58
Nombre HUANCANE MUÑANI ANANEA PROGRESO CRUCERO Id Estación 1 2 3 4 5 Captor MPM MPM MPM MPM MPM Unidad (mm) (mm) (mm) (mm) (mm) Tabla Pluies Pluies Pluies Pluies Pluies Latitud -12.9154 -12.9280 -12.8356 -12.8598 -13.0114 Longitud -75.7285 -75.7788 -75.7140 -75.6879 -75.7578 N° ESTACION 4 5 3 2 7 AÑO HUANCANE MUÑANI ANANEA PROGRESO CRUCERO 1/1/1964 68 18.1 83.4 2/1/1964 81 116.1 57.1 3/1/1964 117.76 8.5 218.4 4/1/1964 27 4.4 17.3 5/1/1964 22.6 7.2 11.43 6/1/1964 0 7.3 12.88 7/1/1964 0 0 0.00 8/1/1964 2.2 0 0.5 9/1/1964 16 34.2 31.9 10/1/1964 13.5 46.8 40.8 11/1/1964 81.4 58.4 56.1 12/1/1964 27.5 70.9 60.4 1/1/1965 177 136 147.2 150.4 2/1/1965 105 41 71.9 130.5 3/1/1965 105 0 86.5 122.2 4/1/1965 18.8 0 37.6 49.41 5/1/1965 3.5 0 0 0.00 6/1/1965 0 0 0 0 7/1/1965 5.5 0 3.2 0 8/1/1965 2 0 13 0 9/1/1965 22 34 35.9 20 10/1/1965 23 30 20.6 16 11/1/1965 75 87 52.2 80.5 12/1/1965 200 130 64.7 131.1 1/1/1966 91 103 50.3 57.1 2/1/1966 123 142 140.4 79.1 3/1/1966 123 64 33.8 45.9 4/1/1966 16.5 11.85 7.7 0.3 5/1/1966 75 26.8 35.5 40.8 6/1/1966 0 0 0 0 7/1/1966 0 0 0 0 8/1/1966 0 0 0 0 9/1/1966 11.6 5.4 23.7 31.3 10/1/1966 37.5 19.2 65.6 60.8 11/1/1966 63.2 50.1 77.5 70.8

Completacion Por El Metodo de Promedios

Embed Size (px)

DESCRIPTION

completacion de datos

Citation preview

Page 1: Completacion Por El Metodo de Promedios

Nombre HUANCANE MUÑANI ANANEA PROGRESO CRUCEROId Estación 1 2 3 4 5

Captor MPM MPM MPM MPM MPM

Unidad (mm) (mm) (mm) (mm) (mm)

Tabla Pluies Pluies Pluies Pluies Pluies

Latitud -12.9154 -12.9280 -12.8356 -12.8598 -13.0114Longitud -75.7285 -75.7788 -75.7140 -75.6879 -75.7578

N° ESTACION 4 5 3 2 7AÑO HUANCANE MUÑANI ANANEA PROGRESO CRUCERO

1/1/1964 68 18.1 83.42/1/1964 81 116.1 57.13/1/1964 117.76 8.5 218.44/1/1964 27 4.4 17.35/1/1964 22.6 7.2 11.436/1/1964 0 7.3 12.887/1/1964 0 0 0.008/1/1964 2.2 0 0.59/1/1964 16 34.2 31.9

10/1/1964 13.5 46.8 40.811/1/1964 81.4 58.4 56.112/1/1964 27.5 70.9 60.4

1/1/1965 177 136 147.2 150.42/1/1965 105 41 71.9 130.53/1/1965 105 0 86.5 122.24/1/1965 18.8 0 37.6 49.415/1/1965 3.5 0 0 0.006/1/1965 0 0 0 07/1/1965 5.5 0 3.2 08/1/1965 2 0 13 09/1/1965 22 34 35.9 20

10/1/1965 23 30 20.6 1611/1/1965 75 87 52.2 80.512/1/1965 200 130 64.7 131.1

1/1/1966 91 103 50.3 57.12/1/1966 123 142 140.4 79.13/1/1966 123 64 33.8 45.94/1/1966 16.5 11.85 7.7 0.35/1/1966 75 26.8 35.5 40.86/1/1966 0 0 0 07/1/1966 0 0 0 08/1/1966 0 0 0 09/1/1966 11.6 5.4 23.7 31.3

10/1/1966 37.5 19.2 65.6 60.811/1/1966 63.2 50.1 77.5 70.8

Page 2: Completacion Por El Metodo de Promedios

12/1/1966 84.4 26.7 101.6 70.71/1/1967 27.5 17.7 40.1 66.92/1/1967 76 43.1 76.2 106.63/1/1967 78 58.6 66 101.64/1/1967 7 10.6 7.7 26.15/1/1967 3.66 12.2 20.8 21.196/1/1967 1 0 0 0.007/1/1967 23.5 20 26.5 13.38/1/1967 16.5 33 24 16.99/1/1967 62 102.8 32 24.9

10/1/1967 47 66.6 48.2 47.511/1/1967 7.3 35 54.9 34.412/1/1967 136.2 230.1 151.7 98.9

1/1/1968 92.2 75.7 183.9 61.22/1/1968 237.4 123.9 175.9 156.13/1/1968 89.2 98.4 89.7 88.84/1/1968 43.7 56 11.2 38.55/1/1968 11.5 13 2 1.76/1/1968 5.4 0 0 07/1/1968 13.4 27.8 22.2 13.48/1/1968 12.2 32.4 36 20.19/1/1968 57 76.2 3.7 28.2

10/1/1968 53.9 37.9 4.7 23.311/1/1968 129.7 91.3 5 80.112/1/1968 85.8 31.6 8.7 44

1/1/1969 124.2 135 143.62/1/1969 148.8 86.6 82.83/1/1969 96 61.8 47.64/1/1969 33.5 60.3 295/1/1969 0 0 0.36/1/1969 2.2 0 1.47/1/1969 11.4 0 10.68/1/1969 8.2 8.4 0.39/1/1969 15.7 27.6 23

10/1/1969 13.3 23.4 19.611/1/1969 53.8 51.2 53.812/1/1969 40.4 86.7 56.4

1/1/1970 164.4 214.1 142.22/1/1970 71.4 68.2 89.43/1/1970 90.4 73.7 123.54/1/1970 52.1 82.2 63.45/1/1970 10.2 15.7 11.96/1/1970 1 0 0.57/1/1970 0 2.4 0.88/1/1970 0 0.4 0

Page 3: Completacion Por El Metodo de Promedios

9/1/1970 42.8 44.3 50.710/1/1970 58.2 65.9 76.5 56 61.211/1/1970 37 23 19.3 52.5 61.212/1/1970 193 174.7 127.1 132.6 234.6

1/1/1971 116.8 135.5 105.3 133 230.72/1/1971 213 252.4 244.1 158.3 287.73/1/1971 49.3 74.3 31.7 22.8 53.24/1/1971 8.5 16.9 35.4 32.1 35.55/1/1971 1 8.2 4.6 5.9 06/1/1971 1 0 6 0.1 8.77/1/1971 0 0 0 0 08/1/1971 2.5 2.2 7.4 4.3 3.49/1/1971 1.2 0 9.8 1.2 5.1

