Item Descripción Metrado 01 1.01 u 1.00 950 1.02 mes 4.00 350 1.03 CONSTRUCCION DE ALMACEN,VESTUARIO Y RESIDENCIA m2 23.00 174.76 1.04 EXCAVACION MANUAL PARA INSTALACION DE SS.HH. m3 1.75 5 1.05 CONSTRUCCION DE SS.HH. m2 4.00 132.36 1.06 INSTALACION PROVICIONAL DE AGUA m 7.00 54.87 1.07 INSTALACION PROVICIONAL DE DESAGUE m 7.00 54.87 1.08 EMPREDRADO DE PISO DE SS.HH. m2 3.00 19.8 1.09 CONCRETO F´c=175 Kg /Cm2 P/PISO DE SS.HH. m3 0.15 381.75 2 2.01 m2 2,113.75 1.06 2.02 glb 1 3,500.00 2.03 glb 116,198.81 2.04 m2 1,150.00 21.63 2.05 m2 2,123.75 1.19 3 3.01 03.01.01 m2 1,691.00 0.95 03.01.02 m3 843.31 4.33 03.01.03 m3 1,351.64 14.77 03.01.04 m2 1,691.00 4.84 03.01.05 u 6 40 3.02 03.02.01 m2 1,691.00 0.95 03.02.02 m3 422.75 4.06 03.02.03 m3 422.75 52.17 03.02.04 m2 1,691.00 4.84 03.02.05 u 8 40 4 PAVIMENTO 4.01 04.01.01 m2 1,691.00 0.95 04.01.02 m2 140.55 24.7 04.01.03 m3 338.2 404.07 04.01.04 kg 411.52 6.46 04.01.05 kg 380.7 4.86 04.01.06 kg 20.12 9.86 04.01.07 kg 1,782.38 4.27 04.01.08 u 40 45 04.01.09 m2 1,691.00 2.56 04.01.10 m 990.75 4.53 5 5.01 SARDINELES 05.01.01 m 845.5 1.17 05.01.02 m3 38.05 12.95 05.01.03 m2 306.2 25 05.01.04 m3 50.73 379.41 05.01.05 u 12 45 05.01.06 m2 126.82 0.06 Precio S/ OBRAS PROVISIONALES CARTEL DE INDENTIFICACION DE OBRA (3.60 x 4.20 M) ALQUILER DE ALMACEN DE OBRA OBRAS PRELIMINARES LIMPIEZA DE TERRENO MANUAL MOVILIZACION Y DESMOVILIZACION DE EQUIPO TRANSPORTE DE MATERIALES A OBRA DEMOLICION DE CONTRUCCIONES EXISTENTES TRAZO, NIVELES Y REPLANTEO PRELIMINAR MOVIMIENTO DE TIERRAS SUB RASANTE TRAZO, NIVELES Y REPLANTEO CORTE DE TERRENO A NIVEL DE SUB RASANTE ELIMINACION DE MATERIAL EXCEDENTE HASTA 4 KM PERFILADO RIEGO Y COMPACION DE SUB-RASANTE PRUEBA DE DENSIDAD DE CAMPO BASE DE 0.20 M. DE ESPESOR TRAZO, NIVELES Y REPLANTEO EXTRACCION Y APILAMIENTO DE MATERIAL DE CANTERA CARGUIO Y TRANSPORTE DE MATERIA DE BASE EXTENDIDO RIEGO Y COMPACTADO PRUEBA DE DENSIDAD DE CAMPO SUPERFICIE DE RODADURA TRAZO, NIVELES Y REPLANTEO ENCOFRADO Y DESENCOFRADO P/LOSA CONCRETO f 'c=210 kg/cm2 ACERO PARA JUNTA TRANSVERSAL DE 1/2" ACERO PARA JUNTA LONGITUDINAL DE 1/2" ACERO PARA JUNTA DE DILATACION DE 3/4" ACERO DE TEMPERATURA 1/4" PRUEBA DE RESISTENCIA DEL CONCRETO CURADO DE LOSAS DE CONCRETO SELLADO DE JUNTAS P/LOSA OBRAS DE ARTE Y DRENAJE SUPERFICIAL TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCION EXCAVACION MANUAL P/SARDINEL ENCOFRADO Y DESENCOFRADO P/SARDINEL CONCRETO f'c = 175 kg/cm2 P/SARDINEL PRUEBA DE RESISTENCIA DEL CONCRETO CURADO DE CONCRETO EN SARDINELES

V. Junio

Embed Size (px)

DESCRIPTION

ann

Citation preview

PRESUPUESTOItemDescripcinMetradoPrecio S/.Parcial S/.1Parcial S/.01OBRAS PROVISIONALES235021.01CARTEL DE INDENTIFICACION DE OBRA (3.60 x 4.20 M)u1.0095095039501.02ALQUILER DE ALMACEN DE OBRAmes4.00350140041,400.001.03CONSTRUCCION DE ALMACEN,VESTUARIO Y RESIDENCIAm223.00174.7615.771.04EXCAVACION MANUAL PARA INSTALACION DE SS.HH.m31.7558.751.05CONSTRUCCION DE SS.HH.m24.00132.3615.771.06INSTALACION PROVICIONAL DE AGUAm7.0054.87384.091.07INSTALACION PROVICIONAL DE DESAGUEm7.0054.87384.091.08EMPREDRADO DE PISO DE SS.HH.m23.0019.859.41.09CONCRETO Fc=175 Kg /Cm2 P/PISO DE SS.HH.m30.15381.7557.26252OBRAS PRELIMINARES049341.147552.01LIMPIEZA DE TERRENO MANUALm22,113.751.062240.57562,240.582.02MOVILIZACION Y DESMOVILIZACION DE EQUIPOglb13,500.00350073,500.002.03TRANSPORTE DE MATERIALES A OBRAglb116,198.8116198.81816,198.812.04DEMOLICION DE CONTRUCCIONES EXISTENTESm21,150.0021.6324874.5924,874.502.05TRAZO, NIVELES Y REPLANTEO PRELIMINARm22,123.751.192527.2625102,527.263MOVIMIENTO DE TIERRAS0113.01SUB RASANTE033646.14511203.01.01TRAZO, NIVELES Y REPLANTEOm21,691.000.951606.45131,606.4503.01.02CORTE DE TERRENO A NIVEL DE SUB RASANTEm3843.314.333651.5323143,651.5303.01.03ELIMINACION DE MATERIAL EXCEDENTE HASTA 4 KMm31,351.6414.7719963.72281519,963.7203.01.04PERFILADO RIEGO Y COMPACION DE SUB-RASANTEm21,691.004.848184.44168,184.4403.01.05PRUEBA DE DENSIDAD DE CAMPOu640240172403.02BASE DE 0.20 M. DE ESPESOR033882.12251803.02.01TRAZO, NIVELES Y REPLANTEOm21,691.000.951606.45191,606.4503.02.02EXTRACCION Y APILAMIENTO DE MATERIAL DE CANTERAm3422.754.061716.365201,716.3703.02.03CARGUIO Y TRANSPORTE DE MATERIA DE BASEm3422.7552.1722054.86752122,054.8703.02.04EXTENDIDO RIEGO Y COMPACTADOm21,691.004.848184.44228,184.4403.02.05PRUEBA DE DENSIDAD DE CAMPOu840320233204PAVIMENTO0244.01SUPERFICIE DE RODADURA0164669.33352504.01.01TRAZO, NIVELES Y REPLANTEOm21,691.000.951606.45261,606.4504.01.02ENCOFRADO Y DESENCOFRADO P/LOSAm2140.5524.73471.585273,471.5904.01.03CONCRETO f 'c=210 kg/cm2m3338.2404.07136656.47428136,656.4704.01.04ACERO PARA JUNTA TRANSVERSAL DE 1/2"kg411.526.462658.4192292,658.4204.01.05ACERO PARA JUNTA LONGITUDINAL DE 1/2"kg380.74.861850.202301,850.2004.01.06ACERO PARA JUNTA DE DILATACION DE 3/4"kg20.129.86198.383231198.3804.01.07ACERO DE TEMPERATURA 1/4"kg1,782.384.277610.7626327,610.7604.01.08PRUEBA DE RESISTENCIA DEL CONCRETOu40451800331,800.0004.01.09CURADO DE LOSAS DE CONCRETOm21,691.002.564328.96344,328.9604.01.10SELLADO DE JUNTAS P/LOSAm990.754.534488.0975354,488.105OBRAS DE ARTE Y DRENAJE SUPERFICIAL0365.01SARDINELES030634.05753705.01.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm845.51.17989.23538989.2405.01.02EXCAVACION MANUAL P/SARDINELm338.0512.95492.747539492.7505.01.03ENCOFRADO Y DESENCOFRADO P/SARDINELm2306.2257655407,655.0005.01.04CONCRETO f'c = 175 kg/cm2 P/SARDINELm350.73379.4119247.46934119,247.4705.01.05PRUEBA DE RESISTENCIA DEL CONCRETOu12455404254005.01.06CURADO DE CONCRETO EN SARDINELESm2126.820.067.6092437.6105.01.07SELLADO DE JUNTAS P/SARDINELm352.84.341531.152441,531.1505.01.08ACARREO MANUAL DE MATERIAL EXCEDENTE D=30 m.m338.054.49170.844545170.845.02VEREDAS020848.42954605.02.01TRAZO, NIVELES Y REPLANTEOm2295.920.95281.12447281.1205.02.02NIVELACION Y APISONADOm2295.921.73511.941648511.9405.02.03EMPEDRADO DE VEREDAS E = 0.15 Mm2295.9219.85859.216495,859.2205.02.04ENCOFRADO Y DESENCOFRADO P/VEREDASm2126.8230.313843.9142503,843.9105.02.05CONCRETO f'c = 175 kg/cm2 P/VEREDASm323.67381.759036.0225519,036.0205.02.06BRUAS EN VEREDASm194.62.19426.17452426.1705.02.07PRUEBA DE RESISTENCIA DEL CONCRETOu10454505345005.02.08CURADO DE CONCRETO EN VEREDASm2295.920.0617.75525417.7605.02.09SELLADO DE JUNTAS P/VEREDAm97.34.34422.28255422.2805.03SUMIDEROS03942.87935605.03.01TRAZO, NIVELES Y REPLANTEOm25.310.955.0445575.0405.03.02EXCAVACION MANUAL P/SUMIDEROSm33.1310.3632.42685832.4305.03.03NIVELACION Y APISONADOm25.311.739.1863599.1905.03.04ENCOFRADO Y DESENCOFRADO P/SUMIDEROm25.7869.82403.559660403.5605.03.05ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg156.426.39999.523861999.5205.03.06CONCRETO f'c = 175 kg/cm2 P/SUMIDEROSm31.42347.79493.861862493.8605.03.07REJILLA DE ACERO P/SUMIDEROm5.55360.231999.2765631,999.285.04MUROS DE CONTECION06238.056405.04.01TRAZO, NIVELES Y REPLANTEOm215.60.9514.826514.8205.04.02EXCAVACION MANUAL PARA ESTRUCTURASm312.4812.32153.753666153.7505.04.03NIVELACION Y APISONADOm215.61.7326.9886726.9905.04.04SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m215.613.25206.768206.705.04.05ENCOFRADO Y DESENCOFRADO P/MUROS CONTENCIONm238.436.791412.736691,412.7405.04.06CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM.m316.32239.713912.0672703,912.0705.04.07COLOCACION DE TUBERIA PVC SAL DE 2"m7.24.2730.7447130.7405.04.08MATERIAL DE FILTROm33.2487.63283.921272283.9205.04.09COLOCACION DE TUBERIA CRIBADA PVC SAP C-5 DE 4"m1612.27196.3273196.326RED DE AGUA016930.55746.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm422.751.17494.617575494.626.02EXCAVACION EN TIERRA ZANJA DE 0.50X0.70m422.7552113.75762,113.756.03REFINE Y NIVELACION DE ZANJASm422.750.74312.83577312.846.04CAMA DE APOYO PARA TUBERIAS MENORES DE 6'' (E=1")m422.751.47621.442578621.446.05RELLENO Y COMPACTACION MANUAL DE ZANJASm422.751.23519.982579519.986.06SUMINISTRO E INSTALACION DE TUB. PVC CLASE 10 DE 3"m422.758.743694.835803,694.846.07SUMINISTRO E INSTALACION DE ACCESORIOS PARA RED DE AGUAglb1105.92105.9281105.926.08CONEX. DOMICIL.: VALVULA ESFERICA 1/2" (TUB. MATRIZ 3")pto37239.468860.02828,860.026.09PRUEBA HIDRAULICA + DESINFECCION TUB. MENOR 4" A ZANJA TAPADAm422.750.49207.147583207.157RED DE DESAGUE055641.9991847.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm422.751.17494.617585494.627.02EXCAVACION CON MAQ. EN TIERRA COMPACTA H MAX=2.00 mm422.756.942933.885862,933.897.03REFINE Y NIVELACION DE ZANJASm422.750.74312.83587312.847.04CAMA DE APOYO PARA TUBO DE 6'' - 8''m422.751.45612.987588612.997.05ZARANDEADO PARA RELLENO Y COMPACTADO C/MAT SELECCIONADOm3317.0619.616217.5466896,217.557.06RELLENO COMP. ZANJA TERR. NORMALm422.7513.075525.3425905,525.347.07TUBERIA PVC SAP UF NPT ISO 4435 SERIE 25 DN 8"m422.7554.8723196.29259123,196.297.08DOBLE PRUEBA HIDRAULICA A ZANJA ABIERTA Y TAPADAm422.750.71300.152592300.157.09BUZON TIPO I EN TN H=2.00 DE PROF.u72,292.6216048.349316,048.347.1CONEXIONES PREDOMICILIARIAS DE ALCANTARILLADO09746.79407.10.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm401.1746.89546.807.10.02EXCAVACION CON MAQ. EN TIERRA COMPACTA H MAX=2.00 mm406.94277.696277.607.10.03REFINE Y NIVELACION DE ZANJASm400.7429.69729.607.10.04CAMA DE APOYO PARA TUBO DE 6'' - 8''m401.4558985807.10.05ZARANDEADO PARA RELLENO Y COMPACTADO C/MAT SELECCIONADOm33019.61588.399588.307.10.06RELLENO COMP. ZANJA TERR. NORMALm4013.07522.8100522.807.10.07CONEXION DOMICILIARIA DE DESAGUE EN MATRIZ DE PVC UF 8"u20411.188223.61018,223.608OTROS041501028.01SEALIZACION DE PISTAS Y VEREDASglb13,500.0035001033,500.008.02PLACA RECORDATORIA DE LA OBRAu16506501046509MITIGACION DE IMPACTOS01521.91059.01LIMPIEZA GENERAL DE LA OBRAm22,113.750.721521.91061,521.90COSTO DIRECTO433,543.33107433,543.33434468.45433543.31415030.58

