110
Comprehensive Solutions / Equipment and interior design Hotels, Hospitals, Airports, Offices, Museums, Restaurants, Geriatrics... January 2015

Dossier Área 3 - Inglés 2015

Embed Size (px)

DESCRIPTION

Presentation of projects implemented by Area 3 Equipment, and Interior Design. Design: Martin Felix Massa

Citation preview

Page 1: Dossier Área 3 - Inglés 2015

Comprehensive Solutions / Equipment and interior designHotels, Hospitals, Airports, Offices, Museums, Restaurants, Geriatrics...

January

2015

Page 2: Dossier Área 3 - Inglés 2015
Page 3: Dossier Área 3 - Inglés 2015

Parador de Cádiz - Commun zones

Comprehensive Solutions / Equipment and interior designHotels, Hospitals, Airports, Offices, Museums, Restaurants, Geriatrics...

Page 4: Dossier Área 3 - Inglés 2015

ÁREA 3

Elecnor, through its subsidiary, ÁREA 3, has incorporated Interior Design, Design and Equipment in theGroup’s activities. As a complementary activity to construction it puts all the pieces together, making itpossible to provide a service that is both comprehensive and specialized.In both new construction and renovation projects, ÁREA 3 contributes added value; in its capacity asan interior designer it is able to achieve an extra level of detail, an optimization of space and aestheticharmony with the building’s architecture, placing an emphasis on functionality or end use and subse-quentmaintenance.ÁREA 3 develops projects in collaboration with other work teams in the Elecnor Group, performing allthe interior design activities in global projects, in addition to undertaking projects independently that areexclusively 100% interior design work.The Elecnor Group has been working on interior design projects for over 10 years. The creation ofÁREA 3 brings these professionals together under a distinctive identity and brand.Over the years, we have acquired experience in a variety of activity sectors:

Renovation and adaptation of spaces

Corporate Offices and Buildings

Hospitality, Leisure and Restaurant Industry

Educational Centres and Libraries

Social Centres, Health Care and Hospital Facilities

Airports and Large Public Venues

Museums, Ephemeral Architecture and Interpretation Centres

Services and Solutions

ÁREA 3 specializes in Interior Design and Equipment for all types of undertakings.The company’s main focus is on spaces intended for public use, in both large-scale and small-scaleprojects.

We collaborate with our clients from the moment of decision to undertake a project to cover a specificneed, to the complete implementation of the project.

We also provide solutions regarding: - Use of space - Selection of materials - Design of special and/or standard equipment - Selection of technical equipment - Adaptation or renovation of the above.

All with a clear objective of aesthetic integration and functionality.We are one of the best alternatives for services in the field of interior architecture, design, implementationand the comprehensive equipping of spaces.

Zen garden Malaga Airport

Page 5: Dossier Área 3 - Inglés 2015

The Team

The ability of a company to contribute added value depends on the choice of its teams. ÁREA 3 hasprofessionals that are prepared to embrace the corporate project, with interests that enrich the work andthe overall outcome.

The team is made up of a variety of technical profiles (design, production and management / administra-tion) and has an organizational structure that is designed and based on ongoing teamwork and a singlegoal. There is a constant interrelationship between design and production, with both areas providingmutual feedback and consequently enriching the project at every stage. The work of the team, inpermanent contact with the client, focuses on providing the best personalized solutions.

We cover all the needs of our clients, providing the necessary experience in global solutions from designto implementation and, in some cases, start-up and subsequent maintenance.

In each job, right from the start, we work closely with both the client and the project planning team,placing the expertise of ÁREA 3 at their disposal to provide the necessary solutions during thedevelopment of any implementation.

Only in this way, with enthusiasm and trust, with teamwork and individuality, is it possible for creativityand innovation to emerge naturally.

Interior Architecture Projects- Personalized proposals

Integration with the environment and the Corporate Identity

- End-use awareness

Comprehensive EquipmentFurniture for all uses:

- Standard- Special customized manufacture

- Accessories- Audiovisual media

- Signs and application of corporate image

ImplementationTraditional construction work:

- Masonry- Installations and lighting

- Stationary and modular partition walls- Ceilings and floors

- Claddings

Decoration- Decorative items

- Single items

Activity Sectors

ÁREA 3 has successfully completed numerous projects, addressing activities related to food service,offices, waiting areas, lockers and dressing rooms, authority rooms, airport equipment, hotels,museums, libraries, geriatrics and all sorts of equipment for public and/or restricted areas.

