5.2 158.60 HOJA DE METRADOS 07.00.00 MUROS Y TABIQUES DE ALBAÑILERIA 07.01.00 MURO DE LADRILLO KING KONG MECANIZADO (SOGA), J=2 cm M2 PRIMER NIVEL SS HH M2 1 1.45 2.75 3.99 M2 1 0.95 2.75 2.61 M2 1 1.00 1.90 1.90 M2 1 0.70 2.75 1.93 M2 1 0.55 2.75 1.51 M2 1 0.30 2.75 0.83 M2 1 1.00 1.90 1.90 M2 1 0.5 2.75 1.38 ARCHIVOS M2 1 4.3 2.75 11.83 M2 1 1.35 2.75 3.71 M2 1 1.25 2.75 3.44 GERENCIA DE PRODUCCION M2 1 2.05 2.75 5.64 DATA CENTER M2 1 0.9 2.75 2.48 07.02.00 MURO DE LADRILLO KING KONG MECANIZADO (CABEZA), J=2 cm M2 PRIMER NIVEL JEFATURA DE INFORMATICA M2 1 3.20 0.30 0.96 M2 1 0.70 2.75 1.93 M2 2 0.75 1.80 1.80 M2 1 0.70 1.10 1.80 OFC ANALISTA CONTABILIDAD M2 1 1.00 0.30 1.80 SEGUNDO NIVEL M2 1 1.85 1.80 1.80 08.00.00 MURO DE TABIQUERIA PREFABRICADA 08.01.00 TABIQUERIA TIPO DRYWALL C/ PLANCHAS GYPLAC M2 PRIMER PISO TD-02 M2 1 4.8 2.8 13.44 TD-03 M2 1 1.25 2.8 3.50 TD-04 M2 1 0.6 2.8 1.68 TD-05 M2 1 0.9 2.8 2.52 TD-06 M2 1 0.45 2.8 1.26 TD-07 M2 1 0.6 2.8 1.68 TD-08 M2 1 0.6 2.8 1.68 TD-09 M2 1 1.4 2.8 3.92 TD-10 M2 1 1.1 2.8 3.08 TD-11 M2 1 4.65 2.8 13.02 TD-12 M2 1 1.2 2.8 3.36 TD-13 M2 1 0.5 2.8 1.40 TD-14 M2 1 1.4 2.8 3.92 TD-16 M2 1 5.05 2.8 14.14 TD-17 M2 1 1.7 2.8 4.76 TD-18 M2 1 1.4 2.8 3.92 TD-19 M2 1 1.35 2.8 3.78 TD-20 M2 1 1.9 2.8 5.32 TD-21 M2 1 2.65 2.8 7.42 TD-22 M2 1 5 2.8 14.00 SEGUNDO PISO TD-02 M2 1 1.20 2.50 3.00 TD-04 M2 1 1.60 2.50 4.00 TD-05 M2 1 1.75 2.50 4.38 TD-06 M2 1 0.35 2.50 0.88 TD-07 M2 5 0.60 2.50 7.50 TD-09 M2 2 3.75 2.50 18.75 TD-10 M2 1 2.40 2.50 6.00 TD-11 M2 4 0.60 2.50 6.00 TD-12 M2 1 0.65 2.50 1.63 TD-13 M2 1 1.10 2.50 2.75 TD-14 M2 1 3.95 2.50 9.88 TD-15 M2 1 1.20 2.50 3.00 TD-16 M2 1 3.15 2.50 7.88 TD-17 M2 1 1.15 2.50 2.88 TD-18 M2 1 1.25 2.50 3.13 TD-19 M2 1 4.75 2.50 11.88 TD-21 M2 1 2.00 2.50 5.00 TD-22 M2 1 1.30 2.50 3.25 TD-23 M2 1 0.70 2.50 1.75 TD-24 M2 1 0.85 2.50 2.13 TD-25 M2 1 0.80 2.50 2.00 POZO DE LUZ DERECHO M2 1 32.65 32.65 POZO DE LUZ IZQUIERDO M2 1 33.30 33.30 HALL M2 1 40.20 40.20 08.02.00 TABIQUERIA DE MELAMINA CONTRAPLACADA E=15 MM M2 PRIMER PISO TA-01 M2 1 0.30 2.70 0.81 TA-02 M2 1 1.20 2.70 3.24 TA-03 M2 1 0.30 2.70 0.81 TA-04 M2 1 1.20 2.70 3.24 TA-05 M2 1 1.20 2.70 3.24 TA-06 M2 1 1.20 2.70 3.24 TA-07 M2 1 1.25 2.70 3.38 SEGUNDO PISO TA-01 M2 1 0.30 2.40 0.72 TA-02 M2 1 1.20 2.40 2.88 TA-03 M2 1 0.30 2.40 0.72 TA-04 M2 1 1.20 2.40 2.88 09.00.00 REVOQUES, ENLUCIDOS Y MOLDURAS CODIGO DENOMINACION Y/O DESCRIPCION UNID Elem MEDIDAS BASE LARG. ALTO PARC. LTADOS OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTA PUNO DE LA E.G.E. SAN GABÁN FECHA Octubre de 2010 PARTIDA : Arquit REV. POR :

METRADO DE ARQUITECTURA

Embed Size (px)

Citation preview

Page 1: METRADO DE ARQUITECTURA

5.2 158.60

HOJA DE METRADOS

07.00.00 MUROS Y TABIQUES DE ALBAÑILERIA

07.01.00 MURO DE LADRILLO KING KONG MECANIZADO (SOGA), J=2 cm M2 43.13PRIMER NIVEL SS HH M2 1 1.45 2.75 3.99

M2 1 0.95 2.75 2.61M2 1 1.00 1.90 1.90M2 1 0.70 2.75 1.92M2 1 0.55 2.75 1.51M2 1 0.30 2.75 0.83M2 1 1.00 1.90 1.90M2 1 0.5 2.75 1.38

ARCHIVOS M2 1 4.3 2.75 11.83M2 1 1.35 2.75 3.71M2 1 1.25 2.75 3.44

GERENCIA DE PRODUCCION M2 1 2.05 2.75 5.64DATA CENTER M2 1 0.9 2.75 2.48

07.02.00 MURO DE LADRILLO KING KONG MECANIZADO (CABEZA), J=2 cm M2 10.09PRIMER NIVEL JEFATURA DE INFORMATICA M2 1 3.20 0.30 0.96

M2 1 0.70 2.75 1.92M2 2 0.75 1.80 1.80M2 1 0.70 1.10 1.80

OFC ANALISTA CONTABILIDAD M2 1 1.00 0.30 1.80SEGUNDO NIVEL

M2 1 1.85 1.80 1.80

08.00.00 MURO DE TABIQUERIA PREFABRICADA 08.01.00 TABIQUERIA TIPO DRYWALL C/ PLANCHAS GYPLAC M2 321.58

PRIMER PISOTD-02 M2 1 4.8 2.8 13.44TD-03 M2 1 1.25 2.8 3.50TD-04 M2 1 0.6 2.8 1.68TD-05 M2 1 0.9 2.8 2.52TD-06 M2 1 0.45 2.8 1.26TD-07 M2 1 0.6 2.8 1.68TD-08 M2 1 0.6 2.8 1.68TD-09 M2 1 1.4 2.8 3.92TD-10 M2 1 1.1 2.8 3.08TD-11 M2 1 4.65 2.8 13.02TD-12 M2 1 1.2 2.8 3.36TD-13 M2 1 0.5 2.8 1.40TD-14 M2 1 1.4 2.8 3.92TD-16 M2 1 5.05 2.8 14.14TD-17 M2 1 1.7 2.8 4.76TD-18 M2 1 1.4 2.8 3.92TD-19 M2 1 1.35 2.8 3.78TD-20 M2 1 1.9 2.8 5.32TD-21 M2 1 2.65 2.8 7.42TD-22 M2 1 5 2.8 14.00SEGUNDO PISOTD-02 M2 1 1.20 2.50 3.00TD-04 M2 1 1.60 2.50 4.00TD-05 M2 1 1.75 2.50 4.38TD-06 M2 1 0.35 2.50 0.88TD-07 M2 5 0.60 2.50 7.50TD-09 M2 2 3.75 2.50 18.75TD-10 M2 1 2.40 2.50 6.00TD-11 M2 4 0.60 2.50 6.00TD-12 M2 1 0.65 2.50 1.63TD-13 M2 1 1.10 2.50 2.75TD-14 M2 1 3.95 2.50 9.88TD-15 M2 1 1.20 2.50 3.00TD-16 M2 1 3.15 2.50 7.88TD-17 M2 1 1.15 2.50 2.88TD-18 M2 1 1.25 2.50 3.13TD-19 M2 1 4.75 2.50 11.88TD-21 M2 1 2.00 2.50 5.00TD-22 M2 1 1.30 2.50 3.25TD-23 M2 1 0.70 2.50 1.75TD-24 M2 1 0.85 2.50 2.13TD-25 M2 1 0.80 2.50 2.00POZO DE LUZ DERECHO M2 1 32.65 32.65POZO DE LUZ IZQUIERDO M2 1 33.30 33.30HALL M2 1 40.20 40.20

