90
Cargo Cuota IMSS I.S.R.P. Guarderia INFONAVIT S.A.R. $47.91 $17,499.13 $71.87 $718.65 $18,289.64 $6,175.27 $182.90 $174.99 $914.48 $365.79 Aluminero $62.91 $22,977.88 $94.37 $943.65 $24,015.89 $8,108.67 $240.16 $229.78 $1,200.79 $480.32 $64.21 $23,452.70 $96.32 $963.15 $24,512.17 $8,276.23 $245.12 $234.53 $1,225.61 $490.24 Ayudante A $52.25 $19,084.31 $78.38 $783.75 $19,946.44 $6,734.67 $199.46 $190.84 $997.32 $398.93 Ayudante B $47.91 $17,499.13 $71.87 $718.65 $18,289.64 $6,175.27 $182.90 $174.99 $914.48 $365.79 Azulejero $59.83 $21,852.91 $89.75 $897.45 $22,840.10 $7,711.68 $228.40 $218.53 $1,142.01 $456.80 Barretero $60.40 $22,061.10 $90.60 $906.00 $23,057.70 $7,785.14 $230.58 $220.61 $1,152.89 $461.15 Bombero $57.63 $21,049.36 $86.45 $864.45 $22,000.25 $7,428.11 $220.00 $210.49 $1,100.01 $440.01 $64.21 $23,452.70 $96.32 $963.15 $24,512.17 $8,276.23 $245.12 $234.53 $1,225.61 $490.24 $47.70 $17,422.43 $71.55 $715.50 $18,209.48 $6,148.20 $182.09 $174.22 $910.47 $364.19 Cadenero $47.90 $17,495.48 $71.85 $718.50 $18,285.83 $6,173.98 $182.86 $174.95 $914.29 $365.72 $59.98 $21,907.70 $89.97 $899.70 $22,897.37 $7,731.01 $228.97 $219.08 $1,144.87 $457.95 $56.85 $20,764.46 $85.28 $852.75 $21,702.49 $7,327.57 $217.02 $207.64 $1,085.12 $434.05 $56.85 $20,764.46 $85.28 $852.75 $21,702.49 $7,327.57 $217.02 $207.64 $1,085.12 $434.05 $60.56 $22,119.54 $90.84 $908.40 $23,118.78 $7,805.77 $231.19 $221.20 $1,155.94 $462.38 $59.83 $21,852.91 $89.75 $897.45 $22,840.10 $7,711.68 $228.40 $218.53 $1,142.01 $456.80 Fierrero $58.88 $21,505.92 $88.32 $883.20 $22,477.44 $7,589.23 $224.77 $215.06 $1,123.87 $449.55 Herrero $58.88 $21,505.92 $88.32 $883.20 $22,477.44 $7,589.23 $224.77 $215.06 $1,123.87 $449.55 $58.88 $21,505.92 $88.32 $883.20 $22,477.44 $7,589.23 $224.77 $215.06 $1,123.87 $449.55 Maestro $125.56 $45,860.79 $188.34 $1,883.40 $47,932.53 $16,183.82 $479.33 $458.61 $2,396.63 $958.65 $56.85 $20,764.46 $85.28 $852.75 $21,702.49 $7,327.57 $217.02 $207.64 $1,085.12 $434.05 Mecánico $56.85 $20,764.46 $85.28 $852.75 $21,702.49 $7,327.57 $217.02 $207.64 $1,085.12 $434.05 $58.88 $21,505.92 $88.32 $883.20 $22,477.44 $7,589.23 $224.77 $215.06 $1,123.87 $449.55 $47.70 $17,422.43 $71.55 $715.50 $18,209.48 $6,148.20 $182.09 $174.22 $910.47 $364.19 $61.13 $22,327.73 $91.70 $916.95 $23,336.38 $7,879.24 $233.36 $223.28 $1,166.82 $466.73 $72.31 $26,411.23 $108.47 $1,084.65 $27,604.34 $9,320.26 $276.04 $264.11 $1,380.22 $552.09 $63.40 $23,156.85 $95.10 $951.00 $24,202.95 $8,171.82 $242.03 $231.57 $1,210.15 $484.06 $70.54 $25,764.74 $105.81 $1,058.10 $26,928.65 $9,092.12 $269.29 $257.65 $1,346.43 $538.57 Operador $47.70 $17,422.43 $71.55 $715.50 $18,209.48 $6,148.20 $182.09 $174.22 $910.47 $364.19 $43.42 $15,859.16 $65.13 $651.30 $16,575.59 $5,596.54 $165.76 $158.59 $828.78 $331.51 $64.79 $23,664.55 $97.19 $971.85 $24,733.58 $8,350.98 $247.34 $236.65 $1,236.68 $494.67 $58.10 $21,221.03 $87.15 $871.50 $22,179.68 $7,488.69 $221.80 $212.21 $1,108.98 $443.59 Peon $41.90 $15,303.98 $62.85 $628.50 $15,995.33 $5,400.62 $159.95 $153.04 $799.77 $319.91 Pintor $58.31 $21,297.73 $87.47 $874.65 $22,259.84 $7,515.76 $222.60 $212.98 $1,112.99 $445.20 Plomero $58.62 $21,410.96 $87.93 $879.30 $22,378.19 $7,555.71 $223.78 $214.11 $1,118.91 $447.56 Poblador $62.28 $22,747.77 $93.42 $934.20 $23,775.39 $8,027.46 $237.75 $227.48 $1,188.77 $475.51 $49.95 $18,244.24 $74.93 $749.25 $19,068.41 $6,438.21 $190.68 $182.44 $953.42 $381.37 $98.49 $35,973.47 $147.74 $1,477.35 $37,598.56 $12,694.68 $375.99 $359.73 $1,879.93 $751.97 $106.33 $38,837.03 $159.50 $1,594.95 $40,591.48 $13,705.20 $405.91 $388.37 $2,029.57 $811.83 Soldador $60.35 $22,042.84 $90.53 $905.25 $23,038.61 $7,778.70 $230.39 $220.43 $1,151.93 $460.77 $97.18 $35,495.00 $145.77 $1,457.70 $37,098.47 $12,525.83 $370.98 $354.95 $1,854.92 $741.97 $47.91 $17,499.13 $71.87 $718.65 $18,289.64 $6,175.27 $182.90 $174.99 $914.48 $365.79 Tornillero $62.49 $22,824.47 $93.74 $937.35 $23,855.56 $8,054.53 $238.56 $228.24 $1,192.78 $477.11 $69.65 $25,439.66 $104.48 $1,044.75 $26,588.89 $8,977.41 $265.89 $254.40 $1,329.44 $531.78 $61.13 $22,327.73 $91.70 $916.95 $23,336.38 $7,879.24 $233.36 $223.28 $1,166.82 $466.73 Velador $53.97 $19,712.54 $80.96 $809.55 $20,603.05 $6,956.36 $206.03 $197.13 $1,030.15 $412.06 Vidriero $58.88 $21,505.92 $88.32 $883.20 $22,477.44 $7,589.23 $224.77 $215.06 $1,123.87 $449.55 Salario Base Percepcion Total Prima Vacacional Gratificac ion Total Devengado a Aux. de Topografo Cabo de oficiales Cabo de peones Carpintero de Banco Carpintero Obra Negra de materiales Chofer de Camion ta Jefe de Almacen a Mecanico montador de equipo Montador de equipo Oficial Albañil electrico "C" Especializ ado Plomero "C" Operador de Equipo de Maquinaria "A" de Maquinaria "B" o te de terraceria e de tuberia soldada Soldador Calificado Tomador de Tiempo Tubero de primera Tubero de segunda

Integracion de Salarios

Embed Size (px)

DESCRIPTION

Documento en Excel que cuantifica los salarios de trabajadores de la construcción, útil para costear un proyecto arquitectónico.