10/1/1971 31.2 47.4 59.1 38.9 28.611/1/1971 46.4 20.8 37.3 61.3 159.312/1/1971 46.5 38.8 96.3 79.8 174.9

1/1/1972 169.8 148.6 112.3 155.2 177.22/1/1972 79 47.2 100.6 166.7 82.93/1/1972 50 13 85.5 79.3 81.74/1/1972 13.5 12 31.7 27.5 108.15/1/1972 0 0 7 0.4 24.26/1/1972 0 0 1.5 0 5.47/1/1972 6.5 0 6.7 2.8 08/1/1972 7.5 4 43.8 8.3 319/1/1972 43 2.8 30.1 16.6 49.7

10/1/1972 26.3 22.4 43.6 21 86.411/1/1972 61.5 77.8 56.2 57.9 101.112/1/1972 167 84.4 109.4 104.2 153.3

1/1/1973 151.6 81.8 75 162.6 244.42/1/1973 63.2 90 109.6 101 134.43/1/1973 163.5 59.2 90.5 103.4 98.64/1/1973 71.5 54.4 67.6 105 123.65/1/1973 9 0.4 13.1 9.5 11.46/1/1973 0 0 0.5 0 0.77/1/1973 0 0 4.7 3.7 23.28/1/1973 8.5 15.6 12.4 5.4 3.89/1/1973 74.8 52.2 52.6 54.1 44.8

10/1/1973 36.4 6 38.5 78.9 89.111/1/1973 12.9 24.6 42.2 70.4 49.812/1/1973 56.5 38.4 66.3 89.8 152.2

1/1/1974 190.4 100 111.1 107.1 136.52/1/1974 141.8 96 110.8 117.5 2543/1/1974 51 25.2 78 86.4 102.14/1/1974 36 17 48.3 49.8 735/1/1974 0 0 9.9 13 3.6

Page 4: Completacion Por El Metodo de Promedios

6/1/1974 3 0.8 11 5.1 11.77/1/1974 0 0 21.3 0.2 9.78/1/1974 24.9 0.4 33.8 21.1 26.59/1/1974 18 0 24.7 32.9 47.2

10/1/1974 35.5 9.6 28.6 30.7 103.611/1/1974 47.5 2.4 28.4 33.5 62.912/1/1974 62.5 69.8 110 55.1 179.2

1/1/1975 127 61 88.5 111.9 137.712/1/1975 209.5 76 126 88.4 116.23/1/1975 103.5 74.2 103.2 121.8 92.84/1/1975 18.4 16.6 56.2 27.2 113.45/1/1975 6 2.8 22.2 9 12.86/1/1975 0 8.32 18.6 0 2.87/1/1975 0 0.00 0 0 1.58/1/1975 0 11.76 26.3 0 10.79/1/1975 10.6 0 23.6 26.4 80.5

10/1/1975 61.5 24.8 79.5 40 68.611/1/1975 26.2 25.3 31.4 45.5 74.912/1/1975 155 0 97.2 90.3 180.8

1/1/1976 66 73.86 122.8 167.6 220.72/1/1976 58 64.91 98.8 80.1 102.13/1/1976 9.7 10.86 90.3 92 114.74/1/1976 0 0.00 28.2 28.8 415/1/1976 Err:511 0 52.6 22.3 34.86/1/1976 4.5 5.04 13.4 4.8 2.87/1/1976 1.8 2.01 16.1 3.3 3.58/1/1976 26.6 29.77 6.7 12.5 12.19/1/1976 34.29 38.37 59.2 41.2 65.1

10/1/1976 4.23 4.73 6.5 8.6 12.111/1/1976 11.51 27.1 19.9 48 42.712/1/1976 97.6 132.2 80.6 117.7 151.2

1/1/1977 31.6 96.4 106.4 84.4 1082/1/1977 150.6 128.9 86.1 112 140.23/1/1977 94.6 120.6 109.3 145 118.34/1/1977 0 16.4 37.3 21.8 88.15/1/1977 2.8 0 23.6 2.7 22.66/1/1977 0 0 4.9 0 9.57/1/1977 1.9 0 4.8 0 5.78/1/1977 3.2 0 0 0 09/1/1977 55.6 46 33.5 21.5 45

10/1/1977 42 41.7 30.6 50.4 30.111/1/1977 96 95.4 99.7 97.2 158.612/1/1977 91 95 60.8 83.9 126.5

1/1/1978 120.8 186.5 87.3 150.6 158.12/1/1978 237.2 156.7 87.6 110.3 168

Page 5: Completacion Por El Metodo de Promedios

3/1/1978 143.6 115.7 113.5 124.3 161.34/1/1978 65.4 46.2 53.5 50.8 65.35/1/1978 0.1 4.1 9.1 4.1 5.46/1/1978 7.7 4.9 6.3 0 14.37/1/1978 6.8 0 0 0 08/1/1978 0.1 0 0 0 1.99/1/1978 34 18.6 51.8 52.9 89.7

10/1/1978 28.5 25.2 19.5 17.3 20.411/1/1978 131.1 170.9 98.6 128.9 121.712/1/1978 195.2 254.8 145 184.6 224.9

1/1/1979 191.8 173.8 174.8 146.4 196.92/1/1979 99.5 45.9 71.5 41.3 1583/1/1979 43.1 77.3 89.5 80.6 181.74/1/1979 70.5 119 77.2 70.2 103.75/1/1979 1.6 11.4 11.2 13.8 32.16/1/1979 0 0 0 0 07/1/1979 2.8 0 0 5 08/1/1979 9.2 0 14.5 4.6 31.89/1/1979 4.2 11.7 24.8 17.2 51.6

10/1/1979 78.2 57.9 53.1 31.3 43.611/1/1979 56.5 29.6 52.6 43.3 92.812/1/1979 107.9 133.3 123.3 131.1 190.5

1/1/1980 118.3 122.9 129.6 117.2 206.22/1/1980 125.4 77.7 94.5 80.4 91.33/1/1980 132.7 112.5 100.5 108 149.54/1/1980 31.3 3.6 21.5 4.9 35.85/1/1980 7.1 1.8 26.5 9.1 13.36/1/1980 0.2 3.4 0 0.3 07/1/1980 5.7 3.6 1.7 2.3 08/1/1980 9.8 0 10.4 0 3.79/1/1980 74.7 27 36.7 6.1 92.5

10/1/1980 91.2 91.1 60.8 74.6 109.511/1/1980 26.3 36.4 42.6 12.3 23.612/1/1980 85.1 64 81.7 81.3 65.4

1/1/1981 326 196.6 186.5 147.4 191.82/1/1981 104 90.4 115.5 101.1 2183/1/1981 114.6 131.6 182 102.6 221.94/1/1981 83 72.6 25.4 52 87.15/1/1981 14.7 11.43 10.1 1.9 2.36/1/1981 0.1 0 4.1 0 4.37/1/1981 0 0 0 0 08/1/1981 21.8 9.9 26 13.2 3.79/1/1981 33.6 25.5 46.5 32.9 68.6

