3
METRADOS ALCANTARILLA TMC D= 24 PULG. TIPO I, L= 5.67 m 1.0 TRAZO Y REPLANTEO D 1.50 m := L 6.48 m := C 0.75 m := F 0.40 m := E 2.00 m := B 0.20 m := W 1.12 m := A 0.73 m := R 1.52 := M 0.45 m .30m + 0.75 m = := F1 0.40 m := Entrada Alcantarilla Salida Emboquillado TR 2C D + ( ) L E W + ( ) 2C D + 2A + 2B + ( ) 2 + 49.77 m 2 = := 2.0 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS L1 1.50 m := L2 1.50 m := L3 1.50 m := L4 1.50 m := Q 0.71 m := A 0.95 m := N 0.75 m := O 0.45 m := U 2.00 m := H 1.12 m := F 0.20 m := Aletas Alcantarilla V2 L1 L2 + L3 + L4 + ( ) D F 1.8 m 3 = := V1 2C D + ( ) L D Q N + ( ) 2 + O + 52.1 m 3 = := Cimentaci ón Emboquillado V3 E W + ( ) D 2C + 2A + 2B + ( ) F 3.31 m 3 = := V4 L1 L1 + E + 2B + 2A + 2C + D + ( ) F F 4 1.65 m 3 = := VE V1 V2 + 2V3 + 2V4 + 63.81 m 3 = := 3.00 RELLENO CON MATERIAL PROPIO SELECCIONADO VR V1 π D 2 4 L - := VR 40.65 m 3 = 4.00 ELIMINACION DE MATERIAL EXCEDENTE VEL VE VR - ( ) 1.3 30.11 m 3 = :=

Mathcad - Alcantarillas Tmc 60 Pulg. 6.48 m Tipo II

Embed Size (px)

DESCRIPTION

carreteras

Citation preview

  • METRADOS ALCANTARILLA TMC D= 24 PULG. TIPO I, L= 5.67 m1.0 TRAZO Y REPLANTEO

    D 1.50m:= L 6.48m:= C 0.75m:= F 0.40m:= E 2.00m:= B 0.20m:=

    W 1.12m:= A 0.73m:= R 1.52:= M 0.45m .30m+ 0.75m=:= F1 0.40m:=

    Entrada Alcantarilla Salida Emboquillado

    TR 2C D+( ) L E W+( ) 2C D+ 2A+ 2B+( ) 2+ 49.77 m2

    =:=

    2.0 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS

    L1 1.50m:= L2 1.50m:= L3 1.50m:= L4 1.50m:=

    Q 0.71m:= A 0.95m:= N 0.75m:= O 0.45m:= U 2.00m:=

    H 1.12m:= F 0.20m:= AletasAlcantarilla

    V2 L1 L2+ L3+ L4+( ) D F 1.8 m3

    =:=V1 2C D+( ) L D

    Q N+( )

    2+ O+

    52.1 m3

    =:=

    Cimentaci nEmboquillado

    V3 E W+( ) D 2C+ 2A+ 2B+( ) F 3.31 m3

    =:= V4 L1 L1+ E+ 2B+ 2A+ 2C+ D+( ) F F 4 1.65 m3

    =:=

    VE V1 V2+ 2V3+ 2V4+ 63.81 m3

    =:=

    3.00 RELLENO CON MATERIAL PROPIO SELECCIONADO

    VR V1 D2

    4 L:=

    VR 40.65 m3

    =

    4.00 ELIMINACION DE MATERIAL EXCEDENTE VEL VE VR( ) 1.3 30.11 m3=:=

  • 5.00 CAMA DE APOYO CON MAT. GRANULAR EN ALCANTARILLA

    NIV 2C D+( ) L .20 E W+( ) 2A 2B+ 2C+ D+( ) 2 .20+ 10.5 m2

    =:= NIV 10.5 m2

    =

    7.00 COLOCACION DE TUBERIA TMC 60 PULG. LT L 6.48 m=:=

    8.00 CONCRETO F'C= 175 KG/CM2.

    CimentacinAletas

    V1 L1 L2+ L3+ L4+( ) 2F( ) 2 F 2 1.92 m3

    =:=

    Aletas V2D Q+ D+ N+( )

    2L1 F 4 2.68 m

    3=:=

    Concretoaletas VP V1 V2+ 4.6 m3=:=

    9.00 CONCRETO F'C= 210KG/CM2.

    V1 Q D+ F+ O+( ) 2 D F Q D+ F+ N+( ) 2 D F+ 3.61 m3

    =:=

    V2 D2

    4 F 2 0.71 m

    3=:=

    VC V1 V2 2.91 m3

    =:=

    10.00 COLOCACION DE ACERO F'Y= 4200 KG/CM2.

    Acero = 221.60 Kg

    11.00 ENCOFRADO Y DESENCOFRADO DE ALCANTARILLAS

    A1 Q D+ F+ O+( ) 2 D 2 Q D+ F+ N+( ) 2 D 2+ 36.12 m2

    =:=Parapetos

    A2 L1 4Q D+ D+ N+( )

    2 13.38 m

    2=:=Aletas

    Emboquillado A3 0.40m E 8 6.4 m2=:=

    AE A1 A2+ A3+ 55.9 m2

    =:=

  • 12.00 EMBOQUILLADO DE PIEDRA EN ALCANTARILLAS e=0.25 mF 0.40m:=Ua entrada/salida

    V1 2A 2C+ D+( ) F F 2 1.57 m3

    =:=

    Parte Inclinada

    V2 4 E F F 1.28 m3

    =:=

    Emboquillado entrada/salida

    V3 2 2A 2B+ 2C+ D+( ) F E4C 2D+ 2A+( )

    2W F 2+ 12.02 m

    3=:=

    VEMB V1 V2+ V3+ 14.87 m3

    =:=

    13. PINTURA ESMALTE EN PARAPETOS

    AREA 2 D 2 0.45 m( ) 4 2D F 2+ 13.2 m2

    =:=

    AREA 13.2 m2

    =