Citation preview

SalariosCargoSalario BasePercepcion TotalPrima VacacionalGratificacionTotal DevengadoCuota IMSSI.S.R.P.GuarderiaINFONAVITS.A.R.Suma TotalSalario RealAlmacenista$47.91$17,499.13$71.87$718.65$18,289.64$6,175.27$182.90$174.99$914.48$365.79$26,103.07$91.19Aluminero$62.91$22,977.88$94.37$943.65$24,015.89$8,108.67$240.16$229.78$1,200.79$480.32$34,275.61$119.74Aux. de Topografo$64.21$23,452.70$96.32$963.15$24,512.17$8,276.23$245.12$234.53$1,225.61$490.24$34,983.89$122.21Ayudante A$52.25$19,084.31$78.38$783.75$19,946.44$6,734.67$199.46$190.84$997.32$398.93$28,467.66$99.45Ayudante B$47.91$17,499.13$71.87$718.65$18,289.64$6,175.27$182.90$174.99$914.48$365.79$26,103.07$91.19Azulejero$59.83$21,852.91$89.75$897.45$22,840.10$7,711.68$228.40$218.53$1,142.01$456.80$32,597.51$113.88Barretero$60.40$22,061.10$90.60$906.00$23,057.70$7,785.14$230.58$220.61$1,152.89$461.15$32,908.07$114.96Bombero$57.63$21,049.36$86.45$864.45$22,000.25$7,428.11$220.00$210.49$1,100.01$440.01$31,398.88$109.69Cabo de oficiales$64.21$23,452.70$96.32$963.15$24,512.17$8,276.23$245.12$234.53$1,225.61$490.24$34,983.89$122.21Cabo de peones$47.70$17,422.43$71.55$715.50$18,209.48$6,148.20$182.09$174.22$910.47$364.19$25,988.66$90.79Cadenero$47.90$17,495.48$71.85$718.50$18,285.83$6,173.98$182.86$174.95$914.29$365.72$26,097.63$91.17Carpintero de Banco$59.98$21,907.70$89.97$899.70$22,897.37$7,731.01$228.97$219.08$1,144.87$457.95$32,679.24$114.16Carpintero Obra Negra$56.85$20,764.46$85.28$852.75$21,702.49$7,327.57$217.02$207.64$1,085.12$434.05$30,973.90$108.21Checador de materiales$56.85$20,764.46$85.28$852.75$21,702.49$7,327.57$217.02$207.64$1,085.12$434.05$30,973.90$108.21Chofer de Camion$60.56$22,119.54$90.84$908.40$23,118.78$7,805.77$231.19$221.20$1,155.94$462.38$32,995.24$115.27Electricista$59.83$21,852.91$89.75$897.45$22,840.10$7,711.68$228.40$218.53$1,142.01$456.80$32,597.51$113.88Fierrero$58.88$21,505.92$88.32$883.20$22,477.44$7,589.23$224.77$215.06$1,123.87$449.55$32,079.92$112.07Herrero$58.88$21,505.92$88.32$883.20$22,477.44$7,589.23$224.77$215.06$1,123.87$449.55$32,079.92$112.07Jefe de Almacen$58.88$21,505.92$88.32$883.20$22,477.44$7,589.23$224.77$215.06$1,123.87$449.55$32,079.92$112.07Maestro$125.56$45,860.79$188.34$1,883.40$47,932.53$16,183.82$479.33$458.61$2,396.63$958.65$68,409.56$238.99Maniobrista$56.85$20,764.46$85.28$852.75$21,702.49$7,327.57$217.02$207.64$1,085.12$434.05$30,973.90$108.21Mecnico$56.85$20,764.46$85.28$852.75$21,702.49$7,327.57$217.02$207.64$1,085.12$434.05$30,973.90$108.21Mecanico montador de equipo$58.88$21,505.92$88.32$883.20$22,477.44$7,589.23$224.77$215.06$1,123.87$449.55$32,079.92$112.07Montador de equipo$47.70$17,422.43$71.55$715.50$18,209.48$6,148.20$182.09$174.22$910.47$364.19$25,988.66$90.79Oficial Albail$61.13$22,327.73$91.70$916.95$23,336.38$7,879.24$233.36$223.28$1,166.82$466.73$33,305.80$116.35Oficial electrico "C"$72.31$26,411.23$108.47$1,084.65$27,604.34$9,320.26$276.04$264.11$1,380.22$552.09$39,397.06$137.63Oficial Especializado$63.40$23,156.85$95.10$951.00$24,202.95$8,171.82$242.03$231.57$1,210.15$484.06$34,542.58$120.67Oficial Plomero "C"$70.54$25,764.74$105.81$1,058.10$26,928.65$9,092.12$269.29$257.65$1,346.43$538.57$38,432.70$134.26Operador$47.70$17,422.43$71.55$715.50$18,209.48$6,148.20$182.09$174.22$910.47$364.19$25,988.66$90.79Operador de Equipo$43.42$15,859.16$65.13$651.30$16,575.59$5,596.54$165.76$158.59$828.78$331.51$23,656.76$82.64Operador de Maquinaria "A"$64.79$23,664.55$97.19$971.85$24,733.58$8,350.98$247.34$236.65$1,236.68$494.67$35,299.90$123.32Operador de Maquinaria "B"$58.10$21,221.03$87.15$871.50$22,179.68$7,488.69$221.80$212.21$1,108.98$443.59$31,654.95$110.58Peon$41.90$15,303.98$62.85$628.50$15,995.33$5,400.62$159.95$153.04$799.77$319.91$22,828.61$79.75Pintor$58.31$21,297.73$87.47$874.65$22,259.84$7,515.76$222.60$212.98$1,112.99$445.20$31,769.36$110.98Plomero$58.62$21,410.96$87.93$879.30$22,378.19$7,555.71$223.78$214.11$1,118.91$447.56$31,938.26$111.57Poblador$62.28$22,747.77$93.42$934.20$23,775.39$8,027.46$237.75$227.48$1,188.77$475.51$33,932.36$118.54Rastrillero$49.95$18,244.24$74.93$749.25$19,068.41$6,438.21$190.68$182.44$953.42$381.37$27,214.54$95.07Sobreestante de terraceria$98.49$35,973.47$147.74$1,477.35$37,598.56$12,694.68$375.99$359.73$1,879.93$751.97$53,660.86$187.46Sobrestante de tuberia soldada$106.33$38,837.03$159.50$1,594.95$40,591.48$13,705.20$405.91$388.37$2,029.57$811.83$57,932.37$202.38Soldador$60.35$22,042.84$90.53$905.25$23,038.61$7,778.70$230.39$220.43$1,151.93$460.77$32,880.83$114.87Soldador Calificado$97.18$35,495.00$145.77$1,457.70$37,098.47$12,525.83$370.98$354.95$1,854.92$741.97$52,947.13$184.97Tomador de Tiempo$47.91$17,499.13$71.87$718.65$18,289.64$6,175.27$182.90$174.99$914.48$365.79$26,103.07$91.19Tornillero$62.49$22,824.47$93.74$937.35$23,855.56$8,054.53$238.56$228.24$1,192.78$477.11$34,046.78$118.94Tubero de primera$69.65$25,439.66$104.48$1,044.75$26,588.89$8,977.41$265.89$254.40$1,329.44$531.78$37,947.80$132.57Tubero de segunda$61.13$22,327.73$91.70$916.95$23,336.38$7,879.24$233.36$223.28$1,166.82$466.73$33,305.80$116.35Velador$53.97$19,712.54$80.96$809.55$20,603.05$6,956.36$206.03$197.13$1,030.15$412.06$29,404.78$102.72Vidriero$58.88$21,505.92$88.32$883.20$22,477.44$7,589.23$224.77$215.06$1,123.87$449.55$32,079.92$112.07Yesero$56.64$20,687.76$84.96$849.60$21,622.32$7,300.51$216.22$206.88$1,081.12$432.45$30,859.49$107.81

Cuadrillas

Cuadrilla No. (1 peon)1Cuadrilla No. (6 peon)6Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.1$79.75$79.75PeonJor.6$79.75$478.50

Mando IntermediosMando IntermediosCabo de PeonesJor.0.05000$90.79$4.54Cabo de PeonesJor.0.30000$90.79$27.24MaestroJor.0.01667$238.99$3.98MaestroJor.0.10000$238.99$23.90Sub-Total$88.27Sub-Total$529.64Dep. Herramienta Menor%4%$88.27$3.53Dep. Herramienta Menor%4%$529.64$21.19Total$91.80Total$550.82

Cuadrilla No. (2 peon)2Cuadrilla No. (7 peon)7Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.2$79.75$159.50PeonJor.7$79.75$558.25$0.00$0.00$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08Cabo de PeonesJor.0.35000$90.79$31.78MaestroJor.0.03333$238.99$7.97MaestroJor.0.11667$238.99$27.88Sub-Total$176.55Sub-Total$617.91Dep. Herramienta Menor%4%$176.55$7.06Dep. Herramienta Menor%4%$617.91$24.72Total$183.61Total$642.63

Cuadrilla No. (3 peon)3Cuadrilla No. (8 peon)8Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.3$79.75$239.25PeonJor.8$79.75$638.00

Mando IntermediosMando IntermediosCabo de PeonesJor.0.15000$90.79$13.62Cabo de PeonesJor.0.40000$90.79$36.32MaestroJor.0.05000$238.99$11.95MaestroJor.0.13333$238.99$31.86Sub-Total$264.82Sub-Total$706.19Dep. Herramienta Menor%4%$264.82$10.59Dep. Herramienta Menor%4%$706.19$28.25Total$275.41Total$734.43

Cuadrilla No. (4 peon)4Cuadrilla No. 9 (1 ayudante "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.4$79.75$319.00Ayudante "B"Jor.1$91.19$91.19

Mando IntermediosMando IntermediosCabo de PeonesJor.0.20000$90.79$18.16Cabo de PeonesJor.0.05000$90.79$4.54MaestroJor.0.06667$238.99$15.93MaestroJor.0.01667$238.99$3.98Sub-Total$353.09Sub-Total$99.71Dep. Herramienta Menor%4%$353.09$14.12Dep. Herramienta Menor%4%$99.71$3.99Total$367.22Total$103.70

Cuadrilla No. (5 peon)5Cuadrilla No.10 ( 1 ayudante "A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.5$79.75$398.75Ayudante "A"Jor.1$99.45$99.45

Mando IntermediosMando IntermediosCabo de PeonesJor.0.25000$90.79$22.70Cabo de PeonesJor.0.05000$90.79$4.54MaestroJor.0.08333$238.99$19.92MaestroJor.0.01667$238.99$3.98Sub-Total$441.37Sub-Total$107.97Dep. Herramienta Menor%4%$441.37$17.65Dep. Herramienta Menor%4%$107.97$4.32Total$459.02Total$112.29

Cuadrilla No. 11(Azulejero+Ayud"B")Cuadrilla No.16 (Of. Alb+4ayd "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAzulejeroJor.1$113.88$113.88Ayudante "B"Jor.4$91.19$364.76Ayudante "B"Jor.1$91.19$91.19Oficial AlbailJor.1$116.35$116.35$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08Cabo de PeonesJor.0.25000$90.79$22.70MaestroJor.0.03333$238.99$7.97MaestroJor.0.08333$238.99$19.92Sub-Total$222.11Sub-Total$523.72Dep. Herramienta Menor%4%$222.11$8.88Dep. Herramienta Menor%4%$523.72$20.95Total$231.00Total$544.67

Cuadrilla No. 12(oficial alb+ peon)Cuadrilla No.17 (Of. Albail+5peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.1$79.75$79.75PeonJor.5$79.75$398.75Oficial AlbailJor.1$116.35$116.35Oficial AlbailJor.1$116.35$116.35$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08Cabo de PeonesJor.0.30000$90.79$27.24MaestroJor.0.03333$238.99$7.97MaestroJor.0.10000$238.99$23.90Sub-Total$213.15Sub-Total$566.24Dep. Herramienta Menor%4%$213.15$8.53Dep. Herramienta Menor%4%$566.24$22.65Total$221.67Total$588.89

Cuadrilla No.13 (Of. Alb+2 peon)Cuadrilla No.18 (Of.Alb+ Ayud "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.2$79.75$159.50Ayudante "B"Jor.1$91.19$91.19Ofical albailJor.1$116.35$116.35Oficial AlbailJor.1$116.35$116.35$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.15000$90.79$13.62Cabo de PeonesJor.0.10000$90.79$9.08MaestroJor.0.05000$238.99$11.95MaestroJor.0.03333$238.99$7.97Sub-Total$301.42Sub-Total$224.59Dep. Herramienta Menor%4%$301.42$12.06Dep. Herramienta Menor%4%$224.59$8.98Total$313.48Total$233.57

Cuadrilla No. 14(OfAlb+3 peon)Cuadrilla No.19 (Of. Esp+ayud "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.3$79.75$239.25Ayudante "B"Jor.1$91.19$91.19Ofical albailJor.1$116.35$116.35Oficial EspecializadoJor.1$120.67$120.67$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.20000$90.79$18.16Cabo de PeonesJor.0.10000$90.79$9.08MaestroJor.0.06667$238.99$15.93MaestroJor.0.03333$238.99$7.97Sub-Total$389.69Sub-Total$228.91Dep. Herramienta Menor%4%$389.69$15.59Dep. Herramienta Menor%4%$228.91$9.16Total$405.28Total$238.06

Cuadrilla No. 15(OfAlb+4 peon)Cuadrilla No.20 (2Of. Esp+2ayud "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.4$79.75$319.00Ayudante "B"Jor.2$91.19$182.38Ofical albailJor.1$116.35$116.35Oficial EspecializadoJor.2$120.67$241.35$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.25000$90.79$22.70Cabo de PeonesJor.0.20000$90.79$18.16MaestroJor.0.08333$238.99$19.92MaestroJor.0.06667$238.99$15.93Sub-Total$477.97Sub-Total$457.82Dep. Herramienta Menor%4%$477.97$19.12Dep. Herramienta Menor%4%$457.82$18.31Total$497.09Total$476.13

Cuadrilla No. 21(Carp.Ob.Neg+Ayud"B")Cuadrilla No.26 (Pintor+ayud "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalCarpintero de Obra NegraJor.1$108.21$108.21Ayudante "B"Jor.1$91.19$91.19Ayudante "B"Jor.1$91.19$91.19PintorJor.1$110.98$110.98$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08Cabo de PeonesJor.0.10000$90.79$9.08MaestroJor.0.03333$238.99$7.97MaestroJor.0.03333$238.99$7.97Sub-Total$216.44Sub-Total$219.22Dep. Herramienta Menor%4%$216.44$8.66Dep. Herramienta Menor%4%$219.22$8.77Total$225.10Total$227.99

