    Installation Guide

    65

    43

    2 2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    1516

    17

    18

    19

    20

    21

    22

    2

    12

    34

    56

    7

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

    Cutting Panels

    To cut DensGlass Gold, score and snaplike regulardrywall.

    Installation

    Install DensGlass Gold vertically or horizontally asrequired by designfor specific fire assemblies andsheerwall applications on either steel or wood studs. Seespacingrequirements below.

    Overview

    DensGlass Gold exterior sheathing is the preferred

    substrate under brick, stone, stucco, EIFS andsidingbecause of its exemplary track record. DensGlass Goldsheathing shouldbe specified for anyproject whereflexibility and easy sheathinginstallation are paramount,without the problems andexpense of delamination,deterioration, sagging andwarping.

    Gua de Instalacin

    continued Continua

    Ayudndole a Construir MejorMejores Casas...

    Mejores Negocios...Mejores Vidas

    Install DensGlass Gold sheathingwith joints staggered.Ends andedges of sheathing should fit tightly.

    Maximumstud spacing

    Size Cladding Spacing

    1/2" DensGlass Gold EIFS 16" o.c.(oncenter)

    All other Claddings 24" o.c.

    5/8" DensGlass Gold All Claddings 24" o.c.

    Choose the Correct Fastener for the Project

    Use the table todetermine the correct fastener for your

    project.

    Length Des cr ipti on Appl ic ati on1/2" Thick 5/8" Thick

    1" 1-1/4" Bugle headfine thread, DensGlass Gold

    rust-resistant, drill sheathing to

    point drywall screw heavy-gaugesteel

    1" 1-1/4" Bugleheadfine DensGlass Gold

    thread, rust-resistant, sheathingto

    sharppointdrywall light-gauge metal

    screw framing furring

    1-1/4" 1-1/4" Wafer head, DensGlass Gold

    rust-resistant screws, sheathingto

    drill or sharppoint heavy-gauge orlight-gauge, metal

    orwood, respectively

    1-1/2" 1-3/4" Hot dip11-gauge, DensGlass Gold

    galvanized7/16" sheathing towood

    headnail framingor equivalent

    Fasteners shouldbe drivenflushwithpanel surface(not countersunk) andintothe framingsystem. Locatefasteners at least 3/8" fromends andedges of thesheathing.

    VisionGeneral

    La cubierta exterior DensGlass Gold es el substrato preferidobajo ladrillo, piedra, estuco,

    EIFS y revestimientos exteriores, gracias a sus antecedentes ejemplares. La cubierta DensGlassGold debe ser la especificada para cualquier proyectoen el que la flexibilidady fcil instalacinde la cubierta sean de suma importancia, sin los problemas de delaminacin, deterioro ycombado.

    Corte de los Paneles

    Para cortar el DensGlass Gold, marquey parta igual que conel drywall corriente.

    Instalacin

    Instale el DensGlass Goldvertical u horizontalmentedependi-endo de cmo lo exija el diseo para ensamblajes especficoscontra incendio, y aplicaciones de paredes delgadas, bienseasobre montantes de acero o de madera. Ver a continuacin lorequerimientos de distancias o espaciado.

    Instale la cubierta DensGlass Gold con juntas escalonadas. Las puntas y los bordes de la cubiertadeben encajar ajustadamente.

    Espacio Mximo entre los Montantes

    Tamao Revestimiento Espacio

    DensGlass Goldde EIFS 40,64cmo.c.1,27 cm (en el centro)

    Todos los dems 60,96cmo.c.Revestimientos

    DensGlass Goldde Todos los 60,96 cmo.c.1,59 Revestimientos

    Escoja el S ujetador Correcto para su Proyecto

    Use la tabla a continuacin para determinar el sujetador apropiado para su proyecto.

    Longitud Descripcin Aplicacin

    1,27 cm de 1,59cm deGrosor Grosor

    1,27 cm 1,27 cm- Tornillopara drywall con cabeza de Cubierta DensGlass Gold

    0,64cm corneta, finamente tratado, resistente para acerode calibre grueso

    al xido

    1,27cm 1,27cm- Tornillopara drywall con cabeza de Cubierta DensGlass Gold

    0,64cm corneta, finamente tratado, esistente para las costillas de la

    al xido estructura de metal de calibre

    ligero

    1,27 cm- 1,27 cm- Tornillos concabeza Cubierta DensGlass Gold

    0,64 cm 0,64 cm de disco, resistentes al para metal de calibregrueso

    xidode punta afilada omaderade calibre ligero

    1,27 cm- 1,27cm- Clavoconcabeza de 1,1 Cubierta DensGlass

    0,64cm 0,75cm cmgalvanizadode Goldpara estructura de

    calibre 11 madera o equivalent

    Los sujetadores se debenclavar a nivel con la superficie del panel (sin avellanar)y dentrodel sistema de la estructura. Coloquelos sujetadores a porlo menos0,95 cm. de distancia de los extremos yde los bordes de la cubierta.

    www.mundoseco.com.a

  • 7/22/2019 Dens Glass Instalacion.pdf

    2/2

    DensGlass Gold ExteriorSheathing Wall Framing

    For 5/8", 24" o.c. maximumframing spacing.

    For 1/2", 16" maximumframingspacing.

    Use metal track whenusing metalstuds.

