RALLADO PISCO (2)PROYECTO MULTIPROPSITO CHONECUADRO DE PERFORACIONES E INYECCIONES COMPLEMENTARIAS EN LA PANTALLA IMPERMEABLE DE HORMIGN PLASTICOPERFORACININYECCIN DE LECHADA SELLO Y/O CORCHON FECHAELEMENTO CDIGOCOORDENADAS COTASLONG. PERFORACION (ML)LONG. TUBO MET. 6MM (ML)FECHASACOS CEMENTO (U)MEZCLA DE BENTONITA PREPARADA LTRSAGUA LTRSVOLUMEN LECHADA LTRSINICIOTERMINACION E (X)N (Y)TNINFINICIOTERMINACION
340.00
CONSORCIO FISCALIZACINSUB-CONTRATISTA
Hoja1# DE PUNTOCOORDENADASDATOS DE PEFORACIN DSTOS DE INYECCIN
DE VAINA XYCOTA DE INICIO (msnm)COTA FINAL (msnm)LONGITUD DE
PERFORACION (m)FECHA INICIO DE PERFORACIN FECHA FIN DE PERFORACIN
CEMENTO (Kg)BENTONITA (Kg)AGUA (Lts)FECHA DE
INYECCIN19923008.14612733.55135.00-7.0042.005/7/155/11/1520025.72278.405/13/15
Franco: CARLOS: HORA DE INYECCION 15H30 - 16H00
29923010.84612737.11635.00-7.0042.005/9/155/10/1515019.29208.805/13/15
Franco: CARLOS: HORA DE INYECCIN 16H15 - 17H40
39923015.31612737.09535.00-7.0042.005/10/155/12/1525032.15348.005/14/15
Franco: CARLOS: HORA DE INYECCIN 10H00 - 12H00
49923018.25612740.7835.00-7.0042.005/9/155/12/150059923022.84612740.81735.00-7.0042.005/11/15
Franco: CARLOS: esta perforacion no se encuentra terminada debido a
que se dao la
maquina.0069923025.54612744.38235.00-7.0042.000079923007.25612735.34435.00-7.0042.000089923011.73612735.32335.00-7.0042.005/12/155/12/150099923014.43612738.88835.00-7.0042.005/12/155/13/1500109923019.14612738.98735.00-7.0042.005/13/155/14/1500119923021.96612742.6135.00-7.0042.005/14/1500129923026.43612742.58935.00-7.0042.0000139923009.05612736.2335.00-7.0042.0000149923013.52612736.20935.00-7.0042.0000159923016.33612739.83235.00-7.0042.0000169923021.05612739.93135.00-7.0042.0000179923023.75612743.49635.00-7.0042.0000189923028.22612743.47535.00-7.0042.005/7/155/9/1500199923009.93612734.43735.00-7.0042.0000209923012.63612738.00235.00-7.0042.0000219923017.22612738.03935.00-7.0042.0000229923020.16612741.72435.00-7.0042.0000239923024.64612741.70335.00-7.0042.0000249923010.39612734.8935.00-7.0042.0000259923008.59612734.8935.00-7.0042.0000269923010.39612735.77635.00-7.0042.0000279923012.18612736.66335.00-7.0042.0000289923013.97612737.54935.00-7.0042.0000299923015.76612738.43535.00-7.0042.0000309923017.67612739.37935.00-7.0042.0000319923019.59612740.32735.00-7.0042.0000329923021.5612741.2735.00-7.0042.0000339923023.3612742.15735.00-7.0042.0000349923025.09612743.04335.00-7.0042.0000359923026.88612743.9335.00-7.0042.0000
xy612733.5519923008.14612737.1169923010.84612737.0959923015.31612740.789923018.25612740.8179923022.84612744.3829923025.54612735.3449923007.25612735.3239923011.73612738.8889923014.43612738.9879923019.14612742.619923021.96612742.5899923026.43612736.239923009.05612736.2099923013.52612739.8329923016.33612739.9319923021.05612743.4969923023.75612743.4759923028.22612734.4379923009.93612738.0029923012.63612738.0399923017.22612741.7249923020.16612741.7039923024.64612734.899923010.39612734.899923008.59612735.7769923010.39612736.6639923012.18612737.5499923013.97612738.4359923015.76612739.3799923017.67612740.3279923019.59612741.279923021.5612742.1579923023.3612743.0439923025.09612743.939923026.88
RESUMENPROYECTO MULTIPROPSITO CHONECUADRO DE PERFORACIONES E
INYECCIONES COMPLEMENTARIAS EN LA PANTALLA IMPERMEABLE DE HORMIGN
PLASTICO# ELEMENTOCOORDENADASDATOS DE PEFORACIN DSTOS DE INYECCIN
DE VAINA XYCOTA DE INICIO (msnm)COTA FINAL (msnm)LONGITUD DE
PERFORACION (m)FECHA INICIO DE PERFORACIN FECHA FIN DE PERFORACIN
CEMENTO (Saco)BENTONITA (Kg)AGUA (Lts)BENTONITA PREPARADA LTRSFECHA