08.02.00 TABIQUERIA DE MELAMINA CONTRAPLACADA E=15 MM M2 25.15PRIMER PISOTA-01 M2 1 0.30 2.70 0.81TA-02 M2 1 1.20 2.70 3.24TA-03 M2 1 0.30 2.70 0.81TA-04 M2 1 1.20 2.70 3.24TA-05 M2 1 1.20 2.70 3.24TA-06 M2 1 1.20 2.70 3.24TA-07 M2 1 1.25 2.70 3.38SEGUNDO PISO TA-01 M2 1 0.30 2.40 0.72TA-02 M2 1 1.20 2.40 2.88TA-03 M2 1 0.30 2.40 0.72TA-04 M2 1 1.20 2.40 2.88

09.00.00 REVOQUES, ENLUCIDOS Y MOLDURAS

18

CODIGO DENOMINACION Y/O DESCRIPCION

UNID N°Elem MEDIDAS

BASE LARG.ALTO

TOTAL

PARC.

RESULTADOS

OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTAPUNO DE LA E.G.E. SAN GABÁN

FECHA Octubre de 2010

: PARTIDAArquitectura REV. POR :

Page 2: METRADO DE ARQUITECTURA

5.2 158.60

HOJA DE METRADOS

18

CODIGO DENOMINACION Y/O DESCRIPCION

UNID N°Elem MEDIDAS

BASE LARG.ALTO

TOTAL

PARC.

RESULTADOS

OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTAPUNO DE LA E.G.E. SAN GABÁN

FECHA Octubre de 2010

: PARTIDAArquitectura REV. POR :

09.01.00 TARRAJEO PRIMARIO O RAYADO (Mezcla C:A 1:5, E=1.5cm) M2 63.11SSHH DAMAS M2 1 12.75 2.70 34.43SSHH VARONES M2 1 13.45 2.70 36.32VANOS V-12 M2 -4 1.00 0.60 -2.40V-03 M2 -5 0.60 0.60 -1.80MESA LAVATORIO DAMAS M2 -1 0.7 2.50 -1.75MESA LAVATORIO VARONES M2 -1 0.7 2.40 -1.68

09.02.00 TARRAJEO EN INTERIORES (Mezcla C:A 1:4, E=2cm) M2 48.85PRIMER NIVEL SSHH DAMAS - PASADIZO M2 1 1.65 2.70 4.46ARCHIVO DOCUMENTOS M2 1 4.25 2.70 11.48GERENCIA DE PRODUCCION M2 1 2.70 2.70 7.29DATA CENTER M2 1 1.45 1.80 2.61DATA CENTER M2 1 0.70 0.70 0.49DATA CENTER M2 1 0.90 2.75 2.48GERENCIA DE PLANEAMIENTO M2 1 3.20 0.30 0.96GERENCIA DE PLANEAMIENTO M2 1 0.90 2.75 2.48GERENCIA DE PLANEAMIENTO M2 1 0.70 2.95 2.07INGRESO PRINCIPAL BASE M2 1 7.45 0.30 2.24OFC ANALISTA DE CONTABILIDAD M2 1 1.00 0.30 0.30SEGUNDO NIVELUSOS MULTIPLES M2 1 1.65 1.50 2.47TRAGALUZ HALL PRINCIPAL P/PASAMANOS M2 2 13.75 0.20 5.50SARDINEL SALA DE EXPOSICIONES M2 2 5.05 0.40 4.04

09.03.00 TARRAJEO EN EXTERIORES (Mezcla C:A 1:4, E=2cm) M2 11.14PRIMER NIVEL DATA CENTER M2 1 1.45 1.80 2.61DATA CENTER M2 1 0.70 0.70 0.49JEFATURA INFORMATICA M2 1 3.20 0.30 0.96JEFATURA INFORMATICA M2 1 0.70 2.95 2.07INGRESO PRINCIPAL BASE M2 1 7.45 0.30 2.24OFC ANALISTA DE CONTABILIDAD M2 1 1.00 0.30 0.30SEGUNDO NIVELUSOS MULTIPLES M2 1 1.65 1.50 2.47

09.04.00 VESTIDURA DE DERRAMES (Mezcla C:A 1:5, E=2cm, E=12cm) ML 34.75PRIMER NIVEL SSHH DAMAS - PASADIZO ML 1 2.70 2.70SSHH DAMAS V-12 ML 2 2.20 4.40ARCHIVO DOCUMENTOS ML 2 2.70 5.40GERENCIA DE PRODUCCION ML 1 2.70 2.70DATA CENTER ML 1 2.10 2.10JEFATURA INFORMATICA ML 1 3.20 3.20INGRESO PRINCIPAL BASE ML 1 7.40 7.40OFC ANALISTA DE CONTABILIDAD ML 1 5.35 5.35SEGUNDO NIVELUSOS MULTIPLES ML 1 1.50 1.50

09.05.00 RESANE DE DERRAMES ML 54.66PRIMER NIVEL TV-2 ML 1 1.10 1.10TV-3 ML 4 0.90 3.60TV-4 ML 2 0.80 1.60TV-5 ML 1 2.60 2.60TV-7 ML 1 0.30 0.30TV-8 ML 1 1.00 1.00TV-9 ML 2 1.30 2.60TV-10 ML 1 1.25 1.25TV-11 ML 1 2.90 2.90TV-12 ML 1 1.81 1.81TV-13 ML 1 0.65 0.65TV-14 ML 1 0.65 0.65TV-15 ML 1 1.50 1.50TV-16 ML 1 1.15 1.15TV-18 ML 1 1.00 1.00TV-19 ML 1 2.30 2.30TV-20 ML 1 1.90 1.90TV-21 ML 1 3.15 3.15SEGUNDO NIVEL TV-2 ML 1 2.35 2.35TV-3 ML 1 2.65 2.65TV-4 ML 5 0.60 3.00TV-6 ML 2 0.80 1.60TV-7 ML 4 0.60 2.40TV-9 ML 1 1.70 1.70TV-10 ML 1 2.80 2.80TV-11 ML 1 1.70 1.70TV-12 ML 1 2.20 2.20TV-13 ML 1 2.20 2.20TV-14 ML 1 1.00 1.00

10.00.00 CIELORRASOS10.01.00 CIELO RASO SUSPENDIDO (BALDOSA ACUSTICA DE 24"X 24" X 5/8") M2 618.53

PRIMER PISOGERENCIA DE PLANEAMIENTO M2 1 25.10 25.10GERENCIA DE PLANEAMIENTO VIGAS M2 -1 3.65 0.25 -0.91JEFATURA DE PLANEAMIENTO ECONÓMICO M2 1 12.30 12.30JEFATURA DE PLANEAMIENTO ECONÓMICO VIGAS M2 -1 3.90 0.25 -0.98JEFATURA DE PLANEAMIENTO CIVIL M2 1 18.50 18.50JEFATURA DE LOGISTICA M2 1 21.75 21.75GERENCIA DE ADMINISTRACION Y FNANZAS M2 1 17.80 17.80

Page 3: METRADO DE ARQUITECTURA

5.2 158.60

HOJA DE METRADOS

18

CODIGO DENOMINACION Y/O DESCRIPCION

UNID N°Elem MEDIDAS

BASE LARG.ALTO

TOTAL

PARC.

