CRONOGRAMA VALORIZADO DE OBRA AREA GEOGRÁFICA: 4 ITEM DESCRIPCIÓN UND. M1 M2 M3 M4 M5 M6 01 OBRAS PROVISIONALES 01.01 ALMACEN DE OBRA mes 612.00 612.00 612.00 612.00 612.00 540.00 01.02 CARTEL DE IDENTIFICACION DE OBRA DE 8.50 X 3.60 m u 1,519.38 01.03 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOS glb 15,606.50 15,606.50 01.04 MANTENIMIENTO Y SEGURIDAD EN OBRA glb 2,171.75 2,171.75 2,171.75 2,171.75 2,171.75 1,916.25 02 PAVIMENTO RIGIDO 02.01 TRABAJOS PRELIMINARES 02.01.01 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 38,147.64 02.01.02 LIMPIEZA DE TERRENO MANUAL m2 4,066.92 02.01.03 TRAZO Y REPLANTEO CON EQUIPO m2 12,107.43 02.02 MOVIMIENTO DE TIERRAS 02.02.01 CORTE MATERIAL SUELTO A NIVEL DE SUBRASANTE C/EQUIPO m3 103,201.83 02.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 10,507.12 02.02.03 ELIM. MAT.CARG.MANUAL/VOLQUETE 10 M3,V=30 D= 7 KMS. m3 113,106.75 02.02.04 CONFORMACION Y COMPACTACION DE SUBRASANTE CON MAQUINARIA m2 7,375.67 11,524.48 10,540.93 02.02.05 MEJORAMIENTO DE SUBRASANTE (PIEDRA OVER 6") E = .20 M m2 174,904.43 02.02.06 BASE CON AFIRMADO Y/O MAT. GRANULAR E=.20 M m2 235,877.09 02.03 CONCRETO EN PAVIMENTOS 02.03.01 LOSA DE CONCRETO E=0.20m f'c= 210 Kg/cm2 m2 104,654.16 226,750.66 218,029.49 169,172.03 02.03.02 ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETO m2 12,021.45 15,627.86 3,717.26 02.03.03 DOWEL ENTRE LOSAS RIGIDAS 1" u 30,000.26 13,244.86 02.03.04 JUNTAS AISLAMIENTO CON TECNOPOR 1" m 12,213.55 12,213.55 1,285.07 1,285.07 02.03.05 CURADO CONCRETO m2 2,990.09 2,990.09 4,238.02 02.03.06 SELLADO JUNTAS CON ASFALTO 1" m 6,919.97 6,919.97 14,533.29 10,666.77 02.04 RAMPA DE CONCRETO 02.04.01 LOSA DE CONCRETO E=0.20m f'c= 210 Kg/cm2 m3 11,231.55 02.04.02 ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETO m2 568.08 02.04.03 JUNTAS AISLAMIENTO CON TECNOPOR 1" m 518.72 02.04.04 CURADO CONCRETO m2 147.14 02.04.05 SELLADO JUNTAS CON ASFALTO 1" m 534.99 02.05 VARIOS 02.05.01 NIVELACION DE BUZONES u 1,878.63 1,878.63 1,400.00 1,166.75 03 MURO DE CONTENCION EN AV. CAJAMARCA 03.01 OBRAS PRELIMINARES 03.01.01 TRAZO Y REPLANTEO CON EQUIPO m2 828.44 03.02 MOVIMIENTO DE TIERRAS 03.02.01 EXCAVACION ZANJAS MURO DE CONTENCION CON MAQUINARIA m3 31,669.78 03.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 48,392.80 03.02.03 FILTRO CON GRAVA PARA DRENAJE DE MURO m3 2,407.85 03.02.04 ELIM. MAT.CARG.MANUAL/VOLQUETE 10 M3,V=30 D= 7 KMS. m3 4,717.43 03.03 CONCRETO SIMPLE 03.03.01 SOLADO CONCRETO f'c = 140 KG/CM2 E = .10 m2 44,115.92 03.04 CONCRETO ARMADO 03.04.01 ZAPATAS 03.04.01.01 CONCRETO f'c= 210 kg/cm2 m3 100,691.26 73,516.28 03.04.01.02 ACERO DE REFUERZO f'y=4200 GRADO 60 kg 34,908.83 29,780.20 03.04.02 PANTALLA 03.04.02.01 CONCRETO f'c= 210 kg/cm2 m3 43,852.01 37,702.68 03.04.02.02 ENCOFRADO Y DESENCOFRADO MUROS DE CONTENCION m2 35,569.17 5,455.67 03.04.02.03 ACERO DE REFUERZO f'y=4200 GRADO 60 kg 37,942.27 7,696.35 03.04.02.04 JUNTAS CONTRACCION 1" SELLADAS CON ASFALTO m 666.89 03.04.02.05 JUNTAS DILATACION TECNOPOR 1" SELLADAS CON ASFALTO m 623.82 03.05 BARANDAS DE SEGURIDAD 03.05.01 BARANDA DE TUBO FIERRO GALVANIZADO 7,975.50 03.05.02 PINTURA EN BARANDAS METALICAS 1,372.50 04 CONSTRUCCION DE SARDINELES Y VEREDAS 04.01 OBRAS PRELIMINARES 04.01.01 DEMOLICION DE VEREDAS DE 0.10 m m2 7,099.79 4,539.67 04.01.02 TRAZO Y REPLANTEO CON EQUIPO m2 5,393.45 04.02 MOVIMIENTO DE TIERRAS 04.02.01 CORTE MATERIAL SUELTO H=.25 DE PROFUNDIDAD MANUAL m2 24,472.49 16,114.19 04.02.02 RELLENO CON AFIRMADO Y/O MAT. GRANULAR E = .15 M m2 62,632.53 12,992.18 04.02.03 EXCAVACION MANUAL DE ZANJA PARA SARDINEL (UÑAS) m3 1,903.79 1,303.78 04.02.04 ELIM. MAT.CARG.MANUAL/VOLQUETE 10 M3,V=30 D= 7 KMS. m3 18,600.94 04.03 CONCRETO EN VEREDAS 04.03.01 CONCRETO EN VEREDAS f'c = 175 KG/CM2 E = .10 M, ACABADO BRUÑADO m3 33,079.30 57,888.77 57,888.77 23,522.44 04.03.02 CONCRETO f'c=175 kg/cm2 EN UÑAS DE VEREDAS m3 6,876.70 12,034.23 12,243.34 3,438.35 04.03.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 4,933.23 8,633.16 8,633.16 4,063.83 04.03.04 CONCRETO F'C = 175 KG/CM2 GRADAS EN VEREDA e=0.10M m3 907.79 04.03.05 ENCOFRADO Y DESENCOFRADO GRADAS m2 327.14 04.03.06 CURADO CONCRETO m2 908.54 1,589.94 1,589.94 529.00 04.03.07 JUNTAS DILATACION TECNOPOR 1" SELLADAS CON ASFALTO m 2,944.35 5,152.62 8,619.14 1,472.18 04.04 SARDINELES 04.04.01 MOVIMIENTO DE TIERRAS 04.04.01.01 EXCAVACION MANUAL DE ZANJA PARA SARDINEL m3 33.74 OBRA: "CREACION DE PISTAS Y VEREDAS EN LAS CALLES CAJAMARCA, TRUJILLO, LOS PINOS, SERGIO ORREGO, LAS DALIAS, LOS FAICALES, 2 DE MAYO, LOS RO DISTRITO DE SANTA CRUZ – PROVINCIA DE SANTA CRUZ – CAJAMARCA" CONTRATISTA: CONSORCIO RIOS (ING. Armando A. Salomón Higueras) SUPERVISOR : HONSAMAA S.A.C. (ING. Manuel Ulises Cotrina Orrego)