METRAMETRADOS JUNIO 2015

Proyecto:MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA CALLE PROLONGACION ALFONSO UGARTE DEL DISTRITO DE PARURO, PROVINCIA DE PARURO, DEPARTAMENTO DEL CUSCO.Presupuesto : S/. 519,092.53519092.53Departamento : CUSCOFecha Presentacin : 05/06/2015Inicio de Obra : 27/04/2015Monday, April 27, 2015Provincia : PARUROPlazo ejecucin : 04 MesesResidente : Ing. Albers Antony Vilca BecerraING. Albers Antony Vilca BecerraLocalidad : PARURO

ITEMDESCRIPCIONUNDPRESUPUESTOJUNIOMETRADP.U. S/.TOTALLMMIJVSDLMMIJVSDLMMIJVSDLMMIJVSDLMDTOTALANTER.ACUMUL.SALDO1234567891011121314151617181920212223242526272829303101OBRAS PROVISIONALES23501.01CARTEL DE INDENTIFICACION DE OBRA (3.60 x 4.20 M)u1.00950.00950.001.001.000.001.000.001.02ALQUILER DE ALMACEN DE OBRAmes4.00350.001,400.001.001.132.131.872OBRAS PRELIMINARES493410.000.000.002.01LIMPIEZA DE TERRENO MANUALm22,113.751.062,240.5813.5013.50945.00958.501,155.252.02MOVILIZACION Y DESMOVILIZACION DE EQUIPOglb1.003,500.003,500.000.000.000.001.002.03TRANSPORTE DE MATERIALES A OBRAglb1.0016,198.8116,198.810.000.000.001.002.04DEMOLICION DE CONTRUCCIONES EXISTENTESm21,150.0021.6324,874.5096.0026.0013.8030.0040.0020.0020.0020.0010.0015.008.0010.00308.80898.271,207.07-57.072.05TRAZO, NIVELES Y REPLANTEO PRELIMINARm22,123.751.192,527.26200.00200.001440.001,640.00483.753MOVIMIENTO DE TIERRAS67528.26760.000.000.003.01SUB RASANTE336460.000.000.0003.01.01TRAZO, NIVELES Y REPLANTEOm21,691.000.951,606.450.000.000.001,691.0003.01.02CORTE DE TERRENO A NIVEL DE SUB RASANTEm3843.314.333,651.530.000.000.00843.3103.01.03ELIMINACION DE MATERIAL EXCEDENTE HASTA 4 KMm31,351.6414.7719,963.7250.4097.50147.90186.75334.651,016.9903.01.04PERFILADO RIEGO Y COMPACION DE SUB-RASANTEm21,691.004.848,184.440.000.000.001,691.0003.01.05PRUEBA DE DENSIDAD DE CAMPOu6.0040.00240.000.000.000.006.003.02BASE DE 0.20 M. DE ESPESOR338820.000.000.0003.02.01TRAZO, NIVELES Y REPLANTEOm21,691.000.951,606.450.000.000.001,691.0003.02.02EXTRACCION Y APILAMIENTO DE MATERIAL DE CANTERAm3422.754.061,716.360.000.000.00422.7503.02.03CARGUIO Y TRANSPORTE DE MATERIA DE BASEm3422.7552.1722,054.870.000.000.00422.7503.02.04EXTENDIDO RIEGO Y COMPACTADOm21,691.004.848,184.440.000.000.001,691.0003.02.05PRUEBA DE DENSIDAD DE CAMPOu8.0040.00320.00
User: User:5.75*990.000.000.008.004PAVIMENTO1646690.000.000.004.01SUPERFICIE DE RODADURA1646690.000.000.0004.01.01TRAZO, NIVELES Y REPLANTEOm21,691.000.951,606.450.000.000.001,691.0004.01.02ENCOFRADO Y DESENCOFRADO P/LOSAm2140.5524.703,471.590.000.000.00140.5504.01.03CONCRETO f 'c=210 kg/cm2m3338.20404.07136,656.470.000.000.00338.2004.01.04ACERO PARA JUNTA TRANSVERSAL DE 1/2"kg411.526.462,658.420.000.000.00411.5204.01.05ACERO PARA JUNTA LONGITUDINAL DE 1/2"kg380.704.861,850.200.000.000.00380.7004.01.06ACERO PARA JUNTA DE DILATACION DE 3/4"kg20.129.86198.380.000.000.0020.1204.01.07ACERO DE TEMPERATURA 1/4"kg1,782.384.277,610.760.000.000.001,782.3804.01.08PRUEBA DE RESISTENCIA DEL CONCRETOu40.0045.001,800.000.000.000.0040.0004.01.09CURADO DE LOSAS DE CONCRETOm21,691.002.564,328.960.000.000.001,691.0004.01.10SELLADO DE JUNTAS P/LOSAm990.754.534,488.100.000.000.00990.755OBRAS DE ARTE Y DRENAJE SUPERFICIAL616630.000.000.005.01SARDINELES306340.000.000.0005.01.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm845.501.17989.230.000.000.00845.5005.01.02EXCAVACION MANUAL P/SARDINELm338.0512.95492.750.000.000.0038.0505.01.03ENCOFRADO Y DESENCOFRADO P/SARDINELm2306.2025.007,655.000.000.000.00306.2005.01.04CONCRETO f'c = 175 kg/cm2 P/SARDINELm350.73379.4119,247.470.000.000.0050.7305.01.05PRUEBA DE RESISTENCIA DEL CONCRETOu12.0045.00540.000.000.000.0012.0005.01.06CURADO DE CONCRETO EN SARDINELESm2126.820.067.610.000.000.00126.8205.01.07SELLADO DE JUNTAS P/SARDINELm352.804.341,531.150.000.000.00352.8005.01.08ACARREO MANUAL DE MATERIAL EXCEDENTE D=30 m.m338.054.49170.840.000.000.0038.055.02VEREDAS208480.000.000.0005.02.01TRAZO, NIVELES Y REPLANTEOm2295.920.95281.120.000.000.00295.9205.02.02NIVELACION Y APISONADOm2295.921.73511.9430.0030.000.0030.00265.9205.02.03EMPEDRADO DE VEREDAS E = 0.15 Mm2295.9219.805,859.220.000.000.00295.9205.02.04ENCOFRADO Y DESENCOFRADO P/VEREDASm2126.8230.313,843.910.000.000.00126.8205.02.05CONCRETO f'c = 175 kg/cm2 P/VEREDASm323.67381.759,036.020.000.000.0023.6705.02.06BRUAS EN VEREDASm194.602.19426.170.000.000.00194.6005.02.07PRUEBA DE RESISTENCIA DEL CONCRETOu10.0045.00450.000.000.000.0010.0005.02.08CURADO DE CONCRETO EN VEREDASm2295.920.0617.760.000.000.00295.9205.02.09SELLADO DE JUNTAS P/VEREDAm97.304.34422.280.000.000.0097.3005.03SUMIDEROS39430.000.000.0005.03.01TRAZO, NIVELES Y REPLANTEOm25.310.955.040.000.000.005.3105.03.02EXCAVACION MANUAL P/SUMIDEROSm33.1310.3632.430.000.000.003.1305.03.03NIVELACION Y APISONADOm25.311.739.190.000.000.005.3105.03.04ENCOFRADO Y DESENCOFRADO P/SUMIDEROm25.7869.82403.560.000.000.005.78-15.128.55-8.586.755.8505.03.05ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg156.426.39999.520.000.000.00156.4205.03.06CONCRETO f'c = 175 kg/cm2 P/SUMIDEROSm31.42347.79493.860.000.000.001.4205.03.07REJILLA DE ACERO P/SUMIDEROm5.55360.231,999.280.000.000.005.555.04MUROS DE CONTECION62380.000.000.0005.04.01TRAZO, NIVELES Y REPLANTEOm215.600.9514.820.000.000.0015.6005.04.02EXCAVACION MANUAL PARA ESTRUCTURASm312.4812.32153.750.000.000.0012.4805.04.03NIVELACION Y APISONADOm215.601.7326.990.000.000.0015.6005.04.04SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m215.6013.25206.700.000.000.0015.6005.04.05ENCOFRADO Y DESENCOFRADO P/MUROS CONTENCIONm238.4036.791,412.740.000.000.0038.4005.04.06CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM.m316.32239.713,912.070.000.000.0016.3205.04.07COLOCACION DE TUBERIA PVC SAL DE 2"m7.204.2730.740.000.000.007.2005.04.08MATERIAL DE FILTROm33.2487.63283.920.000.000.003.2405.04.09COLOCACION DE TUBERIA CRIBADA PVC SAP C-5 DE 4"m16.0012.27196.320.000.000.0016.006RED DE AGUA169310.000.000.006.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm422.751.17494.62150.00150.000.00150.00272.756.02EXCAVACION EN TIERRA ZANJA DE 0.50X0.70m422.755.002,113.7520.0030.0036.0012.0027.005.005.00135.001.00136.00286.756.03REFINE Y NIVELACION DE ZANJASm422.750.74312.8410.0020.0030.000.0030.00392.756.04CAMA DE APOYO PARA TUBERIAS MENORES DE 6'' (E=1")m422.751.47621.4420.0020.000.0020.00402.756.05RELLENO Y COMPACTACION MANUAL DE ZANJASm422.751.23519.980.000.000.00422.756.06SUMINISTRO E INSTALACION DE TUB. PVC CLASE 10 DE 3"m422.758.743,694.840.000.000.00422.756.07SUMINISTRO E INSTALACION DE ACCESORIOS PARA RED DE AGUAglb1.00105.92105.920.000.000.001.006.08CONEX. DOMICIL.: VALVULA ESFERICA 1/2" (TUB. MATRIZ 3")pto37.00239.468,860.020.000.000.0037.006.09PRUEBA HIDRAULICA + DESINFECCION TUB. MENOR 4" A ZANJA TAPADAm422.750.49207.150.000.000.00422.757RED DE DESAGUE556420.000.000.007.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm422.751.17494.6280.0080.000.0080.00342.757.02EXCAVACION CON MAQ. EN TIERRA COMPACTA H MAX=2.00 mm422.756.942,933.890.000.000.00422.757.03REFINE Y NIVELACION DE ZANJASm422.750.74312.840.000.000.00422.757.04CAMA DE APOYO PARA TUBO DE 6'' - 8''m422.751.45612.990.000.000.00422.757.05ZARANDEADO PARA RELLENO Y COMPACTADO C/MAT SELECCIONADOm3317.0619.616,217.550.000.000.00317.067.06RELLENO COMP. ZANJA TERR. NORMALm422.7513.075,525.340.000.000.00422.757.07TUBERIA PVC SAP UF NPT ISO 4435 SERIE 25 DN 8"m422.7554.8723,196.290.000.000.00422.757.08DOBLE PRUEBA HIDRAULICA A ZANJA ABIERTA Y TAPADAm422.750.71300.150.000.000.00422.757.09BUZON TIPO I EN TN H=2.00 DE PROF.u7.002,292.6216,048.340.750.251.000.001.006.007.1CONEXIONES PREDOMICILIARIAS DE ALCANTARILLADO97470.000.000.0007.10.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm40.001.1746.800.000.000.0040.0007.10.02EXCAVACION CON MAQ. EN TIERRA COMPACTA H MAX=2.00 mm40.006.94277.600.000.000.0040.0007.10.03REFINE Y NIVELACION DE ZANJASm40.000.7429.600.000.000.0040.0007.10.04CAMA DE APOYO PARA TUBO DE 6'' - 8''m40.001.4558.000.000.000.0040.0007.10.05ZARANDEADO PARA RELLENO Y COMPACTADO C/MAT SELECCIONADOm330.0019.61588.300.000.000.0030.0007.10.06RELLENO COMP. ZANJA TERR. NORMALm40.0013.07522.800.000.000.0040.0007.10.07CONEXION DOMICILIARIA DE DESAGUE EN MATRIZ DE PVC UF 8"u20.00411.188,223.600.000.000.0020.008OTROS41500.000.000.008.01SEALIZACION DE PISTAS Y VEREDASglb1.003,500.003,500.000.000.000.001.008.02PLACA RECORDATORIA DE LA OBRAu1.00650.00650.000.000.000.001.009MITIGACION DE IMPACTOS15220.000.000.009.01LIMPIEZA GENERAL DE LA OBRAm22,113.750.721,521.900.000.000.002,113.75