10/1/1981 106.2 70.8 73.1 65.3 79.611/1/1981 45.8 41.3 78.4 72.8 104.3

Page 6: Completacion Por El Metodo de Promedios

12/1/1981 106.6 93.6 121.6 109.9 166.71/1/1982 175.2 120.3 190.3 191.7 156.72/1/1982 35.8 70.1 75.9 53.9 111.13/1/1982 112.8 78 114.9 95.5 77.14/1/1982 58 53 92.7 29.8 33.45/1/1982 1.2 0 2.8 0 5.86/1/1982 1.2 0 5.5 0 7.67/1/1982 0 0 0 0 08/1/1982 4.2 2.1 15 0.8 7.19/1/1982 50.4 54.1 40.2 15.8 12.8

10/1/1982 39.2 34.2 55.6 60 44.711/1/1982 126.2 153.9 82.9 111.3 135.812/1/1982 48.2 22.4 83.6 47.8 90.8

1/1/1983 102.4 89.2 82.1 82.7 27.22/1/1983 48.4 83.3 111.5 57.8 154.33/1/1983 24.4 45.1 49 73.4 105.84/1/1983 37.2 49.8 68.1 27.2 113.75/1/1983 13.8 7.2 16.9 6 14.26/1/1983 1 0 26.4 0 5.87/1/1983 0 0 0 0 08/1/1983 2.7 19.7 0 0 1.89/1/1983 44.7 12.4 14.8 0 29.8

10/1/1983 43 36.1 22.3 7.8 31.411/1/1983 35.8 15.6 19.5 40.7 39.312/1/1983 94.3 53.9 76.7 63.1 92.6

1/1/1984 190.4 249.3 158.4 108.7 397.32/1/1984 166.7 188.3 161.3 37.6 228.33/1/1984 125.4 145.4 138.8 124.44/1/1984 38.8 39.2 29 71.85/1/1984 14.2 6 0 9.16/1/1984 9.6 12.32 0 3.87/1/1984 0 0.00 10.8 48/1/1984 17.8 21.9 43.1 33.99/1/1984 1.4 9.4 7 17

10/1/1984 72.2 75 59.8 105.211/1/1984 113.4 158.9 123.7 129.212/1/1984 76.4 154.6 121.1 141.5

1/1/1985 168.8 122.8 145.8 229.92/1/1985 66 137.5 113.8 106.13/1/1985 107.6 96.8 109 1454/1/1985 165.8 85.4 97.7 122.65/1/1985 17 10 12.1 28.66/1/1985 17.4 10.8 40.8 35.27/1/1985 0 0 6.3 0 08/1/1985 3.4 0 5.9 0 24.4

Page 7: Completacion Por El Metodo de Promedios

9/1/1985 103.8 40.1 46.9 34.2 5610/1/1985 28.8 24.28 61.1 12.4 4911/1/1985 203.4 130.9 116.6 123.4 15112/1/1985 163.8 223.1 118 154.4 267.81

1/1/1986 183.2 85.1 131.7 134.3 251.52/1/1986 148.4 192.2 128.6 168.7 340.73/1/1986 151.4 153 152.2 162.8 227.44/1/1986 67.6 94.1 67.1 80.53 146.45/1/1986 9.2 6.7 18 10.6 96/1/1986 0 0 0 0 07/1/1986 9 2.3 5.1 5.58 5.38/1/1986 20.3 0 16.2 6 33.59/1/1986 72.6 32.5 62.8 38.2 61.1

10/1/1986 17.6 0 40.1 39.16 41.511/1/1986 85 78.4 59.3 41.4 116.112/1/1986 115.1 111.6 127.5 102.3 190.1

1/1/1987 191.1 200.1 157.6 119.8 247.62/1/1987 20.1 101 50.5 78.7 117.83/1/1987 77.5 59.2 101.6 82.9 165.34/1/1987 28.2 55.9 41.9 39.2 255/1/1987 23.2 0 13.1 1.5 21.76/1/1987 10.2 6.2 8.9 1 7.67/1/1987 18.2 24.1 35.8 23.4 41.18/1/1987 14.4 3.4 4.8 0 09/1/1987 5.4 1.2 14.7 7.5 16.4

10/1/1987 72.4 42.2 48.1 57.8 73.511/1/1987 78.5 95.7 119.6 126.3 148.112/1/1987 57 58.7 125.9 144.8 111.5

1/1/1988 227.4 118.7 112.8 106.07 1172/1/1988 77.9 112.7 93.9 85 161.33/1/1988 269.8 83.8 115.4 154.8 164.64/1/1988 123.2 90.1 76.8 61.4 88.55/1/1988 48.6 19.2 24.2 17.6 226/1/1988 0 0 0 0 07/1/1988 0 0 0 0 08/1/1988 0 0 0 0 09/1/1988 8.9 0 5.6 9 20.8

10/1/1988 48.4 40.4 22.9 18.3 5711/1/1988 5.1 3.8 30.4 10.5 49.812/1/1988 93.3 123.2 81.8 67.5 178.8

1/1/1989 156 112.8 105.3 151.6 172.62/1/1989 120.3 177.9 59.1 119.8 85.43/1/1989 111.8 89.2 136 172.96 147.44/1/1989 58.8 67.2 26.2 84.8 28.25/1/1989 1.9 0 31.4 44.07 13.1

Page 8: Completacion Por El Metodo de Promedios

6/1/1989 7 10 0 4.7 25.47/1/1989 1.1 0 0 0 08/1/1989 14.7 13.1 41.5 27 25.59/1/1989 15.2 18.9 29.1 25 46.9

10/1/1989 21.9 33.8 48.4 40.9 60.711/1/1989 67.3 42.9 48 48.1 79.612/1/1989 83.6 65.3 95.1 69.7 109.3

1/1/1990 121.9 136.8 167.4 131.5 156.62/1/1990 55.6 55.5 82.5 75.6 112.83/1/1990 49.4 24 22.9 16.54 83.84/1/1990 21.2 3.2 46.7 33.5 55.65/1/1990 12.8 0 8.3 0 06/1/1990 44.9 55.2 49.7 21.6 48.27/1/1990 0 0 3.2 0 08/1/1990 35.9 0 24.5 18.75 3.79/1/1990 25.6 9.2 8.1 19 31.3

10/1/1990 52.1 79.6 76.3 84 106.911/1/1990 98.1 83.8 70.7 72.63 185.112/1/1990 98.6 67.9 119.5 18 81.9

1/1/1991 123.4 129.2 99.8 154.3 125.52/1/1991 137.7 83.6 67.1 73.7 813/1/1991 138 139.2 78.4 65.11 176.54/1/1991 9 71.6 60.2 40.9 59.85/1/1991 20.1 9.6 26 0 49.56/1/1991 51.1 32 31.4 0 30.57/1/1991 1 0 0 0 08/1/1991 0.7 0 0 0 0.59/1/1991 36.4 13 26.6 6 72.9

