CRONOGRAMA VALORIZADO

Embed Size (px)

DESCRIPTION

cronograma

Citation preview

Sheet1CRONOGRAMA PROGRAMADO DE DESEMBOLSOPROYECTO: "MANTENIMIENTO DE LA CARRETERA VISTA HERMOSA - ACHAWAY ALTO - TOLOPAMPA - CRUCE EL PARCO - AMAZONAS- BAGUA CHICA - AMAZONAS"FECHA: MAYO DEL 2014TIEMPO:60 DiasMES 01MES 02TOTALItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)1ra Semana2da Semana3ra Semana4ta Semana5ta Semana6ta Semana7ma Semana8va Semana9na Semana01TRABAJOS PRELIMINARES13,033.0313,033.0301.01CAMPAMENTO PARA MAQUINARIAm272.00116.148,362.087,525.87836.210.000.000.000.000.000.000.008,362.0801.02CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 4.80 mund1.001,156.711,156.711,156.710.000.000.000.000.000.000.000.001,156.7101.03MOVILIZACION Y DESMOVILIZACION DE EQUIPOglb1.003,514.243,514.240.003,514.240.000.000.000.000.000.000.003,514.2402PLATAFORMA303,832.75303,832.7502.01REPOSICION DE AFIRMADO303,832.75303,832.7502.01.01MATERIAL PARA AFIRMADO190,753.92190,753.9202.01.01.01EXTRACCION Y APILAMIENTO DE MATERIAL DE CANTERA (AFIRMADO)m38,208.002.9724,377.760.000.005,363.115,363.115,363.115,363.112,925.330.000.0024,377.7602.01.01.02ZARANDEOm38,208.003.4628,399.680.000.003,123.965,679.945,679.945,679.945,679.942,555.970.0028,399.6802.01.01.03CARGUIO DE MATERIALm38,208.003.2326,511.840.000.002,120.955,302.375,302.375,302.375,302.373,181.420.0026,511.8402.01.01.04TRANSPORTE DE MATERIAL DE CANTERAm3-km8,208.0013.58111,464.640.000.0015,923.5219,108.2219,108.2219,108.2219,108.2219,108.220.00111,464.6402.01.02ESCARIFICADO Y CONFORMACION DE LA PLATAFORMAm234,200.001.7459,508.000.007,736.0412,942.9912,942.9912,942.9912,942.990.000.000.0059,508.0002.01.03EXTENDIDO DEL MATERIALm234,200.000.6221,204.000.000.000.003,816.723,816.723,816.723,816.723,816.722,120.4021,204.0002.01.04AGUA PARA RIEGOm3930.7913.8312,872.830.000.000.001,700.002,293.212,293.212,293.212,293.212,000.0012,872.8302.01.05COMPACATACION DEL MATERIALm234,200.000.5719,494.000.000.000.002,100.003,648.503,648.503,648.503,648.502,800.0019,494.0003OBRAS DE DRENAJE12,596.0012,596.0003.01CUNETAS LONGITUDINALES EN MATERIAL SUELTOm13,400.000.9412,596.000.000.001,700.002,724.002,724.002,724.002,724.000.000.0012,596.0004VARIOS146.440.000.000.00146.4404.01LIMPIEZA DE ALCANTARILLASund5.0012.0060.000.000.000.000.000.000.000.0060.000.0060.0004.02LIMPIEZA DE BARANDAS DE PUENTES Y PONTONESund4.0021.6186.440.000.000.000.000.000.000.0086.440.0086.44COSTO DIRECTO329608.22PROGRAMADO8682.58212086.48841174.529258737.345260879.052760879.052745498.286734750.48356920.4329608.22PORCENTAJE PROGRAMADO2.63%3.67%12.49%17.82%18.47%18.47%13.80%10.54%2.10%100.00%ACUMULADO8682.58220769.0761943.5992120680.9444181559.9971242439.0498287937.3365322687.82329608.22PORCENTAJE ACUMULADO2.63%6.30%18.79%36.61%55.08%73.55%87.36%97.90%100.00%