Presupuesto de pavimentacion

Embed Size (px)

DESCRIPTION

Presupuesto de la pavimentación en el Asentamiento Humano en Carabayllo

Citation preview

Sheet1ItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)001OBRAS PROVISIONALES5,234.22001.01CARTEL DE IDENTIFICACION DE LA OBRA DE 8.50 X 3.60M (ESTRUCTURA DE MADERA Y BANER)und1.001,834.221,834.22001.02ALQUILER DE ALMACEN, OFICINA Y CASETA DE GUARDIANIAmes4.00850.003,400.00002OBRAS PRELIMINARES50,268.68002.01MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS Y HERRAMIENTASglb1.0016,452.6016,452.60002.02TRAZO, NIVELACION Y REPLANTEOkm4.193,111.3913,036.72002.03BAO QUIMICO PARA PERSONAL DE OBRAmes4.001,186.804,747.20002.04MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIALglb1.0013,585.2513,585.25002.05LIMPIEZA DEL TERRENO MANUALm29,411.200.262,446.91003SEGURIDAD Y SALUD EN OBRA16,431.71003.01ELABORACIN, IMPLEMENTACIN Y ADMINISTRACIN DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJOglb1.004,381.714,381.71003.02EQUIPOS DE PROTECCION INDIVIDUALund100.00120.5012,050.00004MOVIMIENTO DE TIERRAS642,616.84004.01EXCAVACION A NIVEL DE SUB RASANTE CON EQUIPOm311,940.727.8994,212.28004.02EXCAVACION MANUAL A NIVEL DE SUB RASANTE PARA VEREDASm31,411.6833.4547,220.70004.03RELLENO CON MATERIAL PROPIO CON EQUIPOm31,138.3022.8926,055.69004.04ELIMINACION DE MATERIAL EXCEDENTEm316,383.7329.00475,128.17005PAVIMENTO FLEXIBLE1,497,191.89005.01CONFORMACION Y COMPACTACION DE SUB RASANTE CON EQUIPOm226,128.802.7872,638.06005.02BASE GRANULAR E= 0.25Mm230,358.8117.30525,207.41005.03IMPRIMACION ASFALTICAm229,730.463.54105,245.83005.04CARPETA ASFALTICA EN CALIENTE DE 2"m229,730.4626.71794,100.59006SARDINELES396,008.91006.01EXCAVACION DE ZANJAS PARA SARDINELES SUMERGIDOS (0.15X0.30M)m4,189.003.2913,781.81006.02CONCRETO PREMEZCLADO F'C=175 KG/CM2 PARA SARDINEL SUMERGIDO (0.15X0.30M)m4,189.0028.80120,643.20006.03EXCAVACION DE ZANJAS PARA SARDINELES PERALTADOS (0.15X0.45M)m4,264.003.2914,028.56006.04ACERO FY= 4200 KG/CM2 GRADO 60kg16,834.865.0785,352.74006.05CONCRETO PREMEZCLADO F'C=175 KG/CM2 PARA SARDINEL PERALTADO (0.15X0.45M)m4,264.0037.45159,686.80006.06JUNTAS ASFALTICAS EN SARDINELESm424.255.932,515.80007VEREDAS DE CONCRETO826,976.63007.01TRAZO, NIVELES Y REPLANTEOm29,411.201.3112,328.67007.02REPARACIONES DE INSTALACIONES DE AGUA, FUGAS PUNTUALES Y ACOMETIDASglb1.002,630.002,630.00007.03CONFORMACION Y COMPACTACION DE SUB RASANTE PARA VEREDASm29,411.209.9093,170.88007.04BASE GRANULAR PARA VEREDAS E= 0.10Mm29,411.2017.60165,637.12007.05VEREDA DE CONCRETO PREMEZCLADO F'C = 175 KG/CM2 E = 0.10M ACABADO BRUAS @ 1.00MTSm29,411.2036.85346,802.72007.06ENCOFRADO Y DESENCOFRADO DE VEREDAm4,516.0610.3646,786.38007.07SARDINEL DE VEREDAS DE CONCRETO PREMEZCLADO F'C=175KG/CM2m4,516.0625.14113,533.75007.08CURADO DE CONCRETO EN VEREDASm29,411.203.0028,233.60007.09JUNTAS ASFALTICASm3,010.715.9317,853.51008SEALIZACION58,137.75008.01PINTURA LINEAL CONTINUA E=0.10Mm4,189.003.1613,237.24008.02PINTURA LINEAL DISCONTUNUA E=0.10Mm1,574.633.836,030.83008.03PINTADO DE SIMBOLOS, LETRAS Y SEALESm2255.4023.475,994.24008.04PINTADO DE SARDINELES PERALTADOSm4,264.007.7132,875.44009VARIOS85,979.56009.01MITIGACION DE IMPACTO AMBIENTALm230,358.810.319,411.23009.02NIVELACION DE TAPAS DE BUZONESund30.00251.527,545.60009.03NIVELACION DE CAJAS DE AGUA Y DESAGUEund634.0089.7356,888.82009.04LIMPIEZA FINAL DE OBRAm239,141.660.3112,133.91