10/1/1991 14.1 32.2 35.4 28.44 43.111/1/1991 46.1 83.3 51.1 25.9 87.312/1/1991 148.2 116.3 52.5 Err:511 183.9

1/1/1992 132 188.3 74.8 Err:511 279.12/1/1992 75.4 91.4 90.1 78.79 274.73/1/1992 46.9 45.8 83.6 49.1 137.54/1/1992 6.4 19.2 42.9 21.1 4.95/1/1992 0 0 0 0 0.86/1/1992 9.7 4.3 14.1 3.2 24.57/1/1992 9 0 0 0 7.48/1/1992 72.1 37.7 30 37.2 116.79/1/1992 13.7 10.8 8.3 18 3.6

10/1/1992 66.6 33 34.9 29.4 59.911/1/1992 45 41.4 69.8 79.8 201.812/1/1992 140 111.7 83.8 78.6 159.8

1/1/1993 127.3 157 127 191.5 178.32/1/1993 47.9 56.3 83.7 79.1 81.5

Page 9: Completacion Por El Metodo de Promedios

3/1/1993 111.2 83.7 100.3 103.6 914/1/1993 58.1 32.2 61.4 52.3 84.25/1/1993 11.5 11.4 26.5 9.7 14.96/1/1993 2.1 0 1.5 3.7 8.57/1/1993 0 12.3 8.6 10.2 08/1/1993 10.6 19.4 31.8 21.9 36.29/1/1993 19.1 24.8 7.7 5.9 25.5

10/1/1993 56.5 54.9 41.8 65 37.111/1/1993 90.6 75.9 71.1 86.6 103.512/1/1993 143.9 104.3 101.1 110.3 160.8

1/1/1994 100.8 104 150.2 120.1 284.92/1/1994 114.7 94.3 188.4 110.7 423.23/1/1994 150.6 91.8 114.4 102 135.44/1/1994 39.5 71 76.5 59.2 835/1/1994 14 23.2 0 4.8 24.96/1/1994 1.8 3.1 3.9 0.5 5.67/1/1994 0 0 0.00 0 08/1/1994 0 0 0.00 6.4 5.19/1/1994 11.8 7.1 7.3 15.1 97.6

10/1/1994 39.2 22.7 23.7 51.8 58.711/1/1994 64.6 64.5 77.18 74.8 62.312/1/1994 132.8 110.2 158.66 116.6 208.4

1/1/1995 133.3 154.5 80.5 69.5 177.92/1/1995 124.1 181.8 84.6 79.1 97.93/1/1995 79.7 110.1 128.5 101.7 152.84/1/1995 13.7 3.9 52 14.8 38.35/1/1995 1.2 0 9.2 0 28.26/1/1995 0 0 0 0 2.37/1/1995 0.8 0 5.2 0 08/1/1995 1.2 0 0 0 12.79/1/1995 17 0 8.4 10.7 24.1

10/1/1995 14.7 12.8 14.4 16.8 42.611/1/1995 69.5 28.3 40.6 65.7 82.112/1/1995 67.2 96.2 68.19 98.2 95.2

1/1/1996 200.9 153.9 132.2 141.5 162.62/1/1996 80.8 70.1 98.6 62.8 134.63/1/1996 71.1 68.8 53.79 94.6 69.704/1/1996 17.5 34.9 28.6 21.4 51.75/1/1996 2.3 18.7 19 10.8 36.36/1/1996 0 0 0 0 07/1/1996 7.6 0 0.5 1.4 6.788/1/1996 3.5 8.5 31.4 3 19.79/1/1996 13.1 8.1 17 4.6 14

10/1/1996 9.8 29.9 27.9 44.8 26.411/1/1996 70 104.2 62.5 50.9 103.9

Page 10: Completacion Por El Metodo de Promedios

12/1/1996 177.4 61.4 23.3 125.4 76.71/1/1997 171.8 181.6 144.7 189.8 205.32/1/1997 110.8 109.2 100 135.8 331.83/1/1997 183.4 217.4 102.3 196.9 197.84/1/1997 83.4 38.3 37.9 48 42.65/1/1997 15.5 3.2 11.89 12.6 16.16/1/1997 0 0 0 0 07/1/1997 0 0 1.4 0 08/1/1997 15.8 22.3 14.4 13.6 13.99/1/1997 40.6 29.4 18.1 17 14.6

10/1/1997 41.1 36.1 23.4 49 42.411/1/1997 85 80.1 48.6 106.5 94.512/1/1997 51.7 32.5 110.3 60.2 31.3

1/1/1998 109.3 62.5 76.4 100.2 37.32/1/1998 69.4 96.4 102.1 72.2 93.43/1/1998 87.5 106.4 76.6 52.8 157.24/1/1998 52.9 39.2 35 17.5 67.15/1/1998 0 0 0.5 0 0.46/1/1998 5.7 3 6.2 7.7 4.47/1/1998 0 0 0 0 08/1/1998 0.5 0 0.5 1.2 0.79/1/1998 4.2 0 8.9 2.2 2.3

10/1/1998 65.2 54.1 66.95 103.7 119.911/1/1998 162 64.4 166.35 88.7 101.712/1/1998 16.6 41.9 49.2 32.6 37.6

1/1/1999 89.4 84.2 136.9 107.6 1412/1/1999 67.4 40.3 103.9 125.6 1203/1/1999 149.5 131.6 103.6 136.6 171.14/1/1999 76.9 37.1 46.7 40.2 67.35/1/1999 9.2 29.3 12.6 0.5 31.76/1/1999 0.5 0 1.4 0 0.547/1/1999 2.1 0 2.9 0 0.438/1/1999 1.7 0 1.5 0 09/1/1999 45.7 35.7 40.7 16.6 55.7

10/1/1999 61.7 34.5 41.7 35.8 44.911/1/1999 46.2 35.9 54.7 54.3 64.412/1/1999 41.2 92.9 67.5 118

1/1/2000 85.2 119.8 93.2 137.7 111.82/1/2000 55.9 98.1 97.8 114.1 61.13/1/2000 113.8 81.4 95.4 105.1 67.14/1/2000 7.1 9.1 23.7 9.6 4.15/1/2000 12.1 0 7.1 1.4 7.46/1/2000 7.3 19.4 18.1 1.2 9.27/1/2000 0.5 0 4.1 1.6 58/1/2000 21.4 10.6 12.7 2.4 5.9

Page 11: Completacion Por El Metodo de Promedios

9/1/2000 10.5 20.2 20.4 10.710/1/2000 97.8 126.8 75 108 87.511/1/2000 14.7 20.5 26.1 17.6 23.812/1/2000 113.5 108.6 112.5 99.6 107.2

