CONTRADO EJECUTADO VALORIZADO
METRADO 120 kg 100 kg 120 kg
CONTRADO EJECUTADO VALORIZADO
METRADO 120 kg 142 kg 120 kg
PRESUPUESTO BASE
DESCRIPCION UND METRADO PRECIO
CONCRETO COLUMNAS F`C=210 KG/CM2 M3 420.00 280.00
CONCRETO COLUMNAS F`C=280 KG/CM2 M3 310.00 390.00
CONCRETO COLUMNAS F`C=350 KG/CM2 M3 200.00 490.00
GG 10%
UTILD 10%
SUB TOTAL
IGV 18%
PRESUPUESTO TOTAL
PRESUPUESTO OFERTA
DESCRIPCION UND METRADO PRECIO
CONCRETO COLUMNAS F`C=210 KG/CM2 M3 420.00 270.00
CONCRETO COLUMNAS F`C=280 KG/CM2 M3 310.00 382.00
CONCRETO COLUMNAS F`C=350 KG/CM2 M3 200.00 479.00
GG 10%
UTILD 10%
SUB TOTAL
IGV 18%
PRESUPUESTO TOTAL
FACTOR DE RELACION
Este facto de relacion se utilizara al momento de valorizar la obra.
COSTO DIRECTO
COSTO DIRECTO
PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
117,600.00 0 - 215.00 60200 215.00 60200
120,900.00 0 - 86.00 33540 86.00 33540
98,000.00 0 - 55.00 26950 55.00 26950
336,500.00 - 120,690.00 120,690.00
- -
33,650.00
33,650.00
403,800.00
72,684.00
476,484.00
PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
113,400.00 0 - 215.00 58050 215.00 58050
118,420.00 0 - 86.00 32852 86.00 32852
95,800.00 0 - 55.00 26345 55.00 26345
327,620.00 - 117,247.00 117,247.00
32,762.00 11,724.70
32,762.00 11,724.70
393,144.00 140,696.40
70,765.92
463,909.92
0.973610698 0
Este facto de relacion se utilizara al momento de valorizar la obra.
VAL ANTERIOR VAL ACTUAL VAL ACUMULADA
VAL ANTERIOR VAL ACTUAL VAL ACUMULADA
METRADO PARCIAL
205.00 57400
224.00 87360
145.00 71050
215,810.00
-
METRADO PARCIAL
205.00 55350
224.00 85568
145.00 69455
210,373.00
SALDO
SALDO
CONTRATO
COSTO DIRECTO 2,568,351.00
GASTOS GENERALES 8% 205,468.08
UTILIDAD 10% 256,835.10
SUBTOTAL 3,030,654.18
IGV 18% 545,517.75
PRESUPUESTO TOTAL 3,576,171.93
item Descripcion Und Metrado Precio S/.
01.00.00 OBRAS PRELIMINARES
01.01.00 MOVILIZACION DE EQUIPO Y HERRAMIENTAS GLB 1.00 133,293.86
01.02.00 CARTEL DE OBRA EN MURO 2.40 X 4.2M UND 2.00 459.58
01.03.00 REHUBICACION DE POSTES UND 1 837.92
VALORIZACION MES 01
item Descripcion Und Metrado Precio S/.
01.01.01 CONCRETO COLUMNAS F`C=210 KG/CM2 M3 120 280
VALORIZACION MES 02
item Descripcion Und Metrado Precio S/.
01.01.01 CONCRETO COLUMNAS F`C=210 KG/CM2 M3 120 280
VALORIZACION MES 03
item Descripcion Und Metrado Precio S/.
01.01.01 CONCRETO COLUMNAS F`C=210 KG/CM2 M3 120 280
Parcial S/. Metrado Parcial Metrado Parcial Metrado Parcial
133,293.86 0.5 66646.93 - 0 0.50 66646.93
919.16 2 919.16 0 0 2.00 919.16
837.92 1 837.92 0 0 1.00 837.92
Parcial S/. Metrado Parcial Metrado Parcial Metrado Parcial
33,600.00 9 2,520.00 9 2,520.00
Parcial S/. Metrado Parcial Metrado Parcial Metrado Parcial
33,600.00 9 2520 18 5,040.00 27 7,560.00
Parcial S/. Metrado Parcial Metrado Parcial Metrado Parcial
33,600.00 27 7560 26 7,280.00 53 14,840.00
VALORIZA. ACUM. ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUM
VALORIZA. ACUM. ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUM
VALORIZA. ACUM. ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUM
VALORIZA. ACUM. ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUM
Metrado Parcial
0.50 66,646.93
- -
- -
Metrado Parcial
111.00 31,080.00
Metrado Parcial
93.00 26,040.00
Metrado Parcial
67.00 18,760.00
Saldo
Saldo
Saldo
Saldo
ADMINISTRACION DIRECTA
COSTO DIRECTO 2,568,351.00
GASTOS GENERALES 8% 205,468.08
SUPERVISION 4% 102,734.04
LIQUIDACION 1% 25,683.51
PRESUPUESTO TOTAL 2,902,236.63
CONTRADO EJECUTADO VALORIZADO
METRADO 120 kg 100 kg 120 kg
CONTRADO EJECUTADO VALORIZADO
METRADO 120 kg 142 kg 120 kg
PRESUPUESTO BASE
DESCRIPCION UND METRADO PRECIO
CONCRETO COLUMNAS F`C=210 KG/CM2 M3 420.00 280.00
CONCRETO COLUMNAS F`C=280 KG/CM2 M3 310.00 390.00
CONCRETO COLUMNAS F`C=350 KG/CM2 M3 200.00 490.00
FACTOR DE RELACION
GG 10%
UTILD 10%
SUB TOTAL
IGV 18%
PRESUPUESTO TOTAL
PRESUPUESTO OFERTA
DESCRIPCION UND METRADO PRECIO
CONCRETO COLUMNAS F`C=210 KG/CM2 M3 405.00 275.50
CONCRETO COLUMNAS F`C=280 KG/CM2 M3 312.00 388.00
CONCRETO COLUMNAS F`C=350 KG/CM2 M3 202.00 480.00
GG 8%
UTILD 9%
SUB TOTAL
IGV 18%
PRESUPUESTO TOTAL
FACTOR DE RELACION
Este facto de relacion se utilizara al momento de valorizar la obra.
