Manual Servicio Enfriadores Aceite Tubo Aluminio

  • Upload
    timians

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

  • 8/10/2019 Manual Servicio Enfriadores Aceite Tubo Aluminio

    1/8

    ALUMINUMTUBE

    AIRTOOILCOOLERS

    SERVICE MANUAL

    Please read and followinstructions carefullybefore installing the

    MESABI Aluminum TubeOil Cooler.

    For further instructions,prints are enclosed

    with packaging.

  • 8/10/2019 Manual Servicio Enfriadores Aceite Tubo Aluminio

    2/8

    2

    CONTENTS

    MESABI

    Aluminum Tube Air to Oil

    Standard Parts ..............................................................Page 3

    Tube Removal ..............................................................Page 4

    Tube Replacement .................................................Page 4 & 5

    External Cleaning .........................................................Page 4

    Internal Cleaning ....................................................Page 6 & 7

    Warranty .......................................................................Page 7

    Safety and Maintenance Instructions ............................Page 7

    Manufacturing Facilities and Parts Depot .....................Page 8

    M E SA B I is a reg istered trad em ark of L& M R ad iator, Inc.

    PICTURE

    SEPTEMBER 1997

    M ESAB I O il C oolers use the replace-able tube concept and are sim ilar in

    design to M ESAB I core engine radiators.They d iffer in that cooling tubes are light-w eight alum inum w ith integral circularfinning rolled from the tube w all.

    Turbulators are placed in tubes toincrease heat-transfer rate and arerem ovable for cleaning.

    Tubes are held in head er sheets w ithM ESA B I fluorocarbon rub ber seals; aretainer clip at top of the tube locks inplace.

    R em oval of tub es for rep lacem ent orcleaning is accom plished in m uch thesam e m anner as w ith M ES A B I coreengine radiators.

    MESABI Oil Coolers

    Quick and Simple Service

    Whether down due to physical damage or for maintenance,MESABI Aluminum Tube Air to Oil Coolers can be quicklyand simply returned to service.

  • 8/10/2019 Manual Servicio Enfriadores Aceite Tubo Aluminio

    3/8

    3

    EXPAN SIO N TOO LP/N 62692(For Turbulator Removal)

    C RIM PING TOO LP/N 62693

    MESABIAluminum Tube Air to Oil Cooler Standard Parts

    DESCRIPTION PART NO.

    TOP HEADER PLATE ................ ................ ................ ......... ______

    MESABI FLUOROCARBON RUBBER SEAL ...... ................ . 35780

    NYLON CUP WASHER .............. ................ ................ ........... 33569

    TURBULATOR* .........................................................68478 / 32683Note: For MESABI Oil Cooler only

    RETAINER CLIP ................ ................ ................ ................ ... 33567

    ALUMINUM COOLING TUBE ............... ................ .............. ______

    INSTALLATION TOOL ............... ................ ................ ........... 42146

    (for removing and installing tubes)

    BOTTOM HEADER PLATE ............... ................ ...._____

    INNER TUBE STAY... ................ ................ ............33570

    OUTER TUBE STAY..............................................33566

    Exploded view of a typicalMESABI intercooler and

    aftercooler core.

    * Please supply our Customer Service Department with the L&M serialnumber at the time of order to ensure proper turbulator replacement.

  • 8/10/2019 Manual Servicio Enfriadores Aceite Tubo Aluminio

    4/8

    4

    EXTERNAL CLEANINGMESABI Aluminum Tube Air to Oil Cooler

    To m aintain efficiency and assure m axim um life of a

    M ESA B I A lum inum Tub e O il C ooler, reasonable care

    m ust be taken w hen cleaning.

    For general external cleaning , a high pressure hot

    w ater w asher, up to 1200 P SI, can be used. U nlike

    conventional cores, you can and should get right up

    next to the core w ith the w and. Starting from the air exit

    side, place the high p ressure w asher nozzle next to the

    fin, concentrating on a sm all area, slow ly w orking from

    the top dow n. M ake sure you spray straight into the

    core, not at an angle. C ontinue w ashing until the exit

    w ater is free of dirt. R epeat from the opposite side.In som e cases it m ay be b est to b low out any dry

    dirt w ith a high pressure (up to 1200 PSI) air gun prior

    to w ashing core w ith the high pressure hot w ater w ash-

    er. If there is any doubt about the cleaning m ethod to

    be used , try the m ethod on a portion of a sing le tub e

    first, or contact an L& M m anufacturing facility.

    M any rad iator shops use a hot alkaline soa p or

    caustic soda in their boil-out tanks w ith chem ical addi-

    tives. Soaking in high pH solutions m ay dam ag e the

    alum inum alloy dep ending on the exact characteristics

    of the solution. Solutions that are either too alkaline

    (pH >9.0) or too acid (pH < 5.0) are not recom m ended.

    Removing MESABI Tubes

    A fter thorough cleaning , as described ab ove, blow

    dry the core section, then rem ove retainer clips from

    top portion of tube, as show n in Fig. 1.