433543.31

.......................................................RESIDENTE DE OBRAFirma y Sello.......................................................SUPERVISOR DE OBRAFirma y SelloMUNICIPALIDAD PROVINCIAL PARURO

MAYMETRMAYORES METRADOS JUNIO 2014

Proyecto: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA CALLE PROLONGACION ALFONSO UGARTE DEL DISTRITO DE PARURO .Presupuesto :519092.53Departamento : CUSCOFecha Presentacin : 09/06/2015Inicio de Obra :Monday, April 27, 2015Provincia : PARUROPlazo ejecucin : 04 MesesResidente : ING ALBERS ANTONY VILCA BECERRALocalidad :PARURO

ITEMDESCRIPCIONUNDPRESUPUESTOJUNIOMETRADP.U. S/.TOTALLMMIJVSDLMMIJVSDLMMIJVSDLMMIJVSDLMMITOTAL12345678910111213141516171819202122232425262728293031

4350.001400.00------------------------------000.000.00------------------------------02,113.751.062240.58------------------------------013,500.003500.00------------------------------0116,198.8116198.81------------------------------0

2,123.751.192527.26------------------------------0

00.000.00------------------------------01,691.000.951606.45------------------------------0843.314.333651.53------------------------------01,351.6414.7719963.72------------------------------01,691.004.848184.44------------------------------0640.00240.00------------------------------000.000.00------------------------------01,691.000.951606.45------------------------------0422.754.061716.36------------------------------0422.7552.1722054.87------------------------------01,691.004.848184.44------------------------------0840.00320.00------------------------------000.000.00------------------------------000.000.00------------------------------01,691.000.951606.45------------------------------0140.5524.703471.59------------------------------0

380.74.861850.20------------------------------020.129.86198.38------------------------------01,782.384.277610.76------------------------------04045.001800.00------------------------------01,691.002.564328.96------------------------------0990.754.534488.10------------------------------000.000.00------------------------------000.000.00------------------------------0845.51.17989.23------------------------------038.0512.95492.75------------------------------0306.225.007655.00------------------------------050.73379.4119247.47------------------------------01245.00540.00------------------------------0126.820.067.61------------------------------0352.84.341531.15------------------------------0

00.000.00------------------------------0295.920.95281.12------------------------------0295.921.73511.94------------------------------0295.9219.805859.22------------------------------0126.8230.313843.91------------------------------023.67381.759036.02------------------------------0194.62.19426.17------------------------------01045.00450.00------------------------------0

824.884.343579.98-------------------------------0.00104.640.000.00-------------------------------0.00--0.00-0.00--0.00--0.00--0.0005.03.06CONCRETO f'c = 175 kg/cm2 P/SUMIDEROSm31.42347.79493.86-------------------------------0.0005.03.07REJILLA DE ACERO P/SUMIDEROm5.55360.231999.28-------------------------------0.005.04MUROS DE CONTECION000.000.00-------------------------------0.0005.04.01TRAZO, NIVELES Y REPLANTEOm215.60.9514.82-------------------------------0.0005.04.02EXCAVACION MANUAL PARA ESTRUCTURASm312.4812.32153.75-------------------------------0.0005.04.03NIVELACION Y APISONADOm215.61.7326.99-------------------------------0.0005.04.04SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m215.613.25206.70-------------------------------0.0005.04.05ENCOFRADO Y DESENCOFRADO P/MUROS CONTENCIONm238.436.791412.74-------------------------------0.0005.04.06CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM.m316.32239.713912.07-------------------------------0.0005.04.07COLOCACION DE TUBERIA PVC SAL DE 2"05.04.08MATERIAL DE FILTROm33.2487.63283.92-------------------------------0.0005.04.09COLOCACION DE TUBERIA CRIBADA PVC SAP C-5 DE 4"m1612.27196.32-------------------------------0.006RED DE AGUA000.000.00-------------------------------0.006.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm422.751.17494.62-------------------------------0.006.02EXCAVACION EN TIERRA ZANJA DE 0.50X0.70m422.755.002113.75-------------------------------0.006.03REFINE Y NIVELACION DE ZANJASm422.750.74312.84-------------------------------0.006.04CAMA DE APOYO PARA TUBERIAS MENORES DE 6'' (E=1")m422.751.47621.44-------------------------------0.006.05RELLENO Y COMPACTACION MANUAL DE ZANJASm422.751.23519.98-------------------------------0.006.06SUMINISTRO E INSTALACION DE TUB. PVC CLASE 10 DE 3"m422.758.743694.84-------------------------------0.006.07SUMINISTRO E INSTALACION DE ACCESORIOS PARA RED DE AGUAglb1105.92105.92-------------------------------0.006.08CONEX. DOMICIL.: VALVULA ESFERICA 1/2" (TUB. MATRIZ 3")pto37239.468860.02-------------------------------0.006.09PRUEBA HIDRAULICA + DESINFECCION TUB. MENOR 4" A ZANJA TAPADAm422.750.49207.15-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.007RED DE DESAGUE7.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCION7.02EXCAVACION CON MAQ. EN TIERRA COMPACTA H MAX=2.00 mm422.756.942933.89-------------------------------0.007.03REFINE Y NIVELACION DE ZANJASm422.750.74312.84-------------------------------0.007.04CAMA DE APOYO PARA TUBO DE 6'' - 8''m422.751.45612.99-------------------------------0.007.05ZARANDEADO PARA RELLENO Y COMPACTADO C/MAT SELECCIONADO7.06RELLENO COMP. ZANJA TERR. NORMALm422.7513.075525.34-------------------------------0.007.07TUBERIA PVC SAP UF NPT ISO 4435 SERIE 25 DN 8"m422.7554.8723196.29-------------------------------0.007.08DOBLE PRUEBA HIDRAULICA A ZANJA ABIERTA Y TAPADAm422.750.71300.15-------------------------------0.007.09BUZON TIPO I EN TN H=2.00 DE PROF.7.1CONEXIONES PREDOMICILIARIAS DE ALCANTARILLADO000.000.00-------------------------------0.0007.10.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm401.1746.80-------------------------------0.0007.10.02EXCAVACION CON MAQ. EN TIERRA COMPACTA H MAX=2.00 mm406.94277.60-------------------------------0.0007.10.03REFINE Y NIVELACION DE ZANJASm400.7429.60-------------------------------0.0007.10.04CAMA DE APOYO PARA TUBO DE 6'' - 8''07.10.05ZARANDEADO PARA RELLENO Y COMPACTADO C/MAT SELECCIONADOm33019.61588.30-------------------------------0.0007.10.06RELLENO COMP. ZANJA TERR. NORMALm4013.07522.80-------------------------------0.0007.10.07CONEXION DOMICILIARIA DE DESAGUE EN MATRIZ DE PVC UF 8"u20411.188223.60-------------------------------0.008OTROS000.000.00-------------------------------0.008.01SEALIZACION DE PISTAS Y VEREDASglb13,500.003500.00-------------------------------0.008.02PLACA RECORDATORIA DE LA OBRAu1650.00650.00-------------------------------0.009MITIGACION DE IMPACTOS9.01LIMPIEZA GENERAL DE LA OBRAm22,113.750.721521.90-------------------------------0.000COSTO DIRECTOERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.000ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!-------------------------------0.00

.......................................................RESIDENTE DE OBRAFirma y Sello.......................................................SUPERVISOR DE OBRAFirma y SelloMUNICIPALIDAD PROVINCIAL PARURO

VALOR.JUNIO MUNICIPALIDAD PROVINCIAL DE PARUROVALORIZACION FISICA DE OBRA MAYO 2015

Proyecto: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA CALLE PROLONGACION ALFONSO UGARTE DEL DISTRITO DE PARURO .Presupuesto :519092.53Departamento : CUSCOFecha Presentacin : 05/06/2015Inicio de Obra :Monday, April 27, 2015Provincia : PARUROPlazo ejecucin : 04 MesesResidente :ING ALBERS ANTONY VILCA BECERRALocalidad :PARURO

