METRADOS ALCANTARILLA TMC D= 24 PULG. TIPO I, L= 5.67 m1.0 TRAZO Y REPLANTEO
D 0.60m:= L 5.67m:= C 0.65m:= F 0.70m:= E 1.00m:= B 0.20m:=
W 0.65m:= A 0.75m:= R0.75m
40.19m=:= M 0.45m .30m+ 0.75m=:=
T RL 0.025⋅
4+
0.22m=:= Entrada Alcantarilla Salida Emboquillado
TR A B+( ) 2⋅ D⋅ 2D L⋅+ W 2 C⋅ D+( )⋅+ E 2C D+( )⋅+ 11.08m2
=:=
2.0 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS
J 0.10m:= A 0.95m:= N 0.75m:= O 0.30m:= G 0.60m:=
H 0.45m:= P M L 0.025⋅+ 0.89m=:=Cajuela Alcantarilla
V1 B N+ J+ O+( ) 2⋅ D⋅ A⋅ 1.54m3
=:= V2 J D+ M+( ) L⋅ 2⋅ D⋅ 9.87m3
=:=
Aletas Salida/emboquillado
V3 F G H+ B+( )⋅D
2⋅ 2⋅ 0.53m
3=:= V4 E W+( ) 2C D+( )⋅ 2⋅ B 1.25m
3=:=
VE V1 V2+ V3+ V4+ 13.18m3
=:=
3.00 RELLENO CON MATERIAL PROPIO SELECCIONADO
VR V2 π D2
4⋅ L⋅− 8.26m
3=:= VR 8.26m
3=
4.00 ELIMINACION DE MATERIAL EXCEDENTE VEL VE VR− 4.92 m3
=:=
5.00 CAMA DE APOYO CON MAT. GRANULAR EN ALCANTARILLA
NIV 2 D⋅ L⋅ 0.10⋅ m 0.68 m3
=:= NIV 0.68 m3
=
6.00 COLOCACION DE TUBERIA TMC Ø 24 PULG. LT L 5.67 m=:=
8.00 CONCRETO F'C= 175 KG/CM2+25% P.M.
Cajuela V1 N O+ B+ J+( ) A⋅ B⋅ 2⋅ 2D 2B−( ) B⋅ N O+ B+ J+( )⋅+ A 2⋅ D⋅ B⋅+ 0.96 m3
=:=
Alcan/parapetoV2
P M+( )
2B
T R+( )
2+
⋅ 2⋅ D 2⋅ D J+ B+( ) 2⋅ D⋅ B T+( )⋅ 2⋅+ 1.71 m3
=:=
V2 V2 π D2
4⋅ B T+( )⋅ 2⋅− 1.47 m
3=:=
V32G H+( )
2
D
2⋅ F⋅ 2⋅ 0.35 m
3=:=Aletas
V42C D+ 2D+( )
2W⋅ 2⋅ B 0.4 m
3=:=Piso/salida
VP V1 2V2+ V3+ V4+ 4.65 m3
=:=
9.00 ENCOFRADO Y DESENCOFRADO DE ALCANTARILLAS
Caja/entrada A1 2A 2D+( ) N O+( )⋅ 2⋅ 2 D M+( )⋅ 2⋅ D⋅+ 9.75 m2
=:=
A2 D P+( ) 2⋅ D⋅ 2⋅2G H+( )
2F⋅ 4⋅+ 5.89 m
2=:=Aletas/salida
AE A1 A2+ 15.64 m2
=:=
10.00 EMBOQUILLADO DE PIEDRA EN ALCANTARILLAS e=0.25 m
Z 0.30m:=Emboquillado
VE 2C D+( ) E⋅ Z⋅ 2C D+( )3 B⋅
2⋅ B⋅+ 0.68 m
3=:=
UñaVEMB VE 0.68 m
3=:=
11. PINTURA ESMALTE EN PARAPETOS
AREA 2 D⋅ 2⋅ 0.30⋅ m( ) 2 B⋅ 2⋅ D⋅+ 1.2 m2
=:=
AREA 1.2 m2
=