    W ith Installation Tool N o. 42146, grasp center por-

    tion of tube, as show n in Fig. 2. R otate the tool, so as

    to break the tube free from the seal then raise the tub e

    only enoug h to clear low er seal and sw ing tub e out just

    far enough to allow tub e to b e p ulled dow n and out of

    its upper seal, as show n in Fig. 3

    R em ove all tub es in the row , rep eating the ab oveprocedure.

    Installing MESABI Tubes

    IMPORTANT: B efore inserting new or original tubes

    into header plates, new seals (P/N 35780) m ust be

    installed.

    A fter rem oving old seals, tube ho les should be

    cleaned of any foreign deb ris. A M cM aster C arr C huck

    G rip 3/4brush #63005T42 (L& M P/N 64092) placed in

    MESABI Aluminum Tube Air to Oil Coole

    Fig. 1

    Fig. 2

    Fig. 3

  • 8/10/2019 Manual Servicio Enfriadores Aceite Tubo Aluminio

    5/8

    5

    ube Removal and Replacement

    an electric or air drill can be used for this p urpose.

    Note: Caution must be taken when cleaning aluminumheader plates not to damage hole surface finish.B e sure to clean the inside of the tanks out w ith airbefore installing seals. Place new seals in the cleanholes. Then, using a flat bottom rubber m allet, gentlytap each seal dow n so that the shoulder of each seal isresting on the header plate.

    B efore original tubes are reinstalled, tube ends m ust be

    clean of foreign m aterial. A fine grit em ery cloth or buffing

    w hee l can b e used . Preca ution should be taken w hen

    buffing so as to not m ar tub e. M ake sure the tub e end s

    are w iped clean prior to installation.

    C oat the inner hole of each seal and the outside end s

    of each tub e w ith a sm all am ount of #10 hydraulic oil or

    petroleum jelly. C up ped w ashers should be installed as

    show n in the exploded view on page 3, prior to installing

    tubes. Starting at the end of one of the row s of holes, push

    the top end of a tub e (the top end of the tub e is the end

    w ith the longest unfinned section) into one up per head erplate seal, as show n in Fig. 4. Place center bottom end

    of tube into respective hole in the bottom seal. Push tube

    dow n and into seal until the w asher is located on top of

    the low er seal. This m ay b e d one b y grasping tub es b y

    hand and pulling tub e dow nw ard until seated , or by using

    Installation Tool, new style N o. 42146, as show n in Fig. 5.

    Note: B e sure tube is properly centered in the seal beforepushing the tub e in p lace or seal dam ag e could result.

    R einstall retainer clip betw een upper tw o w ashers, as

    show n in Fig. 6. M ake sure w ing s on retainer clips are

    parallel w ith each other to block b ypassing air.

    O n som e oil coolers (typically w hen tub es are long er

    than 35 inches) tube stabilizers w ill be required. B eforestarting a second row of tub es, place the center tub e sta-

    bilizer, Part N o. 33570, in position. Stabilizers should be

    line d up w ith the supp ort b ar loca tion . Proce ed w ith

    installation of the next row of tub es, using sam e proce-

    dure as w hen installing first row .

    R em em b er tha t a cen ter tub e stab ilizer shou ld b e

    located B E TW E EN each row of tub es b efore starting

    another row of tub es.

    W hen tub es are com pletely installed, fasten tube stab i-

    lizer, Part N o. 33566, w ith sup port bracket to side m em bers.

    Fig. 5

    Fig. 6

    Fig. 4

    O N THE LEFT:

    Properly installed35780 seal.

    RIG H T:

    35780 seal installedtoo far into header.

    CORRECT

    INCORRECT

  • 8/10/2019 Manual Servicio Enfriadores Aceite Tubo Aluminio

    6/8

    6

    In cases where it is necessary to cleanthe inside of the oil cooler, the following

    procedure can be used.R em ove all the tub es and seals from the oil

    co oler as d esc rib ed on p ag e 4. Flush the

    inside of the tanks w ith a high p ressure w asher

    (a m ild soap can b e used but rinse thorough-

    ly). B low the excess w ater out w ith air and

    m ake sure the tanks are d ry. The tub e holes

    should be clean and dry.

    N ext rem ove the turbulators from the tube

    w ith the tools show n in Fig. 1.

    N ote that the tube ends have been crim ped at

    each end to secure the

    turbulator inside the tube.

    A lso note that there is a

    long, unfinned portion of

    the tub e an d a sho rt,

    unfinned portion.

    Place the tub e end on

    a piece of hard industrial

    rubber as show n in Fig. 2.H olding the tube upright,

    insert tool (P/N 62692) in

    the end of the tube (seeFig. 3), w ith a ham m erlightly tap the tool forcing

    the end of the tub e open

    just far enough to allow

    rem oval of the turbulator.

    Care must be taken notto mushroom the tubeends. O pen both end s inthis m anner.

    Typ ically, turbulators are rem oved out of the

    long unfinned end of the tub e w ith a long noseplier. In this case, the tabs are facing dow n-

    w ards (see Fig. 4.)Care should be taken notto kink the turbulators.

