    STUDY OF A NEW APPROACH FOR AIR

    TRAFFIC CONTROL AND AIRPORT

    MANAGEMENT IN SPAIN

    - PROJECT MANAGEMENT PLAN AND BUDGET -

    Aeronautical Engineering

    Final Project

    UPC ETSEIAT

    September 2012

    Juan Espinar Nova

    Tutorized by Joan Mundet Hiern

  • 8/10/2019 Pressupost PFC Espinar Nova

    2/7

    List of contents, figures and tables

    338

    LIST OF CONTENTS

    0. DESCRIPTION OF CONTENTS ............................................................... 339

    1. PROJECT MANAGEMENT PLAN............................................................ 340

    2. BUDGET .................................................................................................. 342

    LIST OF FIGURES

    Figure 1 Gantt Diagram ................................................................................... 341

    LIST OF TABLES

    Table 1 Costs per item and total costs ............................................................. 343

    http://c/Users/Joan/Dropbox/Masterarbeit/Final/Pressupost_PFC_Espinar_Nova.docx%23_Toc335362055http://c/Users/Joan/Dropbox/Masterarbeit/Final/Pressupost_PFC_Espinar_Nova.docx%23_Toc335362055
  • 8/10/2019 Pressupost PFC Espinar Nova

    3/7

    Description of contents

    339

    0. DESCRIPTION OF CONTENTS

    This volume presents the project management plan and budget.

    Developed at the definition phase of the project, the management plan was

    conceived in order to effectively sequence tasks and optimize resource

    allocation, allowing for flexibility along its deployment in order to successfully

    overcome unexpected delays or commitment of additional resources.

    The budget has been defined under certain assumptions in order to estimate cost

    of resources as accurate as possible with the available information.

  • 8/10/2019 Pressupost PFC Espinar Nova

    4/7

    Project Management Plan

    340

    1. PROJECT MANAGEMENT PLAN

    Within its definition phase, the project was initially divided into four stages, which

    accounted for the nature and volume of contents originally planned to be included

    in the report:

    Defining project

    Gathering information

    Analyzing information

    Interpreting information

    Formatting project

    These phases are graphically represented through a Gantt Diagram (Figure 1),

    including time resources to be committed to each workload unit.

    The amount of literature available on the subject studied led to a particular

    emphasis on the phase of information gathering, which was deemed especiallysignificant to ensure a comprehensive factual input to the project.

    Initially established sequence of contents was adapted after release of the Gantt

    Diagram, thus the represented list does not accurately coincide with the definitive

    contents included in the report.

    As far as the diagrams legend is concerned, the horizontal axis displays blocks

    of 5 hours. Accordingly, the total planned time to conclude the project amounted

    400 hours.

    This estimation has been exceeded since the report includes some contents

    which were not initially envisaged to form part of the scope of the project.

  • 8/10/2019 Pressupost PFC Espinar Nova

    5/7

    Project Management Plan

    341

    1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 15 1 6 1 7 1 8 1 9 20 2 1 2 2 2 3 2 4 2 5 26 2 7 2 8 2 9 3 0 31 3 2 3 3 3 4 3 5 3 6 37 3 8 3 9 4 0 4 1 42 4 3 4 4 4 5 4 6 4 7 48 4 9 5 0 5 1 5 2 53 5 4 5 5 5 6 5 7 5 8 59 6 0 6 1 6 2 6 3 64 6 5 6 6 6 7 6 8 6 9 70 7 1 7 2 7 3 7 4 75 7 6 7 7 7 8 7 9 8 0

