Project Background
Land area12,046 SQ.M
Gross Floor area
20,619 SQ.M
Nett Floor area11,510 SQ.M
The Project is a 11 Storey Faculty of Built Environment, Lot 1520, JalanLingkungan Budi, University Malaya, housing a Library, Auditorium, Indoor
car park, Class rooms, Admin Office, Lecturer rooms, and studios pertains to
Architectural, Real Estate Management, Building Surveying & Quantity
Surveying Studios.
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 3/93
Why Green?2005 Survey by Turner Construction
Company on 665 green schoolsBuilding Occupants on the Benefits of
Green School:
• Improved Community image,
87 percent
• Ability to attract and retain
teachers, 74 percent
• Reduced Student adsenteeism,
72 percent
• Improved Student
performance, 71 percent
•
Lower 20-year operating costs,73 percent
There is no reason not to go GREEN
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 4/93
Assesment CriteriaOverall Points Score
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 5/93
Target Rating
GBITry
AgainCertified Silver Gold Platinum
Score 0 21 49 50 65 66 75 76 85 86 100
BASELINE
SCORING
TARGETEDSCORING
Baseline score | 21 POINTS
GBI target score | 78 POINTS (GOLD)
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 6/93
PART ITEMMAXPOINTS BASELINE MS 1525 TARGET COST (RM)
1 Energy Efficiency 35 3 5 271,504,908
2
Indoor Environmental
Quality 21 9 9 17
182,500
3Sustainable Site Planning &Management 16 7 7 14
21,780
4 Material & Resources 11 2 2 710,000
5 Water Efficiency 10 0 0 6
32,000
6 Innovation 7 0 0 7 421,976
Total Score 100 21 23 78 2,173,164
GBI Gold Rating Summary
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 7/93
PART 1
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 8/93
PART ITEM POINTS BASE MS 1525 TARGET COST
1
EE1 Minimum EE Performance 1 0 1 1 302,408
EE2 Lighting Zoning 3 1 1 3 40,000
EE3 Electrical Sub-metering 1 0 1 1 7,500
EE4 Renewable Energy 5 0 0 4 450,000
EE5 Advanced EE Performance - BEI 15 0 0 8 585,000
EE6 Enhanced Commissioning 3 0 0 3 70,000
EE7 Post Occupancy Commissioning 2 0 0 2 30,000
EE8 EE Verification 2 0 0 2 20,000
EE9 Sustainable Maintenance 3 2 2 3 -
TOTAL 35 3 5 27 1,504,908
Part 1 - Energy Efficiency
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 9/93
ENERGY EFFICIENCY
EE 1 - Minimum EE performance
DESCRIPTION
AREA
m2
U-value
w/m2degC
∆T
OTTV
TT
A x OTTV
AREA
m2
1. WALL OTTV = 15a(1-WWR)Uw a WWR
1.1 SE Elevation - Front Elev 1548 2.87 0.4 0.25 12.92 19,992.42 1161
1.2 NW Elevation - Back Elev 919 2.87 0.4 0.14 14.81 13,609.65 790
1.3 SW Elevation - Left Elev 2711 2.87 0.4 0.49 8.78 23,808.54 1383
1.4 NE Elevation - Right Elev 2865 2.87 0.4 0.48 8.95 25,654.36 1490
Sub-Total Wall OTTV 83,064.98 4824
2. WINDOW OTTV = 6(WWR)Uf
2.1 SE Elevation - Front Elev 1548 5.6 0.25 8.40 13,003.20 387
2.2 NW Elevation - Back Elev 919 5.6 0.14 4.70 4,322.98 129
2.3 SW Elevation - Left Elev 2711 5.6 0.49 16.46 44,633.90 1328
2.4 NE Elevation - Right Elev 2865 5.6 0.48 16.13 46,206.72 1375
Sub-Total Window OTTV 108,166.80 3219
3. WINDOW SOLAR GAIN = 194xCFxWWRxSC CF SC
3.1 SE Elevation - Front Elev 1548 1.13 0.61 0.25 33.43 51,751.27 387
3.2 NW Elevation - Back Elev 919 0.9 0.61 0.14 14.91 13,703.06 1293.3 SW Elevation - Left Elev 2711 0.9 0.4392 0.49 37.58 101,866.68 1328
3.4 NE Elevation - Right Elev 2865 1.09 0.4209 0.48 42.72 122,397.63 1375
Sub-Total Window Solar Gain 289,718.64
TOTAL OTTV 480,950.42 8043
AVERAGE OTTV 59.80
Baseline
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 10/93
ENERGY EFFICIENCY
EE 1 - Minimum EE performance
DESCRIPTIONAREA
m2
U-value
w/m2degC
∆T
OTTV
TT
A x OTTV
AREA
m2
1. WALL OTTV = 15a(1-WWR)Uw a WWR1.1 SE Elevation - Front Elev 1548 0.8 0.4 0.25 3.60 5572.80 1161
1.2 NW Elevation - Back Elev 919 0.8 0.4 0.14 4.13 3793.63 790
1.3 SW Elevation - Left Elev 2711 0.8 0.4 0.49 2.45 6636.53 1383
1.4 NE Elevation - Right Elev 2865 0.8 0.4 0.48 2.50 7151.04 1490
Sub-Total Wall OTTV 23154.00 4824
2. WINDOW OTTV = 6(WWR)Uf
2.1 SE Elevation - Front Elev 1548.00 4.6 0.25 6.90 10681.20 387
2.2 NW Elevation - Back Elev 919.00 4.6 0.14 3.86 3551.02 129
2.3 SW Elevation - Left Elev 2711.00 4.6 0.49 13.52 36663.56 1328
2.4 NE Elevation - Right Elev 2865.00 4.6 0.48 13.25 37955.52 1375
Sub-Total Window OTTV 88851.30 3219
3. WINDOW SOLAR GAIN = 194xCFxWWRxSC CF SC
3.1 SE Elevation - Front Elev 1548.00 1.13 0.61 0.25 33.43 51751.27 387
3.2 NW Elevation - Back Elev 919.00 0.9 0.61 0.14 14.91 13703.06 129
3.3 SW Elevation - Left Elev 2711.00 0.9 0.44 0.49 37.64 102052.23 13283.4 NE Elevation - Right Elev 2865.00 1.09 0.42 0.48 42.63 122135.91 1375
Sub-Total Window Solar Gain 289642.47
