DESAGREGADO DE GASTOS PARA CULMINAR LA O ESPECIFICA INSUMO 2.6.2.3.5.4 BIENES 2.6.2.3.5.4 BIENES BIENES REQUERIDOS 2.6.2.3.5.3 PERSONAL PLANILLA CD(NOV,DIC) PANILLA NOVIEMBRE PLANILLA DICIEMBRE 2.6.2.3.5.3 PERSONAL PLANILLA GG(NOV,DIC) RESIDENTE ASISTENTE TECNICO ASISTENTE ADMINISTRATIVO 2.6.2.3.5.3 PERSONAL PLANILLA GS INSPECTOR DE OBRA ESPECIFICA INSUMO GS 2.6.8.1.4.3 SERVICIO 2.6.8.1.4.3 SERVICIO SERVICIO DE TRANSPORTE 2.6.8.1.4.3 SERVICIO LEVANTAMIENTO TOPOGRAFICO RESUMEN 2.6.2.3.5.4 BIENES 2.6.2.3.5.5 SERVICIO 26.23.53 PERSONAL(PLANILLAS CD) 26.23.53 PERSONAL (PLANILLA GG) 26.81.43 PERSONAL (PLANILLA GS) TOTAL ASIGNACION REQUERIDA PRESUPUESTO DE OBRA TOTAL ASIGNADO SALDO PIM 12-11-15 SALDO POR REASIGNAR SALDO PRESUPUESTAL A LA FECHA TOTAL REASIGNADO NECESARIA

DESAGREGADO PROGRAMADO (2)

Embed Size (px)

DESCRIPTION

DESAGREGADO DE GASTO EJECUTADO PROYECTADO

Citation preview

Page 1: DESAGREGADO PROGRAMADO (2)

DESAGREGADO DE GASTOS PARA CULMINAR LA OBRA S.B.I UMASBAMBA .

ESPECIFICA INSUMO

2.6.2.3.5.4 BIENES

2.6.2.3.5.4 BIENES BIENES REQUERIDOS

2.6.2.3.5.3 PERSONAL PLANILLA CD(NOV,DIC)

PANILLA NOVIEMBRE

PLANILLA DICIEMBRE

2.6.2.3.5.3 PERSONAL PLANILLA GG(NOV,DIC)

RESIDENTE

ASISTENTE TECNICO

ASISTENTE ADMINISTRATIVO

2.6.2.3.5.3 PERSONAL PLANILLA GS

INSPECTOR DE OBRA

ESPECIFICA INSUMO GS

2.6.8.1.4.3 SERVICIO

2.6.8.1.4.3 SERVICIO SERVICIO DE TRANSPORTE

2.6.8.1.4.3 SERVICIO LEVANTAMIENTO TOPOGRAFICO

RESUMEN

2.6.2.3.5.4 BIENES

2.6.2.3.5.5 SERVICIO

26.23.53 PERSONAL(PLANILLAS CD)

26.23.53 PERSONAL (PLANILLA GG)

26.81.43 PERSONAL (PLANILLA GS)

TOTAL ASIGNACION REQUERIDA

PRESUPUESTO DE OBRA

TOTAL ASIGNADO SALDO PIM 12-11-15SALDO POR REASIGNARSALDO PRESUPUESTAL A LA FECHATOTAL REASIGNADO NECESARIA

Page 2: DESAGREGADO PROGRAMADO (2)

DESAGREGADO DE GASTOS PARA CULMINAR LA OBRA S.B.I UMASBAMBA .

UND CANT P.U PARCIAL

S/. 70,540.00

GLB 1 S/. 70,540.00 S/. 70,540.00

PLANILLA CD(NOV,DIC) S/. 3,864.70

PANILLA NOVIEMBRE 1 S/. 48,060.00 S/. 48,060.00

PLANILLA DICIEMBRE 1 S/. 24,030.00 S/. 24,030.00

S/. 72,090.00

PLANILLA GG(NOV,DIC) S/. 19,200.00

RESIDENTE 2 S/. 5,500.00 S/. 11,000.00

ASISTENTE TECNICO 2 S/. 2,300.00 S/. 4,600.00

ASISTENTE ADMINISTRATIVO 2 S/. 1,800.00 S/. 3,600.00

PLANILLA GS S/. 12,000.00

2 S/. 6,000.00 S/. 12,000.00

UND CANT P.U PARCIAL

S/. 7,600.00

GLB 1 S/. 3,000.00 S/. 3,000.00

GLB 1 S/. 800.00 S/. 800.00

S/. 3,800.00

RESUMEN

S/. 70,540.00

S/. 3,800.00

S/. 72,090.00

S/. 19,200.00

S/. 12,000.00

S/. 177,630.00

S/. 1,033,926.05

S/. 798,000.00

S/. 235,926.05

S/. 73,142.43

S/. 104,487.57

Page 3: DESAGREGADO PROGRAMADO (2)

DESAGREGADO DE GASTOS DE OBRA S.B.I UMASBAMA.,BIENES COSTO UNIT CANT UND

PIEDRA CHANCADA 130 42 M3

CONFITILLO 130 56 M3

ARENA FINA 180 36 M3

ACCESORIOS TUBERIAS 11000 1 GLB

UTILES ESCRITORIO 2000 1 GLB

MADERAMEN 4000 1 GLB

FIERRO 22.5 300 VAR

ESCALERA GALVANIZADA 450 1 UND

PINTURAS Y THINER 65 130 GLN

DISEÑO DE MEZCLAS 1 1500 GLB

ALQUILER DE COMPRESORA 25 30 GLB

CEMENTO 27 560 BLS

TANQUE DE AGUA 500 1 UND

PLACA RECORDATORIA 800 1 UND

TOTAL

PERSONAL COSTO DIRECTO (NOVIEMBRE-DICIEMBRE)

NOVIEMBRE

PERSONAL CD CANT COSTO MES PARCIAL

PEONES 17 1200 S/. 20,400.00OPERARIOS 12 1500 S/. 18,000.00OFICIALES 6 1300 S/. 7,800.00MAESTRO DE O 1 1860 S/. 1,860.00

TOTAL S/. 48,060.00DICIEMBRE

PERSONAL CD CANT COSTO 15 DIAS PARCIAL

PEONES 17 600 S/. 10,200.00OPERARIOS 12 750 S/. 9,000.00OFICIALES 6 650 S/. 3,900.00MAESTRO DE O 1 930 S/. 930.00

TOTAL S/. 24,030.00

Page 4: DESAGREGADO PROGRAMADO (2)

DESAGREGADO DE GASTOS DE OBRA S.B.I UMASBAMA.,PARCIAL

S/. 5,460.00S/. 7,280.00S/. 6,480.00

S/. 11,000.00S/. 2,000.00S/. 4,000.00S/. 6,750.00S/. 450.00

S/. 8,450.00S/. 1,500.00S/. 750.00

S/. 15,120.00S/. 500.00S/. 800.00

S/. 70,540.00