    DEFINING PROJECT

    Conception 1

    Pur pose 2

    Requir ements 3

    S co pe 4

    J u st i f i ca t i on 5

    Content / s tr uc tu r e 6

    Pr ogr amming 7

    GATHERING INFORMATION

    Gener a l in f o r mation 8

    Economic da ta 9

    Cor por ate gover nance 10

    Management model 11

    Owner ship 12

    Benchmar king 13

    Ger man Air por ts 14

    Air por t Net wor ks 15

    Pr iva te par t ic ipa tion 16

    P a r t 2 . A N S P Benchmar king 17

    Management models 18

    Pr iva te par t ic ipa tion 19

    Debate on spanish model 20

    ANALYZING INFORMATION

    Gener al inf or mation 21

    Economic data 22

    Cor por ate gover nance 23

    Management model 24

    Owner ship 25

    Benchmar king 26

    Ger man Air por ts 27

    Air por t Net wor ks 28

    Pr iva te par t ic ipa tion 29

    P a r t 2 . A N S P Benchmar king 30

    INTERPRETING INFORMATION

    Management models 31

    Pr iva te par t ic ipa tion 32

    Debate on spanish model 33

    Conc lusions 34

    FORMATTING PROJECT

    In tr oduc tion 35

    Bib l iogr aphy 36

    Ackno wledge ments 37

    Gener al f or matting 38

    Contents 39

    L is t o f f igu r es 40

    L is t of tab les 41

    Rev is ion 42

    Pr in t ing and b ind ing 43

    1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 15 1 6 1 7 1 8 1 9 20 2 1 2 2 2 3 2 4 2 5 26 2 7 2 8 2 9 3 0 31 3 2 3 3 3 4 3 5 3 6 37 3 8 3 9 4 0 4 1 42 4 3 4 4 4 5 4 6 4 7 48 4 9 5 0 5 1 5 2 53 5 4 5 5 5 6 5 7 5 8 59 6 0 6 1 6 2 6 3 64 6 5 6 6 6 7 6 8 6 9 70 7 1 7 2 7 3 7 4 75 7 6 7 7 7 8 7 9 8 0

    P l a n n i n g a n d

    o r g a n i z a t i o n

    D EF IN IN G P ROJEC T GA TH ER IN G INF OR MA TION A NA LYZ IN G INF OR MA TION ( r ed ac t i on o f p ar t s I a nd I I)INTERPRETING INFORMATION (redac ti on

    of part III and conclusions) FORMATTING PROJECT

    60

    P a r t 1

    P a r t 2 . A i r p o r t s

    P a r t 3

    P a r t 1

    P a r t 2 . A i r p o r t s

    P a r t 3

    S p e ci f i c

    f o r m a t t i n g

    35 105 130 70

    8,75% 26,25% 32,50% 17,50% 15,00%

    Figure 1 Gantt Diagram

  • 8/10/2019 Pressupost PFC Espinar Nova

    6/7

    Budget

    342

    2. BUDGET

    For the purpose of budgetary planning, total resources committed are considered

    to comprise:

    Full-time employment of a trainee student for a period of three months,

    perceiving a gross monthly salary of 600,00.

    Urban transport expenses, estimated as of 90,00 per month.

    Consultation sessions and factual assessment, amounting a total of 25 h.

    Expenses involved shall account for cost of expertise, including fees,

    travel and subsistence expenses. Nevertheless, these costs are not

    accounted for, since the consultants offered their guidance free of cost,

    due to the status of trainee student of the author.

    Use of certified copy of Office-Software, whose cost is not accounted for

    since it was not acquired ad-hoc for the project.

    Reprography costs, amounting a total of 37,00.

    These items and the total resulting costs is shown in Table 1.

    It shall be hereby remarked that items accounted for within this budget are

    restrained by the expense limitation of the author, due to his condition of student.

    If the project had been conducted by a consulting company, further resources

    might have been committed, such as subscriptions to publications or acquisition

    of support material.

    In this regard, the author had access to documentation material of the Centro de

    Documentacin y Publicaciones de Aena, whose selling costs would have been

    unaffordable according to the financing conditions of this project.

    Thus, the author thanks expressly all the collaborators who offered their support

    selflessly.