    Infection Control Risk Assessment Guidelines

    Identify the Type of Construction Project Activity (Types A-D)

    A on-inv!sive !ctivities" includin#" $ut not limited to%a. Removal of ceiling tiles where no dust is expectedb. Painting, but not sandingc. Wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of

    walls or access to ceilings other than for visual inspection

    B &m!ll sc!le" short dur!tion !ctivities 'hich cre!te minim!l dust" includin# $ut not limited to%a. nstallation of telephone and computer cablingb. Access to chase spacesc. !utting of walls or ceiling where dust migration can be controlled.

    ! ork th!t #ener!tes ! moder!te to hi#h level of dust or reuires demolition or remov!l of !ny *+ed$uildin# components or !ssem$lies" includin# $ut not limited to%a. "anding of walls for painting or wall coveringb. Removal of #oor coverings, ceiling tiles, and caseworkc. $ew wall constructiond. %inor duct work or electrical work above ceilingse. %a&or cabling activities

    f. An' t'pe A, B or ! activit' that cannot be completed within a single work shift.

    ( ,!jor demolition !nd construction projects" includin# $ut not limited to%

    a. Activities requiring heav' demolition or removal of a complete cabling s'stemb. $ew construction

    Identify the P!tient Risk Group th!t 'ill $e !ected. If more th!n one risk #roup 'ill $e !ected" select the hi#her#roup. /or !ll construction cl!sses" p!tients must $e removed from the room 'hile 'ork is performed.

    0o' ,edium 1i#hAll outpatient clinics and o)ces, exceptoutpatient transplant clinics and outpatientcancer center clinics

    All inpatient areas, except inpatient oncolog',bone marrow transplant, adult oncolog', andpediatric oncolog'. *utpatient transplantclinics and outpatient cancer center clinics.

    npatient oncolog', inpatient bone marrowtransplant, inpatient adult oncolog', inpatientpediatric oncolog', an' other areas caring forimmunocompromised patients.

    ,!tch the P!tient Risk Group (0" ," 1) 'ith the Construction Project Type (A" 2" C" D) to *nd the Cl!ss ofPrec!utions (I 3 4)

    Construction Project TypeP!tient Risk Group Type A Type 2 Type C Type D

    0o' Risk I II I4 4

    ,edium Risk II (no cone" unless$urn p!tient 'ith

    uncovered 'ounds ortr!nspl!nt)

    III (no cone" unless$urn p!tient 'ith

    uncovered 'ounds ortr!nspl!nt)

    4 4

    1i#h Risk II (cone5 pts. ,ust $eout of room5 this

    includes lun#

    tr!nspl!nt pts.)

    I4 4 4

  • 8/20/2019 ICRAGuidelines_r1

    2/3

    Description of Reuired Infection Control Prec!utions $y Cl!ss

    Cl!ss Durin# Construction Project 6pon Completion of Project

    Cl!ss I +. xecute work b' methods to minimi-e raising dustfrom construction operations.

    . mmediatel' replace ceiling tile if displaced.

    Cl!ss II +. /igh Risk patients must remain out of room for onehour after completion of work.

    . xecute work b' methods to minimi-e raising dust.0. mmediatel' replace ceiling tile if displaced.

    +. Remove all visible debris with a wet towel and1or mop.. /ousekeeping to wipe work surfaces with disinfectant.

    Cl!ss III +. xecute work b' methods to minimi-e raising dust.. mmediatel' replace ceiling tile if displaced0. Provide active means to prevent airborne dust from

    dispersing into atmosphere.2. Water3mist work surfaces to control dust while cutting.4. "eal unused doors with duct tape.5. Block o6 and seal /7A! registers and grills.8. Place dust mat at entrance and exit of work area.9. !over construction waste before transport in covered

    containers

    +. !over construction waste before transport in covered containers.. Wet mop and1or vacuum with /PA :ltered vacuum before

    leaving work area.0. *pen previousl' sealed /7A! registers and grills.2. /ousekeeping to wipe work surfaces with disinfectant.

    Cl!ss I4 +. nstall plastic dust barriers to seal area from non3work

    area or implement control cube method ;cart withplastic covering and sealed connection to work sitewith /PA vacuum for vacuuming prior to exit< beforeconstruction begins.

    . solate /7A! s'stem in areas where work is beingperformed to prevent contamination of duct s'stem.

    0. %aintain negative pressure within work site utili-ing/PA equipped air :ltration units.

    2. Place dust mat at entrance and exit of work area.4. !over construction waste before transport in covered

    containers.5. All work associated with a ma&or pro&ect that has an

    approved !RA authori-ation form will be assessed on

    an individual basis.

    +. !over construction waste before transport in covered containers.

    . (o not remove barriers from work area until a /ealth "'stemresponsible person inspects completed pro&ect.

    0. Remove barrier materials carefull' to minimi-e spread of dirt anddebris associated with construction.

    2. Wet mop and vacuum with /PA :ltered vacuum before leavingwork area.

    4. Remove isolation of /7A! s'stem in areas where work was beingperformed.

    5. /ousekeeping to wipe work surfaces with disinfectant.

    Cl!ss 4 +. !onstruct g'psum board1metal stud dust partition,extend and seal to ceiling.

    . solate /7A! s'stem within work areas to preventcontamination of duct s'stem.

    0. "eal doors opening to ad&acent areas with duct tape.2. Block o6 and seal /7A! registers, grills and an'

    openings in ductwork to remain.4. %aintain negative pressure within work site utili-ing

    /PA equipped air :ltration units.5. Place dust mat at entrance and exit of work area.8. !over construction waste before transport in covered

    containers.

    9. All work associated with a ma&or pro&ect that has anapproved !RA authori-ation form will be assessed on

    +. !over construction waste before transport in covered containers.. (o not remove barriers from work area until a /ealth "'stem

    responsible person inspects completed pro&ect.0. Remove barrier materials carefull' to minimi-e spread of dirt and

    debris associated with construction.2. Wet mop and vacuum with /PA :ltered vacuum before leaving

    work area.4. Remove isolation of /7A! s'stem in areas where work was being

    performed.5. /ousekeeping to wipe work surfaces with disinfectant.