Valorizcion Nº 05 - Febrero

Embed Size (px)

DESCRIPTION

valorizaciones

Citation preview

Page 1: Valorizcion Nº 05 - Febrero

CRONOGRAMA VALORIZADO DE OBRA

AREA GEOGRÁFICA: 4

ITEM DESCRIPCIÓN UND. M1 M2 M3 M4 M5 M6

01 OBRAS PROVISIONALES

01.01 ALMACEN DE OBRA mes 612.00 612.00 612.00 612.00 612.00 540.00

01.02 CARTEL DE IDENTIFICACION DE OBRA DE 8.50 X 3.60 m u 1,519.38

01.03 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOS glb 15,606.50 15,606.50

01.04 MANTENIMIENTO Y SEGURIDAD EN OBRA glb 2,171.75 2,171.75 2,171.75 2,171.75 2,171.75 1,916.25

02 PAVIMENTO RIGIDO

02.01 TRABAJOS PRELIMINARES

02.01.01 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 38,147.64

02.01.02 LIMPIEZA DE TERRENO MANUAL m2 4,066.92

02.01.03 TRAZO Y REPLANTEO CON EQUIPO m2 12,107.43

02.02 MOVIMIENTO DE TIERRAS

02.02.01 CORTE MATERIAL SUELTO A NIVEL DE SUBRASANTE C/EQUIPO m3 103,201.83

02.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 10,507.12

02.02.03 ELIM. MAT.CARG.MANUAL/VOLQUETE 10 M3,V=30 D= 7 KMS. m3 113,106.75

02.02.04 CONFORMACION Y COMPACTACION DE SUBRASANTE CON MAQUINARIA m2 7,375.67 11,524.48 10,540.93

02.02.05 MEJORAMIENTO DE SUBRASANTE (PIEDRA OVER 6") E = .20 M m2 174,904.43

02.02.06 BASE CON AFIRMADO Y/O MAT. GRANULAR E=.20 M m2 235,877.09

02.03 CONCRETO EN PAVIMENTOS

02.03.01 LOSA DE CONCRETO E=0.20m f'c= 210 Kg/cm2 m2 104,654.16 226,750.66 218,029.49 169,172.03

02.03.02 ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETO m2 12,021.45 15,627.86 3,717.26

