Precios y cantidades de recursos requeridos por tipo Obra Subpresupuesto Fecha Lugar LA LIBERTAD - TRUJILLO - SARTIMBAMBA Código Recurso Unidad Cantidad Precio S/. Parcial S/. MANO DE OBRA 0147000032 TOPOGRAFO hh 872.1886 7.00 6,105.32 0147010001 CAPATAZ hh 1,021.3920 7.50 7,660.44 0147010002 OPERARIO hh 3,037.3865 6.25 18,983.67 0147010003 OFICIAL hh 1,011.5042 5.00 5,057.52 0147010004 PEON hh 23,341.3725 3.75 87,530.15 125,337.09 MATERIALES 0202000007 ALAMBRE NEGRO RECOCIDO # 16 kg 351.8668 6.13 2,156.94 0202000008 ALAMBRE NEGRO RECOCIDO # 8 kg 153.3458 6.13 940.01 0202000009 ALAMBRE DE PUAS PARA CERCO kg 720.0000 5.00 3,600.00 0202010003 CLAVOS PARA MADERA CON CABEZA DE 2" kg 2.8800 6.00 17.28 0202010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 208.6950 6.00 1,252.17 0202010022 CLAVOS C/CABEZA 3" kg 13.9267 6.00 83.56 0203020003 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 5,474.8433 3.00 16,424.09 0204000000 ARENA FINA m3 15.6567 200.00 3,131.34 0205000033 PIEDRA GRANDE m3 0.8670 200.00 173.40 0205000040 GRAVILLA 3/4" m3 98.8957 200.00 19,779.14 0205000041 FILTRO DE GRAVA O CASCAJO m3 0.0480 200.00 9.60 0205010004 ARENA GRUESA m3 52.1181 200.00 10,423.62 0205300040 MATERIAL ZARANDEADO m3 651.0900 5.00 3,255.45 0210020068 ACCESORIOS PVC PARA CAJA ROMPE PRESIÓN glb 3.0000 50.00 150.00 0210020069 ACCESORIOS PVC LINEA DE CONDUCCIÓN glb 3.0000 50.00 150.00 0210020071 ACCESORIOS PVC SAP- PARA PRUEBA HIDRÁULICA u 1.0000 500.00 500.00 0210020072 ACCESORIOS PARA LAVATORIO u 158.0000 100.00 15,800.00 0210410012 GRIFO DE BRONCE 1/2" u 158.0000 12.00 1,896.00 0221000001 CEMENTO PORTLAND TIPO I (42.5 kg) bls 909.9189 27.00 24,567.81 0229040010 CINTA SEÑALIZACIÓN PELIGRO-LIMITE OBRA m 1,640.0000 1.00 1,640.00 0229050001 CINTA TEFLON rll 122.0000 2.00 244.00 0229060005 YESO DE 28 Kg bls 111.5325 8.00 892.26 0229070082 CANASTILLA DE 3" a 1 1/2" u ### 80.00 1,040.00 0229070084 CANASTILLA DE 3" a 3/4 " u ### 60.00 1,620.00 0229070082 CANASTILLA DE 3" a 1" u ### 72.00 2,808.00 0229070084 CANASTILLA DE 3/4" para Caja de Válvulas u 1.0000 60.00 60.00 0229070084 CANASTILLA DE 2" para Caja de Válvulas u 1.0000 100.00 100.00 0229200012 THINNER gal 18.7183 18.00 336.93 0230160054 ADITIVO IMPERMEABILIZANTE SIKA 1 L 65.0000 50.00 3,250.00 0230450037 LAVADERO DE GRANITO u 158.0000 200.00 31,600.00 0230460048 PEGAMENTO PARA PVC gal 23.1881 110.00 2,550.69 0230990056 CINTA TEFLON u 20.0000 2.50 50.00 0239020027 LIJA DE FIERRO # 80 pza 124.7775 3.20 399.29 0239050000 AGUA m3 2,585.8100 1.00 2,585.81 0239060010 HIPOCLORITO DE CALCIO AL 70% kg 10.0000 15.00 150.00 0239060025 HIPOCLORITO u 2.0000 80.00 160.00 0239130004 CASETA DE GUARDIANIA Y DEPÓSITO glb 1.0000 500.00 500.00 0239130015 CARTELES DE OBRA de 3.60x2.40m Puesto en obra u 1.0000 1,500.00 1,500.00 0243040000 MADERA TORNILLO p2 2,641.2600 6.00 15,847.56 243130000 pza 100.8000 12.00 1,209.60 0244010001 ESTACA DE MADERA p2 434.5620 4.00 1,738.25 0244030021 TRIPLAY DE 4' X 8' X 4 mm pl 53.0800 50.00 2,654.00 0250010013 TAPA SANITARIA DE FIERRO 0.60X0.60, E=1/8" u 86.0000 200.00 17,200.00 0250010014 TAPA SANITARIA DE FIERRO 0.40X0.40, E=1/8" u 28.0000 180.00 5,040.00 0254010001 PINTURA ESMALTE SINTETICO gal 24.9558 45.00 1,123.01 0254160002 IMPRIMANTE gal 74.8665 20.00 1,497.33 0265020028 CODO DE FIERRO GALVANIZADO DE 3/4" X 90° u 3.0000 8.00 24.00 0265020032 CODO DE FIERRO GALVANIZADO DE 2" X 90° u 1.0000 25.00 25.00 0265020050 CODO DE FIERRO GALVANIZADO DE 1/2" X 90° u 158.0000 3.00 474.00 0265050047 UNION UNIVERSAL DE FIERRO GALVANIZADO 2" pza 1.0000 17.00 17.00 INSTALACION DEL SERVICIO DE AGUA POTABLE Y LETRINAS DE ARRASTRE HIDRAULICO EN EL CASERIO DE CACHO I ETAPA - DISTRITO DE SARTIMBAMBA PROVINCIA DE SANCHEZ CARRION MADERA 2"x2"x2.00m. ó MANDAY D=2" x2.00 m. de

Otros Documetos

Embed Size (px)

Citation preview

Page 1: Otros Documetos

Precios y cantidades de recursos requeridos por tipo

ObraSubpresupuestoFecha

Lugar LA LIBERTAD - TRUJILLO - SARTIMBAMBA

Código Recurso Unidad Cantidad Precio S/. Parcial S/.

MANO DE OBRA

0147000032 TOPOGRAFO hh 872.1886 7.00 6,105.320147010001 CAPATAZ hh 1,021.3920 7.50 7,660.440147010002 OPERARIO hh 3,037.3865 6.25 18,983.670147010003 OFICIAL hh 1,011.5042 5.00 5,057.520147010004 PEON hh 23,341.3725 3.75 87,530.15

125,337.09

MATERIALES

0202000007 ALAMBRE NEGRO RECOCIDO # 16 kg 351.8668 6.13 2,156.940202000008 ALAMBRE NEGRO RECOCIDO # 8 kg 153.3458 6.13 940.010202000009 ALAMBRE DE PUAS PARA CERCO kg 720.0000 5.00 3,600.000202010003 CLAVOS PARA MADERA CON CABEZA DE 2" kg 2.8800 6.00 17.280202010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 208.6950 6.00 1,252.170202010022 CLAVOS C/CABEZA 3" kg 13.9267 6.00 83.560203020003 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 5,474.8433 3.00 16,424.090204000000 ARENA FINA m3 15.6567 200.00 3,131.340205000033 PIEDRA GRANDE m3 0.8670 200.00 173.400205000040 GRAVILLA 3/4" m3 98.8957 200.00 19,779.140205000041 FILTRO DE GRAVA O CASCAJO m3 0.0480 200.00 9.600205010004 ARENA GRUESA m3 52.1181 200.00 10,423.620205300040 MATERIAL ZARANDEADO m3 651.0900 5.00 3,255.450210020068 ACCESORIOS PVC PARA CAJA ROMPE PRESIÓN glb 3.0000 50.00 150.000210020069 ACCESORIOS PVC LINEA DE CONDUCCIÓN glb 3.0000 50.00 150.000210020071 ACCESORIOS PVC SAP- PARA PRUEBA HIDRÁULICA u 1.0000 500.00 500.000210020072 ACCESORIOS PARA LAVATORIO u 158.0000 100.00 15,800.000210410012 GRIFO DE BRONCE 1/2" u 158.0000 12.00 1,896.000221000001 CEMENTO PORTLAND TIPO I (42.5 kg) bls 909.9189 27.00 24,567.810229040010 CINTA SEÑALIZACIÓN PELIGRO-LIMITE OBRA m 1,640.0000 1.00 1,640.000229050001 CINTA TEFLON rll 122.0000 2.00 244.000229060005 YESO DE 28 Kg bls 111.5325 8.00 892.260229070082 CANASTILLA DE 3" a 1 1/2" u 13.0000 80.00 1,040.000229070084 CANASTILLA DE 3" a 3/4 " u 27.0000 60.00 1,620.000229070082 CANASTILLA DE 3" a 1" u 39.0000 72.00 2,808.000229070084 CANASTILLA DE 3/4" para Caja de Válvulas u 1.0000 60.00 60.000229070084 CANASTILLA DE 2" para Caja de Válvulas u 1.0000 100.00 100.000229200012 THINNER gal 18.7183 18.00 336.930230160054 ADITIVO IMPERMEABILIZANTE SIKA 1 L 65.0000 50.00 3,250.000230450037 LAVADERO DE GRANITO u 158.0000 200.00 31,600.000230460048 PEGAMENTO PARA PVC gal 23.1881 110.00 2,550.690230990056 CINTA TEFLON u 20.0000 2.50 50.000239020027 LIJA DE FIERRO # 80 pza 124.7775 3.20 399.290239050000 AGUA m3 2,585.8100 1.00 2,585.810239060010 HIPOCLORITO DE CALCIO AL 70% kg 10.0000 15.00 150.000239060025 HIPOCLORITO u 2.0000 80.00 160.000239130004 CASETA DE GUARDIANIA Y DEPÓSITO glb 1.0000 500.00 500.000239130015 CARTELES DE OBRA de 3.60x2.40m Puesto en obra u 1.0000 1,500.00 1,500.000243040000 MADERA TORNILLO p2 2,641.2600 6.00 15,847.56243130000 MADERA 2"x2"x2.00m. ó MANDAY D=2" x2.00 m. de largo pza 100.8000 12.00 1,209.600244010001 ESTACA DE MADERA p2 434.5620 4.00 1,738.250244030021 TRIPLAY DE 4' X 8' X 4 mm pl 53.0800 50.00 2,654.000250010013 TAPA SANITARIA DE FIERRO 0.60X0.60, E=1/8" u 86.0000 200.00 17,200.000250010014 TAPA SANITARIA DE FIERRO 0.40X0.40, E=1/8" u 28.0000 180.00 5,040.000254010001 PINTURA ESMALTE SINTETICO gal 24.9558 45.00 1,123.010254160002 IMPRIMANTE gal 74.8665 20.00 1,497.330265020028 CODO DE FIERRO GALVANIZADO DE 3/4" X 90° u 3.0000 8.00 24.000265020032 CODO DE FIERRO GALVANIZADO DE 2" X 90° u 1.0000 25.00 25.000265020050 CODO DE FIERRO GALVANIZADO DE 1/2" X 90° u 158.0000 3.00 474.000265050047 UNION UNIVERSAL DE FIERRO GALVANIZADO 2" pza 1.0000 17.00 17.00

INSTALACION DEL SERVICIO DE AGUA POTABLE Y LETRINAS DE ARRASTRE HIDRAULICO EN EL CASERIO DE CACHO I ETAPA - DISTRITO DE SARTIMBAMBA PROVINCIA DE SANCHEZ CARRION

