1
Operario S\. 1,272.49 S\. 1,909.52 S\. 1,851.81 S\. 41,415.00 S\. 12,149.33 S\. 17,041.54 S\. 75,639.68 Oficial S\. 792.26 S\. 1,585.76 S\. 1,447.43 S\. 31,584.90 S\. 9,362.62 S\. 1,149.00 S\. 45,921.97 Peon S\. 6,776.83 S\. 6,190.86 S\. 149,645.33 S\. 69,726.24 S\. 11,613.23 S\. 114,336.71 S\. 358,289.18 Topografo S\. 1,381.78 S\. 1,352.32 S\. 2.71 S\. 10.12 S\. 2,746.92 CLAVOS PARA MADERA C/C 3" (kg) S\. 2,946.32 S\. 2,851.21 S\. 36.20 S\. 261.45 S\. 6,095.17 CLAVOS PARA MADERA C/C 4" (kg) S\. 19.43 S\. 8.37 S\. 10.56 S\. 81.51 S\. 119.86 ALAMBRE NEGRO # 16 (kg) S\. 181.18 S\. 28.18 S\. 269.01 S\. 478.38 ALAMBRE NEGRO # 8 (kg) S\. 137.99 S\. 58.57 S\. 73.90 S\. 570.56 S\. 841.02 HOJA DE SIERRA DE 24 DIENTES (und) S\. 32.43 S\. 1,477.31 S\. 1,112.31 S\. 2,622.05 PISONES DE MANO (und) S\. 6.22 S\. 27.91 S\. 2,733.20 S\. 2,767.33 ACERO DE REFUERZO FY=4200 Kg/cm2 - GRADO 60 (kg) S\. 710.20 S\. 710.20 ACERO DE CONSTRUCCION CORRUGADO DE 3/8" (kg) S\. 2,694.44 S\. 7,908.89 S\. 10,603.33 ACERO DE CONSTRUCCION CORRUGADO DE 1/2" (kg) S\. 2,231.08 S\. 2,231.08 ARENA ( Entre las mallas Nº 100 y Nº 4) (m3) S\. 86.34 S\. 33.03 S\. 1,209.32 S\. 1,328.68 ARENA GRUESA (m3) S\. 790.24 S\. 485.72 S\. 17,007.80 S\. 18,283.76 PIEDRA DE 4" A 8" (m3) S\. 1.43 S\. 1.43 GRAVA (de ½" a 1") (m3) S\. 243.00 S\. 243.00 PIEDRA DE 10" a 12" (m3) S\. 4.56 S\. 4.56 PIEDRA MEDIANA (m3) S\. 395.01 S\. 395.01 PIEDRA CHANCADA DE 1/2" (m3) S\. 648.62 S\. 704.92 S\. 2,372.74 S\. 3,726.27 PIEDRA CHANCADA DE 3/4" (m3) S\. 648.12 S\. 99.24 S\. 21,943.95 S\. 22,691.32 PIEDRA GRANDE (m3) S\. 837.54 S\. 837.54 CEMENTO PORTLAND TIPO IP (42.5 kg) (bol) S\. 3,679.36 S\. 1,915.19 S\. 52,478.65 S\. 58,073.21 ADITIVO IMPERMEABILIZANTE (kg) S\. 19.49 S\. 7.33 S\. 439.05 S\. 465.88 FULMINANTE (und) S\. 15.48 S\. 9.82 S\. 2,730.02 S\. 38.56 S\. 2,793.88 MEHCA NARANJA S\. 40.64 S\. 25.78 S\. 7,166.30 S\. 101.22 S\. 7,333.94 LLAVE BAYONETA PE D=1" (und) S\. 2,910.00 S\. 2,910.00 VALVULA ESFERICA F°G° D=1 1/2" (und) S\. 14,502.86 S\. 10,877.14 S\. 25,380.00 UNION UNIVERSAL DE FºGº - LIVIANO C/ROSCA D= 2 1/2" (und) S\. 400.00 S\. 400.00 UNION UNIVERSAL DE FºGº - LIVIANO C/ROSCA D= 3" (und) S\. 580.00 S\. 580.00 CARTEL DE OBRA PREFABRICADO TIPO BANNER (und) S\. 700.00 S\. 700.00 CODO GIRATORIO CON ROSCA HEMBRA /MACHO PE DE = 1" (und) S\. 1,455.00 S\. 