02.03.03 DOWEL ENTRE LOSAS RIGIDAS 1" u 30,000.26 13,244.86

02.03.04 JUNTAS AISLAMIENTO CON TECNOPOR 1" m 12,213.55 12,213.55 1,285.07 1,285.07

02.03.05 CURADO CONCRETO m2 2,990.09 2,990.09 4,238.02

02.03.06 SELLADO JUNTAS CON ASFALTO 1" m 6,919.97 6,919.97 14,533.29 10,666.77

02.04 RAMPA DE CONCRETO

02.04.01 LOSA DE CONCRETO E=0.20m f'c= 210 Kg/cm2 m3 11,231.55

02.04.02 ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETO m2 568.08

02.04.03 JUNTAS AISLAMIENTO CON TECNOPOR 1" m 518.72

02.04.04 CURADO CONCRETO m2 147.14

02.04.05 SELLADO JUNTAS CON ASFALTO 1" m 534.99

02.05 VARIOS

02.05.01 NIVELACION DE BUZONES u 1,878.63 1,878.63 1,400.00 1,166.75

03 MURO DE CONTENCION EN AV. CAJAMARCA

03.01 OBRAS PRELIMINARES

03.01.01 TRAZO Y REPLANTEO CON EQUIPO m2 828.44

03.02 MOVIMIENTO DE TIERRAS

03.02.01 EXCAVACION ZANJAS MURO DE CONTENCION CON MAQUINARIA m3 31,669.78

03.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 48,392.80

03.02.03 FILTRO CON GRAVA PARA DRENAJE DE MURO m3 2,407.85

03.02.04 ELIM. MAT.CARG.MANUAL/VOLQUETE 10 M3,V=30 D= 7 KMS. m3 4,717.43

03.03 CONCRETO SIMPLE

03.03.01 SOLADO CONCRETO f'c = 140 KG/CM2 E = .10 m2 44,115.92

03.04 CONCRETO ARMADO

03.04.01 ZAPATAS

03.04.01.01 CONCRETO f'c= 210 kg/cm2 m3 100,691.26 73,516.28

03.04.01.02 ACERO DE REFUERZO f'y=4200 GRADO 60 kg 34,908.83 29,780.20

03.04.02 PANTALLA

03.04.02.01 CONCRETO f'c= 210 kg/cm2 m3 43,852.01 37,702.68

03.04.02.02 ENCOFRADO Y DESENCOFRADO MUROS DE CONTENCION m2 35,569.17 5,455.67

03.04.02.03 ACERO DE REFUERZO f'y=4200 GRADO 60 kg 37,942.27 7,696.35

03.04.02.04 JUNTAS CONTRACCION 1" SELLADAS CON ASFALTO m 666.89

03.04.02.05 JUNTAS DILATACION TECNOPOR 1" SELLADAS CON ASFALTO m 623.82

03.05 BARANDAS DE SEGURIDAD

03.05.01 BARANDA DE TUBO FIERRO GALVANIZADO 7,975.50

03.05.02 PINTURA EN BARANDAS METALICAS 1,372.50

04 CONSTRUCCION DE SARDINELES Y VEREDAS

04.01 OBRAS PRELIMINARES

04.01.01 DEMOLICION DE VEREDAS DE 0.10 m m2 7,099.79 4,539.67

04.01.02 TRAZO Y REPLANTEO CON EQUIPO m2 5,393.45

04.02 MOVIMIENTO DE TIERRAS

04.02.01 CORTE MATERIAL SUELTO H=.25 DE PROFUNDIDAD MANUAL m2 24,472.49 16,114.19

04.02.02 RELLENO CON AFIRMADO Y/O MAT. GRANULAR E = .15 M m2 62,632.53 12,992.18

04.02.03 EXCAVACION MANUAL DE ZANJA PARA SARDINEL (UÑAS) m3 1,903.79 1,303.78

04.02.04 ELIM. MAT.CARG.MANUAL/VOLQUETE 10 M3,V=30 D= 7 KMS. m3 18,600.94

04.03 CONCRETO EN VEREDAS

04.03.01 CONCRETO EN VEREDAS f'c = 175 KG/CM2 E = .10 M, ACABADO BRUÑADOm3 33,079.30 57,888.77 57,888.77 23,522.44

04.03.02 CONCRETO f'c=175 kg/cm2 EN UÑAS DE VEREDAS m3 6,876.70 12,034.23 12,243.34 3,438.35

04.03.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 4,933.23 8,633.16 8,633.16 4,063.83

04.03.04 CONCRETO F'C = 175 KG/CM2 GRADAS EN VEREDA e=0.10M m3 907.79

04.03.05 ENCOFRADO Y DESENCOFRADO GRADAS m2 327.14

04.03.06 CURADO CONCRETO m2 908.54 1,589.94 1,589.94 529.00

04.03.07 JUNTAS DILATACION TECNOPOR 1" SELLADAS CON ASFALTO m 2,944.35 5,152.62 8,619.14 1,472.18

04.04 SARDINELES

04.04.01 MOVIMIENTO DE TIERRAS

04.04.01.01 EXCAVACION MANUAL DE ZANJA PARA SARDINEL m3 33.74

04.04.02 CONCRETO EN SARDINELES

OBRA: "CREACION DE PISTAS Y VEREDAS EN LAS CALLES CAJAMARCA, TRUJILLO, LOS PINOS, SERGIO ORREGO, LAS DALIAS, LOS FAICALES, 2 DE MAYO, LOS ROSALES, DEL DISTRITO DE SANTA CRUZ – PROVINCIA DE SANTA CRUZ – CAJAMARCA"

CONTRATISTA: CONSORCIO RIOS (ING. Armando A. Salomón Higueras)SUPERVISOR : HONSAMAA S.A.C. (ING. Manuel Ulises Cotrina Orrego)