COSTO DIRECTO
COSTO DIRECTO
PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
117,600.00 0 - 215.00 60200 215.00 60200
120,900.00 0 - 86.00 33540 86.00 33540
98,000.00 0 - 55.00 26950 55.00 26950
336,500.00 - 120,690.00 120,690.00
0.9549886 115,257.57 115,257.57
33,650.00
33,650.00
403,800.95
72,684.17
476,485.13
PARCIAL
111,577.50
121,056.00
96,960.00
329,593.50
26,367.48
29,663.42
385,624.40
69,412.39
455,036.79
0.954986337
Este facto de relacion se utilizara al momento de valorizar la obra.
VAL ANTERIOR VAL ACTUAL VAL ACUMULADA
MODALIDAD SUMA ALZADA
PRESUPUESTO BASE O VALOR REFERENCIAL
DESCRIPCION UND METRADO PRECIO
CONCRETO COLUMNAS F`C=210 KG/CM2 M3 420.00 280.00
ENCOFRADOY DESENCOFRADOCOLUMNAS M2 250.00 45.00
ACERO FY=4200 G/CM2 EN COLUMNAS KG 1,350.00 5.00
GG 10%
UTILD 10%
SUB TOTAL
IGV 18%
PRESUPUESTO TOTAL
EL CONTRATISTA INTERNAMENTE HACE SU PRESUPUESTO
PROPUESTA DEL CONTRATISTA
DESCRIPCION UND METRADO PRECIO
CONCRETO COLUMNAS F`C=210 KG/CM2 M3 425.00 265.00
ENCOFRADOY DESENCOFRADOCOLUMNAS M2 220.00 40.00
ACERO FY=4200 G/CM2 EN COLUMNAS KG 1,250.00 5.50
GG 8%
UTILD 7%
SUB TOTAL
IGV 18%
PRESUPUESTO TOTAL
FACTOR DE RELACION F.R. EN FUNCION SUB TOTAL
EN FUNCION AL TOTAL
COSTO DIRECTO
COSTO DIRECTO
PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
117,600.00 0 - 156.00 43680 156.00 43680
11,250.00 0 - 125.00 5625 125.00 5625
6,750.00 0 - 426.00 2130 426.00 2130
135,600.00 - 51,435.00 51,435.00
- -
13,560.00 5,143.50
13,560.00 5,143.50
162,720.00 61,722.00
29,289.60 F.R. = -
192,009.60
PARCIAL
112,625.00
8,800.00
6,875.00
128,300.00
10,264.00
8,981.00
147,545.00
26,558.10
174,103.10
VAL ANTERIOR VAL ACTUAL VAL ACUMULADA
MODALIDAD PRECIOS UNITATIOS
PRESUPUESTO BASE O VALOR REFERENCIAL
DESCRIPCION UND METRADO PRECIO
CONCRETO COLUMNAS F`C=210 KG/CM2 M3 420.00 280.00
ENCOFRADOY DESENCOFRADOCOLUMNASM2 250.00 45.00
ACERO FY=4200 G/CM2 EN COLUMNAS KG 1,350.00 5.00
NOTA 1 METRADO NO CAMBIA GG 10%
NOTA 2 CAMBIAPRECIOSUNITARIOS, % DE COSTOS INDIRECTOS UTILD 10%
SUB TOTAL
IGV 18%
PRESUPUESTO TOTAL
EL CONTRATISTA INTERNAMENTE HACE SU PRESUPUESTO
EL CONTRATISTA PROPONE SUS PRECIOS UNITARIOS Y LO PRESENTA A LA ENTIDAD DURANTE ELPROCESO DE SELECCION
DESCRIPCION UND METRADO PRECIO
CONCRETO COLUMNAS F`C=210 KG/CM2 M3 420.00 279.00
ENCOFRADOY DESENCOFRADOCOLUMNASM2 250.00 45.00
ACERO FY=4200 G/CM2 EN COLUMNAS KG 1,350.00 4.90
GG 8.5%
UTILD 9.5%
SUB TOTAL
IGV 18%
PRESUPUESTO TOTAL
FACTOR DE RELACION F.R. 1
COSTO DIRECTO
COSTO DIRECTO
PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
117,600.00 0 - 156.00 43680 156.00 43680
11,250.00 0 - 125.00 5625 125.00 5625
6,750.00 0 - 426.00 2130 426.00 2130
135,600.00 - 51,435.00 51,435.00
- -
13,560.00 5,143.50
13,560.00 5,143.50
162,720.00 61,722.00
29,289.60 F.R. = -
192,009.60
EL CONTRATISTA PROPONE SUS PRECIOS UNITARIOS Y LO PRESENTA A LA ENTIDAD DURANTE ELPROCESO DE SELECCION
PARCIAL
117,180.00
11,250.00
6,615.00
135,045.00
11,478.83
12,829.28
159,353.10
28,683.56
188,036.66
VAL ANTERIOR VAL ACTUAL VAL ACUMULADA