    NOTE: A lthough rare, you m ay find turbulators

    inserted the opposite w ay because of flow direction.

    If so, please rem ove from the short unfinned end.

    C lean and flush the tube w ith a high p ressurew asher. B low off w ith air and m ake sure tub esare thoroughly dry.

    MESABI Oil Cooler Internal Cleaning

    Fig. 1

    Fig. 4

    Fig. 3Fig. 2

  • 8/10/2019 Manual Servicio Enfriadores Aceite Tubo Aluminio

    7/8

    7

    R eplace the turbulator by pushing the turbula-

    tor through the short, unfinned end of the tube

    (see Fig. 5). Push the turbulator far enough intothe tube to allow for recrim ping.

    N ote: D epending on tolerances pushingthe

    turbulator into the tube m ay cause kinking. A n

    alternative w ould be to use a piece of w ire w ith a

    hook on the end. The turbulator can be pulled

    into p lace from the long unfinned end of tube.

    C rim p both ends of the tube using tool (P/N

    62693) and a ham m er (see Fig. 6). Lightly tap,forcing the end closed far enoug h to hold the

    MESABI OIL COOLER 48-MONTH WARRANTY

    Fig. 5 Fig. 6

    turbulator securely in place. (A gain, care should

    be taken not to m ushroom the tube ends.)

    Finally, check the tube ends for burrs, etc.

    Lightly buff the tube ends or use a fine em ery

    cloth to rem ove any deb ris. M ake sure the tub eends are w iped clean prior to installing. Follow

    the installation procedures on pages 4 and 5 to

    com plete the job .

    L& M R ad iator w arrants the M ESA B I O il C oolerm anufactured by L& M for a p eriod of 18 m onths from

    date of invoice. U nder this w arranty, our obligation islim ited to the rep air or replacem ent (at our option) ofprod ucts or parts m anufactured by L& M that areproven to be defective in w orkm anship or m aterial.L& M further w arrants the M ESA B I O il C ooler ag ainstseal leakag e during norm al use for 48 m onths fromd ate of invoice on n ew cores w ith M E S A B I

    fluorocarbon seals installed . D am ag e or leakage d ueto accidents, m isuse, or corrosion is not w arranted .

    W arranty on com po nents not m anufactured byL& M R ad iator sha ll b e tha t of the ind ivid ual

    m anufacturers. Individual m anufacturers operationaland m aintenance req uirem ents m ust be m et andtheir policies reg arding shipm ent and inspection ofclaim ed defective parts w ill apply.

    L& M is not liable for consequential or incidentaldam ag es no r the Ir related co sts. C on sult factoryb efore p roc ee d ing w ith w arran ty c laim s. Th isw arran ty sup ersed es all p reviou sly p ub lishedw arranties.

  • 8/10/2019 Manual Servicio Enfriadores Aceite Tubo Aluminio

    8/8

    M E SA B I O il C oolers, radiator cores and related

    cooling com ponents are m arketed on a factory direct

    basis from four L& M R ad iator plants around the w orld.

    L& M R adiator is able to give exceptional service to

    users and O EM s because all service is controlled at

    the m anufacturer level. In em ergencies, w e can ship

    com plete oil coolers or parts w ithin 48 hours. O n site

    technical and engineering assistance is available

    nearly anyw here in the w orld w ithin a few days notice.

    L& M R ad iator is proud to p rovide b oth old and new

    custom ers around the w orld w ith prod ucts know n forquality and dependability since 1957.

    L& M R adiator m anufacturing facilities and parts

    depots are located in the countries listed below .

    We solve big heat transfer problemsaround the world.

    Parts shipped within 48 hours from four plants around the world.

    Manufacturing Facilities

    E-mail: [email protected] www.mesabi.com

    d S 0200 & dS d d k f d

    UNITED STATES

    L& M R ad iator, Inc.141 4 E ast 37th S treetH ibbing , M inne sota 557 46 U .S.A .Telep hon e: (218) 263-8993FA X: (218 ) 263 -823 4

    Toll Free: 1-800-346-3500(U .S.A . and C anad a)

    L& M R ad iator, Inc.696 6 M arket StreetEl Paso, Texas 7 9915 U .S.A .Telep hon e: (915) 779-3866FA X: (915 ) 779 -319 5

    MEXICO

    L y M de M xico S.A . de C .V.C alle D e La P lata Y Los N og alesParque Ind ustrialA partad o P ostal 763H erm osillo, Sonora, M xicoTelep hon e: 52-62-510480FA X: 52-62-510638

    AUSTRALIA

    L& M R ad iator Pty. Ltd.C nr. K ew & M ars StreetsW elshpo ol, W .A .P.O . B ox 1049East Victoria P ark 6981W .A . , A ustraliaTelep hon e: 08-936 1-685 5FA X: 08-9470-3075

    L&M RADIATOR

    QualityEndorsedCompanyASNZ/ISO 9002STANDARDS AUSTRALIA

    QualitySystem

    Flexible Core Heat Exchangers