12.29
12.18
12.19
12.20
12.21
12.22
12.23
13.2
13.3
13.4
13.5
13.6
13.7
12.30
12.31
12.32
13
13.1
13.14
13.15
13.16
14
14.1
13.8
13.9
13.10
13.11
13.12
13.13
14.2
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNADOQUÍN CONCRETO 6CM M2 53,593 54,509 53,751 53,340 54,004 53,814 53,941 54,193 54,699 53,720
ADOQUÍN CONCRETO 8CM M2 56,243 57,159 56,401 55,990 56,654 56,464 56,591 56,843 57,349 56,370
ADOQUÍN GRES PEATONAL M2 59,699 60,615 59,857 59,446 60,110 59,920 60,047 60,299 60,805 59,825BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO
BLANCO. INCLUYE ALISTADOM2 61,526 61,893 61,590 61,425 61,691 61,615 61,665 61,767 61,969 61,577
GRAVILLA PARA GRADAS ML 30,287 30,672 30,354 30,181 30,460 30,380 30,433 30,539 30,752 30,340
ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 135,124 136,773 135,408 134,669 135,863 135,522 135,749 136,205 137,115 135,351
ACABADO EN GRAVILLA LAVADA M2 38,434 39,388 38,599 38,171 38,862 38,665 38,796 39,059 39,585 38,566
GUARDAESCOBA EN GRANITO ML 35,215 35,215 35,215 35,215 35,215 35,215 35,215 35,215 35,215 35,215
GUARDAESCOBA EN GRAVILLA ML 8,544 8,929 8,610 8,437 8,716 8,637 8,690 8,796 9,008 8,597
GUARDAESCOBA PVC CARAMELO ML 7,607 7,607 7,607 7,607 7,607 7,607 7,607 7,607 7,607 7,607
GUARDAESCOBA PVC CEDRO ML 10,205 10,205 10,205 10,205 10,205 10,205 10,205 10,205 10,205 10,205
GUARDAESCOBA PINO CARIBE ML 8,481 8,481 8,481 8,481 8,481 8,481 8,481 8,481 8,481 8,481
GUARDAESCOBA CEDRO BLANCO ML 14,224 14,224 14,224 14,224 14,224 14,224 14,224 14,224 14,224 14,224
GUARDAESCOBA EN MADERA SAPAN ML 27,736 27,736 27,736 27,736 27,736 27,736 27,736 27,736 27,736 27,736
GUARDAESCOBA GRES Y CERÁMICA ML 7,425 7,425 7,425 7,425 7,425 7,425 7,425 7,425 7,425 7,425
LISTÓN M.H. AMARILLO M2 59,976 59,976 59,976 59,976 59,976 59,976 59,976 59,976 59,976 59,976
PASO ESCALERA GRANITO ML 97,531 98,813 97,752 97,177 98,106 97,840 98,017 98,371 99,079 97,708
PIRLANES ALUMINIO ML 6,043 6,043 6,043 6,043 6,043 6,043 6,043 6,043 6,043 6,043
PIRLANES LADRILLO ML 26,281 26,618 26,339 26,188 26,432 26,363 26,409 26,502 26,688 26,328
PISO VINILO TRÁFICO RESIDENCIAL M2 37,065 37,065 37,065 37,065 37,065 37,065 37,065 37,065 37,065 37,065
PISO VINILO TRÁFICO PESADO M2 43,086 43,086 43,086 43,086 43,086 43,086 43,086 43,086 43,086 43,086
PULIDA LACADA PISO MADERA M2 39,623 39,623 39,623 39,623 39,623 39,623 39,623 39,623 39,623 39,623
TABLETA DE GRES 25X25 M2 40,714 41,081 40,778 40,613 40,879 40,803 40,853 40,955 41,157 40,765
TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 45,618 45,985 45,681 45,517 45,783 45,707 45,757 45,858 46,061 45,669
GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 8,822 8,822 8,822 8,822 8,822 8,822 8,822 8,822 8,822 8,822
ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 40,856 41,362 40,943 40,716 41,083 40,978 41,048 41,187 41,466 40,926
JABONERA PORCELANA ACUARIO UN 16,646 16,646 16,646 16,646 16,646 16,646 16,646 16,646 16,646 16,646JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,
JABONERA,CEPILLERA Y PERCHA SIMPLE)UN 99,664 99,664 99,664 99,664 99,664 99,664 99,664 99,664 99,664 99,664
REJILLA PLÁSTICA SOSCO 3X2 UN 7,995 7,995 7,995 7,995 7,995 7,995 7,995 7,995 7,995 7,995
REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 18,200 18,200 18,200 18,200 18,200 18,200 18,200 18,200 18,200 18,200
REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 11,653 11,653 11,653 11,653 11,653 11,653 11,653 11,653 11,653 11,653
REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 11,321 11,321 11,321 11,321 11,321 11,321 11,321 11,321 11,321 11,321
REMATES BOCEL ALUMINIO ML 6,866 6,866 6,866 6,866 6,866 6,866 6,866 6,866 6,866 6,866
REMATES BOCEL PORCELANA ML 6,987 6,987 6,987 6,987 6,987 6,987 6,987 6,987 6,987 6,987
TAPA REGISTRO 20X20 UN 15,396 15,396 15,396 15,396 15,396 15,396 15,396 15,396 15,396 15,396
TAPA REGISTRO 6X6 UN 14,028 14,028 14,028 14,028 14,028 14,028 14,028 14,028 14,028 14,028
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 15,121 15,121 15,121 15,121 15,121 15,121 15,121 15,121 15,121 15,121
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL
FUNDIDO EN SITIOM2 17,480 17,480 17,480 17,480 17,480 17,480 17,480 17,480 17,480 17,480
CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 53,469 53,836 53,532 53,368 53,634 53,558 53,608 53,709 53,912 53,520
MEDIA CAÑA EN GRANITO ML 62,713 62,713 62,713 62,713 62,713 62,713 62,713 62,713 62,713 62,713
14.8
14.9
14.10
14.11
14.12
14.13
14.3
14.4
14.5
14.6
14.7
14.20
14.21
14.22
14.23
14.24
14.25
14.14
14.15
14.16
14.17
14.18
14.19
14.32
14.33
14.34
14.35
14.36
14.37
14.26
14.27
14.28
14.29
14.30
14.31
14.38
14.39
14.40
14.41
14.42
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNPISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 27,361 27,361 27,361 27,361 27,361 27,361 27,361 27,361 27,361 27,361
PINTURA ACRÍLICA PARA PISOS M2 10,701 10,701 10,701 10,701 10,701 10,701 10,701 10,701 10,701 10,701
PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 82,354 82,354 82,354 82,354 82,354 82,354 82,354 82,354 82,354 82,354
GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 99,632 99,632 99,632 99,632 99,632 99,632 99,632 99,632 99,632 99,632
CIELO RASO
APLIQUE YESO ML 58,872 58,872 58,872 58,872 58,872 58,872 58,872 58,872 58,872 58,872
ARMADURA MADERA Y MALLA M2 28,872 28,872 28,872 28,872 28,872 28,872 28,872 28,872 28,872 28,872
CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 44,702 44,702 44,702 44,702 44,702 44,702 44,702 44,702 44,702 44,702
CIELO RASO DURACUSTIC M2 54,880 54,880 54,880 54,880 54,880 54,880 54,880 54,880 54,880 54,880
CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 40,953 40,953 40,953 40,953 40,953 40,953 40,953 40,953 40,953 40,953
CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 75,971 75,971 75,971 75,971 75,971 75,971 75,971 75,971 75,971 75,971
CORNISAS YESO ML 39,524 39,524 39,524 39,524 39,524 39,524 39,524 39,524 39,524 39,524
LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 84,001 84,001 84,001 84,001 84,001 84,001 84,001 84,001 84,001 84,001
MALLA CON VENA M2 10,806 10,806 10,806 10,806 10,806 10,806 10,806 10,806 10,806 10,806
EXCAVACIONES Y RELLENOS
EXPLANACIÓN Y EXTENDIDA M3 4,547 4,547 4,547 4,547 4,547 4,547 4,547 4,547 4,547 4,547EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 17,474 17,474 17,474 17,474 17,474 17,474 17,474 17,474 17,474 17,474
EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 20,426 20,426 20,426 20,426 20,426 20,426 20,426 20,426 20,426 20,426EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYE
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 35,830 35,830 35,830 35,830 35,830 35,830 35,830 35,830 35,830 35,830
EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 40,782 40,782 40,782 40,782 40,782 40,782 40,782 40,782 40,782 40,782
EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 67,329 67,329 67,329 67,329 67,329 67,329 67,329 67,329 67,329 67,329
RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 15,227 15,227 15,227 15,227 15,227 15,227 15,227 15,227 15,227 15,227
RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 63,045 61,752 57,065 63,045 50,110 50,110 50,110 59,639 55,759 59,165
RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 100,848 123,050 104,676 94,723 110,800 106,207 109,269 115,394 127,644 103,910RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
MECÁNICAMENTEM3 131,624 144,923 122,570 118,689 133,282 137,162 133,282 123,863 144,559 130,331
AFRIMADO (NORMA INVIAS 311) M3 67,349 66,056 54,414 67,349 54,414 54,414 54,414 59,588 59,588 63,469
SUBBASE GRANULAR (NORMA INVIAS 320) M3 122,616 134,569 109,681 109,681 122,928 122,928 122,928 114,855 135,551 121,322
BASE GRANULAR (NORMA INVIAS 330) M3 132,302 145,601 123,247 119,367 133,959 137,840 133,959 124,541 145,237 131,008
APARATOS SANITARIOS
SUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 244,056 244,056 244,056 244,056 244,056 244,056 244,056 244,056 244,056 244,056
SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE
GRIFERÍA)UN 719,843 719,843 719,843 719,843 719,843 719,843 719,843 719,843 719,843 719,843
SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 389,948 389,948 389,948 389,948 389,948 389,948 389,948 389,948 389,948 389,948
SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 112,866 112,866 112,866 112,866 112,866 112,866 112,866 112,866 112,866 112,866
SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE
GRIFERÍA)UN 158,157 158,157 158,157 158,157 158,157 158,157 158,157 158,157 158,157 158,157
14.44
14.45
14.46
15
15.1
14.43
15.8
15.9
16
16.1
16.2
15.2
15.3
15.4
15.5
15.6
15.7
16.9
16.10
16.11
16.12
16.13
16.3
16.4
16.5
16.6
16.7
16.8
17
17.1
17.2
17.3
17.4
17.5
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNSUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE
GRIFERÍA)UN 146,865 146,865 146,865 146,865 146,865 146,865 146,865 146,865 146,865 146,865
SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 323,566 323,566 323,566 323,566 323,566 323,566 323,566 323,566 323,566 323,566
SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE
GRIFERÍA)UN 827,878 827,878 827,878 827,878 827,878 827,878 827,878 827,878 827,878 827,878
SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 234,986 234,986 234,986 234,986 234,986 234,986 234,986 234,986 234,986 234,986
SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A
BAÑERAUN 166,379 166,379 166,379 166,379 166,379 166,379 166,379 166,379 166,379 166,379
SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 66,083 66,083 66,083 66,083 66,083 66,083 66,083 66,083 66,083 66,083SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO
INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)UN 201,526 201,526 201,526 201,526 201,526 201,526 201,526 201,526 201,526 201,526
SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO
INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)UN 296,970 296,970 296,970 296,970 296,970 296,970 296,970 296,970 296,970 296,970
PINTURAS
IMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 6,693 6,693 6,693 6,693 6,693 6,693 6,693 6,693 6,693 6,693
ANTICORROSIVO SOBRE LÁMINA LINEAL ML 2,483 2,483 2,483 2,483 2,483 2,483 2,483 2,483 2,483 2,483
ANTICORROSIVO SOBRE LÁMINA LLENA M2 8,903 8,903 8,903 8,903 8,903 8,903 8,903 8,903 8,903 8,903
BARNIZ SOBRE MUEBLES M2 33,930 33,930 33,930 33,930 33,930 33,930 33,930 33,930 33,930 33,930
CARBURO SOBRE PAÑETES M2 4,668 4,668 4,668 4,668 4,668 4,668 4,668 4,668 4,668 4,668
COLORPLAST FACHADA SOBRE FACHADA M2 53,071 53,071 53,071 53,071 53,071 53,071 53,071 53,071 53,071 53,071
DEMARCACIÓN CON MARMOLINA ML 2,774 2,774 2,774 2,774 2,774 2,774 2,774 2,774 2,774 2,774
ESMALTE SOBRE LÁMINA LINEAL ML 2,227 2,227 2,227 2,227 2,227 2,227 2,227 2,227 2,227 2,227
ESMALTE SOBRE LÁMINA LLENA M2 11,171 11,171 11,171 11,171 11,171 11,171 11,171 11,171 11,171 11,171
ESMALTE SOBRE MADERA LINEAL ML 3,238 3,238 3,238 3,238 3,238 3,238 3,238 3,238 3,238 3,238
ESMALTE SOBRE MADERA LLENA M2 11,780 11,780 11,780 11,780 11,780 11,780 11,780 11,780 11,780 11,780
ESMALTE SOBRE MARCOS LÁMINA M2 4,623 4,623 4,623 4,623 4,623 4,623 4,623 4,623 4,623 4,623
ESMALTE SOBRE MARCOS MADERA M2 5,257 5,257 5,257 5,257 5,257 5,257 5,257 5,257 5,257 5,257
ESTUCO M2 5,625 5,625 5,625 5,625 5,625 5,625 5,625 5,625 5,625 5,625
ESTUCO (LINEAL) ML 3,518 3,518 3,518 3,518 3,518 3,518 3,518 3,518 3,518 3,518
ESTUCO Y VINILO 3 MANOS M2 12,446 12,446 12,446 12,446 12,446 12,446 12,446 12,446 12,446 12,446
ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,704 7,704 7,704 7,704 7,704 7,704 7,704 7,704 7,704 7,704
LACA PISOS MADERA M2 18,194 18,194 18,194 18,194 18,194 18,194 18,194 18,194 18,194 18,194
LÍNEAS TRÁFICO 0.10 ML 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150
MARMOLINA SOBRE PAÑETE M2 9,792 9,792 9,792 9,792 9,792 9,792 9,792 9,792 9,792 9,792
TINTILLA SOBRE MADERA LINEAL ML 2,641 2,641 2,641 2,641 2,641 2,641 2,641 2,641 2,641 2,641
TINTILLA SOBRE MADERA LLENA M2 10,098 10,098 10,098 10,098 10,098 10,098 10,098 10,098 10,098 10,098
VINILO SOBRE PAÑETE 2 MANOS M2 5,676 5,676 5,676 5,676 5,676 5,676 5,676 5,676 5,676 5,676
VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML 3,564 3,564 3,564 3,564 3,564 3,564 3,564 3,564 3,564 3,564
WASH-PRIMER SOBRE ALUMNIO M2 17,529 17,529 17,529 17,529 17,529 17,529 17,529 17,529 17,529 17,529
PINTURA EPÓXICA M2 10,148 10,148 10,148 10,148 10,148 10,148 10,148 10,148 10,148 10,148
PINTURA EPÓXICA (LINEAL) ML 6,264 6,264 6,264 6,264 6,264 6,264 6,264 6,264 6,264 6,264
DOTACIONES DEPORTIVAS
17.6
17.7
17.8
17.9
17.10
17.11
18.3
18.4
18.5
18.6
18.7
18.8
17.12
17.13
18
18.1
18.2
18.15
18.16
18.17
18.18
18.19
18.20
18.9
18.10
18.11
18.12
18.13
18.14
18.27
19
18.21
18.22
18.23
18.24
18.25
18.26
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNCANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 4,903,675 4,903,675 4,903,675 4,903,675 4,903,675 4,903,675 4,903,675 4,903,675 4,903,675 4,903,675CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON
RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)UN 8,664,025 8,664,025 8,664,025 8,664,025 8,664,025 8,664,025 8,664,025 8,664,025 8,664,025 8,664,025
CANCHA PARA MICROFÚTBOL (PAR) UN 2,267,356 2,267,356 2,267,356 2,267,356 2,267,356 2,267,356 2,267,356 2,267,356 2,267,356 2,267,356
CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 7,409,938 7,409,938 7,409,938 7,409,938 7,409,938 7,409,938 7,409,938 7,409,938 7,409,938 7,409,938
CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 6,939,364 6,939,364 6,939,364 6,939,364 6,939,364 6,939,364 6,939,364 6,939,364 6,939,364 6,939,364
DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150 2,150
TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 695,681 695,681 695,681 695,681 695,681 695,681 695,681 695,681 695,681 695,681
MALLA NYLON PETROLIZADA VOLEIBOL UN 69,539 69,539 69,539 69,539 69,539 69,539 69,539 69,539 69,539 69,539
SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,259,739 1,260,038 1,259,790 1,259,657 1,259,873 1,259,811 1,259,852 1,259,935 1,260,099 1,259,780
CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 553,450 560,514 554,668 551,501 556,617 555,155 556,129 558,078 561,976 554,424
INSTALACIONES RED GASES
TUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 24,090 24,090 24,090 24,090 24,090 24,090 24,090 24,090 24,090 24,090
TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 35,618 35,618 35,618 35,618 35,618 35,618 35,618 35,618 35,618 35,618
TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 44,070 44,070 44,070 44,070 44,070 44,070 44,070 44,070 44,070 44,070
TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 14,586 14,586 14,586 14,586 14,586 14,586 14,586 14,586 14,586 14,586
TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 17,590 17,590 17,590 17,590 17,590 17,590 17,590 17,590 17,590 17,590
TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 23,862 23,862 23,862 23,862 23,862 23,862 23,862 23,862 23,862 23,862
TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 21,455 21,455 21,455 21,455 21,455 21,455 21,455 21,455 21,455 21,455
TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 22,591 22,591 22,591 22,591 22,591 22,591 22,591 22,591 22,591 22,591
TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 28,156 28,156 28,156 28,156 28,156 28,156 28,156 28,156 28,156 28,156
VÁLVULA DE BOLA GAS 1/2" UN 14,218 14,218 14,218 14,218 14,218 14,218 14,218 14,218 14,218 14,218
VÁLVULA DE BOLA GAS 3/4" UN 18,645 18,645 18,645 18,645 18,645 18,645 18,645 18,645 18,645 18,645
VÁLVULA DE BOLA GAS 1" UN 28,699 28,699 28,699 28,699 28,699 28,699 28,699 28,699 28,699 28,699
VÁLVULA POLIETILENO GAS 1/2" UN 220,387 220,387 220,387 220,387 220,387 220,387 220,387 220,387 220,387 220,387
VÁLVULA POLIETILENO GAS 3/4" UN 253,644 253,644 253,644 253,644 253,644 253,644 253,644 253,644 253,644 253,644
VÁLVULA POLIETILENO GAS 1" UN 264,528 264,528 264,528 264,528 264,528 264,528 264,528 264,528 264,528 264,528
ACOMETIDA GAS 1/2" ML 245,876 245,876 245,876 245,876 245,876 245,876 245,876 245,876 245,876 245,876
INSTALACIONES RED VOZ Y DATOS
SENSOR DE HUMO FOTOELÉCTRICO UN 178,909 178,909 178,909 178,909 178,909 178,909 178,909 178,909 178,909 178,909
CABLE DETECTOR LINEAL DE CALOR ML 27,448 27,448 27,448 27,448 27,448 27,448 27,448 27,448 27,448 27,448
SIRENA DE 110 V UN 83,440 83,440 83,440 83,440 83,440 83,440 83,440 83,440 83,440 83,440
CÁMARA CCTV UN 211,239 211,239 211,239 211,239 211,239 211,239 211,239 211,239 211,239 211,239
PARLANTE-CIELO FALSO UN 41,820 41,820 41,820 41,820 41,820 41,820 41,820 41,820 41,820 41,820
AMPLIFICADOR 100W UN 462,184 462,184 462,184 462,184 462,184 462,184 462,184 462,184 462,184 462,184
AMPLIFICADOR 300W UN 1,147,589 1,147,589 1,147,589 1,147,589 1,147,589 1,147,589 1,147,589 1,147,589 1,147,589 1,147,589
ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 35,700 35,700 35,700 35,700 35,700 35,700 35,700 35,700 35,700 35,700
MICRÓFONO PG 48LC (INCLUYE BASE) UN 179,037 179,037 179,037 179,037 179,037 179,037 179,037 179,037 179,037 179,037
TOMA PARA MICRÓFONO UN 35,301 35,301 35,301 35,301 35,301 35,301 35,301 35,301 35,301 35,301
CABLE BLINDADO STEREO PARA MICRÓFONO ML 3,029 3,029 3,029 3,029 3,029 3,029 3,029 3,029 3,029 3,029
SPLITERS UN 5,099 5,099 5,099 5,099 5,099 5,099 5,099 5,099 5,099 5,099
19.1
19.2
19.3
19.10
20
20.1
20.2
20.3
19.4
19.5
19.6
19.7
19.8
19.9
20.10
20.11
20.12
20.13
20.14
20.15
20.4
20.5
20.6
20.7
20.8
20.9
21.4
21.5
21.6
21.7
21.8
21.9
20.16
21.1
21.1
21.2
21.3
21.10
21.11
21.12
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNTUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 14,891 14,891 14,891 14,891 14,891 14,891 14,891 14,891 14,891 14,891
TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 19,614 19,614 19,614 19,614 19,614 19,614 19,614 19,614 19,614 19,614
TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 25,367 25,367 25,367 25,367 25,367 25,367 25,367 25,367 25,367 25,367
BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 99,051 99,051 99,051 99,051 99,051 99,051 99,051 99,051 99,051 99,051
TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 25,840 25,840 25,840 25,840 25,840 25,840 25,840 25,840 25,840 25,840
BANDEJA PORTACABLES PARA RACK UN 84,564 84,564 84,564 84,564 84,564 84,564 84,564 84,564 84,564 84,564
RACK 2' X 24" UN 147,435 147,435 147,435 147,435 147,435 147,435 147,435 147,435 147,435 147,435
RACK 3' X 24" UN 232,155 232,155 232,155 232,155 232,155 232,155 232,155 232,155 232,155 232,155
RACK 5' X 24" UN 288,178 288,178 288,178 288,178 288,178 288,178 288,178 288,178 288,178 288,178
RACK 7' X 24" UN 314,988 314,988 314,988 314,988 314,988 314,988 314,988 314,988 314,988 314,988
PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 460,644 460,644 460,644 460,644 460,644 460,644 460,644 460,644 460,644 460,644
PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 271,171 271,171 271,171 271,171 271,171 271,171 271,171 271,171 271,171 271,171
SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 83,944 83,944 83,944 83,944 83,944 83,944 83,944 83,944 83,944 83,944
PATCH CORD 2M CATEGORÍA 6A UN 11,191 11,191 11,191 11,191 11,191 11,191 11,191 11,191 11,191 11,191
PATCH CORD 5M CATEGORÍA 6A UN 22,880 22,880 22,880 22,880 22,880 22,880 22,880 22,880 22,880 22,880
CABLE UTP CATEGORÍA 6A ML 4,021 4,021 4,021 4,021 4,021 4,021 4,021 4,021 4,021 4,021
CANALETA METÁLICA 4X6 CMS ML 28,306 28,306 28,306 28,306 28,306 28,306 28,306 28,306 28,306 28,306