ITEMDESCRIPCIONUNDPRESUPUESTOVALORIZACIONMETRADP.U. S/.TOTALAVANCE ANTERIORAVANCE ACTUALAVANCE ACUMULADOSALDO ACTUALMetradoMonto (S/.)%MetradoMonto (S/.)%MetradoMonto (S/.)%MetradoMonto (S/.)%01OBRAS PROVISIONALES1.01CARTEL DE INDENTIFICACION DE OBRA (3.60 x 4.20 M)u1.00950.00950.000.000.000.00%1.00950.00100.00%1.00950.00100.00%0.000.000.00%0.000.001.02ALQUILER DE ALMACEN DE OBRAmes4.00350.001400.001.13395.5028.25%1.00350.0025.00%2.13745.5053.25%1.87654.5046.75%396.671.132OBRAS PRELIMINARES2.01LIMPIEZA DE TERRENO MANUALm22,113.751.062240.58945.001001.7044.71%13.5014.310.64%958.501,016.0145.35%1155.251,224.5754.65%1,001.70945.002.02MOVILIZACION Y DESMOVILIZACION DE EQUIPOglb1.003,500.003500.000.000.000.00%0.000.000.00%0.000.000.00%1.003,500.00100.00%0.000.002.03TRANSPORTE DE MATERIALES A OBRAglb1.0016,198.8116198.810.000.000.00%0.000.000.00%0.000.000.00%1.0016,198.81100.00%0.000.002.04DEMOLICION DE CONTRUCCIONES EXISTENTESm21,150.0021.6324874.50898.2719429.5878.11%308.806679.3426.85%1207.0726,108.92104.96%-57.07-1,234.42-4.96%19,429.58898.272.05TRAZO, NIVELES Y REPLANTEO PRELIMINARm22,123.751.192527.261440.001713.6067.80%200.00238.009.42%1640.001,951.6077.22%483.75575.6622.78%1,713.601440.003MOVIMIENTO DE TIERRAS3.01SUB RASANTE03.01.01TRAZO, NIVELES Y REPLANTEOm21,691.000.951606.450.000.000.00%0.000.000.00%0.000.000.00%1691.001,606.45100.00%0.000.0003.01.02CORTE DE TERRENO A NIVEL DE SUB RASANTEm3843.314.333651.530.000.000.00%0.000.000.00%0.000.000.00%843.313,651.53100.00%0.000.0003.01.03ELIMINACION DE MATERIAL EXCEDENTE HASTA 4 KMm31,351.6414.7719963.72186.752758.3013.82%147.902184.4810.94%334.654,942.7824.76%1016.9915,020.9475.24%2,758.30186.7503.01.04PERFILADO RIEGO Y COMPACION DE SUB-RASANTEm21,691.004.848184.440.000.000.00%0.000.000.00%0.000.000.00%1691.008,184.44100.00%0.000.0003.01.05PRUEBA DE DENSIDAD DE CAMPOu6.0040.00240.000.000.000.00%0.000.000.00%0.000.000.00%6.00240.00100.00%0.000.003.02BASE DE 0.20 M. DE ESPESOR03.02.01TRAZO, NIVELES Y REPLANTEOm21,691.000.951606.450.000.000.00%0.000.000.00%0.000.000.00%1691.001,606.45100.00%0.000.0003.02.02EXTRACCION Y APILAMIENTO DE MATERIAL DE CANTERAm3422.754.061716.360.000.000.00%0.000.000.00%0.000.000.00%422.751,716.36100.00%0.000.0003.02.03CARGUIO Y TRANSPORTE DE MATERIA DE BASEm3422.7552.1722054.870.000.000.00%0.000.000.00%0.000.000.00%422.7522,054.87100.00%0.000.0003.02.04EXTENDIDO RIEGO Y COMPACTADOm21,691.004.848184.440.000.000.00%0.000.000.00%0.000.000.00%1691.008,184.44100.00%0.000.0003.02.05PRUEBA DE DENSIDAD DE CAMPOu8.0040.00320.000.000.000.00%0.000.000.00%0.000.000.00%8.00320.00100.00%0.000.004PAVIMENTO4.01SUPERFICIE DE RODADURA04.01.01TRAZO, NIVELES Y REPLANTEOm21,691.000.951606.450.000.000.00%0.000.000.00%0.000.000.00%1691.001,606.45100.00%0.000.0004.01.02ENCOFRADO Y DESENCOFRADO P/LOSAm2140.5524.703471.590.000.000.00%0.000.000.00%0.000.000.00%140.553,471.59100.00%0.000.0004.01.03CONCRETO f 'c=210 kg/cm2m3338.20404.07136656.470.000.000.00%0.000.000.00%0.000.000.00%338.20136,656.47100.00%0.000.0004.01.04ACERO PARA JUNTA TRANSVERSAL DE 1/2"Kg411.526.462658.420.000.000.00%0.000.000.00%0.000.000.00%411.522,658.42100.00%0.000.0004.01.05ACERO PARA JUNTA LONGITUDINAL DE 1/2"kg380.704.861850.200.000.000.00%0.000.000.00%0.000.000.00%380.701,850.20100.00%0.000.0004.01.06ACERO PARA JUNTA DE DILATACION DE 3/4"kg20.129.86198.380.000.000.00%0.000.000.00%0.000.000.00%20.12198.38100.00%0.000.0004.01.07ACERO DE TEMPERATURA 1/4"kg1,782.384.277610.760.000.000.00%0.000.000.00%0.000.000.00%1782.387,610.76100.00%0.000.0004.01.08PRUEBA DE RESISTENCIA DEL CONCRETOu40.0045.001800.000.000.000.00%0.000.000.00%0.000.000.00%40.001,800.00100.00%0.000.0004.01.09CURADO DE LOSAS DE CONCRETOm21,691.002.564328.960.000.000.00%0.000.000.00%0.000.000.00%1691.004,328.96100.00%0.000.0004.01.10SELLADO DE JUNTAS P/LOSAm990.754.534488.100.000.000.00%0.000.000.00%0.000.000.00%990.754,488.10100.00%0.000.005OBRAS DE ARTE Y DRENAJE SUPERFICIAL5.01SARDINELES05.01.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm845.501.17989.230.000.000.00%0.000.000.00%0.000.000.00%845.50989.23100.00%0.000.0005.01.02EXCAVACION MANUAL P/SARDINELm338.0512.95492.750.000.000.00%0.000.000.00%0.000.000.00%38.05492.75100.00%0.000.0005.01.03ENCOFRADO Y DESENCOFRADO P/SARDINELm2306.2025.007655.000.000.000.00%0.000.000.00%0.000.000.00%306.207,655.00100.00%0.000.0005.01.04CONCRETO f'c = 175 kg/cm2 P/SARDINELm350.73379.4119247.470.000.000.00%0.000.000.00%0.000.000.00%50.7319,247.47100.00%0.000.0005.01.05PRUEBA DE RESISTENCIA DEL CONCRETOu12.0045.00540.000.000.000.00%0.000.000.00%0.000.000.00%12.00540.00100.00%0.000.0005.01.06CURADO DE CONCRETO EN SARDINELESm2126.820.067.610.000.000.00%0.000.000.00%0.000.000.00%126.827.61100.00%0.000.0005.01.07SELLADO DE JUNTAS P/SARDINELm352.804.341531.150.000.000.00%0.000.000.00%0.000.000.00%352.801,531.15100.00%0.000.0005.01.08ACARREO MANUAL DE MATERIAL EXCEDENTE D=30 m.38.054.49170.840.000.000.00%0.000.000.00%0.000.000.00%38.05170.84100.00%0.000.005.02VEREDAS05.02.01TRAZO, NIVELES Y REPLANTEOm2295.920.95281.120.000.000.00%0.000.000.00%0.000.000.00%295.92281.12100.00%0.000.0005.02.02NIVELACION Y APISONADOm2295.921.73511.940.000.000.00%30.0051.9010.14%30.0051.9010.14%265.92460.0489.86%0.000.0005.02.03EMPEDRADO DE VEREDAS E = 0.15 Mm2295.9219.805859.220.000.000.00%0.000.000.00%0.000.000.00%295.925,859.22100.00%0.000.0005.02.04ENCOFRADO Y DESENCOFRADO P/VEREDASm2126.8230.313843.910.000.000.00%0.000.000.00%0.000.000.00%126.823,843.91100.00%0.000.0005.02.05CONCRETO f'c = 175 kg/cm2 P/VEREDASm323.67381.759036.020.000.000.00%0.000.000.00%0.000.000.00%23.679,036.02100.00%0.000.0005.02.06BRUAS EN VEREDASm194.602.19426.170.000.000.00%0.000.000.00%0.000.000.00%194.60426.17100.00%0.000.0005.02.07PRUEBA DE RESISTENCIA DEL CONCRETOu10.0045.00450.000.000.000.00%0.000.000.00%0.000.000.00%10.00450.00100.00%0.000.0005.02.08CURADO DE CONCRETO EN VEREDAS295.920.0617.760.000.000.00%0.000.000.00%0.000.000.00%295.9217.76100.00%0.000.0005.02.09SELLADO DE JUNTAS P/VEREDAm97.304.34422.280.000.000.00%0.000.000.00%0.000.000.00%97.30422.28100.00%0.000.0005.03SUMIDEROS05.03.01TRAZO, NIVELES Y REPLANTEOm25.310.955.040.000.000.00%0.000.000.00%0.000.000.00%5.315.04100.00%0.000.0005.03.02EXCAVACION MANUAL P/SUMIDEROSm33.1310.3632.430.000.000.00%0.000.000.00%0.000.000.00%3.1332.43100.00%0.000.0005.03.03NIVELACION Y APISONADOm25.311.739.190.000.000.00%0.000.000.00%0.000.000.00%5.319.19100.00%0.000.0005.03.04ENCOFRADO Y DESENCOFRADO P/SUMIDEROm25.7869.82403.560.000.000.00%0.000.000.00%0.000.000.00%5.78403.56100.00%0.000.0005.03.05ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg156.426.39999.520.000.000.00%0.000.000.00%0.000.000.00%156.42999.52100.00%0.000.0005.03.06CONCRETO f'c = 175 kg/cm2 P/SUMIDEROSm31.42347.79493.860.000.000.00%0.000.000.00%0.000.000.00%1.42493.86100.00%0.000.0005.03.07REJILLA DE ACERO P/SUMIDEROm5.55360.231999.280.000.000.00%0.000.000.00%0.000.000.00%5.551,999.28100.00%0.000.005.04MUROS DE CONTECION05.04.01TRAZO, NIVELES Y REPLANTEOm215.600.9514.820.000.000.00%0.000.000.00%0.000.000.00%15.6014.82100.00%0.000.0005.04.02EXCAVACION MANUAL PARA ESTRUCTURASm312.4812.32153.750.000.000.00%0.000.000.00%0.000.000.00%12.48153.75100.00%0.000.0005.04.03NIVELACION Y APISONADOm215.601.7326.990.000.000.00%0.000.000.00%0.000.000.00%15.6026.99100.00%0.000.0005.04.04SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m215.6013.25206.700.000.000.00%0.000.000.00%0.000.000.00%15.60206.70100.00%0.000.0005.04.05ENCOFRADO Y DESENCOFRADO P/MUROS CONTENCIONm238.4036.791412.740.000.000.00%0.000.000.00%0.000.000.00%38.401,412.74100.00%0.000.0005.04.06CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM.m316.32239.713912.070.000.000.00%0.000.000.00%0.000.000.00%16.323,912.07100.00%0.000.0005.04.07COLOCACION DE TUBERIA PVC SAL DE 2"7.204.2730.740.000.000.00%0.000.000.00%0.000.000.00%7.2030.74100.00%0.000.0005.04.08MATERIAL DE FILTROm33.2487.63283.920.000.000.00%0.000.000.00%0.000.000.00%3.24283.92100.00%0.000.0005.04.09COLOCACION DE TUBERIA CRIBADA PVC SAP C-5 DE 4"m16.0012.27196.320.000.000.00%0.000.000.00%0.000.000.00%16.00196.32100.00%0.000.006RED DE AGUA6.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm422.751.17494.620.000.000.00%150.00175.5035.48%150.00175.5035.48%272.75319.1264.52%0.000.006.02EXCAVACION EN TIERRA ZANJA DE 0.50X0.70m422.755.002113.751.005.000.24%135.00675.0031.93%136.00680.0032.17%286.751,433.7567.83%5.001.006.03REFINE Y NIVELACION DE ZANJASm422.750.74312.840.000.000.00%30.0022.207.10%30.0022.207.10%392.75290.6492.90%0.000.006.04CAMA DE APOYO PARA TUBERIAS MENORES DE 6'' (E=1")m422.751.47621.440.000.000.00%20.0029.404.73%20.0029.404.73%402.75592.0495.27%0.000.006.05RELLENO Y COMPACTACION MANUAL DE ZANJASm422.751.23519.980.000.000.00%0.000.000.00%0.000.000.00%422.75519.98100.00%0.000.006.06SUMINISTRO E INSTALACION DE TUB. PVC CLASE 10 DE 3"m422.758.743694.840.000.000.00%0.000.000.00%0.000.000.00%422.753,694.84100.00%0.000.006.07SUMINISTRO E INSTALACION DE ACCESORIOS PARA RED DE AGUAglb1.00105.92105.920.000.000.00%0.000.000.00%0.000.000.00%1.00105.92100.00%0.000.006.08CONEX. DOMICIL.: VALVULA ESFERICA 1/2" (TUB. MATRIZ 3")pto37.00239.468860.020.000.000.00%0.000.000.00%0.000.000.00%37.008,860.02100.00%0.000.006.09PRUEBA HIDRAULICA + DESINFECCION TUB. MENOR 4" A ZANJA TAPADAm422.750.49207.150.000.000.00%0.000.000.00%0.000.000.00%422.75207.15100.00%0.000.007RED DE DESAGUE7.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCION422.751.17494.620.000.000.00%80.0093.6018.92%80.0093.6018.92%342.75401.0281.08%0.000.007.02EXCAVACION CON MAQ. EN TIERRA COMPACTA H MAX=2.00 mm422.756.942933.890.000.000.00%0.000.000.00%0.000.000.00%422.752,933.89100.00%0.000.007.03REFINE Y NIVELACION DE ZANJASm422.750.74312.840.000.000.00%0.000.000.00%0.000.000.00%422.75312.84100.00%0.000.007.04CAMA DE APOYO PARA TUBO DE 6'' - 8''m422.751.45612.990.000.000.00%0.000.000.00%0.000.000.00%422.75612.99100.00%0.000.007.05ZARANDEADO PARA RELLENO Y COMPACTADO C/MAT SELECCIONADO317.0619.616217.550.000.000.00%0.000.000.00%0.000.000.00%317.066,217.55100.00%0.000.007.06RELLENO COMP. ZANJA TERR. NORMALm422.7513.075525.340.000.000.00%0.000.000.00%0.000.000.00%422.755,525.34100.00%0.000.007.07TUBERIA PVC SAP UF NPT ISO 4435 SERIE 25 DN 8"m422.7554.8723196.290.000.000.00%0.000.000.00%0.000.000.00%422.7523,196.29100.00%0.000.007.08DOBLE PRUEBA HIDRAULICA A ZANJA ABIERTA Y TAPADAm422.750.71300.150.000.000.00%0.000.000.00%0.000.000.00%422.75300.15100.00%0.000.007.09BUZON TIPO I EN TN H=2.00 DE PROF.7.002,292.6216048.340.000.000.00%1.002292.6214.29%1.002,292.6214.29%6.0013,755.7285.71%0.000.007.1CONEXIONES PREDOMICILIARIAS DE ALCANTARILLADO07.10.01TRAZO, NIVELES Y REPLANTEO DURANTE LA CONSTRUCCIONm40.001.1746.800.000.000.00%0.000.000.00%0.000.000.00%40.0046.80100.00%0.000.0007.10.02EXCAVACION CON MAQ. EN TIERRA COMPACTA H MAX=2.00 mm40.006.94277.600.000.000.00%0.000.000.00%0.000.000.00%40.00277.60100.00%0.000.0007.10.03REFINE Y NIVELACION DE ZANJASm40.000.7429.600.000.000.00%0.000.000.00%0.000.000.00%40.0029.60100.00%0.000.0007.10.04CAMA DE APOYO PARA TUBO DE 6'' - 8''m40.001.4558.000.000.000.00%0.000.000.00%0.000.000.00%40.0058.00100.00%0.000.0007.10.05ZARANDEADO PARA RELLENO Y COMPACTADO C/MAT SELECCIONADOm330.0019.61588.300.000.000.00%0.000.000.00%0.000.000.00%30.00588.30100.00%0.000.0007.10.06RELLENO COMP. ZANJA TERR. NORMALm40.0013.07522.800.000.000.00%0.000.000.00%0.000.000.00%40.00522.80100.00%0.000.0007.10.07CONEXION DOMICILIARIA DE DESAGUE EN MATRIZ DE PVC UF 8"u20.00411.188223.600.000.000.00%0.000.000.00%0.000.000.00%20.008,223.60100.00%0.000.008OTROS8.01SEALIZACION DE PISTAS Y VEREDASglb1.003,500.003500.000.000.000.00%0.000.000.00%0.000.000.00%1.003,500.00100.00%0.000.008.02PLACA RECORDATORIA DE LA OBRAu1.00650.00650.000.000.000.00%0.000.000.00%0.000.000.00%1.00650.00100.00%0.000.00|9MITIGACION DE IMPACTOS9.01LIMPIEZA GENERAL DE LA OBRAm22,113.750.721521.900.000.000.00%0.000.000.00%0.000.000.00%2113.751,521.90100.00%0.000.00