TOTAL OTTV 401647.77 8043
AVERAGE OTTV 49.94
MS 1525
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 11/93
ENERGY EFFICIENCY
EE 1 - Minimum EE performance
DESCRIPTIONAREA
m2
U-value
w/m2deg
C
∆T
OTTV
TT
A x OTTV
AREA
m2
1. WALL OTTV = 15a(1-WWR)Uw a WWR
1.1 SE Elevation - Front Elev 1548 0.8 0.4 0.25 3.60 5572.80 1161
1.2 NW Elevation - Back Elev 919 0.8 0.4 0.14 4.13 3793.63 790
1.3 SW Elevation - Left Elev 2711 0.8 0.4 0.49 2.45 6636.53 1383
1.4 NE Elevation - Right Elev 2865 0.8 0.4 0.48 2.50 7151.04 1490
Sub-Total Wall OTTV 23154.00 4824
2. WINDOW OTTV = 6(WWR)Uf
2.1 SE Elevation - Front Elev 1548 1.8 0.25 2.70 4179.60 387
2.2 NW Elevation - Back Elev 919 1.8 0.14 1.51 1389.53 129
2.3 SW Elevation - Left Elev 2711 1.8 0.49 5.29 14346.61 1328
2.4 NE Elevation - Right Elev 2865 1.8 0.48 5.18 14852.16 1375
Sub-Total Window OTTV 34767.90 3219
3. WINDOW SOLAR GAIN =
194xCFxWWRxSC CF SC
3.1 SE Elevation - Front Elev 1548 1.13 0.4 0.25 21.92 33935.26 3873.2 NW Elevation - Back Elev 919 0.9 0.4 0.14 9.78 8985.61 129
3.3 SW Elevation - Left Elev 2711 0.9 0.4 0.49 34.22 92774.76 1328
3.4 NE Elevation - Right Elev 2865 1.09 0.4 0.48 40.60 116319.92 1375
Sub-Total Window Solar Gain 252015.54
TOTAL OTTV 309937.44 8043
AVERAGE OTTV 38.54
Target
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 12/93
ENERGY EFFICIENCY (EE)
EE1 – MINIMUM EE PERFORMANCE
ROOF - U VALUE
OriginalDesign
Revised Design
Type Description U Value
(W/m2K)
U Value with
insulation to roof
slab or underneath
metal sheet (W/m2K)
Area
1
Metal Sheet Roof above Service
Area 1.381 0.537
Area2 Auditorium 3.205 0.235
Area3 Flat Roof At Ruang Bacaan 2.762 2.762
Area
4 L9-roof deck 2.762 0.537
Existing Weighted Roof U-Value is 1.89 W/m2K
Improved Roof U Value with Insulation Layer to Underneath of the Metal Sheet and the concrete slab, improved U
Value is 0.50 W/m2K
Therefore, comply to MS 1525:2007, with heavy duty (Above 50 kg/m2) Maximum
Allowable U Value for Roof of 0.6 W/m2K
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 13/93
ENERGY EFFICIENCY
EE 1 - Minimum EE performance Target
• EMS is provided with the following
features:• Maximum Demand Limiting
Programme
• Monitoring of Electrical and Water usage
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 14/93
ENERGY EFFICIENCY
EE 1 - Minimum EE performance
• Factors Leading to Reduction of
Air Conditioning Load– Improved Envelope Performance
– Reduced Plug Load
– Reduced Lighting Load
– Use of CO2 Sensors to RegulateOutdoor Air
– Increased Design Temperature
Base BuildingProposed
Building
OTTV (W/m²K) 60 38
Plug Load (W/m²) 15 8
Lighting Load (W/m²) 15 8
CO2 Sensors to
regulate Outdoor Air No Yes
Design Temperature
(°C)23 24
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 15/93
ENERGY EFFICIENCY
EE 1 - Minimum EE performance
• High Efficiency AirConditioning System– Chilled Water System
– High Efficiency Chiller
– Variable Speed AHU
– VAV Boxes– VSD Fans for Cooling Tower
• No additional cost forhigher efficiency systemdue to the reduced cooling
load
Base Building Proposed Building
Total Peak Load 580 RT 420 RT
Chiller Selection 2 nos.of 300RT 3 nos. of 150RT
Chiller kW/RT 0.75 0.62
AHU Constant Speed AHUMulti Zone c/w VAV
boxes
Cooling Tower Constant Speed Fan
Motor
Variable Speed Fan
Motor
Total System COP 3.52 4.13
Air Conditioning System CostBase Building Proposed
Peak Load (RM) 580 420
RM/RT 5500 7500
Total Cost (RM) 3,190,000.00 3,150,000.00
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 16/93
ENERGY EFFICIENCY
EE 1 - Minimum EE performance
• Part Load Usage Consideration– Use of VSD AHU c/w VAV Boxes
– Multiple Compressors Chillers
Minimum Operating
Load for Chiller 20% of 150RT 30RT
Scenario 1 Auditorium 40RT
Scenario 2 L8 Office 50RT
Scenario 3 Half Lev 9 and Half Level 10 50RT
Scenario 4 Half Level 8 Office and Half Level 9 50RT
Minimum Load for Chiller System to Operate
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 17/93
ENERGY EFFICIENCY
EE 2 - Lighting Zone
• Optimization of Lighting with Flexible Lighting Control
– Photocell sensors at perimeter zones particularly at areas with Daylight Factor between 1 to 3%
– Combined motion sensor lighting switch at meeting rooms
– Lighting circuit per zone less than 100 m2
– Clear Labeling of lighting circuits Photocell sensor at
perimeter zones
Motion sensor
lighting switch for
meeting rooms
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 18/93
ENERGY EFFICIENCY
EE 3 – Electrical Sub-metering
Separate
electricity
metering to be
linked to EMS
• Separate metering provided for Major Load Centre
exceeding 100 KVA such as : – Lighting Load
– Air-conditioning and Mechanical Ventilation System
– Plug Load
M M M M M
M M
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 19/93
ENERGY EFFICIENCY
EE 4 - Renewable Energy
STRATEGYTo install PV modules on roof top above cooling tower area
PV Required = 20 kWp (=1.5% of total electricity consumption)Power generated by PV modules = 1300 kWH/KWp/yr x 20 kWp
= 26,000 kWH/yrArea Required = 20 kWp x 13 sqm/kWp = 260 sqmADDITIONAL COST
Cost of PV modules per kWp = RM22,500.00Total cost for PV modules = RM22,500 x 20kWp
= RM450,000.00
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 20/93
ENERGY EFFICIENCY
EE 5 - Advanced EE Performance
• The BEI is calculated using
Dynamic Load SimulationSoftware E-Quest
• Total AC 2354 hours per year
• BEI corrected to 2700 hours
• BEI is 120kWH/m2/year
Building Specification for BEI Calculation
Base Building Proposed GBI Gold
Building
Total AC Floor Area (m²) 11529 11529
OTTV (W/m²) 59.80 38.54
Type of Glazing Solar Reflective Glass Double glazed low-eU Value of Glazing (W/m²K) 5.60 1.8
SC of Glazing 0.61 0.4
Type of Wall Brick Wall Lightweight Block Wall
U Value of Wall (W/m²K) 2.87 0.8
Electrical
Lighting Load during AC hours (W/m²) 15 8
Plug Load during AC hours (W/m²) 15 8
Elevators and Escalators (kW/building) 60 60
Hydraulic systems (kW/building) 15 15
ACMV System
Design Temperature (°C) 23 24
Design Relative Humidity (%) 55 55
Total Chiller Cooling Load 580 411
Btu/hr/sq.ft 56 40
Type of System Water Cooled Chiller Water Cooled Chiller
No of Chillers 2 nos of 300RT Screw Chiller 3 nos of 150RT Screw Chiller
Minimum Part Load for Chiller 20% 20%
Refrigerant R134a R134a
Cooling Tower 2 nos. of 360RT 3 nos of 200RT
Air System Constant Speed AHU Variable Speed AHU with VAV boxe
AHU Airfoil blade Airfoil blade c/w VSD
Average Fan Total Static Pressure (Pa) 600 500
Carbon Dioxide Monitoring and Control Not provided Provided
ACMV Consumption
Chiller COP 5.02 5.67
Chiller Efficiency (kW/RT) 0.70 0.62
Cooling Tower Consumption (kW/RT) 0.025 0.018
Chilled Water Pump Consumption (kW/RT) 0.050 0.050
Condenser Water Pump Consumption (kW/RT) 0.064 0.064
AHU consumption (kW/RT) 0.160 0.100
Total kW/RT 0.999 0.852
AC System COP 3.520 4.127
BEI Calculated based on E-Quest (2354 hours) 175 100
BEI (Corrected based on 2700 hours) 201 115
Power Generated from PV per year (kWhr) 0 26000
Nett BEI 201 112
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 21/93
ENERGY EFFICIENCY
EE 5 - Advanced EE Performance
• The BEI is counter-checked with the BEITsoftware
Summary of BEI Results
Base BuildingMS 1525
CompliantGBI Gold
BEIT (2700 hours) 225 211 121
E-Quest (2354 hours) 175 100
E-Quest corrected (2700 hours) 201 115N/A
ENERGY EFFICIENCY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 22/93
ENERGY EFFICIENCY
EE 6 - Enhanced Commissioning
All building’s energy related systems will be
commissioned according to ASHRAE Guideline 0-
2005 to verify that the HVAC systems achieve the
owner’s project requirements. The Commissioning
Process will be used to achieve, verify, and
document the performance of facilities, systems,
and assemblies to ensure that they meet definedobjectives and criteria
An independent GBI recognized commissioning
specialist will be appointed at the onset of the
design process to verify that comprehensive pre-
commissioning and commissioning is performed forall the building's energy related systems
ENERGY EFFICIENCY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 23/93
ENERGY EFFICIENCY
EE 6 - Enhanced Commissioning
Budget to be included
in project cost
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 24/93
ENERGY EFFICIENCY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 25/93
ENERGY EFFICIENCY
EE 7 - Post Occupancy Commissioning
Design engineer shall review all tenancy fit-out plans to ensure
original design intent is not compromised and upon completion of
the fit-out works, verify and fine-tune the installations to suit
Within 12 months of practical completion (or earlier if there is at
least 50% occupancy), the commissioning specialist shall carry out
a full post/re-commissioning of the building's energy related
systems to verify that their performance is sustained in conjunction
with the completed tenancy fit-outs
Verification will be
conducted by CS
ENERGY EFFICIENCY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 26/93
ENERGY EFFICIENCY
EE 8 - EE Verification
Energy Management System will be used to monitor and
analyze energy consumption including reading of sub-meters
EMS will be fully commissioned including Maximum Demand
Limiting program within 12 months of practical completion (or
earlier if there is at least 50% occupancy).
ENERGY EFFICIENCY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 27/93
ENERGY EFFICIENCY
EE 9 - Sustainable Maintenance
• Three maintenance personnel (50% of permanent buildingmaintenance team ) will be employed to be on-board one (1) tothree (3) months before practical completion and to fullyparticipate in the Testing & Commissioning of all building energyservices.
• A designated building maintenance office that is fully equipped with facilities (including tools and instrumentation) andinventory storage will be provided
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 28/93
PART 2
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 29/93
PART ITEM POINTS BASE MS 1525 TARGET COST
2
EQ1 Minimum IAQ Performance 1 1 1 1 -
EQ2 Environmental Tobacco Smoke (ETS) Control 1 1 1 1 -
EQ3 Carbon Dioxide Monitoring and Control 1 0 0 1 42,500
EQ4 Indoor Air Pollutants 2 0 0 2 -
EQ5 Mould Prevention 1 1 1 1 -
EQ6Thermal Comfort: Design & Controllability ofSystems 2 1 1 2 -
EQ7 Air Change Effectiveness 1 0 0 0 -
EQ8 Daylighting 2 1 1 1 -
EQ9 Daylight Glare Control 1 0 1 1 40,000
EQ10 Electric Lighting Levels 1 1 1 1 -
EQ11 High Frequency Ballasts 1 0 0 1 80,000
EQ12 External Views 2 1 1 1 -EQ13 Internal Noise Levels 1 1 1 1 -
EQ14 IAQ Before & During Occupancy 2 0 0 1 10,000
EQ15 Post Occupancy Comfort Survey & Verification 2 0 0 2 10,000
TOTAL 21 8 9 17 182,500
Part 2 - Indoor Environment Quality
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 30/93
INDOOR ENVIRONMENTAL QUALITY
EQ1 – Minimum IAQ Performance
• Establish minimum outdoor
air requirement based on ASHRAE 62:2007 andUBBL 1984 3rd Schedule
Place
Auditorium 5 cfm/pax 5 cfm/seat 5 cfm/seat
Library 5 cfm/pax 5 cfm/pax
Computer Room 5 cfm/pax 10 cfm/pax 10 cfm/pax
Lecture Room 1 to 8 5 cfm/seat 7.5 cfm/pax 7.5 cfm/pax
Studio Ukur 1 10 cfm/pax 10 cfm/pax
Studio Senibina 10 cfm/pax 10 cfm/pax
Faculty Meeting Room 10 cfm/pax 5 cfm/pax 10 cfm/pax
Lecturer's Room 5 cfm/pax 5 cfm/pax 5 cfm/pax
ASHRAE 62UBBL
Outdoor Air Requirement
N/A
N/A
N/A
Selected
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 31/93
INDOOR ENVIRONMENTAL QUALITY
EQ2 – Environmental Tobacco Smoke (ETS) Control
•Prohibit smoking in the building, provide no smoking signage in the building•Locate exterior designated smoking areas at least 10 m away from entries,outdoor air intake or operable windows
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 32/93
Q
EQ3 – Carbon Dioxide Monitoring and Control
• To ensure good indoor air quality, Code of Practice on “Indoor Air Quality 2005” will be adopted
• The amount of CO2 will not exceed C1000 ppm for an eight-hours time-weighted average
• Demand Control Ventilation system will be installed to reduceenergy consumption when there is low level occupancy
• CO2 sensors will be installed at all main return points on each
floor for continuous monitoring
Damper Actuator
DDC
CO2 Sensor
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 33/93
EQ4 – Indoor Air Pollutants
•Provision to use low VOC paint and coating, carpet or flooring
throughout the building and encourage to use low VOC adhesive and
sealant•Use product with no added urea formaldehyde.
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 34/93
EQ5 – Mould Prevention
Architectural Component
• To prevent rainwater leakage through r c. roof
– Ensure proper roof detailing and construction– Specifies appropriate waterproofing membrane
– Ensure waterproofing is applied by specialist with warranty
– Recommend waterproofing admixture to be added to theconcrete flat roof as additional measure
– Ensure the surface to receive waterproofing membrane is
properly prepared (i.e. no depression to avoid ponding and allcracks are sealed and rectified before application of waterproofing membrane. Ponding test to be carried out to testthe integrity of the roof before and after application of waterproofing
– constant inspection to be carried out at the roof soffit to detectany sign of leakage during occupancy
• To prevent water leakage through walls– Ensure proper construction of the walls to prevent water
seepage by minimizing cracks and porosity of wall such as:
• To ensure the walls are constructed with quality bricksthat comply with minimum compressive strength
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 35/93
EQ5 – Mould Prevention
• To prevent water leakage through walls (cont)
• Ensure the brick walls are properly dubbed and filled
with cement mortar before plastering• Ensure adequate bonding ties are provided for
brickwork construction
• To ensure the plaster composition and thickness arecorrect
• To wet the walls before plastering to minimize
shrinkage cracks• Ensure junction of windows/openings and walls are
properly sealed
• To prevent leakage through floors especially at toilet areasand areas exposed to weather
– To provide waterproofing to all the wet areas
– To ensure waterproofing is applied correctly by thespecialist
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 36/93
EQ6 – Thermal Comfort
• Two design parameters to be considered are;
– Relevant design temperatures as per AHSRAE 55/MS1525
– Air velocity in the region of 0.15 m/s to 5.5 m/s
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 37/93
EQ6 – Thermal Comfort
• Comfort controls for occupants considered;
– Zoning of perimeter due to higher radiant heat through
windows
– Apply VAV system according to different zoning
– Limit of VAV airflow to meet design noise level
– Room thermostat to be located at strategic locations within each zone to achieve comfort conditions
VAV Box
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 38/93
EQ8 – Daylighting
•Provide 30% of the NLA has a daylight factor of 1.0% - 3.5%
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 39/93