1/1/2001 205.1 173 132.9 151.8 170.32/1/2001 142.2 109.2 46.2 111 65.13/1/2001 159.7 163.2 86.4 132.4 135.34/1/2001 13.8 19.5 49.9 30.6 27.15/1/2001 21.7 26.3 62.6 70.91 14.346/1/2001 3.5 1.6 0.5 0.57 2.767/1/2001 6.2 10.3 13.2 5.5 16.18/1/2001 10.9 7.5 13.6 0 11.39/1/2001 9.1 21.4 11.9 14.2 4.33

10/1/2001 92 61.3 65.53 49.6 41.0711/1/2001 63.3 57 63.7 62.7 50.212/1/2001 123.6 87 59.8 57.4 89.3

1/1/2002 90.9 90.3 65.9 117 52.52/1/2002 175.5 115.9 125.7 107 166.73/1/2002 151.5 104.5 107.9 94.4 91.84/1/2002 102.3 42.5 42.3 149.2 22.55/1/2002 21.1 5.7 10.1 8.8 11.46/1/2002 4.8 4.4 0.5 1.8 0.97/1/2002 23.5 16.5 27.2 25.4 21.28/1/2002 6.1 4.9 19.7 4.4 109/1/2002 37.3 27.9 39.5 25.6 25.8

10/1/2002 140.1 90 48.8 131.6 7111/1/2002 85.8 58 115.3 86 74.912/1/2002 116.8 125.7 74.4 Err:511 149.5

1/1/2003 216.5 225.1 184.8 181.6 161.82/1/2003 107.8 102.3 71.4 114.9 87.33/1/2003 131.3 108.2 114 Err:511 1144/1/2003 46.3 43.4 52.3 60.2 595/1/2003 3 4.6 2.9 7 10.16/1/2003 11 9.1 9.4 7.6 14.37/1/2003 1.1 0 0 0.5 08/1/2003 3 13 19.4 7 13.29/1/2003 22.4 30.5 13.1 15.4 15.1

10/1/2003 67.6 73.2 79.3 14.8 65.111/1/2003 40.8 68 43.1 16.1 5412/1/2003 105.9 117.4 85.4 80.6 56.1

1/1/2004 195.9 282.6 236.3 240.4 114.22/1/2004 147.1 129.1 126.8 160.2 59.33/1/2004 54.1 120.4 79.4 61.8 384/1/2004 42.8 66.7 39.8 Err:511 46.65/1/2004 6.1 25.2 11.7 7.4 7.8

Page 12: Completacion Por El Metodo de Promedios

6/1/2004 11.8 1.8 12.61 0 10.17/1/2004 8.3 0.8 6 4.8 4.18/1/2004 32.8 20.6 11.4 22.8 1.39/1/2004 21.1 28.1 31.2 40.6 10.8

10/1/2004 34 39.4 45.8 13 32.611/1/2004 51.3 65.4 60.2 53.8 70.312/1/2004 91.9 133.5 83.8 118.8 67.1

1/1/2005 109.4 98.6 79.6 52.5 88.12/1/2005 148.6 224.2 152.9 200.8 114.53/1/2005 96.6 84.6 56 54.7 544/1/2005 16.6 27.9 17.7 35.4 19.45/1/2005 0.5 2.3 1.1 0.5 4.76/1/2005 0 0 0.2 07/1/2005 0 0.00 0 1.2 3.48/1/2005 5.2 6.22 14 2.8 8.39/1/2005 28 8.4 7.9 3.8 5.8

10/1/2005 75.5 80.1 51.9 75.9 45.811/1/2005 31.5 68.2 63 62.2 44.512/1/2005 94.2 124.8 148.1 86.4 91.2

1/1/2006 224.3 203.9 165 146.4 156.42/1/2006 31.1 61.9 83.1 46.9 45.93/1/2006 76.7 57 61.3 64.6 53.94/1/2006 39.3 87.2 62.6 50.5 345/1/2006 0.5 0 2.8 0 0.96/1/2006 1.5 0 5.4 2.1 4.97/1/2006 0 0 0 0 08/1/2006 3.8 6.6 20.8 3.9 14.29/1/2006 29.22 32.26 30.65 Err:511 Err:511

10/1/2006 64.36 71.07 67.52 Err:511 Err:51111/1/2006 51.3 56.65 69.2 63.6 105.412/1/2006 113.2 124.9 98.1 79.5 94.7

1/1/2007 150.31 118.1 Err:511 Err:5112/1/2007 97.4 15.6 79.2 58.1 403/1/2007 123.33 96.9 Err:511 Err:5114/1/2007 64 33.6 Err:511 19.45/1/2007 5.2 16.3 14.4 6.96/1/2007 0 0 0 0.6 0.57/1/2007 2.2 0 9.8 0.5 1.78/1/2007 0.7 0 0 09/1/2007 83.1 14.7 25.8 14.8

10/1/2007 7.6 12.6 39.7 19.4 59.111/1/2007 58.1 61 75.4 40.912/1/2007 119.4 0 89.6 53.6 55.8

1/1/2008 134.3 112.60 168.2 130.3 135.32/1/2008 76.6 65.4 62.7 73 48.1

Page 13: Completacion Por El Metodo de Promedios

3/1/2008 61.8 42.7 60.3 52.4 60.94/1/2008 5.1 10 40.6 Err:511 21.85/1/2008 8.7 1.9 24.7 6.2 14.36/1/2008 0 0 2.8 0 07/1/2008 0 0 1.8 0 08/1/2008 0 0 7.7 0 5.39/1/2008 5.5 4.61 7.1 7.6 3.9

10/1/2008 48.5 67.7 48.3 49.6 57.311/1/2008 32.7 31.4 56 26.5 43.612/1/2008 212.2 154.5 133.7 155.6 123.3

1/1/2009 80.1 77.7 135.1 112.1 81.72/1/2009 113.3 121.66 79.9 90.9 733/1/2009 42.9 39.1 63.7 59.7 37.94/1/2009 9.3 27.1 52.6 15.3 24.65/1/2009 0.5 0 17.6 5.2 8.86/1/2009 0 0 0 0 07/1/2009 2.82 3.03 4.04 Err:511 Err:5118/1/2009 0 0.00 0 0.8 09/1/2009 12.6 23.8 16.6 9.2 51.2

10/1/2009 13.1 18.5 26.8 19.2 10.611/1/2009 58.8 69 125.3 111.8 67.412/1/2009 100 85.5 98.5 104.6 57.3

1/1/2010 156.2 115.4 153.8 162.62/1/2010 112.5 95 118.8 95.13/1/2010 38.8 69.5 103.2 71.6 63.14/1/2010 21.2 25 22.6 40.8 41.85/1/2010 24.6 10.2 14.4 8.6 7.66/1/20107/1/20108/1/20109/1/2010

10/1/201011/1/201012/1/2010

Page 14: Completacion Por El Metodo de Promedios

TARACO MOHO6 8

MPM MPM

(mm) (mm)

Pluies Pluies

-12.9710 -12.9952-75.8335 -75.6761 Muñani Ananea Crucero Progreso Moho TARACO huancane

