  • ETAPA 1.0 : INFRAESTRUCTURA VEHICULAR - PEATONALPROPIETARIO : APV. AGUA BUENAUBICACION : DPTO:CUSCO PROV:CUSCO DIST:SAN SEBASTIANFECHA PROYECTO : 29/06/2015Item Descripcin Unid. Cant. Precio Parcial Sub Total

    1 INFRAESTRUCTURA VEHICULAR - PEATONAL S/. 4,803,345.691.1 OBRAS PROVISIONALES S/. 12,677.851.1.1 CARTEL DE OBRA und 1 677.85 S/. 677.851.1.2 ALMACEN DE OBRA mes 12 1000 S/. 12,000.001.2 TRABAJOS PRELIMINARES S/. 55,570.581.2.1 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS gbl 1 3500 S/. 3,500.001.2.2 FLETE DE MATERIALES gbl 1 3000 S/. 3,000.001.2.3 TRAZO Y REPLANTEO INICIAL m 24125.86 1.5 S/. 36,188.791.2.4 ENCIMADO DE BUZONES und 41 314.19 S/. 12,881.791.3 MOVIMIENTO DE TIERRAS S/. 397,533.931.3.1 CORTE DE TERRENO A NIVEL DE SUB BASE m 11067.98 10.12 S/. 112,007.961.3.2 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m 4934.64 25.98 S/. 128,201.951.3.3 PERFILADO Y COMPACTADO DE SUB RASANTE EN ZONAS DE CORTE m 18841.2 8.35 S/. 157,324.02

    1.4 SUB BASE GRANULAR S/. 558,495.571.4.1 m 18841.2 2.03 S/. 38,247.64

    1.4.2 EXTRACCION Y PREPARACION DE MATERIAL DE SUB-BASE m 6123.39 22.68 S/. 138,878.491.4.3 CARGUIO Y TRANSPORTE DE MATERIAL SUB BASE m 6123.39 25.05 S/. 153,390.921.4.4 EXTENDIDO Y COMPACTACION SUB BASE m 18841.2 7.98 S/. 150,352.781.4.5 RIEGO m 18841.2 4.12 S/. 77,625.741.5 PAVIMENTO RIGIDO S/. 2,329,621.001.5.1 m 18841.2 2.03 S/. 38,247.64

    1.5.2 ENCOFRADO Y DESENCOFRADO DE LOSA DE PAVIMENTO m 3768.24 73.59 S/. 277,304.781.5.3 ACERO DE TEMPERATURA DE 1/4" kg 24370.94 8.17 S/. 199,110.581.5.4 ACERO CORRUGADO G-60 DE 1/2" EN JUNTA LONGITUDINAL kg 778.23 8.61 S/. 6,700.561.5.5 ACERO DE 3/4" EN JUNTA DE CONTRACCION kg 9787.98 8.64 S/. 84,568.151.5.6 ACERO DE 1" EN JUNTAS DE DILATACION kg 234.02 8.77 S/. 2,052.361.5.7 CONCRETO f'c=210 kg/cm2. m 3768.24 437.7 S/. 1,649,358.651.5.8 SELLADO DE JUNTAS DE DILATACION e=3/4" h=0.05 m. m 1884.12 6.66 S/. 12,548.241.5.9 SELLADO DE JUNTAS DE CONTRACCION h=0.06m. m 6280.4 2.63 S/. 16,517.451.5.10 SELLADO DE JUNTAS LONGITUDINALES DE 1/2" X 1 1/2" m 3141.2 3.44 S/. 10,805.731.5.11 CURADO DE CONCRETO m 18841.2 1.72 S/. 32,406.861.6 SARDINELES S/. 282,746.711.6.1 m 942.36 2.03 S/. 1,912.99

