PRESUPUESTO GENERALProyecto: CONST. REPRESA CHIUTARA (POTOS)

Cliente: F.P.S. - GAM POTOS

Lugar: CHIUTARA

ItemDESCRIPCINUNID.CANT.P UNITPARCIALN

(Bs.)(Bs.) 1 INSTALACIONES GENERALES1.1MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIGLB1.009,726.039,726.031.2INSTALACION DE FAENAS C/ALQUILER DE AMBIENTESGLB1.009,849.789,849.781.3LETRERO DE OBRAS FPS (SEGUN DISEO)PZA1.00695.84695.841.4LETRERO DE OBRAS MURO DE LADRILLO (SEGUN DISEO)PZA1.002,433.082,433.081.5PLACA ENTREGA DE OBRAS FPS (SEGUN DISEOPZA2.00817.271,634.54

SUBTOTAL Bs.

24,339.27 2 PREPARACION2.1LIMPIEZA MECANICA DE SUPERFICIESHA1.012,431.512,455.832.2DESVIO Y CONTROL DE AGUASGLB1.004,940.104,940.10

SUBTOTAL Bs.

7,395.93 3 INYECCIONES DE CEMENTO3.1ESTUDIO GEOSISMICOGLB1.008,510.288,510.283.2PERFORACIONES NQML734.001,276.54936,980.363.3CASINGML54.00521.5528,163.703.4ENSAYOS LUGEON CON 5 ETAPASPTO15.00389.045,835.603.5INYECCIONES DE CEMENTOTON18.004,863.0287,534.363.6ARENA BENTONITA Y OTROSGLB1.0012,157.5412,157.54

SUBTOTAL Bs.

1,079,181.84 4 CUERPO REPRESA GRAVEDAD4.1REPLANTEO (ESTRUCTURAS Y EDIFICACIONES)M2716.8318.0812,960.294.2EXCAVACION ESTRUCTURAS A MAQUINA SUELO SEMIDUROM3250.9732.268,096.294.3EXCAVACION ESTRUCTURAS A MAQUINA ROCAM34,768.3492.94443,169.524.4RELLENO Y COMPACTADO CON MATERIAL SELECCIONADOM32,857.4948.84139,559.814.5HC - FUNDACIONES (1:2:3-50% PD-H21)M33,922.84879.293,449,313.984.6HC - ELEVACIONES (1:2:3-50% PD-H21)M31,863.651,136.612,118,243.234.7HS (1:2:3 - H21)-RECUBRIMIENTOM3114.04993.43113,290.764.8HA (1:2:3-H21) - LOSAS (ESTRUCTURAS CORRIENTES)M334.354,083.71140,275.444.9JUNTAS DE DILATACION CON CINTA WATER STOP 0-32ML78.04262.5220,487.064.10BARANDADO METALICOM2129.82497.1264,536.124.11PIEZOMETROPZA2.001,812.613,625.224.12LIMNIMETROPZA1.00132.95132.95

SUBTOTAL Bs.

6,513,690.66 5 DISIPADOR DE ENERGIA5.1REPLANTEO (ESTRUCTURAS Y EDIFICACIONES)M239.5618.08715.245.2EXCAVACION ESTRUCTURAS A MAQUINA SUELO SEMIDUROM311.0132.26355.185.3EXCAVACION ESTRUCTURAS A MAQUINA ROCAM3238.4792.9422,163.405.4RELLENO Y COMPACTADO CON MATERIAL SELECCIONADOM320.6648.841,009.035.5HC - FUNDACIONES (1:2:3-50% PD-H21)M337.38879.2932,867.865.6HA (1:2:3-H21) - ESTRUCTURAS CORRIENTESM314.114,083.7157,621.15

SUBTOTAL Bs.

114,731.87 6 OBRA DE TOMA REPRESA6.1REPLANTEO (ESTRUCTURAS Y EDIFICACIONES)M224.0018.08433.926.2EXCAVACION ESTRUCTURAS 0-2M - SUELO DUROM360.39130.167,860.366.3PROVISION Y TENDIDO TUBERIA F.G. 10"ML18.00611.1911,001.426.4VALVULA DE CIERRE 10 PLG PN 20 INCL/ ACC.PZA2.0021,258.1742,516.346.5REJILLA DE ACERO INOXID.M21.25677.61847.016.6ESCALERA METALICA INTERIOR (ANCHO 0.50M)ML24.76289.467,167.036.7TAPA METALICA VISITA (0.70*0.70*3/16) INCL./ ACC.PZA2.001,660.923,321.846.8HC - CAMARAS (1:2:3-50% PD-H21)M321.541,016.0121,884.866.9HA (1:2:3-H21) - ESTRUCTURAS CORRIENTESM31.204,083.714,900.45

SUBTOTAL Bs.

99,933.23 7 DESAGUE DE AZOLVES7.1REPLANTEO (ESTRUCTURAS Y EDIFICACIONES)M234.8518.08630.097.2EXCAVACION ESTRUCTURAS A MAQUINA SUELO SEMIDUROM31.7132.2655.167.3EXCAVACION ESTRUCTURAS A MAQUINA ROCAM332.5592.943,025.207.4HA (1:2:3-H21) - ESTRUCTURAS CORRIENTESM316.434,083.7167,095.367.5COMPUERTA METALICA PARA PRESAS HP=20MPZA1.00230,174.67230,174.677.6TUBERIA LLENADO DE CONDUCTO DN 10"ML4.60669.403,079.247.7VALVULA DE CIERRE LLENADO DE CONDUCTO DN250PZA1.0011,780.1511,780.157.8ZAMPEADO DE PIEDRAM26.30162.081,021.10

SUBTOTAL Bs.

316,860.97 8 CONDUCCION POR TUBERIA8.1REPLANTEO Y CONTROL DE LINEAS DE TUBERIAML2,500.251.473,675.378.2EXCAVACION DE ZANJAS 0-2M - SUELO DUROM31,954.57151.85296,801.458.3RELLENO MANUAL C/TIERRA CERNIDA (NO I/MAM3390.9193.7536,647.818.4PROV.Y TEND.TUBERIA PVC 10" SDR-64 (U-A)ML1,656.65178.45295,629.198.5PROV.Y TEND.TUBERIA PVC 4" SDR-64 (U-A)ML639.2739.4625,225.598.6PROV.Y TEND.TUBERIA PVC 2 1/2" SDR-64 (U-A)ML168.7326.544,478.098.7PROVISION Y TENDIDO TUBERIA F.G. 10"ML35.60611.1921,758.368.8RELLENO COMUN ZANJA (COMPACT.S/PROV.MATEM31,250.9338.5048,160.818.9ENCAMISADO DE HS (1:2:3 - H21)M31.941,097.512,129.178.10CAMARA DISTRIBUCION HC H21 DE 10"-8"-6" A 4"PZA9.003,553.9131,985.198.11CAMARA DE DERIVACIN DE HC H21 DE 4" A 2 1/2"PZA1.002,671.902,671.908.12CAMARA DE DERIVACIN DE HC H21 DE 4" A 4"PZA1.003,194.673,194.678.13CAMARA FINAL DE HC H21 DE 4"PZA1.003,591.113,591.118.14CAMARA LIMPIEZA FINAL 2 1/2" TIPO "B" (HC H21)PZA1.002,765.102,765.108.15ACCESORIOS ADUCCION 10"- 4"- 2 1/2"GLB1.0012,959.7012,959.708.16DESINFECCION DE TUBERIAS DE 2" A 20"ML2,500.250.07175.028.17PRUEBA HIDRAULICA (TUBERIAS 2" A 20")ML2,500.251.724,300.43

SUBTOTAL Bs.

796,148.97 9 PASOS DE QUEBRADA TUBERIA9.1REPLANTEO (ESTRUCTURAS Y EDIFICACIONES)M224.5918.08444.599.2EXCAVACION ESTRUCTURAS 0-2M - SUELO DUROM331.24130.164,066.209.3PUENTE COLGANTE ACUEDUCTO (L=102M) TUBERIA D=10"PZA1.004,656.584,656.589.4PUENTE COLGANTE ACUEDUCTO (L=252M) TUBERIA D=10"PZA1.0010,843.0710,843.079.5HC H21 - MACIZO DE ANCLAJE (1:2:4 - 50% PD)M328.401,213.1834,454.31

SUBTOTAL Bs.

54,464.75 10 MEDIDAS DE MITIGACION AMBIENTAL10.1SEALIZACION VERTICAL PREVENTIVA E INFORMATIVAPZA4.001,667.066,668.2410.2PROVISIN Y COLOCADO SEALIZACIN AMBIENTALPZA5.00145.89729.4510.3PROVISIN DE CONTENEDORES PLASTICOSPZA5.00121.58607.9010.4REVEGETACION CON PLANTINESHA1.5080,637.77120,956.6610.5LIMPIEZA Y RETIRO DE ESCOMBROSM360.00149.998,999.40

SUBTOTAL Bs.

137,961.65COSTO TOTAL DEL PROYECTO (Bs.)

9,144,709.14Son : Nueve millones ciento cuarenta y cuatro mil setecientos nueve con 14/100 Bolivianos