Cuadrilla No. 22(Carp Banco+ Ayud "A")Cuadrilla No.27 (Herrero+ Ayud"B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "A"Jor.1$99.45$99.45Ayudante "B"Jor.1$91.19$91.19Carpintero de BancoJor.1$114.16$114.16HerreroJor.1$112.07$112.07$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08$0.00MaestroJor.0.03333$238.99$7.97MaestroJor.0.03333$238.99$7.97Sub-Total$230.66Sub-Total$211.23Dep. Herramienta Menor%4%$230.66$9.23Dep. Herramienta Menor%4%$211.23$8.45Total$239.89Total$219.67

Cuadrilla No.23 (Fierrero+Ayud "B")Cuadrilla No.28 (Herrero+ Ayud"A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "B"Jor.1$91.19$91.19Ayudante "A"Jor.1$99.45$99.45FierreroJor.1$112.07$112.07HerreroJor.1$112.07$112.07$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08$0.00MaestroJor.0.03333$238.99$7.97MaestroJor.0.03333$238.99$7.97Sub-Total$220.30Sub-Total$219.49Dep. Herramienta Menor%4%$220.30$8.81Dep. Herramienta Menor%4%$219.49$8.78Total$229.12Total$228.27

Cuadrilla No. 24(Fierrero+2Ayud "B")Cuadrilla No.29 (Soldador+ayud "B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "B"Jor.2$91.19$182.38Ayudante "B"Jor.1$91.19$91.19FierreroJor.1$112.07$112.07SoldadorJor.1$114.87$114.87$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.15000$90.79$13.62$0.00MaestroJor.0.05000$238.99$11.95MaestroJor.0.03333$238.99$7.97Sub-Total$320.02Sub-Total$214.02Dep. Herramienta Menor%4%$320.02$12.80Dep. Herramienta Menor%4%$214.02$8.56Total$332.82Total$222.58

Cuadrilla No. 25(yesero+ ayud "B")Cuadrilla No.30 (Sold.Calif+ayud "A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "B"Jor.1$91.19$91.19Ayudante "A"Jor.1$99.45$99.45YeseroJor.1$107.81$107.81Saldador CalificadoJor.1$184.97$184.97$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.10000$90.79$9.08Cabo de PeonesJor.0.10000$90.79$9.08MaestroJor.0.03333$238.99$7.97MaestroJor.0.05000$238.99$11.95Sub-Total$216.04Sub-Total$305.45Dep. Herramienta Menor%4%$216.04$8.64Dep. Herramienta Menor%4%$305.45$12.22Total$224.68Total$317.66

Cuadrilla No. 31(1 Aluminero)Cuadrilla No.36 (Plomero+2ayud "A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAlumineroJor.1$119.74$119.74Ayudante "A"Jor.2$99.45$198.90$0.00PlomeroJor.1$111.57$111.57$0.00$0.00$0.00$0.00Mando IntermediosMando Intermedios$0.00Cabo de OficialesJor.0.15000$122.21$18.33MaestroJor.0.05000$238.99$11.95MaestroJor.0.07500$238.99$17.92Sub-Total$131.69Sub-Total$346.73Dep. Herramienta Menor%4%$131.69$5.27Dep. Herramienta Menor%4%$346.73$13.87Total$136.96Total$360.60

Cuadrilla No. 32(Alum.+ Ayud "A")Cuadrilla No.37 (Electric+ Ayud"A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "A"Jor.1$99.45$99.45Ayudante "A"Jor.1$99.45$99.45AlumineroJor.1$119.74$119.74ElectricistaJor.1$113.88$113.88$0.00$0.00$0.00$0.00Mando IntermediosMando Intermedios$0.00Cabo de OficialesJor.0.10000$122.21$12.22MaestroJor.0.10000$238.99$23.90MaestroJor.0.05000$238.99$11.95Sub-Total$243.09Sub-Total$237.50Dep. Herramienta Menor%4%$243.09$9.72Dep. Herramienta Menor%4%$237.50$9.50Total$252.81Total$247.00

Cuadrilla No.33 (Vidriero+Ayud "B")Cuadrilla No.38(Electric+ 2Ayud"A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "B"Jor.1$91.19$91.19Ayudante "A"Jor.2$99.45$198.90VidrieroJor.1$112.07$112.07ElectricistaJor.1$113.88$113.88$0.00$0.00$0.00$0.00Mando IntermediosMando Intermedios$0.00Cabo de OficialesJor.0.15000$122.21$18.33MaestroJor.0.10000$238.99$23.90MaestroJor.0.07500$238.99$17.92Sub-Total$227.16Sub-Total$349.03Dep. Herramienta Menor%4%$227.16$9.09Dep. Herramienta Menor%4%$349.03$13.96Total$236.24Total$363.00

Cuadrilla No. 34(Vidriero+Ayud "A")Cuadrilla No.39 (Operador Equipo)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "A"Jor.1$99.45$99.45Operador de EquipoJor.1$82.64$82.64VidrieroJor.1$112.07$112.07$0.00$0.00$0.00$0.00$0.00Mando IntermediosMando Intermedios$0.00Cabo de OficialesJor.0.05000$122.21$6.11MaestroJor.0.10000$238.99$23.90MaestroJor.0.01667$238.99$3.98Sub-Total$235.42Sub-Total$92.74Dep. Herramienta Menor%4%$235.42$9.42Dep. Herramienta Menor%4%$92.74$3.71Total$244.84Total$96.45

Cuadrilla No. 35(Plomero+ ayud "A")Cuadrilla No.40 (Op. Equipo+ peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "A"Jor.1$99.45$99.45Operador de EquipoJor.1$82.64$82.64PlomeroJor.1$111.57$111.57PeonJor.1$79.75$79.75$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.10000$122.21$12.22Cabo de OficialesJor.0.10000$122.21$12.22MaestroJor.0.05000$238.99$11.95MaestroJor.0.03333$238.99$7.97Sub-Total$235.20Sub-Total$182.58Dep. Herramienta Menor%4%$235.20$9.41Dep. Herramienta Menor%4%$182.58$7.30Total$244.60Total$189.89

Cuadrilla No. 41(Op. Equipo+2peones)Cuadrilla No.46 (Chofer Camio+peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOperador de EquipoJor.1$82.64$82.64PeonJor.1$79.75$79.75PeonJor.2$79.75$159.50Chofer de CamionJor.1$115.27$115.27$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.15000$122.21$18.33Sobrestante de TerraceriasJor.0.10000$187.46$18.75MaestroJor.0.05000$238.99$11.95MaestroJor.0.03333$238.99$7.97Sub-Total$272.43Sub-Total$221.73Dep. Herramienta Menor%4%$272.43$10.90Dep. Herramienta Menor%4%$221.73$8.87Total$283.32Total$230.60

Cuadrilla No. 42(Op. Equ + 3 peon)Cuadrilla No.47 (Chofer Camion+ Ayud"B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOperador de EquipoJor.1$82.64$82.64Ayudante "B"Jor.1$91.19$91.19PeonJor.3$79.75$239.25Chofer de CamionJor.1$115.27$115.27$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.20000$122.21$24.44Sobrestante de TerraceriasJor.0.10000$187.46$18.75MaestroJor.0.06667$238.99$15.93MaestroJor.0.03333$238.99$7.97Sub-Total$362.27Sub-Total$233.17Dep. Herramienta Menor%4%$362.27$14.49Dep. Herramienta Menor%4%$233.17$9.33Total$376.76Total$242.50

Cuadrilla No.43 (Op.Equ+4peon)Cuadrilla No.48(Aux. Topografo+ 4Ayud"A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOperador de EquipoJor.1$82.64$82.64Ayudante "A"Jor.4$99.45$397.80PeonJor.4$79.75$319.00Aux. TopografoJor.1$122.21$122.21$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.25000$122.21$30.55$0.00MaestroJor.0.08333$238.99$19.92$0.00Sub-Total$452.12Sub-Total$520.02Dep. Herramienta Menor%4%$452.12$18.08Dep. Herramienta Menor%4%$520.02$20.80Total$470.20Total$540.82

Cuadrilla No. 44(Op.Maq"B"+Ayud"B")Cuadrilla No.49 (2 Of. Albail+ 4 peones)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "B"Jor.1$91.19$91.19PeonesJor.4$79.75$319.00Op. Maquinaria "B"Jor.1$110.58$110.58Oficial. AlbailJor.2$116.35$232.70$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosSobrestante de TerraceriasJor.0.10000$187.46$18.75Cabo de OficialesJor.0.30000$122.21$36.66MaestroJor.0.03333$238.99$7.97MaestroJor.0.10000$238.99$23.90Sub-Total$228.49Sub-Total$612.27Dep. Herramienta Menor%4%$228.49$9.14Dep. Herramienta Menor%4%$612.27$24.49Total$237.63Total$636.76

Cuadrilla No. 45(Op.Maq"A"+ayud "A")Cuadrilla No.50 (2Oficial Albail+ 9peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "A"Jor.1$99.45$99.45Oficial. AlbailJor.2$116.35$232.70Operador de Maquinaria "A"Jor.1$123.32$123.32PeonJor.9$79.75$717.76$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosSobrestante de TerraceriasJor.0.10000$187.46$18.75Cabo de OficialesJor.0.55000$122.21$67.22MaestroJor.0.03333$238.99$7.97MaestroJor.0.18333$238.99$43.81Sub-Total$249.48Sub-Total$1,061.49Dep. Herramienta Menor%4%$249.48$9.98Dep. Herramienta Menor%4%$1,061.49$42.46Total$259.46Total$1,103.95

Cuadrilla No. 51(2Oficial Albail+5peones)Cuadrilla No.56 (9 peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.2$116.35$232.70PeonJor.9$79.75$717.76PeonJor.5$79.75$398.75$0.00$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.35000$122.21$42.78Cabo de PeonesJor.0.45000$90.79$40.86MaestroJor.0.11667$238.99$27.88MaestroJor.0.15000$238.99$35.85Sub-Total$702.11Sub-Total$794.46Dep. Herramienta Menor%4%$702.11$28.08Dep. Herramienta Menor%4%$794.46$31.78Total$730.20Total$826.24

Cuadrilla No. 52(2 Oficial Albail + 10 peon)Cuadrilla No.57 (Poblador + Ayud"A")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.2$116.35$232.70Ayudante "A"Jor.1$99.45$99.45PeonJor.10$79.75$797.51PobladorJor.1$118.54$118.54$0.00$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.60000$122.21$73.33Cabo de OficialesJor.0.10000$122.21$12.22MaestroJor.0.20000$238.99$47.80MaestroJor.0.03333$238.99$7.97Sub-Total$1,151.34Sub-Total$238.18Dep. Herramienta Menor%4%$1,151.34$46.05Dep. Herramienta Menor%4%$238.18$9.53Total$1,197.39Total$247.71