RESULTADOS

OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTAPUNO DE LA E.G.E. SAN GABÁN

FECHA Octubre de 2010

: PARTIDAArquitectura REV. POR :

SECRETARIA M2 1 13.25 13.25OFICINA DE AISITENTE DE FINANZAS Y PRESUPUETSO M2 1 10.15 10.15JEFATURA DE FINANZAS Y PRESUPUESTO M2 1 15.28 15.28CONTADOR GENERAL M2 1 11.95 11.95ANALISTA DE CONTABILIDAD M2 1 23.65 23.65RECURSOSO HUMANOS M2 1 17.50 17.50TESORERIA Y PAGADURIA M2 1 15.60 15.60IMPRESIONES M2 1 3.40 3.40GERENCIA DE PRODUCCION M2 1 13.20 13.20SECRETARIA DE GERENCIA DE PRODUCCION M2 1 13.50 13.50OFC. JEFATURA Y ASITENTE DE INFORMATICA M2 1 32.40 32.40OFC. JEFATURA Y ASITENTE DE INFORMATICA VIGA M2 -1 3.85 0.25 -0.96PASADIZO SALIDA EMERGENCIA M2 1 6.75 6.75PASADIZO SALIDA EMERGENCIA POLICARBONATO M2 1 2.50 0.62 1.55HALL ALA IZQUIERDA M2 1 16.50 16.50HALL ALA IZQUIERDA CIELO RASO POLICARBONATO M2 -2 1.62 0.62 -2.01HALL ALA IZQUIERDA CIELO RASO POLICARBONATO M2 -2 2.02 0.62 -2.50CIELO RASO TRAGALUZ M2 -1 1.40 1.00 -1.40PASADIZO ALA IZQUIERDA M2 1 13.90 13.90PASADIZO ALA IZQUIERDA POLICARBONATO M2 -1 3.63 0.62 -2.25PASADIZO ALA IZQUIERDA VIGA M2 -1 1.50 0.25 -0.38HALL ALA DERECHA M2 1 15.90 15.90HALL ALA DERECHA CIELO RASO POLICARBONATO M2 -2 1.65 0.62 -2.05HALL ALA DERCHA CIELO RASO POLICARBONATO M2 -2 2.00 0.62 -2.48CIELO RASO TRAGALUZ M2 -1 1.40 1.00 -1.40PASADIZO ALA DERECHA M2 1 7.95 7.95PASADIZO ALA DERECHA POLICARBONATO M2 -1 3.60 0.62 -2.23PASADIZO ZONA NORTE M2 1 5.40 5.40PASADIZO ZONA NORTE POLICARBONATO M2 -1 1.65 0.62 -1.02SEGUNDO PISOSALA DE DIRECTORIO M2 1 26.30 26.30DETALLE CIELOR RASO EN DESNIVEL M2 -1 12.85 -12.85PRESIDENCIA DEL DIRECTORIO M2 1 19.35 19.35GERENCIA GENERAL M2 1 24.30 24.30SALA DE ESPERA Y SECRETARIA DE GERENCIA GENRAL M2 1 26.95 26.95CONSERJERIA E IMPRESIONES Y FOTOCOPIADO M2 1 10.15 10.15SALA DE REUNIONES M2 1 19.45 19.45SALA DE REUN IONES DETALLE FALSO TECHO EN DESNIVEL M2 -1 9.75 -9.75JEFATURA DE MERCADEO Y TARIFAS M2 1 12.80 12.80OFC. DE ASISTENTE DE MERCADEO Y TARIFAS M2 1 14.10 14.10DESPACHO ECONOMICO M2 1 18.30 18.30GERENCIA COMERCIAL M2 1 20.10 20.10SECRETARIA M2 1 18.70 18.70SALA DE EXPOSICIONES U OFICINA M2 1 21.45 21.45SALA DE EXPOSICIONES U OFICINA DETALLE FALSO TECHO A DESNIVEL M2 -1 10.40 -10.40 ASESORIA LEGAL Y ASITENTE M2 1 36.30 36.30 ASESORIA LEGAL Y ASITENTE VIGA M2 -1 5.00 0.25 -1.25REPOSTERO M2 1 11.25 11.25REPOSTERO VIGA M2 -1 3.75 0.25 -0.94ASITENTE DE AUDITOR , AUDITOR Y ARCHIVO M2 1 44.60 44.60ASITENTE DE AUDITOR , AUDITOR Y ARCHIVO VIGA M2 -2 3.75 0.25 -1.88PASILLO DE ESCAPE M2 1 6.95 6.95PASILLO DE ESCAPE M2 -1 1.86 0.62 -1.15PASILLO ALA IZQUIERDA M2 1 13.85 13.85PASILLO ALA IZQUIERDA POLICARBONATO M2 -2 3.63 0.62 -4.50PASILLO ALA DERECHA M2 1 8.25 8.25PASILLO ALA DERECHA POLICARBONATO M2 -2 3.72 0.62 -4.61

10.02.00 CIELO RASO SUSPENDIDO (SUPERBOARD E= 6") M2 154.80PRIMER PISO SALA DE CAPCITACION M2 1.00 25.60 25.60SS HH Y ARCHIVO DE DOCUMENTOS M2 1.00 26.60 26.60HALL PRINCIPAL M2 1.00 47.50 47.50SEGUNDO PISO SSHH DMAS Y VARONES M2 1.00 21.45 21.45SS HH PRESIDENCIA DE DIRECTORIO Y GERENCIA GENERAL M2 1.00 4.10 4.10USOS MULTIPLES M2 1.00 10.45 10.45DETALLE DE RELIEVE LAMPARA SUPERDOARD M2 1.00 7.65 0.10 0.77DETALLE POLICRABONATO M2 -1.00 2.88 -2.88SALA DE DIRECTOR LAMPARA SUPERBOARD M2 1.00 12.85 12.85DETALLE DE RELIEVE LAMPARA SUPERDOARD M2 1.00 8.15 0.10 0.82DETALLE POLICARBONATO M2 -1.00 4.35 -4.35DETALLE POLICARBONATO M2 1.00 0.61 0.61SLA DE REUNIONES M2 1.00 9.80 9.80DETALLE DE RELIEVE LAMPARA SUPERDOARD M2 -1.00 2.80 -2.80DETALLE DE RELIEVE LAMPARA SUPERDOARD M2 1.00 6.30 0.10 0.63DETALLE POLICARBONATO M2 1.00 0.60 0.60DETALLE POLICARBONATO M2 1.00 2.80 0.10 0.28SSHH PASADIZO M2 1.00 2.78 2.78

10.03.00 FALSO TECHO PLANCHA DE POLICARBONATO ALVEOLAR E=8 MM (POLISHADE AZUL)PRIMER PISO 37.81HALL ALA IZQUIERDA M2 2 1.65 0.65 2.15PASADIZO M2 2 2.05 0.65 2.67PASADIZO SALIDA D ESCAPE M2 1 2.50 0.65 1.63PASADIZO LONGITUDINAL (IZQUIERDA ) M2 2 3.65 0.65 4.75PASADIZO LONGITUDINAL (DERECHA ) M2 1 3.65 0.65 2.37HALL ALA DERECHA M2 2 1.65 0.64 2.10HALL ALA DERECHA M2 2 2.05 0.65 2.67PASADIZO DE INGRESO DE SERVICIO M2 1 1.65 0.65 1.07SEGUNDO NIVEL SALA DE DIRECTORIO M2 1 4.35 4.35SALIDA DE ESCAPE PASADIZO M2 1 1.85 0.65 1.20PASADIZO ALA IZQUIERDA M2 2 3.65 0.65 4.75

Page 4: METRADO DE ARQUITECTURA

5.2 158.60

HOJA DE METRADOS

18

CODIGO DENOMINACION Y/O DESCRIPCION

UNID N°Elem MEDIDAS

BASE LARG.ALTO

TOTAL

PARC.

RESULTADOS

OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTAPUNO DE LA E.G.E. SAN GABÁN

FECHA Octubre de 2010

: PARTIDAArquitectura REV. POR :

USOS MULTIPLES M2 1 2.80 1.05 2.94PASADIZO ALA DERECHA M2 1 3.75 0.65 2.44GERENCIA COMERCIAL M2 1 2.75 2.75

11.00.00 PISOS Y PAVIMENTOS

11.01.00 REPOSICION DE PISO DE CONCRETO 175 KG/CM2 M3 7.62SSHH VARONES Y SSHH DAMAS Y ARCHIVO M3 1 26.57 0.26 6.80GERENCIA DE PLANEAMIENTO M3 1 3.20 0.26 0.816

11.02.00 CONTRAPISO DE 40mm (Mezcla C:A, Base 1:5, Acabado 1:2) M2 29.60PRIMER PISO SSHH VARONE, DAMAS Y ARCHIVO DE DOCUMENTOS M2 1 26.60 26.60JEFATURA DE INFORMATICA M2 1 3.00 3.00

11.03.00 PISO DE CERAMICO ANTIDESLIZANTE DE 30 X 30 CM. (america blanco) M2 42.30PRIMER PISO SSHH DAMAS M2 1 9.50 9.50SSHH VARONES M2 1 10.50 10.50ARCHIVO DE DOCUMENTOS M2 1 5.40 5.40DTA CENTER M2 1 16.90 16.90

