Mov. tierrasPLANILLA DE METRADOSOBRA:VIVIENDA
MULTIFAMILIARMODULO 01FECHA:JUNIO 201301.00.00OBRAS
PROVISIONALES01.01.00 Cartel de obraDescripcinCantidadLargo
(m)Ancho (m)Alto (m)Parcial(und)Cartel de obra de1.01.003,60x2,40m
segn diseoTotal (und)1.0001.02.00 Oficina, Almacn y Caseta de
GuardianaDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(m2)Oficina, Almacn y Caseta de Guardiana1.03.003.009.00Total
(m2)9.0002.00.00TRABAJOS PRELIMINARES02.01.00 Trazo y
ReplanteoDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(m2)CASA HABITACION1.0020.008.00160.00Total
(m2)160.0003.00.00MOVIMIENTO DE TIERRAS03.01.00 Corte y nivelacion
de terrenoDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(M3)Corte superficial1.0020.008.000.058.00Total (m3)8.0003.02.00
Excavacin de Zanjas y ZapatasDescripcinCantidadLargo (m)Ancho
(m)Alto (m)Parcial (m3)Zapatas : Eje 2-21.001.100.901.301.29Zapatas
: Eje 4-61.001.701.601.303.54Zapatas : Eje
5-51.001.111.101.301.59Zapatas : Eje 8-71.001.111.101.301.59Zapatas
: Eje 9-101.001.111.101.301.59Zapatas : Eje
13-131.000.901.101.301.29Cimiento Corrido : Eje
2-21.008.000.501.104.40Cimiento Corrido : Eje
5-51.008.000.501.104.40Cimiento Corrido : Ejes
61.003.000.501.101.65Cimiento Corrido : Ejes
7-81.005.000.501.102.75Cimiento Corrido : Ejes
9-101.008.000.501.104.40Cimiento Corrido : Ejes
111.003.000.501.101.65Cimiento Corrido : Eje
13-131.008.000.501.104.40Total (m3)34.5203.03.00 Afirmado e=6" para
zapatas, compactadoDescripcinCantidadLargo (m)Ancho (m)Alto
(m)Parcial (m2)Zapatas : Eje 2-21.001.100.901.300.99Zapatas : Eje
4-61.001.701.601.302.72Zapatas : Eje 5-51.001.111.101.301.22Zapatas
: Eje 8-71.001.111.101.301.22Zapatas : Eje
9-101.001.111.101.301.22Zapatas : Eje
13-131.000.901.101.300.99Cimentacin
Escalera1.001.400.500.800.70Total (m2)9.0603.04.00 Grava de 6" para
zapatas , compactadoDescripcinCantidadLargo (m)Ancho (m)Alto
(m)Parcial (m2)Zapatas : Eje 2-21.001.100.901.300.99Zapatas : Eje
4-61.001.701.601.302.72Zapatas : Eje 5-51.001.111.101.301.22Zapatas
: Eje 8-71.001.111.101.301.22Zapatas : Eje
9-101.001.111.101.301.22Zapatas : Eje
13-131.000.901.101.307.37Total (m2)14.7503.05.00 Afirmado e=4" para
cimientos, compactadoDescripcinCantidadLargo (m)Ancho (m)Alto
(m)Parcial (m2)Cimiento Corrido : Eje
2-21.008.000.501.104.40Cimiento Corrido : Eje
5-51.008.000.501.104.40Cimiento Corrido : Ejes
61.003.000.501.101.65Cimiento Corrido : Ejes
7-81.005.000.501.102.75Cimiento Corrido : Ejes
9-101.008.000.501.104.40Cimiento Corrido : Ejes
111.003.000.501.101.50Cimiento Corrido : Eje
13-131.008.000.501.1019.10Total (m2)38.2003.06.00 Grava de 6" para
cimientos, compactadoDescripcinCantidadLargo (m)Ancho (m)Alto
(m)Parcial (m2)Cimiento Corrido : Eje
2-21.008.000.501.104.00Cimiento Corrido : Eje
5-51.008.000.501.104.00Cimiento Corrido : Ejes
61.003.000.501.101.50Cimiento Corrido : Ejes
7-81.005.000.501.102.50Cimiento Corrido : Ejes
9-101.008.000.501.104.00Cimiento Corrido : Ejes
111.003.000.501.101.50Cimiento Corrido : Eje
13-131.008.000.501.104.00Total (m2)21.5003.07.00 Relleno con
material propio en edificacinDescripcinCantidadLargo (m)Ancho
(m)Alto (m)Parcial (m3)Zapatas : Eje 2-21.001.100.901.301.29Zapatas
: Eje 4-61.001.701.601.303.54Zapatas : Eje
5-51.001.111.101.301.59Zapatas : Eje 8-71.001.111.101.301.59Zapatas
: Eje 9-101.001.111.101.301.59Zapatas : Eje
13-131.000.901.101.301.29Cimiento Corrido : Eje
2-21.008.000.501.104.40Cimiento Corrido : Eje
5-51.008.000.501.104.40Cimiento Corrido : Ejes
61.003.000.501.101.65Cimiento Corrido : Ejes
7-81.005.000.501.102.75Cimiento Corrido : Ejes
9-101.008.000.501.104.40Cimiento Corrido : Ejes
111.003.000.501.101.65Cimiento Corrido : Eje
13-131.008.000.501.104.40Total (m3)34.5203.08.00 Nivelacin y
Compactacin para pisos y veredasDescripcinCantidadLargo (m)Ancho
(m)Alto (m)Parcial (m2)SALA
COMEDOR1.006.153.4521.22COCINA1.003.602.609.36BAR1.009.804.3042.14TERRAZA1.002.102.204.62BAO1.003.482.037.04DORMITORIO
PRINCIPAL1.002.554.1010.46DORMITORIO1.003.852.9011.17ESTUDIO1.0021.001.5031.50DORMITORIOS1.0021.000.9018.90Total
(m2)156.3903.09.00 Afirmado e=4" para pisos interiores y
veredasDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial (m2)Sala
Comedor, Cocina, Bar, Terraza, Dormitorio.160.00160.00Total
(m2)160.0003.10.00 Acarreo interno de material
excedenteDescripcinCantidadLargo (m)Ancho (m)# vecesParcial
(m3)Acarreo interno de material excedente8.001.008.00Total
(m3)8.0003.11.00 Eliminacin de material
excedenteDescripcinCantidadLargo (m)Ancho (m)# vecesParcial
(m3)Eliminacion de material8.001.008.00Total (m3)8.0004.00.00OBRAS
DE CONCRETO SIMPLE04.01.00 Solado e=3" C:H 1:12 Para
ZapatasDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(m2)Zapatas : Eje 2-25.001.401.409.80Zapatas : Eje
4-63.001.701.608.16Zapatas : Eje 5-56.001.001.006.00Zapatas : Eje
8-75.001.401.409.80Zapatas : Eje 9-103.001.701.608.16Zapatas : Eje
13-131.001.400.500.70Total (m3)0.7004.02.00 Solado e=3" C:H 1:12
Para CimientosDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(m2)Cimiento Corrido : Eje 2-21.008.000.501.104.00Cimiento Corrido
: Eje 5-51.008.000.501.104.00Cimiento Corrido : Ejes
61.003.000.501.101.50Cimiento Corrido : Ejes
7-81.005.000.501.102.50Cimiento Corrido : Ejes
9-101.008.000.501.104.00Cimiento Corrido : Ejes
111.003.000.501.101.50Cimiento Corrido : Eje
13-131.008.000.501.104.00Total (m2)21.5004.03.00 Concreto C:H 1:10
+ 30% P.G para Cimiento CorridoDescripcinCantidadLargo (m)Ancho
(m)Alto (m)Parcial (m3)Cimiento Corrido : Eje
2-21.008.000.501.104.40Cimiento Corrido : Eje
5-51.008.000.501.104.40Cimiento Corrido : Ejes
61.003.000.501.101.65Cimiento Corrido : Ejes
7-81.005.000.501.102.75Cimiento Corrido : Ejes
9-101.008.000.501.104.40Cimiento Corrido : Ejes
111.003.000.501.101.65Cimiento Corrido : Eje
13-131.008.000.501.104.40Total (m3)23.6504.04.00 Concreto C:H 1:8 +
25% P.M para Sobre cimientosDescripcinCantidadLong (m)Ancho (m)Alto
(m)Parcial (m3)Sobrecimiento : Eje
2-21.008.000.150.200.24Sobrecimiento : Eje
5-51.008.000.150.200.24Sobrecimiento : Ejes
64.003.000.150.200.36Sobrecimiento : Ejes
7-81.005.000.150.200.15Sobrecimiento : Ejes
9-101.008.000.150.200.24Sobrecimiento : Eje
111.003.000.150.200.09Sobrecimiento : Eje
13-131.008.000.150.200.24Total (m3)1.5604.05.00 Encofrado y
desencofrado de SobrecimientosDescripcinCantidadLargo (m)#carasAlto
(m)Parcial (m2)Sobrecimiento : Eje
2-21.008.002.000.203.20Sobrecimiento : Eje
5-51.008.002.000.203.20Sobrecimiento : Ejes
61.003.002.000.201.20Sobrecimiento : Ejes
7-81.005.002.000.202.00Sobrecimiento : Ejes
9-101.008.002.000.203.20Sobrecimiento : Eje
111.003.002.000.201.20Sobrecimiento : Eje
13-131.008.002.000.203.20Total (m2)17.2004.06.00 Falso Piso Mezcla
C:H 1:8DescripcinCantidadLargo (m)Ancho (m)Espesos (cm)Parcial
(m2)SALA
COMEDOR1.006.153.450.1221.22COCINA1.003.602.600.12BAR1.009.804.300.12TERRAZA1.002.102.200.124.62BAO1.003.482.030.127.04DORMITORIO
PRINCIPAL1.002.554.100.1210.46DORMITORIO1.003.852.900.1211.17ESTUDIO1.0021.001.500.1231.50DORMITORIO1.0021.000.900.1218.90Total
(m2)104.8904.07.00 Canaleta de Concreto para evacuacin pluvial
f'c=140 Kg/cm2DescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(ml)Laterales2.008.7017.40Posterior1.0021.0021.00Total
(ml)38.4004.08.00 Canaleta Encof. Y Desencof. Segn
diseoDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(ml)Canaleta de concreto f'c = 140 Kg/cm21.0029.7029.70Total
(ml)29.7005.01.00OBRAS DE CONCRETO ARMADO05.01.00ZAPATAS05.01.01
Zapatas - Concreto f'c = 175 Kg/cm2DescripcinCantidadLargo (m)Ancho
(m)Alto (m)Parcial (m3)Zapatas : Eje 2-25.001.401.400.605.88Zapatas
: Eje 4-63.001.701.600.604.90Zapatas : Eje
5-56.001.001.000.603.60Zapatas : Eje 8-75.001.401.400.605.88Zapatas
: Eje 9-103.001.701.60Zapatas : Eje 13-131.001.400.50Total
(m3)20.2605.01.02 Zapatas - Acero Fy = 4200 Kg/cm2Descripcin
(pulg)# veces# Piezas/ElemLong (m)Peso (kg/m)Parcial (Kg)Acero
longitudinal :Zapatas : Eje A - Z41/25.007.001.301.0045.50Zapatas :
Eje A - Z31/23.009.001.601.0043.20Zapatas : Eje B -
Z11/26.005.000.901.0027.00Zapatas : Eje C -
Z41/25.007.001.301.0045.50Cimiento Corrido : Eje
2-21/23.009.001.601.0043.20Cimiento Corrido : Eje
5-51/21.004.001.251.005.00Cimiento Corrido : Ejes 6Cimiento Corrido
: Ejes 7-81/25.007.001.301.0045.50Cimiento Corrido : Ejes
9-101/23.008.001.501.0036.00Cimiento Corrido : Ejes
111/26.005.000.901.0027.00Cimiento Corrido : Eje
13-131/25.007.001.301.0045.50Total (Kg)363.4005.02.00VIGA
CIMENTACION05.02.01 Viga cimentacin - Concreto f'c = 175
Kg/cm2DescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(m3)Cimiento Corrido : Eje 2-21.0015.810.250.351.38Cimiento Corrido
: Eje 5-51.0015.810.250.351.38Cimiento Corrido : Ejes
64.003.440.250.351.20Cimiento Corrido : Ejes
7-81.003.440.250.350.30Cimiento Corrido : Ejes
9-101.001.720.250.350.15Cimiento Corrido : Ejes
111.003.380.250.350.30Cimiento Corrido : Eje
13-131.008.000.250.350.70Total (m3)4.0305.02.02 Viga cimentacin -
Encofrado y desencofradoDescripcinCantidadLargo (m)# carasAlto
(m)Parcial (m2)Viga de Cimentacion : Eje
2-21.0015.810.250.351.38Viga de Cimentacion : Eje
5-51.0015.810.250.351.38Viga de Cimentacion : Ejes
64.003.440.250.35Viga de Cimentacion : Ejes 7-81.003.440.250.35Viga
de Cimentacion . Ejes 9-101.001.720.250.350.15Viga de Cimentacion :
Ejes 111.003.380.250.350.30Cimiento Corrido : Eje
13-131.001.722.000.351.20Total (m2)4.4205.02.03 Viga cimentacin -
Acero Fy = 4200 Kg/cm2Descripcin (pulg)# Elem.# Piezas/ElemLargo
(m)Peso (kg/m)Parcial (Kg)Acero longitudinal :Ejes
2-25/82.004.0014.381.58181.75Ejes 5-55/82.004.006.961.5887.95Ejes
6, 7-8, 9-10, 115/82.004.003.781.5847.72Ejes 7-8, 9-10,
115/85.004.004.951.58156.33Ejes 135/81.004.002.131.5813.43Estribos
:Ejes 2-23/82.0073.001.250.58105.85Ejes
5-53/81.0030.001.250.5821.75Ejes 6, 7-8, 9-10,
113/85.0028.001.250.58101.50Ejes 7-8, 9-10,
113/81.0014.001.250.5810.15Total (Kg)726.42
user:CCION
user:CCION
CA05.04.00COLUMNAS05.04.01 Columnas - Concreto f'c = 210
Kg/cm2Descripcin# Elem.CantidadLargo (m)Ancho (m)AreaAlto
(m)Parcial (m3)Tipo C3 - Ejes A, C2.005.000.166.009.75Tipo C4 -
Ejes A, C2.003.000.216.007.65Tipo C1 - Eje
B1.006.000.250.256.6710.01Tipo Ca (1 P) - Eje
C1.003.000.150.151.200.54Tipo Ca (1 P) - Eje
71.001.000.150.151.200.18Tipo Ca (Pasadizo 2do
piso)1.0012.000.200.150.951.71Total (m3)29.8405.04.02 Columnas -
Encofrado y desencofradoDescripcinCantidadPerim (m)Ancho (m)Alto
(m)Parcial (m2)Tipo C3 - Ejes A, C5.001.805.6050.40Tipo C4 - Ejes
A, C3.002.205.6036.96Tipo C1 - Eje B6.001.556.4259.71Tipo Ca (1 P)
- Eje C3.000.601.202.16Tipo Ca (1 P) - Eje 71.000.601.200.72Tipo Ca
(Pasadizo 2do piso)12.000.401.205.76Total (m2)155.7105.04.03
Columnas - Acero Fy = 4200 Kg/cm2Descripcin (pulg)# Elem.#
Piezas/Elem.Long (m)Peso (kg/m)Parcial (Kg)Acero longitudinal :Tipo
C2 - Ejes A5/84.008.008.061.58407.29Tipo C3 - Ejes
C5/84.008.008.061.58407.29Tipo C4 - Ejes
A5/83.006.008.061.58229.10Tipo C4 - Ejes
A3/43.004.008.062.30222.34Tipo C4 - Ejes
C5/83.006.008.061.58229.10Tipo C4 - Ejes
C3/43.004.008.062.30222.34Tipo C1 - Eje
B5/86.004.008.321.58315.53Tipo Ca (1 P) - Eje
C3/83.004.001.720.5811.95Tipo Ca (1 P) - Eje
73/83.004.001.720.5811.97Tipo Ca (Pasadizo 2do
piso)3/812.004.001.720.5847.88Estribos :Tipo C2 - Ejes
A3/84.0044.001.400.58142.91Tipo C3 - Ejes
C3/82.0044.000.800.5840.83Tipo C4 - Ejes
A3/84.0044.001.400.58142.91Tipo C4 - Ejes
A3/86.0044.001.400.58214.37Tipo C4 - Ejes
C3/86.0044.001.760.58269.49Tipo C4 - Ejes
C3/85.0044.000.960.58122.50Tipo C1 - Eje
B1/412.0050.000.650.2597.50Tipo Ca (1 P) - Eje
C1/412.0012.000.650.2523.40Tipo Ca (1 P) - Eje
71/41.0012.000.650.251.95Tipo Ca ( 2do
piso)1/41.0012.000.650.251.95Total (Kg)3162.6105.05.00VIGAS05.05.01
Vigas - Concreto f'c = 210 Kg/cm2DescripcinCantidadLargo (m)Ancho
(m)Alto (m) / Area (m2)Parcial (m3)Primer Piso :Eje A, C : V-10A,
10C (25x40)2.0016.810.240.403.23Eje B : V-10B
(30x20)1.0018.970.200.301.14Eje 1, 2, 5, 6, 8 :
V-101,102,105,106,108 (24x20)5.003.450.240.200.83Eje 3,4,7 :
V-103,104,107(24x50)3.003.450.240.501.24Eje 1,2,3,4,5,6,7,8 : VE -
(24xVar.)8.001.500.536.41Viga de borde:
Vb1.0020.970.200.200.84Segundo Piso :Eje A,C : V-20A,20C
(24x35)2.0016.810.240.352.82Eje 1,2,5,6,8 : V-201,202,205,206,208
(24x17)5.003.450.240.170.70Eje 1,2,5,6,8 :
VES-(24x17)1.001.500.240.170.06Eje 1,2,5,6,8 :
VES-(24x17)1.000.900.240.170.04Eje 3,4,7 :
VES-(24x17)1.001.500.240.170.06Eje 3,4,7 :
VES-(24x17)1.000.900.240.170.04Total (m3)17.4005.05.02 Vigas -
Encofrado y desencofradoDescripcinCantidadLargo (m)Ancho
(m)Perimetro (m) / Area (m)Parcial (m2)Primer Piso :Eje A, C :
V-10A, 10C (25x40)2.0016.810.8026.90Eje B : V-10B
(30x20)1.0018.971.8635.28Eje 1, 2, 5, 6, 8 : V-101,102,105,106,108
(24x20)5.003.450.203.45Eje 3,4,7 :
V-103,104,107(24x50)5.003.450.8514.66Eje 1,2,3,4,5,6,7,8 : VE -
(24xVar.)8.001.500.253.0016.001.500.174.14Viga de borde:
Vb1.0020.970.204.19Segundo Piso :Eje A,C : V-20A,20C
(24x35)2.0016.810.6923.21Eje 1,2,5,6,8 : V-201,202,205,206,208
(24x17)5.003.450.171.002.93Eje 1,2,5,6,8 :
VES-(24x17)1.001.500.851.28Eje 1,2,5,6,8 :
VES-(24x17)1.000.900.250.23Eje 3,4,7 :
VES-(24x17)1.001.500.170.26Eje 3,4,7 :
VES-(24x17)1.000.900.170.15Total (m2)119.6705.05.03 Vigas - Acero
Fy = 4200 Kg/cm2Descripcin (pulg)# Elem.# Piezas/Elem.Long (m)Peso
(kg/m)Parcial (Kg)Primer Piso :Eje A, C : V-10A, 10C
(25x40)5/82.004.0015.171.58191.781/22.002.0015.171.0060.69Estribos3/82.0076.001.320.58116.28Eje
A, C : V-10A, 10C
(25x40)5/82.004.007.521.5895.001/22.002.007.521.0030.06Estribos3/82.0038.001.320.5858.14Eje
B : V-10B
(30x20)5/82.006.0515.171.58290.061/24.002.0015.171.00121.38Estribos3/81.0083.000.920.5844.23Eje
B : V-10B
(30x20)5/82.006.057.521.58143.771/24.002.007.521.0060.16Estribos3/81.0041.000.920.5821.85Eje
1, 2, 5, 6, 8 : V- (24x20)5/85.002.007.821.58123.54y los Ejes
1,2,5,6,8 : VE -
(24xVar.)1/25.002.007.631.0076.345/85.002.002.891.5845.645/85.002.002.291.5836.18Estribos3/85.0042.001.040.58126.77Estribos3/85.0013.001.210.5845.56Eje
3,4,7 : V-103,104,107(24x50)3/43.002.008.092.30111.67y el Ejes
3,4,7 : VE -
(24xVar.)3/43.002.003.732.3051.435/83.001.002.111.589.983/83.002.007.620.5826.515/83.002.004.201.5839.823/43.002.006.262.3086.34Estribos3/83.0033.001.360.5878.09Estribos3/83.0011.001.200.5822.97Viga
de borde:
Vb3/81.004.0020.970.5848.66Estribos1/41.00126.000.650.2520.35Segundo
Piso :Eje A,C : V-20A,20C
(24x35)5/82.002.0014.641.5892.553/82.001.0014.670.5817.025/82.002.007.791.5849.263/82.001.007.790.589.04Estribos3/82.0076.000.740.5865.24Eje
1,2,5,6,8 : V- (24x17)1/25.002.005.071.0050.68y los Ejes 1,2,5,6,8
: VE -
(24xVar.)1/25.002.005.231.0052.265/85.001.002.661.5821.031/25.002.004.311.0043.061/25.002.004.411.0044.06Estribos3/85.0042.001.040.58126.77Estribos3/85.007.001.040.5821.13Estribos3/85.0011.001.040.5833.20Eje
3,4,7 : V- (24x20)5/83.003.009.581.58136.17y el Ejes 3,4,7 : VE -
(24xVar.)1/23.002.001.741.0010.445/83.003.002.711.5838.605/83.003.004.541.5864.575/83.003.004.521.5864.34Estribos3/83.0010.001.040.5818.11Estribos3/83.0010.001.040.5818.11Estribos3/83.0040.001.280.5889.43Eje
B : V-10B
(25x35)5/81.002.0014.761.5846.663/81.001.0014.750.588.565/81.002.007.491.5823.683/81.001.007.490.584.35Estribos3/81.0078.001.220.5855.23Estribos3/81.0038.001.220.5826.91Total
(m2)3044.9105.06.00LOSAS ALIGERADAS05.06.01 Losa Aligerada -
Concreto f'c = 210 Kg/cm2DescripcinCantidadLargo (m)rea (m2) /
Ancho (m)Factor (m3/m2)Parcial (m3)Primer Piso h = 0.20 m. :Sala
Comedor, Cocina; SS.HH1.0066.560.095.99Tterraza, Dormitorio
Principal1.0024.660.092.22Segundo Piso h = 0.17 m.:Sala Comedor,
Cocina; SS.HH1.0013.280.081.06Terraza, Dormitorio
Principal1.0021.350.081.716.003.380.500.080.822.002.550.500.080.212.002.920.500.080.241.003.370.500.080.14Total
(m3)12.3705.06.02 Losa Aligerada - Encofrado y
desencofradoDescripcinCantidadLargo (m)Ancho (m) / rea (m2)Parcial
(m2)Primer Piso h = 0.20 m. :Sala Comedor, Cocina;
SS.HH1.0066.5666.56Terraza, Dormitorio
Principal1.0024.6624.66Segundo Piso h = 0.17 m.:Sala Comedor,
Cocina; SS.HH1.0013.2813.28Terraza, Dormitorio
Principal1.0021.3521.356.001.7010.202.001.282.572.001.472.941.001.701.70Total
(m2)143.2605.06.03 Losa Aligerada - Acero Fy = 4200
Kg/cm2Descripcin (pulg)# Elem.# Piezas/Elem.Long (m)Peso
(kg/m)Parcial (Kg)Primer Piso h = 0.20 m. :Tipo 1 -
Positivo1/23.001.0013.801.0041.39Positivo1/23.001.006.921.0020.77Positivo3/83.001.002.370.584.13Positivo3/83.001.001.930.583.35Positivo3/83.003.002.180.5811.35Positivo3/83.001.001.550.582.70Negativo1/24.001.001.201.004.80Negativo3/83.002.002.200.587.66Negativo3/83.006.002.850.5829.75Temperatura1/41.0033.565.840.2548.98Temperatura1/41.0016.373.780.2515.48Tipo
2 - Ambientes:
Positivo1/210.001.0013.801.00137.96Positivo3/810.001.003.300.5819.12Negativo1/210.004.001.201.0048.00Negativo3/810.002.002.200.5825.52Negativo3/810.004.002.850.5866.12Positivo1/25.001.003.301.0016.49Positivo3/810.001.001.930.5811.17Positivo1/25.001.006.921.0034.61Positivo3/85.001.001.930.585.58Positivo3/85.001.002.370.586.89Negativo1/25.002.001.201.0012.00Negativo3/85.002.002.850.5816.53Segundo
Piso h = 0.17 m.:Tipo 1 -
Positivo1/215.001.0013.801.00207.00Positivo1/215.002.006.921.00207.73Negativo1/215.004.002.851.00171.00Temperatura1/434.811.003.300.2528.68Temperatura1/434.811.003.950.2534.38Temperatura1/417.621.003.300.2514.52Temperatura1/417.621.003.950.2517.40Total
(Kg)1271.0605.06.04 Losa Aligerada - Bloque ladrillo hueco
15x30x25DescripcinCantidadLargo (m)rea (m2)Factor (und/m2)Parcial
(und)Primer Piso h = 0.20 m.
:Ambientes1.001.0066.5610.50698.881.001.0024.6610.50258.94Total
(und)957.8205.06.04 Losa Aligerada - Bloque ladrillo hueco
12x30x25DescripcinCantidadLargo (m)Ancho (m)Factor (und/m2)Parcial
(und)Segundo Piso h = 0.17 m.:Voladizo
Frontal1.0013.2810.50139.46Voladizo
Posterior1.0021.3510.50224.16Ambientes6.001.7010.50107.082.001.2810.5026.972.001.4710.5030.881.001.7010.5017.84Total
(und)546.3905.07.00ESCALERA05.07.01 Escalera - Concreto f'c = 210
Kg/cm2DescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial (m3)Losa
inclinada2.002.851.600.151.37losa plana -
descanso2.003.250.500.200.65peldaos18.001.600.280.090.73Total
(m3)2.7405.07.02 Escalera - Encofrado y
desencofradoDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(m2)Losa inclinada de 1er y 2do tramos2.002.851.609.12losa plana -
descanso2.003.250.503.25peldaos18.001.600.185.18Total
(m2)17.5505.07.03 Escalera - Acero Fy = 4200 Kg/cm2Descripcin
(pulg)# Elem.# Piezas/Elem.Long (m)Peso (kg/m)Parcial (Kg)Primer
Tramo : Positivo1/21.009.004.651.0242.69Negativo -
Cimentac.1/21.009.001.951.0217.90Negativo -
Cimentac.1/21.009.002.751.0225.25Negativo3/81.009.002.150.5811.22Negativo3/81.009.001.400.587.31Temperatura3/81.0032.001.550.5828.77Sefundo
Tramo :
positivo1/21.009.004.151.0238.10Negativo3/81.009.001.500.587.83Negativo3/81.009.001.450.587.57Negativo3/81.009.002.000.5810.44Negativo3/81.009.001.250.586.53Temperatura3/81.0029.001.550.5826.07Total
(Kg)229.66
Muros- Tabiq06.00.00MUROS Y TABIQUES DE ALBAILERIA06.01.00
Muro de Cabeza - Ladrillo KK de arcillaDescripcinCantidadLong (m)#
VecesAlto (m)Parcial (m2)Primer Piso :Ejes
1,2,5,6,85.001.732.002.8549.16Ejes A1.002.981.002.858.48Segundo
Piso :Ejes 1,2,5,6,85.001.732.002.8549.16Ejes
A1.002.981.001.504.46Total (m2)62.1006.02.00 Muro de Soga -
Ladrillo KK de arcillaDescripcinCantidadLargo (m)# VecesAlto
(m)Parcial (m2)Primer Piso :Eje
A1.003.051.001.504.581.002.981.001.504.461.002.151.001.503.23Eje
C1.002.031.001.202.432.001.931.001.204.621.002.151.001.202.581.002.981.001.203.57Segundo
Piso :Eje
C1.002.031.001.202.432.001.931.001.204.621.002.151.001.202.581.002.981.001.203.57Total
(m2)38.6606.03.00 Alambre # 8 Refuerzo Horizontal en
murosDescripcinCantidad (m2)Largo (m)Factor (ml/m2)Factor
(kg/ml)Parcial (Kg)Muros Cabeza0.006.000.100.00Muros
Soga3.236.000.101.94Total (Kg)1.9406.04.00 Limpieza General de
ObraDescripcinCantidad (m2)Largo (m)# VecesAlto (m)Parcial
(m2)Limpieza de Obra0.001.000.00Total (m2)0.0006.05.00
VARIOS06.05.01 Diseo de MezclasDescripcinCantidad (m2)Largo
(m)Factor (ml/m2)Factor (kg/ml)Parcial (Glb)Muros
Cabeza1.001.001.001.00Total (Glb)1.0006.05.02 Ensayo de
EspecimenesDescripcinCantidad (m2)Largo (m)# VecesAlto (m)Parcial
(Glb)Limpieza de Obra1.001.001.00Total (Glb)1.00
Arquitectura07.00.00REVOQUES, ENLUCIDOS Y MOLDURAS07.01.00
Tarrajeo de muros Interior y Exterior - Mezcla 1:5
C:ADescripcinCantidad (m2)Long (m)# VecesAlto (m)Parcial (m2)Muros
de cabeza62.102.00124.21Muros de soga38.662.0077.33Total
(m2)201.5307.02.00 Tarrajeo de Columnas - Mezcla 1:5
C:ADescripcinCantidad (m2)Largo (m)# VecesAlto (m)Parcial (m2)Del
encofrado de columnas155.711.00155.71Total (m2)155.7107.03.00
Tarrajeo de Vigas - Mezcla 1:5 C:ADescripcinCantidad (m2)Largo (m)#
VecesAlto (m)Parcial (m2)Del encofrado de
vigas119.671.00119.67Total (m2)119.6707.04.00 Cielorrasos - Mezcla
1:5 C:ADescripcinCantidad (m2)Largo (m)# VecesAlto (m)Parcial
(m2)1er piso y 2do piso143.261.00143.26Total (m2)143.2607.05.00
Revestimiento en fondo de Escalera - Mezcla 1:5
C:ADescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial (m2)Losa
inclinada de 1er y 2do tramos2.002.851.609.12losa plana -
descanso2.003.250.503.25Total (m2)12.3707.06.00 Revest. paso y
c/paso en Escalera - Mez. 1:4 C:A e = 3cm.DescripcinCantidadLargo
(m)Ancho (m)Alto (m)Parcial
(m2)Pasos18.001.600.288.06Contrapasos18.001.600.185.18Total
(m2)13.2507.07.00 Bruas segn detalleDescripcinCantidad (ml)Largo
(m)Ancho (m)Alto (m)Parcial (ml)Bruas480.00480.00Total
(ml)480.0007.08.00 Vestidura de derrames - Mezcla 1:5
C:ADescripcinCantidadLong (m)# VecesAlto (m)Parcial (ml)Primer
PisoP14.002.9311.72P-24.002.934.0046.88P-31.002.932.93V-13.002.982.0017.853.001.432.008.58V-21.002.152.004.301.001.432.002.86V-32.001.932.007.702.001.732.006.92V-41.002.032.004.051.001.732.003.46V-51.002.152.004.301.001.732.003.46Segundo
PisoP41.000.802.001.601.002.802.005.60P53.000.902.005.403.002.802.0016.80V-54.002.982.0023.804.001.302.0010.40V-61.002.152.004.301.001.302.002.60V-72.001.932.007.702.001.602.006.40V-81.002.032.004.051.001.602.003.20V-91.002.152.004.301.001.602.003.20V-101.002.722.005.451.001.302.002.60Total
(ml)232.4108.00.00PISOS Y PAVIMENTOS08.01.00 Piso de cemento pulido
bruado e = 2"DescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(m2)1er piso1.0021.011.5031.51Estacionamiento1.003.501.936.742do
Piso1.0021.011.5031.51Total (m2)69.7508.02.00 Contrapiso de
concreto 44mmDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(m2)Estacionamiento1.003.382.087.00Sala Comedor,
Cocina.1.003.482.037.04SS.HH,1.003.382.087.00Terraza,
Patio.1.004.452.9213.01Dormitorios, Estudio1.009.804.3042.14Total
(m2)76.2008.03.00 Piso de cermico 30x30cm, color
claroDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(m2)Almacen, Direccion, Cocina, Comedor, Hall76.2076.20Total
(m2)76.2008.04.00 Pisos de Concreto f'c=140 Kg/cm2 e =
4"DescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial (m2)frontal
Ambientes1.0021.011.5031.51posterior
Ambientes1.0021.010.9018.91Total (m2)50.4108.05.00 Sardinel de
Concreto f'c=140 segn diseoDescripcinCantidadLong (m)Ancho (m)Alto
(m)Parcial (ml)frontal1.0021.0121.01posterior1.0021.0121.01Total
(ml)42.0108.06.00 Pisos - Encofrado y
desencofradoDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(m2)42.010.3012.60Total (m2)12.6008.07.00 Juntas de dilatacin
asfltica e=1/2"DescripcinCantidadLong (m)Ancho (m)Alto (m)Parcial
(ml)Estacionamiento6.001.509.006.000.905.40Total
(ml)14.4009.00.00CONTRAZOCALOS09.01.00 Contrazcalo Ext. de cemento
h=0.20m. C:A 1:3 e=1.5cm.DescripcinCantidadLong (m)Ancho (m)Alto
(m)Parcial (ml)1er Piso1.0033.9033.902do Piso1.0015.6515.65descanso
escalera1.004.934.93deposito escalera1.008.808.80parapeto en
pasadizo1.0023.6023.60Total (ml)52.9709.02.00 Contrazcalo Int. de
cermico 10x30 cmDescripcinCantidadLong (m)Ancho (m)Alto (m)Parcial
(ml)Estacionamiento1.0010.3510.35Sala Comedor,
Cocina.1.009.659.65SS.HH,1.0029.4029.40Terraza,
Patio.1.007.037.03Dormitorios, Estudio1.0010.3510.35Total
(ml)66.7709.03.00 Contrazcalo recto en escalera h=0.20m. C:A 1:3
e=1.5cm.DescripcinCantidadLong (m)Ancho (m)Alto (m)Parcial (ml)1er
y 2do tramos4.003.0012.00Total (ml)12.0010.00.00CUBIERTAS10.01.00
Cobertura con teja de arcilla maquinada
livianaDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(m2)AMBIENTES y ESCALERA1.0021.007.25152.15Total (m2)152.1510.02.00
Cumbrera con teja de arcilla maquinada
livianaDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial
(ml)AMBIENTES y ESCALERA1.0021.001.0021.00Total
(ml)21.0011.00.00CARPINTERIA DE MADERA11.01.00 Puertas de madera
cedro - tipo tableroDescripcinCantidadLargo (m)Ancho (m)Alto
(m)Parcial
(m2)P24.000.902.9310.55P31.000.802.932.34P41.000.802.802.24P53.000.902.807.56Total
(m2)22.6911.02.00 Ventanas de madera cedroDescripcinCantidadLargo
(m)Ancho (m)Alto (m)Parcial
(m2)V13.002.981.4312.76V21.002.151.433.07V32.001.931.736.66V41.002.031.733.50V51.002.151.733.72V61.002.151.302.80V72.001.931.606.16V81.002.031.603.24V91.002.151.603.44V101.002.731.303.54Total
(m2)48.9012.00.00CARPINTERIA METALICA12.01.00 Pasamanos de Tub. Fo
Go 2"DescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial (ml)1er
tramo escalera2.002.555.102do tramo escalera1.002.552.55Total
(ml)7.6512.02.00 Cantonera de fierro en
escaleraDescripcinCantidadLargo (m)Ancho (m)Alto (m)Parcial (ml)1er
y 2do tramos18.001.5027.00Total (ml)27.0012.03.00 Barras de
seguridad F. Liso 1/2" en ventanas 1er pisoDescripcinCantidadLargo
(m)# VecesAlto (m)Parcial (ml)Sobreluz P24.000.906.0021.60Sobreluz
P31.000.806.004.80Sobreluz P41.001.206.007.20Sobreluz