1,455.00 CODO PEAD 90°x1" (und) S\. 970.00 S\. 970.00 TIERRA ZARANDEADA (m3) S\. 55.81 S\. 2,823.56 S\. 2,823.56 S\. 5,702.92 SACO DE POLIETILENO (und) S\. 60.00 S\. 60.00 YESO DE 28 KG (bol) S\. 462.13 S\. 452.28 S\. 0.91 S\. 3.38 S\. 918.70 AGUA (m3) S\. 10.26 S\. 31.16 S\. 95.59 S\. 2,817.63 S\. 2,954.65 REGLA DE MADERA (p2) S\. 2.74 S\. 1.03 S\. 61.62 S\. 65.39 CAMPAMENTO PROVISIONAL EN OBRA (Glb) S\. 30,800.00 S\. 30,800.00 TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10´ (und) S\. 1,398.78 S\. 1,398.78 LISTONES DE MADERA CORRIENTE DE 2"x3"x10´ (pza) S\. 383.89 S\. 383.89 TABLAS DE MADERA AGUANO DE 1 1/2" x 8" x 10´ (und) S\. 753.08 S\. 950.10 S\. 7,335.75 S\. 9,038.93 LISTONES DE MADERA AGUANO DE 2"x3"x10´ (pza) S\. 216.22 S\. 272.78 S\. 2,106.18 S\. 2,595.18 ROLLIZOS DE EUCALIPTO DE 6" x 3m (und) S\. 36.00 S\. 36.00 ROLLIZOS DE EUCALIPTO DE 4" x 3m (und) S\. 223.80 S\. 96.39 S\. 121.61 S\. 938.98 S\. 1,380.79 TECNOPOR DE 1" x 2.40 m x 1.20 m (pln) S\. 1.41 S\. 1.41 PETROLEO B5 (gln) S\. 23.31 S\. 10.04 S\. 12.67 S\. 97.81 S\. 143.83 LATAS CONCRETERAS (und) S\. 1.24 S\. 5.58 S\. 546.64 S\. 553.47 COMPUERTA METALICA SEGUN DISEÑO (und) S\. 3,000.00 S\. 3,000.00 REJILLA CON RIELES Y MARCO METALICO SEGUN DISEÑO (und) S\. 800.00 S\. 800.00 ELEVADOR DE ALUMINIO D=1´x1m (und) S\. 1,940.00 S\. 1,940.00 TAPA METALICA PLANCHA ESTRIADA DE 3/16" x 0.5 x 0.5m (und) S\. 450.00 S\. 450.00 TAPA METALICA PLANCHA ESTRIADA DE 3/16" x 0.8 x 0.8m (und) S\. 550.00 S\. 550.00 TAPA METALICA PLANCHA ESTRIADA DE 3/16" x 0.5 x 0.4m (und) S\. 4,028.57 S\. 3,021.43 S\. 7,050.00 TEE DE FºGº - LIVIANO C/ROSCA D = 1½" (und) S\. 805.71 S\. 604.29 S\. 1,410.00 UNION SIMPLE DE F°G° D=1" (und) S\. 1,261.00 S\. 1,261.00 BUSHING DE F°G° D=1" x 1/2" (und) S\. 1,067.00 S\. 1,067.00 UNION SIMPLE DE F°G° D=1 1/2" (und) S\. 402.86 S\. 302.14 S\. 705.00 BUSHING DE F°G° D=1" x 1 1/2" (und) S\. 1,128.00 S\. 846.00 S\. 1,974.00 NIPLE DE FºGº - LIVIANO C/ROSCA D=2 1/2" x 10" cm (und) S\. 100.00 S\. 100.00 NIPLE DE FºGº - LIVIANO C/ROSCA D= 3" x 10 cm (und) S\. 120.00 S\. 120.00 NIPLE DE FºGº - LIVIANO C/ROSCA D= 1 1/2" x 40 cm (und) S\. 2,820.00 S\. 2,115.00 S\. 4,935.00 NIPLE DE FºGº - LIVIANO C/ROSCA D= 1 1/2" x 2" (und) S\. 1,128.00 S\. 846.00 S\. 1,974.00 NIPLE DE FºGº - LIVIANO C/ROSCA D= 1 1/2" x 3" (und) S\. 1,450.29 S\. 1,087.71 S\. 2,538.00 ACCESORIOS EN LINEA DE CONDUCCION (Glb) S\. 2,550.00 S\. 450.00 S\. 3,000.00 TRANSPORTE DE OBRA (Glb) S\. 14,000.00 S\. 14,000.00 TUB. PVC NTP 399.002 SP C-7.5 (S-13) D= 1½" (und) S\. 50,415.33 S\. 18,853.71 S\. 69,269.05 MANGUERA PEAD 1" S\. 29,100.00 S\. 29,100.00 TUB. PVC NTP 399.002 SP C-7.5 (S-13) D= 2" (und) S\. 6,995.38 S\. 6,995.38 TUB. PVC NTP 399.002 SP C-7.5 (S-13) D= 2 1/2" (und) S\. 3,087.99 S\. 1,764.57 S\. 4,852.56 TUB. PVC NTP 399.002 SP C-7.5 (S-13) D= 3" (und) S\. 8,098.73 S\. 8,098.73 TUB. PVC NTP 399.002 SP C-7.5 (S-13) D= 4" (und) S\. 17,472.43 S\. 17,472.43 TUB. PVC NTP 399.002 SP C-7.5 (S-13) D= 6" (und) S\. 19,312.61 S\. 19,312.61 ACCESORIOS EN RED DE DISTRIBUCION (Glb) S\. 100.00 S\. 100.00 TUB. PVC NTP 399.002 SP C-5 (S-13) D= 2" S\. 2,717.14 S\. 1,812.86 S\. 4,530.00 TUB. PVC NTP 399.002 SP C-5 (S-13) D= 3" S\. 4,890.86 S\. 3,263.14 S\. 8,154.00 TUBO PVC SAP 6" x 5m C-7.5 (Union flex.) S\. 4,218.86 S\. 4,218.86 UNION PRESION ROSCA DE PVC NTP 399.002 SP de Ø 1 ½" (und) S\. 402.86 S\. 302.14 S\. 705.00 CURVA DE PVC NTP 399.002 SP D= 2 1/2" x 22.5° (und) S\. 35.00 S\. 35.00 CURVA DE PVC NTP 399.002 SP D= 3" x 22.5° (und) S\. 40.00 S\. 40.00 CURVA DE PVC NTP 399.002 SP D= 3" x 45° (und) S\. 60.00 S\. 60.00 CURVA DE PVC NTP 399.002 SP D= 2 1/2" x 45° (und) S\. 50.00 S\. 50.00 TEE PVC NTP 399.002 SP D=2 1/2" (c/reduccion) (und) S\. 25.00 S\. 25.00 TEE PVC NTP 399.002 SP D= 3" (c/reduccion) (und) S\. 30.00 S\. 30.00 CURVA DE PVC NTP 399.002 SP D= 1 1/2 " x 90° (und) S\. 1,047.43 S\. 785.57 S\. 1,833.00 FILTRO DE TUBERIA PVC NTP 399 002 SP D=2 1/2" X LC CM (HECHIZO) (und) S\. 150.00 S\. 150.00 FILTRO DE TUBERIA PVC NTP 399 002 SP D= 3" X LC CM (HECHIZO) (und) S\. 175.00 S\. 175.00 NIPLE DE PVC x 10" C/ROSCA D=1 1/2" x 6" (und) S\. 564.00 S\. 423.00 S\. 987.00 LUBRICANTE PARA TUBERIA PVC (gln) S\. 334.83 S\. 334.83 PEGAMENTO PARA PVC (gln) S\. 3,175.30 S\. 2,471.81 S\. 5,647.11 UNION UNIVERSAL PEAD D=1" (und) S\. 970.00 S\. 970.00 CINTA TEFLON DE 1/2" x 6.00 m (und) S\. 362.57 S\. 271.93 S\. 634.50 ANILLOS DE JEBE DE 6" (und) S\. 111.61 S\. 111.61 TUBERIA DE PVC NTP 399.002 SP C-7.5 D=2 1/2" S\. 1,470.00 S\. 1,470.00 TUBERIA DE PVC NTP 399.002 SP C-7.5 D= 3" S\. 1,890.00 S\. 1,890.00 CODO PVC NTP 399.002 SP C-10 D=2 1/2" x 90° (und) S\. 75.00 S\. 75.00 CODO PVC NTP 399.002 SP C-10 D= 3" x 90° (und) S\. 