11.04.00 PISO DE PORCELANTO COR BEIGE DE 40 X 40 CM M2 246.96PRIMER PISO M2PASADIZO ALA IZQUIERDA M2 1 16.50 16.50PASADIZO ESCAPE M2 1 6.80 6.80PASADIZO ALA IZQUIERDA TRAMO CENTRAL M2 1 13.90 13.90HALL PRINCIPAL M2 1 47.60 47.60PASADIZO ALA DERECHA M2 1 7.95 7.95HALL ALA DERECHA M2 1 15.90 15.90PASADIZO SALIDA DE EMRGENCIA M2 1 5.40 5.40SEGUNDO PISO M2PASADIZO ESCAPE M2 1 6.95 6.95HALL ALA IZQUIERDA M2 1 16.30 16.30TRAGALUZ M2 -1 1.40 1.00 -1.40PASADIZO ALA IZQUIERDA M2 1 13.85 13.85HALL PRINCIPAL M2 1 56.11 56.11TRAGALUZ M2 -1 13.95 -13.95PASADIZO ALA DERECHA M2 1 8.25 8.25HALL ALA DERECHA M2 1 15.50 15.50TRAGALUZ M2 -1 1.40 1.00 -1.40SALA DE EXPOSICIONES U OFICINA M2 1 21.45 21.45REPOSTERO M2 1 11.25 11.25

11.05.00 PISO ENCHAPADO DE PIEDRA VOLCANICA, POROSA TIPO AMANTANI (COLOR GRIS) M2 58.00INGRESO PRINCIPAL M2 1 58.00 58.00

11.06.00 PISO MACHIEMBRADO MADERA M2 582.35PRIMER PISOGERENCIA DE PLANEAMIENTO M2 1 25.10 25.10JEFATURA DE PLANEAMIENTO ECONÓMICO M2 1 12.30 12.30JEFATURA DE PLANEAMIENTO CIVIL M2 1 18.50 18.50JEFATURA DE LOGISTICA M2 1 21.75 21.75SALA DE CAPACITACION M2 1 25.60 25.60GERENCIA DE ADMINISTRACION Y FNANZAS M2 1 17.80 17.80SECRETARIA M2 1 13.25 13.25OFICINA DE AISITENTE DE FINANZAS Y PRESUPUETSO M2 1 10.15 10.15JEFATURA DE FINANZAS Y PRESUPUESTO M2 1 15.30 15.30CONTADOR GENERAL M2 1 11.95 11.95ANALISTA DE CONTABILIDAD M2 1 23.65 23.65RECURSOSO HUMANOS M2 1 17.50 17.50TESORERIA Y PAGADURIA M2 1 15.60 15.60IMPRESIONES M2 1 3.40 3.40GERENCIA DE PRODUCCION M2 1 13.20 13.20SECRETARIA DE GERENCIA DE PRODUCCION M2 1 13.50 13.50OFC. JEFATURA Y ASITENTE DE INFORMATICA M2 1 32.40 32.40SEGUNDO PISO M2SALA DE DIRECTORIO M2 1 26.30 26.30PRESIDENCIA DEL DIRECTORIO M2 1 19.35 19.35GERENCIA GENERAL M2 1 24.30 24.30SALA DE ESPERA Y SECRETARIA DE GERENCIA GENRAL M2 1 26.95 26.95COSERJERIA E IMPRESIONES Y FOTOCOPIADO M2 1 10.15 10.15SALA DE REUNIONES M2 1 19.45 19.45JEFATURA DE MERCADEO Y TARIFAS M2 1 12.80 12.80OFC. DE ASISTENTE DE MERCADEO Y TARIFAS M2 1 14.10 14.10DESPACHO ECONOMICO M2 1 18.30 18.30GERENCIA COMERCIAL M2 1 20.10 20.10SECRETARIA M2 1 18.70 18.70 ASESORIA LEGAL Y ASITENTE M2 1 36.30 36.30ASITENTE DE AUDITOR , AUDITOR Y ARCHIVO M2 1 44.60 44.60

12.00.00 CONTRAZOCALOS 12.01.00 CONTRAZOCALO DE MADERA CEDRO 3/4"x4" (Incluye Rodón) M 541.22

PRIMER PISOGERENCIA DE PLANEAMIENTO M 1 19.70 19.70JEFATURA DE PLANEAMIENTO ECONÓMICO M 1 12.92 12.92JEFATURA DE PLANEAMIENTO CIVIL M 1 17.74 17.74JEFATURA DE LOGISTICA M 1 18.20 18.20SALA DE CAPACITACION M 1 15.35 15.35GERENCIA DE ADMINISTRACION Y FNANZAS M 1 15.25 15.25SECRETARIA M 1 15.70 15.70OFICINA DE AISITENTE DE FINANZAS Y PRESUPUETSO M 1 9.15 9.15JEFATURA DE FINANZAS Y PRESUPUESTO M 1 15.65 15.65CONTADOR GENERAL M 1 10.93 10.93

Page 5: METRADO DE ARQUITECTURA

5.2 158.60

HOJA DE METRADOS

18

CODIGO DENOMINACION Y/O DESCRIPCION

UNID N°Elem MEDIDAS

BASE LARG.ALTO

TOTAL

PARC.

RESULTADOS

OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTAPUNO DE LA E.G.E. SAN GABÁN

FECHA Octubre de 2010

: PARTIDAArquitectura REV. POR :

ANALISTA DE CONTABILIDAD M 1 22.83 22.83RECURSOSO HUMANOS M 1 18.15 18.15TESORERIA Y PAGADURIA M 1 18.05 18.05IMPRESIONES M 1 5.35 5.35GERENCIA DE PRODUCCION M 1 14.05 14.05SECRETARIA DE GERENCIA DE PRODUCCION M 1 13.40 13.40OFC. JEFATURA Y ASITENTE DE INFORMATICA M 1 29.90 29.90SEGUNDO PISOSALA DE DIRECTORIO M 1 19.20 19.20PRESIDENCIA DEL DIRECTORIO M 1 16.55 16.55GERENCIA GENERAL M 1 19.05 19.05SALA DE ESPERA Y SECRETARIA M 1 20.70 20.70COSERJERIA E IMPRESIONES Y FOTOCOPIADO M 1 15.40 15.40SALA DE REUNIONES M 1 16.80 16.80JEFATURA DE MERCADEO Y TARIFAS M 1 14.25 14.25OFC. DE ASISTENTE DE MERCADEO Y TARIFAS M 1 15.70 15.70DESPACHO ECONOMICO M 1 17.95 17.95GERENCIA COMERCIAL M 1 18.65 18.65SECRETARIA M 1 16.05 16.05 ASESORIA LEGAL Y ASISTENTE M 1 33.75 33.75ASITENTE DE AUDITOR , AUDITOR Y ARCHIVO M 1 44.85 44.85

13.00.00 ZOCALOS13.01.00 ZOCALO CERAMICO 0.30 X 0.30 M2 72.02

PRIMER NIVEL SSHH DAMAS M2 1 12.65 2.70 34.16V-12 M2 -1 1.00 0.60 -0.60SSHH VARONES M2 1 13.80 2.70 37.26V-12 M2 -1 1.00 0.60 -0.60V-3 M2 -5 0.60 0.60 -1.80SEGUNDO NIVEL REPOSTERO M2 1 6.00 0.60 3.60

13.02.00 TERMINAL PLASTICO PARA CERAMICO ML 46.90PRIMER NIVEL MLSSHH DAMAS ML 1 9.80 9.80SSHH VARONES ML 1 24.2 24.20SEGUNDO NIVEL REPOSTERO - MESA DE TRABAJO ML 1 12.9 12.90

14.00.00 REVESTIMIENTO DE GRADAS Y ESCALERA (OTROS)

14.01.00 REVESTIMIENTO EN GRADAS CON PIEDRA VOLCANICA ML 17.70GRADAS DE ENTRADA PRINCIPAL, PELDAÑOS DE 0.30 X 5.90 ML 3 5.9 17.70

14.02.00 PISO DE CEMENTO: ACABADO BRUÑADO E= 1" M2 10.88RAMPA DE ACCESO M2 2 5.44 10.88

14.03.00 REVESTIMIENTO DE ESCALERAS LATERALES CON CEMENTO P=0.25 M X C=0.18 ML 22.50ESCALERAS DE EMERGENCIA ML 18 1.25 22.50

14.04.00 REVESTIMIENTO EN GRADAS CON PORCELANATO BEIGE DE 0.40 X 0.40 9.53ESCALERA PRINCIPAL M2 14 0.30 1.30 5.46ESCALERA PRINCIPAL M2 8 0.30 1.10 2.64DESCANSO M2 1 1.10 1.30 1.43

14.05.00 CANTONERAS DE PVC 1 1/2" ML 18.20ESCALERAS PRINCIPALES ML 14 1.30 18.20ESCALERAS PRINCIPALES ML 8 1.10 8.80

14.06.00 CANTONERAS DE ALUMINIO DE 1 1/2" X 1" 22.50ESCALERAS LATERALES DE MERGENCIA ML 18 1.25 22.50

14.07.00 REVESTIMIENTO DE MESAS CON MARMOL NACIONAL E =1'' M2 3.00SEGUNDO NIVELSSHH DAMAS M2 1 0.80 1.30 1.04SSHH VARONES M2 1 0.80 2.45 1.96

14.07.00 REVESTIMIENTO DE MESAS CON CERAMICO 0.30 X 0.30 M.PRIMER NIVEL 15.66SSHH DAMAS M2 1 0.80 2.40 1.92SSHH VARONES M2 1 0.80 2.50 2.00SEGUNDO NIVEL REPOSTERO M2 1 1.15 3.95 4.54SOPORTES VERTICALES M2 4 2.00 0.90 7.20

15.00.00 CARPINTERIA DE MADERA

15.01.00 PUERTAS DE TABLERO REBAJADO E=3/4" M2 36.40PRIMER PISOP-4 M2 6 0.90 2.20 11.88P-7 M2 1 1.00 2.20 2.20SEGUNDO PISOP-1 M2 1 0.90 2.40 2.16P-3 M2 4 1.00 2.10 8.40P-4 M2 2 0.90 2.10 3.78P-5 M2 2 0.70 2.10 2.94P-6 M2 1 0.80 2.10 1.68P-9 M2 2 0.80 2.10 3.36

15.02.00 MARCO DE MADERA EN TODO EL DERRAME E= 1''X 0.12 M. ML 112.30PRIMER PISOP-4 ML 6 6.30 37.80

Page 6: METRADO DE ARQUITECTURA

5.2 158.60

HOJA DE METRADOS

18

CODIGO DENOMINACION Y/O DESCRIPCION

UNID N°Elem MEDIDAS

BASE LARG.ALTO

TOTAL

PARC.

RESULTADOS

OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTAPUNO DE LA E.G.E. SAN GABÁN

FECHA Octubre de 2010

: PARTIDAArquitectura REV. POR :

P-7 ML 1 6.40 6.40SEGUNDO PISOP-1 ML 1 5.70 5.70P-3 ML 4 5.80 23.20P-4 ML 2 5.70 11.40P-5 ML 2 5.50 11.00P-6 ML 1 5.60 5.60P-9 ML 2 5.60 11.20

15.03.00 PASAMANOS DE MADERA ML 65.45PRIMER NIVEL ESCALERAS PRINCIPALES ML 2 6.65 13.30TRAGALUZ ML 1 13.75 13.75SALA DE EXPOSICIONES ML 5 5.60 28.00BARANDA TRAGALUZ DE HALL LATERAL ML 2 5.20 10.40

16.00.00 CARPINTERIA METALICA Y HERRERIA

16.01.00 167.85PRIMER NIVEL ESCALERAS CORTE LONGITUDINAL ML 6 6.65 39.90ESCALERAS CORTE VERTICAL ML 8 1.00 8.00SEGUNDO NIVEL TRAGALUZ CORTE HORIZONTAL ML 3 13.75 41.25TRAGALUZ CORTE VERTICAL ML 12 1.00 12.00SAL DE EXPOSICION ML 3 5.10 15.30SAL DE EXPOSICION ML 7 1.00 7.00HALL LATERALES CORTE LONGITUDINAL ML 6 5.40 32.40HALL LATERALES CORTE VERTICAL ML 12 1.00 12.00

16.02.00 BARANDAS DE TUBO ELCTROSOLDADO DE 2'' X 1 1/2'' ML 36.00ESCALERA EXTERIOR CORTE LONGITUDINAL ML 4 6.00 24.00ESCALERA EXTERIOR CORTE VERTICAL ML 12 1.00 12.00

16.03.00 PUERTAS METALICAS PLANCHA DE ACERO DE 4MM DE ESPESOR 2.43P-10 SEGUNDO NIVEL M2 1 0.90 2.70 2.43

REJILLA METALICA ANCHO 0.33 M M2 34.49REJILLA METALICA PARA CANAL DE AGUAS PLUVIALES M2 1 0.33 104.50 34.49

16.04.00 ML 48.65PRIMER PISO ML 7 2.95 20.65SEGUNDO PISO ML 7 4.00 28.00

16.05.00 MARCO DE ALUMINIO EN VENTANAS 2 '' X 2 1/2' (INCLUYE COLOCACION 366.20PRIMER PISOV-1 ML 7 6.20 43.40V-2 ML 3 11.90 35.70V-3 ML 5 2.40 12.00V-5 ML 2 7.90 15.80V-7 ML 2 5.80 11.60V-8 ML 3 6.60 19.80V-9 ML 1 6.50 6.50V-12 ML 2 3.20 6.40V-14 ML 2 6.50 13.00V-15 ML 1 6.40 6.40V-16 ML 1 6.60 6.60V-17 ML 1 6.00 6.00SEGUNDO NIVEL V-1 ML 13 6.20 80.60V-3 ML 7 2.40 16.80V-4 ML 1 7.40 7.40V-5 ML 4 7.60 30.40V-6 ML 1 4.50 4.50V-7 ML 2 5.00 10.00V-8 ML 1 7.50 7.50V-9 ML 1 6.60 6.60V-10 ML 3 6.40 19.20

17.00.00 CARPINTERIA DE MELAMINA

17.01.00 TABIQUERIA PARA SEPARACION EN SSHH (INCLUYE ACCESORIOS Y COLOCACION) M2 24.00PRIMER NIVEL SSHH DAMAS M2 1 2.1 2.00 4.20SSHH VARONES M2 1 3.3 2.00 6.60SEGUNDO NIVEL SSHH DAMAS M2 1 3.3 2.00 6.60SSHH VARONES M2 1 3.3 2.00 6.60

17.02.00 PUERTAS DE MELAMINA E= 18 mm INCLUYE ACCESORIOS Y BISAGARAS TIPO BRAZO SUPERIOR 11.20PRIMER NIVEL SSHH DAMAS M2 2 0.7 2.00 2.80SSHH VARONES M2 2 0.7 2.00 2.80SEGUNDO NIVEL SSHH DAMAS M2 2 0.7 2.00 2.80SSHH VARONES M2 2 0.7 2.00 2.80

18.00.00 CERRAJERIA 18.01.00 BISAGRAS PZA 60.00

PRIMER PISOP-4 PZA 6 3 18.00P-7 PZA 1 3 3.00

BARANDAS DE ALUMINIO SEMIPESADO 1 " X 1 "CON PASAMANO DE MADERA CEDRO INCLUYE ACCESORIOS DE FIJACION

REFUERZO, PERFIL DE ALUMINIO PESADO 2" X 2 1/2" EN INTERIOR INCLUYE ACCESORIOS DE COLOCACION Y FIJACION

Page 7: METRADO DE ARQUITECTURA

5.2 158.60

HOJA DE METRADOS

18

CODIGO DENOMINACION Y/O DESCRIPCION

UNID N°Elem MEDIDAS

BASE LARG.ALTO

TOTAL

PARC.

RESULTADOS

OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTAPUNO DE LA E.G.E. SAN GABÁN

FECHA Octubre de 2010

: PARTIDAArquitectura REV. POR :

P-10 PZA 1 3 3.00SEGUNDO PISOP-1 PZA 1 3 3.00P-3 PZA 4 3 12.00P-4 PZA 2 3 6.00P-5 PZA 2 3 6.00P-6 PZA 1 3 3.00P-9 PZA 2 3 6.00

18.02.00 CERRADURA PARA PUERTAS INTERIORES DE DOS GOLPES PZA 21.00PRIMER NIVEL PZA 8 8.00SEGUNDO NIVEL PZA 13 13.00

18.03.00 CERRADURA ELECTRONICA PARA PUERTAS PRINCIPALES PZA 1.00PRIMER NIVEL PZA 1 1.00

18.04.00 CERRADURA TIPO BOLA CON SEGURO INTERIOR PZA 19.00PRIMER NIVELP-4 PZA 6 6.00P-7 PZA 1 1.00SEGUNDO NIVEL P-1 PZA 1 1.00P-3 PZA 4 4.00P-4 PZA 2 2.00P-5 PZA 2 2.00P-6 PZA 1 1.00P-9 PZA 2 2.00

18.05.00 CERRADURA TIPO JALADOR DOS GOLPES INCLUYE PORTA CHAPA PZA 27.00PRIMER NIVEL P-5 PZA 14 14.00P-6 PZA 1 1.00SEGUNDO NIVEL P-2 PZA 9 9.00P-7 PZA 3 3.00

18.06.00 CERRADURA DE TRES GOLPES INCLUY PORTACHAPA PARA PUERTA PRINCIPAL DE VIDRIO 3.00PRIMER NIVEL P-1 PZA 1 1.00P-3 PZA 1 1.00P-9 PZA 1 1.00