EQ9 – Daylight Glare Control
• Eliminate glare from: Direct SUNLIGHT and maintain workspace LUX less than 2,000
• Diffuse SUNLIGHT for occupant-workspace at viewing angles of 15° to 60° from thehorizontal at eye level
• Manual roller blinds will be adopted
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 40/93
EQ10 – Electric Lighting Levels
• Design lighting level comply with MS 1525
• Lighting lux level simulated
with appropriate software
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 41/93
EQ11 – High Frequency Ballasts
• High frequency ballasts will be used for all fluorescentlamps
• The primary advantage of high-frequency fluorescentlighting is the improvement of efficacy relative tolighting systems with 60Hz magnetic ballast
• High-frequency operation also reduces the possibilityof perceptible lamp flicker that is sometimes
associated with low-frequency ballast, as the lampphosphors are refreshed more often
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 42/93
EQ12 – External Views
• Allows more than 60% of the NLA has external views through windows
• Open Plan Concept will be adopted• Meeting rooms , store and archive rooms will be located away from
windows
• Low cubicle partition vision glass panels will be used
• Purpose is to create a pleasant working environment thus higher work productivity
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 43/93
EQ13 – Internal Noise Levels
• Establish noise
criteria dependingon space usage
• Minimize noise from building services
• Also consider noise
breakout from othersources
Recommended Noise Level
Spaces NC dBA
Auditorium 35 40
Library 30 40
Lecture Rooms 35 40
Studios 35 40
Lecturer's Rooms 35 40
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 44/93
EQ13 – Internal Noise Levels
63 125 250 500 1000 2000 4000 8000 dBA
Estimated sound pressure for AHU fan 88 88 85 91 88 86 80 72
End relection -12 -8 -4 -1
Attenuation due to lined duct (6 meter) -3 -3 -12 -18 -24 -24 -30 -30
Attenuation due to lined elbow -7 -7 -12 -14 -16 -18 -18 -18
Power level split from branch to terminals -6 -6 -6 -6 -6 -6 -6 -6
Power level split from main duct to branch
duct -10 -10 -10 -10 -10 -10 -10 -10
Sub Total 50 54 41 42 32 28 16 8
Selected Silencer spec -10 -12 -15 -18 -20 -19 -10 -2
Total for Supply 40 42 26 24 12 9 6 6
Similar Value for Return 40 42 26 24 12 9 6 6
Resultant Value 43 45 29 27 15 12 9 9
A-scale weighting factor -26 -16 -9 -3 0 1 1 -1
Adjusted Spectrum to A scale 17 29 20 24 15 13 10 8
Total dB 29 25 17 12
Total dB 31 18
Resultant dBA 31
63 125 250 500 1000 2000 4000 8000 dBA
AHU Noise after Casing Loss 73 73 68 65 59 57 40 43 66
125 thk brick wall 10 15 18 21 30 33 33 33
Acoustic Treatment STC 35 17 12 29 44 54 39 46 46
Ceiling Form/RA Duct Correction -2 -2 -4 -4 -3 -5 -5 -5
Total Value outside AHU Room 48 48 25 4 0 0 0 0
A-scale weighting factor -26 -16 -9 -3 0 1 1 -1
Adjusted Spectrum to A scale 22 32 16 1 0 1 1 -1
Total dB 32 16 4 3
Total dB 33 6
Resultant dBA 33
Frequency (Hz)
In-Duct Noise Tra nsmission through Supply Air Duct
Frequency (Hz)
Noise Transmission through AHU Room W all
• Sample Calculation
Summary of NoiseNC dBA
Glazing STL 35 40
Lecture Room AHU In-
Duct Noise30 31
Lecture Room AHU
Room Wall
30 33
Lecturer's Rooms AC
UnitN/A 30
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 45/93
EQ14 – IAQ Before & After Occupancy
A building flush-out will be performed at the end of the
construction prior to occupancy to reduce indoor airquality contamination
All ventilation air filters will be changed after the flush-out
Pressure sensor to detect filter blockage
Purging to eliminate bad odors and improve air qualityespecially for building space that does not have
adequate openable windows
Ventilation of the encapsulation, hood or extraction type
should be provided so that the spread of contaminants is
prevented
Building materials and surface finishes should not
contain any substances that emit chemicals, bacteria or
fun i
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 46/93
EQ15 – Post Occupancy Survey : Verification
• A post-occupancy comfort survey of building occupants will be conducted within 12 months after occupancy/building
completion. The survey will be collected by a neutral thirdparty and respondents are to be remained anonymous.
• Measured data will be compared to ASHRAE STD 62.1-2007, STD 55-2004, MS 1525-2007 and Code of Practice onIndoor Air Quality 2005
• The survey will cover the following:
– Lighting comfort
– Temperature comfort
– Acoustical comfort
– Ventilation comfort
– Day lighting/views comfort
– Perceived productivity
INDOOR ENVIRONMENTAL QUALITY
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 47/93
EQ15 – Post Occupancy Survey : Verification
Preliminary
Draft
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 48/93
PART 3
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 49/93
PART ITEM POINTS BASELINE MS 1525 TARGET COST
SM1 Site Selection 1 1 1 1 -
SM2 Brownfield Redevelopment 1 0 0 0 -
SM3 Development Density &Community Connectivity 2 1 1 1 -
SM4 Environment Management 2 1 1 2 -
SM5 Earthworks - Construction Activity
Pollution Control 1 1 1 1 -SM6 QLASSIC 1 0 0 1 -
3 SM7 Workers' Site Amenities 1 1 1 1 -
SM8 Public Transportation Access 1 1 1 1 -
SM9 Green Vehicle Priority 1 0 0 1 -
SM10 Parking Capacity 1 0 0 1 -
SM11 Stormwater Design - Quantity &
Quality Control 1 1 1 1 -SM12 Greenery & Roof 2 0 0 2 21,780
SM13 Building User Manual 1 0 0 1 -
TOTAL 16 7 7 14 21,780
Part 3 - Site Planning and Management
SUSTAINABLE SITE
PLANNING & MANAGEMENT
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 50/93
SM1 – Site Selection
Site is not within
farmland, forestreserve, wetlands,
Mean High Water
Spring and 20m
lake, river and
stream.
SUSTAINABLE SITE PLANNING &
MANAGEMENT
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 51/93
• Facilities Identified
within 1km radius1. Bookshop
2. Post Office
3. Convenience Store
4. Bank
5. Laundry
6. Internet Café7. Hospital
8. Park
9. Gymnasium
10. Mosque
11. Library
12. Hair Dressing Saloon
13. Travel Agent
`
SM3 – Development Density & Community Connectivity
SUSTAINABLE SITE
PLANNING & MANAGEMENT
SM4 E i t M t
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 52/93
SM4 – Environment Management
A. Conservation
On previously developed or graded site, restore or protect a minimum
of 50% of the site area (excluding the building footprint) with native or
adaptive vegetation. Native or adaptive plants are plants indigenous
to a locality or cultivars of native plants that are adapted to the local
climate and are not considered invasive species or noxious weeds.
Applicable to landscaping on rooftops and roof gardens so long as the
plans meet the definition of native or adaptive vegetation. Total Site Area = 12,046 m2
Building Footprint = 3,334 m2
Balance area = 8,712m2
50% of balance area = 8,712/ 2 = 4,356m2
Existing Hard & Soft Landscape Area Ground Level = 4,659 m2
Roof garden Level = 336 m2
SUSTAINABLE SITE
PLANNING & MANAGEMENT
SM4 E i t M t
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 53/93
SM4 – Environment Management
SUSTAINABLE SITE
PLANNING & MANAGEMENT
SM4 Environment Management
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 54/93
SM4 – Environment Management
B. Open Space
Reduce by 25%, the development footprint (defined as the total area of
the building footprint, hardscape, access road and parking) and/or provide
vegetated open space within the project boundary to exceed the local
zoning’s open space requirement for the site by 25%
Total site area = 12,046m2
Assuming10% open space requirement = 1,205m2
Additional 25% open space = 1,205 X 0.25
= 301m2
Additional vegetated open space by converting car park premix surfaces
to grass crete pavers: = 990m2
990/1,205 = 82% > 25% Compliance to SM 4 Part B (Open Space)
SUSTAINABLE SITE
PLANNING & MANAGEMENT
SM4 Environment Management
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 55/93
SM4 – Environment Management
SUSTAINABLE SITE PLANNING & MANAGEMENT
SM5 EARTHWORKS CONSTRUCTION ACTIVITY POLLUTION CONTROL
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 56/93
SM5 - EARTHWORKS – CONSTRUCTION ACTIVITY POLLUTION CONTROL
During Construction, disruption to the natural hydrology will occur and they can
be mitigated by due diligence site planning and storm water design and with theprovision of :
● Implement an Erosion & Sediment Control (ESC) Plan
● Proper site management of surface water run-off treatment.
● Increasing or improving ground surface infiltration.
● Elimination of contamination sources.● Proper handling of contaminants and disposal.
● Removing pollutants from storm water run-off.
● Provision of silt-traps prior to final discharge to exist drains and waterways.
● Maintain as much as possible the existing vegetation during conceptual design.
SUSTAINABLE SITE PLANNING &
MANAGEMENT
SM5 Earthworks Construction Activity Pollution Control
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 57/93
SM5 – Earthworks – Construction Activity Pollution Control
SUSTAINABLE SITEPLANNING & MANAGEMENT
SM6– Qlassic
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 58/93
SM6 Qlassic
Subscribe to independent method to
assess and evaluate quality ofworkmanship of building project based on
CIDB’s CIS 7: Quality Assessment System
for Building Construction Work (QLASSIC)
to achieve quality of workmanship
Must achieve a minimum score of 70%
SUSTAINABLE SITEPLANNING & MANAGEMENT
SM7– Workers Site Amenities
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 59/93
SM7 Workers Site Amenities
• Reduce pollution from construction activities by controlling pollution from waste and rubbish from workers. Create and implement a Site Amenities Plan
for all construction workers associated with the project.• Provide proper accommodation in site completed with electric and water
supply, septic tank to treat sewer water, waste collection centre and recycle bins. Provide first aid box and sport facilities such as sepak takraw andstraightly no open burning in site.
SUSTAINABLE SITEPLANNING & MANAGEMENT
SM8 – Public Transportation Access
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 60/93
p
• Bus Stop 500m from site
• Buses travels within and beyond campus
SUSTAINABLE SITEPLANNING & MANAGEMENT
SM9 – Green Vehicle Priority
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 61/93
y
• Provide preferred parking for low-emitting and fuel efficientvehicles for 5% of Full-Time Equivalent
SUSTAINABLE SITEPLANNING & MANAGEMENT
SM10 – Parking Capacity
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 62/93
g p y
• Provide preferred parking for carpools for 5% of the totalprovided parking spaces.
• Provided – 148 nos.• 5% of 148 – 7 nos.
SUSTAINABLE SITE PLANNING &MANAGEMENT
SM11 – Stormwater Design – Quantity & Quality Control
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 63/93
g y y
Disruption to the natural hydrology can be mitigated by diligence site planning and storm water design by:
• Maintain as much as possible the existing vegetation
during conceptual design.
• To ensure storm water management design andprovision complies to MASMA.
• Using pervious paving block for external car parks toimprove impervious cover and improving groundsurface infiltration
SUSTAINABLE SITEPLANNING & MANAGEMENT
SM12 – Greenery & Roof
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 64/93
Part A - Hardscape & Greenery Application
Provide any combination of the following
strategies for 50% of the site hardscape(including sidewalks, plazas and parking lots)
Shade (within 5 years of occupancy).