Page 2: Valorizcion Nº 05 - Febrero

04.04.02.01 CONCRETO EN SARDINELES, F'C=175 KG/CM2 m3 531.44

04.04.02.02 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 121.84

04.04.02.03 ACERO DE REFUERZO f'y=4200 GRADO 60 kg 48.96

04.05 VARIOS

04.05.01 ENCIMADO DE CAJAS DOMICILIARIAS DE AGUA u 1,727.17 3,022.54 3,022.54 863.58

04.05.02 ENCIMADO DE CAJAS DOMICILIARIAS DE DESAGUE u 1,799.04 3,148.32 3,148.32 899.52

04.06 JARDINERIA

04.06.01 OBRAS PRELIMINARES

04.06.01.01 TRAZO Y REPLANTEO CON EQUIPO m2 636.53 480.61

04.06.02 MOVIMIENTO DE TIERRAS

04.06.02.01 EXCAVACION MANUAL DE TERRENO m3 4,116.71 2,340.22

04.06.02.02 ELIM. MAT.CARG.MANUAL/VOLQUETE 10 M3,V=30 D= 7 KMS. m3 2,642.20

04.06.03 OBRAS DE CONCRETO

04.06.03.01 SARDINELES DE CONCRETO DE f'c=175 kg/cm2 EN JARDINERAS m3 9,273.13 4,280.89

04.06.03.02 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 6,256.82 3,507.24

04.06.04 AREAS VERDES

04.06.04.01 AREAS VERDES m2 35,949.50

04.06.04.02 PLANTONES 2,278.80

05 OBRAS DE ARTE

05.01 ALCANTARILLA DE CONCRETO ARMADO DE 0.9x0.9M

05.01.01 OBRAS PRELIMINARES

05.01.01.01 DEMOLICION DE ALCANTARILLAS m2 643.94

05.01.01.02 TRAZO Y REPLANTEO CON EQUIPO m2 35.03

05.01.02 MOVIMIENTO DE TIERRAS

05.01.02.01 EXCAVACION MANUAL PARA ALCANTARILLA m3 644.30

05.01.02.02 REFINE Y NIVELACION DE EXCAVACION m 54.18

05.01.02.03 RELLENO CON MATERIAL PROPIO m3 197.42

05.01.02.04 ELIM. MAT.CARG.MANUAL/VOLQUETE 10 M3,V=30 D= 7 KMS. m3 257.48

05.01.03 CONCRETO SIMPLE 0.00

05.01.03.01 ENBOQUILLADO DE PIEDRA 8" CON MORTERO m2 131.33

05.01.03.02 SOLADO CONCRETO f'c = 140 KG/CM2 E = .10 m2 1,678.77

05.01.04 CONCRETO ARMADO EN ESTRUCTURAS DE ENTRADA Y SALIDA

05.01.04.01 CONCRETO f'c= 210 kg/cm2 EN LOSA DE FONDO m3 1,386.88

05.01.04.02 CONCRETO f'c= 210 kg/cm2 EN LOSA DE SUPERIOR m3 1,443.38

05.01.04.03 CONCRETO f'c= 210 kg/cm2 EN MUROS Y ALETAS m3 3,179.56

05.01.04.04 ENCOFRADO Y DESENCOFRADO DE ALCANTARILLAS m2 897.60

05.01.04.05 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 4,568.27

05.01.05 TARRAJEO DE ALCANTARILLAS

05.01.05.01 TARRAJEO EN MUROS m2 1,851.86

05.02 ALCANTARILLA DE CONCRETO ARMADO DE 1.5x(2.5-3.5)M

05.02.01 OBRAS PRELIMINARES

05.02.01.01 DEMOLICION DE ALCANTARILLAS m2 643.94

05.02.01.02 TRAZO Y REPLANTEO CON EQUIPO m2 49.60

05.02.02 MOVIMIENTO DE TIERRAS

05.02.02.01 EXCAVACION MANUAL PARA ALCANTARILLA m3 696.83

05.02.02.02 REFINE Y NIVELACION DE EXCAVACION m 54.18

05.02.02.03 RELLENO CON MATERIAL PROPIO m3 151.91

05.02.02.04 ELIM. MAT.CARG.MANUAL/VOLQUETE 10 M3,V=30 D= 7 KMS. m3 249.46

05.02.03 CONCRETO SIMPLE

05.02.03.01 ENBOQUILLADO DE PIEDRA 8" CON MORTERO m2 182.40

05.02.03.02 SOLADO CONCRETO f'c = 140 KG/CM2 E = .10 m2 2,427.12

05.02.04 CONCRETO ARMADO EN ESTRUCTURAS DE ENTRADA Y SALIDA

05.02.04.01 CONCRETO f'c= 210 kg/cm2 EN LOSA DE FONDO m3 2,486.11

05.02.04.02 CONCRETO f'c= 210 kg/cm2 EN LOSA DE SUPERIOR m3 1,374.31 731.70

05.02.04.03 CONCRETO f'c= 210 kg/cm2 EN MUROS Y ALETAS m3 9,055.83

05.02.04.04 ENCOFRADO Y DESENCOFRADO DE ALCANTARILLAS m2 2,123.68

05.02.04.05 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 9,508.54 3,241.94