1 6TARACO MOHO

52.167.1

101.136.312.3

000

26.713.449.833.5

128.3100.1133.6

40.24.4

0.0000

21.915.949.6

121.460.363.246.4

5.133.1

0007

27.226.8

Page 15: Completacion Por El Metodo de Promedios

8434.9

118.264.7

2.53.7

05.84.8

49.775.210.8

120.121.1110

74.517.214.7

5.54.318

7.745.3

128.140.4

100.549.643.312.9

00.95.2

012.618.8

3271.6

128.579.9 154.783.6 167.644.4 68.5

7.7 48.40 0.80 0.20 1

Page 16: Completacion Por El Metodo de Promedios

14.3 5229.7 5641.5 24.477.9 192.492.1 223.7

118.9 263.945.5 66.817.8 34.7

0 5.20 1.20 00 231 2.6

27.5 49.864.4 68.334.9 97.3

200.5 21578.7 112.481.3 10923.2 46.1

4.2 3.300 21 8.7

9.6 43.619.5 54.469.8 66.670.3 179.4

149.3 263.868.2 127.5

103.2 116.686 88.7

1.5 23.90 1.8

2.1 11.52.3 38.7

19.5 98.617.4 60.462.6 26.551.4 88.8

225.8 328.498.5 179.8

101.8 81.926.4 48.6

0 1.9

Page 17: Completacion Por El Metodo de Promedios

5.1 100 0

35.1 26.52.3 12.720 57.7

30.7 32.884.1 146102 207.7

87.3 221139 166.9

15.5 48.315.1 55

1.3 8.90 00 0.5

31.9 47.738.9 73.3

6.9 45.3159.2 163.8162.4 200.9

80.3 95.840.8 129.8

0 23.411.3 71.3

0 10.70 13.3

9.1 9.352 118.7

0 190 8.9

49.3 121.586.4 94.1

200.8 167.6120 134.4

8 3.20 31.40 0.30 3.40 0.2

46.5 54.434.8 47.273.1 125.2

78 190188.7 240.8135.9 152.7

Page 18: Completacion Por El Metodo de Promedios

72.2 141.831.3 67

0 3.20 11.20 1.50 2.1

26.3 28.88.7 39.5

98.4 161.8128.2 190.7205.7 318.1

75.4 96.4119.8 118.2

47.9 113.20 7.60 0

8.6 12.110 12.8

0.7 17.241.9 122.529.1 39.777.4 243.856.2 146.7

79 74.485.1 160.821.7 61.1

0 3.50 3.7

0.2 25.218.5 30.254.3 86.981.4 9122.2 12.440.5 47.2

148.5 335160.1 162.3135.3 103.7

43.6 78.40.3 9.8

0 10 0

18.7 41.130.8 52.871.6 121.353.8 50.7

Page 19: Completacion Por El Metodo de Promedios

70.9 118.5159.4 299

65.6 61.255.8 107.438.9 67.6

0 30 0.30 1.6

5.9 8.563.4 105.854.8 74.781.4 95.846.6 46.4

124.1 90.225.4 118.826.3 55.536.9 87.6

0.2 370 5.90 0.000 2

14.5 72.929.6 60.125.7 23.371.2 60.1

256.7 376.6207.6 299.7123.1 142.7

41.5 26.56 31.8

38 32.18 1.2

24.5 43.10 2.8

64.9 46.8100.1 134.3178.4 136.6151.3 212.7

177 140.695.3 181.4

148.9 135.918.4 34.637.4 40.3

0 0.25.4 1

Page 20: Completacion Por El Metodo de Promedios

100.7 115.569.8 42.3

278.7 254.4220.8 224.5194.5 201.8217.9 207.2233.8 116.5147.9 95.8

0 44.60 00 27.4

19.1 41.361.5 91.820.6 18.162.3 76.5

140.9 183.4285.4 252.1

38.5 55.640.8 109.3

38 35.23.7 13.10.8 7.132 46.2

7.5 18.89 10

34.8 51.4101.3 94.9

67.3 84.1119.2 214.6

49.8 158177.3 263.1134.2 94.2

31.1 57.20 00 00 00 3.8

38 40.14.8 14.1

108.3 94.8126.4 92.6

69.1 84.176 79.6

50.3 96.70.6 24.8

Page 21: Completacion Por El Metodo de Promedios

16 13.50 3

21.6 3914.3 11.712.4 16

24 51.954.5 43.6

166.4 166.679.8 74.524.8 58.835.6 63.8

4.5 942.5 72.5

0 09.7 22.7

10.6 25.767.7 110.183.7 125.9

192.1 102.3168.7 117.5102.6 182.1126.9 184.5

26.2 39.423.5 31.7

55 51.53.5 0

0 7.610.5 3228.9 15.832.8 6363.7 124.6

137.7 156.6116.4 100.7

26.6 39.79.3 21.7

0 00 25.2

6.2 1.558.1 101.6

3.8 4.659.7 8445.5 38.8

79 145.7149.5 310.3

50.7 49.1

Page 22: Completacion Por El Metodo de Promedios

98.9 6546.2 83.615.4 17.7

4.6 18.70 1.4

6.6 10.423.8 30.6

22 53.375.2 106.4

123.8 124.2140.6 192.5196.4 102.5

76.6 124.456.3 116.111.2 21.7

0 2.80 00 2

2.4 7.412.6 38.325.7 7498.4 157.3

135.7 133.7179.8 142.7129.1 110.9

22 7.33.2 10

0 00 00 1.7

12.6 38.223.2 28.640.4 76.5

107.1 148.974.2 266.5

51 88.179.1 78.119.6 40.5

3.8 5.10 00 7.6

12.8 4.316.8 23.321.2 18.155.4 86.2

Page 23: Completacion Por El Metodo de Promedios

98.2 169.2190.2 262146.4 159.4

109 185.327.8 85

0 90 00 0.2

17.8 24.944.1 78.3

22 40.361.6 145.7

92 108.8123.6 110.1

98.6 92.758.4 144.664.6 38.4

0 06.4 11.3

0 00 2.30 3.8

54.6 39.779.56 8528.69 20.2

99.6 104.896 63.3

115.8 255.467.2 62.3

5.8 4.70 0.50 0.40 0.8

39.4 47.856.2 108.2

26 50.138.6 32.9135 143.4

73.4 94.374 110.6

2.4 198 9.7

19.3 10.60 05 39.2

Page 24: Completacion Por El Metodo de Promedios

5.6 9.581.2 114.5

1.8 24.854 122.7

111.8 424.1109.8 184.9

144 181.911.8 40.6

9.6 26.52.8 5.1

0 20.32.2 14.56.6 837 75.931 41.2

79.6 13693.6 112.9

126.2 260.363.8 21433.4 43.8

6.4 18.10 4.4

12 32.20 13.8

39 64.6109.2 117.5

34.5 136.753.6 124197 300

100.2 154.2102.4 0

14.4 52.310 21

4.8 10.60 10.14 14.3

25 47.321.8 54.732.2 12.378.2 219.1

157.2 244.2127 114.3107 61.1

37.6 28.29.4 4.8

Page 25: Completacion Por El Metodo de Promedios

5.2 17.24.6 10

19.8 30.520.2 18.3

8.8 21.349.6 69.547.2 52.178.4 144

110.6 231.3105.4 33.8

26.6 49.90 0.50 00 01 9

21.2 30.675 94.7

71.2 97.2108.2 131.2187.6 238.4

47.8 93.666.2 69.216.6 21.8

1.4 2.42 00 0

1.4 1.426.6 5558.6 16.944.6 63.8

125.6 148.989.2 131.846.2 96.4

123.5 Err:51177.4 118.9

