CONSTRUCCIONES RIVER, CORIVER C.A N° DE CONTRATO: S/C PRESUPUESTO CRONOGRAMA EN MESES ( 1 mes) ACTIVIDAD CANTD BSF ANTICIPO sem. 1 sem. 2 sem. 3 s 1 240.20 35,592.84 2 465.10 78,550.74 3 50.00 26,464.50 4 65.00 212,648.80 5 70.00 8,901.20 6 PINTURA DE ESMALTE EN COLUMNAS METALICAS. 10.00 1,608.20 7 40.00 37,818.00 8 PINTURA DE ESMALTE EN VIGAS METALICAS DE ALMA LLENA. 64.00 12,371.84 9 BARNIZ EN TECHOS DE MADERA. INCLUYE FONDO SELLADOR 65.00 23,830.95 10 56.00 8,757.28 11 72.00 9,958.32 12 1.00 478.31 13 1.00 315.43 14 1.00 290.18 15 1.00 5,127.72 16 6.00 10,226.04 17 S/C DE SOBREPISO DE CEMENTO LISO, DE 7 CM DE ESPESOR 54.00 44,225.46 18 100.00 9,369.00 19 6.00 3,372.54 20 15.00 1,854.00 21 65.00 105,255.15 22 S/I DE BREAKER DE 1 X 20 AMP 4.00 1,623.00 23 S/I DE BREAKER DE 1 X 30 AMP TIPO FI 3.00 1,372.38 24 100.00 10,684.00 25 1.90 210.71 26 70.00 11,354.70 27 8.00 12,388.08 28 25.00 4,209.75 29 1.90 7,220.36 30 5.10 3,385.58 31 5.00 23,338.65 32 600.00 24,138.00 33 1.00 1,215.93 34 VARIACION DE PRECIOS (10%) 1.00 17,567.57 35 IMPUESTO AL VALOR AGREGADO (12,00%) 1.00 88,339.29 36 INSPECCION, SEGUIMIENTO Y CONTROL DE OBRA, (3,00%) 1.00 25,000.00 TOTAL 440000 98563 99683 105322 1 TOTALACUMULADO 425000 523563 623246 728568 8 OBRA: AMPLIACION ESCUELA PUEBLO NUEVO UBICADO EN LA PARROQUIA SAN RAFAEL DE ALCAZAR DEL MUNICIPIO OBISPO RAMOS DE LORA DEL ESTADO MERIDA (1era ETAPA) SUMINISTRO, CONFECCION Y COLOCACION DE ESTRUCTURAS METALICAS DE VIGAS SIMPLES .INCLUYE SU TRANSPORTE HASTA 50 KM DE DISTANCIA. SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURAS METALICAS DE CORREAS SIMPLES, INCLUYE SU TRANSPORTE HASTA 50 KM DE DISTANCIA CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO LISO. INCLUYE FRISO BASE COLOCACION DE REVESTIMIENTO DE MADERA MACHIHEMBRADO EN ESTRUCTURAS (TECHOS). PINTURA DE FONDO ANTICORROSIVO PARA ELEMENTOS Y ESTRUCTURAS METALICAS. ONSTRUCCION DE REVESTIMIENTO EXTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO SALPICADO. INCLUYE FRISO BASE PINTURA DE CAUCHO INTERIOR EN PAREDES. INCLUYENDO FONDO ANTIALCALINO. PINTURA DE CAUCHO EXTERIOR EN PAREDES. INCLUYENDO FONDO ANTIALCALINO. I.E. INTERRUPTORES COMBINABLES DOBLES, CON TAPA METALICA, PUENTE Y TORNILLOS, 20 A. I.E. INTERRUPTORES (SWITCHES) COMBINABLES SIMPLES, CON TAPA DE PLASTICO, PUENTE Y TORNILLOS, 25 A. I.E. TOMACORRIENTES CON TAPA PLASTICA DOBLE 1 FASE 2O AMP TRANSPORTE E INSTALACION DE TABLERO DE ELECTRICIDAD, 12 CIRCUITOS, MONOFASICO, TENSION DE TRABAJO 208/120 V, INTERRUPTOR PPAL 3 Ø DE 25 KACC@240 V, 3 FASES, 5 HILOS, INTERRUPTORES SECUNDARIOS S/I, GABINETE NEMA 12, TIPO NAB I.E. LAMPARA FLUORESCENTE DE TECHO TIPO INDUSTRIAL, TIPO FS-2, LAMP-O-LUX O SIMILAR DE 2 X 40 W. I.E. CABLE DE COBRE, TRENZADO, REVESTIDO, THW, CALIBRE 12 AWG (2.32 MM). LUMINARIA INCANDECENTE TIPO APLIQUE CON BOMBILLO 60 W. INSTALACION SUPERFICIAL I.E. CABLE DE COBRE, TRENZADO, REVESTIDO, THW, CALIBRE 8 AWG (3.71 MM) RECUBRIMIENTO EXTERIOR EN TECHOS CON TEJAS CRIOLLAS. INCLUYENDO MORTERO DE CEMENTO I.E. CABLE DE COBRE, TRENZADO, REVESTIDO, THW, CALIBRE 10 AWG (2.95 MM) APLICADA CON BROCHA VIGAS METALICAS DE ALMA LLENA. THW (FIJADO SUPERFICIALMENTE) EMT, EMBUTIDA. DIAMETRO 1/2 PLG (13 MM). SUMINISTRO, TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADAS DE HIERRO. DE BLOQUE DE 10 CM DE ESPESOR INCLUIR VIDRIO. SOLDADAS CON LLAVE