    1.6.2 EXCAVACION DE TERRENO MANUAL m 424.06 37.56 S/. 15,927.691.6.3 ENCOFRADO Y DESENCOFRADO m 1884.72 38.63 S/. 72,806.731.6.4 CONCRETO f'c=175 kg/cm2. m 471.18 392.12 S/. 184,759.101.6.5 SELLADO DE JUNTAS DE CONTRACCION h=0.06m. m 942.06 2.63 S/. 2,477.621.6.6 CURADO DE CONCRETO m 2827.08 1.72 S/. 4,862.581.7 VEREDAS S/. 336,379.061.7.1 m 4240.62 2.03 S/. 8,608.46

    1.7.2 PERFILADO Y COMPACTADO MANUAL m 4240.62 3.6 S/. 15,266.231.7.3 EXCAVACION DE TERRENO MANUAL m 848.12 37.56 S/. 31,855.391.7.4 EMPEDRADO DE 6" m 4240.62 24.84 S/. 105,337.001.7.5 ENCOFRADO Y DESENCOFRADO m 785.3 38.63 S/. 30,336.141.7.6 CONCRETO f'c=175 kg/cm2. m 339.25 392.12 S/. 133,026.711.7.7 SELLADO CON MESCLA ASFALTICA E=0.05 M.SARDINELES m 471.18 9.88 S/. 4,655.26

    TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO

    TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO

    TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO

    TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO

  • 1.7.8 CURADO DE CONCRETO m 4240.62 1.72 S/. 7,293.871.8 CANAL DE EVACUACIN DE AGUAS PLUVIALES S/. 356,633.001.8.1 m 2512.96 2.03 S/. 5,101.31

    1.8.2 EXCAVACION DE TERRENO MANUAL m 1507.78 37.56 S/. 56,632.221.8.3 PERFILADO Y COMPACTADO MANUAL m 2512.96 3.6 S/. 9,046.661.8.4 ENCOFRADO Y DESENCOFRADO m 2512.96 38.63 S/. 97,075.641.8.5 CONCRETO f'c=175 kg/cm2. m 219.89 392.12 S/. 86,223.271.8.6 TARRAJEO CON IMPERMEABILIZANTE m 2512.96 39.09 S/. 98,231.611.8.7 CURADO DE CONCRETO m 2512.96 1.72 S/. 4,322.291.9 SEALIZACION S/. 22,234.001.9.1 PINTURA EN EJE DE PAVIMENTO m 3141.2 2.53 S/. 7,947.241.9.2 SEALIZACION DE CRUZERO PEATONAL m 90 5.87 S/. 528.301.9.3 PINTADO DE SARDINELES m 6282.4 2.19 S/. 13,758.461.1 CONTROL DE CALIDAD S/. 10,315.821.10.1 DISEO DE MESCLAS und 2 800 S/. 1,600.001.10.2 ENSAYO DE RESISTENCIA A LA COMPRESION und 180 39.24 S/. 7,063.201.10.3 ENSAYO DE DENSIDAD DE CAMPO und 38 43.49 S/. 1,652.621.11 MITIGACIN DE IMPACTO AMBIENTAL S/. 441,138.171.11.1 LIMPIEZA FINAL DE OBRA m 24125.86 0.65 S/. 15,681.811.11.2 ELIMINACION DE MATERIAL EXEDENTE (D=15 KM.) m 17451.04 24.38 S/. 425,456.36

    Costo Directo S/. 4,803,345.69

    GASTOS GENERALES 9.550% S/. 458,719.51

    GASTOS DE INSPECCION 5.200% S/. 249,773.98

    COSTO DE EXPEDIENTE TECNICO 1.110% S/. 53,317.14

    COSTO DE LIQUIDACION DE OBRA 1.05% S/. 50,435.13

    Costo Total S/. 5,615,591.45

    TOTAL : S/. 5,615,591.45

    [Son: cinco millones seiscientos quince mil quinientos noventa y un Nuevos Soles con cuarenta y cinco cntimos]

    TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO