EQUIPO ROC-L8 25 18 PRODUCCION MES agosto-13 DIA METROS PERFORADOS HRAS PERCUSION VELO TURNO A TURNO B TOTAL DIA ACUMULADO PARCIAL ACUMULADO DIA 8/1/2013 136.8 152.0 288.8 288.8 7.0 7.00 41.26 8/2/2013 152.7 314.0 466.7 755.5 10.0 17.00 46.67 8/3/2013 60.6 266.9 327.5 1,083.0 9.0 26.00 36.39 8/4/2013 288.5 310.4 598.9 1,681.9 17.0 43.00 35.23 8/5/2013 46.6 368.0 414.6 2,096.5 10.0 53.00 41.46 8/6/2013 216.5 430.0 646.5 2,743.0 13.7 66.67 47.30 8/7/2013 87.0 266.9 353.9 3,096.9 8.8 75.50 40.06 8/8/2013 141.6 173.8 315.4 3,412.3 12.0 87.50 26.28 8/9/2013 112.7 182.6 295.3 3,707.6 9.0 96.50 32.81 8/10/2013 183.0 232.2 415.2 4,122.8 11.0 107.50 37.75 8/11/2013 159.5 336.1 495.6 4,618.4 13.0 120.50 38.12 8/12/2013 352.9 337.7 690.6 5,309.0 16.0 136.50 43.16 8/13/2013 346.4 378.1 724.5 6,033.5 15.0 151.50 48.30 8/14/2013 389.0 364.0 753.0 6,786.5 16.0 167.50 47.06 8/15/2013 393.5 0.0 393.5 7,180.0 7.0 174.50 56.21 8/16/2013 108.0 191.0 299.0 7,479.0 6.0 180.50 49.83 8/17/2013 241.5 64.8 306.3 7,785.3 6.0 186.50 51.05 8/18/2013 0.0 0.0 0.0 7,785.3 0.0 186.50 #DIV/0! 8/19/2013 374.0 148.2 522.2 8,307.5 8.3 194.83 62.66 8/20/2013 0.0 0.0 0.0 8,307.5 0.0 194.83 #DIV/0!

perforacion

Embed Size (px)

DESCRIPTION

TOTAL

Citation preview

Page 1: perforacion

RESUMEN DIARIO DE OPERACIÓN - PERFORACIÓN EQUIPO ROC-L8 25 18 PRODUCCION

MES agosto-13

DIAMETROS PERFORADOS HRAS PERCUSION VELOCIDAD DE PENETRACIÓN METROS / HORA

TURNO A TURNO B TOTAL DIA ACUMULADO PARCIAL ACUMULADO DIA TOTAL c/t (Acumula) TOTAL s/t (Acumula)

8/1/2013 136.8 152.0 288.8 288.8 7.0 7.00 41.26 41.26 41.26

8/2/2013 152.7 314.0 466.7 755.5 10.0 17.00 46.67 39.76 44.44

8/3/2013 60.6 266.9 327.5 1,083.0 9.0 26.00 36.39 41.65 41.65

8/4/2013 288.5 310.4 598.9 1,681.9 17.0 43.00 35.23 39.11 39.11

8/5/2013 46.6 368.0 414.6 2,096.5 10.0 53.00 41.46 38.12 39.56

8/6/2013 216.5 430.0 646.5 2,743.0 13.7 66.67 47.30 40.34 41.14

8/7/2013 87.0 266.9 353.9 3,096.9 8.8 75.50 40.06 40.05 41.02

8/8/2013 141.6 173.8 315.4 3,412.3 12.0 87.50 26.28 38.56 39.00

8/9/2013 112.7 182.6 295.3 3,707.6 9.0 96.50 32.81 37.64 38.42

8/10/2013 183.0 232.2 415.2 4,122.8 11.0 107.50 37.75 38.35 38.35

8/11/2013 159.5 336.1 495.6 4,618.4 13.0 120.50 38.12 38.01 38.33

8/12/2013 352.9 337.7 690.6 5,309.0 16.0 136.50 43.16 38.61 38.89

8/13/2013 346.4 378.1 724.5 6,033.5 15.0 151.50 48.30 39.56 39.83

8/14/2013 389.0 364.0 753.0 6,786.5 16.0 167.50 47.06 40.28 40.52

8/15/2013 393.5 0.0 393.5 7,180.0 7.0 174.50 56.21 41.15 41.15

8/16/2013 108.0 191.0 299.0 7,479.0 6.0 180.50 49.83 41.43 41.43

8/17/2013 241.5 64.8 306.3 7,785.3 6.0 186.50 51.05 41.74 41.74

8/18/2013 0.0 0.0 0.0 7,785.3 0.0 186.50 #DIV/0! 41.74 41.74

8/19/2013 374.0 148.2 522.2 8,307.5 8.3 194.83 62.66 42.49 42.64

8/20/2013 0.0 0.0 0.0 8,307.5 0.0 194.83 #DIV/0! 42.42 42.64

C21
Usuario: 152,2 mts precorte 80 mts produccion
B22
Usuario: 115,5 mts precorte 44 mts produccion
Page 2: perforacion

8/21/2013 0.0 211.3 211.3 8,518.8 6.0 200.83 35.22 42.21 42.42

8/22/2013 280.1 313.2 593.3 9,112.1 10.5 211.33 56.50 42.81 43.12

8/23/2013 189.7 115.5 305.2 9,417.3 6.0 217.33 50.87 42.94 43.33

8/24/2013 65.4 111.1 176.5 9,593.8 4.0 221.33 44.13 42.96 43.35

8/25/2013 724.4 711.0 1,435.4 11,029.2 14.0 235.33 102.53 46.87 46.87

8/26/2013 131.4 222.2 353.6 11,382.8 7.5 242.83 47.15 46.78 46.87

8/27/2013 199.1 494.4 693.5 12,076.3 12.0 254.83 57.79 47.39 47.39

8/28/2013 231.5 0.0 231.5 12,307.8 4.0 258.83 57.88 47.55 47.55

8/29/2013 338.0 195.0 533.0 12,840.8 11.0 269.83 48.45 47.59 47.59

8/30/2013 449.0 469.5 918.5 13,759.3 16.0 285.83 57.41 48.14 48.14

8/31/2013 52.5 0.0 52.5 13,811.8 1.0 286.83 52.50 48.15 48.15

TOTALES 6,451.9 7,359.9 13,811.8 TOTALES EN MINUTOS

TOTALES EN HORAS

RESUMEN VARIABLES OPERACIONALES

HORAS DE OPERACIO ACUM. 286.83

METROS PERFORADOS 13,811.8

PETROLEO CONSUMIDO 16,178

AGUA CONSUMIDA #REF!

VEL. PERF. CON TRASLADO M / HR. 48.15

VEL. PERF. SIN TRASLADO M / HR. 48.15

PETROLEO POR HORA OPERACIÓN 56.40

LITRO PETROLEO POR METRO 1.17

LITRO AGUA POR METRO PERF. #REF!

HORAS MOTOR FINAL PERIODO 315

B34
Usuario: 129,7 mts precorte 60 mts produccion
B36
Usuario: 669,3 mts precorte 55,1 mts produccion
Page 3: perforacion

RESUMEN DIARIO DE OPERACIÓN - PERFORACIÓN

DISTRIBUCION DEL TIEMPO EN MINUTOS

Panne mecánica Esp. De sello Abas. Combustible Abas. Agua Reserva oper. Sin acceso Sin marcas Sin operador Pegadura Tronadura Colación

0 0 0 0 0 0 270 0 0 0 120

0 0 180 30 0 0 240 0 0 0 120

0 0 50 60 60 0 360 0 0 0 120

0 0 60 50 0 0 0 0 0 30 120

0 0 80 60 0 0 240 0 0 60 120

0 0 60 60 0 0 120 0 0 0 120

0 0 40 60 0 0 270 0 0 0 120

0 0 60 60 0 0 120 0 60 0 120

60 0 30 0 0 0 300 0 0 0 120

60 0 30 30 0 0 120 0 0 0 120

0 0 0 60 0 0 0 0 0 0 120

60 0 60 60 0 0 0 0 0 0 120

60 0 60 90 0 0 0 0 0 0 120

0 0 60 30 0 0 90 0 0 0 120

0 0 30 30 0 0 720 0 0 0 120

0 0 30 0 0 0 760 0 0 0 120

0 0 0 20 0 0 780 0 0 0 120

0 0 0 0 0 0 1,180 0 0 0 120

0 0 0 30 0 0 570 0 0 0 120

0 0 0 0 0 0 1,130 0 0 0 120

Page 4: perforacion

0 0 0 30 60 0 580 0 0 0 60

0 0 30 0 30 0 150 0 0 60 120

0 0 0 0 0 60 480 0 0 60 120

0 480 0 0 0 0 240 0 0 0 120

0 0 60 30 0 120 150 0 0 0 120

0 0 0 0 0 0 720 0 0 0 120

0 0 60 60 0 0 300 0 0 0 120

0 600 0 60 0 0 300 0 0 0 120

480 0 30 30 0 0 0 0 0 0 120

0 0 90 60 0 0 0 0 0 0 120

0 0 30 0 0 0 1,100 0 0 0 120

720 1,080 1,130 1,000 150 180 11,290 0 60 210 3,660

12.00 18.00 18.83 16.67 2.50 3.00 188.17 0.00 1.00 3.50 61.00

% DISPONIBILIDAD MECANICA 97.1

UTILIZACIÓN % 39.7

#REF!