Cuadrilla No.53 (Plomero + Ayudante "B"+ Peon)Cuadrilla No.58(Oficial Albail+ 1Ayud"B"+ 7 Peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPlomeroJor.1$111.57$111.57Ayudante "B"Jor.1$91.19$91.19PeonJor.1$79.75$79.75Oficial AlbailJor.1$116.35$116.35Ayudante "B"Jor.1$91.19$91.19PeonJor.7$79.75$558.25$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.15000$122.21$18.33Cabo de OficialesJor.0.45000$122.21$55.00MaestroJor.0.05000$238.99$11.95MaestroJor.0.15000$238.99$35.85Sub-Total$312.80Sub-Total$856.64Dep. Herramienta Menor%4%$312.80$12.51Dep. Herramienta Menor%4%$856.64$34.27Total$325.31Total$890.91

Cuadrilla No. 54(Oficial Electrico "C"+Ayud"B" + Peon)Cuadrilla No.59 (Oficial Albail+ 1Ayud"B"+ 3 Peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalAyudante "B"Jor.1$91.19$91.19Ayudante "B"Jor.1$91.19$91.19Oficial Electrico "C"Jor.1$137.63$137.63Oficial AlbailJor.1$116.35$116.35PeonJor.1$79.75$79.75PeonJor.3$79.75$239.25$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.15000$122.21$18.33Cabo de OficialesJor.0.25000$122.21$30.55MaestroJor.0.05000$238.99$11.95MaestroJor.0.08333$238.99$19.92Sub-Total$338.85Sub-Total$497.26Dep. Herramienta Menor%4%$338.85$13.55Dep. Herramienta Menor%4%$497.26$19.89Total$352.41Total$517.15

Cuadrilla No. 55(10 Peon)Cuadrilla No.60 (Oficial Albail+ Ayudante "A" + peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalPeonJor.10$79.75$797.51Oficial. AlbailJor.1$116.35$116.35$0.00PeonJor.1$79.75$79.75$0.00Ayudante "A"Jor.1$99.45$99.45$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.50000$90.79$45.40Cabo de OficialesJor.0.15000$122.21$18.33MaestroJor.0.16667$238.99$39.83MaestroJor.0.05000$238.99$11.95Sub-Total$882.73Sub-Total$325.83Dep. Herramienta Menor%4%$882.73$35.31Dep. Herramienta Menor%4%$325.83$13.03Total$918.04Total$338.87

Cuadrilla No. 61(Oficial Albail +Tubero 2da.+2peones)Cuadrilla No.66 (Tubero 1ra+ 2Tubero 2da + 4 peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.1$116.35$116.35PeonJor.4$79.75$319.00PeonJor.2$79.75$159.50Tubero de segundaJor.2$116.35$232.70Tubero de segundaJor.1$116.35$116.35Tubero de primeraJor.1$132.57$132.57$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.20000$122.21$24.44Cabo de OficialesJor.0.35000$122.21$42.78MaestroJor.0.06667$238.99$15.93MaestroJor.0.11667$238.99$27.88Sub-Total$432.58Sub-Total$754.93Dep. Herramienta Menor%4%$432.58$17.30Dep. Herramienta Menor%4%$754.93$30.20Total$449.88Total$785.13

Cuadrilla No. 62(Oficial Albail +Tubero 1ra.+2peones)Cuadrilla No.67 (Tubero 1ra+ 2Tubero 2da + 6 peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.1$116.35$116.35PeonJor.6$79.75$478.50PeonJor.2$79.75$159.50Tubero de segundaJor.2$116.35$232.70Tubero de primeraJor.1$132.57$132.57Tubero de primeraJor.1$132.57$132.57$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.20000$122.21$24.44Cabo de OficialesJor.0.45000$122.21$55.00MaestroJor.0.06667$238.99$15.93MaestroJor.0.15000$238.99$35.85Sub-Total$448.80Sub-Total$934.62Dep. Herramienta Menor%4%$448.80$17.95Dep. Herramienta Menor%4%$934.62$37.38Total$466.75Total$972.01

Cuadrilla No.63 (Oficial Albail +Tubero 1ra.+4peones)Cuadrilla No.68(Tornillero + 4 Rastrillero+ 5 Peon)Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.1$116.35$116.35TornilleroJor.1$118.94$118.94PeonJor.4$79.75$319.00RastrilleroJor.4$95.07$380.29Tubero de primeraJor.1$132.57$132.57PeonJor.5$79.75$398.75$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.30000$122.21$36.66Cabo de OficialesJor.0.50000$122.21$61.11MaestroJor.0.10000$238.99$23.90MaestroJor.0.16667$238.99$39.83Sub-Total$628.49Sub-Total$998.92Dep. Herramienta Menor%4%$628.49$25.14Dep. Herramienta Menor%4%$998.92$39.96Total$653.63Total$1,038.88

Cuadrilla No. 64(Oficial Albail +Tubero 1ra.+7peones)Cuadrilla No.69 (4Oficial Albail+ 4Ayud"B")Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.1$116.35$116.35Ayudante "B"Jor.4$91.19$364.76PeonJor.7$79.75$558.25Oficial AlbailJor.4$116.35$465.41Tubero de primeraJor.1$132.57$132.57$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de OficialesJor.0.45000$122.21$55.00Cabo de OficialesJor.0.40000$122.21$48.89MaestroJor.0.15000$238.99$35.85MaestroJor.0.13333$238.99$31.86Sub-Total$898.02Sub-Total$910.92Dep. Herramienta Menor%4%$898.02$35.92Dep. Herramienta Menor%4%$910.92$36.44Total$933.94Total$947.35

Cuadrilla No. 65(Oficial Albail +Tubero 1ra.+9peones)Cuadrilla No.70 (Montador de Equipo + Ayudante "B" )Mano de obraUnidadCantidadSalario RealImp. TotalMano de obraUnidadCantidadSalario RealImp. TotalOficial. AlbailJor.1$116.35$116.35Montador de EquipoJor.1$90.79$90.79PeonJor.9$79.75$717.76Ayudante "B"Jor.1$91.19$91.19Tubero de primeraJor.1$132.57$132.57$0.00$0.00$0.00Mando IntermediosMando IntermediosCabo de PeonesJor.0.55000$90.79$49.93Cabo de OficialesJor.0.10000$122.21$12.22MaestroJor.0.18333$238.99$43.81MaestroJor.0.03333$238.99$7.97Sub-Total$1,060.42Sub-Total$202.17Dep. Herramienta Menor%4%$1,060.42$42.42Dep. Herramienta Menor%4%$202.17$8.09Total$1,102.84Total$210.25

Cuadrilla No. 71(Montador de Equipo + Ayudante "B"+ Peon)Mano de obraUnidadCantidadSalario RealImp. TotalMontador de EquipoJor.1$90.79$90.79Ayudante "B"Jor.1$91.19$91.19PeonJor.1$79.75$79.75$0.00Mando IntermediosCabo de OficialesJor.0.15000$122.21$18.33MaestroJor.0.05000$238.99$11.95Sub-Total$292.01Dep. Herramienta Menor%4%$292.01$11.68Total$303.69

Cuadrilla No. 72(Barretero + Ayudante "A")Mano de obraUnidadCantidadSalario RealImp. TotalBarreteroJor.1$114.96$114.96Ayudante "A"Jor.1$99.45$99.45$0.00$0.00Mando IntermediosCabo de OficialesJor.0.10000$122.21$12.22MaestroJor.0.03333$238.99$7.97Sub-Total$234.60Dep. Herramienta Menor%4%$234.60$9.38Total$243.98

Precios de Mat.MATERIALES Y OTROS

CONCEPTOPRECIO UNITARIO UNIDADCemento gris$1,740.00Toncemento Blaco$3,360.00TonCemento Crest$3,450.00TonYeso$1,000.00TonGrano de Marmol (marmolina)$700.00TonSIKALITE$14.00kgArena #5$220.00M3Arena #4$195.00M3Agua$11.00M3Grava 3/4$195.00M3

Gasolina Magna$5.89LtGasolina Premium$6.60LtDiesel$4.88LtLubricante$26.00LtTaza de Interes39.72%

Alambre recocido # 16$8.00kg.Clavo 3/4", 2 1/2", y 4"$11.00kg.Malla electrosoldada 6-6/10-10$18.50kg.Alambron 1/4" (2) F'y= 3000 Kg/cm2$6,500.00ton.Varilla 5/16" (2.5)$6,000.00ton.Varilla 3/8" (3)$5,940.00ton.Varilla 1/2" (4)$5,920.00ton.Varilla 5/8" (5)$5,890.00ton.Varilla 3/4" (6)$5,850.00ton.Varilla 1" (8)$5,820.00ton.Varilla 1 1/4" (10)$5,790.00ton.Varilla 1 1/2" (12)$5,760.00ton.

Equipo

DESCRIPCION: CAMION PETROLIZADORA,MARCA FORD ,MODELO 48-826,INCLUYE EQUIPO CON PETROLIZADORA SEAMANN-GUNISSON

precio de (Pa)=745800horas trabajadas (Ha)=1680Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=122.8lubricante(aL)=0.00358adicionalvalor de (Vn)=13800potencia(Hp)=61.400precio del(Pl)=26llantasdel equipolubricantevalor(Va)=724000salario (So)CUA=47244.3tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=149160combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=8400precio de (Pc)=5.89factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=1800capacidad de(C) =7factor de (Fo)=0.5de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=68.43CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i103.22fijosSeguro =(13000 -11700) + 2(s+ha)=2.60Mantenimiento =0.868.43=54.75SUMA =229.00

cargos por combustible0.227165.8954.75cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)6.625consumocargos por llantasvn /hv07.67SUMA =69.04

cargos por so/ha *286.5SUMA =41.63operacincosto total hora equipo TOTAL 339.67

DESCRIPCION: REVOLVEDORA PARA CONCRETO MARCA MIPSA DE UN SACO DE CAPACIDAD MOTOR REVOLVEDORA DE GASOLINA MARCA KOHLER ,MODELO K-181 DE 8 H.P.

precio de (Pa)=13000horas trabajadas (Ha)=1400Cambio(T)=50adquisicional aode lubricanteequipo(Ea)=0potencia(j)=8lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencia(Hp)=6.000precio del(Pl)=26llantasdel equipolubricantevalor(Va)=13000salario (So)CUA =3996.448tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=11700combustible(c) =0.2271prima anual(S)=0.01rescatede segurovida economica(Ve)=4200precio de (Pc)=5.89factor de (Q)=0.9de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =1factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=0.31CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i3.50fijosSeguro =(13000 -11700) + 2(s+ha)=0.09Mantenimiento =0.868.43=0.28SUMA =4.18

cargos por combustible0.227165.898.03cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)0.999consumocargos por llantasvn /hv00.00SUMA =9.02

cargos por so/ha *286.5SUMA =19.72operacincosto total hora equipo TOTAL 32.92

DESCRIPCION: VIBRADOR DE AGUJA PARA CONCRETO MARCA MECSA MODELO K-8 MOTOR DE GASOLINA KOHLER K-181 ,8 H.P. 3600 RPM

precio de (Pa)=9900horas trabajadas (Ha)=1475Cambio(T)=50adquisicional aode lubricanteequipo(Ea)=0potencia(j)=4lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencial(Hp)=3.000precio del(Pl)=26llantasdel equipolubricantevalor(Va)=9900salario (So)CUA=9105.336tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=8910combustible(c) =0.2271prima anual(S)=0.01rescatede segurovida economica(Ve)=4425precio de (Pc)=5.89factor de (Q)=0.9de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =1.7factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=0.22CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i2.53fijosSeguro =(13000 -11700) + 2(s+ha)=0.06Mantenimiento =0.868.43=0.20SUMA =3.02

cargos por combustible0.227165.894.01cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)1.123consumocargos por llantasvn /hv00.00SUMA =5.14

cargos por so/ha *286.5SUMA =20.44operacincosto total hora equipo TOTAL 28.60

DESCRIPCION: MALACATE MARCA MECSA ,MODELO M -1000 1 TONELADA DE CAPACIDAD MOTOR DE GASOLINA WISCONSIN S14D-R DE 14 H.P. 3600 RPM.