We are constantly growing, consolidating our presence in multiple sectors, while at the same timediversifying our interior design activities in all aspects and promoting new guidelines for quality andsafety.

Page 6: Dossier Área 3 - Inglés 2015

Quality and the Environment

ÁREA 3 has sought to infuse its Environmental and Quality policies with maximum rigour and a commonmission: the continuous improvement of the organization.

The Management System is configured in accordance with two sets of criteria:

- A precise knowledge of the nature and magnitude of environmental impact, customer requirements and the occupational risks inherent in the activities and products of ÁREA 3.

- Strict compliance with current applicable legislation and other requirements to which ÁREA 3 subscribes in any market in which it operates.

Based on these common goals, the Management System establishes commitments and specific linesof action per area.

Quality

Quality is a top priority for ÁREA 3. It is the differentiating factor in a highly competitive market.

Within the Elecnor Group, each subsidiary is adapted to the specific characteristics of its business areaand activity, although they all share common lines of action in their quality management systems. The most prevalent are:

- Development of initiatives and actions aimed at improving the quality of service provided.

- Setting of goals with regard to quality and ensuring their fulfilment.

Environment

ÁREA 3 is committed to protecting the environment, a commitment that guides our activity.

The work carried out by Ehisa and ÁREA 3 blends harmoniously and respectfully with the environment,earning us certification under the UNE-EN ISO 14001 standard.

The environmental priorities are identified in each subsidiary and the necessary policies and actions fortheir compliance are put in place.

view of row of check-in counters

Page 7: Dossier Área 3 - Inglés 2015
Page 8: Dossier Área 3 - Inglés 2015

overview

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

REMODELLING AND EQUIPMENTRESTAURANTE ALABASTER

ALABASTER S.L.

Madrid / 2014

€330,751.49

Project development and complete remodelling of Restaurante Alabaster in Madrid.

Work included new electrical installations, air-conditioning, plumbing and fire protection system. It also involved all vertical and horizontal surfaces, metalwork and woodwork and additional accessories required to make the location serviceable.

Page 9: Dossier Área 3 - Inglés 2015

RES

TAU

RA

NT

ALA

BA

STE

R

Page 10: Dossier Área 3 - Inglés 2015

sign

dining room

dining room

wine cellar

dining room

dining room and wine cellar

1

2

3

4

1

3

56

Page 11: Dossier Área 3 - Inglés 2015

2

5

6

4

Page 12: Dossier Área 3 - Inglés 2015

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

LAST MINUTE POINT ATOCHA RENFE STATION

RENFE VIAJEROS S.A.

Madrid / 2014

€49,894.00

Renovation of the new boarding area and Last Minute Point at Atocha Station in Madrid.

Work involved flooring and panelling (graphic design included), new backup LED lighting, Last Minute Point equipment/counter, as well as the integration of all ancillary equipment and elements.

overview

Page 13: Dossier Área 3 - Inglés 2015

LAS

T M

INU

TE P

OIN

T AT

OC

HA

Page 14: Dossier Área 3 - Inglés 2015

detail seat

overview

detail counter

rest area

detail seat

rest area

1

2

3

4

5

6

1

Page 15: Dossier Área 3 - Inglés 2015

2 3

4

5 6

Page 16: Dossier Área 3 - Inglés 2015

overview

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

TAX OFFICE SERVICE COUNTERS

TAX OFFICE

Valladolid / 2014

€49,080.90

Manufacture and installation of service cou-nters, consultation lecterns and consultation tables/lecterns for the Tax Office’s New Special Delegation for Castile and León in Valladolid.

Page 17: Dossier Área 3 - Inglés 2015

AG

ENC

IA T

RIB

UTA

RIA

Page 18: Dossier Área 3 - Inglés 2015

detail counter

interior counters

rest area

exterior view

counters

1

2

3

4

5

1

44

Page 19: Dossier Área 3 - Inglés 2015

5

2

3

Page 20: Dossier Área 3 - Inglés 2015

exterioroverview

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

EQUIPMENT FOR THE PORTO DO MOLLE CO-WORKING CENTRE AND BUSINESS INCUBATOR

VIGO FREE ZONE

Nigrán, Pontevedra / 2014

€171,757.92

Renovation of the new co-working centre and office equipment for the business incubator in the Porto do Molle Business Park in Nigrán (Pontevedra).