05.02.05 TARRAJEO DE ALCANTARILLAS

05.02.05.01 TARRAJEO EN MUROS m2 4,708.52

05.03 ALCANTARILLA DE TMC 36"

05.03.01 OBRAS PRELIMINARES

05.03.01.01 DEMOLICION DE ALCANTARILLAS m2 526.86

05.03.01.02 TRAZO Y REPLANTEO CON EQUIPO m2 49.16

05.03.02 MOVIMIENTO DE TIERRAS

05.03.02.01 EXCAVACION MANUAL PARA ALCANTARILLA m3 50.60

05.03.02.02 REFINE Y NIVELACION DE EXCAVACION m 54.18

05.03.02.03 RELLENO CON MATERIAL PROPIO m3 228.61

05.03.02.04 ELIM. MAT.CARG.MANUAL/VOLQUETE 10 M3,V=30 D= 7 KMS. m3 159.25

05.03.02.05 COLOCACION DE MATERIAL DE AFIRMADO EN BASE E=0.10M m2 450.80

05.03.03 CONCRETO SIMPLE

05.03.03.01 ENBOQUILLADO DE PIEDRA 8" CON MORTERO m2 19.61

05.03.03.02 SOLADO CONCRETO f'c = 140 KG/CM2 E = .10 m2 539.61

05.03.04 CONCRETO ARMADO EN ALCANTARILLAS

05.03.04.01 CONCRETO f'c= 210 kg/cm2 EN CABEZAL ENTRADA Y SALIDA m3 1,130.28

05.03.04.02 CONCRETO f'c= 210 kg/cm2 EN LOSA DE ENTRADA Y SALIDA m3 588.30

05.03.04.03 ENCOFRADO Y DESENCOFRADO DE ALCANTARILLAS m2 1,211.21

05.03.04.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 609.51

05.03.05 TUBERIA PARA ALCANTARILLA

05.03.05.01 TMC 36" m 6,191.43

05.03.06 TARRAJEO DE ALCANTARILLAS

05.03.06.01 TARRAJEO EN MUROS m2 449.27

05.04 CONSTRUCCION DE CUNETAS

05.04.01 OBRAS PRELIMINARES

05.04.01.01 TRAZO Y REPLANTEO CON EQUIPO m2 393.37

Page 3: Valorizcion Nº 05 - Febrero

05.04.02 MOVIMIENTO DE TIERRAS

05.04.02.01 EXCAVACION MANUAL PARA CUNETAS m3 4,547.24

05.04.02.02 REFINE Y NIVELACION DE FONDO CAJA DE CUNETA m 2,433.77

05.04.02.03 ELIM. MAT.CARG.MANUAL/VOLQUETE 10 M3,V=30 D= 7 KMS. m3 1,860.73

05.04.03 CONCRETO CUNETAS

05.04.03.01 CONCRETO PARA CUNETAS F'C=175 KG/CM2 m3 19,213.55 10,274.79

05.04.03.02 ENCOFRADO Y DESENCOFRADO CUNETA m2 11,321.94 8,330.32

05.04.03.03 TAPAS DE CONCRETO F'C=175 KG/CM2 CUNETA E = .10 M m3 8,910.74 2,825.65

05.04.03.04 ACERO DE REFUERZO f'y=4200 GRADO 60 kg 4,098.00 2,297.13

05.04.03.05 REJILLA SUMIDERO A=0.40 m PLATINA 1 1/2"x1/4" @ 2" Y MARCO "L" 2 x 1u 9,981.61 6,420.09

05.04.04 VARIOS

05.04.04.01 JUNTAS DILATACION TECNOPOR 1" SELLADAS CON ASFALTO m 1,595.55 1,059.90

06 SEÑALIZACION

06.01 SEÑALES VERTICALES

06.01.01 SEÑALES PREVENTIVAS P-56 u 294.62

06.01.02 SEÑALES REGULADORAS R-30 u 589.24

06.02 MARCAS EN EL PAVIMENTO

06.02.01 CRUCE PEATONAL m2 120.13

06.02.02 LINEA CONTINUA m 1,481.94

06.02.03 LINEA DISCONTINUA m 780.73

06.02.04 PINTADO DE SARDINEL DE MURO m 486.40

06.02.05 PINTADO DE SARDINEL DE VEREDA m 8,091.39

06.02.06 SIMBOLOS Y FLECHAS m2 1,801.28

07 OTROS

07.01 LIMPIEZA DE OBRA m2 2,232.73 2,232.73 3,976.98 3,976.98 5,603.55

07.02 FLETE TERRESTRE glb 29,269.80 28,269.80 17,761.88 16,761.88 16,525.21 5,253.96

TOTAL COSTO DIRECTO S/. 957,858.65 622,206.31 481,964.00 449,827.08 368,604.03 139,194.01

GASTOS GENERALES (8%) 76,628.69 49,776.50 38,557.12 35,986.17 29,488.32 11,135.52

UTILIDAD (7%) 67,050.11 43,554.44 33,737.48 31,487.90 25,802.28 9,743.58

SUBTOTAL 1,101,537.45 715,537.26 554,258.60 517,301.14 423,894.63 160,073.11

IMPUESTO GENERAL A LAS VENTAS (IGV 18%) 198,276.74 128,796.71 99,766.55 93,114.20 76,301.03 28,813.16

TOTAL PRESUPUESTO S/. 1,299,814.19 844,333.96 654,025.15 610,415.34 500,195.67 188,886.28

Page 4: Valorizcion Nº 05 - Febrero

CRONOGRAMA VALORIZADO DE OBRA

49,107.38

3,600.00

1,519.38

31,213.00

12,775.00

1,610,158.3

54,321.99

38,147.64

4,066.92

12,107.43

667,038.30

103,201.83

10,507.12

113,106.75

29,441.08

174,904.43

235,877.09

869,473.50

718,606.35

31,366.56

43,245.12

26,997.25

10,218.21

39,040.01

13,000.48

11,231.55

568.08

518.72

147.14

534.99

6,324.00

6,324.00

549,885.65

828.44

828.44

87,187.86

31,669.78

48,392.80

2,407.85

4,717.43

44,115.92

44,115.92

408,405.43

238,896.57

174,207.54

64,689.03

169,508.86

81,554.69

41,024.84

45,638.62

666.89

623.82

9,348.00

7,975.50

1,372.50

502,458.40

17,032.91

11,639.46

5,393.45

138,019.90

40,586.68

75,624.71

3,207.57

18,600.94

257,275.90

172,379.27

34,592.62

26,263.38

907.79

327.14

4,617.41

18,188.29

735.98

33.74

33.74

702.24

"CREACION DE PISTAS Y VEREDAS EN LAS CALLES CAJAMARCA, TRUJILLO, LOS PINOS, SERGIO ORREGO, LAS DALIAS, LOS FAICALES, 2 DE MAYO, LOS ROSALES,