precio de (Pa)=6900horas trabajadas (Ha)=1600Cambio(T)=50adquisicional aode lubricanteequipo(Ea)=0potencia(j)=12.5lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencial(Hp)=9.380precio del(Pl)=26llantasdel equipolubricantevalor(Va)=6900salario (So)CUA=3996.448tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=6210combustible(c) =0.2271prima anual(S)=0.01rescatede segurovida economica(Ve)=4800precio de (Pc)=5.89factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =2.7factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=0.14CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i1.63fijosSeguro =(13000 -11700) + 2(s+ha)=0.04Mantenimiento =0.868.43=0.12SUMA =1.93

cargos por combustible0.227165.8912.55cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)2.153consumocargos por llantasvn /hv00.00SUMA =14.70

cargos por so/ha *286.5SUMA =17.26operacincosto total hora equipo TOTAL 33.88

DESCRIPCION: PLUMA PARA MALACATE DE 1 TONELADA DE CAPACIDAD COMPLETA

precio de (Pa)=5300horas trabajadas (Ha)=1600Cambio(T)=0adquisicional aode lubricanteequipo(Ea)=0potencia(j)=0lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencial(Hp)=0.000precio del(Pl)=0llantasdel equipolubricantevalor(Va)=5300salario (So)CUA=9105.336tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=0combustible(c) =0prima anual(S)=0.01rescatede segurovida economica(Ve)=8000precio de (Pc)=0factor de (Q)=1de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =0factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=0.66CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i0.66fijosSeguro =(13000 -11700) + 2(s+ha)=0.02Mantenimiento =0.868.43=0.66SUMA =2.00

cargos por combustible0.227165.890.00cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)0.000consumocargos por llantasvn /hv00.00SUMA =0.00

cargos por so/ha *286.5SUMA =18.85operacincosto total hora equipo TOTAL 20.84

DESCRIPCION: CAMION DE VOLTEO MARCA FORD ,MOTOR DIESEL DE 170 H.P. ,8M3 DE CAPACIDAD

precio de (Pa)=489000horas trabajadas (Ha)=1700Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=122.8lubricante(aL)=0.00358adicionalvalor de (Vn)=13800potencial(Hp)=61.400precio del(Pl)=26llantasdel equipolubricantevalor(Va)=474800salario (So)CUA=46230.599tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=97800combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=8500precio de (Pc)=4.88factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=1800capacidad de(C) =6.6factor de (Fo)=0.5de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=44.35CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i66.89fijosSeguro =(13000 -11700) + 2(s+ha)=1.68Mantenimiento =0.868.43=35.48SUMA =148.41

cargos por combustible0.227164.8845.36cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)6.573consumocargos por llantasvn /hv07.67SUMA =59.60

cargos por so/ha *286.5SUMA =38.83operacincosto total hora equipo TOTAL 246.85

DESCRIPCION: CAMION PIPA MARCA FORD ,MOTOR DIESEL DE 170 H.P.INCLUYE TANQUE DE 10000 LITROS DE CAPACIDAD.

precio de (Pa)=469000horas trabajadas (Ha)=1700Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=122.8lubricante(aL)=0.00358adicionalvalor de (Vn)=13800potencial(Hp)=61.400precio del(Pl)=26llantasdel equipolubricantevalor(Va)=455400salario (So)CUA=46230.599tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=93800combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=8500precio de (Pc)=4.88factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=1800capacidad de(C) =7.5factor de (Fo)=0.5de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=42.54CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i64.16fijosSeguro =(13000 -11700) + 2(s+ha)=1.62Mantenimiento =0.868.43=34.03SUMA =142.35

cargos por combustible0.227164.8845.36cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)6.690consumocargos por llantasvn /hv07.67SUMA =59.72

cargos por so/ha *286.5SUMA =38.83operacincosto total hora equipo TOTAL 240.90

DESCRIPCION: MOTONIVELADORA CATERPILLAR ,MODELO 120 B ,MONTADO SOBRE BASTIDOR DE LLANTAS ,MOTOR DIESEL DE 125 H.P.

precio de (Pa)=1367800horas trabajadas (Ha)=2000Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=125lubricante(aL)=0.00358adicionalvalor de (Vn)=135000potencial(Hp)=93.750precio del(Pl)=26llantasdel equipolubricantevalor(Va)=1282300salario (So)CUA=45252.673tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=205100combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=10000precio de (Pc)=4.88factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=1000capacidad de(C) =27factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=107.72CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i147.70fijosSeguro =(13000 -11700) + 2(s+ha)=3.72Mantenimiento =0.868.43=86.18SUMA =345.31

cargos por combustible0.227164.8869.27cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)12.236consumocargos por llantasvn /hv0135.00SUMA =216.50

cargos por so/ha *286.5SUMA =36.16operacincosto total hora equipo TOTAL 597.98

DESCRIPCION: APLANADORA MARCA COPACTO - HUMBER MODELO CT - 1014 DE 10 A 14 TONELADAS,DE RODILLOS ,MOTOR DE 73 H.P.

precio de (Pa)=643700horas trabajadas (Ha)=2000Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=73lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencial(Hp)=54.750precio del(Pl)=26llantasdel equipolubricantevalor(Va)=643700salario (So)CUA=45252.673tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=128750combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=10000precio de (Pc)=5.89factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =12factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=51.50CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i76.70fijosSeguro =(13000 -11700) + 2(s+ha)=1.93Mantenimiento =0.868.43=41.20SUMA =171.33

cargos por combustible0.227165.8948.82cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)5.930consumocargos por llantasvn /hv00.00SUMA =54.75

cargos por so/ha *286.5SUMA =36.16operacincosto total hora equipo TOTAL 262.24

DESCRIPCION: PAVIMENTADORA BARBER GREEN MODELO BG -220 ,MOTOR JOHN DEERE ,78 HP. REGLA MAESTRA 2.44 M. ANCHO BASICO 3.05

precio de (Pa)=1282300horas trabajadas (Ha)=1500Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=81lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencial(Hp)=60.750precio del(Pl)=26llantasdel equipolubricantevalor(Va)=1282300salario (So)CUA=45252.673tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=256400combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=6000precio de (Pc)=5.89factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =19factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=170.98CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i203.72fijosSeguro =(13000 -11700) + 2(s+ha)=5.13Mantenimiento =0.868.43=136.79SUMA =516.62

cargos por combustible0.227165.8954.17cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)7.319consumocargos por llantasvn /hv00.00SUMA =61.49

cargos por so/ha *286.5SUMA =48.22operacincosto total hora equipo TOTAL 626.33

DESCRIPCION: RETROEXCAVADORA HIDRAULICA CASE MODELO 580 H, MOTOR DIESEL PERKINS 4,236 ,73 HP. ,2200 RPM

precio de (Pa)=554100horas trabajadas (Ha)=2000Cambio(T)=200adquisicional aode lubricanteequipo(Ea)=0potencia(j)=73lubricante(aL)=0.00307adicionalvalor de (Vn)=27800potencia(Hp)=54.750precio del(Pl)=26llantasdel equipolubricantevalor(Va)=527700salario (So)CUA=44239.431tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=110800combustible(c) =0.1514prima anual(S)=0.01rescatede segurovida economica(Ve)=14000precio de (Pc)=4.88factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=1000capacidad de(C) =8factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=29.78CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i63.40fijosSeguro =(13000 -11700) + 2(s+ha)=1.60Mantenimiento =0.868.43=23.82SUMA =118.60

cargos por combustible0.227164.8840.45cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)5.410consumocargos por llantasvn /hv027.80SUMA =73.66

cargos por so/ha *286.5SUMA =34.27operacincosto total hora equipo TOTAL 226.53

DESCRIPCION:NIVEL NATIONAL ,MODELO DUMPY(EQUIPO PARA MEDICION )

precio de (Pa)=8300horas trabajadas (Ha)=1400Cambio(T)=0adquisicional aode lubricanteequipo(Ea)=0potencia(j)=0lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencia(Hp)=0.000precio del(Pl)=0llantasdel equipolubricantevalor(Va)=8300salario (So)CUA=48540.815tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=1660combustible(c) =0prima anual(S)=0.01rescatede segurovida economica(Ve)=14000precio de (Pc)=0factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =0factor de (Fo)=0.9de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=0.47CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i1.41fijosSeguro =(13000 -11700) + 2(s+ha)=0.04Mantenimiento =0.868.43=0.38SUMA =2.30

cargos por combustible0.2271600.00cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)0.000consumocargos por llantasvn /hv00.00SUMA =0.00

cargos por so/ha *286.5SUMA =110.58operacincosto total hora equipo TOTAL 112.88

DESCRIPCION: TRANSITO NATIONAL K-E ,CHS (EQUIPO PARA MEDICION )

precio de (Pa)=17800horas trabajadas (Ha)=1400Cambio(T)=0adquisicional aode lubricanteequipo(Ea)=0potencia(j)=0lubricante(aL)=0.00307adicionalvalor de (Vn)=0potencia(Hp)=0.000precio del(Pl)=0llantasdel equipolubricantevalor(Va)=17800salario (So)CUA=48540.815tasa de interes(i)=39.72%inicialde operacinanualvalor de (Vr)=3560combustible(c) =0prima anual(S)=0.01rescatede segurovida economica(Ve)=14000precio de (Pc)=0factor de (Q)=0.8de maquinariacombustiblemantenimientovida economica(Hv)=0capacidad de(C) =0factor de (Fo)=0.9de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=1.02CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i3.03fijosSeguro =(13000 -11700) + 2(s+ha)=0.08Mantenimiento =0.868.43=0.81SUMA =4.94

cargos por combustible0.227165.890.00cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)0.000consumocargos por llantasvn /hv00.00SUMA =0.00

cargos por so/ha *286.5SUMA =110.58operacincosto total hora equipo TOTAL 115.51

DESCRIPCION: CARRETILLA DE VOLTEO BUGGY ,MODELO JPR -175 , 160 LITROS DE CAPACIDAD , MONTADA SOBRE NEUMATICOS

precio de (Pa)=2580horas trabajadas (Ha)=2000Cambio(T)=0adquisicional aode lubricanteequipo(Ea)=0potencia(j)=0lubricante(aL)=0.00307adicionalvalor de (Vn)=520potencia(Hp)=0.000precio del(Pl)=0llantasdel equipolubricantevalor(Va)=2060salario (So)CUA=191.805tasa de interes(i)=0.3972inicialde operacinanualvalor de (Vr)=0combustible(c) =0prima anual(S)=0.01rescatede segurovida economica(Ve)=2000precio de (Pc)=0factor de (Q)=1de maquinariacombustiblemantenimientovida economica(Hv)=1000capacidad de(C) =0factor de (Fo)=0.75de llantascarteroperacion Procedimiento de Calculo

Depreciacion =(13000 -11700) +4200=1.03CargosIntereres =[(13000 + 11700) + 2 (Ha) ] i0.20fijosSeguro =(13000 -11700) + 2(s+ha)=0.01Mantenimiento =0.868.43=1.03SUMA =2.27

cargos por combustible0.2271600.00cargos de cargos por lubricantec/t (pl) +(al)(hp)(pl)0.000consumocargos por llantasvn /hv00.52SUMA =0.52

cargos por so/ha *286.5SUMA =13.14operacincosto total hora equipo TOTAL 13.14

MorterosMortero cemento-arena 1:2Mortero cemento-arena 1:6Mano de obra Unid. Cant. P.U.ImporteMano de obra Unid. Cant. P.U.ImporteCemento gris(0.605+5%)Ton.0.63525$1,740.00$1,105.34Cemento gris(0.298+5%)Ton.0.31290$1,740.00$544.45Arena #5(1.004+10%)m31.10440$220.00$242.97Arena #4(1.184+10%)m31.30240$195.00$253.97Agua (0.276+20%)m30.3312$11.00$3.64Agua(0.259+20%)m30.3108$11.00$3.42

SUB-TOTAL$1,351.95SUB-TOTAL$801.83Mano de obra y equipoMano de obra y equipo

SUB-TOTALSUB-TOTALTOTAL$1,351.95TOTAL$801.83

Mortero cemento-arena 1:3Mortero cemento-arena 1:7Mano de obra Unid. Cant. P.U.ImporteMano de obra Unid. Cant. P.U.ImporteCemento gris(0.496+5%)Ton.0.52080$1,740.00$906.19Cemento gris(0.248+5%)Ton.0.26040$1,740.00$453.10Arena #4(1.104+10%)m31.21440$195.00$236.81Arena #4(1.265+10%)m31.39150$195.00$271.34Agua (0.271+20%)m30.3252$11.00$3.58Agua(0.252+20%)m30.3024$11.00$3.33

SUB-TOTAL$1,146.58SUB-TOTAL$727.76Mano de obra y equipoMano de obra y equipo

SUB-TOTALSUB-TOTALTOTAL$1,146.58TOTAL$727.76

Mortero cemento-arena 1:4Mortero cemento-arena 1:8Mano de obra Unid. Cant. P.U.ImporteMano de obra Unid. Cant. P.U.ImporteCemento gris(0.421+5%)Ton.0.44205$1,740.00$769.17Cemento gris(0.209+5%)Ton.0.21945$1,740.00$381.84Arena #4(1.129+10%)m31.24190$195.00$242.17Arena #4(1.305+10%)m31.43550$195.00$279.92Agua (0.268+20%)m30.3216$11.00$3.54Agua(0.247+20%)m30.2964$11.00$3.26

SUB-TOTAL$1,014.88SUB-TOTAL$665.03Mano de obra y equipoMano de obra y equipo

SUB-TOTALSUB-TOTALTOTAL$1,014.88TOTAL$665.03

Mortero cemento-arena 1:5Mortero yeso-aguaMano de obra Unid. Cant. P.U.ImporteMano de obra Unid. Cant. P.U.ImporteCemento gris(0.351+5%)Ton.0.36855$1,740.00$641.28Yeso(0.682+5%)Ton.0.71610$1,000.00$716.10Arena #4(1.154+10%)m31.26940$195.00$247.53Agua(0.451+20%)m30.54120$11.00$5.95Agua (0.261+20%)m30.3132$11.00$3.45

SUB-TOTAL$892.26SUB-TOTAL$722.05Mano de obra y equipoMano de obra y equipo

SUB-TOTALSUB-TOTALTOTAL$892.26TOTAL$722.05

Mortero yeso-arena-aguaLechada cemento gris-aguaMano de obra Unid. Cant. P.U.ImporteMano de obra Unid. Cant. P.U.ImporteYeso(0.433+5%)Ton.0.45465$1,000.00$454.65Cemento gris(1.305+5%)Ton.1.37025$1,740.00$2,384.24Arena #5(0.539+10%)m30.59290$220.00$130.44Agua(0.988+20%)m31.18560$11.00$13.04Agua (0.290+20%)m30.348$11.00$3.83

SUB-TOTAL$588.92SUB-TOTAL$2,397.28Mano de obra y equipoMano de obra y equipo

SUB-TOTALSUB-TOTALTOTAL$588.92TOTAL$2,397.28

Pasta cemento blanco-cemento crest-marmolinaLechada cemento blanco-aguaMano de obra Unid. Cant. P.U.ImporteMano de obra Unid. Cant. P.U.ImporteCemento blanco(0.322+5%)Ton.0.33810$3,360.00$1,136.02Cemento blanco(1.305+5%)Ton.1.37025$3,360.00$4,604.04Cemento crest(0.107+5%)Ton.0.11235$3,450.00$387.61Agua(0.988+20%)m31.18560$11.00$13.04Marmolina(1.194+10%)Ton.1.3134$700.00$919.38Agua(0.507+20%)m30.6084$11.00$6.69SUB-TOTAL$2,449.70SUB-TOTAL$4,617.08Mano de obra y equipoMano de obra y equipo

SUB-TOTALSUB-TOTALTOTAL$2,449.70TOTAL$4,617.08

Pasta cemento gris-aguaMano de obra Unid. Cant. P.U.ImporteCemento gris(2.008+5%)Ton.2.10840$1,740.00$3,668.62Agua(0.953+20%)m31.1436$11.00$12.58

SUB-TOTAL$3,681.20Mano de obra y equipo

SUB-TOTALTOTAL$3,681.20

Pasta cemento blanco-aguaMano de obra Unid. Cant. P.U.ImporteCemento blanco(2.008+5%)Ton.2.10840$3,360.00$7,084.22Agua(0.953+20%)m31.1436$11.00$12.58

SUB-TOTAL$7,096.80Mano de obra y equipo

SUB-TOTALTOTAL$7,096.80

Conc. resist. norm

Concreto fc=100 kg/cm2, con resistencia normal Concreto fc=200 kg/cm2, con resistencia normalmx.3/4", fabricado en obra c/revolvedora 1 saco. mx. 3/4", fabricado en obra c/revolvedora 1 sacoMaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.267+5%)Ton.0.28$1,740.00$487.81Cemento gris(0.359+5%)Ton0.38$1,740.00$655.89Arena #4(0.509+10%)m30.56$195.00$109.18Arena #4(0.498+10%)m30.55$195.00$106.82Grava #3/4(0.616+10%)m30.68$195.00$132.13Grava 3/4"(0.603+10%)m30.66$195.00$129.34Agua (0.217+20%)m30.26$11.00$2.86Agua(0.202+20%)m30.24$11.00$2.67

SUB-TOTAL$731.99SUB-TOTAL$894.72Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Revolvedora (8/13)Hr.0.61538$32.92$20.26Revolvedora (8/13)Hr0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$780.49TOTAL$943.23

Concreto fc=125 kg/cm2, con resistencia normalConcreto fc=225 kg/cm2, con resistencia normalmx.3/4", fabricado en obra c/revolvedora 1 saco. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.293+5%)Ton0.31$1,740.00$535.31Cemento gris(0.380+5%)Ton0.40$1,740.00$694.26Arena #4(0.506+10%)m30.56$195.00$108.54Arena #4(0.500+10%)m30.55$195.00$107.25Grava #3/4(0.613+10%)m30.67$195.00$131.49Grava #3/4(0.600+10%)m30.66$195.00$128.70Agua (0.214+20%)m30.26$11.00$2.82Agua (0.198+20%)m30.24$11.00$2.61

SUB-TOTAL$778.16SUB-TOTAL$932.82Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Revolvedora (8/13)Hr.0.61538$32.92$20.26Revolvedora (8/13)Hr.0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$826.67TOTAL$981.33

Concreto fc=150 kg/cm2, con resistencia normalConcreto fc=250 kg/cm2, con resistencia normalmx.3/4", fabricado en obra c/revolvedora 1 saco. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.318+5%)Ton0.33$1,740.00$580.99Cemento gris(0.401+5%)Ton0.42$1,740.00$732.63Arena #4(0.503+10%)m30.55$195.00$107.89Arena #4(0.502+10%)m30.55$195.00$107.68Grava #3/4(0.610+10%)m30.67$195.00$130.85Grava #3/4(0.598+10%)m30.66$195.00$128.27Agua (0.211+20%)m30.25$11.00$2.79Agua (0.195+20%)m30.23$11.00$2.57

SUB-TOTAL$822.51SUB-TOTAL$971.15Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Revolvedora (8/13)Hr.0.61538$32.92$20.26Revolvedora (8/13)Hr.0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$871.02TOTAL$1,019.66

Concreto fc=175 kg/cm2, con resistencia normalConcreto fc=275 kg/cm2, con resistencia normalmx.3/4", fabricado en obra c/revolvedora 1 saco. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.338+5%)Ton0.35$1,740.00$617.53Cemento gris(0.416+5%)Ton0.44$1,740.00$760.03Arena #4(0.500+10%)m30.55$195.00$107.25Arena #4(0.504+10%)m30.55$195.00$108.11Grava #3/4(0.606+10%)m30.67$195.00$129.99Grava #3/4(0.606+10%)m30.67$195.00$129.99Agua (0.206+20%)m30.25$11.00$2.72Agua (0.195+20%)m30.23$11.00$2.57

SUB-TOTAL$857.48SUB-TOTAL$1,000.70Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Revolvedora (8/13)Hr.0.61538$32.92$20.26Revolvedora (8/13)Hr.0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$905.99TOTAL$1,049.21

Concreto fc=300 kg/cm2, con resistencia normalmx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteCemento gris(0.431+5%)Ton0.45$1,740.00$787.44Arena #4(0.507+10%)m30.56$195.00$108.75Grava #3/4(0.614+10%)m30.68$195.00$131.70Agua (0.196+20%)m30.24$11.00$2.59

SUB-TOTAL$1,030.48Mano de obra y equipoCuadrilla No. 4 (1/13)Jor.0.07692$367.22$28.25Revolvedora (8/13)Hr.0.61538$32.92$20.26SUB-TOTAL$48.51TOTAL$1,078.99