Work at the co-working centre included supplying and installing new flooring and general lighting. The centre was fitted with both standard and custom-manufactured equipment to make it serviceable.

As for the business incubator, it was fitted with 78 complete workstations.

Page 21: Dossier Área 3 - Inglés 2015

WO

RK

ING

CEN

TRE

Page 22: Dossier Área 3 - Inglés 2015

vista terraza habitación

habitación tipo + terraza

habitación tipo + mueble aparador

habitación tipo + terraza

habitación tipo + cama supletoria

habitación tipo + terraza

1

2

3

4

5

1

5

3

6

Page 23: Dossier Área 3 - Inglés 2015

2

4

6

Page 24: Dossier Área 3 - Inglés 2015

overview

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

ADAPTATION OF SHOPPING PLAZASIN TERMINALS T4 AND T4S AT ADOLFO SUÁREZ-BARAJAS AIRPORT IN MADRID

AENA

Madrid / 2013

Madrid / 2013

Project development and renovation of the new shopping plazas in Terminals T4 and T4S at Adolfo Suárez-Barajas Airport in Madrid.

The project included new installations and supports for monitors and lighting, new flooring and ancillary equipment (special benches, loading tables and accessories).

The content due to be projected and the six-monthly updates were also determined.

Page 25: Dossier Área 3 - Inglés 2015

SH

OP

PIN

G P

LAZA

S T

4

Page 26: Dossier Área 3 - Inglés 2015

videowall and structure

overview

detail seats

overview

connecting point

1

2

3

4

5

1

44

Page 27: Dossier Área 3 - Inglés 2015

5

2

3

Page 28: Dossier Área 3 - Inglés 2015

view blue space

view green space

view orange space

union spaces

1

2

3

4

1

3

Page 29: Dossier Área 3 - Inglés 2015

2

4

Page 30: Dossier Área 3 - Inglés 2015

overview

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

EQUIPMENT AND FURNITURE FOR THE BORN CULTURAL CENTRE MUSEUM PROJECT

BIM/SA

BIM/SA

€107,910.91

Supply and installation of equipment for the Born Cultural Centre’s new museum space in Barcelona, including furniture for meeting areas, waiting areas, storerooms and dressing rooms, as well as a mobile stage for events.

Page 31: Dossier Área 3 - Inglés 2015

CU

LTU

RA

L C

ENTR

E B

OR

N

Page 32: Dossier Área 3 - Inglés 2015

interior overview

stage and grandstand

bench

folding tables

meeting room

1

2

3

4

5

1

44

Page 33: Dossier Área 3 - Inglés 2015

5

2

3

Page 34: Dossier Área 3 - Inglés 2015

overview

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

EQUIPMENT FOR THE TERMINAL 2 EXTENSIONAT VALENCIA AIRPORT

AENA

Valencia / 2012-2013

Valencia / 2012-2013

Manufacture and installation of equipment for the check-in and boarding areas, common areas, offices, signs and accessories for the Terminal 2 extension at Valencia Airport.

Work consisted of supplying and installing:- Check-in and boarding counters, and passport control booths.- Office furniture: operational workstations (tables, chairs, closets and ancillary accessories)- Dressing room furniture: Lockers.- Furniture for public areas: benches, rubbish bins, belt barriers, etc.- Signs: directional signposts.- Check-in area frieze- Roller gates- Vertical gates: glass front and stainless steel.- Special stainless steel items: interior loc king drawers and exterior loading dock.

Page 35: Dossier Área 3 - Inglés 2015

VALE

NC

IA A

IRP

OR

T

Page 36: Dossier Área 3 - Inglés 2015

overview

detail gates

detail counter

detail screen

2

3

4

1

1

Page 37: Dossier Área 3 - Inglés 2015

2

3

4

Page 38: Dossier Área 3 - Inglés 2015

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

DECORATION OF ROOMS AND COMMONAREAS OF THE PARADOR DE TURISMO HOTELIN CÁDIZ - HOTEL ATLÁNTICO

Paradores de Turismo de España S.A

Cádiz / 2012

€ 2.185.061,87

The new Parador Hotel in Cádiz is a modernseven storey building whose avant-gardedesign has given rise to a new icon in contemporary architecture.