CANALETA METÁLICA 4X10 CMS ML 29,584 29,584 29,584 29,584 29,584 29,584 29,584 29,584 29,584 29,584
CANALETA METÁLICA 6X10 CMS ML 30,222 30,222 30,222 30,222 30,222 30,222 30,222 30,222 30,222 30,222
CANALETA PLÁSTICA 13X7 MM ML 19,708 19,708 19,708 19,708 19,708 19,708 19,708 19,708 19,708 19,708
CANALETA PLÁSTICA 20X12 MM ML 21,810 21,810 21,810 21,810 21,810 21,810 21,810 21,810 21,810 21,810
CANALETA PLÁSTICA 32X12 MM ML 22,693 22,693 22,693 22,693 22,693 22,693 22,693 22,693 22,693 22,693
CANALETA PLÁSTICA 40X60 MM ML 38,216 38,216 38,216 38,216 38,216 38,216 38,216 38,216 38,216 38,216
SWITCH 10/100/1000 24 PUERTOS UN 494,893 494,893 494,893 494,893 494,893 494,893 494,893 494,893 494,893 494,893
SWITCH 10/100/1000 16 PUERTOS UN 254,010 254,010 254,010 254,010 254,010 254,010 254,010 254,010 254,010 254,010
SWITCH 10/100/1000 8 PUERTOS UN 71,037 71,037 71,037 71,037 71,037 71,037 71,037 71,037 71,037 71,037
CABLE TELEFÓNICO 2 PARES ML 1,475 1,475 1,475 1,475 1,475 1,475 1,475 1,475 1,475 1,475
CABLE TELEFÓNICO 10 PARES ML 6,817 6,817 6,817 6,817 6,817 6,817 6,817 6,817 6,817 6,817
CABLE TELEFÓNICO 20 PARES ML 10,176 10,176 10,176 10,176 10,176 10,176 10,176 10,176 10,176 10,176
CABLE TELEFÓNICO 40 PARES ML 16,993 16,993 16,993 16,993 16,993 16,993 16,993 16,993 16,993 16,993
CABLE TELEVISIÓN RG6 ML 3,145 3,145 3,145 3,145 3,145 3,145 3,145 3,145 3,145 3,145
ACOMETIDA TELEFÓNICA 1/2" ML 17,832 17,832 17,832 17,832 17,832 17,832 17,832 17,832 17,832 17,832
ACOMETIDA TELEFÓNICA 1" ML 25,979 25,979 25,979 25,979 25,979 25,979 25,979 25,979 25,979 25,979
ACOMETIDA TELEVISIÓN 1" RG6" ML 15,517 15,517 15,517 15,517 15,517 15,517 15,517 15,517 15,517 15,517
CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE
CERTIFICACIÓN)ML 12,361 12,361 12,361 12,361 12,361 12,361 12,361 12,361 12,361 12,361
BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 499,929 499,929 499,929 499,929 499,929 499,929 499,929 499,929 499,929 499,929
21.16
21.17
21.18
21.19
21.20
21.21
21.13
21.14
21.15
21.28
21.29
21.30
21.31
21.32
21.33
21.22
21.23
21.24
21.25
21.26
21.27
21.40
21.41
21.42
21.43
21.44
21.45
21.34
21.35
21.36
21.37
21.38
21.39
21.46
21.47
21.48
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNURBANISMOACUEDUCTO
CODO 45 PVC UNIÓN MECÁNICA 2" UN 7,658 7,658 7,658 7,658 7,658 7,658 7,658 7,658 7,658 7,658
CODO 45 PVC UNIÓN MECÁNICA 4" UN 73,172 73,172 73,172 73,172 73,172 73,172 73,172 73,172 73,172 73,172
CODO 45 PVC UNIÓN MECÁNICA 8" UN 412,199 412,199 412,199 412,199 412,199 412,199 412,199 412,199 412,199 412,199
CODO 45 PVC UNIÓN MECÁNICA 10" UN 879,800 879,800 879,800 879,800 879,800 879,800 879,800 879,800 879,800 879,800
CODO 90 PVC UNIÓN MECÁNICA 4" UN 100,843 100,843 100,843 100,843 100,843 100,843 100,843 100,843 100,843 100,843
CODO 90 PVC UNIÓN MECÁNICA 8" UN 614,393 614,393 614,393 614,393 614,393 614,393 614,393 614,393 614,393 614,393
CODO 90 PVC UNIÓN MECÁNICA 10" UN 1,322,291 1,322,291 1,322,291 1,322,291 1,322,291 1,322,291 1,322,291 1,322,291 1,322,291 1,322,291
COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 10,526 10,526 10,526 10,526 10,526 10,526 10,526 10,526 10,526 10,526
COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 12,989 12,989 12,989 12,989 12,989 12,989 12,989 12,989 12,989 12,989
COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 16,317 16,317 16,317 16,317 16,317 16,317 16,317 16,317 16,317 16,317
COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 17,861 17,861 17,861 17,861 17,861 17,861 17,861 17,861 17,861 17,861
COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 21,418 21,418 21,418 21,418 21,418 21,418 21,418 21,418 21,418 21,418
COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 21,418 21,418 21,418 21,418 21,418 21,418 21,418 21,418 21,418 21,418
TAPÓN PVC UNIÓN MECÁNICA 3" UN 86,193 86,193 86,193 86,193 86,193 86,193 86,193 86,193 86,193 86,193
TAPÓN PVC UNIÓN MECÁNICA 4" UN 99,834 99,834 99,834 99,834 99,834 99,834 99,834 99,834 99,834 99,834
TAPÓN PVC UNIÓN MECÁNICA 8" UN 308,974 308,974 308,974 308,974 308,974 308,974 308,974 308,974 308,974 308,974
TEE PVC UNIÓN MECÁNICA 2" UN 116,027 116,027 116,027 116,027 116,027 116,027 116,027 116,027 116,027 116,027
TEE PVC UNIÓN MECÁNICA 4" UN 191,270 191,270 191,270 191,270 191,270 191,270 191,270 191,270 191,270 191,270
TEE PVC UNIÓN MECÁNICA 8" UN 846,461 846,461 846,461 846,461 846,461 846,461 846,461 846,461 846,461 846,461
TEE PVC UNIÓN MECÁNICA 10" UN 975,256 975,256 975,256 975,256 975,256 975,256 975,256 975,256 975,256 975,256
TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 11,426 11,426 11,426 11,426 11,426 11,426 11,426 11,426 11,426 11,426
TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 10,081 10,081 10,081 10,081 10,081 10,081 10,081 10,081 10,081 10,081
TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 24,931 24,931 24,931 24,931 24,931 24,931 24,931 24,931 24,931 24,931
TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 98,869 98,869 98,869 98,869 98,869 98,869 98,869 98,869 98,869 98,869
TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 147,254 147,254 147,254 147,254 147,254 147,254 147,254 147,254 147,254 147,254
TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 24,053 24,053 24,053 24,053 24,053 24,053 24,053 24,053 24,053 24,053
TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 82,878 82,878 82,878 82,878 82,878 82,878 82,878 82,878 82,878 82,878
TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 122,835 122,835 122,835 122,835 122,835 122,835 122,835 122,835 122,835 122,835
UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 0 0 0 0 0 0 0 0 0 0
UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 50,142 50,142 50,142 50,142 50,142 50,142 50,142 50,142 50,142 50,142
UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 202,001 202,001 202,001 202,001 202,001 202,001 202,001 202,001 202,001 202,001
UNIÓN REPARACION PVC 4" UN 58,507 58,507 58,507 58,507 58,507 58,507 58,507 58,507 58,507 58,507
UNIÓN REPARACIÓN PVC 8" UN 235,031 235,031 235,031 235,031 235,031 235,031 235,031 235,031 235,031 235,031
UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 140,852 140,852 140,852 140,852 140,852 140,852 140,852 140,852 140,852 140,852
UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 401,081 401,081 401,081 401,081 401,081 401,081 401,081 401,081 401,081 401,081
VÁLVULA COMPUERTA ELÁSTICA 6" UN 1,074,536 1,074,536 1,074,536 1,074,536 1,074,536 1,074,536 1,074,536 1,074,536 1,074,536 1,074,536