Total

Page 5: Valorizcion Nº 05 - Febrero

531.44

121.84

48.96

17,631.04

8,635.83

8,995.21

71,762.64

1,117.14

1,117.14

9,099.13

6,456.93

2,642.20

23,318.07

13,554.01

9,764.06

38,228.30

35,949.50

2,278.80

162,479.13

16,970.00

678.97

643.94

35.03

1,153.38

644.30

54.18

197.42

257.48

1,810.10

131.33

1,678.77

11,475.69

1,386.88

1,443.38

3,179.56

897.60

4,568.27

1,851.86

1,851.86

37,686.07

693.54

643.94

49.60

1,152.38

696.83

54.18

151.91

249.46

2,609.52

182.40

2,427.12

28,522.11

2,486.11

2,106.01

9,055.83

2,123.68

12,750.48

4,708.52

4,708.52

12,258.68

576.02

526.86

49.16

943.44

50.60

54.18

228.61

159.25

450.80

559.22

19.61

539.61

3,539.30

1,130.28

588.30

1,211.21

609.51

6,191.43

6,191.43

449.27

449.27

95,564.38

393.37

393.37

Page 6: Valorizcion Nº 05 - Febrero

8,841.74

4,547.24

2,433.77

1,860.73

83,673.82

29,488.34

19,652.26

11,736.39

6,395.13

16,401.70

2,655.45

2,655.45

13,645.73

883.86

294.62

589.24

12,761.87

120.13

1,481.94

780.73

486.40

8,091.39

1,801.28

131,865.52

18,022.98

113,842.54

3,019,708.11

241,576.65

211,379.57

3,472,664.33

625,079.58

4,097,743.92

Page 7: Valorizcion Nº 05 - Febrero

VALORIZACIÓN DE OBRA VALORIZACION DE OBRA Nº 05 (DEL 01/02/2015 AL 28/02/2015)

ESPECIFICACION PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZARPARTIDADESCRIPCION UNIDADMETRADOPRECIO UNITARIO PARCIAL METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE01.00.0 PABELLON 01