C O S T O D I R E C T O (S/.)433,543.31 (S/.)25,303.68 (S/.)13,756.36 (S/.)39,060.03 (S/.)394,483.28

TOTAL VALORIZACION MENSUAL ACUMULADA DE OBRA (S/.)25303.6776S/39,060.0313756.36VALORIZACION MENSUAL ACUMULADA DE OBRA (%)9.01%39,060.03394,483.28394,474.36PRESUPUESTO BASE SEGUN EL EXPEDIENTE TECNICO APROB. S/.ACUMULADO ANTERIORAVANCE ACTUALAVANCE ACUMULADOSALDO ACTUALPARCIAL%PARCIAL%PARCIAL%PARCIAL%COSTO DIRECTO DE OBRAS/433,543.3125,303.685.84%13,756.363.17%39,060.039.01%394,483.2890.99%GASTOS GENERALES 11.08%S/48,036.602,803.655.84%1,524.203.17%4,327.859.01%43,708.7590.99%GASTOS DE SUPERVISION4.50%S/19,509.451,138.675.84%619.043.17%1,757.709.01%17,751.7590.99%GASTOS DE ELABORACION DE EXPEDIENTE TECNICO2.65%S/11,500.00671.205.84%364.903.17%1,036.099.01%10,463.9190.99%GASTOS DE LIQUIDACION DE OBRA1.50%S/6,503.15379.565.84%206.353.17%585.909.01%5,917.2590.99%PRESUPUESTO DE INVERSION519,092.5130,296.745.84%16,470.843.17%46,767.589.01%472,324.9390.99%

TOTAL VALORIZADO 519,092.5125,303.685.84%13,756.363.17%39,060.039.01%394,483.2890.99%

....................................RESIDENTE DE OBRAFirma y Sello.......................................................SUPERVISOR DE OBRAFirma y Sello

V P NUEVASMUNICIPALIDAD PROVINCIAL DE PARUROVALORIZACION FISICA DE PARTIDAS NUEVAS JUNIO 2015

Proyecto: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA CALLE PROLONGACION ALFONSO UGARTE DEL DISTRITO DE PARURO .Presupuesto :519092.53Departamento : CUSCOFecha Presentacin : 07/07/2015Inicio de Obra :Monday, April 27, 2015Provincia : PARUROPlazo ejecucin : 04 MesesResidente : ING ALBERS ANTONY VILCA BECERRALocalidad :PARURO

ITEMDESCRIPCIONUNDPRESUPUESTOVALORIZACIONMETRADP.U. S/.TOTALAVANCE ANTERIORAVANCE ACTUALAVANCE ACUMULADOSALDO ACTUALMetradoMonto (S/.)%MetradoMonto (S/.)%MetradoMonto (S/.)%MetradoMonto (S/.)%01OBRAS PROVISIONALES1.03CONSTRUCCION DE ALMACEN,VESTUARIO Y RESIDENCIAm223.00174.764,019.480.000.000.00%23.004019.48100.00%23.004,019.48100.00%0.000.000.00%1.04EXCAVACION MANUAL PARA INSTALACION DE SS.HH.m31.755.008.750.000.000.00%1.758.75100.00%1.758.75100.00%0.000.000.00%1.05CONSTRUCCION DE SS.HH.m24.00132.36529.440.000.000.00%4.00529.44100.00%4.00529.44100.00%0.000.000.00%1.06INSTALACION PROVICIONAL DE AGUAm7.0054.87384.090.000.000.00%7.00384.09100.00%7.00384.09100.00%0.000.000.00%1.07INSTALACION PROVICIONAL DE DESAGUEm7.0054.87384.090.000.000.00%7.00384.09100.00%7.00384.09100.00%0.000.000.00%1.08EMPREDRADO DE PISO DE SS.HH.m23.0019.8059.400.000.000.00%3.0059.40100.00%3.0059.40100.00%0.000.000.00%1.09CONCRETO Fc=175 Kg /Cm2 P/PISO DE SS.HH.m30.15381.7557.260.000.000.00%0.1557.26100.00%0.1557.26100.00%0.000.000.00%

C O S T O D I R E C T O (S/.)5,442.51 (S/.)0.00 (S/.)5,442.51 (S/.)5,442.51 (S/.)0.00

TOTAL VALORIZACION MENSUAL ACUMULADA DE OBRA (S/.)S/5,442.51VALORIZACION MENSUAL ACUMULADA DE OBRA (%)100.00%

PRESUPUESTO BASE SEGUN EL EXPEDIENTE TECNICO APROB. S/.ACUMULADO ANTERIORAVANCE ACTUALAVANCE ACUMULADOSALDO ACTUALPARCIAL%PARCIAL%PARCIAL%PARCIAL%COSTO DIRECTO DE OBRAS/5,442.510.000.00%5,442.51100.00%5,442.51100.00%0.000.00%GASTOS GENERALES 11.08%S/603.030.000.00%603.03100.00%603.03100.00%0.000.00%GASTOS DE SUPERVISION4.50%S/244.910.000.00%244.91100.00%244.91100.00%0.000.00%GASTOS DE ELABORACION DE EXPEDIENTE TECNICO2.65%S/144.230.000.00%144.23100.00%144.23100.00%0.000.00%GASTOS DE LIQUIDACION DE OBRA1.50%S/81.640.000.00%81.64100.00%81.64100.00%0.000.00%PRESUPUESTO DE INVERSION6,516.320.000.00%6,516.32100.00%6,516.32100.00%0.000.00%

TOTAL VALORIZADO 6,516.320.000.00%5,442.51100.00%5,442.51100.00%0.000.00%

.......................................................RESIDENTE DE OBRAFirma y Sello.......................................................SUPERVISOR DE OBRAFirma y Sello

RESUMENMUNICIPALIDAD PROVINCIAL DE CALCARESUMEN DE VALORIZACION DE OBRA MAYO 2015

Proyecto: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA CALLE PROLONGACION ALFONSO UGARTE DEL DISTRITO DE PARURO .Presupuesto :519092.53Departamento : CUSCOFecha Presentacin : 09/06/2015Inicio de Obra :Monday, April 27, 2015Provincia :PARUROPlazo ejecucin : 04 MesesResidente :ING ALBERS ANTONY VILCA BECERRALocalidad :PARURO

ITEMDESCRIPCIONPRESUPUESTOVALORIZACIONTOTAL DE INVERSIONAVANCE ANTERIORAVANCE ACTUALAVANCE ACUMLADOSALDO ACTUAL(S/.)Monto (S/.)%Monto (S/.)%Monto (S/.)%Monto (S/.)%1 VALORIZACION MENSUAL DE OBRA433,543.3125,303.685.84%13,756.363.17%39,060.0359.01%394,483.2890.99%2 VALORIZACION PARTIDAS NUEVAS5,442.510.000.00%5,442.511.26%5,442.511.26%0.000.00%2 VALORIZACION MAYORES METRADOS1,234.420.000.00%1,234.420.28%1,234.420.28%0.000.00%2 VALORIZACION DEDUCTIVOS0.000.000.00%0.000.00%0.000.00%0.000.00%SUB TOTAL ACMULULADO25303.685.84%20,433.294.71%45,736.97110.55%394,483.2890.99%