6.2 7.11.2 00.6 5.81.8 0

36.8 7518.8 38.264.4 100.768.8 89.8154 219.3

60 135.6

Page 26: Completacion Por El Metodo de Promedios

67.8 1180 7

1.4 20.20 00 00 0

3.8 5.337.4 85

34 10.598.4 209.5

67 85.2150 87.8

50.4 47.86.4 15.5

0 2.20 03 5.80 0

20.2 12.531.4 4860.2 124.4

72 158.6103 218.6

145.4 182.763.8 78.439.6 31.818.4 35.2

Page 27: Completacion Por El Metodo de Promedios

Muñani Ananea Crucero Progreso Moho TARACO huancane

Page 28: Completacion Por El Metodo de Promedios
Page 29: Completacion Por El Metodo de Promedios
Page 30: Completacion Por El Metodo de Promedios
Page 31: Completacion Por El Metodo de Promedios
Page 32: Completacion Por El Metodo de Promedios
Page 33: Completacion Por El Metodo de Promedios
Page 34: Completacion Por El Metodo de Promedios
Page 35: Completacion Por El Metodo de Promedios
Page 36: Completacion Por El Metodo de Promedios
Page 37: Completacion Por El Metodo de Promedios
Page 38: Completacion Por El Metodo de Promedios
Page 39: Completacion Por El Metodo de Promedios
Page 40: Completacion Por El Metodo de Promedios

PrecipitaciónESTACIÓN 64 65 66 67 68 69 70 71 72 73 74 75

1 Huancane 12 12 12 12 12 12 12 12 12 12 12 122 Muñani 12 11 12 12 12 12 12 12 12 12 83 Ananea 12 12 12 12 12 3 12 12 12 12 124 Crucero 3 12 12 12 12 125 Progreso 9 10 12 10 12 12 12 12 12 12 12 126 Moho 11 12 11 12 12 127 TARACO 12 12 12 12 12 12 12 12 12 12 12 12

CaudalesHuancane 12 12 12 12 12 12 12 12 12 12 12 4

2 3 4 5 6 7 8 9 10 11 12 131 2 3 4 5 6 7 8 9 10 11

45 58 59 58 60 48 65 84 83 84 84 80

1 2 3 4 5 6 7

CALIBRACIÓN (25)64 69

Page 41: Completacion Por El Metodo de Promedios

Precipitación76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 9212 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12

3 12 12 12 12 11 12 12 10 11 12 12 12 12 12 12 1212 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 1212 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 1212 12 12 12 12 12 12 12 2 6 9 12 11 10 9 9 1012 12 12 12 12 12 12 11 12 12 12 12 12 12 12 12 1212 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12

Caudales12 12 12 12 12 12 12 12 12 11 12 12 12 12 12 12 1214 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3012 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

75 84 84 84 84 83 84 83 72 77 81 84 83 82 81 81 82

8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

CALIBRACIÓN (25) VALIDACIÓN (10)88 89

Page 42: Completacion Por El Metodo de Promedios

Precipitación93 94 95 96 97 98 99 0 1 2 3 4 5 6 7 8 912 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 1212 12 12 12 12 12 12 12 12 12 12 12 10 9 4 10 912 8 11 11 11 10 12 12 11 12 12 11 12 10 12 12 1112 12 12 10 12 12 10 12 8 12 12 12 11 10 10 12 1112 12 12 12 12 12 11 11 10 11 11 11 12 10 9 11 1112 12 12 12 12 12 12 12 12 12 12 12 12 12 11 12 1212 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12

Caudales11 12 12 12 12 11 0 0 0 0 0 0 1 4 12 11 1231 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 4729 30 31 32 33 34

84 80 83 81 83 82 81 83 77 83 83 82 81 75 70 81 78

25 26 27 28 29 30

VALIDACIÓN (10)98

Page 43: Completacion Por El Metodo de Promedios

Precipitación10 11

5355555

Caudales12 648

33 0

Page 44: Completacion Por El Metodo de Promedios

Nombre HUANCANE MUÑANI ANANEA PROGRESO CRUCEROId Estación 1 2 3 4 5

Captor MPM MPM MPM MPM MPM

Unidad (mm) (mm) (mm) (mm) (mm)

Tabla Pluies Pluies Pluies Pluies Pluies

Latitud -12.9154 -12.9280 -12.8356 -12.8598 -13.0114Longitud -75.7285 -75.7788 -75.7140 -75.6879 -75.7578

N° ESTACION 4 5 3 2 7AÑO HUANCANE MUÑANI ANANEA PROGRESO CRUCERO

1964 456.96 416.14 371.9 590.21 553.991965 736.8 458 532.8 700.11 893.241966 625.2 449.05 536.1 456.8 757.951967 485.66 629.7 548.1 558.29 588.781968 831.4 664.2 543 555.4 1007.931969 547.5 541 511.13 468.4 663.751970 720.5 764.6 672.64 723.5 3571971 517.4 596.5 637 537.7 987.11972 624.1 412.2 628.4 639.9 9011973 647.9 422.6 573 783.8 9761974 610.6 321.2 615.9 552.4 10101975 717.7 300.78 672.7 560.5 892.711976 347.46 388.85 595.1 626.9 802.81977 569.3 640.4 597 618.9 852.61978 970.5 983.6 672.2 823.8 10311979 665.3 659.9 692.5 584.8 1082.71980 707.8 544 606.5 496.5 790.81981 956.4 743.73 869.2 699.1 1148.31982 652.4 588.1 759.4 606.6 682.91983 447.7 412.3 487.3 358.7 615.91984 826.3 1060.32 853 751.62 1265.51985 1045.80 881.68 874 945.09 1215.611986 879.4 755.9 808.6 789.57 1422.61987 596.2 647.7 722.5 682.9 975.61988 902.6 591.9 563.8 530.17 859.81989 659.6 631.1 620.1 788.63 794.11990 616.1 515.2 679.8 491.12 865.91991 725.8 710 528.5 441.47 910.51992 616.8 583.6 532.3 465.46 1270.71993 678.8 632.2 662.5 739.8 821.51994 669.8 591.9 800.24 662 1389.11995 522.4 587.6 491.59 456.5 754.11996 654 558.5 494.79 561.2 702.391997 799.1 750.1 612.99 829.4 990.31998 573.3 467.9 588.71 478.8 622