18.07.00 CERRADURA TIPO PICO DE LORO PARA PUERTA PRINCIPAL 3.00PRIMER NIVEL P-1 PZA 1 1.00P-3 PZA 1 1.00P-9 PZA 1 1.00

18.08.00 SEGURO INTERIOR PARA PUERTAS DE MELAMINA PZA 8.00PRIMER NIVEL P-8 PZA 4 4.00SEGUNDO NIVEL P-8 PZA 4 4.00

18.09.00 BRAZO ANTIPANICO PZA 2.00P-3 (PRIMER NIVEL) PZA 2 2.00

18.10.00 FRENO DE PIE HIDRAULICO PARA PUERTAS DE VIDRIOPRIMER NIVEL 3.00P-1 PZA 1 1.00P-3 PZA 1 1.00P-9 PZA 1 1.00

18.11.00 BRAZO HIDRAULICO SUPERIOR 47.00PRIMER NIVEL P-5 PZA 14 14.00P-6 PZA 1 1.00P-4 PZA 6 6.00P-7 PZA 1 1.00SEGUNDO NIVEL P-2 PZA 9 9.00P-7 PZA 4 4.00P-1 PZA 1 1.00P-3 PZA 4 4.00P-4 PZA 2 2.00P-5 PZA 2 2.00P-6 PZA 1 1.00P-9 PZA 2 2.00

18.12.00 JALADORES P/PUERTA DE VIDRIO PRINCIPALES DE ACERO INOXIDABLE 0.30M D= 1" (CROMADOS) PZA 5.00P-1 PZA 2 2.00P-3 PZA 1 1.00P-9 PZA 2 2.00

19.00.00 VIDRIOS CRISTALES Y SIMILARES 19.01.00 PUERTA DE VIDRIO TEMPLEX TRANSPARENTE SISTEMA MODUGLAS E=8 MM P2 901.45

PRIMER PISOP-1 P2 1 2.200 10.76 2.40 56.81P-2 P2 1 2.000 10.76 2.40 51.65P-3 P2 1 1.200 10.76 2.70 34.86P-5 P2 14 1.000 10.76 2.70 406.73P-6 P2 1 0.960 10.76 2.70 27.89P-9 P2 1 1.500 10.76 2.70 43.58SEGUNDO PISO

Page 8: METRADO DE ARQUITECTURA

5.2 158.60

HOJA DE METRADOS

18

CODIGO DENOMINACION Y/O DESCRIPCION

UNID N°Elem MEDIDAS

BASE LARG.ALTO

TOTAL

PARC.

RESULTADOS

OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTAPUNO DE LA E.G.E. SAN GABÁN

FECHA Octubre de 2010

: PARTIDAArquitectura REV. POR :

P-2 P2 7 1.000 10.76 2.40 180.77P-7 P2 4 0.960 10.76 2.40 99.16

19.02.00 VIDRIO POLARIZADO GRIS e=4 MM (TRAGALUZ DE PUERTAS ) P2 68.33PRIMER PISOP-4 P2 6 10.76 0.90 0.50 29.05P-7 P2 1 10.76 1.00 0.50 5.38SEGUNDO PISOP-1 P2 1 10.76 0.90 0.30 2.91P-3 P2 4 10.76 1.00 0.30 12.91P-4 P2 2 10.76 0.90 0.30 5.81P-5 P2 2 10.76 0.70 0.30 4.52P-6 P2 1 10.76 0.80 0.30 2.58P-9 P2 2 10.76 0.80 0.30 5.16

19.03.00 VIDRIO POLARIZADO E=8 MM PARA VENTANAS EXTERIORES P2 1573.53PRIMER PISOV-1 P2 7 1.30 10.76 1.80 176.31V-3 P2 3 1.30 10.76 4.65 195.20V-4 P2 5 0.60 10.76 0.60 19.38V-5 P2 2 2.15 10.76 1.80 83.31V-7 P2 2 1.20 10.76 1.80 46.50V-8 P2 3 1.50 10.76 1.80 87.19V-9 P2 1 1.85 10.76 1.80 35.84V-14 P2 2 0.85 10.76 2.40 43.92V-15 P2 1 0.78 10.76 2.40 20.15V-16 P2 1 0.92 10.76 2.40 23.77V-17 P2 1 2.20 10.76 2.20 52.08SEGUNDO NIVEL V-1 P2 13 1.30 10.76 1.80 327.44V-3 P2 7 0.60 10.76 0.60 27.13V-4 P2 1 2.15 10.76 1.55 35.87V-5 P2 4 2.00 10.76 1.80 155.00V-6 P2 1 1.45 10.76 0.60 9.36V-7 P2 2 1.50 10.76 1.85 59.74V-8 P2 1 1.95 10.76 1.80 37.78V-9 P2 1 1.50 10.76 1.80 29.06V-10 P2 3 1.80 10.76 1.80 104.63V-12 P2 1 0.60 10.76 0.60 3.87

19.04.00 VIDRIO TEMPLEX TRANS. e=8 mm. SIST. MODUGLASEN TABIQUERIA INTERIOR P2 1498.47PRIMER NIVEL TV-2 P2 1 10.76 1.10 2.55 30.18TV-3 P2 4 10.76 0.90 2.55 98.78TV-4 P2 2 10.76 0.80 2.55 43.90TV-5 P2 1 10.76 2.60 2.55 71.34TV-7 P2 1 10.76 0.30 2.55 8.23TV-8 P2 1 10.76 1.00 2.55 27.44TV-9 P2 2 10.76 1.30 2.55 71.34TV-10 P2 1 10.76 1.25 2.55 34.30TV-11 P2 1 10.76 2.90 2.55 79.57TV-12 P2 1 10.76 1.81 2.55 49.66TV-13 P2 1 10.76 0.65 2.55 17.83TV-14 P2 1 10.76 0.65 2.55 17.83TV-15 P2 1 10.76 1.50 2.55 41.16TV-16 P2 1 10.76 1.15 2.55 31.55TV-18 P2 1 10.76 1.00 2.55 27.44TV-19 P2 1 10.76 2.30 2.55 63.11TV-20 P2 1 10.76 1.90 2.55 52.13TV-21 P2 1 10.76 3.15 2.55 86.43TV-22 P2 2 10.76 1.85 2.55 101.52SEGUNDO NIVEL TV-2 P2 1 10.76 2.35 2.25 56.89TV-3 P2 1 10.76 2.65 2.25 64.16TV-4 P2 5 10.76 0.60 2.25 72.63TV-6 P2 2 10.76 0.80 2.25 38.74TV-7 P2 4 10.76 0.60 2.25 58.10TV-9 P2 1 10.76 1.70 2.25 41.16TV-10 P2 1 10.76 1.70 2.25 41.16TV-11 P2 1 10.76 1.70 2.25 41.16TV-12 P2 1 10.76 2.20 2.25 53.26TV-13 P2 1 10.76 2.20 2.25 53.26TV-14 P2 1 10.76 1.00 2.25 24.21

19.05.00 1052.28MAMPARA ACCESO LATERALES P2 2 10.76 2.05 6.80 300.10FRONTAL P2 1 10.76 6.00 7.00 452.08DISMINUIR PUERTA P2 -1 10.76 2.20 2.40 -56.83V-4 P2 1 10.76 5.40 2.60 151.13V-10 P2 1 10.76 2.00 5.40 116.25V-11 P2 1 10.76 3.20 2.60 89.56

19.06.00 VENTANAA VITROVEX 12.91V-12 (PRIMER NIVEL P2 2 10.76 1.00 0.60 12.91

19.07.00 VENTANAS PROYECTANTES PARA SISTEMA ESTRUCTURAL MURO CORTINA UND 3.00PRIMER NIVEL UND 2 2.00SEGUNDO NIVEL UND 1 1.00

19.08.00 LAMINA DECORATIVA AUTOADHESIVA PARA TABIQUES DE CRITAL TEMPLEX INTERIORES M2 114.09PRIMER NIVEL TV-2 P2 1 1.10 1.30 1.43

SISTEMA ESTRUCTURAL MURO CORTINA CON VIDRIO POLARIZADO DE 8 MNM Y ESTRUCTURA DE ALUMINIO PESADO

Page 9: METRADO DE ARQUITECTURA

5.2 158.60

HOJA DE METRADOS

18

CODIGO DENOMINACION Y/O DESCRIPCION

UNID N°Elem MEDIDAS

BASE LARG.ALTO

TOTAL

PARC.