.......................................................RESIDENTE DE OBRAFirma y Sello.......................................................SUPERVISOR DE OBRAFirma y Sello

hojitasITEMDESCRIPCIONUNDCANTIDADTOTAL01COMPONENTE 1: MEJORAMIENTO DE LA INFRAESTRUCTURA PARA EL SISTEMA DE AGUA POTABLE01.01 OBRAS PROVISIONALES01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 mu1.001.0001.01.02 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITOm240.0040.0001.01.03 CAMPAMENTO PROVISIONAL m280.0080.0001.01.04 CONSTRUCCION DE LETRINAS CON ARRASTRE HIDRAULICOu2.002.0001.01.05 CONTROL PRELIMINAR TOPOGRAFICO DE NIVELES mes1.001.0001.02 TRANSPORTE DE MATERIALES EN OBRA Y LIMPIEZA01.02.01 TRANSPORTE DE MATERIALES A OBRAkg100,000.00100,000.0001.03 CAPTACION DE MANANTE TIPO I01.03.01 LIMPIEZA DE TERRENO MANUALm212.0012.0001.03.02 DEMOLICION Y RETIRO DE CAPTACIN m38.188.1801.03.03 TRAZO DURANTE LA EJECUCION DE LA OBRAm28.188.1801.03.04 CORTE EN MATERIAL ROCOSOm310.6810.6801.03.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m312.8212.8201.03.06 FILTRO DE GRAVA DE 1 1/2"m33.153.1501.03.07 SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m22.882.8801.03.08 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm30.300.3001.03.09 ENCOFRADO Y DESENCOFRADOm278.5078.5001.03.10 CONCRETO f'c=175 kg/cm2m37.067.0601.03.11 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO - ARENAm223.2723.2701.03.12 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE SIKA 1:3 E=2cm211.2811.2801.03.13 INSTALACION DE ACCESORIOS u3.003.0001.03.14 TAPA DE 0.60x0.60m METALICAu3.003.0001.03.15 TAPA DE 0.40x0.40m METALICAu3.003.0001.03.16 CONSTRUCCION DE CERCO DE PROTECCION m40.0040.0001.04 CAMARA ROMPEPRESIONES TIPO VII (LD=1")01.04.01 LIMPIEZA DE TERRENO MANUALm216.9416.9401.04.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm218.7018.7001.04.03 CORTE EN MATERIAL ROCOSOm312.4612.4601.04.04 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m316.8016.8001.04.05 SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m218.7018.7001.04.06 Concreto Ciclopeo Mescla 1:10 (Base de Cimiento)m32.802.8001.04.07 ENCOFRADO Y DESENCOFRADO NORMALm2110.60110.6001.04.08 concreto f'c=175kg/cm2m39.149.1401.04.09 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO - ARENAm273.7873.7801.04.10 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE SIKA 1:3 E=2cmm261.4661.4601.04.11 TAPA DE 0.30x0.30m METALICAu14.0014.0001.04.12 TAPA DE 0.60x0.60m METALICAu14.0014.0001.04.13 INSTALACION DE ACCESORIOSu14.0014.0001.04.14 PINTURA EN CAPTACIONES Y CAMARAS ROMPEPRESIONm273.7873.7801.04.15 CONSTRUCCION DE CERCO DE PROTECCION m40.0040.0001.05 LINEA DE CONDUCCION01.05.01 LIMPIEZA DE TERRENO MANUALm21,043.671,043.6701.05.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm21,043.671,043.6701.05.03 EXCAVACION MANUAL DE ZANJA H=0.40 mm2,609.182,609.1801.05.04 REFINE Y NIVELACION INCLUYE CAMA DE APOYO EN TERRENO NORMALm2,609.182,609.1801.05.05 RELLENO COMP.ZANJA TERR.NORMALTUB. AGUA POTABLEm2,609.182,609.1801.05.06 TUBERIA DE PVC SAP 2"m2,609.182,609.1801.05.07 PRUEBA HIDRAULICA + DESINFECCION TUBERIA A ZANJA TAPADAm2,609.182,609.1801.05.08 ACCESORIOS EN LA RED DE CONDUCCIONglb1.001.0001.06 RESERVORIO Y CAJA DE VALVULAS01.06 RESERVORIO Y CAJA DE VALVULASUndMetradoITEMDESCRIPCIONUNDPRESUPUESTO01.06.01 LIMPIEZA DE TERRENO MANUALm225.1225.1201.06.01 LIMPIEZA DE TERRENO MANUALm225.12METRADP.U. S/.TOTAL01.06.03 CORTE EN MATERIAL ROCOSOm310.7510.7501.06.03 CORTE EN MATERIAL ROCOSOm310.7501COMPONENTE 1: MEJORAMIENTO DE LA INFRAESTRUCTURA PARA EL SISTEMA DE AGUA POTABLE01.06.04 NIVELACION INTERIOR APISONADO MANUALm225.1225.1201.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m313.9701.06 RESERVORIO Y CAJA DE VALVULAS01.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m313.9713.9701.10 FLETE TERRESTREUndMetrado01.06.01 LIMPIEZA DE TERRENO MANUALm2824.880.288237.38601.06.06 SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m225.1225.1201.10.01 FLETE TERRESTREglb1.0001.06.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm2104.641.167122.08501.06.07 ENCOFRADO Y DESENCOFRADO NORMALm2171.65171.6501.06.03 CORTE EN MATERIAL ROCOSOm396.0619.0151826.53501.06.08 CONCRETO f'c=210 kg/cm2m320.6220.6201.06 RESERVORIO Y CAJA DE VALVULASUndMetrado01.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m336.789.379344.97701.06.09 ACERO fy=4200 kg/cm2 GRADO 60kg2,101.102,101.1001.06.01 LIMPIEZA DE TERRENO MANUALm2824.8801.10 FLETE TERRESTRE01.06.10 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE SIKA 1:3 E=2cmm269.8469.8401.06.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm2104.6401.10.01 FLETE TERRESTREglb1130001300001.06.11 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO - ARENAm290.6490.6401.06.03 CORTE EN MATERIAL ROCOSOm396.0601.06.12 PINTADO EXTERIOR CON ESMALTEm2182.00182.0001.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m336.7801.06.13 TANQUE DE AGUA DE POLIETILENO DE 1000 Lts. EN 02 CAPTACIONESu2.002.0001.06.14 TAPA DE 0.60x0.60m METALICAu4.004.0001.06.15 INSTALACION DE ACCESORIOS EN EL RESERVORIOglb2.002.0001.06.16 CONSTRUCCION DE CERCO DE PROTECCION m59.2059.2001.07 RED DE DISTRIBUCION01.06 RESERVORIO Y CAJA DE VALVULASUndMetrado01.06 RESERVORIO Y CAJA DE VALVULASUndMetrado01.07.01 LIMPIEZA DE TERRENO MANUALm23,308.393,308.3901.06.01 LIMPIEZA DE TERRENO MANUALm285001.06.01 LIMPIEZA DE TERRENO MANUALm285001.07.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm23,308.393,308.3901.06.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm2129.7601.06.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm2129.7601.07.03 EXCAVACION MANUAL DE ZANJA H=0.40 mm8,270.988,270.9801.06.03 CORTE EN MATERIAL ROCOSOm3106.8101.06.03 CORTE EN MATERIAL ROCOSOm3106.8101.07.04 REFINE Y NIVELACION INCLUYE CAMA DE APOYO EN TERRENO NORMALm8,270.988,270.9801.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m350.7501.06.04 NIVELACION INTERIOR APISONADO MANUALm27201.07.05 RELLENO COMP.ZANJA TERR.NORMALTUB. AGUA POTABLEm8,270.988,270.9801.10 FLETE TERRESTREUndMetrado01.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m350.7501.07.06 ACCESORIOS EN LA RED DE DISTRIBUCIONglb1.001.0001.10.01 FLETE TERRESTREglb101.06.06 SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m232.4801.07.07 TUBERIA DE PVC SAP AGUA POTABLE 1/2"m984.16984.1601.06.07 ENCOFRADO Y DESENCOFRADO NORMALm282.4501.07.08 TUBERIA DE PVC SAP AGUA POTABLE 3/4"m2,523.932,523.9301.06.08 CONCRETO f'c=210 kg/cm2m331.2501.07.09 TUBERIA DE PVC SAP AGUA POTABLE 1"m3,666.273,666.2701.06 RESERVORIO Y CAJA DE VALVULASUndMetrado01.06.09 ACERO fy=4200 kg/cm2 GRADO 60kg2101.101.07.10 TUBERIA DE PVC SAP AGUA POTABLE 1 1/2"m391.80391.8001.06.03 CORTE EN MATERIAL ROCOSOm301.10 FLETE TERRESTREUndMetrado01.07.11 TUBERIA PVC SAP C-10, 1 1/2"m651.36651.3601.06.04 NIVELACION INTERIOR APISONADO MANUALm201.10.01 FLETE TERRESTREglb101.07.12 TUBERIA PVC SAP C-5, DE 2"m53.4653.4601.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m301.07.13 TUBERIA FIERRO GALVANIZADO 1" m80.0080.0001.06.06 SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m201.06 RESERVORIO Y CAJA DE VALVULASUndMetrado01.08 INSTALACIONES SANITARIAS01.06.07 ENCOFRADO Y DESENCOFRADO NORMALm201.06.03 CORTE EN MATERIAL ROCOSOm313.3801.08.01 INSTALACION DE VALVULAS DE PASO01.06.08 CONCRETO f'c=210 kg/cm2m301.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m316.7201.08.01.01 VALVULA DE COMPUERTA 3 / 4"u6.006.0001.06.09 ACERO fy=4200 kg/cm2 GRADO 60kg01.06.07 ENCOFRADO Y DESENCOFRADO NORMALm298.827801.08.01.02 VALVULA DE COMPUERTA 1"u4.004.0001.06.10 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE SIKA 1:3 E=2cmm201.08.01.03 VALVULA DE COMPUERTA 1/2"u4.004.0001.06.11 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO - ARENAm201.08.02 INSTALACION DE VALVULAS DE PURGA01.06.12 PINTADO EXTERIOR CON ESMALTEm201.08.02.01 VALVULA DE PURGA DE 1"u2.002.0001.06.13 TAPA DE 0.60x0.60m METALICAu01.08.02.02 VALVULA DE PURGA DE 3/4"u1.001.0001.06.14 INSTALACION DE ACCESORIOS EN EL RESERVORIOglb01.08.02.03 VALVULA DE PURGA DE 1/2"u4.004.0001.06.15 CONSTRUCCION DE CERCO DE PROTECCION m01.08.03 INSTALACIONES DOMICILIARIAS01.06.16 TUBERIA FIERRO GALVANIZADO 1" m01.08.03.01 INSTALACIONES DOMICILIARIAS DE AGUA POTABLEu210.00210.0001.10 FLETE TERRESTREUnd01.08.03.02 VALVULA TIPO BOLA 1/2"u210.00210.0001.10.01 FLETE TERRESTREglb01.08.03.03 DUCHAS CROMADAS DE CABEZA GIRATORIA Y LLAVE MEZCLADORApza210.00210.0001.08.03.04 PRUEBA HIDRAULICA + DESINFECCION TUBERIA A ZANJA TAPADAm8,270.988,270.9801.09 MITIGACION DE IMPACTOS AMBIENTALES01.06 RESERVORIO Y CAJA DE VALVULASUnd01.09.01 EXCAVACION MANUAL PARA MICRO RELLENOS SANITARIOSm320.0020.0001.06.03 CORTE EN MATERIAL ROCOSOm301.09.02 CONTENEDOR DE DESECHOS GENERADOS EN OBRAu5.005.0001.06.04 NIVELACION INTERIOR APISONADO MANUALm201.09.03 RECOLECCION DE DESECHOS EN OBRAglb1.001.0001.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m301.09.04 SELLADO DE MICRO RELLENO SANITARIOm230.0030.0001.06.06 SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m201.09.05 RELLENO CON MATERIAL AGRICOLA EN AREA DE MICRO RELLENO SANITARIOm230.0030.0001.06.07 ENCOFRADO Y DESENCOFRADO NORMALm201.09.06 REFORESTACION CON PLANTAS NATIVASm230.0030.0001.06.08 CONCRETO f'c=210 kg/cm2m301.10 FLETE TERRESTRE01.06.09 ACERO fy=4200 kg/cm2 GRADO 60kg01.10.01 FLETE TERRESTREglb1.001.0001.10 FLETE TERRESTREUnd02COMPONENTE 2:INSTALACIN DE INFRAESTRUCTURA PARA LA DISPOSICIN DE EXCRETAS01.10.01 FLETE TERRESTREglb02.01 PILETAS DOMICILIARIAS02.01.01 LIMPIEZA DE TERRENO MANUALm2183.96183.9601.06 RESERVORIO Y CAJA DE VALVULASUnd02.