Paving materials with Solar Reflectance
Index (SRI) of at least 29.
Open grid pavement system
SUSTAINABLE SITEPLANNING & MANAGEMENT
SM12 – Greenery & Roof
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 65/93
Part B – Roof Application
Solar Reflectance Index (SRI) for low-
sloped roof < 2:12 78
SUSTAINABLE SITEPLANNING & MANAGEMENT
SM13 – Building User Manual
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 66/93
• Provide Building user manual which documents passive &active feature that should not be downgraded
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 67/93
PART 4
Part 4 - Materials and Resources
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 68/93
PART
CRITERI
A ITEM POINTS BASELINE MS 1525 TARGET COST
4
MR1 Materials reuse and selection 2 0 0 1 -
MR2 Recycled content materials 2 0 0 1 -
MR3 Regional Materials 1 1 1 1 -
MR4 Sustainable Timber 1 0 0 1 -MR5 Storage & Collection of recyclables 1 1 1 1 10,000
MR6 Construction waste management 2 0 0 1 -
MR7 Refrigerants & Green Agents 2 0 0 1 -
TOTAL 11 2 2 7 10,000
Part 4 Materials and Resources
MATERIALS & RESOURCES
MR1 – Materials Reuse & Selection
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 69/93
Reuse building materials and products to
reduce demand for virgin materials andreduce creation of waste.
Reused products/materials constitutes ≥ 2%
of the project’s total material cost value.
MATERIALS & RESOURCES
MR2 – Recycled Content Materials
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 70/93
Increase demand for building products that incorporate
recycled content materials in their production
Use of materials with recycled content is such that the sum of
post-consumer recycled plus one-half of the pre-consumer
content constitutes ≥ 10% (based on cost) of the total value of
the materials in the project
MATERIALS & RESOURCES
MR3 – Regional Materials
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 71/93
•
The map indicates that The
Whole of Peninsular Malaysia,
Singapore, and part of Sumatra
and Southern Thailand are
encompassed within 500 km
from the project site.
•
There shall be no problems atall, and very obvious that the
more than 20% of the building
material could be obtained
within this region.
MATERIALS & RESOURCES
MR4 – Sustainable Timber
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 72/93
Encourage environmentally responsible forest
management
Where ≥ 50% of wood-based materials andproducts used are certified
STRATEGIESAll timber doors used in the building to be of
MTCC and FSC certified wood products
MATERIALS & RESOURCES
MR5 – Storage & Collection of Recyclables
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 73/93
Facilitate reduction of waste generated during
construction and during building occupancy that ishauled and disposed of in landfills
STRATEGIESDuring Construction
Provide dedicated storage area for collection of non-hazardous materials for recycling
During Building OccupancyProvide permanent recycle bins on each floors exceptfor mechanical and car park floors and also at RefuseCollection Centre
ADDITIONAL COST50 recycle bins x RM 150/u = RM 7,500.00
2 bins at Refuse Chamber = RM 2,500.00Total = RM10,000.00
MATERIALS & RESOURCES
MR6 – Construction Waste Management
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 74/93
Develop and implement a construction waste management plan that, as aminimum identifies the materials to be diverted from disposal regardless or
whether the materials will be sorted on site or comingled. Quantify bymeasuring total truck loads of waste sent for disposalRecycle and/or salvage ≥ 50% volume of non-hazardous construction debris
STRATEGIES
Specify in Tender Documents
Set up Construction Waste Sorting
Guidelines
Identify relevant debris/ waste storage
area
Record waste sent for disposal
MATERIALS & RESOURCES
MR7 – Refrigerants & Clean Agents
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 75/93
Non ozone depleting gas not limited to ACMV
system but also other systems such as fire
suppression system. Zero ozone depleting gas asfollow;
R134a HFC refrigerant gas
R410a HFC refrigerant gas, if any
Fire suppression system such as Argonite
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 76/93
PART 5
P 5 W Effi i
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 77/93
PART ITEM POINTS BASELINE MS 1525 TARGET COST
5
WE1 Rainwater Harvesting 2 0 0 1 2,000
WE2 Water Recycling 2 0 0 0 -
WE3
Water Efficient - Irrigation/
Landscaping 2 0 0 2 -
WE4 Water Efficient Fittings 2 0 0 1 25,000
WE5Metering & Leak DetectionSystem
2 0 0 2 5,000
Total 10 0 0 6 32,000
Part 5 - Water Efficiency
WATER EFFICIENCY
WE1 – Rainwater Harvesting
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 78/93
Encourage rainwater harvesting that will lead to
reduction in potable water consumption.
RAIN FALL COLLECTED YEARLY
Rainfall
(mm) Runoff Coe.