VÁLVULA COMPUERTA ELÁSTICA 8" UN 1,587,758 1,587,758 1,587,758 1,587,758 1,587,758 1,587,758 1,587,758 1,587,758 1,587,758 1,587,758
ALCANTARILLADO - EXCAVACIONES
ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,587 8,587 8,587 8,587 8,587 8,587 8,587 8,587 8,587 8,587
ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 19,617 19,617 19,617 19,617 19,617 19,617 19,617 19,617 19,617 19,617
RELLENO CON MATERIAL DE EXCAVACIÓN M3 15,227 15,227 15,227 15,227 15,227 15,227 15,227 15,227 15,227 15,227
RELLENO TIPO 1 "GRAVILLA" M3 84,799 105,992 88,453 78,953 94,299 89,915 92,838 98,684 110,377 87,722
1.1
1.2
1.3
1.4
1.5
1.6
1
1.13
1.14
1.15
1.16
1.17
1.18
1.7
1.8
1.9
1.10
1.11
1.12
1.25
1.26
1.27
1.28
1.29
1.30
1.19
1.20
1.21
1.22
1.23
1.24
1.37
2
2.1
2.2
2.3
1.31
1.32
1.33
1.34
1.35
1.36
2.4
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNRELLENO TIPO 2 "RECEBO" M3 59,050 57,757 53,070 59,050 46,115 46,115 46,115 55,644 51,764 55,170
RELLENO TIPO 4 "SUBBASE B-200" M3 69,320 68,027 56,385 69,320 56,385 56,385 56,385 61,559 61,559 65,440
RELLENO TIPO 5 "TRITURADO GRUESO" M3 71,639 70,614 62,203 103,182 63,440 63,440 61,391 75,753 75,753 75,753
RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 72,916 71,871 72,700 105,071 64,558 64,558 62,469 77,110 77,110 77,110
RELLENO TIPO 7 "ARENA DE PEÑA" M3 95,792 117,709 99,570 89,746 105,616 101,082 104,106 110,152 122,243 98,815
ALCANTARILLADO - TUBERÍA
CODO 45 PVC ALCANTARILLADO 8" UN 92,141 92,141 92,141 92,141 92,141 92,141 92,141 92,141 92,141 92,141
CODO 45 PVC ALCANTARILLADO 16" UN 960,868 960,868 960,868 960,868 960,868 960,868 960,868 960,868 960,868 960,868
CODO 90 PVC ALCANTARILLADO 8" UN 120,420 120,420 120,420 120,420 120,420 120,420 120,420 120,420 120,420 120,420
CODO 90 PVC ALCANTARILLADO 16" UN 1,112,934 1,112,934 1,112,934 1,112,934 1,112,934 1,112,934 1,112,934 1,112,934 1,112,934 1,112,934
CODO 90 PVC ALCANTARILLADO 24" UN 775,689 775,689 775,689 775,689 775,689 775,689 775,689 775,689 775,689 775,689
SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 59,279 59,279 59,279 59,279 59,279 59,279 59,279 59,279 59,279 59,279
SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 91,466 91,466 91,466 91,466 91,466 91,466 91,466 91,466 91,466 91,466
SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 216,004 216,004 216,004 216,004 216,004 216,004 216,004 216,004 216,004 216,004
SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 215,999 215,999 215,999 215,999 215,999 215,999 215,999 215,999 215,999 215,999
SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 346,791 346,791 346,791 346,791 346,791 346,791 346,791 346,791 346,791 346,791
SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 91,505 91,505 91,505 91,505 91,505 91,505 91,505 91,505 91,505 91,505
SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 91,505 91,505 91,505 91,505 91,505 91,505 91,505 91,505 91,505 91,505
SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 216,004 216,004 216,004 216,004 216,004 216,004 216,004 216,004 216,004 216,004
SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 216,004 216,004 216,004 216,004 216,004 216,004 216,004 216,004 216,004 216,004
SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 346,791 346,791 346,791 346,791 346,791 346,791 346,791 346,791 346,791 346,791
TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 350,301 350,301 350,301 350,301 350,301 350,301 350,301 350,301 350,301 350,301
TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 567,526 567,526 567,526 567,526 567,526 567,526 567,526 567,526 567,526 567,526
TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 910,291 910,291 910,291 910,291 910,291 910,291 910,291 910,291 910,291 910,291
TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 56,065 56,065 56,065 56,065 56,065 56,065 56,065 56,065 56,065 56,065
TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 293,464 293,464 293,464 293,464 293,464 293,464 293,464 293,464 293,464 293,464
TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 326,670 326,670 326,670 326,670 326,670 326,670 326,670 326,670 326,670 326,670
TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 907,032 907,032 907,032 907,032 907,032 907,032 907,032 907,032 907,032 907,032
TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 53,323 53,549 53,362 53,261 53,424 53,378 53,409 53,471 53,596 53,354
TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 266,227 266,227 266,227 266,227 266,227 266,227 266,227 266,227 266,227 266,227
TUBERÍA PVC ALCANTARILLADO 8" ML 40,185 40,185 40,185 40,185 40,185 40,185 40,185 40,185 40,185 40,185
TUBERÍA PVC ALCANTARILLADO 10" ML 56,842 56,842 56,842 56,842 56,842 56,842 56,842 56,842 56,842 56,842
TUBERÍA PVC ALCANTARILLADO 12" ML 82,035 82,035 82,035 82,035 82,035 82,035 82,035 82,035 82,035 82,035
TUBERÍA PVC ALCANTARILLADO 16" ML 125,930 125,930 125,930 125,930 125,930 125,930 125,930 125,930 125,930 125,930
TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 202,404 202,404 202,404 202,404 202,404 202,404 202,404 202,404 202,404 202,404
TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 295,098 295,098 295,098 295,098 295,098 295,098 295,098 295,098 295,098 295,098
TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 373,066 373,066 373,066 373,066 373,066 373,066 373,066 373,066 373,066 373,066
TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 490,359 490,359 490,359 490,359 490,359 490,359 490,359 490,359 490,359 490,359
TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 673,881 673,881 673,881 673,881 673,881 673,881 673,881 673,881 673,881 673,881
ALCANTARILLADO - SUMIDEROS Y POZOS
PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
REFUERZO)UN 550,308 567,262 553,231 545,631 557,908 554,401 556,739 561,416 570,770 552,646
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC.
PAÑETE INTERNO E=1.5CM Y CAÑUELA)ML 543,533 555,207 545,546 540,313 548,766 546,351 547,960 551,181 557,622 545,143
3
3.1
3.2
3.3
3.4
2.5
2.6
2.7
2.8
2.9
3.11
3.12
3.13
3.14
3.15
3.16
3.5
3.6
3.7
3.8
3.9
3.10
3.23
3.24
3.25
3.26
3.27
3.28
3.17
3.18
3.19
3.20
3.21
3.22
4
4.1
4.2
3.29
3.30
3.31
3.32
3.33
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNCUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON
REFUERZO (INCLUYE ARO Y TAPA HF)UN 582,646 593,949 584,595 579,528 587,713 585,375 586,933 590,051 596,288 584,205
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
REFUERZO)UN 654,894 676,087 658,548 649,048 664,394 660,010 662,932 668,779 680,472 657,817
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC.