Our involvement consisted of the design,supply and installation of comprehensiveequipment for the common areas and forthe 106 rooms comprising the New Paradorde Cádiz.

The rooms have been equipped with desig-ner furniture and adapted/special woodwork.They have been complemented with built-in,decorative lighting, standard furniture andoutdoor furnishings for terraces.

The common areas are distributed overthe ground floor, the mezzanine and thefirst floor, where we have equipped all theaccess, reception, administrative, GaleríaTierra, snack room, restaurant, conventionhalls, business/client rooms, library,breakfast room, spa, terrace and outdoorpool areas. Modifications were also made tothe lighting system, in order to adapt lightingto the desired design.

overview terrace-pool

Page 39: Dossier Área 3 - Inglés 2015

PAR

AD

OR

DE

DIZ

Page 40: Dossier Área 3 - Inglés 2015

view room terrace

standard room + terrace

standard room + detail of writing desk

standard room + terrace

standard room + extra bed

standard room + terrace

1

2

3

4

5

1

5

3

6

Page 41: Dossier Área 3 - Inglés 2015

2

4

6

Page 42: Dossier Área 3 - Inglés 2015

terrace - restaurant “Bahía de Cádiz”

breakfast room “Balcón del Atlántico”

terrace - bar “La Tacita del Atlántico”

terrace - restaurant “Bahía de Cádiz”

restaurant “Bahía de Cádiz”

terrace - bar “La Tacita del Atlántico”

1

2

3

4

2

5

5

6

Page 43: Dossier Área 3 - Inglés 2015

1

6

3 4

Page 44: Dossier Área 3 - Inglés 2015

Spa

reception Parador

treatment booth - spa

equipment terrace

multi-use room

multi-use room

multi-use room

lobby Parador

1

2

3

4

1

3 4

6

5

6

5

6

Page 45: Dossier Área 3 - Inglés 2015

2

87

5

Page 46: Dossier Área 3 - Inglés 2015

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

DECORATION OF SUITES FOR THE PARADORDE TURISMO HOTEL IN CÁDIZ -HOTEL ATLÁNTICO

Paradores de Turismo de España S.A

Cádiz / 2012

€ 283.736,81

After the previous facilities were torn downand following 3 years of work, the newParador Hotel in Cádiz, “Hotel Atlántico”, hasbecome a new icon in contemporary archi-tecture, a new and modern seven storeybuilding featuring an avant-garde design.

Our involvement consisted of the design,supply and installation of comprehensiveequipment for the 18 junior suites distributedover the floors of rooms of the Parador.The 18 suites have been equipped with designer furniture and adapted/special woodwork.

They have been complemented withbuilt-in, decorative lighting, standard furniture

and outdoor furnishings for terraces.

interior view of suite room

Page 47: Dossier Área 3 - Inglés 2015

SU

ITES

PA

RA

DO

R D

E C

ÁD

IZ

Page 48: Dossier Área 3 - Inglés 2015

equipment room

sofa detail

equipment room

headboard detail

terrace

rest area

1

2

3

4

5

1

3

5

6

Page 49: Dossier Área 3 - Inglés 2015

2

6

4

Page 50: Dossier Área 3 - Inglés 2015

interior view of room

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

USP SAGRADO CORAZÓN CLINIC IN SEVILLE

Clínicas Sagrado Corazón SLU

Sevilla / 2012

120.024,93€

Supply and installation of equipment andfurniture for the common areas and rooms of

the USP Sagrado Corazón Clinic.

Page 51: Dossier Área 3 - Inglés 2015

SA

GR

AD

O C

OR

AZÓ

N C

LIN

IC

Page 52: Dossier Área 3 - Inglés 2015

reception and waiting area overview

outdoor vertical garden

waiting area

signage

interior view of the reception

2

3

4

2

1

4

5

Page 53: Dossier Área 3 - Inglés 2015

1

3

5

Page 54: Dossier Área 3 - Inglés 2015

room furnishings

bathroom

room furnishings

view of the reception

1

2

3

4

2

Page 55: Dossier Área 3 - Inglés 2015

1

3

4

Page 56: Dossier Área 3 - Inglés 2015

whole building view

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

SUPPLY AND INSTALLATION OFIMDEA EQUIPMENT SOFTWAREON CAMPUS MONTEGANCEDO

IMDEA Software

Madrid / 2012

€ 178.152,71

Supply and installation of equipment IMDEASoftware facilities located on the campus ofMontegancedo in Madrid.

The equipment is made up of chairs andtables to their different rooms,meeting the needs of use.

Page 57: Dossier Área 3 - Inglés 2015

IMD

EA S

OFT

WA

RE

MA

DR

ID

Page 58: Dossier Área 3 - Inglés 2015

office equipment

meeting room

rest area

meeting room

operational positions

1

2

3

4

1

4

5

Page 59: Dossier Área 3 - Inglés 2015

3

5

2

Page 60: Dossier Área 3 - Inglés 2015

view entry access

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

PROVISION OF EQUIPMENT ANDMOUNT POWER FOR THE OFFICESMADRID ELECNOR

ELECNOR

Madrid / 2012

€ 446.577,57

Equipment for new energy facilities ofElecnor in Madrid, located in the buildingSollube.

Supply and installation of operational posi-tions, management offices, meeting roomsand office dividing walls.

Page 61: Dossier Área 3 - Inglés 2015

OFF

ICES

ELE

CN

OR

MA

DR

ID

Page 62: Dossier Área 3 - Inglés 2015

3

operational positions

glass dividing walls

office

bulkhead blind

operational positions

1

2

3

4

5

1

44

Page 63: Dossier Área 3 - Inglés 2015

5

2

Page 64: Dossier Área 3 - Inglés 2015

overviewboarding area

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

EQUIPMENT FOR THE NEW SOUTHTERMINAL OF THE BARCELONAAIRPORT

AENA / Plan Barcelona

Barcelona / 2008 - 2009

€ 11.419.338,00

General and specific equipment for:- Offices of AENA, Guardia Civil, Mossos d´Esquadra and Customs- Storage and dressing rooms- Lockers and lost and found- Airport Health Offices- Employee Lunchroom- Authorities Room- VIP Lounges- Chapels- Public areas- Parking and Access Ways- Terminal Information Points- Employee canteen- Signage for restricted areas

Page 65: Dossier Área 3 - Inglés 2015

BA

RC

ELO

NA

AIR

PO

RT

Page 66: Dossier Área 3 - Inglés 2015

AENA information points

view of security filter

public telephone mounting

outdoor equipment

view of electronic lockers

ground zone benches

1

2

3

4

1

3 4

5

5

6

Page 67: Dossier Área 3 - Inglés 2015

2

6

Page 68: Dossier Área 3 - Inglés 2015

view of office equipment

general view of CGA (airport management centre)

multi-faith chapel

check-in counters VIP lounge

airport medical ward

view of employee lunchroom

1

2

3

4

5

1

3

5

6

Page 69: Dossier Área 3 - Inglés 2015

2

4

6

Page 70: Dossier Área 3 - Inglés 2015

VIP lounge equipment

VIP lounge self service and coffee shop

authorities room

detail of VIP lounge furnishings

press room

1

2

3

4

5

2

Page 71: Dossier Área 3 - Inglés 2015

1

3 4

5

Page 72: Dossier Área 3 - Inglés 2015

overviewcommercial modules

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

SUPPLY OF EQUIPMENT FOR THECHECK-IN AND DEPARTURES BUILDINGREUS AIRPORT

AENA

Reus, Tarragona / 2009

€ 1.423.971,00

Supply and Installation of:- Standard furniture for offices and other rooms- Airport Control Centre Console- Restroom equipment- Specially manufactured furniture- Check-in counters- Commercial premises and for Concessions- Equipment for public areas and acces sories- Signage

Page 73: Dossier Área 3 - Inglés 2015

REU

S A

IRO

PR

T

Page 74: Dossier Área 3 - Inglés 2015

office area equipment

airport management centre (CGA) equipment

interior view of check-in counters

front view of airline counters

boarding zone equipment

view of row of check-in counters

1

2

3

4

6

1

3

5

Page 75: Dossier Área 3 - Inglés 2015

6

2

4 5

Page 76: Dossier Área 3 - Inglés 2015

overview of equipmentboarding area

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

ADAPTATION AND EQUIPMENT FOR THENEW T3 TERMINAL BUILDINGMÁLAGA AIRPORT

AENA

Málaga / 2008 - 2010

€ 14.465.000,00

Construction of the Authorities Room, PressRoom and VIP Lounge.

Architecture: pavements, enclosures, compartmentalization, floors, ceilings, surfacings, wood and metal carpentry and claddings.Installations: electric, sanitation and plumbing, air conditioning, fire detection andextinguishing.Single elements, railings, partition walls, etc.

Specialized carpentry and locksmith work:- Check-in cubicles, tourist information, arrival information- Tour operator stands / Rent a Car- Pat-down booths- Passport Control Booths- Check-in counters, information, security forces and handling- Technical Consoles (Airport Management Centre, Loudspeakers and CECOA - Airport Coordination Centre)

Furniture and equipment:- Offices (management, operations and meeting rooms)- Furniture for public areas- Chapels- Food Service

Page 77: Dossier Área 3 - Inglés 2015

LAG

A T

3 A

IRP

OR

T

Page 78: Dossier Área 3 - Inglés 2015

view of multi-purpose room

detail of railing

authorities room

pat-down booths

press room

1

2

3

4

5

1

44

Page 79: Dossier Área 3 - Inglés 2015

5

2

3

Page 80: Dossier Área 3 - Inglés 2015

passport control area

outdoor equipment

Airport Coordination Centre (CECOA) equipment

view of airline modules

view of row of check-in counters

1

2

3

4

5

5

1

3

Page 81: Dossier Área 3 - Inglés 2015

6

2

44

5

Page 82: Dossier Área 3 - Inglés 2015

general view of VIP lounge

VIP lounge working area

Catholic chapel

self-service VIP Lounge

detail of VIP lounge furnishings

indoor Zen garden

1

2

3

4

2

5

5

6

Page 83: Dossier Área 3 - Inglés 2015

1

6

3 4

Page 84: Dossier Área 3 - Inglés 2015

view of exterior façade of the building

Diputació de Barcelona. Photos: ago2/Oscar Ferrer

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

FURNITURE FOR THE MUNICIPALLIBRARY OF CASTELLDEFELS

Castelldefels City Council

Castelldefels, Barcelona / 2011

€ 515.706,00

Supply and Installation of:- Specific library equipment- Rest and play area furniture- Customized furniture / special carpentry- Anti-theft system- Specialized locksmith work- Signage and signs

Page 85: Dossier Área 3 - Inglés 2015

LIB

RAY

OF

CA

STE

LLD

EFEL

LS

Page 86: Dossier Área 3 - Inglés 2015

children’s area

book storage area

children’s books storage area

detail of book shelf

book storage area

1

2

3

4

5

Diputació de Barcelona. Photos: ago2/Oscar Ferrer

Page 87: Dossier Área 3 - Inglés 2015

1 2

3 4

5

Page 88: Dossier Área 3 - Inglés 2015

general view

children’s area

graphic children’s area

book storage area

children’s area

1

2

3

4

2

5

5

Diputació de Barcelona. Photos: ago2/Oscar Ferrer

Page 89: Dossier Área 3 - Inglés 2015

1

3 4

Page 90: Dossier Área 3 - Inglés 2015

general view of premises

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

NIÑO DE ORO BUILDINGS, I AND IIIADMINISTRATIVE, TRAINING ANDBUSINESS CONSULTANCY AREAS

Caepionis

Chipiona, Cádiz / 2011

341.763,89 €

Adaptation of new multi-purpose venueNIÑO DE ORO BUILDINGS, I AND III,consisting of:- Trade Fair- Administrative / Office area- Training rooms- Restrooms- Signage

Page 91: Dossier Área 3 - Inglés 2015

NIÑ

O D

E O

RO

BU

ILD

ING

S

Page 92: Dossier Área 3 - Inglés 2015

training room

training room

reception desk

administrative area

1

2

3

4

1

3

Page 93: Dossier Área 3 - Inglés 2015

2

4

Page 94: Dossier Área 3 - Inglés 2015

detail of display cases

detail of display case and printed graphics

projection room

seating area

general view of coffee shop

detail of coffee shop furniture

1

2

3

4

5

1

3

6

5

Page 95: Dossier Área 3 - Inglés 2015

2

4

6

Page 96: Dossier Área 3 - Inglés 2015

interior view of coffee shop

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

EQUIPMENT FOR RESTAURANT SERVICE -CAFETERÍA DE LAS CARACOLAS

Madrid / 2008

Chipiona, Cádiz / 2011

€ 193.183,00

Adaptation of modular building for use asa dining room/coffee shop, for which thefollowing actions were performed:- Analysis of flows and operability- Equipment and food service furniture- Refrigerator chambers- Washing area- Kitchen and food preparation area- Coffee shop counters- Laundry- Self-service- Fire protection system- Adaptation of facilities