Roof Area
(m2) Q (l) Diverted
Nett
Colelcted
2,495.60 0.80 2,279.00 4,549,977.92 54,696. 4,495,281.92
Total harvested per year = 4,549,978 litre
= 1,000,995 gal
= 4,550 m³
WATER EFFICIENCY
WE1 – Rainwater Harvesting
A i 115 S ff 20 G l d d 1200 S d 10 G l d
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 79/93
Assumption: 115 Staffs at 20 Gal per day, and 1200 Students at 10 Gal per day
Estimated Daily Demand = 14,300 gal per day
Estimated yearly at 36 weeks @ 5 days week = 2,574,057 gal per year
17% Demand = 437,642 gal or 1,989 m3
Existing Design provided with 2 Rain Water Harvesting Tank at 1,500 gal each
Provide additional Rainwater Harvesting Tank at 1,500 gal per tank, and capable
of harvesting 1,989 m3 of water which is replacing 17% of portable water
THEREFORE, Harvested and Stored for irrigation use >15% of Portable Water
Demand, and Points Earned = 1
WATER EFFICIENCY
WE1 – Rainwater Harvesting
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 80/93
• Fully Engineered
System to be usedsuch as:– Diverter fittings
with built in filter
– Floating Strainer
• Fittings selected tohave independent verified testingresults
WATER EFFICIENCY
WE 3 - WATER EFFICIENT LANDSCAPING
Irrigation Demand for the Proposed Development
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 81/93
Irrigation Demand for the Proposed Development
Total Tress 127 nos
Turf Area 1835.4 m2
Grasscrete 990 m2 (turf area assume 40%)
Landscape
Type Area (sf) Species Factor (Ks)
Densit
y
Factor
(Kd)
Microclim
ate Factor
(Kmc) KL ETo ETL IE
TPWA
(Gal)
Trees (No.) 127( Assume 15
litre/tree/day) 152,953.15
Turf 19,7560.70 1.00 1.20
0.84 8.525 7.16 Sprinkler 226,357.06
Total Plant Water Applied 379,310.20
Total water required for irrigation= 379,310 gal or 1,724 m3 per year
Provide 3 Rainwater tank capturing 1,989 m3 per year, One additional Tank Cost RM
2,000.00
Therefore, No requirement of Portable Water required, GBI Points Earned 2 Points
WATER EFFICIENCY
WE4 – Water Efficient Fittings
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 82/93
Sink or Bib Taps:Cotto Art Ct 183 (3.16L/min)
Basin Taps & Mixers:
Docol Benefits (1.60L/min)
Showerheads:
Grohe 28368000 (3.97L/min)
Encourage reduction in portable water consumption
through use of efficient devices
STRATEGY
Reduce annual portable water consumption by ≥ 30 %via :1. Dual flush WCs2. Auto sensor taps to all public washrooms3. Low capacity flushing cisterns
4. Self closing delayed action tap
WATER EFFICIENCY
WE5 – Metering & Leak Detection System
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 83/93
AC Make
Up TankToilet Irrigation Cafeteria• Locate digital sub-meter
at major water usagearea to record usage andmonitor leakage
• All sub-meters linked back to EMS formonitoring and detectionof leakage
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 84/93
PART 6
Part 6 - Innovation
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 85/93
PART ITEM POINTS BASE MS 1525 TARGET COST
IN INNOVATION
6
IN1Innovation in Design & Environmental Design
Initiatives
6 0 1 6 221,976
IN2 Green Building Index Accredited Facilitator 1 0 0 1 200,000
TOTAL 7 0 0 7 421,976
Part 6 - Innovation
INNOVATION
IN1 – Innovation in Design & Environmental Design Initiatives
C d t t ( ti f t l t 50% f t t l
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 86/93
STRATEGYTo recover condensate water into a/c make up tank
Condensate water recovery (accounting for at least 50% of total
AHUs/FCUs for use as cooling tower make up water etc
Estimation of Condensate water generation.
Latent heat = mass of water x heat of vaporisation
H = m x L
Base on 1445kW(411RT) cooling load, 20% goes to latent heat.
The heat of vaporisation is 2438kJ/kg, to condense vapor into
water.
Hence, the generated condensate water is estimated to be
Q (l/s) = 1445kW x 0.20 / 2438kJ/kg x 1 L/kg = 0.12 L/s
Daily condensate water generation = 0.12 L/s x 3600 s/hrs x 10
hrs/day x 0.8DF = 3456 Liter/day (3.5m3/day)
INNOVATION
IN1 – Innovation in Design & Environmental Design Initiatives
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 87/93
Waterless urinals (fitted to all male toilets)
STRATEGYTo provide waterless urinals in all maletoilets
ADDITIONAL COSTUrinal per floor = 4 nos.Additional cost per urinal = RM 500
Additional Cost = 38 x RM 500= RM 19,000
INNOVATION
IN1 – Innovation in Design & Environmental Design Initiatives
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 88/93
System Unit Rate Number
of coats
Price differenceVS
SiM Paint In %
Life span
SiM Silicate Paint
(light colour) RM 19.00/MS 2 coats 10 - 15 years
Water base Acrylic RM 11.50/MS 3 coats -39.5 % 2 - 5 years
Solvent base Acrylic /
Silicone Paint RM 14.00/MS 3 coats -26.3 % 3 - 5 years
Poly-Urethane RM 28.00/MS 3 coats 47.4 % extra cost 4 - 7 year
INNOVATION
IN1 – Innovation in Design & Environmental Design Initiatives
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 89/93
Recycling of all fire system water during regular
testing-Water for the following fire fighting systems will be
recovered during monthly testing either through drain
pipe or a break tank:-
-The system identified are:-
Sprinkler System (OH1)
Wet Riser System
Hose Reel System
INNOVATION
IN1 – Innovation in Design & Environmental Design Initiatives
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 90/93
• Other Innovations to be
included:• Refrigerant leakage
detection and recycling
facilities
• Auto Condenser Tube
Cleaning System• Non-Chemical Water
Treatment for Cooling
Tower
INNOVATION
IN2 – Green Building Index Accredited Facilitator
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 91/93
To provide at least one principle participant of the
project team shall be a Green Building IndexAccredited Facilitator
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 92/93
RETURN ONINVESTMENT
RETURN ON INVESTMENT
7/22/2019 GD GBI Presentation
http://slidepdf.com/reader/full/gd-gbi-presentation 93/93
AREA 11,510 m2
Base BEI 175 kWh/m2/year
Proposed BEI 100 kWh/m2/year
Different 75 kWh/m2/year Tariff 0.41 RM/kWh
Amount save 353,932.50 RM per year
Total Amount Required 2,173,163.72 RM
Simple Pay Back 6.14 year