DE INYECCINCEMENTO EN LITROS 16,67 LTRSVOLUMEN DE LECHADA
LTRS1612733.5519923008.1435.00-7.0042.005/7/155/9/15425.72278.40302.885/13/15
Franco: CARLOS: HORA DE INYECCION 15H30 -
16H0066.68369.562612737.1169923010.8435.00-7.0042.005/9/155/10/15319.29208.80227.165/13/15
Franco: CARLOS: HORA DE INYECCIN 16H15 -
17H4050.01277.173612737.0959923015.3135.00-7.0042.005/10/155/12/15532.15348.00378.605/14/15
Franco: CARLOS: HORA DE INYECCIN 10H00 -
12H0083.35461.954612740.789923018.2535.00-7.0042.005/9/155/12/15851.44556.80605.765/16/15133.36739.125612740.8179923022.8435.00-7.0042.005/11/15
Franco: CARLOS: esta perforacion no se encuentra terminada debido a
que se dao la
maquina.5/18/15957.87626.40851.855/12/15150.031001.886612744.3829923025.5435.00-7.0042.005/16/155/20/15638.58417.60454.325/23/15100.02554.347612735.3449923007.2535.00-7.0042.005/11/155/15/15851.44556.80605.765/15/15133.36739.128612735.3239923011.7335.00-7.0042.005/12/155/12/151277.16835.20908.645/17/15200.041108.689612738.8889923014.4335.00-7.0042.005/12/155/13/15532.15348.00378.605/16/1583.35461.9510612738.9879923019.1435.00-7.0042.005/13/155/18/15319.29208.80227.165/23/1550.01277.1711612742.619923021.9635.00-7.0042.005/14/155/21/15532.15348.00378.605/23/1583.35461.9512612742.5899923026.4335.00-7.0042.005/20/155/22/15638.58417.60454.325/23/15100.02554.3413612736.239923009.0535.00-7.0042.005/21/155/22/15851.44556.80605.766/1/15133.36739.1214612736.2099923013.5235.00-7.0042.005/26/156/1/155.535.37382.80416.465/15/1591.685508.1515612739.8329923016.3335.00-7.0042.005/29/155/29/154.528.94313.20340.746/2/1575.015415.7616612739.9319923021.0535.00-7.0042.005/25/155/26/15425.72278.40302.886/2/1566.68369.5617612743.4969923023.7535.00-7.0042.005/28/155/29/15425.72278.40302.886/2/1566.68369.5618612743.4759923028.2235.00-7.0042.005/7/155/19/15851.44556.80605.765/23/15133.36739.1219612734.4379923009.9335.00-7.0042.005/27/155/30/15745.01487.20530.046/1/15116.69646.7320612738.0029923012.6335.00-7.0042.005/25/155/26/1510.567.52730.80795.066/1/15175.035970.1021612738.0399923017.2235.00-7.0042.005/27/155/30/15532.15348.00378.606/2/1583.35461.9522612741.7249923020.1635.00-7.0042.005/29/155/30/15425.72278.40302.886/2/1566.68369.5623612741.7039923024.6435.00-7.0042.005/24/155/25/15425.72278.40302.885/26/1566.68369.5624612734.899923010.3935.00-7.0042.005/23/155/23/15745.01487.20530.045/25/15116.69646.7325612734.899923008.5935.00-7.0042.000.000.000.0000.0026612735.7769923010.3935.00-7.0042.000.000.000.0000.0027612736.6639923012.1835.00-7.0042.000.000.000.0000.0028612737.5499923013.9735.00-7.0042.000.000.000.0000.0029612738.4359923015.7635.00-7.0042.000.000.000.0000.0030612739.3799923017.6735.00-7.0042.000.000.000.0000.0031612740.3279923019.5935.00-7.0042.000.000.000.0000.0032612741.279923021.535.00-7.0042.006/8/156/9/15638.58417.60660.006/11/15100.02760.0233612742.1579923023.335.00-7.0042.006/7/156/8/15425.72278.40440.006/10/1566.68506.6834612743.0439923025.0935.00-7.0042.006/5/156/6/15319.29208.80330.006/10/1550.01380.0135612743.939923026.8835.00-7.0042.006/5/156/5/15532.15348.00550.006/10/1583.35633.35163.51051.3111379.613167.63
Datos perforacion corcho
DATOS DE DOSIFICACION DE VAINADATOS DE DOSIFICACION DE VAINACEMENTO KGBENTONITA KG AGUA LTSCEMENTO SACOBENTONITA KG AGUA LTS10.12861.39216.4369.6
BENTONITA PREPARADA POR SACO =75.72LTSBENTONITA POR SACO EN KG=6.43KGVOLUMEN DE BENTONITA POR SACO =6.12LITROSVOLUMEN DE AGUA POR SACO =69.6LITROSAJUSTE DE LECHADA VAINA 1BENTONITA PREPARADA POR SACO =94.65LTSAJUSTE DE LECHADA VAINA 2BENTONITA PREPARADA POR SACO =110Ltrs