PAÑETE INTERNO E=1.5CM Y CAÑUELA)ML 772,275 788,713 775,109 767,741 779,644 776,243 778,510 783,045 792,114 774,542
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
REFUERZO (INCLUYE ARO Y TAPA HF)UN 675,402 690,944 678,082 671,115 682,369 679,154 681,297 685,584 694,159 677,546
SUMIDERO EN LADRILLO SL-100 UN 803,029 811,153 804,430 800,791 806,672 804,990 806,113 808,351 812,836 804,152
SUMIDERO EN LADRILLO SL-250 UN 1,181,026 1,204,774 1,185,121 1,174,480 1,191,674 1,186,757 1,190,037 1,196,584 1,209,690 1,184,306
SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,631,570 1,676,602 1,639,335 1,619,148 1,651,757 1,642,440 1,648,651 1,661,075 1,685,920 1,637,781
SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,203,041 2,277,897 2,215,948 2,182,392 2,236,597 2,221,110 2,231,435 2,252,086 2,293,386 2,213,366
SUMIDERO PREFABRICADO SL-100 UN 1,469,655 1,469,655 1,469,655 1,469,655 1,469,655 1,469,655 1,469,655 1,469,655 1,469,655 1,469,655
SUMIDERO PREFABRICADO SL-250 UN 3,110,241 3,110,241 3,110,241 3,110,241 3,110,241 3,110,241 3,110,241 3,110,241 3,110,241 3,110,241NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M,
H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)UN 111,793 112,270 111,875 111,662 112,007 111,908 111,974 112,105 112,368 111,859
ANDENES Y SARDINELES
ADOQUÍN DE ARCILLA 20X10X6CM M2 59,646 60,827 59,850 59,321 60,175 59,931 60,094 60,420 61,071 59,809
ADOQUÍN DE ARCILLA 20X10X8CM M2 70,462 71,643 70,666 70,137 70,991 70,747 70,910 71,236 71,887 70,625
ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 48,789 51,841 49,315 47,947 50,157 49,526 49,947 50,788 52,472 49,210
ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 52,748 55,715 53,260 51,930 54,078 53,465 53,874 54,692 56,329 53,158
ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 53,024 55,907 53,521 52,229 54,316 53,720 54,118 54,913 56,503 53,422
BORDE SEPARADOR VERDE A-170 ML 204,376 204,853 204,458 204,245 204,590 204,491 204,557 204,688 204,951 204,442
BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 15,114 15,480 15,177 15,013 15,278 15,202 15,253 15,354 15,556 15,165
BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 34,856 37,007 35,227 34,263 35,820 35,375 35,672 36,265 37,452 35,153
CAÑUELA PREFABRICADA TIPO A-120 ML 67,112 67,367 67,156 67,042 67,226 67,173 67,208 67,279 67,419 67,147
CONTENEDOR DE RAÍCES TIPO A B-20 UN 454,240 460,785 455,368 452,435 457,174 455,820 456,722 458,528 462,139 455,143
LOSETA PREFABRICADA A-40 M2 51,308 52,398 51,496 51,007 51,797 51,571 51,722 52,022 52,624 51,458
LOSETA PREFABRICADA A-60 M2 73,961 75,052 74,149 73,661 74,450 74,225 74,375 74,676 75,277 74,112
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 28,340 29,527 28,545 28,013 28,872 28,626 28,790 29,118 29,772 28,504
SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 46,364 48,766 46,779 45,702 47,441 46,944 47,276 47,938 49,263 46,696
SARDINEL PREFABRICADO A-10 ML 82,982 85,283 81,633 80,922 83,351 83,896 83,334 81,955 85,280 82,818
TABLETA PREFABRICADA A-20 (20X20CM ) M2 49,220 49,880 49,334 49,038 49,516 49,379 49,470 49,652 50,016 49,311
MOBILIARIO URBANO
BANCA EN CONCRETO M-40 UN 164,416 165,829 164,660 164,027 165,050 164,757 164,952 165,342 166,122 164,611
BANCA EN CONCRETO M-30 UN 536,518 538,496 536,859 535,972 537,405 536,996 537,268 537,814 538,905 536,791
BOLARDO M-63 ALTO/HIERRO UN 172,073 172,370 172,125 171,992 172,206 172,145 172,186 172,268 172,431 172,114
BOLARDO M-60 CONCRETO UN 131,867 133,562 132,159 131,399 132,627 132,276 132,510 132,977 133,913 132,100
BOLARDO M-61 BAJO/CONCRETO UN 133,339 135,035 133,632 132,872 134,099 133,748 133,982 134,450 135,385 133,573
BOLARDO M-62 BAJO/HIERRO UN 155,725 157,505 156,032 155,234 156,523 156,154 156,400 156,891 157,873 155,970
BORDE CONTENEDOR DE RAICES A-70 ML 48,627 49,531 48,783 48,378 49,032 48,845 48,970 49,219 49,718 48,752
BORDILLO PREFABRICADO A-80 ML 55,655 56,667 55,829 55,376 56,108 55,899 56,039 56,318 56,876 55,794
CANECA M-120 UN 250,060 250,286 250,099 249,997 250,161 250,114 250,145 250,208 250,332 250,091
4.3
4.4
4.5
4.12
4.13
5
5.1
5.2
4.6
4.7
4.8
4.9
4.10
4.11
5.9
5.10
5.11
5.12
5.13
5.14
5.3
5.4
5.5
5.6
5.7
5.8
6.3
6.4
6.5
6.6
6.7
6.8
5.15
5.16
6
6.1
6.2
6.9
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNCANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 659,432 660,280 659,578 659,198 659,812 659,637 659,754 659,988 660,455 659,549
HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,703,266 2,703,831 2,703,363 2,703,110 2,703,519 2,703,402 2,703,480 2,703,636 2,703,948 2,703,344
HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 2,780,890 2,781,455 2,780,987 2,780,734 2,781,143 2,781,026 2,781,104 2,781,260 2,781,572 2,780,968
CICLOPARQUEADERO M100 TIPO 1 UN 389,353 389,946 389,455 389,189 389,619 389,496 389,578 389,741 390,069 389,435
CICLOPARQUEADERO M101 TIPO 2 UN 517,811 520,185 518,220 517,156 518,875 518,384 518,712 519,366 520,676 518,139
BANCA EN MADERA M-50 UN 427,540 427,540 427,540 427,540 427,540 427,540 427,540 427,540 427,540 427,540
PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 199,210 200,058 199,356 198,976 199,590 199,415 199,532 199,765 200,233 199,327
PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 461,458 462,023 461,556 461,302 461,711 461,595 461,672 461,828 462,140 461,536
POSTE HISTÓRICO M-131 UN 5,144,318 5,148,557 5,145,049 5,143,149 5,146,218 5,145,341 5,145,926 5,147,095 5,149,434 5,144,903
SEÑALIZACIÓN
LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 3,230 3,230 3,230 3,230 3,230 3,230 3,230 3,230 3,230 3,230
MARCA VIAL CON PINTURA EN FRÍO M2 34,685 34,685 34,685 34,685 34,685 34,685 34,685 34,685 34,685 34,685
SEÑAL DOBLE DE CICLORUTA UN 362,454 362,693 362,495 362,389 362,561 362,512 362,545 362,610 362,742 362,487
SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 396,841 398,028 397,045 396,513 397,373 397,127 397,291 397,618 398,273 397,004
SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 256,585 256,824 256,626 256,520 256,692 256,643 256,676 256,741 256,873 256,618
SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 299,503 299,742 299,544 299,438 299,610 299,561 299,594 299,659 299,791 299,536
SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 405,863 406,102 405,904 405,798 405,970 405,921 405,954 406,019 406,151 405,896
TACHAS REFLECTIVAS UN 10,847 10,847 10,847 10,847 10,847 10,847 10,847 10,847 10,847 10,847
SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 11,583 11,583 11,583 11,583 11,583 11,583 11,583 11,583 11,583 11,583TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
SUMINISTRO E INSTALACIÓN)UN 94,161 94,161 94,161 94,161 94,161 94,161 94,161 94,161 94,161 94,161
6.15
6.16
6.17
6.18
7
6.10
6.11
6.12
6.13
6.14
7.7
7.8
7.9
7.10
7.1
7.2
7.3
7.4
7.5
7.6
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓNVÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES
1.1 201 PDEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5KM)M3 127,138 127,138 127,138 127,138 127,138 127,138 127,138 127,138 127,138 127,138
1.2 201 PDEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5KM)M3 44,161 44,161 44,161 44,161 44,161 44,161 44,161 44,161 44,161 44,161
1.3 200.1DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5KM)HA 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096
1.4 200.2DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)HA 784,698 784,698 784,698 784,698 784,698 784,698 784,698 784,698 784,698 784,698
1.5 201.7DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5KM)M3 74,038 74,038 74,038 74,038 74,038 74,038 74,038 74,038 74,038 74,038
1.6 ***TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES,
PRESTAMOS, SOBREACARREOS Y DERRUMBESM3-KM 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210
2 NORMA INV EXPLANACIÓN Y EXCAVACIONES
2.1 210.1.1EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y
PRÉSTAMOSM3 7,328 7,328 7,328 7,328 7,328 7,328 7,328 7,328 7,328 7,328
2.2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 29,927 29,927 29,927 29,927 29,927 29,927 29,927 29,927 29,927 29,927
2.3 210.2.2EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y
PRÉSTAMOSM3 6,603 6,603 6,603 6,603 6,603 6,603 6,603 6,603 6,603 6,603
2.4 220.1 TERRAPLENES M3 13,237 13,237 13,237 13,237 13,237 13,237 13,237 13,237 13,237 13,237
2.5 221.1 PEDRAPLÉN COMPACTO M3 10,551 10,551 10,551 10,551 10,551 10,551 10,551 10,551 10,551 10,551
2.6 221.2 PEDRAPLÉN SUELTO M3 6,051 6,051 6,051 6,051 6,051 6,051 6,051 6,051 6,051 6,051
2.7 230.1MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO
EXISTENTEM2 460 460 460 460 460 460 460 460 460 460
2.8 230.2MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTE
MATERIAL ADICIONADOM3 12,267 12,267 12,267 12,267 12,267 12,267 12,267 12,267 12,267 12,267
2.9 600.1EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 18,871 18,871 18,871 18,871 18,871 18,871 18,871 18,871 18,871 18,871
2.10 600.2EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 52,246 52,246 52,246 52,246 52,246 52,246 52,246 52,246 52,246 52,246
2.11 600.3EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 65,125 65,125 65,125 65,125 65,125 65,125 65,125 65,125 65,125 65,125
2.12 600.4EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO
DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 12,018 12,018 12,018 12,018 12,018 12,018 12,018 12,018 12,018 12,018
2.13 600.4 PEXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 28,052 28,052 28,052 28,052 28,052 28,052 28,052 28,052 28,052 28,052
2.14 600.5EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 22,877 22,877 22,877 22,877 22,877 22,877 22,877 22,877 22,877 22,877
2.15 600.5 PEXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO
(INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 39,061 39,061 39,061 39,061 39,061 39,061 39,061 39,061 39,061 39,061
3 NORMA INV ESTRUCTURA DE PAVIMENTO
3.1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 4,404 4,404 4,404 4,404 4,404 4,404 4,404 4,404 4,404 4,404
3.2 320.1 SUBBASE GRANULAR M3 130,162 141,277 114,432 114,432 127,120 127,120 127,120 120,724 145,892 128,589
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓN3.3 330.1 BASE GRANULAR M3 139,848 152,309 128,837 124,118 138,152 142,871 138,152 130,410 155,578 138,275
3.4 365.1EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE
RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)M3 113,137 113,137 113,137 113,137 113,137 113,137 113,137 113,137 113,137 113,137
3.5 420.1 RIEGO DE IMPRIMACIÓN M2 2,577 2,577 2,577 2,577 2,577 2,577 2,577 2,577 2,577 2,577
3.6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 898 898 898 898 898 898 898 898 898 898
3.7 461.1PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION
ASFÁLTICA M3 188,459 194,211 189,450 186,872 191,037 189,847 190,641 192,228 195,401 189,252
3.8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 54,441 56,112 54,729 53,980 55,190 54,845 55,075 55,536 56,458 54,672
3.9 450.1 PMEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO
ASFÁLTICO)M3 493,487 491,975 505,587 493,487 481,387 484,412 478,362 517,687 501,050 488,950
3.10 450.2 PMEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO
ASFÁLTICO)M3 499,287 497,775 511,387 499,287 487,187 490,212 484,162 523,487 506,850 494,750
3.11 450.9 PMEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
ASFÁLTICO)M3 516,879 515,367 528,979 516,879 504,779 507,804 501,754 541,079 524,442 512,342
3.12 450.3 PMEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO
ASFÁLTICO)M3 529,737 528,225 541,837 529,737 517,637 520,662 514,612 553,937 537,300 525,200
3.13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 256,702 269,162 245,691 240,972 255,005 259,724 255,005 247,264 272,432 255,129
3.14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 246,727 257,842 230,997 230,997 243,685 243,685 243,685 237,289 262,457 245,154
3.15 311.1 AFIRMADO M3 74,337 72,764 58,607 74,337 58,607 58,607 58,607 64,899 64,899 69,618
3.16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 9,670 10,073 9,739 9,558 9,851 9,767 9,823 9,934 10,157 9,725
3.17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 3,918 4,119 3,952 3,862 4,008 3,966 3,994 4,050 4,161 3,945
3.18 500.1CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓNM3 550,641 577,687 555,304 543,180 562,765 557,169 560,900 568,361 583,283 554,371
3.19 500.1CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓNM3 579,200 607,458 584,072 571,405 591,867 586,021 589,919 597,714 613,304 583,098
3.20 500.1CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓNM3 598,421 627,486 603,432 590,403 611,450 605,437 609,446 617,463 633,499 602,430
3.21 ***SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE
LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)ML 5,588 5,588 5,588 5,588 5,588 5,588 5,588 5,588 5,588 5,588
3.22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 98,726 97,395 96,135 132,413 88,078 88,078 85,416 100,755 100,755 100,755
4 NORMA INV OBRAS DE ARTE
4.1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 777,629 808,309 782,919 769,166 791,382 785,035 789,267 797,730 814,657 781,861
4.2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 675,137 705,309 680,340 666,815 688,662 682,420 686,582 694,905 711,551 679,300
4.3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 713,645 745,011 719,053 704,993 727,705 721,216 725,542 734,195 751,500 717,972
4.4 630 P CONCRETOS f´c =3500 psi (bases) M3 495,136 522,861 499,917 487,488 507,564 501,828 505,652 513,301 528,597 498,960
4.5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 573,040 601,863 578,010 565,090 585,961 579,998 583,973 591,925 607,827 577,016
4.6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 492,482 521,021 497,403 484,609 505,276 499,371 503,307 511,180 526,927 496,418
4.7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 570,281 599,951 575,397 562,096 583,581 577,443 581,535 589,720 606,090 574,373
4.8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 619,603 648,143 624,524 611,731 632,397 626,493 630,429 638,302 654,049 623,539
4.9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 509,601 539,270 514,716 501,416 522,901 516,763 520,855 529,039 545,410 513,692
4.10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 655,911 685,581 661,027 647,727 669,212 663,073 667,165 675,350 691,721 660,003
4.11 650 PSUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE
ACERO A-36KG 9,476 9,476 9,476 9,476 9,476 9,476 9,476 9,476 9,476 9,476
4.12 650 PSUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE
DE ACERO A-588 GRADO BKG 12,163 12,163 12,163 12,163 12,163 12,163 12,163 12,163 12,163 12,163
4.13 641.1 ACERO DE PREESFUERZO TON-M 1,429 1,429 1,429 1,429 1,429 1,429 1,429 1,429 1,429 1,429
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓN4.14 621.1PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M,
CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)ML 2,133,032 2,133,032 2,133,032 2,133,032 2,133,032 2,133,032 2,133,032 2,133,032 2,133,032 2,133,032
4.15 621.1 PPILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN
MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL,
REFUERZO Y ANILLOS)
ML 3,342,442 3,394,920 3,351,490 3,327,965 3,365,967 3,355,109 3,362,348 3,376,824 3,405,778 3,349,680
4.16 621.2BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
REFUERZO)M3 1,409,874 1,438,131 1,414,746 1,402,079 1,422,541 1,416,695 1,420,592 1,428,387 1,443,978 1,413,771
4.17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 69,474 69,474 69,474 69,474 69,474 69,474 69,474 69,474 69,474 69,474
4.18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 285,377 288,768 285,961 284,441 286,897 286,195 286,663 287,598 289,469 285,844
4.19 632 P BARANDA METÁLICA ML 336,979 336,979 336,979 336,979 336,979 336,979 336,979 336,979 336,979 336,979
4.20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 13,484 13,484 13,484 13,484 13,484 13,484 13,484 13,484 13,484 13,484
4.21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 433,847 462,816 429,328 425,588 437,586 431,392 435,521 447,652 464,169 435,072
4.22 673.1 MATERIAL GRANULAR FILTRANTE M3 85,414 84,083 70,843 119,100 74,766 74,766 72,104 87,442 87,442 87,442
4.23 610.1 RELLENO PARA ESTRUCTURAS M3 69,729 68,277 61,629 69,729 55,209 55,209 55,209 65,037 60,681 65,373
4.24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 339,797 369,763 344,963 331,530 353,230 347,029 351,163 359,430 375,964 343,930
4.25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 318,882 336,200 321,009 326,221 322,990 319,307 320,795 331,283 341,105 322,075
4.26 630.7CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA
ELEVACIONESM3 325,979 343,297 328,106 333,318 330,087 326,404 327,892 338,380 348,202 329,172
4.27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 331,357 348,312 333,421 338,796 335,302 331,694 333,131 343,520 353,141 334,500
4.28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 338,454 355,409 340,518 345,893 342,399 338,791 340,228 350,617 360,238 341,597
4.29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 449,864 479,219 454,925 441,765 463,023 456,949 460,998 469,096 485,292 453,913
4.30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 526,154 556,673 531,416 517,735 539,835 533,520 537,730 546,148 562,986 530,364
4.31 681.1 GAVIÓN M3 165,751 164,480 163,277 197,906 155,587 155,587 153,046 167,687 167,687 167,687
4.32 681.1 GAVIÓN MALLA PVC M3 170,105 168,834 167,631 202,260 159,941 159,941 157,400 172,041 172,041 172,041
4.33 672.1BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E,
2500 PSIML 35,906 37,708 36,217 35,409 36,714 36,341 36,590 37,087 38,081 36,155
4.34 672.1BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E,
2500 PSIML 14,158 15,059 14,313 13,909 14,562 14,375 14,500 14,748 15,245 14,282
4.35 ***SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO
(RESISTENCIA ÚLTIMA 25 KN)M2 8,054 8,054 8,054 8,054 8,054 8,054 8,054 8,054 8,054 8,054
4.36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 11,486 11,486 11,486 11,486 11,486 11,486 11,486 11,486 11,486 11,486
4.37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 15,459 15,459 15,459 15,459 15,459 15,459 15,459 15,459 15,459 15,459
4.38 ***SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
(RESISTENCIA ÚLTIMA 100 KN)M2 18,534 18,534 18,534 18,534 18,534 18,534 18,534 18,534 18,534 18,534
4.39 ***SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO
(RESISTENCIA ÚLTIMA 165 KN)M2 23,817 23,817 23,817 23,817 23,817 23,817 23,817 23,817 23,817 23,817
4.40 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800
(ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 5,780 5,780 5,780 5,780 5,780 5,780 5,780 5,780 5,780 5,780
4.41 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000
(ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 6,587 6,587 6,587 6,587 6,587 6,587 6,587 6,587 6,587 6,587
4.42 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500
(ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 6,847 6,847 6,847 6,847 6,847 6,847 6,847 6,847 6,847 6,847
4.43 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN,
FILTRO Y SEPARACIÓN) M2 4,877 4,877 4,877 4,877 4,877 4,877 4,877 4,877 4,877 4,877
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓN4.44 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN,
FILTRO Y SEPARACIÓN) M2 7,346 7,346 7,346 7,346 7,346 7,346 7,346 7,346 7,346 7,346
4.45 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN,
FILTRO Y SEPARACIÓN) M2 5,990 5,990 5,990 5,990 5,990 5,990 5,990 5,990 5,990 5,990
4.46 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN,
FILTRO Y SEPARACIÓN) M2 7,346 7,346 7,346 7,346 7,346 7,346 7,346 7,346 7,346 7,346
4.47 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000
(ESTABILIZACIÓN, FILTRO Y SEPARACIÓN) M2 14,119 14,119 14,119 14,119 14,119 14,119 14,119 14,119 14,119 14,119
4.48 661.1SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO
Ø=36" CLASE I, INCLUYE EMBOQUILLADAML 503,640 504,048 503,710 503,528 503,823 503,738 503,795 503,907 504,132 503,696
4.49 660.3SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE,
DIÁMETRO 600 MMML 296,439 302,849 297,544 294,670 299,312 297,986 298,870 300,639 304,176 297,323
4.50 ***SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO,
DIÁMETRO 36"ML 703,727 703,727 703,727 703,727 703,727 703,727 703,727 703,727 703,727 703,727
4.51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 138,983 137,470 123,858 138,983 123,858 123,858 123,858 129,908 129,908 134,445
4.52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 3,380 3,380 3,380 3,380 3,380 3,380 3,380 3,380 3,380 3,380
4.53 ***GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E
INSTALACIÓN) ML 68,540 68,540 68,540 68,540 68,540 68,540 68,540 68,540 68,540 68,540
4.54 ***GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E
INSTALACIÓN) ML 104,377 104,377 104,377 104,377 104,377 104,377 104,377 104,377 104,377 104,377
4.55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 459,830 490,349 465,092 451,412 473,511 467,196 471,406 479,825 496,662 464,040
4.56 682.1 P COLCHONETA RENO M3 179,370 178,099 176,896 211,525 169,206 169,206 166,665 181,306 181,306 181,306
4.57 *** TRINCHO EN MADERA M2 54,192 54,192 54,192 54,192 54,192 54,192 54,192 54,192 54,192 54,192
5 NORMA INV SEÑALIZACIÓN
5.1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 3,230 3,230 3,230 3,230 3,230 3,230 3,230 3,230 3,230 3,230
5.2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 34,685 34,685 34,685 34,685 34,685 34,685 34,685 34,685 34,685 34,685
5.3 730.3 TOPE DEFENSA METÁLICA UN 66,818 66,818 66,818 66,818 66,818 66,818 66,818 66,818 66,818 66,818
5.4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 55,579 55,579 55,579 55,579 55,579 55,579 55,579 55,579 55,579 55,579
5.5 730.1 DEFENSA METÁLICA ML 120,051 121,464 120,294 119,661 120,684 120,392 120,587 120,976 121,756 120,246
5.6 701.1SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS
UNIDIRECCIONALESUN 10,847 10,847 10,847 10,847 10,847 10,847 10,847 10,847 10,847 10,847
6 NORMA INV MANTENIMIENTO VIAL
6.1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 746 746 746 746 746 746 746 746 746 746
6.2 801.6LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø=
36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A
UNA DISTANCIA DE 5 KM
UN 104,282 104,282 104,282 104,282 104,282 104,282 104,282 104,282 104,282 104,282
6.3 801.7LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE
DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KMML 20,287 20,287 20,287 20,287 20,287 20,287 20,287 20,287 20,287 20,287
6.4 211.1 REMOCIÓN DE DERRUMBES M3 6,118 6,118 6,118 6,118 6,118 6,118 6,118 6,118 6,118 6,118
6.5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 356,750 356,750 356,750 356,750 356,750 356,750 356,750 356,750 356,750 356,750
6.6 801.4LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5 KM)M2 1,636 1,636 1,636 1,636 1,636 1,636 1,636 1,636 1,636 1,636
6.7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 12,313 12,313 12,313 12,313 12,313 12,313 12,313 12,313 12,313 12,313
DESCRIPCIÓN UNIDAD Bojacá Cota El_Rosal Facatativá Funza Madrid Mosquera Subachoque Tenjo Zipacón
GOBERNACIÓN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2014)
PROVINCIA: SABANA OCCIDENTEESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE
ÍTEM
CONSTRUCCIÓN6.8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 19,935 19,935 19,935 19,935 19,935 19,935 19,935 19,935 19,935 19,935
6.9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 7,898 7,898 7,898 7,898 7,898 7,898 7,898 7,898 7,898 7,898
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES