7/28/2019 N-S CIM Presentation
1/47
Improving the Transportation Network inWestern Prince William and Eastern
Loudoun Counties
June 3, 2013
Charles Kilpatrick, PE
Chief Deputy Commissioner
7/28/2019 N-S CIM Presentation
2/47
2
2010
Household
Density andPopulation
121,700
342,400
835,100
233,120
90,000
7/28/2019 N-S CIM Presentation
3/47
3
2040HouseholdDensity andPopulationGrowth
1,021,000+ 22%
327,000+ 41%
195,000+ 60%
147,000+ 63%
488,000+ 43%
7/28/2019 N-S CIM Presentation
4/47
4
2010Employment
36,260
104,180
507,450
145,090
38,200
7/28/2019 N-S CIM Presentation
5/47
5
2040Employment
Growth
706,390+39%
269,550+ 86%
78,620
+106% 190,600+83%
76,720+ 112%
7/28/2019 N-S CIM Presentation
6/47
6
Volumes to Capacity (V/C) Ratio
V/C ratio is a planning-level measure of the extent towhich a roadway accommodates traffic
V/C ratios greater than 1.0 indicate high levels ofcongestion and stop-and-go travel
-- (0-0.4) Less than 40% of capacity utilized
-- (0.4-0.7) 40% to 70% of capacity utilized
-- (0.7-1) 70% to 100% of capacity utilized
-- (1-1.4) 140% of capacity utilized
-- (> 1.4) Demand is more than 140% of capacity
7/28/2019 N-S CIM Presentation
7/47
2013 Network Traffic AM Peak Hour
7
7/28/2019 N-S CIM Presentation
8/47
2040 Network Traffic No Build Scenario AM
8
7/28/2019 N-S CIM Presentation
9/47
2013 Network Traffic PM Peak Hour
9
7/28/2019 N-S CIM Presentation
10/47
2040 Network Traffic No Build Scenario PM
10
7/28/2019 N-S CIM Presentation
11/47
2040 Network Traffic Build Scenario AM
11
7/28/2019 N-S CIM Presentation
12/47
2040 Network Traffic Build Scenario PM
12
7/28/2019 N-S CIM Presentation
13/47
EXISTING TRAFFICCONGESTION
13
7/28/2019 N-S CIM Presentation
14/47
14
7/28/2019 N-S CIM Presentation
15/47
15
7/28/2019 N-S CIM Presentation
16/47
16
7/28/2019 N-S CIM Presentation
17/47
17
4:38 pm, Wed., May 22, 2013
7/28/2019 N-S CIM Presentation
18/47
18
7/28/2019 N-S CIM Presentation
19/47
19
7/28/2019 N-S CIM Presentation
20/47
20
7/28/2019 N-S CIM Presentation
21/47
21
7/28/2019 N-S CIM Presentation
22/47
22
7/28/2019 N-S CIM Presentation
23/47
23
7/28/2019 N-S CIM Presentation
24/47
24
7/28/2019 N-S CIM Presentation
25/47
25
7/28/2019 N-S CIM Presentation
26/47
26
7/28/2019 N-S CIM Presentation
27/47
27
East-West Improvements
Total Over $ 1.2 Billion Allocated in Six Year Program
VA 7 Widen to 6 LanesReston Ave. to Jarrett Valley Dr.
In Design
I-66 Spot Improvement 2Westmoreland St to Haycock Rd
In Design
Metro Silver LineEast Falls Church to Route 772
Under Construction
US 50 Widen to 6 LanesPoland Rd (VA 742) to VA 28
Under Construction
I-66 / VA 28 InterchangeIn Design
I-66 Widening (1 HOV + 1 SOV)US 15 to US 29
Design / Build - Advertised
I-66 / US 15 InterchangeDesign/Build
US 29 / Linton Hall Rd InterchangeUnder Construction
VA 234 Bypass / Balls Ford Rd Relocated InterchangeIn Study
I-66 EIS (Tier 1)US 15 to I-495
Study
I-66 Bus on Shoulder PilotI-495 to Roosevelt Bridge
In Design
I-66 ATMUS 29 to T R Bridge
In Design
Dulles LoopRt 606/VA 28/US 50
In Design
7/28/2019 N-S CIM Presentation
28/47
Composite Studies Map
28
7/28/2019 N-S CIM Presentation
29/47
North-South Corridor Master Plan Study45-mile multi-modal transportation network between I-95 inPrince William County and Rte. 7 in Loudoun County
29
7/28/2019 N-S CIM Presentation
30/47
Manassas National Battlefield Park BypassEIS and Location Study
Initiated as directed byCongress in 1988legislation to developalternatives that allowfor the closure ofRoutes 29 and 234 to
preserve theBattlefield
30
7/28/2019 N-S CIM Presentation
31/47
Dulles Air Cargo, Passenger and MetroAccess Highway Environmental Assessmentand Location Study
Enhance themovement of
people, passenger
services and aircargo traffic toDullesInternationalAirport
31
7/28/2019 N-S CIM Presentation
32/47
Bi-County Parkway(Tri-County Parkway)
EIS & Location Study
New north-south
link between PrinceWilliam County andLoudoun County
32
7/28/2019 N-S CIM Presentation
33/47
33
Today
7/28/2019 N-S CIM Presentation
34/47
34
2040 NoBuild
2040Build
7/28/2019 N-S CIM Presentation
35/47
Will there be tolls on the Bi-CountyParkway?
The Bi-County Parkway willnot have tolls.
35
7/28/2019 N-S CIM Presentation
36/47
Will the Bi-County Parkway destroy theRural Crescent by inducing development?
No, the road will not change localland use restrictions
The road will be limited-accessThe only access points in the Rural
Crescent will be at I-66, Route 29,
existing Route 234 west of the
battlefield
36
7/28/2019 N-S CIM Presentation
37/47
When will the Bi-County Parkwayconstruction begin?
There is no Construction Schedule VDOT needs to complete the EIS FHWA needs to issue Record of
Decision
$12 million is available for design37
7/28/2019 N-S CIM Presentation
38/47
Will Route 234 through the Park closewith the construction of the Bi-County
Parkway?
Route 234 will be widened andrelocated to the west of Manassas
National Battlefield Park
The segment of Route 234 currentlylocated in the Park would close to
through traffic but still remain open foraccess to private property
38
7/28/2019 N-S CIM Presentation
39/47
Will Route 29 through the ManassasNational Battlefield Park close with
construction of the Bi-County Parkway?
No The Manassas National Battlefield
Bypass will relocate Route 29, when it isbuilt
No funding for construction of theMNBPB has been identified
39
7/28/2019 N-S CIM Presentation
40/47
Will there be traffic-calming on Route29?
Yes, VDOT will design and construct at least$300,000 of traffic-calming measures
Traffic on Route 29 will not be restricted Project is solely intended to maintain safe
travel and preserve the parks historiccharacter
Work would be completed prior to openingthe Bi-County Parkway
Project will be open to public involvement40
7/28/2019 N-S CIM Presentation
41/47
Will Pageland Lane remain open tothrough traffic
Yes
41
7/28/2019 N-S CIM Presentation
42/47
Wont the historic Civil War Battlefieldsbe destroyed?
The Battlefield will be enhanced by removing a majortraffic bottleneck at the intersection of Routes 29 and234 at the Stone House
The National Park Service supports the Bi-CountyParkway at the proposed location because traffic willbe relocated from the core of the Battlefield to theParks periphery
The key to minimizing and mitigating potentialadverse effects of the Bi-County Parkway on historicresources is laid out in the ProgrammaticAgreement, which implements regulations andmeasures agreed upon by the signatory parties
42
What about access to Sudley
7/28/2019 N-S CIM Presentation
43/47
What about access to SudleyMethodist Church and other propertyowners on existing Route 234?
All local property owners will haveaccess to their properties during andafter the construction of the Bi-CountyParkway
Directional signage to Sudley MethodistChurch will be provided on the Bi-CountyParkway
43
7/28/2019 N-S CIM Presentation
44/47
What about Route 234 South of I-66
VDOT is studying projects to gradeseparate Route 234 at Balls Ford Roadand Prince William Parkway
While Prince William CountysComprehensive Plan calls Route 234 to
be six lanes from I-95 to I-66, there areno formal plans or funding to widen theroad
44
7/28/2019 N-S CIM Presentation
45/47
What traffic volumes are anticipated for theBi-County Parkway?
In 202022,000 to 42,000 vehicles a day
In 204045,000 to 61,000 vehicles a day
45
What happens if the Bi County Parkway and the
7/28/2019 N-S CIM Presentation
46/47
What happens if the Bi-County Parkway and theMNBPB are not built?
46
7/28/2019 N-S CIM Presentation
47/47
Questions ?
Meeting [email protected]
Include in subject line:
North-South Corridor Meeting