OBRAS PROVISIONALES CARTEL DE IDENTIFICACION DE OBRA DE 8.50 X 3.60 m und 1.00 1,478.70 1,478.70 1.00 1,478.70 100.00% 0.00 0.00% 1.00 1,478.70 100.00% 0.00 0.00 0.00% ALMACEN, CASETA Y GUARDIANIA m2 48.00 106.88 5,130.24 48.00 5,130.24 100.00% 0.00 0.00% 48.00 5,130.24 100.00% 0.00 0.00 0.00% CERCO PROVISIONAL DE SEGURIDAD DE OBRA ml 456.00 18.25 8,322.00 456.00 8,322.00 100.00% 0.00 0.00% 456.00 8,322.00 100.00% 0.00 0.00 0.00% MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS glb 1.00 3,800.00 3,800.00 0.50 1,900.00 50.00% 0.00 0.00% 0.50 1,900.00 50.00% 0.50 1,900.00 50.00% TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 224.45 0.74 166.09 224.45 166.09 100.00% 0.00 0.00% 224.45 166.09 100.00% 0.00 0.00 0.00% TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 224.45 2.95 662.13 224.45 662.13 100.00% 0.00 0.00% 224.45 662.13 100.00% 0.00 0.00 0.00% MOVIMIENTO DE TIERRAS CORTE DE MATERIAL SUELTO CON MAQUINARIA PARA EXPLANACIONES m3 258.43 7.58 1,958.90 258.43 1,958.90 100.00% 0.00 0.00% 258.43 1,958.90 100.00% 0.00 0.00 0.00% EXCAVACION MANUAL PARA CIMIENTOS Y ZAPATAS m3 126.22 36.96 4,665.09 126.22 4,665.09 100.00% 0.00 0.00% 126.22 4,665.09 100.00% 0.00 0.00 0.00% RELLENO COMPACTADO CON MATERIAL PROPIO m3 57.52 44.42 2,555.04 57.52 2,555.04 100.00% 0.00 0.00% 57.52 2,555.04 100.00% 0.00 0.00 0.00% AFIRMADO COMPACTADO E=6" PARA ZAPATAS m2 56.15 39.85 2,237.58 56.15 2,237.58 100.00% 0.00 0.00% 56.15 2,237.58 100.00% 0.00 0.00 0.00% AFIRMADO COMPACTADO E=4" PARA CIMIENTOS m2 33.53 28.81 966.00 33.53 966.00 100.00% 0.00 0.00% 33.53 966.00 100.00% 0.00 0.00 0.00% NIVELACION INT. PARA FALSO PISO Y VEREDAS m2 269.91 3.31 893.40 224.50 743.10 83.18% 45.41 150.31 16.82% 269.91 893.40 100.00% 0.00 0.00 0.00% AFIRMADO COMPACTADO E=4" PARA PISOS Y VEREDAS m2 269.91 28.81 7,776.11 134.50 3,874.95 49.83% 135.41 3,901.16 50.17% 269.91 7,776.11 100.00% 0.00 0.00 0.00% ACARREO INTERNO DE MATERIAL EXCEDENTE m3 408.91 15.11 6,178.63 408.91 6,178.63 100.00% 0.00 0.00% 408.91 6,178.63 100.00% 0.00 0.00 0.00% ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) m3 408.91 29.06 11,882.92 408.91 11,882.92 100.00% 0.00 0.00% 408.91 11,882.92 100.00% 0.00 0.00 0.00% OBRAS DE CONCRETO SIMPLE SOLADOS SOLADO PARA ZAPATAS DE E=4" MEZCLA 1:12 CEMENTO:HORMIGON m2 56.15 40.26 2,260.60 56.15 2,260.60 100.00% 0.00 0.00% 56.15 2,260.60 100.00% 0.00 0.00 0.00% CIMIENTO CORRIDO CIMIENTO CORRIDO MEZCLA C:H = 1:10 30% P.G. m3 19.13 338.92 6,483.54 19.13 6,483.54 100.00% 0.00 0.00% 19.13 6,483.54 100.00% 0.00 0.00 0.00% SOBRECIMIENTOS SOBRECIMIENTOS, CONCRETO 1:8+25% PM m3 8.08 368.05 2,973.84 8.08 2,973.84 100.00% 0.00 0.00% 8.08 2,973.84 100.00% 0.00 0.00 0.00% SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 85.92 31.00 2,663.52 85.92 2,663.52 100.00% 0.00 0.00% 85.92 2,663.52 100.00% 0.00 0.00 0.00% FALSO PISO FALSO PISO DE 4" DE CONCRETO C:H = 1:8 m2 179.55 42.46 7,623.69 0.00 0.00 0.00% 179.55 7,623.69 100.00% 179.55 7,623.69 100.00% 0.00 0.00 0.00% OBRAS DE CONCRETO ARMADO ZAPATAS ZAPATAS, CONCRETO f'c=210 kg/cm2 m3 33.68 447.37 15,067.42 33.68 15,067.42 100.00% 0.00 0.00% 33.68 15,067.42 100.00% 0.00 0.00 0.00% ZAPATAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 595.98 5.34 3,182.53 595.98 3,182.53 100.00% 0.00 0.00% 595.98 3,182.53 100.00% 0.00 0.00 0.00% VIGAS DE CIMENTACION VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2 m3 10.74 445.12 4,780.59 10.74 4,780.59 100.00% 0.00 0.00% 10.74 4,780.59 100.00% 0.00 0.00 0.00% VIGAS DE CIMENTACION , ENCOFRADO Y DESENCOFRADO m2 85.92 37.87 3,253.79 85.92 3,253.79 100.00% 0.00 0.00% 85.92 3,253.79 100.00% 0.00 0.00 0.00% VIGAS DE CIMENTACION, ACERO CORRUGADO fy=4200 kg/cm2 kg 2,254.18 5.34 12,037.32 2,254.18 12,037.32 100.00% 0.00 0.00% 2,254.18 12,037.32 100.00% 0.00 0.00 0.00% COLUMNAS Y COLUMNETAS COLUMNAS Y COLUMNETAS, CONCRETO f'c=210 KG/CM2 m3 23.36 543.25 12,690.32 11.68 6,345.16 50.00% 11.68 6,345.16 50.00% 23.36 12,690.32 100.00% 0.00 0.00 0.00% COLUMNAS Y COLUMNETAS , ENCOFRADO Y DESENCOFRADO NORMAL m2 293.33 32.37 9,495.09 146.66 4,747.38 50.00% 146.67 4,747.71 50.00% 293.33 9,495.09 100.00% 0.00 0.00 0.00% COLUMNAS Y COLUMNETAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 4,479.69 5.34 23,921.54 3,583.75 19,137.21 80.00% 895.94 4,784.34 20.00% 4,479.69 23,921.54 100.00% 0.00 0.00 0.00% VIGAS, VIGUETAS Y DINTELES VIGAS, VIGUETAS Y DINTELES, CONCRETO f'c=210 KG/CM2 m3 35.54 456.61 16,227.92 12.00 5,479.32 33.76% 23.54 10,748.60 66.24% 35.54 16,227.92 100.00% 0.00 0.00 0.00% VIGAS, VIGUETAS Y DINTELES , ENCOFRADO Y DESENCOFRADO NORMAL m2 548.46 48.70 26,710.00 250.00 12,175.00 45.58% 298.46 14,535.00 54.42% 548.46 26,710.00 100.00% 0.00 0.00 0.00% VIGAS, VIGUETAS Y DINTELES, ACERO CORRUGADO fy=4200 kg/cm2 kg 5,982.27 5.34 31,945.32 2,500.00 13,350.00 41.79% 3,482.27 18,595.32 58.21% 5,982.27 31,945.32 100.00% 0.00 0.00 0.00% LOSAS ALIGERADAS LOSAS ALIG., CONCRETO f'c=210 KG/CM2 m3 51.97 440.38 22,886.55 0.00 0.00 0.00% 51.97 22,886.55 100.00% 51.97 22,886.55 100.00% 0.00 0.00 0.00% LOSAS ALIG., ENCOFRADO Y DESENCOFRADO m2 519.65 31.20 16,213.08 0.00 0.00 0.00% 519.65 16,213.08 100.00% 519.65 16,213.08 100.00% 0.00 0.00 0.00% LOSAS ALIG., ACERO CORRUGADO fy=4200 kg/cm2 kg 3,588.54 5.34 19,162.80 1,500.00 8,010.00 41.80% 2,088.54 11,152.80 58.20% 3,588.54 19,162.80 100.00% 0.00 0.00 0.00% LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.15 X 0.25 X 0.30 M. und 2,360.00 2.99 7,056.40 1,000.00 2,990.00 42.37% 1,360.00 4,066.40 57.63% 2,360.00 7,056.40 100.00% 0.00 0.00 0.00% LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.12 X 0.25 X 0.30 M. und 2,694.68 2.78 7,491.21 0.00 0.00 0.00% 2,694.68 7,491.21 100.00% 2,694.68 7,491.21 100.00% 0.00 0.00 0.00% MUROS Y TABIQUE DE ALBAÑILERIA