P51.001.566.009.36V13.002.983.0026.78V21.002.153.006.45V32.001.935.0019.25V41.002.035.0010.13V51.002.155.0010.75V61.002.153.006.45V72.001.935.0019.25V81.002.035.0010.13V91.002.155.0010.75V101.002.733.008.18Total
(ml)171.0613.00.00CERRAJERIA13.01.00 Bisagra capuchina 4"x4" para
puertasDescripcinCantidadLargo (m)# VecesAlto (m)Parcial
(und)Puertas8.004.0032.00Total (und)32.0013.02.00 Cerradura de dos
golpes para puertaDescripcinCantidadLargo (m)# VecesAlto (m)Parcial
(und)Puertas8.001.008.00Total (und)8.0013.03.00 Cerrojo de aluminio
3" para puertaDescripcinCantidadLargo (m)# VecesAlto (m)Parcial
(und)Puertas8.001.008.00Total (und)8.0013.04.00 Manija de bronce 4"
para puertaDescripcinCantidadLargo (m)# VecesAlto (m)Parcial
(und)Puertas8.001.008.00Total (und)8.0014.00.00VIDRIOS, CRISTALES Y
SIMILARES14.01.00 Vidrio semidoble incoloroDescripcinCantidadLargo
(m)Alto (m)Factor (p2/m2)Parcial (p2)Sobreluz
P24.000.900.5510.7621.30Sobreluz P31.000.800.5510.764.73Sobreluz
P41.001.200.5510.767.10Sobreluz
P51.001.560.5510.769.23V13.002.981.4310.76137.33V21.002.151.4310.7633.08V32.001.931.7310.7671.67V41.002.031.7310.7637.69V51.002.151.7310.7640.02V61.002.151.3010.7630.07V72.001.931.6010.7666.28V81.002.031.6010.7634.86V91.002.151.6010.7637.01V101.002.731.3010.7638.12Total
(p2)568.5215.00.00PINTURA15.01.00 Pintura Ltex 2 manos en
cielorraso y vigasDescripcinCantidad (m2)Largo (m)# VecesAlto
(m)Parcial
(m2)cielorrasos143.261.00143.26vigas119.671.00119.67Total
(m2)262.9315.02.00 Pintura Ltex 2 manos en muros y
columnasDescripcinCantidad (m2)Largo (m)# VecesAlto (m)Parcial
(m2)muros 1er y 2do
piso201.531.00201.53columnas155.711.00155.71Total
(m2)357.2415.03.00 Pintura Barniz en puertas de
maderaDescripcinCantidad (m2)Largo (m)# CarasAlto (m)Parcial
(m2)puertas22.692.0045.38Total (m2)45.3815.04.00 Pintura Barniz en
ventanas de maderaDescripcinCantidad (m2)Largo (m)# CarasAlto
(m)Parcial (m2)ventanas48.902.0097.80Total (m2)97.8015.05.00
Pintura Esmalte en contrazcalos de cementoDescripcinCantidad
(ml)Largo (m)# VecesAlto (m)Parcial (m2)contrazcalos
h=0.20m52.971.000.2010.59contrazcalos recto en
escaleras12.001.000.202.40Total (m2)12.9915.06.00 Pintura Esmalte
en borde de parapetoDescripcinCantidad (ml)Largo (m)# VecesPerim
(m)Parcial (m2)borde boleado en pasamanos1.006.850.453.08borde
boleado en parapeto1.0030.900.4513.91Total (m2)16.9915.07.00
Canaleta metlica - evacuacin aguas de lluviaDescripcinCantidadLargo
(m)Ancho (m)Alto (m)Parcial (ml)Canaleta
metlica.2.0021.0142.01Total (ml)42.0115.08.00 Tuberia de bajada
PVC-SAP C-5 3" p/lluviasDescripcinCantidadLargo (m)Ancho (m)Alto
(m)Parcial (ml)Tubera BAP PVC SAP C-5 3"4.006.5026.00Total
(ml)26.00
user:CCION
user:CCION
Electricas16.00.00INSTALACIONES ELECTRICAS16.01.00 Salida de
techo (Centro de luz)DescripcinCantidadLong (m)Ancho (m)Alto
(m)Parcial (pto)1er PisoFluorescente 2x40 W11.0011.00Fluorescente
2x20 W7.007.002do PisoFluorescente 2x40 W11.0011.00Fluorescente
2x20 W7.007.00Total (pto)36.0016.02.00 Salida de tomacorriente
doble con puesta atierraDescripcinCantidadLong (m)Ancho (m)Alto
(m)Parcial (pto)1er Piso12.0012.002do Piso16.0016.00Total
(pto)28.0016.03.00 Conexin a Red externa y
medidorDescripcinCantidadLong (m)Ancho (m)Alto (m)Parcial
(ml)conexin1.0025.0025.00Total (ml)25.0016.04.00 Tablero
distribucin metlico 1-2x60, 4-2x15, 2-2x20DescripcinCantidadLong
(m)Ancho (m)Alto (m)Parcial (und)Tablero automtico1.001.00Total
(und)1.0016.05.00 Caja de pase Fo Go
200x200x75DescripcinCantidadLong (m)Ancho (m)Alto (m)Parcial
(und)Caja de pase Fo Go 200x200x751.001.00Total (und)1.0016.06.00
Fluorescente recto 2x40W tipo para adosarDescripcinCantidadLong
(m)Ancho (m)Alto (m)Parcial (und)Fluorescente recto 2x40 W en 1er
Piso11.0011.00Fluorescente recto 2x40 W en 2do Piso11.0011.00Total
(und)22.0016.07.00 Fluorescente recto 2x20W tipo para
empotrarDescripcinCantidadLong (m)Ancho (m)Alto (m)Parcial (und)En
Pasadizo y Deposito 1er Piso7.007.00En Pasadizos y Deposito 2do
Piso7.007.00Total (und)14.0016.08.00 Pozo Puesta a
TierraDescripcinCantidadLong (m)Ancho (m)Alto (m)Parcial (und)Pozo
de tierra del Sistema elctrico1.001.00Total (und)1.00
Hoja1