Page 5: perforacion

DISTRIBUCION DEL TIEMPO EN MINUTOS

Cambio de turno Esp. De materiales Cambio de aceros Condición de riesgo Revisión de equipo Charla de seg. Traslados Mantención Prog. Tº Equipo

40 0 0 420 40 40 0 90 0

30 0 0 0 60 60 120 0 0

70 0 0 0 60 60 0 60 0

60 0 0 0 50 50 0 0 0

60 0 0 0 50 50 120 0 0

70 0 0 0 50 60 80 0 0

60 0 20 120 50 50 110 0 0

70 0 0 0 60 50 60 0 0

40 0 0 60 40 40 120 0 0

50 0 0 0 60 40 0 210 0

40 0 0 90 40 40 60 60 0

40 0 0 0 40 40 60 0 0

50 0 0 0 60 40 60 0 0

40 0 0 0 40 40 60 0 0

40 0 0 0 40 40 0 0 0

60 0 0 0 50 60 0 0 0

60 0 0 0 50 50 0 0 0

60 0 0 0 20 60 0 0 0

70 0 0 0 50 50 40 0 0

60 0 0 0 20 50 60 0 0

Page 6: perforacion

60 0 0 0 50 60 60 0 0

60 0 0 0 60 60 90 0 0

40 0 60 0 40 40 120 0 0

40 0 60 60 40 40 120 0 0

20 0 0 0 20 20 0 0 0

40 0 0 0 40 40 30 0 0

50 0 0 0 60 40 0 0 0

40 0 0 0 40 40 0 0 0

40 0 0 0 40 40 0 0 0

70 30 0 0 50 60 0 0 0

60 0 0 0 35 35 0 0 0

1,590 30 140 750 1,405 1,445 1,370 420 0

26.50 0.50 2.33 12.50 23.42 24.08 22.83 7.00 0.00

Page 7: perforacion

DISTRIBUCION DEL TIEMPO EN MINUTOS PETROLEO LITROS DISP. MECÁNICA UTILIZACIÓN HOROMETROS

Fuerza Mayor Perforación Perfo Acum. TOTAL TA TB TOTAL ACUMULADO % % INICIAL FINAL

0 420 420 1,440 352 0 352 352 100.00 0.00 149 156

0 600 1,020 1,440 0 669 669 1,021 100.00 12.50 156 168

0 540 1,560 1,440 393 237 630 1,651 100.00 3.47 168 178

0 1,020 2,580 1,440 350 287 637 2,288 100.00 4.17 178 195

0 600 3,180 1,440 0 749 749 3,037 100.00 5.56 195 207

0 820 4,000 1,440 0 650 650 3,687 100.00 4.17 207 221

10 530 4,530 1,440 495 395 890 4,577 100.00 2.78 221 232

60 720 5,250 1,440 0 527 527 5,104 100.00 4.17 232 246

90 540 5,790 1,440 0 485 485 5,589 95.83 2.17 246 259

60 660 6,450 1,440 400 377 777 6,366 95.83 2.17 259 270

150 780 7,230 1,440 0 575 575 6,941 100.00 0.00 270 285

0 960 8,190 1,440 463 495 958 7,899 95.83 4.35 285 302

0 900 9,090 1,440 371 606 977 8,876 95.83 4.35 302 319

0 960 10,050 1,440 401 413 814 9,690 100.00 4.17 319 335

0 420 10,470 1,440 400 0 400 10,090 100.00 2.08 335 342

0 360 10,830 1,440 0 305 305 10,395 100.00 2.08 342 348

0 360 11,190 1,440 0 0 0 10,395 100.00 0.00 348 354

0 0 11,190 1,440 0 0 0 10,395 100.00 0.00 354 354

10 500 11,690 1,440 401 0 401 10,796 100.00 0.00 354 363

0 0 11,690 1,440 0 0 0 10,796 100.00 0.00 363 364

Page 8: perforacion

120 360 12,050 1,440 500 0 500 11,296 100.00 0.00 364 371

150 630 12,680 1,440 450 410 860 12,156 100.00 2.08 371 383

60 360 13,040 1,440 0 0 0 12,156 100.00 0.00 383 391

0 240 13,280 1,440 500 0 500 12,656 100.00 0.00 391 397

60 840 14,120 1,440 338 275 613 13,269 100.00 4.17 397 411

0 450 14,570 1,440 251 0 251 13,520 100.00 0.00 411 419

30 720 15,290 1,440 275 493 768 14,288 100.00 4.17 419 431

0 240 15,530 1,440 390 0 390 14,678 100.00 0.00 431 436

0 660 16,190 1,440 327 0 327 15,005 66.67 3.13 436 447

0 960 17,150 1,440 539 0 539 15,544 100.00 6.25 447 463

0 60 17,210 1,440 634 0 634 16,178 100.00 2.08 463 464

800 17,210 44,640

13.33 286.83 744

Page 9: perforacion

TOTAL HORAS

MOTOR ACUMULADAS

7 7

12 19

10 29

17 46

12 58

14 72

11 83

14 97

13 110

11 121

15 136

17 153

17 170

16 186

7 193

6 199

6 205

0 205

9 214

1 215

Page 10: perforacion

7 222

12 234

8 242

6 248

14 262

8 270

12 282

5 287

11 298

16 314

1 315

Page 11: perforacion

FORMULARIO DE RESULTADOS OPERACIONALES Codigo:

Fecha:

Versión:

MES - AÑOEL TESORO

Contrato: GPD 436

Aug-13

EQUIPO ROC L8 25 N° 18

DESCRIPCION UNIDAD TOTAL

RESULTADOS OPERACIONALES

METROS PERFORADOS METROS 13,811.8

DISPONIBILIDAD MECANICA % 97.1

USO DE LA DISPONIBILIDAD % 39.7

TIEMPO NOMINAL DE OPERACIÓN HORAS 744.0

TIEMPO NOMINAL DE OPERACIÓN DIA HORAS 24.0

TIEMPO DE OPERACIÓN HORAS 286.8

VEL. PERFORACION SIN TRASLADO M / HR. OP. 48.2

VEL. PERFORACION CON TRASLADO M / HR. OP. 48.2

COMBUSTIBLE TOTAL CONSUMIDO LITROS PETROLEO 16,178

COMBUSTIBLE POR METRO PERF. LITROS / M. PERF. 1.17

TIEMPO Tº DE EQUIPO (RESERVA) HORAS 0.00

COMBUSTIBLE POR HORA OPER. LITROS / HR. OP. 56.40

DEMORAS % PESO

PANNE MECANICA HORAS 12.00 2.70

ESPERA DE SELLO MARCACIÓN HORAS 18.00 4.05

ABASTECIMIENTO COMBUSTIBLE HORAS 18.83 4.24

ABASTECIMIENTO AGUA HORAS 16.67 3.75

RESERVA OPERATIVA HORAS 2.50 0.56

SIN ACCESO HORAS 3.00 0.67

SIN MARCAS HORAS 188.17 42.32

SIN OPERADOR HORAS 0.00 0.00

PEGADURA HORAS 1.00 0.22

TRONADURA HORAS 3.50 0.79

COLACIÓN HORAS 61.00 13.72

CAMBIO DE TURNO HORAS 26.50 5.96

ESPERA DE MATERIALES HORAS 0.50 0.11

CAMBIO DE ACEROS HORAS 2.33 0.52

CONDICIÓN DE RIESGO HORAS 0.00 0.00

REVISIÓN DE EQUIPO HORAS 23.42 5.27

TRASLADOS HORAS 22.83 5.13

CHARLA SEGURIDAD HORAS 24.08 5.42

MANTENCIÓN PROGRAMADA HORAS 7.00 1.57

FUERZA MAYOR (CLIMA ADVERSO) HORAS 13.33 3.00

PERFORACIÓN EFECTIVA HORAS 286.83 64.51

TOTAL PERDIDAS HORAS 444.67 100.00

Page 12: perforacion

REG.065.SGI

Feb-11

0

Contrato: GPD 436

Page 13: perforacion

PERIODO Aug-13

RESUMEN GRÁFICO FECHA INICIO 1-Aug

FECHA CONTROL Aug-13

DIAS PERIODO 31

METROS A LA FECHA 13811.8

DISPONIBILIDAD % 97.1

UTILIZACION % 39.7

TIEMPOS HRS

OPERACIÓN (1) 286.83

DEMORA (2) 53.83

RESERVA (3) 42.88

MANTENCION (4) 7.00

INHABIL (5) 170.33

TOTAL 560.9

DEMORAS

Abast. Combustible 18.8

Tronadura 3.5

Abast. Agua 16.7

Atribuibles a ROCMIN 62.0

RESERVA

Sin Marcacion 188.2

Tiempo Tº Equipo 0.0

Reserva Operativa 2.5

OPERACIÓN (1)

51%

DEMORA (2)10%

RESERVA (3)8%

MANTENCION (4)1%

INHABIL (5)30%

DISTRIBUCIÓN DE TIEMPOS

OPERACIÓN (1)

DEMORA (2)

RESERVA (3)

MANTENCION (4)

INHABIL (5)

Page 14: perforacion

RESUMEN GRÁFICO

OPERACIÓN (1)

51%

DEMORA (2)10%

RESERVA (3)8%

MANTENCION (4)1%

INHABIL (5)30%

DISTRIBUCIÓN DE TIEMPOS

OPERACIÓN (1)

DEMORA (2)

RESERVA (3)

MANTENCION (4)

INHABIL (5)