COMPARACION DE COSTOS
EN OBRA(9 METROS)
PESO DEL PROYECTO (TN) 127.00MERMA DE ACERO (%) 10.00TOTAL ACERO COMPRADO 139.70
MANO DE OBRA (SUBCONTRATO) S/. 1.00XTN 1000.00
$/. 363.64
PRECIO DE BARRAS $/. x TN 1000.00
COSTO DIMENSIONADO $/.
TOTAL COSTO MANO DE OBRA $/. 50800.00TOTAL COSTO DIMENSIONADO $/. 0.00COSTO TOTAL ACERO 139700.00
TOTAL $/. 190500.00
AHORRO $/.
T.CAMBIO: 2.75
COMPARACION DE COSTOS
ACERODIMENSIONADO
127.000.00
127.00
0.90900.00327.27
1000.00
100.00
41563.6412700.00
127000.00
181263.64
9236.36