Cronograma Pueblo Nuevo

Embed Size (px)

DESCRIPTION

civil

Citation preview

DESEMBOLSO defCONSTRUCCIONES RIVER, CORIVER C.AOBRA: AMPLIACION ESCUELA PUEBLO NUEVO UBICADO EN LA PARROQUIA SAN RAFAEL DE ALCAZAR DEL MUNICIPIO OBISPO RAMOS DE LORA DEL ESTADO MERIDA (1era ETAPA)N DE CONTRATO: S/CNPRESUPUESTOCRONOGRAMA EN MESES ( 1 mes)ACTIVIDADCANTDBSFANTICIPOsem. 1sem. 2sem. 3sem. 41SUMINISTRO, CONFECCION Y COLOCACION DE ESTRUCTURAS METALICAS DE VIGAS SIMPLES .INCLUYE SU TRANSPORTE HASTA 50 KM DE DISTANCIA.240.2035,592.842SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURAS METALICAS DE CORREAS SIMPLES, INCLUYE SU TRANSPORTE HASTA 50 KM DE DISTANCIA465.1078,550.743CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO LISO. INCLUYE FRISO BASE50.0026,464.504COLOCACION DE REVESTIMIENTO DE MADERA MACHIHEMBRADO EN ESTRUCTURAS (TECHOS).65.00212,648.805PINTURA DE FONDO ANTICORROSIVO PARA ELEMENTOS Y ESTRUCTURAS METALICAS.70.008,901.206PINTURA DE ESMALTE EN COLUMNAS METALICAS.10.001,608.207CONSTRUCCION DE REVESTIMIENTO EXTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO SALPICADO. INCLUYE FRISO BASE40.0037,818.007ONSTRUCCION DE REVESTIMIENTO EXTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO SALPICADO. INCLUYE FRISO BASE40.0037,818.008PINTURA DE ESMALTE EN VIGAS METALICAS DE ALMA LLENA.64.0012,371.84CONSTRUCCION DE REVESTIMIENTO EXTERIOR EN9BARNIZ EN TECHOS DE MADERA. INCLUYE FONDO SELLADOR65.0023,830.95PAREDES CON MORTERO A BASE DE CAL, ACABADO10PINTURA DE CAUCHO INTERIOR EN PAREDES. INCLUYENDO FONDO ANTIALCALINO.56.008,757.28SALPICADO. INCLUYE FRISO BASE11PINTURA DE CAUCHO EXTERIOR EN PAREDES. INCLUYENDO FONDO ANTIALCALINO.72.009,958.3212I.E. INTERRUPTORES COMBINABLES DOBLES, CON TAPA METALICA, PUENTE Y TORNILLOS, 20 A.1.00478.3113I.E. INTERRUPTORES (SWITCHES) COMBINABLES SIMPLES, CON TAPA DE PLASTICO, PUENTE Y TORNILLOS, 25 A.1.00315.4314I.E. TOMACORRIENTES CON TAPA PLASTICA DOBLE 1 FASE 2O AMP1.00290.1815TRANSPORTE E INSTALACION DE TABLERO DE ELECTRICIDAD, 12 CIRCUITOS, MONOFASICO, TENSION DE TRABAJO 208/120 V, INTERRUPTOR PPAL 3 DE 25 KACC@240 V, 3 FASES, 5 HILOS, INTERRUPTORES SECUNDARIOS S/I, GABINETE NEMA 12, TIPO NAB1.005,127.7216I.E. LAMPARA FLUORESCENTE DE TECHO TIPO INDUSTRIAL, TIPO FS-2, LAMP-O-LUX O SIMILAR DE 2 X 40 W.6.0010,226.0417S/C DE SOBREPISO DE CEMENTO LISO, DE 7 CM DE ESPESOR54.0044,225.4618I.E. CABLE DE COBRE, TRENZADO, REVESTIDO, THW, CALIBRE 12 AWG (2.32 MM).100.009,369.0019LUMINARIA INCANDECENTE TIPO APLIQUE CON BOMBILLO 60 W. INSTALACION SUPERFICIAL6.003,372.5420I.E. CABLE DE COBRE, TRENZADO, REVESTIDO, THW, CALIBRE 8 AWG (3.71 MM)15.001,854.0021RECUBRIMIENTO EXTERIOR EN TECHOS CON TEJAS CRIOLLAS. INCLUYENDO MORTERO DE CEMENTO65.00105,255.1522S/I DE BREAKER DE 1 X 20 AMP4.001,623.0023S/I DE BREAKER DE 1 X 30 AMP TIPO FI3.001,372.3824I.E. CABLE DE COBRE, TRENZADO, REVESTIDO, THW, CALIBRE 10 AWG (2.95 MM)100.0010,684.0025PINTURA DE FONDO CROMATO DE ZINC EN PUERTAS METALICAS APLICADA CON BROCHA1.90210.7126PINTURA DE FONDO ANTICORROSIVO CROMATO DE ZINC EN VIGAS METALICAS DE ALMA LLENA.70.0011,354.7027I.E. CONSTRUCCION DE PUNTO PARA ELECTRICIDAD EN PAREDES Y TECHOS CON TUBERIA EMT DE 3/4" Y CABLE 12 THW (FIJADO SUPERFICIALMENTE)8.0012,388.0828I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA, TIPO EMT, EMBUTIDA. DIAMETRO 1/2 PLG (13 MM).25.004,209.7529SUMINISTRO, TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADAS DE HIERRO.1.907,220.3630S/T/C DE MARCOS DE CHAPA DOBLADA DE HIERRO, EN PAREDES DE BLOQUE DE 10 CM DE ESPESOR5.103,385.5831SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS CORREDERAS DE PERFILES DE HIERRO, CON PAO FIJO. SIN INCLUIR VIDRIO.5.0023,338.6532MONTAJE DE ESTRUCTURA METALICA DE ACERO CON CONEXIONES SOLDADAS600.0024,138.0033CERRADURA DE POMO, ACABADO CROMO BRILLANTE, CILINDRO FIJO, SIN CERROJO, PESTILLO DE SEGURIDAD. AMBOS POMOS CON LLAVE1.001,215.9334VARIACION DE PRECIOS (10%)1.0017,567.5735IMPUESTO AL VALOR AGREGADO (12,00%)1.0088,339.2936INSPECCION, SEGUIMIENTO Y CONTROL DE OBRA, (3,00%)1.0025,000.00TOTAL4400009856399683105322121432TOTALACUMULADO42500052356362324672856885000088000088000088000030000

&C

&R

CRONOGRAMA DEFCONSTRUCCIONES RIVER, CORIVER C.AOBRA: AMPLIACION ESCUELA PUEBLO NUEVO UBICADO EN LA PARROQUIA SAN RAFAEL DE ALCAZAR DEL MUNICIPIO OBISPO RAMOS DE LORA DEL ESTADO MERIDA (1era ETAPA)DURACION DE LA PARTIDADIA NO LABORALN DE CONTRATO: S/CNPRESUPUESTOCRONOGRAMA EN MESES ( 1 mes)ACTIVIDADCANTDsem. 1sem. 2sem. 3sem. 41SUMINISTRO, CONFECCION Y COLOCACION DE ESTRUCTURAS METALICAS DE VIGAS SIMPLES .INCLUYE SU TRANSPORTE HASTA 50 KM DE DISTANCIA.240.202SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURAS METALICAS DE CORREAS SIMPLES, INCLUYE SU TRANSPORTE HASTA 50 KM DE DISTANCIA465.103CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO LISO. INCLUYE FRISO BASE50.004COLOCACION DE REVESTIMIENTO DE MADERA MACHIHEMBRADO EN ESTRUCTURAS (TECHOS).65.005PINTURA DE FONDO ANTICORROSIVO PARA ELEMENTOS Y ESTRUCTURAS METALICAS.70.006PINTURA DE ESMALTE EN COLUMNAS METALICAS.10.007CONSTRUCCION DE REVESTIMIENTO EXTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO SALPICADO. INCLUYE FRISO BASE40.008PINTURA DE ESMALTE EN VIGAS METALICAS DE ALMA LLENA.64.009BARNIZ EN TECHOS DE MADERA. INCLUYE FONDO SELLADOR65.0010PINTURA DE CAUCHO INTERIOR EN PAREDES. INCLUYENDO FONDO ANTIALCALINO.56.0011PINTURA DE CAUCHO EXTERIOR EN PAREDES. INCLUYENDO FONDO ANTIALCALINO.72.0012I.E. INTERRUPTORES COMBINABLES DOBLES, CON TAPA METALICA, PUENTE Y TORNILLOS, 20 A.1.0013I.E. INTERRUPTORES (SWITCHES) COMBINABLES SIMPLES, CON TAPA DE PLASTICO, PUENTE Y TORNILLOS, 25 A.1.0014I.E. TOMACORRIENTES CON TAPA PLASTICA DOBLE 1 FASE 2O AMP1.0015TRANSPORTE E INSTALACION DE TABLERO DE ELECTRICIDAD, 12 CIRCUITOS, MONOFASICO, TENSION DE TRABAJO 208/120 V, INTERRUPTOR PPAL 3 DE 25 KACC@240 V, 3 FASES, 5 HILOS, INTERRUPTORES SECUNDARIOS S/I, GABINETE NEMA 12, TIPO NAB1.0016I.E. LAMPARA FLUORESCENTE DE TECHO TIPO INDUSTRIAL, TIPO FS-2, LAMP-O-LUX O SIMILAR DE 2 X 40 W.6.0017S/C DE SOBREPISO DE CEMENTO LISO, DE 7 CM DE ESPESOR54.0018I.E. CABLE DE COBRE, TRENZADO, REVESTIDO, THW, CALIBRE 12 AWG (2.32 MM).100.0019CAPA IMPERMEABILIZANTE EN LOSAS O PLACAS INCLINADAS CON MEMBRANA ASFALTICA MANTO DE ESPESOR 4 MM65.0020LUMINARIA INCANDECENTE TIPO APLIQUE CON BOMBILLO 60 W. INSTALACION SUPERFICIAL6.0021I.E. CABLE DE COBRE, TRENZADO, REVESTIDO, THW, CALIBRE 8 AWG (3.71 MM)15.0022RECUBRIMIENTO EXTERIOR EN TECHOS CON TEJAS CRIOLLAS. INCLUYENDO MORTERO DE CEMENTO65.0023S/I DE BREAKER DE 1 X 20 AMP4.0024S/I DE BREAKER DE 1 X 30 AMP TIPO FI3.0025I.E. CABLE DE COBRE, TRENZADO, REVESTIDO, THW, CALIBRE 10 AWG (2.95 MM)100.0026PINTURA DE FONDO CROMATO DE ZINC EN PUERTAS METALICAS APLICADA CON BROCHA1.9027PINTURA DE FONDO ANTICORROSIVO CROMATO DE ZINC EN VIGAS METALICAS DE ALMA LLENA.70.0028I.E. CONSTRUCCION DE PUNTO PARA ELECTRICIDAD EN PAREDES Y TECHOS CON TUBERIA EMT DE 3/4" Y CABLE 12 THW (FIJADO SUPERFICIALMENTE)8.0029I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA, TIPO EMT, EMBUTIDA. DIAMETRO 1/2 PLG (13 MM).25.0030SUMINISTRO, TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADAS DE HIERRO.1.9031S/T/C DE MARCOS DE CHAPA DOBLADA DE HIERRO, EN PAREDES DE BLOQUE DE 10 CM DE ESPESOR5.1032SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS CORREDERAS DE PERFILES DE HIERRO, CON PAO FIJO. SIN INCLUIR VIDRIO.5.0033MONTAJE DE ESTRUCTURA METALICA DE ACERO CON CONEXIONES SOLDADAS600.0034CERRADURA DE POMO, ACABADO CROMO BRILLANTE, CILINDRO FIJO, SIN CERROJO, PESTILLO DE SEGURIDAD. AMBOS POMOS CON LLAVE1.00

&C

&R

CURVA DE INVERSIONRIF: J-09036055-7GRAFICO DE INVERSIONMESMONTO171,273.242119,495.75379,231.01NSEMANASMONTO SEMANAL (Bs.)MONTO ACUMULADO (Bs.)(%) INCIDENCIA1SEMANA 1235,698.00235,698.0026.782SEMANA 2213,654.00449,352.0024.283SEMANA 3213,659.00663,011.0024.284SEMANA 4216,989.00880,000.0024.66880,000.00100.00SEMANA235,698.002213,654.003213,659.004216,989.00-363,011.008800000.00216,989.00

CURVA DE INVERSIONSEMANASSEMANASSEMANASSEMANAS

SEMANA 1SEMANA2SEMANA 3SEMANA 4MONTO EN BS

DESEMBOLSOCONSTRUCCIONES RIVER, CORIVER C.AOBRA: CONSTRUCCION DE AULA EN LA U.E BOLlVARIANA PUEBLO NUEVO

OBRA: CONSTRUCCION DE AULA EN LA U.E BOLlVARIANA PUEBLO NUEVON DE CONTRATO: S/CNPRESUPUESTOCRONOGRAMA EN MESES ( 1 mes)ACTIVIDADCANTDBSFANTICIPOsem. 1sem. 2sem. 3sem. 41REPLANTEO DE LA SUPERFICIE PARA UBICACION DE LA OBRA O SERVICIOS.88.0061.792EXCAVACION EN TIERRA A MANO PARA ASIENTO DE FUNDACIONES, ZANJAS U OTROS, HASTA PROFUNDIDADES COMPRENDIDAS ENTRE 0.00 Y 1.50 M.3.14583.473CARGA A MANO DE MATERIAL PROVENIENTE DE LAS EXCAVACIONES PARA ASIENTO DE FUNDACIONES, ZANJAS, U OTROS.3.46123.794COMPACTACION DE RELLENOS CON APISONADORES DE PERCUSION, CORRESPONDIENTE A LOS ASIENTOS DE FUNDACIONES, ZANJAS U OTROS.0.26230.425CONSTRUCCION DE BASE DE PIEDRA PICADA CORRESPONDIENTE A OBRAS PREPARATIVAS. INCLUYE EL SUMINISTRO Y TRANSPORTE DEL MATERIAL HASTA UNA DISTANCIA DE 50 KM.0.371,320.076CONCRETO DE F'C 200 KGF/CM2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA CONSTRUCCION DE BASES Y ESCALONES.1.624,230.48CONSTRUCCION DE MURO DE GAVIONES METALICOS. TIPO MACAFERRY O SIMILIAR , CON MALLA A DOBRE TORSION, TIPO 8X10, ALAMBRE 2.7MM DIMENSION 2.0X1.0X1.0, CON RECUBRIMIENTO TIPO GALFAN, RELLENO CON PIEDRA. INCLUYE EL TRANPORTE DE LA PIEDRA HASTA 50KM2.594,349.217CONCRETO DE FC 200 KGF/CM2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA CONSTRUCCION DE VIGAS DE RIOSTRA, TIRANTES Y FUNDACIONES DE PARED [CONCRETO PREPARADO EN OBRA]2.594,349.218CONCRETO DE F'C 200 KGF/CM2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA CONSTRUCCION DE BASE DE PAVIMENTO.8.174,472.969ENCOFRADO DE MADERA, TIPO RECTO, ACABADO CORRIENTE, EN CABEZALES DE PILOTES, BASES Y ESCALONES, PEDESTALES, VIGAS DE RIOSTRA, TIRANTES, FUNDACIONES DE PARED, LOSAS DE FUNDACION Y BASES DE PAVIMENTO.4.02419.9810S/T/C DE ANCLAJE DE FUNDACION FORMADO POR PLANCHA DE HIERRO 20X20 E=1/2" Y CUATRO CABILLAS DE 1/2"10.00661.3511SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLA IGUAL O MENOR DEL N 3 (DIAMETRO 3/8") PARA INFRAESTRUCTURA132.4848.6812SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 2800 KGF/CM2, UTILIZANDO CABILLA NO.4 A NO.7 (1/2" A 7/8"), PARA INFRAESTRUCTURA139.1650.2313SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE MALLA SOLDADA DE ACERO, PARA INFRAESTRUCTURA.134.8666.6114SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURAS METALICAS SIMPLES EN COLUMNAS, INCLUYE EL TRANSPORTE DE ELEMENTOS HASTA 50 KM DE DISTANCIA267.41110.1415I.E. TUBERIA PLASTICA RIGIDA PESADA, PVC, EMBUTIDA. DIAMETRO 1/2 PLG (13 MM)49.85879.4616SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURAS METALICAS DE CORREAS SIMPLES, INCLUYE SU TRANSPORTE HASTA 50 KM DE DISTANCIA540.5783.7117PINTURA DE ESMALTE EN COLUMNAS METALICAS.12.03183.3418PINTURA DE ESMALTE EN VIGAS METALICAS DE ALMA LLENA.16.16183.3419I.E. TUBERIA PLASTICA RIGIDA PESADA, PVC, EMBUTIDA. DIAMETRO 1/2 PLG (13 MM)49.85879.4620CONSTRUCCION DE PAREDES DE BLOQUES DE CONCRETO, ACABADO CORRIENTE, E= 15 CM NO INCLUYE MACHONES, DINTELES Y BROCALES.45.00671.70TOTAL14500040000400005000017500TOTALACUMULADO145000185000225000275000292500

&C

&R

CRONOGRAMA (2)CONSTRUCCIONES RIVER, CORIVER C.AOBRA: CONSTRUCCION DE AULA EN LA U.E BOLlVARIANA PUEBLO NUEVO

OBRA: CONSTRUCCION DE AULA EN LA U.E BOLlVARIANA PUEBLO NUEVOLEYENDADURACION DE LA PARTIDADIA NO LABORALN DE CONTRATO: S/CNPRESUPUESTOCRONOGRAMA EN MESES ( 1 mes)ACTIVIDADCANTDBSFsem. 1sem. 2sem. 3sem. 41REPLANTEO DE LA SUPERFICIE PARA UBICACION DE LA OBRA O SERVICIOS.88.0061.792EXCAVACION EN TIERRA A MANO PARA ASIENTO DE FUNDACIONES, ZANJAS U OTROS, HASTA PROFUNDIDADES COMPRENDIDAS ENTRE 0.00 Y 1.50 M.3.14583.473CARGA A MANO DE MATERIAL PROVENIENTE DE LAS EXCAVACIONES PARA ASIENTO DE FUNDACIONES, ZANJAS, U OTROS.3.46123.794COMPACTACION DE RELLENOS CON APISONADORES DE PERCUSION, CORRESPONDIENTE A LOS ASIENTOS DE FUNDACIONES, ZANJAS U OTROS.0.26230.425CONSTRUCCION DE BASE DE PIEDRA PICADA CORRESPONDIENTE A OBRAS PREPARATIVAS. INCLUYE EL SUMINISTRO Y TRANSPORTE DEL MATERIAL HASTA UNA DISTANCIA DE 50 KM.0.371,320.076CONCRETO DE F'C 200 KGF/CM2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA CONSTRUCCION DE BASES Y ESCALONES.1.624,230.48CONSTRUCCION DE MURO DE GAVIONES METALICOS. TIPO MACAFERRY O SIMILIAR , CON MALLA A DOBRE TORSION, TIPO 8X10, ALAMBRE 2.7MM DIMENSION 2.0X1.0X1.0, CON RECUBRIMIENTO TIPO GALFAN, RELLENO CON PIEDRA. INCLUYE EL TRANPORTE DE LA PIEDRA HASTA 50KM2.594,349.217CONCRETO DE FC 200 KGF/CM2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA CONSTRUCCION DE VIGAS DE RIOSTRA, TIRANTES Y FUNDACIONES DE PARED [CONCRETO PREPARADO EN OBRA]2.594,349.218CONCRETO DE F'C 200 KGF/CM2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA CONSTRUCCION DE BASE DE PAVIMENTO.8.174,472.969ENCOFRADO DE MADERA, TIPO RECTO, ACABADO CORRIENTE, EN CABEZALES DE PILOTES, BASES Y ESCALONES, PEDESTALES, VIGAS DE RIOSTRA, TIRANTES, FUNDACIONES DE PARED, LOSAS DE FUNDACION Y BASES DE PAVIMENTO.4.02419.9810S/T/C DE ANCLAJE DE FUNDACION FORMADO POR PLANCHA DE HIERRO 20X20 E=1/2" Y CUATRO CABILLAS DE 1/2"10.00661.3511SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLA IGUAL O MENOR DEL N 3 (DIAMETRO 3/8") PARA INFRAESTRUCTURA132.4848.6812SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 2800 KGF/CM2, UTILIZANDO CABILLA NO.4 A NO.7 (1/2" A 7/8"), PARA INFRAESTRUCTURA139.1650.2313SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE MALLA SOLDADA DE ACERO, PARA INFRAESTRUCTURA.134.8666.6114267.41110.1415324.01120.9216540.5783.711712.03183.3418PINTURA DE ESMALTE EN VIGAS METALICAS DE ALMA LLENA.16.16183.3419I.E. TUBERIA PLASTICA RIGIDA PESADA, PVC, EMBUTIDA. DIAMETRO 1/2 PLG (13 MM)49.85879.4620CONSTRUCCION DE PAREDES DE BLOQUES DE CONCRETO, ACABADO CORRIENTE, E= 15 CM NO INCLUYE MACHONES, DINTELES Y BROCALES.45.00671.70