PRESUPUESTO ITEM DESCRIPCION 01.00,00 LIMPIEZA DE TERRENO 01.01.00 LIMPIEZA DE TERRENO MANUAL 02.00.00 TRAZO, NIVEL Y REPLANTEO 02.01.00 NIVELACION, TRAZO Y REPLANTEO PRELIMINAR 02.02.00 NIVELACION, TRAZO Y REPLANTEO DURANTE LA OBRA 0.3.00.00 MOVIMIENTO DE TIERRA 03.01.00 EXCAVACION DE ZANJAS EN TERRENO NORMAL H<=150M 03.02.00 EXCAVACION DE ZANJAS EN TERRENO NORMAL H>150 M 03.03.00 ACARRREO DE MATERIAL EXCEDENTE DPROMEDIO=30 M. 03.04.00 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO HASTA 5 KM 04.00.00 OBRAS DE CONCRETO SIMPLE 04.01.00 SOLADOS Y SUB ZAPATAS 04.01.01 SOLADOS CONCRETO FC=100 KG/CM2 E010 CM 04.01.02 SUB ZAPATA CONCRETO FC=10 KG/CM2 +50% PIEDRA GRANDE 04.02.00 CIMIENTO Y SOBRECIMIENTO 04.02.01 CIEMIENTO CORRIDOS C.H=1.8+30%

Metrado

Embed Size (px)

DESCRIPTION

COSTOS Y PRESUPUESTOS

Citation preview

PRESUPUESTOPRESUPUESTOITEMDESCRIPCIONUND.METRADOPRECIO UNIT. s/.PARCIAL01.00,00LIMPIEZA DE TERRENO01.01.00 LIMPIEZA DE TERRENO MANUALM2155.8202.00.00TRAZO, NIVEL Y REPLANTEO 02.01.00 NIVELACION, TRAZO Y REPLANTEO PRELIMINARM2155.8202.02.00 NIVELACION, TRAZO Y REPLANTEO DURANTE LA OBRAM2155.820.3.00.00MOVIMIENTO DE TIERRA03.01.00EXCAVACION DE ZANJAS EN TERRENO NORMAL H150 MM3126.5803.03.00ACARRREO DE MATERIAL EXCEDENTE DPROMEDIO=30 M.M3187.1103.04.00ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO HASTA 5 KMM3187.1104.00.00OBRAS DE CONCRETO SIMPLEM35.0604.01.00SOLADOS Y SUB ZAPATAS04.01.01SOLADOS CONCRETO FC=100 KG/CM2 E010 CMM35.0604.01.02SUB ZAPATA CONCRETO FC=10 KG/CM2 +50% PIEDRA GRANDEM340.5004.02.00CIMIENTO Y SOBRECIMIENTOM304.02.01CIEMIENTO CORRIDOS C.H=1.8+30%M312.35

METRADOSPLANILLA DE METRADOS

PROYECTOMEJORAMIENTO DE LA INFRAESTRUCCTURA ED. DE LA I.E. PILLONE, DISTRITO DE UBINAS, PROVINCIA SANCHEZ CERRO , MOQUEGUA

ITEMDESCRIPCIONUNID.CANT.MEDIDASPARCIALTOTALLARGO(L)ANCHO(A)ALTO(H)

01.00,00LIMPIEZA DE TERRENO01.01.00LIMPIEZA DE TERRENO NATURALM221.27.35155.82

02.00,00TRAZO, NIVEL Y REPLANTEO 02.01.00NIVELACION, TRAZO Y REPLANTEO PRELIMINARM221.27.35155.8202.02.00 NIVELACION, TRAZO Y REPLANTEO DURANTE LA OBRAM221.27.35155.82

0.3.00.00MOVIMIENTO DE TIERRA03.01.00EXCAVACION DE DOS ZANJAS EN TERRENO NORMAL H1.5 MM3CANT.LARGO(L)ANCHO(A)ALTO(H)126.575AULAS 1,2 Y 3Z1M322.151.82.519.35Z2M322.351.752.520.56Z3M341.151.152.513.23Z4M321.651.82.514.85Z5M312.451.82.511.03Z6M312.51.82.511.25AULA 4Z3M321.151.152.56.61Z4M341.651.82.529.70

03.03.00ACARREO DE MATERIAL EXCELENTE Dprom=30mM3CANT.LARGO(L)ANCHO(A)ALTO(H)METRADO TOTAL DE EXCAVACION143.93187.11Mas 30% de espongamiento 43.1803.04.00ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO HASTA 5 KMM3METRADO TOTAL DE EXCAVACION143.93187.11Mas 30% de espongamiento 43.18

04.00.00OBRAS DE CONCRETO SIMPLE04.01.00SOLADOS Y SUB ZAPATAS04.01.01SOLADOS CONCRETO FC=100 KG/CM2 E010 CMM3CANT.LARGO(L)ANCHO(A)ALTO(H)5.06AULA 1,2 Y 3Z1M322.151.80.10.77Z2M322.351.750.10.82Z3M341.151.150.10.53Z4M321.651.80.10.59Z5M312.451.80.10.44Z6M312.51.80.10.45AULA 4Z3M321.151.150.10.26Z4M341.651.80.11.1904.01.02SUB ZAPATA CONCRETO FC=10 KG/CM2 +50% PIEDRA GRANDEM3CANT.LARGO(L)ANCHO(A)ALTO(H)40.50AULA 1,2 Y 3Z1M322.151.80.86.19Z2M322.351.750.86.58Z3M341.151.150.84.23Z4M321.651.80.84.75Z5M312.451.80.83.53Z6M312.51.80.83.60AULA 4Z3M321.151.150.82.12Z4M341.651.80.89.5004.02.00CIMIENTO Y SOBRECIMIENTO04.02.01CIEMIENTO CORRIDOS C.H=1.8+30%M3CANT.LARGO(L)AREA(M2)12.35AULA 1,2 Y 3EJE 1 DESDE EJE C HASTA EJE FM38.270.241.98EJE 3 DESDE EJE C HASTA EJE FM38.120.241.95EJE F DESDE EJE 1 HASTA EJE 3M34.900.241.18EJE E DESDE EJE 1 HASTA EJE 3M34.900.241.18EJE D DESDE EJE 1 HASTA EJE 3M34.900.241.18EJE C DESDE EJE 1 HASTA EJE 3M34.900.241.18AULA 4EJE 1 DESDE EJE A HASTA EJE BM32.990.240.72EJE 3 DESDE EJE A HASTA EJE BM32.990.240.72EJE B DESDE EJE 1 HASTA EJE 3M34.60.241.10EJE A DESDE EJE 1 HASTA EJE 3M34.90.241.18