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm2183.96183.9601.06.01 LIMPIEZA DE TERRENO MANUALm202.01.03 CORTE DE MATERIAL SUELTO MANUALm336.7936.7901.06.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm202.01.04 EXCAVACION DE ZANJAS PARA CIMIENTOSm334.0234.0201.06.03 CORTE EN MATERIAL ROCOSOm302.01.05 NIVELACION INTERIOR APISONADO MANUALm289.4689.4601.06.04 NIVELACION INTERIOR APISONADO MANUALm202.01.06 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m392.0692.0601.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m302.01.07 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm328.3528.3501.06.06 SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m202.01.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOSm2657.72657.7201.06.07 ENCOFRADO Y DESENCOFRADO NORMALm202.01.09 CONCRETO F'C=140 KG/CM2 +30% PM PARA SOBRECIMIENTOSm350.4050.4001.06.08 CONCRETO f'c=210 kg/cm2m302.01.10 ENCOFRADO Y DESENCOFRADO NORMALm2495.81495.8101.06.09 ACERO fy=4200 kg/cm2 GRADO 60kg02.01.11 CONCRETO f'c=175 kg/cm2m334.2434.2401.06.10 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE SIKA 1:3 E=2cmm202.01.12 ACERO fy=4200 kg/cm2 GRADO 60kg1,329.041,329.0401.06.11 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO - ARENAm202.01.13 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE SIKA 1:3 E=2cmm2364.77364.7701.06.12 PINTADO EXTERIOR CON ESMALTEm202.01.14 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO - ARENAm2774.17774.1701.06.13 TAPA DE 0.60x0.60m METALICAu02.02 MODULO LETRINAS Y DUCHAS01.06.14 INSTALACION DE ACCESORIOS EN EL RESERVORIOglb02.03 OBRAS PRELIMINARES01.06.15 CONSTRUCCION DE CERCO DE PROTECCION m02.03.01 LIMPIEZA DE TERRENO MANUALm21,264.731,264.7301.06.16 TUBERIA FIERRO GALVANIZADO 1" m02.03.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm21,264.731,264.7301.10 FLETE TERRESTREUnd02.04 MOVIMIENTO DE TIERRAS01.10.01 FLETE TERRESTREglb02.04.01 CORTE DE MATERIAL SUELTO MANUALm3150.73150.7302.04.02 EXCAVACION DE ZANJAS PARA CIMIENTOSm3165.38165.3801.06 RESERVORIO Y CAJA DE VALVULASUnd02.04.03 NIVELACION INTERIOR APISONADO MANUALm2874.65874.6501.06.01 LIMPIEZA DE TERRENO MANUALm202.04.04 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m3410.93410.9301.06.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm202.05 CONCRETO SIMPLE01.06.03 CORTE EN MATERIAL ROCOSOm302.05.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm3152.46152.4601.06.04 NIVELACION INTERIOR APISONADO MANUALm202.05.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOSm2655.20655.2001.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m302.05.03 ENCOFRADO Y DESENCOFRADO PARA SARDINELESm2172.20172.2001.06.06 SOLADOS CONCRETO f'c=100 kg/cm2 h=2"m202.05.04 ENCOFRADO Y DESENCOFRADO PARAPETOm250.4050.4001.06.07 ENCOFRADO Y DESENCOFRADO NORMALm202.05.05 CONCRETO F'C=140 KG/CM2 +30% PM PARA SOBRECIMIENTOSm340.9540.9501.06.08 CONCRETO f'c=210 kg/cm2m302.05.06 concreto f'c=175kg/cm2 SARDINELES Y PARAPETOm328.3528.3501.06.09 ACERO fy=4200 kg/cm2 GRADO 60kg02.06 CONCRETO ARMADO01.10 FLETE TERRESTREUnd02.06.01 COLUMNAS01.10.01 FLETE TERRESTREglb02.06.01.01 ENCOFRADO Y DESENCOFRADO m21,281.001,281.0002.06.01.02 ACERO DE REFUERZO fy=4200 kg/cm2, G-60kg4,231.204,231.2002.06.01.03 concreto f'c=175kg/cm2m346.4646.4602.06.02 VIGAS02.06.02.01 ENCOFRADO Y DESENCOFRADOOm2421.89421.8902.06.02.02 ACERO DE REFUERZO fy=4200 kg/cm2, G 60kg1,256.221,256.2201.06 RESERVORIO Y CAJA DE VALVULASUnd02.06.02.03 concreto f'c=175kg/cm2m318.0818.0801.06.03 CORTE EN MATERIAL ROCOSOm302.06.03 ALBAILERIA01.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m302.06.03.01 MURO DE BLOQUE HUECO DE CONCRETO E=15 cm MEZCLA 1:5 (CEMENTO:ARENA)m21,969.591,969.5901.06.07 ENCOFRADO Y DESENCOFRADO NORMALm202.06.04 COBERTURAS02.06.04.01 ESTRUCTURA DE MADERA AGUANO PARA AREAS TECHADAS Y COBERTURA CON TEJA ANDINAm21,086.751,086.7502.06.04.02 IMPERMEABILIZACION DE TEJA ANDINAm21,086.751,086.7502.06.04.03 COBERTURA CON TEJA ANDINAm21,086.751,086.7501.06 RESERVORIO Y CAJA DE VALVULAS%02.07 TARRAJEO DE MUROS01.06.01 LIMPIEZA DE TERRENO MANUAL100%02.07.01 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO - ARENAm24,289.884,289.8801.06.02 TRAZO DURANTE LA EJECUCION DE LA OBRA100%02.07.02 TARRAJEO EN DERRAMESm21,358.701,358.7001.06.03 CORTE EN MATERIAL ROCOSO100%02.08 PISOS Y PAVIMENTOS01.06.04 NIVELACION INTERIOR APISONADO MANUAL100%02.08.01 EMPEDRADO DE PISOS Y VEREDAS E = 0.10 Mm2786.45786.4501.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)100%02.08.02 concreto f'c=175kg/cm2 PARA PISOSm355.0555.0501.06.06 SOLADOS CONCRETO f'c=100 kg/cm2 h=2"100%02.08.03 PISO DE CERMICO NACIONAL ANTIDESLIZANTE DE 0.30 X 0.30 Mm2551.25551.2501.06.07 ENCOFRADO Y DESENCOFRADO NORMAL100%02.09 BRUAS01.06.08 CONCRETO f'c=210 kg/cm2100%02.09.01 BRUASm1,249.901,249.9001.06.09 ACERO fy=4200 kg/cm2 GRADO 60100%02.10 ZOCALO Y CONTRAZOCALO01.06.10 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE SIKA 1:3 E=2cm100%02.10.01 CONTRAZOCALO DE CERAMICO DE H=1.20Mm21,411.201,411.2001.06.11 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO - ARENA100%02.11 CARPINTERIA DE MADERA01.06.12 PINTADO EXTERIOR CON ESMALTE100%02.11.01 PUERTAS DE MADERA TABLEROS REBAJADOS DE 4.5 mm m2264.60264.6001.06.13 TAPA DE 0.60x0.60m METALICA100%02.12 CERRAJERIA01.06.14 INSTALACION DE ACCESORIOS EN EL RESERVORIO100%02.12.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"pza630.00630.0001.06.15 CONSTRUCCION DE CERCO DE PROTECCION 100%02.12.02 PICAPORTE DE BRONCE DE 3"u210.00210.0001.06.16 TUBERIA FIERRO GALVANIZADO 1" 100%02.13 PINTURA01.10 FLETE TERRESTRE%02.13.01 PINTURA VINILICA EN MUROS EXTERIORES 2 MANOSm24,493.694,493.6901.10.01 FLETE TERRESTRE40%02.13.02 PINTURA EN PUERTAS CON BARNIZ 2 MANOSm2529.20529.2002.14 SISTEMA DE DESAGUE02.14.01 TUBERIAS DE DESAGE01.06 RESERVORIO Y CAJA DE VALVULAS%02.14.01.01 LIMPIEZA DE TERRENO MANUALm2366.00366.0001.06.01 LIMPIEZA DE TERRENO MANUAL100.00%02.14.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm2366.00366.0001.06.02 TRAZO DURANTE LA EJECUCION DE LA OBRA100.00%02.14.01.03 EXCAVACION MANUAL DE ZANJA H=0.80 mm936.00936.0001.06.03 CORTE EN MATERIAL ROCOSO100.00%02.14.01.04 RELLENO COMPACTADO MANUAL MATERIAL PROPIO SELECCIONADOm936.00936.0001.06.04 NIVELACION INTERIOR APISONADO MANUAL100.00%02.14.01.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m3365.04365.0401.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)100.00%02.14.01.06 TUBERIA DE PVC SAL 2"m204.00204.0001.06.06 SOLADOS CONCRETO f'c=100 kg/cm2 h=2"100.00%02.14.01.07 TUBERIA DE PVC SAL 4"m732.00732.0001.06.07 ENCOFRADO Y DESENCOFRADO NORMAL100.00%02.14.02 INSTALACIONES DOMICILIARIAS DE DESAGUE01.06.08 CONCRETO f'c=210 kg/cm260.59%02.14.02.01 INSTALACIONES DOMICILIARIASu210.00210.0001.06.09 ACERO fy=4200 kg/cm2 GRADO 6079.67%02.14.02.02 SUMIDERO DE BRONCE 2" PROVISION Y COLOCACIONu210.00210.0001.10 FLETE TERRESTRE%02.14.02.03 SUMINISTRO E INSTALACION DE INODORO TANQUE BAJOu210.00210.0001.10.01 FLETE TERRESTRE39.41%02.14.02.04 PRUEBA HIDRAULICA + ESCORRENTIA DE TUBO PARA DESAGUEm732.00732.0002.14.03 BIODIGESTOR 01.06 RESERVORIO Y CAJA DE VALVULAS%02.14.03.01 LIMPIEZA DE TERRENO MANUALm296.2396.2301.06.03 CORTE EN MATERIAL ROCOSO100.00%02.14.03.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm296.2396.2301.06.05 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)100.00%02.14.03.03 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m3231.44231.4401.06.07 ENCOFRADO Y DESENCOFRADO NORMAL67.13%02.14.03.04 RELLENO COMPACTADO MANUAL MATERIAL PROPIO SELECCIONADOm371.3871.3802.14.03.05 NIVELACION INTERIOR APISONADO MANUALm296.2396.2302.14.03.06 CORTE DE MATERIAL SUELTO MANUALm3178.03178.0302.14.03.07 BIODIGESTOR AUTOLIMPIABLE DE 600 LTS.u110.00110.0002.14.04 POSO DE ABSORCION02.14.04.01 LIMPIEZA DE TERRENO MANUALm2102.54102.5402.14.04.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm2102.54102.5402.14.04.03 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m3173.30173.3002.14.04.04 RELLENO CON MATERIAL SELECIONADOm3205.08205.0802.14.04.05 RELLENO COMPACTADO MANUAL MATERIAL PROPIO SELECCIONADOm318.7518.7502.14.04.06 CORTE DE MATERIAL SUELTO MANUALm3133.30133.3002.14.04.07 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm321.6321.6302.14.04.08 ENCOFRADO Y DESENCOFRADO NORMALm2173.04173.0402.14.04.09 ENCOFRADO Y DESENCOFRADO NORMAL LOSA TAPAm240.0640.0602.14.04.10 CONCRETO f'c=210 kg/cm2m325.6425.6402.14.04.11 ACERO fy=4200 kg/cm2 GRADO 60kg899.64899.6402.14.04.12 MURO DE PIEDRA GRANDE E=25m2823.00823.0002.14.04.13 PINTADO EXTERIOR CON ESMALTEm2102.54102.5402.14.05 POSO PERCOLADOR02.14.05.01 LIMPIEZA DE TERRENO MANUALm290.1290.1202.14.05.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm290.1290.1202.14.05.03 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m3269.47269.4702.14.05.04 RELLENO CON MATERIAL SELECIONADOm3207.29207.2902.14.05.05 CORTE DE MATERIAL SUELTO MANUALm3207.29207.2902.14.06 CAJA DE LODOS02.14.06.01 LIMPIEZA DE TERRENO MANUALm218.3618.3602.14.06.02 TRAZO DURANTE LA EJECUCION DE LA OBRAm218.3618.3602.14.06.03 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m)m342.9642.9602.14.06.04 NIVELACION INTERIOR APISONADO MANUALm241.3141.3102.14.06.05 CORTE DE MATERIAL SUELTO MANUALm333.0533.0502.14.06.06 CONCRETO f'c=175 kg/cm2m313.7713.7702.14.06.07 ENCOFRADO Y DESENCOFRADO NORMALm2132.19132.1902.14.06.08 ACERO fy=4200 kg/cm2 GRADO 60kg194.21194.2102.14.06.09 CONCRETO f'c=210 kg/cm2m32.072.0702.14.06.10 ENCOFRADO Y DESENCOFRADO NORMALm249.5749.5702.14.06.11 PINTADO EXTERIOR CON ESMALTEm241.3141.3103COMPONENTE 03 CAPACITACION03.01 CAPACITACIONglb1.001.00