Page 2: Otros Documetos

0268030008 UNION UNIVERSAL DE COBRE DE 3/4" u 1.0000 12.00 12.000268030010 UNION UNIVERSAL DE COBRE DE 1" u 2.0000 5.00 10.000272000107 TUBERIA DE 3/4 CLASE 10 " PVC-SAP m 11,495.0000 2.20 25,289.000272000108 TUBERIA DE 1/2 CLASE 10 " PVC-SAP m 4,535.0000 1.60 7,256.000272000109 TUBERIA DE 1 CLASE 10 " PVC-SAP m 3,643.0000 4.00 14,572.000272000110 TUBERIA DE 2" CLASE 10 " PVC-SAP m 1,950.0000 6.15 11,992.500272000111 TUBERIA DE 1 1/2" CLASE 10 " PVC-SAP m 1,190.0000 3.60 4,284.000272020000 REDUCCION PVC SAP PARA AGUA CON ROSCA 3/4" A 1/2" u 68.0000 10.00 680.000272060004 CODO PVC SAP PARA AGUA CON ROSCA DE 1 1/2" X 90° u 47.0000 4.00 188.000272060010 CODO PVC SAP PARA AGUA CON ROSCA DE 1/2" X 90° u 72.0000 3.00 216.000272060015 CODO PVC SAP PARA AGUA CON ROSCA DE 2" X 90° u 29.0000 5.00 145.000272070000 TEE PVC SAP PARA AGUA CON ROSCA DE 1/2" u 18.0000 10.00 180.000272070081 TEE PVC SAP 2" x 2" u 2.0000 9.00 18.000272180010 UNION UNIVERSAL PVC SAP 3/4" pza 2.0000 10.00 20.000272300019 UNION UNIVERSAL PVC SAP DE 2" u 2.0000 4.00 8.000272310001 ADAPTADOR PVC SAP 2" u 335.0000 6.00 2,010.000272310004 ADAPTADOR PVC SAP 1 " u 16.0000 7.00 112.000272310005 ADAPTADOR PVC SAP 3/4" u 39.0000 4.00 156.000272310006 ADAPTADOR PVC SAP 1/2" u 2.0000 4.00 8.000273010007 TUBERIA PVC SAL 2" X 3 m pza 138.2520 5.00 691.260273110002 CODO PVC SAP 3/4" X 90° pza 117.0000 4.00 468.000273110007 CODO PVC SAP 3/4" pza 128.0000 2.20 281.600273110057 CODO PVC SAP 1" X 90° pza 81.0000 5.00 405.000273110058 CODO PVC SAP 1" pza 15.0000 7.00 105.000273110059 CODO PVC SAP 2" pza 6.0000 6.00 36.000273110060 CODO PVC SAP 1 1/2" pza 39.0000 5.00 195.000273130021 TEE PVC SAP 3/4" X 3/4" pza 118.0000 10.00 1,180.000273170018 UNION PVC SAL 1/2" pza 158.0000 2.00 316.000273180008 REDUCCION PVC 1 1/2" X 1" pza 13.0000 4.00 52.000273180019 REDUCCION PVC 1" A 3/4" pza 18.0000 12.00 216.000273180020 REDUCCION PVC 2 X1 1/2" pza 12.0000 5.00 60.00277000000 VALVULA FLOTADORA DE 1 1/2" u 13.0000 80.00 1,040.00277000001 VALVULA FLOTADORA DE 1" u 27.0000 72.00 1,944.00277000001 VALVULA FLOTADORA DE 3/4" u 39.0000 60.00 2,340.000277000002 VALVULA COMPUERTA DE BRONCE DE 1/2" u 159.0000 70.00 11,130.000277000003 VALVULA COMPUERTA DE BRONCE DE 3/4" u 58.0000 80.00 4,640.000277000006 VALVULA COMPUERTA DE BRONCE DE 1 1/2" u 13.0000 150.00 1,950.000277000007 VALVULA COMPUERTA DE BRONCE DE 2" u 9.0000 200.00 1,800.000277000020 VALVULA COMPUERTA DE BRONCE DE 1" u 35.0000 180.00 6,300.000278020000 VALVULA ESFERICA DE 3/4" u 3.0000 80.00 240.000278020003 VALVULA ESFERICA DE 2" u 3.0000 200.00 600.00

305,793.50

EQUIPOS

0337540001 MIRAS Y JALONES hm 347.7500 5.00 1,738.750348820001 BOMBA MANUAL PARA PRUEBA DE TUBERIA hm 86.8120 6.00 520.870349880003 TEODOLITO hm 351.3238 8.00 2,810.59

5,070.21

Total S/. 436,200.81

Page 3: Otros Documetos

Precios y cantidades de recursos requeridos por tipo

LA LIBERTAD - TRUJILLO - SARTIMBAMBA

Parcial S/.