    Horizontal ApplicationAplicacinHorizontal

    Vertical ApplicationAplicacin Vertical

    48"48"

    Plac e Fasteners

    For woodand steel framingplace fasteners8" ono.c. around the perimeterandalongthe intermediate studs for both 1/2" and5/8" boardwhen racking shear is notrequired.

    For wood stud shear walls, place fasteners4" o.c. aroundthe perimeterof eachpaneland8" o.c. along intermediate studs.

    Always apply board parallel toframing.

    1,27 cm, 40,64 cm o.c.Ajustadores de la Estructura

    de 20,32 cm o.c. paraEstructuras de Madera o Acero.

    8' 8"

    16" 16" 16"

    4'

    1,59 cm, 60,96 cm o.c.Ajustadores de la Estructura

    de 20,32 cm o.c. paraEstructuras de Madera o Acero.

    1/2"; 16" o.c. FramingFasteners 8" o.c.

    Wood or Steel Framing

    5/8"; 24" o.c. FramingFasteners 8" o.c.

    Wood or Steel Framing

    8' 8"

    24" 24"

    4'

    1/2"; 16" o.c. FramingFasteners 8" o.c.

    Shear Wall Wood Frame Only

    8' 4"

    8"

    16" 16" 16"

    4'

    24" 24"

    5/8"; 24" o.c. FramingFasteners 8" o.c.

    Shear Wall Wood Frame Only

    1,27 cm, 40,64 cm o.c.Ajustadores de la Estructura

    de 20,32 cm o.c. paraEstructuras de Madera o Acero.

    1,59 cm, 60,96 cm o.c.Ajustadores de la Estructura

    de 20,32 cm o.c. paraEstructuras de Madera o Acero.

    8' 4"

    8"

    4'

    Using DensGlass Gold for Soffits

    To use DensGlass Goldin soffits, place 1/2" panel24 o.c. maximumand apply perpendicular toframing.

    If 1/2" panel is applied parallel to the framing, theframe space should not exceed16" o.c.

    For 5/8" DensGlass Gold, place board 24" o.c.maximumfor parallel or perpendicular application.

    Fasten 8" o.c. along framingoras required bydesignwhenusing screws.

    Finishing DensGlass Gold in SoffitsFinish DensGlass Gold joints using2" wide fiber-glass mesh tape and90 minute joint compound.

    Skimtheentire surface with the 90 minutecompound andprime with exterior grade primer.

    Apply twocoats of exterior grade paint.

    For synthetic type direct applied finish system,follow coating manufacturers recommendations.

    A. DensGlass GoldSheathingB. 2" 10 x 10Glass MeshTape

    C. ReinforcingMesh/Base Coat

    D. Drip Edge

    E. ToughRock Setting Compound*

    F. BaseCoat

    G. Finish Coat*Sandable settingcompounds are not recommended.

    A

    DC

    F

    G

    A

    D

    B

    E

    G

    El Marco para Cubierta Exteriorde DensGlass Gold:

    Para paneles de 1,6 cm. (5/8")el espacio del marco debe sermxi mo de 60,96 cm. (24") de c entroa centro (oc)

    Para paneles de 1,27 cm. (1/2")el espacio del marco debe sermxi mo de 40,64 cm. (16") de c entro

    a centro.

    Use unriel metlicocuando use mon-tantes metlicos

    Coloque los Sujetadores

    Para estructuras de madera y acerocoloquelossujetadores a 20,23 cm. de centroa centroyalrededor del permetro y a lo largo de la vigaintermedia para ambos paneles de 1/2 y 5/8cuando nose requiera estantes cortados.

    Para paredes cortadas demontantes de madera,coloque los sujetadores a 10,16 cm. o.c. alrededordel permetrode cada panel, y a 20,23 cm. a lo

    largodelos montantes intermedios. Siempreaplique los tableros enparaleloa la estructura.

    Uso de DensGlass Gold para S offitos

    Para usar el DensGlass Gold enplafones, coloqueunpanel de 1,27cm. a una distancia mxima de 61 cm.o.c., y aplquelos perpendiculares a la estructura.

    Si el panel de 1,27 cm. se aplica paraleloa la estructura,el espaciado de la estructura nodebe exceder 40,64cm. o.c.

    Para paneles de 1,6 cm. de DensGlass Gold paraaplicacin paralela o perpendicular colquelo a mximo61 cm. o.c.

    Ajuste cada 20,32 cm. o.c. a lo largo de la estructurao como lo requiera el diseocuando se usentornillos.

    Terminando el DensGlass Gold en Plafones

    Termine las juntas del DensGlass Goldusando cintaentramada de fibra de vidriode 5,08cm. y con elcompuesto para juntas de 90 minutos.

    Cubra completamente la superficie conel compuesto de90 minutos y apreste con un aprestode grado exterior.

    Aplique dos capas de pintura para exteriores.

    Para un sistema de terminado de tipo sinttico, y deaplicacin directa, siga las recome daciones derecubrimientodel fabricante.

    A. Cubierta DensGlass Gold

    B. Cinta Entramada de Fibra de Vidrio de 5,08cm10x 10

    C. Malla de Refuerzo/Capa Base

    D. Borde de Goteo

    E. Compuesto Endurecedor ToughRock *

    F. Para Base

    G. Capa de Terminado*No se recomiendan compuesto endurecedores li jables.