ACU PNUEVASPartida01.01.06DEMOLICION DEL MURO DE ADOBE EXISTENTERendimiento10M2/DIACosto unitario directo por : M24.417

DESCRIPCIONUNIDADCUADRILLACANTIDADCOSTO UNITARIOPARCIALMANO DE OBRAH.HPEON10.8005.4404.3524.352EQUIPOHERRAMIENTAS MANUALES%MO3.0002.1760.0650.065

Partida01.01.07ARMADO DE PUERTA DE CALAMINARendimiento30UND/DIACosto unitario directo por : UND369.594

DESCRIPCIONUNIDADCUADRILLACANTIDADCOSTO UNITARIOPARCIALMANO DE OBRAH.HPEON10.2675.4401.4511.451MATERIALLESCALAMINASKg8.00019.450155.600CLAVOSP21.0004.5004.500ROLLIZO DE EUCALIPTO DE 6" X 6.00 MPZA4.00052.000208.000368.100EQUIPOHERRAMIENTAS MANUALES%MO3.0001.4510.0440.044

Partida01.01.08COLOCADO DE PUERTA DE CALAMINARendimiento20UND/DIACosto unitario directo por : UND2.241|

DESCRIPCIONUNIDADCUADRILLACANTIDADCOSTO UNITARIOPARCIALMANO DE OBRAH.HPEON10.4005.4402.1762.176

EQUIPOHERRAMIENTAS MANUALES%MO3.0002.1760.065

Partida01.01.09DEMOLICION DE CONCRETORendimiento30M3/DIACosto unitario directo por : M31.494

DESCRIPCIONUNIDADCUADRILLACANTIDADCOSTO UNITARIOPARCIALMANO DE OBRAH.HPEON10.2675.4401.4511.451EQUIPOHERRAMIENTAS MANUALES%MO3.0001.4510.0440.044

Partida01.01.10CORTE DE MATERIAL EN TERRENO SUELTORendimiento20M3/DIACosto unitario directo por : M32.241

DESCRIPCIONUNIDADCUADRILLACANTIDADCOSTO UNITARIOPARCIALMANO DE OBRAH.HPEON10.4005.4402.1762.176EQUIPOHERRAMIENTAS MANUALES%MO3.0002.1760.0650.0651.03 CONSTRUCCION DE ALMACEN Y VESTIDORESRendimiento12m2/DiaCosto174.76375Cuadrilla01 Oficial + 02 PeonesDescripcin RecursoUnd.CuadrillaCantidadPrecio (S/.)Parcial (S/.)MNO DE OBRAOFICIALhh1.000.675.003.33PEONhh2.001.334.405.87

MATERIALESALAMBRE NEGRO N8kg0.104.500.45CLAVOS PARA MADERA C/C 3"kg0.084.970.37CLAVOS PARA CALAMINAkg0.104.970.50ROLLIZO DE EUCALIPTO DE 3' X 3 MP210.0015.00150.00CALAMINA # 31 DE 1.83m x 0.83m x 2.7mmpza0.7219.4013.97

EQUIPOSHERRAMIENTAS MANUALES%MO3.009.200.28

1.04 EXCAVACION MANUAL PARA INSTALACION DE SS.HH.Rendimiento7.4m3/DiaCosto4.8994594595Cuadrilla01 PeonesDescripcin RecursoUnd.CuadrillaCantidadPrecio (S/.)Parcial (S/.)MNO DE OBRA

PEONhh1.001.0814.4004.8

EQUIPOSHERRAMIENTAS MANUALES%MO3.0004.7570.1

1.05 CONSTRUCCION DE S.H.HRendimiento12m2/DiaCosto132.36025Cuadrilla01 Oficial + 02 PeonesDescripcin RecursoUnd.CuadrillaCantidadPrecio (S/.)Parcial (S/.)MNO DE OBRAOFICIALhh1.000.675.003.33PEONhh2.001.334.405.87

MATERIALESCLAVOS PARA MADERA C/C 3"kg0.084.970.37CLAVOS PARA CALAMINAkg0.054.970.25ROLLIZO DE EUCALIPTO DE 3' X 3 MP25.0015.0075.00CALAMINA # 31 DE 1.83m x 0.83m x 2.7mmpza0.7219.4013.97CEMENTO PORTLAND IP (42.5 Kg)Bls0.8425.5021.42HORMIGONm30.1395.0011.88

EQUIPOSHERRAMIENTAS MANUALES%MO3.009.200.28

1.06 INSTALACIO PROVICIONAL DE AGUARendimiento135m/DiaCosto54.4992Cuadrilla01 OPERARIO + 01 Oficial + 05 PeonesDescripcin RecursoUnd.CuadrillaCantidadPrecio (S/.)Parcial (S/.)MNO DE OBRAOPERARIOhh1.000.05936.30000.37OFICIALhh1.000.05935.00000.30PEONhh5.000.29634.40001.30

MATERIALESLUBRICANTE PARA TUBERIA PVCGLN0.00410.000.04ANILLO DE JEBE P/TUBERIA PVC UF DN 200 mmkg0.16015.002.40TUBERIA U PVC DESAGUE ISO 4435 S 25 DN 200 mmkg1.05048.0050.40

EQUIPOSHERRAMIENTAS MANUALES%MO3.001.970.06

1.07 INSTALACIO PROVICIONAL DE DESAGUERendimiento135m/DiaCosto54.4992Cuadrilla01 OPERARIO + 01 Oficial + 05 PeonesDescripcin RecursoUnd.CuadrillaCantidadPrecio (S/.)Parcial (S/.)MNO DE OBRAOPERARIOhh1.000.05936.30000.37OFICIALhh1.000.05935.000.30PEONhh5.000.29634.401.30

MATERIALESLUBRICANTE PARA TUBERIA PVCGLN0.00410.000.04ANILLO DE JEBE P/TUBERIA PVC UF DN 200 mmkg0.16015.002.40TUBERIA U PVC DESAGUE ISO 4435 S 25 DN 200 mmkg1.05048.0050.40

EQUIPOSHERRAMIENTAS MANUALES%MO3.001.970.06

1.08 EMPEDRADO DE PISO DE SS.HH.Rendimiento35m/DiaCosto19.7978285714Cuadrilla01 OPERARIO + 01 Oficial + 05 PeonesDescripcin RecursoUnd.CuadrillaCantidadPrecio (S/.)Parcial (S/.)MNO DE OBRAOFICIALhh2.000.45715.002.29PEONhh4.000.91434.404.02

MATERIALESPIEDRA GRANDE DE T. MAX. 6"M30.14095.0013.30

EQUIPOSHERRAMIENTAS MANUALES%MO3.006.310.19

1.09 CONCRETO Fc=175 Kg/Cm2 P/PISO DE SS.HH.Rendimiento10m/DiaCosto381.7378Cuadrilla02 OPERARIO + 01 Oficial + 09 PeonesDescripcin RecursoUnd.CuadrillaCantidadPrecio (S/.)Parcial (S/.)MNO DE OBRAOPERARIOhh2.001.60006.3010.08OFICIALhh1.000.80005.004.00PEONhh9.007.20004.4031.68

MATERIALESPIEDRA CHANCADA DE 3/4"M30.79795.0075.72ARENA GRUESA M30.50595.0047.98CEMENTO PORTLAND TIPO IP (42.5 Kg)BLS7.61025.50194.06AGUAM30.0501.200.06EQUIPOSHERRAMIENTAS MANUALES%MO3.0045.761.37VIBRADOR DE CONCRETO 4 HP 2.40"hm10.806.004.80MEZCLADORA DE CONCRETO TAMBOR 18HP 11P3hm10.8015.0012.00

MAYORES METMUNICIPALIDAD PROVINCIAL DE PARUROVALORIZACION FISICA DE MAYORES METRADOS JUNIO 2015

Proyecto: MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA CALLE PROLONGACION ALFONSO UGARTE DEL DISTRITO DE PARURO .Presupuesto :519092.53Departamento : CUSCOFecha Presentacin : 05/07/2015Inicio de Obra :Monday, April 27, 2015Provincia : PARUROPlazo ejecucin : 04 MesesResidente : ING ALBERS ANTONY VILCA BECERRALocalidad :PARURO

ITEMDESCRIPCIONUNDPRESUPUESTOVALORIZACIONMETRADP.U. S/.TOTALAVANCE ANTERIORAVANCE ACTUALAVANCE ACUMULADOSALDO ACTUALMetradoMonto (S/.)%MetradoMonto (S/.)%MetradoMonto (S/.)%MetradoMonto (S/.)%01OBRAS PROVISIONALES2.04DEMOLICION DE CONTRUCCIONES EXISTENTESm257.0721.631,234.420.000.000.00%57.071234.42100.00%57.071,234.42100.00%0.000.000.00%

C O S T O D I R E C T O (S/.)1,234.42 (S/.)0.00 (S/.)1,234.42 (S/.)1,234.42 (S/.)0.00

TOTAL VALORIZACION MENSUAL ACUMULADA DE OBRA (S/.)S/1,234.42VALORIZACION MENSUAL ACUMULADA DE OBRA (%)100.00%

PRESUPUESTO BASE SEGUN EL EXPEDIENTE TECNICO APROB. S/.ACUMULADO ANTERIORAVANCE ACTUALAVANCE ACUMULADOSALDO ACTUALPARCIAL%PARCIAL%PARCIAL%PARCIAL%COSTO DIRECTO DE OBRAS/1,234.420.000.00%1,234.42100.00%1,234.42100.00%0.000.00%GASTOS GENERALES 11.08%S/136.770.000.00%136.77100.00%136.77100.00%0.000.00%GASTOS DE SUPERVISION4.50%S/55.550.000.00%55.55100.00%55.55100.00%0.000.00%GASTOS DE ELABORACION DE EXPEDIENTE TECNICO2.65%S/32.710.000.00%32.71100.00%32.71100.00%0.000.00%GASTOS DE LIQUIDACION DE OBRA1.50%S/18.520.000.00%18.52100.00%18.52100.00%0.000.00%PRESUPUESTO DE INVERSION1,477.980.000.00%1,477.98100.00%1,477.98100.00%0.000.00%

TOTAL VALORIZADO 1,477.980.000.00%1,234.42100.00%1,234.42100.00%0.000.00%

.......................................................RESIDENTE DE OBRAFirma y Sello.......................................................SUPERVISOR DE OBRAFirma y Sello