Page 45: Completacion Por El Metodo de Promedios

1999 591.5 521.5 614.1 517.2 815.072000 539.8 614.5 586.1 598.3 500.82001 851.1 737.3 606.23 686.67 627.202002 955.7 686.3 677.3 843.90 698.22003 756.7 794.8 675.1 600.54 6502004 697.2 913.6 745.01 761.30 462.22005 606.1 725.32 592.4 576.2 479.72006 635.28 701.47 666.47 529.90 567.672007 711.34 647.79 558.9 427.20 356.362008 585.4 490.81 613.9 533.96 513.82009 433.42 465.39 620.14 532.00 416.29

Page 46: Completacion Por El Metodo de Promedios

TARACO MOHO6 8

MPM MPM

(mm) (mm)

Pluies Pluies

-12.9710 -12.9952-75.8335 -75.6761

1 6TARACO MOHO

392.3 582.61615.4 939.39353.1 797.10490.4 619.20486.8 1060.00347.4 698.04507.5 766402.1 836.5558.1 840.5563.5 946.8629.8 926.3597.1 1038.4405.2 822.6647.6 851.4689.7 1041.1616.5 1101.6459.1 743.1733.6 1074.6571.8 871.3353.9 613.4

1048.8 1274.21303.7 1383.41098.5 1104.4

659.1 777.8662.7 939.9465.2 556.5717.4 831.9642.3 849.7542.3 720.1616.7 870.7620.2 839653.1 698.5432.1 787710.9 1098.9

514.46 548.1

Page 47: Completacion Por El Metodo de Promedios

544.6 731.2459.7 698.3546.2 1159571.7 1142.3

590 895.9593.6 671.5597.6 822.2578.4 711.4534.9 802.90456.8 810.4460.6 587.8

Page 48: Completacion Por El Metodo de Promedios

N° ESTACION 1 2 3 4 5AÑO TARACO PROGRESO ANANEA HUANCANE MUÑANI1964 392.30 590.21 371.90 456.96 416.141965 615.40 700.11 532.80 736.80 458.001966 353.10 456.80 536.10 625.20 449.051967 490.40 558.29 548.10 485.66 629.701968 486.80 555.40 543.00 831.40 664.201969 347.40 468.40 511.13 547.50 541.001970 507.50 723.50 672.64 720.50 764.601971 402.10 537.70 637.00 517.40 596.501972 558.10 639.90 628.40 624.10 412.201973 563.50 783.80 573.00 647.90 422.601974 629.80 552.40 615.90 610.60 321.201975 597.10 560.50 672.70 717.70 300.781976 405.20 626.90 595.10 347.46 388.851977 647.60 618.90 597.00 569.30 640.401978 689.70 823.80 672.20 970.50 983.601979 616.50 584.80 692.50 665.30 659.901980 459.10 496.50 606.50 707.80 544.001981 733.60 699.10 869.20 956.40 743.731982 571.80 606.60 759.40 652.40 588.101983 353.90 358.70 487.30 447.70 412.301984 1048.80 751.62 853.00 826.30 1060.321985 1303.70 945.09 874.00 1045.80 881.681986 1098.50 789.57 808.60 879.40 755.901987 659.10 682.90 722.50 596.20 647.701988 662.70 530.17 563.80 902.60 591.901989 465.20 788.63 620.10 659.60 631.101990 717.40 491.12 679.80 616.10 515.201991 642.30 441.47 528.50 725.80 710.001992 542.30 465.46 532.30 616.80 583.601993 616.70 739.80 662.50 678.80 632.201994 620.20 662.00 800.24 669.80 591.901995 653.10 456.50 491.59 522.40 587.601996 432.10 561.20 494.79 654.00 558.501997 710.90 829.40 612.99 799.10 750.101998 514.46 478.80 588.71 573.30 467.901999 544.60 517.20 614.10 591.50 521.502000 459.70 598.30 586.10 539.80 614.502001 546.20 686.67 606.23 851.10 737.302002 571.70 843.90 677.30 955.70 686.302003 590.00 600.54 675.10 756.70 794.802004 593.60 761.30 745.01 697.20 913.602005 597.60 576.20 592.40 606.10 725.322006 578.40 529.90 666.47 635.28 701.47

Page 49: Completacion Por El Metodo de Promedios

2007 534.90 427.20 558.90 711.34 647.792008 456.80 533.96 613.90 585.40 490.812009 460.60 532.00 620.14 433.42 465.39

PROMEDIO 587.88 612.24 628.50 673.22 613.07

677.07 mmPROMEDIO ARITMETICO

Page 50: Completacion Por El Metodo de Promedios

6 7MOHO CRUCERO

582.61 553.99939.39 893.24797.10 757.95619.20 588.78

1060.00 1007.93698.04 663.75766.00 357.00836.50 987.10840.50 901.00946.80 976.00926.30 1010.00

1038.40 892.71822.60 802.80851.40 852.60

1041.10 1031.001101.60 1082.70

743.10 790.801074.60 1148.30

871.30 682.90613.40 615.90

1274.20 1265.501383.40 1215.611104.40 1422.60

777.80 975.60939.90 859.80556.50 794.10831.90 865.90849.70 910.50720.10 1270.70870.70 821.50839.00 1389.10698.50 754.10787.00 702.39

1098.90 990.30548.10 622.00731.20 815.07698.30 500.80

1159.00 627.201142.30 698.20

895.90 650.00671.50 462.20822.20 479.70711.40 567.67

Page 51: Completacion Por El Metodo de Promedios

802.90 356.36810.40 513.80587.80 416.29

858.32 816.16

Page 52: Completacion Por El Metodo de Promedios

ESTACION

1 587.88 17.56 0.06 34.082 612.24 71.39 0.24 144.303 628.50 64.65 0.21 134.154 673.22 55.73 0.18 123.875 613.07 40.13 0.13 81.236 858.32 44.27 0.15 125.457 816.16 9.16 0.03 24.68

SUMA 302.89 1.00 667.76

667.76 mm

PRECIPITACION(mm)

AREAS(Km2)

AREAS(%)

ALTURA DE PRECIPITACIONES

(mm)

PROMEDIO PRECIPITACION

Page 53: Completacion Por El Metodo de Promedios

ID X Y Z1 361872 8657584 587.882 368079 8665017 612.243 365584 8671482 628.504 372579 8672502 673.225 368717 8678086 613.076 373323 8681691 858.327 367939 8686162 816.16

Page 54: Completacion Por El Metodo de Promedios
Page 55: Completacion Por El Metodo de Promedios

ISOYETAS PROMEDIO

570.51 - 600 585.26600 - 650 625.00650 - 665.47 657.74650 - 700 675.00700 - 750 725.00750 - 800 775.00800 - 850 825.00850 - 900 875.00900 - 950 925.00950 - 1000 975.00

1000 - 1045.95 1022.98

676.11PROMEDIO

PRECIPITACION

Page 56: Completacion Por El Metodo de Promedios

% AREAS

0.112 65.510.495 309.270.042 27.780.100 67.700.070 50.480.051 39.230.044 36.680.033 29.170.027 24.810.020 19.230.006 6.251.000 676.11

mm

ALTURAPRECIPITACIONES

(mm)

Page 57: Completacion Por El Metodo de Promedios
Page 58: Completacion Por El Metodo de Promedios