100.00 S\. 100.00 TEE PVC NTP 399.002 DE 1 1/2" x 1 1/2" (und) S\. 20,787.43 S\. 15,590.57 S\. 36,378.00 TEE PVC NTP 399.002 CON REDUCCION DE 2" A 1 1/2" (und) S\. 14,664.00 S\. 10,998.00 S\. 25,662.00 TEE PVC NTP 399.002 CON REDUCCION DE 2 1/2" A 1 1/2" (und) S\. 644.57 S\. 483.43 S\. 1,128.00 ACCESORIOS PARA CÁMARA DE CARGA (Glb) S\. 17,000.00 S\. 17,000.00 ACCESORIOS PARA CÁMARA ROMPE PRESION (Glb) S\. 19,800.00 S\. 19,800.00 ACCESORIOS PARA VALVULAS DE PURGA Y/O PASO (Glb) S\. 58,666.67 S\. 11,733.33 S\. 70,400.00 VALVULA TIPO COMPUERTA LIVIANA DE BRONCE - ROSCA NTP - PRESION 250 lbs. PSI D=2 1/2" (und) S\. 650.00 S\. 650.00 VALVULA TIPO COMPUERTA LIVIANA DE BRONCE - ROSCA NTP - PRESION 250 lbs. PSI D=3" (und) S\. 725.00 S\. 725.00 ACCESORIOS - PARTIDOR (Glb) S\. 4,500.00 S\. 4,500.00 DINAMITA (und) S\. 19.35 S\. 12.28 S\. 3,412.53 S\. 48.20 S\. 3,492.35 MADERA TORNILLO CEPILLADA (p2) S\. 899.76 S\. 881.45 S\. 0.88 S\. 3.30 S\. 1,785.39 Volquete de 10 m³ S\. 1,381.82 S\. 27,083.64 S\. 28,465.45 Camión Plataforma S\. 15,002.59 S\. 10,433.95 S\. 25,436.54 WINCHA DE 30M S\. 93.57 S\. 90.86 S\. 0.91 S\. 3.38 S\. 188.73 ESTACION TOTAL S\. 5.97 S\. 2.13 S\. 3.77 S\. 14.10 S\. 25.97 NIVEL TOPOGRAFICO S\. 920.53 S\. 901.79 S\. 0.91 S\. 3.38 S\. 1,826.61 COMPRESORA NEUMATICA 87 HP de 250 - 330 PCM S\. 22.70 S\. 14.40 S\. 4,010.35 S\. 69.11 S\. 4,116.56 MARTILLO DEUMATICO DE 29 KG S\. 3.10 S\. 1.96 S\. 546.87 S\. 9.42 S\. 561.35 BARRENO DE 1" x 3P S\. 2.06 S\. 1.31 S\. 364.58 S\. 6.28 S\. 374.23 BALDE DE PRUEBA - TAPON - ABRAZ. Y ACCESORIOS S\. 11.91 S\. 258.67 S\. 1,204.72 S\. 1,475.29 CIZALLA P/CORTE DE FIERRO S\. 20.50 S\. 20.50 HERRAMIENTASS MANUALES S\. 314.14 S\. 334.81 S\. 4,719.20 S\. 6,126.16 S\. 1,652.73 S\. 4,089.61 S\. 17,236.65 VIBRADOR DE 4 HP CAB. = 2.4" S\. 73.08 S\. 33.68 S\. 934.75 S\. 1,041.51 MEZCLADORA DE CONCRETO TAMBOR 9 P3 - 10 HP S\. 146.15 S\. 67.36 S\. 1,966.19 S\. 2,179.70 FLETE TERRESTRE S\. 24,000.00 S\. 24,000.00 PLAN DE CAPACITACION Y ASISTENCIA TECNICA S\. 19,652.60 S\. 19,652.60 Total S\. 101,485.73 S\. 109,232.82 S\. 180,655.84 S\. 551,475.46 S\. 169,327.77 S\. 143,919.04 S\. 1,256,096.67 Total junio julio agosto septiembre octubre noviembre diciembre CRONOGRAMA VALORIZADO DE ADQUISICION DE MATERIALES: “INSTALACIÓN DEL SISTEMA DE RIEGO DE LA COMUNIDAD DE PARUPARU, DISTRITO DE PISAC, CALCA - CUSCO”

Cronograma de Adquisicion de Materiales

Embed Size (px)

DESCRIPTION

CRONOGRAMA DE ADQUISICION DE MATERIALES

Citation preview

  • Operario S\. 1,272.49 S\. 1,909.52 S\. 1,851.81 S\. 41,415.00 S\. 12,149.33 S\. 17,041.54 S\. 75,639.68Oficial S\. 792.26 S\. 1,585.76 S\. 1,447.43 S\. 31,584.90 S\. 9,362.62 S\. 1,149.00 S\. 45,921.97Peon S\. 6,776.83 S\. 6,190.86 S\. 149,645.33 S\. 69,726.24 S\. 11,613.23 S\. 114,336.71 S\. 358,289.18Topografo S\. 1,381.78 S\. 1,352.32 S\. 2.71 S\. 10.12 S\. 2,746.92CLAVOS PARA MADERA C/C 3" (kg) S\. 2,946.32 S\. 2,851.21 S\. 36.20 S\. 261.45 S\. 6,095.17CLAVOS PARA MADERA C/C 4" (kg) S\. 19.43 S\. 8.37 S\. 10.56 S\. 81.51 S\. 119.86ALAMBRE NEGRO # 16 (kg) S\. 181.18 S\. 28.18 S\. 269.01 S\. 478.38ALAMBRE NEGRO # 8 (kg) S\. 137.99 S\. 58.57 S\. 73.90 S\. 570.56 S\. 841.02HOJA DE SIERRA DE 24 DIENTES (und) S\. 32.43 S\. 1,477.31 S\. 1,112.31 S\. 2,622.05PISONES DE MANO (und) S\. 6.22 S\. 27.91 S\. 2,733.20 S\. 2,767.33ACERO DE REFUERZO FY=4200 Kg/cm2 - GRADO 60 (kg) S\. 710.20 S\. 710.20ACERO DE CONSTRUCCION CORRUGADO DE 3/8" (kg) S\. 2,694.44 S\. 7,908.89 S\. 10,603.33ACERO DE CONSTRUCCION CORRUGADO DE 1/2" (kg) S\. 2,231.08 S\. 2,231.08ARENA ( Entre las mallas N 100 y N 4) (m3) S\. 86.34 S\. 33.03 S\. 1,209.32 S\. 1,328.68ARENA GRUESA (m3) S\. 790.24 S\. 485.72 S\. 17,007.80 S\. 18,283.76PIEDRA DE 4" A 8" (m3) S\. 1.43 S\. 1.43GRAVA (de " a 1") (m3) S\. 243.00 S\. 243.00PIEDRA DE 10" a 12" (m3) S\. 4.56 S\. 4.56PIEDRA MEDIANA (m3) S\. 395.01 S\. 395.01PIEDRA CHANCADA DE 1/2" (m3) S\. 648.62 S\. 704.92 S\. 2,372.74 S\. 3,726.27PIEDRA CHANCADA DE 3/4" (m3) S\. 648.12 S\. 99.24 S\. 21,943.95 S\. 22,691.32PIEDRA GRANDE (m3) S\. 837.54 S\. 837.54CEMENTO PORTLAND TIPO IP (42.5 kg) (bol) S\. 3,679.36 S\. 1,915.19 S\. 52,478.65 S\. 58,073.21ADITIVO IMPERMEABILIZANTE (kg) S\. 19.49 S\. 7.33 S\. 439.05 S\. 465.88FULMINANTE (und) S\. 15.48 S\. 9.82 S\. 2,730.02 S\. 38.56 S\. 2,793.88MEHCA NARANJA S\. 40.64 S\. 25.78 S\. 7,166.30 S\. 101.22 S\. 7,333.94LLAVE BAYONETA PE D=1" (und) S\. 2,910.00 S\. 2,910.00VALVULA ESFERICA FG D=1 1/2" (und) S\. 14,502.86 S\. 10,877.14 S\. 25,380.00UNION UNIVERSAL DE FG - LIVIANO C/ROSCA D= 2 1/2" (und) S\. 400.00 S\. 400.00UNION UNIVERSAL DE FG - LIVIANO C/ROSCA D= 3" (und) S\. 580.00 S\. 580.00CARTEL DE OBRA PREFABRICADO TIPO BANNER (und) S\. 700.00 S\. 700.00CODO GIRATORIO CON ROSCA HEMBRA /MACHO PE DE = 1" (und) S\. 1,455.00 S\. 1,455.00CODO PEAD 90x1" (und) S\. 970.00 S\. 970.00TIERRA ZARANDEADA (m3) S\. 55.81 S\. 2,823.56 S\. 2,823.56 S\. 5,702.92SACO DE POLIETILENO (und) S\. 60.00 S\. 60.00YESO DE 28 KG (bol) S\. 462.13 S\. 452.28 S\. 0.91 S\. 3.38 S\. 918.70AGUA (m3) S\. 10.26 S\. 31.16 S\. 95.59 S\. 2,817.63 S\. 2,954.65REGLA DE MADERA (p2) S\. 2.74 S\. 1.03 S\. 61.62 S\. 65.39CAMPAMENTO PROVISIONAL EN OBRA (Glb) S\. 30,800.00 S\. 30,800.00TABLAS DE MADERA CORRIENTE DE 1 1/2" x 8" x 10 (und) S\. 1,398.78 S\. 1,398.78LISTONES DE MADERA CORRIENTE DE 2"x3"x10 (pza) S\. 383.89 S\. 383.89TABLAS DE MADERA AGUANO DE 1 1/2" x 8" x 10 (und) S\. 753.08 S\. 950.10 S\. 7,335.75 S\. 9,038.93LISTONES DE MADERA AGUANO DE 2"x3"x10 (pza) S\. 216.22 S\. 272.78 S\. 2,106.18 S\. 2,595.18ROLLIZOS DE EUCALIPTO DE 6" x 3m (und) S\. 36.00 S\. 36.00ROLLIZOS DE EUCALIPTO DE 4" x 3m (und) S\. 223.80 S\. 96.39 S\. 121.61 S\. 938.98 S\. 1,380.79TECNOPOR DE 1" x 2.40 m x 1.20 m (pln) S\. 1.41 S\. 1.41PETROLEO B5 (gln) S\. 23.31 S\. 10.04 S\. 12.67 S\. 97.81 S\. 143.83LATAS CONCRETERAS (und) S\. 1.24 S\. 5.58 S\. 546.64 S\. 553.47COMPUERTA METALICA SEGUN DISEO (und) S\. 3,000.00 S\. 3,000.00REJILLA CON RIELES Y MARCO METALICO SEGUN DISEO (und) S\. 800.00 S\. 800.00ELEVADOR DE ALUMINIO D=1x1m (und) S\. 1,940.00 S\. 1,940.00TAPA METALICA PLANCHA ESTRIADA DE 3/16" x 0.5 x 0.5m (und) S\. 450.00 S\. 450.00TAPA METALICA PLANCHA ESTRIADA DE 3/16" x 0.8 x 0.8m (und) S\. 550.00 S\. 550.00TAPA METALICA PLANCHA ESTRIADA DE 3/16" x 0.5 x 0.4m (und) S\. 4,028.57 S\. 3,021.43 S\. 7,050.00TEE DE FG - LIVIANO C/ROSCA D = 1" (und) S\. 805.71 S\. 604.29 S\. 1,410.00UNION SIMPLE DE FG D=1" (und) S\. 1,261.00 S\. 1,261.00BUSHING DE FG D=1" x 1/2" (und) S\. 1,067.00 S\. 1,067.00UNION SIMPLE DE FG D=1 1/2" (und) S\. 402.86 S\. 302.14 S\. 705.00BUSHING DE FG D=1" x 1 1/2" (und) S\. 1,128.00 S\. 846.00 S\. 1,974.00NIPLE DE FG - LIVIANO C/ROSCA D=2 1/2" x 10" cm (und) S\. 100.00 S\. 100.00NIPLE DE FG - LIVIANO C/ROSCA D= 3" x 10 cm (und) S\. 120.00 S\. 120.00NIPLE DE FG - LIVIANO C/ROSCA D= 1 1/2" x 40 cm (und) S\. 2,820.00 S\. 2,115.00 S\. 4,935.00NIPLE DE FG - LIVIANO C/ROSCA D= 1 1/2" x 2" (und) S\. 1,128.00 S\. 846.00 S\. 1,974.00NIPLE DE FG - LIVIANO C/ROSCA D= 1 1/2" x 3" (und) S\. 1,450.29 S\. 1,087.71 S\. 2,538.00ACCESORIOS EN LINEA DE CONDUCCION (Glb) S\. 2,550.00 S\. 450.00 S\. 3,000.00TRANSPORTE DE OBRA (Glb) S\. 14,000.00 S\. 14,000.00TUB. PVC NTP 399.002 SP C-7.5 (S-13) D= 1" (und) S\. 50,415.33 S\. 18,853.71 S\. 69,269.05MANGUERA PEAD 1" S\. 29,100.00 S\. 29,100.00TUB. PVC NTP 399.002 SP C-7.5 (S-13) D= 2" (und) S\. 6,995.38 S\. 6,995.38TUB. PVC NTP 399.002 SP C-7.5 (S-13) D= 2 1/2" (und) S\. 3,087.99 S\. 1,764.57 S\. 4,852.56TUB. PVC NTP 399.002 SP C-7.5 (S-13) D= 3" (und) S\. 8,098.73 S\. 8,098.73TUB. PVC NTP 399.002 SP C-7.5 (S-13) D= 4" (und) S\. 17,472.43 S\. 17,472.43TUB. PVC NTP 399.002 SP C-7.5 (S-13) D= 6" (und) S\. 19,312.61 S\. 19,312.61ACCESORIOS EN RED DE DISTRIBUCION (Glb) S\. 100.00 S\. 100.00TUB. PVC NTP 399.002 SP C-5 (S-13) D= 2" S\. 2,717.14 S\. 1,812.86 S\. 4,530.00TUB. PVC NTP 399.002 SP C-5 (S-13) D= 3" S\. 4,890.86 S\. 3,263.14 S\. 8,154.00TUBO PVC SAP 6" x 5m C-7.5 (Union flex.) S\. 4,218.86 S\. 4,218.86UNION PRESION ROSCA DE PVC NTP 399.002 SP de 1 " (und) S\. 402.86 S\. 302.14 S\. 705.00CURVA DE PVC NTP 399.002 SP D= 2 1/2" x 22.5 (und) S\. 35.00 S\. 35.00CURVA DE PVC NTP 399.002 SP D= 3" x 22.5 (und) S\. 40.00 S\. 40.00CURVA DE PVC NTP 399.002 SP D= 3" x 45 (und) S\. 60.00 S\. 60.00CURVA DE PVC NTP 399.002 SP D= 2 1/2" x 45 (und) S\. 50.00 S\. 50.00TEE PVC NTP 399.002 SP D=2 1/2" (c/reduccion) (und) S\. 25.00 S\. 25.00TEE PVC NTP 399.002 SP D= 3" (c/reduccion) (und) S\. 30.00 S\. 30.00CURVA DE PVC NTP 399.002 SP D= 1 1/2 " x 90 (und) S\. 1,047.43 S\. 785.57 S\. 1,833.00FILTRO DE TUBERIA PVC NTP 399 002 SP D=2 1/2" X LC CM (HECHIZO) (und) S\. 150.00 S\. 150.00FILTRO DE TUBERIA PVC NTP 399 002 SP D= 3" X LC CM (HECHIZO) (und) S\. 175.00 S\. 175.00NIPLE DE PVC x 10" C/ROSCA D=1 1/2" x 6" (und) S\. 564.00 S\. 423.00 S\. 987.00LUBRICANTE PARA TUBERIA PVC (gln) S\. 334.83 S\. 334.83PEGAMENTO PARA PVC (gln) S\. 3,175.30 S\. 2,471.81 S\. 5,647.11UNION UNIVERSAL PEAD D=1" (und) S\. 970.00 S\. 970.00CINTA TEFLON DE 1/2" x 6.00 m (und) S\. 362.57 S\. 271.93 S\. 634.50ANILLOS DE JEBE DE 6" (und) S\. 111.61 S\. 111.61TUBERIA DE PVC NTP 399.002 SP C-7.5 D=2 1/2" S\. 1,470.00 S\. 1,470.00TUBERIA DE PVC NTP 399.002 SP C-7.5 D= 3" S\. 1,890.00 S\. 1,890.00CODO PVC NTP 399.002 SP C-10 D=2 1/2" x 90 (und) S\. 75.00 S\. 75.00CODO PVC NTP 399.002 SP C-10 D= 3" x 90 (und) S\. 100.00 S\. 100.00TEE PVC NTP 399.002 DE 1 1/2" x 1 1/2" (und) S\. 20,787.43 S\. 15,590.57 S\. 36,378.00TEE PVC NTP 399.002 CON REDUCCION DE 2" A 1 1/2" (und) S\. 14,664.00 S\. 10,998.00 S\. 25,662.00TEE PVC NTP 399.002 CON REDUCCION DE 2 1/2" A 1 1/2" (und) S\. 644.57 S\. 483.43 S\. 1,128.00ACCESORIOS PARA CMARA DE CARGA (Glb) S\. 17,000.00 S\. 17,000.00ACCESORIOS PARA CMARA ROMPE PRESION (Glb) S\. 19,800.00 S\. 19,800.00ACCESORIOS PARA VALVULAS DE PURGA Y/O PASO (Glb) S\. 58,666.67 S\. 11,733.33 S\. 70,400.00VALVULA TIPO COMPUERTA LIVIANA DE BRONCE - ROSCA NTP - PRESION 250 lbs. PSI D=2 1/2" (und) S\. 650.00 S\. 650.00VALVULA TIPO COMPUERTA LIVIANA DE BRONCE - ROSCA NTP - PRESION 250 lbs. PSI D=3" (und) S\. 725.00 S\. 725.00ACCESORIOS - PARTIDOR (Glb) S\. 4,500.00 S\. 4,500.00DINAMITA (und) S\. 19.35 S\. 12.28 S\. 3,412.53 S\. 48.20 S\. 3,492.35MADERA TORNILLO CEPILLADA (p2) S\. 899.76 S\. 881.45 S\. 0.88 S\. 3.30 S\. 1,785.39Volquete de 10 m S\. 1,381.82 S\. 27,083.64 S\. 28,465.45Camin Plataforma S\. 15,002.59 S\. 10,433.95 S\. 25,436.54WINCHA DE 30M S\. 93.57 S\. 90.86 S\. 0.91 S\. 3.38 S\. 188.73ESTACION TOTAL S\. 5.97 S\. 2.13 S\. 3.77 S\. 14.10 S\. 25.97NIVEL TOPOGRAFICO S\. 920.53 S\. 901.79 S\. 0.91 S\. 3.38 S\. 1,826.61COMPRESORA NEUMATICA 87 HP de 250 - 330 PCM S\. 22.70 S\. 14.40 S\. 4,010.35 S\. 69.11 S\. 4,116.56MARTILLO DEUMATICO DE 29 KG S\. 3.10 S\. 1.96 S\. 546.87 S\. 9.42 S\. 561.35BARRENO DE 1" x 3P S\. 2.06 S\. 1.31 S\. 364.58 S\. 6.28 S\. 374.23BALDE DE PRUEBA - TAPON - ABRAZ. Y ACCESORIOS S\. 11.91 S\. 258.67 S\. 1,204.72 S\. 1,475.29CIZALLA P/CORTE DE FIERRO S\. 20.50 S\. 20.50HERRAMIENTASS MANUALES S\. 314.14 S\. 334.81 S\. 4,719.20 S\. 6,126.16 S\. 1,652.73 S\. 4,089.61 S\. 17,236.65VIBRADOR DE 4 HP CAB. = 2.4" S\. 73.08 S\. 33.68 S\. 934.75 S\. 1,041.51MEZCLADORA DE CONCRETO TAMBOR 9 P3 - 10 HP S\. 146.15 S\. 67.36 S\. 1,966.19 S\. 2,179.70FLETE TERRESTRE S\. 24,000.00 S\. 24,000.00PLAN DE CAPACITACION Y ASISTENCIA TECNICA S\. 19,652.60 S\. 19,652.60

    Total S\. 101,485.73 S\. 109,232.82 S\. 180,655.84 S\. 551,475.46 S\. 169,327.77 S\. 143,919.04 S\. 1,256,096.67

    Totaljunio julio agosto septiembre octubre noviembre diciembre

    CRONOGRAMA VALORIZADO DE ADQUISICION DE MATERIALES:INSTALACIN DEL SISTEMA DE RIEGO DE LA COMUNIDAD DE PARUPARU, DISTRITO DE PISAC, CALCA - CUSCO