RALLADO PISCOPROYECTO MULTIPROPSITO CHONECUADRO DE PERFORACIONES E INYECCIONES COMPLEMENTARIAS EN LA PANTALLA IMPERMEABLE DE HORMIGN PLASTICOPERFORACININYECCIN DE LECHADA SELLO Y/O CORCHON FECHAELEMENTO CDIGOCOORDENADAS COTASLONG. PERFORACION (ML)LONG. TUBO MET. 6MM (ML)FECHASACOS CEMENTO (U)MEZCLA DE BENTONITA PREPARADA LTRSAGUA LTRSVOLUMEN LECHADA LTRSINICIOTERMINACION E (X)N (Y)TNINFINICIOTERMINACION 15/7/155/9/1518612733.5519923008.1435.00-7.0042.0042.0025/7/155/9/151612737.1169923010.8435.00-7.0042.0042.005/13/155/13/154302.88-340.00340.0035/9/155/10/152612737.0959923015.3135.00-7.0042.0042.005/13/155/13/153227.16-340.0045/9/155/10/154612740.789923018.2535.00-7.0042.0042.005/16/155/16/155605.76605.765612740.8179923022.846612744.3829923025.547612735.3449923007.258612735.3239923011.739612738.8889923014.4310612738.9879923019.1411612742.619923021.9612612742.5899923026.4313612736.239923009.0514612736.2099923013.5215612739.8329923016.3316612739.9319923021.0517612743.4969923023.7518612743.4759923028.2219612734.4379923009.9320612738.0029923012.6321612738.0399923017.2222612741.7249923020.1623612741.7039923024.6424612734.899923010.3925612734.899923008.5926612735.7769923010.3927612736.6639923012.1828612737.5499923013.9729612738.4359923015.7630612739.3799923017.6731612740.3279923019.5932612741.279923021.533612742.1579923023.334612743.0439923025.0935612743.939923026.88
CONSORCIO FISCALIZACINSUB-CONTRATISTA
RESUMEN DE INYECCINCONTROL DE INYECCIN D LECHADAS DE CEMENTO PROYECTO MULTIPROPSITO CHONE SECTOR: Pantalla impermeable de hormigon plstico en presa de Rio Grande ALTURA DE INYECCIN:24,00 mCOTA SUPERIOR:35,00 msnmCONTRATANTE: SENAGUA COTA INFERIOR: - 7,00 msnmCONTRATISTA: CONSORCIO EQUITESA - EQUITRANSA PROFUNDIDAD DE PERFORACIN:42,00 mlFISCALIZACIN:ESPEPROFUNDIDAD SOBRE INYECCIN:18,00 mlFECHAMANIOBRA #CDIGO HUECOMEZCLA TIPOPROFUNDIDADSACOS CEMENTOBENTONITA PREPPARADA (Ltrs)AGUA (Ltrs)VOLUMEN DE LECHADA (Ltrs)HORATIEMPOPRESIN DE INYECCIN (BAR)TOTAL DE CEMENTO (KG)OBSERVACIONESINICIALFINALDESDE (COTA)HASTA (COTA)INICIOFINALRELACINETAPA5/20/15119_2-7.00-6.001.00111.10127.7715h5016h00107 -- 8 50.001.00219_21.00111.10127.7716h0316h13107 -- 850.001.00319_2-6.00-5.001.00111.10127.7716h2316h33107 -- 850.001.0016.675/20/15419_21.00111.10127.7716h3316h48157 -- 850.001.005/21/15519_2_1-5.00-4.001.0092.42109.0912h5513h05107 -- 850.001.00619_2_11.0092.42109.0913h0513h1387 -- 850.001.00719_2_1-4.00-3.001.0092.42109.0913h2013h3717850.001.00819_2_11.0092.42109.0913h3714h00237 -- 850.001.00919_2_1-3.00-2.001.0092.42109.0914h0714h35287 -- 850.001.001019_2_10.5046.2154.5514h3715h05287 -- 825.001.001119_2_1-2.00-1.000.5046.2154.5516h1514h40257 -- 825.001.001219_2_11.0092.42109.0916h4017h05157 -- 850.001.001319_2_11.0092.42109.0917h0517h20157 -- 850.001.001419_2_1-1.000.001.0092.42109.0917h2517h3497 -- 850.001.001519_2_10.5046.2154.5517h3417h53197 -- 825.001.005/21/151619_2_10.001.000.5046.2154.5518h0018h20207 -- 825.001.006/7/151719_2_11.0092.42109.091819_2_1121.0092.42109.091919_2_1231.0092.42109.092019_2_1341.0092.42109.092119_2_1451.0092.42109.092219_2_1561.0092.42109.092319_2_1671.0092.42109.092419_2_1781.0092.42109.092519_2_1891.0092.42109.092619_2_19101.0092.42109.092719_2_110111.0092.42109.09OBSERVAQCIONES: problemas de funciuonamientos de equipos de inyeccin, desperfecto en obturadores por lo que la inyeccion se compopleto en dias posteriores, se realiz la primer ajuste de lalechada plstica.
CONSORCIO FISCALIZACINSUB-CONTRATISTA
Datos InyeccionDISEO DE LECHADA PLSTICA 9-21ER AJUSTE DISEO DE LECHADA PLSTICA 9-2Agua65%9_2Agua62%9_2_1Cemento30%Cemento34%Bentonita5%Bentonita4%
Peso en KgPeso en KgAgua108.33kgAgua91.17kgCemento50.00kgCemento50.00kgBentonita8.33kgBentonita5.88kg
Bentonita + Agua111.10LtBentonita + Agua92.42Lt
Hoja3INYECCIONES POR FRACTURAMIENTO HIDRAULICO CUADRO DE INYECCIONES COMPLEMENTARIAS EN LA PANTALLA IMPERMEABLE DE HORMIGN PLASTICONFECHACDIGO INYECCINCOORDENADASCOTASSACOS DE CEMENTO UBENTONITA PREPARADA LTRS.VOLUMEN DE LECHADA LTRSPRESIN DE INYECCIN PROMEDIO BARTOTAL DE CEMNETO KGETAPASINICIO TERMINADOE(X)N(Y)DESDE HASTA 15/20/156/7/151612733.5519923008.14-71732
CONSORCIO FISCALIZACINSUB-CONTRATISTA
diagrama de perforaccionessCONSTRUCCIN DE LAS OBRAS DE FINALIZACIN DE LA PANTALLA DE HORMIGN PLSTICOESQUEMA DE ADMISIN DE CAMPO EN INYECCIONES DE CORCHO Y POR FRACTURAMIENTO HIDRUILICOAGUAS ABAJO383640Sacos11981432110165231218Corcho:47125.555349468Fracturamiento 1ra Et.:322022.524251723.52415211622Fracturamiento 2da Et.:2412.5192424241624211922.524
Sacos2526272829303132333435Corcho:88810106435Fracturamiento 1ra Et.:6.7521810.56.52414.75Fracturamiento 2da Et.:
Sacos7132209154221117624Corcho:88310.554.5845467Fracturamiento 1ra Et.:22.52120232023222521252422Fracturamiento 2da Et.:211424242424242424242424374139AGUAS ARRIBASimbologaEquivalencias de sacos en inyecin pro fracturamientoCementoCementoLodo bentonticoLechada cemento-bentonitaBentonita2Primario1 saco=50kg92,42 lt109,09 lt5,88 kg13Secundario0,5 saco=25 kg46,21 lt54,54 lt2,94 kg26Franja central sin perforar32Franja central listo para inyectar por fracturamiento hidrulico37Pozos en zona de hundimiento26Sondeo cota 17 a -7, SPT y permeabilidad tipo Lefranc
Nota:1)La admisin de los pozos secundarios inyectados a la fecha mantienen admisiones por fracturamiento hidulico similar a los pozos primarios2)La distancia entre pozos primarios y secundarios adyacentes es de 2m, la distancia entre estos y la franja central es de 1,41 m3)La inyeccin por fracturamiento hidrulico se ha realizado desdee la cota -7 m hasta +17 m (24 m)
3)Prueba de campo CM:Se busca inyectar una segunda etapa en P5, P11, P17 y P23 para corroborar reduccin de admisin en P334)Prueba de campo CA:Se busca inyectar en P35 para contrastar con experimentoDaJunioPozosNmeroRendimiento(pozos/da)1251.222Cota(m)SPTLefrancObservacin2263,4,5 (comenzado)2.52.5DesdeHastaN(Golpes)K(cm/s)3275 (comenzado),6,7,16(comenzado)333517No aplicaPerforacion destructiva4288,16(comenzado)1.51.51716.5364.04e-6SPT cada metro5299,17,13, 18 (comenzado)3.53.51615.525SPT cada metro1514.5mayor a 100SPT cada metro12.51413.5mayor a 1004.04e-6SPT cada metro1312.575SPT cada metro1211.5--1110.5mayor a 100SPT cada 3 m109.5--98.5-87.524SPT cada 3m