MANO DE OBRA

6,105.327,660.44

18,983.675,057.52

87,530.15

125,337.09

MATERIALES

2,156.94940.01

3,600.0017.28

1,252.1783.56

16,424.093,131.34

173.4019,779.14

9.6010,423.623,255.45

150.00150.00500.00

15,800.001,896.00

24,567.811,640.00

244.00892.26

1,040.001,620.002,808.00

60.00100.00336.93

3,250.0031,600.002,550.69

50.00399.29

2,585.81150.00160.00500.00

1,500.0015,847.561,209.601,738.252,654.00

17,200.005,040.001,123.011,497.33

24.0025.00

474.0017.00

INSTALACION DEL SERVICIO DE AGUA POTABLE Y LETRINAS DE ARRASTRE HIDRAULICO EN EL CASERIO DE CACHO I ETAPA - DISTRITO DE

Page 4: Otros Documetos

12.0010.00

25,289.007,256.00

14,572.0011,992.504,284.00

680.00188.00216.00145.00180.0018.0020.008.00

2,010.00112.00156.00

8.00691.26468.00281.60405.00105.0036.00

195.001,180.00

316.0052.00

216.0060.00

1,040.001,944.002,340.00

11,130.004,640.001,950.001,800.006,300.00

240.00600.00

305,793.50

EQUIPOS

1,738.75520.87

2,810.59

5,070.21

436,200.81

Page 5: Otros Documetos

DESAGREGADO GASTOS GENERALES

Obra

Fecha: SEPTIEMBRE 2013ITEM CONCEPTO UND. CANT. C.U. S/.

1.0 GASTOS INDIRECTOS

1.1 Alquiler de Oficina y Mantenimiento

Alquiler de Oficina Mes 2 800

2.0 GASTOS DIRECTOS

2.1 Sueldos Personal Técnico y Administrativo

01 Ingeniero Civil o Sanitario Mes 2 2,00001 Asistentes de Ingenieros Residentes Mes 1 1,30001 Maestro de Obra Mes 2 3,20001 Almacenero Mes 2 1,90001 Guardian Mes 2 1,40001 Dibujante CAD Mes 2 1,70001 Chofer Mes 2 1,80001 Administrativo Mes 1 1,317

2.2 Gastos Varios

Equipo de Ingenieria Mes 2 3,000Equipo de Computo Mes 2 800Útiles de Oficina e Impresión Mes 2 800Mobiliario de Oficina Est 1 400Copias Documentos Tecnico y Adm. Mes 2 300Camioneta Pick cup Est 1 1,200Implementos de Seguridad Glb 1 5,267movilidad y viaticos Mes 1 800

GASTOS GENERALES NOTARIALES Mes 2 38

2.3 Pruebas de Control de Calidad

Diseño Mezcla Concreto Est. 1 500.00Alquiler Molde Rotura Probetas Concreto Mes 2 250Rotura Probetas Concreto u 10 125

2.4 Gastos de Liquidación de Obra

Gastos Liquidación de Obra Gbl 1 800

COSTOS (10%)

PROYECTO: "MEJORAMIENTO DE LA PLAZUELA EN LA URBANIZACION MIGUEL GRAU I ETAPA MZ N DE LA LOCALIDAD DE CASA GRANDE, DISTRITO DE CASA GRANDE - PROVINCIA DE ASCOPE - LA LIBERTAD"

Page 6: Otros Documetos

DESAGREGADO GASTOS GENERALES

Fecha: SEPTIEMBRE 2013COSTO S/.

1,600

1,600

1,600

47,209

26,617

4,0001,3006,4003,8002,8003,4003,6001,317

17,543

6,0001,6001,600

400600

1,2005,267

80076

2,250

500500

1,250

800

800

48,809.27

PROYECTO: "MEJORAMIENTO DE LA PLAZUELA EN LA URBANIZACION MIGUEL GRAU I ETAPA MZ N DE LA LOCALIDAD DE CASA GRANDE, DISTRITO DE CASA GRANDE - PROVINCIA DE ASCOPE - LA LIBERTAD"

Page 7: Otros Documetos

CUADRO DE APORTES

PresupuestoMEJORAMIENTO DE LA PLAZUELA EN LA URBANIZACIÓN MIGUEL GRAU I ETAPA - CASA GRANDE

Cliente MUNICIPALIDAD DISTRITAL DE CASAGRANDE

Lugar LA LIBERTAD - ASCOPE - CASAGRANDE

DESCRIPCION DEL APORTE

COSTO DIRECTO DE OBRA: 437,663.34 I. MATERIALES

1.1 MATERIALES 0.00 111,198.94

1.2 AGREGADOS 0.00 109,087.05

II. MANO DE OBRA

2.1 MANO DE OBRA CALIFICADA 0.00 61,761.89

2.2 MANO DE OBRA NO CALIFICADA 0.00 82,531.77

III. MAQUINARIA, EQUIPO Y TRANSPORTE

3.1 ALQUILER DE MAQUINARIA Y/O QUIPO 0.00 69,781.57

0.00

IV. HERRAMIENTAS

4.1 HERRAMIENTAS 0.00 3,302.12

GASTOS GENERALES DE OBRA (% CD) 0.00 21,141.33

GASTOS DE PROMOCION DEL PROYECTO (1.00 CD) 0.00 3,000.00

GASTOS DE INSPECCION (CD) 0.00 9,125.00

GASTOS DE EXPEDIENTE TECNICO 2.80% CD 0.00 10,500.00

TOTAL FINANCIAMIENTO 0.00 481,429.67

COSTO TOTAL DEL PROYECTO 481,429.67

APORTE EXTERNO 0%

APORTE M.D.S. 100.00%

Page 8: Otros Documetos

CUADRO DE APORTES

MEJORAMIENTO DE LA PLAZUELA EN LA URBANIZACIÓN MIGUEL GRAU I ETAPA - CASA GRANDE

Page 9: Otros Documetos

RESUMEN DEL COSTO TOTAL DEL PROYECTO

MEJORAMIENTO DE LA PLAZUELA EN LA URBANIZACIÓN MIGUEL GRAU I ETAPA - CASA GRANDEPresupuesto

Cliente MUNICIPALIDAD DISTRITAL DE CASAGRANDE

Lugar LA LIBERTAD - ASCOPE - CASAGRANDE

_ COSTO DIRECTO DE OBRA : S/. 437,663.34

_ GASTOS GENERALES DE OBRA CD : S/. 21,141.33

_ GASTOS SUPERVISION / INSPECCION DE OBRA : S/. 9,125.00

_ GASTOS DE PROMOCION PARA LA SOSTENIBILIDAD DEL PROYECTO : S/. 3,000.00

_ COSTO DEL EXPEDIENTE TECNICO : S/. 10,500.00

_ COSTOS DE FINANCIAMIENTO DE LA M.D.S. (100%) : 481,429.67

_ COSTOS DE FINANCIAMIENTO EXTERNO (0%) : 0.00

_ COSTO TOTAL DEL PROYECTO : S/. 481,429.67

Page 10: Otros Documetos

MEJORAMIENTO DE LA PLAZUELA EN LA URBANIZACIÓN MIGUEL GRAU I ETAPA - CASA GRANDE

Page 11: Otros Documetos

Página :

DEDUCCION DEL COSTO TOTAL DEL PROYECTO

Presupuesto MEJORAMIENTO DE LA PLAZUELA EN LA URBANIZACIÓN MIGUEL GRAU I ETAPA - CASA GRANDE

Cliente MUNICIPALIDAD DISTRITAL DE CASAGRANDE

Lugar LA LIBERTAD - ASCOPE - CASAGRANDE

I.- COSTO DIRECTO DE OBRA:

Subtotal

II.- GASTOS GENERALES DE OBRA C.D.

Código Descripción Unidad Personas %Particip. Tiempo Sueldo/Jornal

2.1 RESIDENTE DE OBRA / ASISTENTE mes 1.00 1.00 2.00 3,500.00

2.2 MAESTRO DE OBRA mes 1.00 1.00 2.00 3,200.00

2.3 CONTROLADOR DE OBRA mes 1.00 1.00 2.00 1,500.00

2.4 GUARDIAN / ALMACENERO mes 1.00 1.00 2.00 1,500.00

2.5 MOVILIDAD Y VIATICOS glb 1.00 1.00 2.00 200.00

2.6 GASTOS DE LIQUIDACION glb 1.00 1.00 1.00 1,000.00

2.7 UTILES DE ESCRITORIO glb 1.00 1.00 1.00 341.33

Subtotal

III.- GASTOS DE SUPERVISION / INSPECCION C.D.

Código Descripción Unidad Personas %Particip. Tiempo Sueldo/Jornal

3.1 SUPERVISOR / INSPECTOR DE OBRA mes 1.00 1.00 2.00 3,500.00

3.2 MOVILIDAD Y VIATICOS glb 1.00 1.00 2.00 1,000.00

3.3 UTILES DE ESCRITORIO,OTROS glb 1.00 0.25 1.00 500.00

Subtotal

IV.- GASTOS DE PROMOCION PARA LA SOSTENIBILIDAD DEL PROYECTO

Código Descripción Unidad Cantidad Precio

4.1 GASTOS DE PROMOCION 0.00% C.D.) glb 1.00 3,000.00

Subtotal

V.- GASTOS DE PRE INVERSION

Código Descripción Unidad

5.1 ELABORACION DEL EXPEDIENTE TECNICO C.D.

Subtotal

_ COSTOS DE FINANCIAMIENTO DE LA M.D.S. (100.00% CT)

_ COSTOS DE FINANCIAMIENTO EXTERNO

_ COSTO TOTAL DEL PROYECTO

Page 12: Otros Documetos

1

MEJORAMIENTO DE LA PLAZUELA EN LA URBANIZACIÓN MIGUEL GRAU I ETAPA - CASA GRANDE

437,663.34

Parcial

7,000.00

6,400.00

3,000.00

3,000.00

400.00

1,000.00

341.33

21,141.33

Parcial

7,000.00

2,000.00

125.00

9,125.00

Parcial

3,000.00

3,000.00

Parcial

10,500.00

10,500.00

481,429.67

0.00

S/. 481,429.67

Page 13: Otros Documetos

PRESUPUESTO ANALITICO

Presupuesto:

Subpresupuesto

Cliente: MUNICIPALIDAD DISTRITAL DE SARTIMBAMBA

Lugar: LA LIBERTAD - SANCHEZ CARRION - SARTIMBAMBA

DESCRIPCION TOTAL

APORTESMUNICIPALIDAD

S/. 480,348.10

2. GASTOS PRESUPUESTARIOS

2.6. ADQUISICION DE ACTIVOS NO FINANCIEROS

2.6.2. CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS

2.6.2 3. OTRAS ESTRUCTURAS

2.6.2 3.5. AGUA Y SANEAMIENTO

2.6.2 3.5 2 Costo de Construccion Por Contrata 0.00

_ Costo de Obra a Contratar 0.00

2.6.2 3.5 3 Costo de Construccion Por Administracion Directa-Personal 125,337.09

_ Mano de Obra Calificada 37,806.95

_ Mano de Obra no Calificada 87,530.15

2.6.2 3.5 4 Costo de Construccion Por Administracion Directa-Bienes 224,929.44

_ Materiales 111,198.94

_ Agregados 109,087.05

_ herramientas 3,302.12

_ Combustibles y Lubricantes 0.00

_ Materiales Explosivos y Municiones 0.00

_ Gastos de Liquidacion 1000.00

_ Utiles de Escritorio ( Papeleria e Impresión) 341.33

2.6.2 3.5 5 Costo de Construccion Por Administracion Directa-Servicios 105,581.57

_Pruebas de Calidad 0.00

_ Gastos de Promocion 3000.00

_ Maquinaria y/o Alquiler de Equipo 69781.57

_ Flete terrestre 12000.00

_ Flete rural 8000.00

_ Controlador de Obra 3000.00

_ Guardian / Almacenero 3000.00

_ Maestro de obra 6400.00

_ Movilidad y Viaticos 400.00

_ Servisios no Personales 0.00

_ Pasajes y Gastos de Transporte 0.00

2.6.3. ADQUISICION DE VEHICULOS, MAQUINARIAS Y OTROS

2.6.3 1. ADQUISICION DE VEHICULOS

2.6.3 1.1 ADQUISICION DE VEHICULOS

2.6.3 1.1 1 Para Transporte Terrestre 0.00

2.6.5. ADQUISICION DE ACTIVOS NO PRODUCIDOS

2.6.5 1. ACTIVOS NO PRODUCIDOS

2.6.5 1.1 TERRENOS

2.6.5 1.1 2 Terrenos Rurales 0.00

2.6.8. OTROS GASTOS DE ACTIVOS NO FINANCIEROS

2.6.8 1. OTROS GASTOS DE ACTIVOS NO FINANCIEROS

2.6.8 1.3 ELABORACION DE EXPEDIENTES TECNICOS

2.6.8 1.3 1 Elaboracion de Expedientes Tecnicos 10,500.00

2.6.8 1.4 OTROS GASTOS DIVERSOS DE ACTIVOS NO FINANCIEROS

2.6.8 1.4 3 Gasto por la Contratacion de Servicios 14,000.00

INSTALACION DEL SERVICIO DE AGUA POTABLE Y LETRINAS DE ARRASTRE HIDRAULICO EN EL CASERIO DE CACHO I ETAPA - DISTRITO DE SARTIMBAMBA PROVINCIA DE SANCHEZ CARRION

Page 14: Otros Documetos

_ Inspector de Obra 7,000.00

_ Residente de Obra 7,000.00

_ Asistente de Residente 0.00

Page 15: Otros Documetos

PRESUPUESTO ANALITICO

S/. 480,348.10APORTES

EXTERNOSS/. 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

INSTALACION DEL SERVICIO DE AGUA POTABLE Y LETRINAS DE ARRASTRE HIDRAULICO EN EL CASERIO DE CACHO I ETAPA - DISTRITO DE SARTIMBAMBA PROVINCIA DE SANCHEZ CARRION

Page 16: Otros Documetos

0.00

0.00

0.00

Page 17: Otros Documetos

PRESUPUESTO POR COMPONENTES Y COSTOSPresupuesto

MEJORAMIENTO DE LA PLAZUELA EN LA URBANIZACIÓN MIGUEL GRAU I ETAPA - CASA GRANDESubpresupuesto

Cliente MUNICIPALIDAD DISTRITAL DE CASAGRANDE

Lugar LA LIBERTAD - ASCOPE - CASAGRANDE

COMPONENTES COSTO DIRECTO DE OBRA: COSTO PARCIAL COSTO TOTAL

I. MATERIALES 220,285.99 1.1 MATERIALES 111,198.94

1.2 AGREGADOS 109,087.05

II. MANO DE OBRA 144,293.66 2.1 MANO DE OBRA CALIFICADA 61,761.89

2.2 MANO DE OBRA NO CALIFICADA 82,531.77

III. MAQUINARIA, EQUIPO Y TRANSPORTE 69,781.57 3.1 ALQUILER DE MAQUINARIA Y/O QUIPO 69,781.57

IV. HERRAMIENTAS 3,302.12 4.1 HERRAMIENTAS 3,302.12

GRAFICO DE INVERSION DE COSTOS Y COMPONENTESDEL COSTO DIRECTO

0.00

20,000.00

40,000.00

60,000.00

80,000.00

100,000.00

120,000.00

MATERIALES

AGREGADOS

MANO DE OBRA CALIFICADA

MANO DE OBRA NO CALIFICADA

ALQUILER DE MAQUINARIA Y/O EQUIPO

HERRAMIENTAS

Page 18: Otros Documetos

Página 1

PRESUPUESTO POR COMPONENTES Y COSTOS

GRAFICO DE INVERSION DE COSTOS Y COMPONENTESDEL COSTO DIRECTO

0.00

20,000.00

40,000.00

60,000.00

80,000.00

100,000.00

120,000.00

MATERIALES

AGREGADOS

MANO DE OBRA CALIFICADA

MANO DE OBRA NO CALIFICADA

ALQUILER DE MAQUINARIA Y/O EQUIPO

HERRAMIENTAS