RESULTADOS

OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTAPUNO DE LA E.G.E. SAN GABÁN

FECHA Octubre de 2010

: PARTIDAArquitectura REV. POR :

TV-3 P2 4 0.90 1.30 4.68TV-4 P2 2 0.80 1.30 2.08TV-5 P2 1 2.60 1.30 3.38TV-7 P2 1 0.30 1.30 0.39TV-8 P2 1 1.00 1.30 1.30TV-9 P2 2 1.30 1.30 3.38TV-10 P2 1 1.25 1.30 1.63TV-11 P2 1 2.90 1.30 3.77TV-12 P2 1 1.81 1.30 2.35TV-13 P2 1 0.65 1.30 0.85TV-14 P2 1 0.65 1.30 0.85TV-15 P2 1 1.50 1.30 1.95TV-16 P2 1 1.15 1.30 1.49TV-18 P2 1 1.00 1.30 1.30TV-19 P2 1 2.30 1.30 2.99TV-20 P2 1 1.90 1.30 2.47TV-21 P2 1 3.15 1.30 4.10TV-22 P2 2 1.85 1.30 4.81SEGUNDO NIVEL TV-2 P2 1 2.35 1.30 3.06TV-3 P2 1 2.65 1.30 3.45TV-4 P2 5 0.60 1.30 3.90TV-6 P2 2 0.80 1.30 2.08TV-7 P2 4 0.60 1.30 3.12TV-9 P2 1 1.70 1.30 2.21TV-10 P2 1 1.70 1.30 2.21TV-11 P2 1 1.70 1.30 2.21TV-12 P2 1 2.20 1.30 2.86TV-13 P2 1 2.20 1.30 2.86TV-14 P2 1 1.00 1.30 1.30PRIMER PISOP-3 P2 1 1.20 1.30 1.56P-5 P2 14 1.00 1.30 18.20P-6 P2 1 0.96 1.30 1.25P-9 P2 1 1.50 1.30 1.95SEGUNDO PISOP-2 P2 9 1.00 1.30 11.70P-7 P2 4 0.96 1.30 4.99

19.09.00 COLOCACION DE ESPEJOS EN SSHH 17.43SS HH P2 1 17.43 17.43

20.00.00 PINTURA

20.01.00 PINTURA LATEX EN CIELO RASO (VOLADOS Y FONDO DE ESCALERAS) M2 412.88PRIMER PISO SALA DE CAPCITACION M2 1.00 25.60 25.60SS HH Y ARCHIVO DE DOCUMENTOS M2 1.00 26.60 26.60HALL PRINCIPAL M2 1.00 47.50 47.50SEGUNDO PISO SSHH DMAS Y VARONES M2 1.00 21.45 21.45SS HH PRESIDENCIA DE DIRECTORIO Y GERENCIA GENERAL M2 1.00 4.10 4.10USOS MULTIPLES M2 1.00 10.45 10.45DETALLE DE RELIEVE LAMPARA SUPERDOARD M2 1.00 7.65 0.10 0.77PRIMER PISO SALA DE CAPCITACION M2 1.00 25.60 25.60SS HH Y ARCHIVO DE DOCUMENTOS M2 1.00 26.60 26.60HALL PRINCIPAL M2 1.00 47.50 47.50SEGUNDO PISO SSHH DMAS Y VARONES M2 1.00 21.45 21.45SS HH PRESIDENCIA DE DIRECTORIO Y GERENCIA GENERAL M2 1.00 4.10 4.10USOS MULTIPLES M2 1.00 10.45 10.45DETALLE DE RELIEVE LAMPARA SUPERDOARD M2 1.00 7.65 0.10 0.77DETALLE POLICRABONATO M2 -1.00 2.88 -2.88SALA DE DIRECTOR LAMPARA SUPERBOARD M2 1.00 12.85 12.85DETALLE DE RELIEVE LAMPARA SUPERDOARD M2 1.00 8.15 0.10 0.82DETALLE POLICARBONATO M2 -1.00 4.35 -4.35DETALLE POLICARBONATO M2 1.00 0.61 0.61GERENCIA COMERCIAL M2 1.00 9.80 9.80DETALLE DE RELIEVE LAMPARA SUPERDOARD M2 -1.00 2.80 -2.80DETALLE DE RELIEVE LAMPARA SUPERDOARD M2 1.00 6.30 0.10 0.63DETALLE POLICARBONATO M2 1.00 0.60 0.60DETALLE POLICARBONATO M2 1.00 2.80 0.10 0.28SSHH PASADIZO M2 1.00 2.78 2.78ESCALERA PRONCIPAL M2 1.00 1.90 6.45 12.25ESCALERA SECUNDARIA LATERAL M2 1.00 1.55 6.10 9.46VOLADOS LONGITUDINALES M2 1.00 0.97 73.00 70.81VOLADOS TRANSVERSALES M2 1.00 0.97 30.00 29.10

20.02.00 PINTURA EN MUROS INTERIORES (Incluye Columnas y Derrames) M2 1952.00TABIQUES DE DRYWALLTD-01 M2 2 4.00 2.95 23.60TD-02 M2 2 4.8 2.95 28.32TD-03 M2 2 1.25 2.95 7.38TD-04 M2 2 0.6 2.95 3.54TD-05 M2 2 0.9 2.95 5.31TD-06 M2 2 0.45 2.95 2.66TD-07 M2 2 0.6 2.95 3.54TD-08 M2 2 0.6 2.95 3.54TD-09 M2 2 1.4 2.95 8.26TD-10 M2 2 1.1 2.95 6.49TD-11 M2 2 4.65 2.95 27.44TD-12 M2 2 1.2 2.95 7.08TD-13 M2 2 0.5 2.95 2.95

Page 10: METRADO DE ARQUITECTURA

5.2 158.60

HOJA DE METRADOS

18

CODIGO DENOMINACION Y/O DESCRIPCION

UNID N°Elem MEDIDAS

BASE LARG.ALTO

TOTAL

PARC.

RESULTADOS

OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTAPUNO DE LA E.G.E. SAN GABÁN

FECHA Octubre de 2010

: PARTIDAArquitectura REV. POR :

TD-14 M2 2 1.4 2.95 8.26TD-16 M2 2 5.05 2.95 29.80TD-17 M2 2 1.7 2.95 10.03TD-18 M2 2 1.4 2.95 8.26TD-19 M2 2 1.35 2.95 7.97TD-20 M2 2 1.9 2.95 11.21TD-21 M2 2 2.65 2.95 15.64TD-22 M2 2 5 2.95 29.50SEGUNDO PISOTD-02 M2 2 1.20 2.70 6.48TD-04 M2 2 1.60 2.70 8.64TD-05 M2 2 1.75 2.70 9.45TD-06 M2 2 0.35 2.70 1.89TD-07 M2 10 0.60 2.70 16.20TD-08 M2 2 1.60 2.70 8.64TD-09 M2 4 3.75 2.70 40.50TD-10 M2 2 2.40 2.70 12.96TD-11 M2 8 0.60 2.70 12.96TD-12 M2 2 0.65 2.70 3.51TD-13 M2 2 1.10 2.70 5.94TD-14 M2 2 3.95 2.70 21.33TD-16 M2 2 3.15 2.70 17.01TD-17 M2 2 1.15 2.70 6.21TD-18 M2 2 1.25 2.70 6.75TD-19 M2 2 4.75 2.70 25.65TD-20 M2 2 2.10 2.70 11.34TD-21 M2 2 2.00 2.70 10.80TD-22 M2 2 1.30 2.70 7.02TD-23 M2 2 0.70 2.70 3.78TD-24 M2 2 0.85 2.70 4.59TD-25 M2 2 0.80 2.70 4.32POZO DE LUZ DERECHO M2 2 32.65 65.30POZO DE LUZ IZQUIERDO M2 2 33.30 66.60HALL M2 2 40.20 80.40SOBRECIMEINTO DE TABIQUES DE MELAMINA M2 2 9.65 0.15 2.90SOBRECIMEINTO DE TABIQUES DE VIDRIO M2 2 55.90 0.15 16.77DERRAMES PRIMER NIVEL M2 79 0.15 2.40 28.44DERRAMES SEGUNDO NIVEL M2 82 0.15 2.40 29.52EJE 1-1 TRAMO DE G-I PRIMER NIVEL M2 1 36.75 2.95 108.41SUSTRACCION DE VANOS V-7 M2 -2 1.2 1.80 -4.32V-8 M2 -2 1.5 1.80 -5.40V-18 M2 -1 1.3 1.80 -2.34V-9 M2 -1 1.85 1.80 -3.33P-4 M2 -5 0.9 2.70 -12.15P-10 M2 -1 0.9 2.70 -2.43EJE A-A TRAMO 1-4' PRIMER NIVEL M2 1 13.40 2.85 38.19SUSTRACCION DE VANOS V-05 M2 -2 2.15 1.80 -7.74V-18 M2 -1 0.7 0.70 -0.49EJE I-I TRAMO 1-4' PRIMER NIVEL M2 1 14.40 2.85 41.04SUSTRACCION DE VANOS V-2 M2 -1 1.3 2.65 -3.45V-1 M2 -2 1.3 1.80 -4.68V-10 M2 -1 2 2.10 -4.20EJE 4' TRAMO A-I PRIMER NIVEL M2 1 38.75 2.85 110.44V-1 M2 -4 1.3 1.80 -9.36V-2 M2 -2 1.3 2.70 -7.02V-3 M2 -5 0.6 0.60 -1.80V-4 M2 -1 5.4 2.60 -14.04V-11 M2 -1 3.2 2.60 -8.32V-14 M2 -2 0.85 2.40 -4.08V-15 M2 -1 0.78 2.40 -1.87V-16 M2 -1 0.92 2.40 -2.21P-2 M2 -1 5.4 2.40 -12.96