Conc. Imp

Concreto fc=100 kg/cm2, con Imp. integral agr. Concreto fc=200 kg/cm2, con Imp. integral, agr.mx.3/4", fabricado en obra c/revolvedora 1 saco. mx. 3/4", fabricado en obra c/revolvedora 1 sacoMaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.267+5%)Ton0.28$1,740.00$487.81Cemento gris(0.359+5%)Ton0.38$1,740.00$655.89Arena #4(0.509+10%)m30.56$195.00$109.18Arena #4(0.498+10%)m30.55$195.00$106.82Grava #3/4(0.616+10%)m30.68$195.00$132.13Grava 3/4"(0.603+10%)m30.66$195.00$129.34Agua (0.217+20%)m30.26$11.00$2.86Agua(0.202+20%)m30.24$11.00$2.67Sikalite(3.204+5%)kg3.36$14.00$47.10Sikalite(4.308+5%)kg4.52$14.00$63.33SUB-TOTAL$779.08SUB-TOTAL$958.05Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Revolvedora (8/13)Hr0.61538$32.92$20.26Revolvedora (8/13)Hr0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$827.59TOTAL$1,006.56

Concreto fc=125 kg/cm2, con Imp. Integral, agr. Concreto fc=225 kg/cm2, con Imp. Integral, agr. mx.3/4", fabricado en obra c/revolvedora 1 saco. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.293+5%)Ton0.31$1,740.00$535.31Cemento gris(0.380+5%)Ton0.40$1,740.00$694.26Arena #4(0.506+10%)m30.56$195.00$108.54Arena #4(0.500+10%)m30.55$195.00$107.25Grava #3/4(0.613+10%)m30.67$195.00$131.49Grava #3/4(0.600+10%)m30.66$195.00$128.70Agua (0.214+20%)m30.26$11.00$2.82Agua (0.198+20%)m30.24$11.00$2.61Sikalite(3.516+5%)kg3.69$14.00$51.69Sikalite(4.560+5%)kg4.79$14.00$67.03SUB-TOTAL$829.85SUB-TOTAL$999.86Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Revolvedora (8/13)Hr0.61538$32.92$20.26Revolvedora (8/13)Hr0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$878.36TOTAL$1,048.36

Concreto fc=150 kg/cm2, con Imp. Integral, agr. Concreto fc=250 kg/cm2, con Imp. Integral, agr. mx.3/4", fabricado en obra c/revolvedora 1 saco. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.318+5%)Ton0.33$1,740.00$580.99Cemento gris(0.401+5%)Ton0.42$1,740.00$732.63Arena #4(0.503+10%)m30.55$195.00$107.89Arena #4(0.502+10%)m30.55$195.00$107.68Grava #3/4(0.610+10%)m30.67$195.00$130.85Grava #3/4(0.598+10%)m30.66$195.00$128.27Agua (0.211+20%)m30.25$11.00$2.79Agua (0.195+20%)m30.23$11.00$2.57Sikalite(3.816+5%)kg4.01$14.00$56.10Sikalite(4.812+5%)kg5.05$14.00$70.74SUB-TOTAL$878.60SUB-TOTAL$1,041.89Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Revolvedora (8/13)Hr0.61538$32.92$20.26Revolvedora (8/13)Hr0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$927.11TOTAL$1,090.40

Concreto fc=175 kg/cm2, con Imp. Integral, agr. Concreto fc=275 kg/cm2, con Imp. Integral, agr. mx.3/4", fabricado en obra c/revolvedora 1 saco. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteCemento gris(0.338+5%)Ton0.35$1,740.00$617.53Cemento gris(0.416+5%)Ton0.44$1,740.00$760.03Arena #4(0.500+10%)m30.55$195.00$107.25Arena #4(0.504+10%)m30.55$195.00$108.11Grava #3/4(0.606+10%)m30.67$195.00$129.99Grava #3/4(0.606+10%)m30.67$195.00$129.99Agua (0.206+20%)m30.25$11.00$2.72Agua (0.195+20%)m30.23$11.00$2.57Sikalite(4.056+5%)kg4.26$14.00$59.62Sikalite(4.992+5%)kg5.24$14.00$73.38SUB-TOTAL$917.11SUB-TOTAL$1,074.08Mano de obra y equipoMano de obra y equipoCuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Cuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Revolvedora (8/13)Hr0.61538$32.92$20.26Revolvedora (8/13)Hr0.61538$32.92$20.26SUB-TOTAL$48.51SUB-TOTAL$48.51TOTAL$965.61TOTAL$1,122.59

Concreto fc=300 kg/cm2, con Imp. Integral, agr. mx.3/4", fabricado en obra c/revolvedora 1 saco. MaterialUnid. Cant. P.U.ImporteCemento gris(0.431+5%)Ton0.45$1,740.00$787.44Arena #4(0.507+10%)m30.56$195.00$108.75Grava #3/4(0.614+10%)m30.68$195.00$131.70Agua (0.196+20%)m30.24$11.00$2.59Sikalite(5.172+5%)kg5.43$14.00$76.03SUB-TOTAL$1,106.51Mano de obra y equipoCuadrilla No. 4 (1/13)Jor0.07692$367.22$28.25Revolvedora (8/13)Hr0.61538$32.92$20.26SUB-TOTAL$48.51TOTAL$1,155.02

Conc. Norm. Cim

COLADO DECOLADO DEConcreto fc=100 kg/cm2, con resistencia normal con agr.Concreto fc=200 kg/cm2, con resistencia normal con agr.mx.3/4", vaciado con carretillas y botes en elems. de cim. mx.3/4", vaciado con carretillas y botes en elems. de cim. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=100kg/cm2(1.00+5%)m31.05$780.49$819.52Conc.fc=200kg/cm2(1.00+5%)m31.05$943.23$990.39Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$830.08SUB-TOTAL$1,000.95Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$945.55TOTAL$1,116.42

COLADO DECOLADO DEConcreto fc=125 kg/cm2, con resistencia normal con agr.Concreto fc=225 kg/cm2, con resistencia normal con agr.mx.3/4", vaciado con carretillas y botes en elems. de cim. mx.3/4", vaciado con carretillas y botes en elems. de cim. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=125kg/cm2(1.00+5%)m31.05$826.67$868.00Conc.fc=225kg/cm2(1.00+5%)m31.05$981.33$1,030.40Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$878.56SUB-TOTAL$1,040.96Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$994.03TOTAL$1,156.43

COLADO DECOLADO DEConcreto fc=150 kg/cm2, con resistencia normal con agr.Concreto fc=250 kg/cm2, con resistencia normal con agr.mx.3/4", vaciado con carretillas y botes en elems. de cim. mx.3/4", vaciado con carretillas y botes en elems. de cim. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=150kg/cm2(1.00+5%)m31.05$871.02$914.57Conc.fc=250kg/cm2(1.00+5%)m31.05$1,019.66$1,070.64Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$925.13SUB-TOTAL$1,081.20Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$1,040.60TOTAL$1,196.67

COLADO DECOLADO DEConcreto fc=175 kg/cm2, con resistencia normal con agr.Concreto fc=275 kg/cm2, con resistencia normal con agr.mx.3/4", vaciado con carretillas y botes en elems. de cim. mx.3/4", vaciado con carretillas y botes en elems. de cim. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=175kg/cm2(1.00+5%)m31.05$905.99$951.29Conc.fc=275kg/cm2(1.00+5%)m31.05$1,049.21$1,101.67Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$961.85SUB-TOTAL$1,112.23Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$1,077.32TOTAL$1,227.70

COLADO DEConcreto fc=300 kg/cm2, con resistencia normal con agr.mx.3/4", vaciado con carretillas y botes en elems. de cim. MaterialUnid. Cant. P.U.ImporteConc.fc=300kg/cm2(1.00+5%)m31.05$1,078.99$1,132.94Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$1,143.50Mano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47TOTAL$1,258.97

Conc. Imp. CimColado de Concreto con Impermeabilizacion Integral en elementos de Cimentacion

Colado de Concreto fc=100 kg/cm2, con Imp. integral en elem. De CimentacionColado de Concreto fc=200 kg/cm2, con Imp. integral en elem. De CimentacionAgregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado Agregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=100kg/cm2(1.00+5%)m31.05$827.59$868.97Conc.fc=200kg/cm2(1.00+5%)m31.05$1,006.56$1,056.89Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$879.53SUB-TOTAL$1,067.45Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$995.00TOTAL$1,182.92

Colado de Concreto fc=125 kg/cm2, con Imp. integral en elem. De CimentacionColado de Concreto fc=225 kg/cm2, con Imp. integral en elem. De CimentacionAgregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado Agregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=125kg/cm2(1.00+5%)m31.05$878.36$922.27Conc.fc=225kg/cm2(1.00+5%)m31.05$1,048.36$1,100.78Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$932.83SUB-TOTAL$1,111.34Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$1,048.30TOTAL$1,226.81

Colado de Concreto fc=150 kg/cm2, con Imp. integral en elem. De CimentacionColado de Concreto fc=250 kg/cm2, con Imp. integral en elem. De CimentacionAgregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado Agregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=150kg/cm2(1.00+5%)m31.05$927.11$973.47Conc.fc=250kg/cm2(1.00+5%)m31.05$1,090.40$1,144.92Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$984.03SUB-TOTAL$1,155.48Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$1,099.50TOTAL$1,270.95

Colado de Concreto fc=175 kg/cm2, con Imp. integral en elem. De CimentacionColado de Concreto fc=275 kg/cm2, con Imp. integral en elem. De CimentacionAgregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado Agregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=175kg/cm2(1.00+5%)m31.05$965.61$1,013.90Conc.fc=275kg/cm2(1.00+5%)m31.05$1,122.59$1,178.72Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$1,024.46SUB-TOTAL$1,189.28Mano de obra y equipoMano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47SUB-TOTAL$115.47TOTAL$1,139.92TOTAL$1,304.75

Colado de Concreto fc=300 kg/cm2, con Imp. integral en elem. De CimentacionAgregado mx.3/4", vaciado con carretillas y botes. Incluye vibrado y curado MaterialUnid. Cant. P.U.ImporteConc.fc=300kg/cm2(1.00+5%)m31.05$1,155.02$1,212.77Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$1,223.33Mano de obra y equipoCuadrilla No. 49 (1/8)Jor.0.12500$636.76$79.60Cuadrilla No. 1(0.0235*10)Jor.0.23500$91.80$21.57Vibrador (4/8)Hr.0.50000$28.60$14.30SUB-TOTAL$115.47TOTAL$1,338.80

Conc. Norm. Estruc

COLADO DECOLADO DEConcreto fc=100 kg/cm2, con Resistencia normal, agr. Concreto fc=200 kg/cm2, con Resistencia normal, agr. mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=100kg/cm2(1.00+5%)m31.05$780.49$819.52Conc.fc=200kg/cm2(1.00+5%)m31.05$943.23$990.39Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$830.08SUB-TOTAL$1,000.95Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,095.32TOTAL$1,266.20

COLADO DECOLADO DEConcreto fc=125 kg/cm2, con Resistencia normal, agr. Concreto fc=225 kg/cm2, con Resistencia normal, agr. mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=125kg/cm2(1.00+5%)m31.05$826.67$868.00Conc.fc=225kg/cm2(1.00+5%)m31.05$981.33$1,030.40Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$878.56SUB-TOTAL$1,040.96Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,143.81TOTAL$1,306.20

COLADO DECOLADO DEConcreto fc=150 kg/cm2, con Resistencia normal, agr. Concreto fc=250 kg/cm2, con Resistencia normal, agr. mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=150kg/cm2(1.00+5%)m31.05$871.02$914.57Conc.fc=250kg/cm2(1.00+5%)m31.05$1,019.66$1,070.64Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$925.13SUB-TOTAL$1,081.20Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,190.37TOTAL$1,346.45

COLADO DECOLADO DEConcreto fc=175 kg/cm2, con Resistencia normal, agr. Concreto fc=275 kg/cm2, con Resistencia normal, agr. mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=175kg/cm2(1.00+5%)m31.05$905.99$951.29Conc.fc=275kg/cm2(1.00+5%)m31.05$1,049.21$1,101.67Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$961.85SUB-TOTAL$1,112.23Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,227.10TOTAL$1,377.47

COLADO DEConcreto fc=300 kg/cm2, con Resistencia normal, agr. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteConc.fc=300kg/cm2(1.00+5%)m31.05$1,078.99$1,132.94Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$1,143.50Mano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24TOTAL$1,408.74

Conc. Imp. Estruc

COLADO DECOLADO DEConcreto fc=100 kg/cm2, con Impermea. Integral, agr. Concreto fc=200 kg/cm2, con Impermea. Integral, agr.mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=100kg/cm2(1.00+5%)m31.05$827.59$868.97Conc.fc=200kg/cm2(1.00+5%)m31.05$1,006.56$1,056.89Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$879.53SUB-TOTAL$1,067.45Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,144.78TOTAL$1,332.69

COLADO DECOLADO DEConcreto fc=125 kg/cm2, con Impermea. Integral, agr. Concreto fc=225 kg/cm2, con Impermea. Integral, agr.mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=125kg/cm2(1.00+5%)m31.05$878.36$922.27Conc.fc=225kg/cm2(1.00+5%)m31.05$1,048.36$1,100.78Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$932.83SUB-TOTAL$1,111.34Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,198.08TOTAL$1,376.59

COLADO DECOLADO DEConcreto fc=150 kg/cm2, con Impermea. Integral, agr.Concreto fc=250 kg/cm2, con Impermea. Integral, agr. mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=150kg/cm2(1.00+5%)m31.05$927.11$973.47Conc.fc=250kg/cm2(1.00+5%)m31.05$1,090.40$1,144.92Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$984.03SUB-TOTAL$1,155.48Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,249.27TOTAL$1,420.72

COLADO DECOLADO DEConcreto fc=175 kg/cm2, con Impermea. Integral, agr.Concreto fc=275 kg/cm2, con Impermea. Integral, agr.mx.3/4", vaciado con carretillas y botes en elems. estructural. mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteConc.fc=175kg/cm2(1.00+5%)m31.05$965.61$1,013.90Conc.fc=275kg/cm2(1.00+5%)m31.05$1,122.59$1,178.72Agua (0.800+20%)m30.96$11.00$10.56Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$1,024.46SUB-TOTAL$1,189.28Mano de obra y equipoMano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24SUB-TOTAL$265.24TOTAL$1,289.70TOTAL$1,454.53

COLADO DEConcreto fc=300 kg/cm2, con Impermea. Integral, agr.mx.3/4", vaciado con carretillas y botes en elems. estructural. MaterialUnid. Cant. P.U.ImporteConc.fc=300kg/cm2(1.00+5%)m31.05$1,155.02$1,212.77Agua (0.800+20%)m30.96$11.00$10.56

SUB-TOTAL$1,223.33Mano de obra y equipoCuadrilla No. 50 (1/5)Jor.0.2000$1,103.95$220.79Cuadrilla No. 1(0.0235*10)Jor.0.2350$91.80$21.57Vibrador (4/5)Hr.0.8000$28.60$22.88SUB-TOTAL$265.24TOTAL$1,488.57

Acero Cim.

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos decimentacion alambron 1/4" (2) fy =3000 kg/cm2cimentacion varilla 1/2" (4) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteAlambron 1/4"no.2(1.00+4%)m31.04$6,500.00$6,760.00varilla 1/2"no.4(1.00+6%)m31.06$5,920.00$6,275.20alambre recocido (43+7%)m346.01$8.00$368.08alambre recocido (18+7%)m319.26$8.00$154.08

SUB-TOTAL$7,128.08SUB-TOTAL$6,429.28Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.15)Jor.6.6667$332.82$2,218.78Cuadrilla No 24 (1/0.20)Jor.5.00000$332.82$1,664.10

SUB-TOTAL$2,218.78SUB-TOTAL$1,664.10TOTAL$9,346.86TOTAL$8,093.38

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos decimentacion varilla 5/16" (2.5) fy =4200 kg/cm2cimentacion varilla 5/8" (5) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.Importevarilla 5/16"no.2.5(1.00+5%)m31.05$6,000.00$6,300.00varilla 5/8"no.5(1.00+6%)m31.06$5,890.00$6,243.40alambre recocido (28kg+7%)m329.96$8.00$239.68alambre recocido (16+7%)m317.12$8.00$136.96

SUB-TOTAL$6,539.68SUB-TOTAL$6,380.36Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.17)Jor.5.88235$332.82$1,957.76Cuadrilla No 24 (1/0.22)Jor.4.54545$332.82$1,512.82

SUB-TOTAL$1,957.76SUB-TOTAL$1,512.82TOTAL$8,497.44TOTAL$7,893.18

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos decimentacion varilla 3/8" (3) fy =4200 kg/cm2cimentacion varilla 3/4" (6) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.Importevarilla 3/8"no.3(1.00+6%)m31.06$5,940.00$6,296.40varilla 3/4"no.6(1.00+6%)m31.06$5,850.00$6,201.00alambre recocido (22+7%)m323.54$8.00$188.32alambre recocido (10+7%)m310.70$8.00$85.60

SUB-TOTAL$6,484.72SUB-TOTAL$6,286.60Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.18)Jor.5.55556$332.82$1,849.00Cuadrilla No 24 (1/0.24)Jor.4.16667$332.82$1,386.75

SUB-TOTAL$1,849.00SUB-TOTAL$1,386.75TOTAL$8,333.72TOTAL$7,673.35

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos decimentacion varilla 1" (8) fy =4200 kg/cm2cimentacion varilla 1 1/2" (12) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.Importevarlla 1"no.8(1.00+7%)m31.07$5,820.00$6,227.40varlla 1 1/2 "no.12(1.00+7%)m31.07$5,760.00$6,163.20alambre recocido (15+7%)m316.05$8.00$128.40alambre recocido (14+7%)m314.98$8.00$119.84

SUB-TOTAL$6,355.80SUB-TOTAL$6,283.04Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.26)Jor.3.84615$332.82$1,280.08Cuadrilla No 24 (1/0.30)Jor.3.33333$332.82$1,109.40

SUB-TOTAL$1,280.08SUB-TOTAL$1,109.40TOTAL$7,635.88TOTAL$7,392.44

Habilitado y armado de acero de refuerzo en elementos decimentacion varilla 1 1/4" (10) fy =4200 kg/cm2MaterialUnid. Cant. P.U.Importevarlla 1 1/4" no.10(1.00+7%)m31.07$5,790.00$6,195.30alambre recocido (14+7%)m314.98$8.00$119.84

SUB-TOTAL$6,315.14Mano de obra y equipoCuadrilla No 24 (1/0.28)Jor.3.57143$332.82$1,188.64

SUB-TOTAL$1,188.64TOTAL$7,503.78

Acero Estruc.

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos deestructurales alambron 1/4" (2) fy =3000 kg/cm2estructurales varilla 1/2" (4) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.ImporteAlambron 1/4"no.2(1.00+4%)m31.04$6,500.00$6,760.00varilla 1/2"no.4(1.00+6%)m31.06$5,920.00$6,275.20alambre recocido (43+7%)m346.01$8.00$368.08alambre recocido (18+7%)m319.26$8.00$154.08

SUB-TOTAL$7,128.08SUB-TOTAL$6,429.28Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.12)Jor.8.33333$332.82$2,773.48Cuadrilla No 24 (1/0.18)Jor.5.55556$332.82$1,848.99

SUB-TOTAL$2,773.48SUB-TOTAL$1,848.99TOTAL$9,901.56TOTAL$8,278.27

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos deestructurales varilla 5/16" (2.5) fy =4200 kg/cm2estructurales varilla 5/8" (5) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.Importevarilla 5/16"no.2.5(1.00+5%)m31.05$6,000.00$6,300.00varilla 5/8"no.5(1.00+6%)m31.06$5,890.00$6,243.40alambre recocido (28kg+7%)m329.96$8.00$239.68alambre recocido (16+7%)m317.12$8.00$136.96

SUB-TOTAL$6,539.68SUB-TOTAL$6,380.36Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.14)Jor.7.14286$332.82$2,377.27Cuadrilla No 24 (1/0.20)Jor.5.00000$332.82$1,664.09

SUB-TOTAL$2,377.27SUB-TOTAL$1,664.09TOTAL$8,916.95TOTAL$8,044.45

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos deestructurales varilla 3/8" (3) fy =4200 kg/cm2estructurales varilla 3/4" (6) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.Importevarilla 3/8"no.3(1.00+6%)m31.06$5,940.00$6,296.40varilla 3/4"no.6(1.00+6%)m31.06$5,850.00$6,201.00alambre recocido (22+7%)m323.54$8.00$188.32alambre recocido (10+7%)m310.70$8.00$85.60

SUB-TOTAL$6,484.72SUB-TOTAL$6,286.60Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.16)Jor.6.25000$332.82$2,080.11Cuadrilla No 24 (1/0.22)Jor.4.54545$332.82$1,512.81

SUB-TOTAL$2,080.11SUB-TOTAL$1,512.81TOTAL$8,564.83TOTAL$7,799.41

Habilitado y armado de acero de refuerzo en elementos deHabilitado y armado de acero de refuerzo en elementos deestructurales varilla 1" (8) fy =4200 kg/cm2estructurales varilla 1 1/2" (12) fy =4200 kg/cm2MaterialUnid. Cant. P.U.ImporteMaterialUnid. Cant. P.U.Importevarlla 1"no.8(1.00+7%)m31.07$5,820.00$6,227.40varlla 1 1/2 "no.12(1.00+7%)m31.07$5,760.00$6,163.20alambre recocido (15+7%)m316.05$8.00$128.40alambre recocido (14+7%)m314.98$8.00$119.84

SUB-TOTAL$6,355.80SUB-TOTAL$6,283.04Mano de obra y equipoMano de obra y equipoCuadrilla No 24 (1/0.24)Jor.4.16667$332.82$1,386.74Cuadrilla No 24 (1/0.28)Jor.3.57143$332.82$1,188.63

SUB-TOTAL$1,386.74SUB-TOTAL$1,188.63TOTAL$7,742.54TOTAL$7,471.67

Habilitado y armado de acero de refuerzo en elementos deestructurales varilla 1 1/4" (10) fy =4200 kg/cm2MaterialUnid. Cant. P.U.Importevarlla 1 1/4" no.10(1.00+7%)m31.07$5,790.00$6,195.30alambre recocido (14+7%)m314.98$8.00$119.84

SUB-TOTAL$6,315.14Mano de obra y equipoCuadrilla No 24 (1/0.26)Jor.3.84615$332.82$1,280.07

SUB-TOTAL$1,280.07TOTAL$7,595.21