Page 97: Dossier Área 3 - Inglés 2015

EQU

IPM

ENT

SER

VIC

E

Page 98: Dossier Área 3 - Inglés 2015

interior view barra

view autoservice zone

view wash zone

view cook zone

view autoservice zone

coffe shop view

1

2

3

4

5

6

1

Page 99: Dossier Área 3 - Inglés 2015

2 3

4

5 6

Page 100: Dossier Área 3 - Inglés 2015

view of façade

PROJECT:

CLIENT:

LOCATION / YEAR:

AMOUNT:

DESCRIPTION:

RESIDENCE AND DAY CARE CENTREFOR THE ELDERLY

Fundació Sant Joan de Deu

Martorell, Barcelona / 2011

€ 7.000.000,00

Comprehensive implementation of residenceand day care centre for the elderly andsubsequent equipping.

The Sant Joan de Deu Residence andDay Care Centre for the Elderly in Martorellis a healthcare centre with 91 rooms thatis designed to accommodate up to 135residents and to provide service to another35 in the day care centre. It has 47 privaterooms and 44 shared rooms for residents.It is located in the western part of the city ofMartorell, with almost direct access from theA-7 highway.

The new site is a single curved building,consisting of a basement, a ground floor andtwo more floors. The parking and auxiliaryservices of the centre are located in thebasement, the day care centre and commonservices are on ground floor and the roomsfor residents are on the first and secondfloors.

In total, the building is 7,200 m2, built on aplot of 5,247 m2.

Page 101: Dossier Área 3 - Inglés 2015

MA

RTO

REL

L R

ESID

ENC

E

Page 102: Dossier Área 3 - Inglés 2015

exterior view of building

interior room

reception

general view of common areas

detail equipment

1

2

3

4

5

1

3

Page 103: Dossier Área 3 - Inglés 2015

2

4 5

Page 104: Dossier Área 3 - Inglés 2015

entrance

meeting room

detail equipment

detail equipment

diagram south elevation

1

2

3

4

1

5

3

Page 105: Dossier Área 3 - Inglés 2015

2

4

5

Page 106: Dossier Área 3 - Inglés 2015

Corporate Offices and Buildings

o Administrative area, training room and business consultancy area. Niño De Oro Buildings. Chipiona (Cadiz).

o Office equipment for terminal building extension, Reus Airport (Tarragona).

o New office area in Ibiza Airport (Ibiza).

o Office furniture and training rooms, Pamplona Airport (Pamplona).

o Office furniture and multi-purpose rooms, Girona Airport (Girona).

o Office equipment new South Terminal Area (NAT), Barcelona Airport (Barcelona).

o Office equipment New Terminal Area (NAT), Malaga Airport (Malaga).

o Office equipment Deimos, Puertollano (Ciudad Real).

o Office equipment Hipoges, Madrid and Lisbon (Spain - Portugal).

o Office equipment and interior partitions Elecnor-Energy, Sollube Building (Madrid).

o Office equipment new Earth Observation Space Services integration building - Deimos (Puertollano).

o Office equipment and new office facilities, Hipoges (Madrid).

o Office equipment and new office facilities, Incus Capital (Madrid).

o Management office equipment, Elecnor centre (Madrid).

o Equipment for new local police force headquarters in Majadahonda (Madrid).

o Office equipment for Chavarri&Muñoz Lawyers (Madrid).

o Office equipment for Elecnor Engineering (Madrid).

o Remodelling of Elecnor offices, 15th floor of Europa Tower (Madrid).

o Office equipment and interior partitions, 5th floor Chavarri&Muñoz Lawyers (Madrid).

o Equipment for new Finanzauto headquarters in Barberà del Vallès (Barcelona).

o Remodelling of Elecnor Call Centre Getafe (Madrid).

o Equipment for Porto do Molle Co-Working Centre and Business Incubator (Pontevedra).

o Service equipment for Tax Office (Valladolid).

o Equipment for new ICEX Spain headquarters at Paseo de la Castellana, 278 (Madrid).

o Equipment for new COFIDES Spain headquarters at Paseo de la Castellana, 278 (Madrid).