EJE 1-1 TRAMO DE G-I SEGUNDO NIVEL M2 1 42.30 2.70 114.21SUSTRACCION DE VANOS V-1 M2 -2 1.3 1.80 -4.68V-5 M2 -3 2 1.80 -10.80V-8 M2 -1 1.95 1.50 -2.93V-9 M2 -1 1.5 1.80 -2.70V-10 M2 -3 1.85 1.80 -9.99EJE A-A TRAMO 1-4' SEGUNDO NIVEL M2 1 19.80 2.70 53.46SUSTRACCION DE VANOS V-1 M2 -8 1.3 1.80 -18.72V-2 M2 -2 1.3 2.70 -7.02V-3 M2 -7 0.6 0.60 -2.52EJE I-I TRAMO 1-4' SEGUNDO NIVEL M2 1 14.50 2.70 39.15SUSTRACCION DE VANOS V-4 M2 -1 2.15 1.15 -2.47V-5 M2 -1 2 1.80 -3.60V-6 M2 -1 1.45 0.60 -0.87P-1 M2 -1 0.9 2.35 -2.12EJE 4' TRAMO A-I SEGUNDO NIVEL M2 1 37.85 2.70 102.20SUSTRACCION DE VANOS V-1 M2 -3 1.3 1.80 -7.02V-2 M2 -1 1.3 2.70 -3.51V-10 M2 -1 2 2.70 -5.40

MUROS DE LADRILLO PRIMER NIVEL M2 1 156.90 2.90 455.01MUROS DE LADRILLO SEGUNDO NIVEL M2 1 115.30 2.60 299.78

20.03.00 PINTURA EN MUROS EXTERIORES (Incluye Columnas, Derrames y Obras de Arte) M2 720.95

Page 11: METRADO DE ARQUITECTURA

5.2 158.60

HOJA DE METRADOS

18

CODIGO DENOMINACION Y/O DESCRIPCION

UNID N°Elem MEDIDAS

BASE LARG.ALTO

TOTAL

PARC.

RESULTADOS

OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTAPUNO DE LA E.G.E. SAN GABÁN

FECHA Octubre de 2010

: PARTIDAArquitectura REV. POR :

PRIMER PISO M2EJE 1-1 TRAMO DE G-I PRIMER NIVEL M2 1 36.75 3.15 115.76SUSTRACCION DE VANOS V-7 M2 -2 1.2 1.80 -4.32V-8 M2 -2 1.5 1.80 -5.40V-18 M2 -1 1.3 1.80 -2.34V-9 M2 -1 1.85 1.80 -3.33P-4 M2 -5 0.9 2.70 -12.15P-10 M2 -1 0.9 2.70 -2.43EJE A-A TRAMO 1-4' PRIMER NIVEL M2 1 13.40 3.15 42.21SUSTRACCION DE VANOS V-05 M2 -2 2.15 1.80 -7.74V-18 M2 -1 0.7 0.70 -0.49EJE I-I TRAMO 1-4' PRIMER NIVEL M2 1 14.40 3.15 45.36SUSTRACCION DE VANOS V-2 M2 -1 1.3 2.65 -3.45V-1 M2 -2 1.3 1.80 -4.68V-10 M2 -1 2 2.10 -4.20EJE 4' TRAMO A-I PRIMER NIVEL M2 1 38.75 3.15 122.06V-1 M2 -4 1.3 1.80 -9.36V-2 M2 -2 1.3 2.70 -7.02V-3 M2 -5 0.6 0.60 -1.80V-4 M2 -1 5.4 2.60 -14.04V-11 M2 -1 3.2 2.60 -8.32V-14 M2 -2 0.85 2.40 -4.08V-15 M2 -1 0.78 2.40 -1.87V-16 M2 -1 0.92 2.40 -2.21P-2 M2 -1 5.4 2.40 -12.96

EJE 1-1 TRAMO DE G-I SEGUNDO NIVEL M2 1 42.30 2.90 122.67SUSTRACCION DE VANOS V-1 M2 -2 1.3 1.80 -4.68V-5 M2 -3 2 1.80 -10.80V-8 M2 -1 1.95 1.50 -2.93V-9 M2 -1 1.5 1.80 -2.70V-10 M2 -3 1.85 1.80 -9.99EJE A-A TRAMO 1-4' SEGUNDO NIVEL M2 1 19.80 2.90 57.42SUSTRACCION DE VANOS V-1 M2 -8 1.3 1.80 -18.72V-2 M2 -2 1.3 2.70 -7.02V-3 M2 -7 0.6 0.60 -2.52EJE I-I TRAMO 1-4' SEGUNDO NIVEL M2 1 14.50 2.90 42.05SUSTRACCION DE VANOS V-4 M2 -1 2.15 1.15 -2.47V-5 M2 -1 2 1.80 -3.60V-6 M2 -1 1.45 0.60 -0.87P-1 M2 -1 0.9 2.35 -2.12EJE 4' TRAMO A-I SEGUNDO NIVEL M2 1 37.85 2.90 109.77SUSTRACCION DE VANOS V-1 M2 -3 1.3 1.80 -7.02V-2 M2 -1 1.3 2.70 -3.51V-10 M2 -1 2 2.70 -5.40

OBRAS DE ARTE FACHADA PRINCIPAL M2 6 0.2 38.35 46.02CANALETA M2 1 1.6 108.30 173.28GARGOLAS M2 9 0.1 0.90

M2 9 0.3 1.25 3.37TIMPANO M2 2 18.3 36.60

20.04.00 PINTURA BARNIZ EN CONTRAZOCALOS DE MADERA ML 541.22Contazocalos de madera 4" x 3/4" ML 1 541.22 541.22

20.05.00 PINTURA BARNIZ EN PUERTAS DE MADERA M2 104.08Puertas de madera contraplacado M2 2 38.38 76.76pasamanos en barandas M2 1 13.09 13.09Marco de puertas M2 1 14.23 14.23

20.06.00 PINTURA ANTICORROSIVA EN BARANDAS PASAMANOS Y MARCOS ML 36.00PASAMANOS LATERALES ML 1 36.00 36.00

20.07.00 PINTURA ANTICORROSIVA EN ELEMENTOS METALICOS (CLARABOYA Y ESTRUCTURA METALICA) ML 231.35CLARABOYA ML 6 10.60 63.60

ML 11 5.65 62.15ML 2 5.55 11.10

TRAGALUCES LATERALES ML 10 4.95 49.50CLARABOYAS ML 10 4.50 45.00

20.08.00 PINTURA ANTICORROSIVA EN PUERTAS METALICAS M2P-10 SEGUNDO NIVEL M2 2 0.9 2.70 4.86

20.09.00 PINTURA ANTICORROSIVA EN COLUMNAS METALICAS MAMPARA DE VIDRIO ACCESO M2 46.78COLUMNAS M2 2 1.60 2.40 7.68VIGAS M2 1 1.60 2.80 4.48COLUMNETAS M2 4 0.60 7.30 17.52VIGUETAS M2 3 0.60 9.50 17.10

M2

21.00.00 VARIOS, LIMPIEZA Y JARDINERIA

21.01.00 SEMBRADO DE GRASS M2 30.00ACCESO M2 1 1 30.00 30.00

21.02.00 TRANSPORTE INTERNO DE MATERIALES Y EQUIPOS GLB 1.00

Page 12: METRADO DE ARQUITECTURA

5.2 158.60

HOJA DE METRADOS

18

CODIGO DENOMINACION Y/O DESCRIPCION

UNID N°Elem MEDIDAS

BASE LARG.ALTO

TOTAL

PARC.

RESULTADOS

OBRA : CONCLUSION DE LA REMODELACION Y AMPLIACION DEL AREA DE OFICINAS ADMINISTRATIVAS BELLAVISTAPUNO DE LA E.G.E. SAN GABÁN

FECHA Octubre de 2010

: PARTIDAArquitectura REV. POR :

Acarreo interno de Materiales (Area Influencia=400m2) glb 1 -- -- 1.00 1.00

21.03.00 LIMPIEZA PERMANENTE DE OBRA GLB 1.00Limpieza Permanente de Obra glb 1 -- -- 1.00 1.00

21.04.00 LIMPIEZA FINAL DE OBRA M2 1469.901ER NIVEL M2 1 A = 1173.70 -- 958.902DO NIVEL M2 1 A = 948.70 -- 511.00