Hospitality, Leisure and Restaurant Industry

o Equipment for restaurant service “Cafetería de las Caracolas” - RENFE (Madrid).

o Decoration of rooms and common areas at Parador de Cádiz (Cadiz).

o Decoration of suites at Parador de Cádiz (Cadiz).

o Food service equipment for new terminal area at Pamplona Airport (Pamplona).

o Self-service food service equipment for Authorities Room at Malaga Airport (Malaga).

o Self-service food service equipment for Authorities Room at Barcelona Airport (Barcelona).

o Remodelling and equipment for Restaurante Alabaster (Madrid).

o Industrial kitchen equipment and accessories (Democratic Republic of Congo).

o Equipment for Restaurant Allard (Madrid).

Educational Centres, Libraries

o Furniture for the Castelldefels Municipal Library (Barcelona).

o Office equipment for IMDEA Software (Madrid).

o Extension of equipment for IMDEA Software Campus in Montegancedo (Madrid).

Social, Residential, Care

and Medical Centres

o Nursing home in Martorell (Barcelona).

o Sagrado Corazón Clinic USP (Seville).

o General furniture for the new Central University Hospital of Asturias - Lot 8 (Oviedo).

o Equipment for Mijas Costa Fuengirola Alzheimers Day Centre (Malaga).

ÁREA 3: References

Barcelona Airport

Page 107: Dossier Área 3 - Inglés 2015
Page 108: Dossier Área 3 - Inglés 2015

ÁREA 3: References

Airports and Large Public Venues

o New fire extinguishing building (S.E.I.), Granada Airport (Granada).

o Passport control facilities, Ibiza Airport (Ibiza).

o Relocation of finance and administration division and several interventions at Aena 1, Palma Airport (Palma de Mallorca).

o Equipment check-in and departure building, Reus Airport (Tarragona).

o Equipment new South Terminal Area (NAT), Barcelona Airport (Barcelona).

o Construction commercial areas, Ibiza Airport (Ibiza).

o Furniture and equipment for the remodelling of Girona Airport (Girona).

o Furniture and equipment air bridge VIP lounge and public payphones, Barcelona Airport (Barcelona).

o Supply and installation of counters for the New Terminal Area (NAT), Malaga Airport (Malaga).

o Furniture for public areas at the New Terminal Area (NAT), Malaga Airport (Malaga).

o Furniture and decoration for the New Terminal Area (NAT), Malaga Airport (Malaga).

o Furniture and equipment for the New Terminal Area (NAT), Pamplona Airport (Navare).

o Equipment and furniture for the New Terminal Area (NAT), Algeciras Heliport (Cadiz).

o Furniture and equipment for the New Terminal Area (NAT), La Palma Airport. (Santa Cruz de Tenerife)

o General equipment for the New Terminal Area (NAT), Santiago de Compostela Airport (A Coruña).

o Furniture and equipment for the new fire extinguishing building (S.E.I.), Malaga Airport (Malaga).

o Furniture and equipment for the terminal building, Ibiza Airport (Ibiza).

o Furniture and equipment for the terminal building, Valencia Airport (Valencia).

o Furniture and equipment for the terminal building, Vigo Airport (Pontevedra).

o Furniture and equipment for Gran Canaria Airport (Las Palmas).

o Adaptation of shopping plazas in Terminals T4 and T4S, Adolfo Suárez-Barajas Airport (Madrid).

o Last Minute Point, Atocha Renfe Station (Madrid).

o Last Minute Point, Chamartín Renfe Station (Madrid).

Museums, Ephemeral Architecture and

Special Projects

o Multi-purpose venue for conferences, exhibitions and trade fairs. Niño De Oro Buildings (phase 3).

Rocío Jurado Museum. Chipiona (Cadiz).

o Administrative area, training room and business consultancy area. Niño De Oro Buildings. Chipiona (Cadiz).

o Equipment and furniture for the Born Cultural Centre Museum Project (Barcelona).

o Supply of carts for BIM/SA mobile stage (Barcelona).

VideoWall Madrid T4 Airport

Page 109: Dossier Área 3 - Inglés 2015
Page 110: Dossier Área 3 - Inglés 2015

ÁREA3Equipamiento, Diseño e Interiorismo S.L.

Maestro Alonso 21-2328028 Madrid

T +34 917 260 076F +34 917 130 817

[email protected]