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YAUYUCAN OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)

SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675) DISTRITO: YAUYUCAN PROVINCIA : SANTA CRUZ

Page 8: Valorizcion Nº 05 - Febrero

VALORIZACIÓN DE OBRA VALORIZACION DE OBRA Nº 05 (DEL 01/02/2015 AL 28/02/2015)

ESPECIFICACION PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZARPARTIDADESCRIPCION UNIDADMETRADOPRECIO UNITARIO PARCIAL METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YAUYUCAN OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)

SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675) DISTRITO: YAUYUCAN PROVINCIA : SANTA CRUZ

MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 218.47 61.25 13,381.29 152.64 9,349.08 69.87% 65.83 4,032.21 30.13% 218.47 13,381.29 100.00% 0.00 0.00 0.00% MURO DE CABEZA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 151.20 99.02 14,971.82 105.84 10,480.28 70.00% 45.36 4,491.55 30.00% 151.20 14,971.82 100.00% 0.00 0.00 0.00% CUBIERTAS COBERTURA DE TEJA ANDINA SOBRE LOSA DE CONCRETO m2 300.43 83.05 24,950.71 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 300.43 24,950.71 100.00% CUMBRERA DE TEJA ANDINA ml 30.50 34.43 1,050.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.50 1,050.12 100.00% REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO EN INTERIORES Y EXTERIORES E=1.5 CM, MEZC: C:A=1:3 m2 1,153.43 20.68 23,852.93 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,153.43 23,852.93 100.00% TARRAJEO DE COLUMNAS MZ.C:A=1:3, E=1.5 CM. m2 325.25 29.04 9,445.26 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 325.25 9,445.26 100.00% TARRAJEO DE VIGASE=1.5 CM, MEZC. C:A=1:3, m2 548.46 33.97 18,631.19 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 548.46 18,631.19 100.00% VESTIDURA DE DERRAMES E=1.5 CM. MEZCLA C:A=1:3 ml 158.37 12.38 1,960.62 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 158.37 1,960.62 100.00% CIELORRASOS CIELORRASOS CON MEZCLA C:A=1:3, INC. TARRAJEO DE FONDO ESCALERA m2 533.75 24.18 12,906.08 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 533.75 12,906.08 100.00% PISOS Y PAVIMENTOS CONTRAPISO DE CEMENTO 48 MM m2 410.75 23.65 9,714.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 410.75 9,714.24 100.00% PISO CERAMICO 0.30 X 0.30 M. m2 410.75 65.45 26,883.59 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 410.75 26,883.59 100.00% VEREDAS DE CONCRETO F'C 175KG/CM2 m2 90.36 61.18 5,528.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 90.36 5,528.22 100.00% SARDINEL, CONCRETO f'c= 175 kg/cm2, 15X35 XM ml 3.38 64.36 217.54 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.38 217.54 100.00% SARDINEL, ENCOFRADO Y DESENCOFRADO m2 22.53 42.22 951.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.53 951.22 100.00% JUNTAS ASFALTICAS EN VEREDAS 1:5, E=1" ml 21.60 5.16 111.46 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.60 111.46 100.00% ZOCALOS Y CONTRAZOCALOS CONTRAZOCALO DE CEMENTO PULIDO H=20 CM EN EXTERIORES ml 97.49 8.57 835.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 97.49 835.49 100.00% CONTRAZOCALO DE CEMENTO PULIDO H=10 CM EN INTERIORES ml 123.20 8.22 1,012.70 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 123.20 1,012.70 100.00% CARPINTERIA DE MADERA PUERTA DE MADERA CEDRO P-1 TABLERADA S/MODELO D 1.05X2.80 M. und 7.00 1,300.00 9,100.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 9,100.00 100.00% PUERTA DE MADERA CEDRO P-3 TABLERADA S/MODELO DE 1.05X2.25 M. und 3.00 850.00 2,550.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 2,550.00 100.00% VENTANA DE MADERA DE CEDRO V-1 DE 3.175 X 1.60 M. und 7.00 700.00 4,900.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 4,900.00 100.00% VENTANA DE MADERA DE CEDRO V-2 DE 4.225 X 1.60 M. und 5.00 800.00 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 4,000.00 100.00% VENTANA DE MADERA DE CEDRO V-3 DE 4.225 X 1.30 M. und 12.00 650.00 7,800.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 7,800.00 100.00% CARPINTERIA METALICA BARRAS DE SEGURIDAD FIERRO LISO 1/2" EN VENTANAS ml 479.40 8.60 4,122.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 479.40 4,122.84 100.00% CERRAJERIA BISAGRA CAPUCHINA DE 4" X 4" und 20.00 14.55 291.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 291.00 100.00% BISAGRA CAPUCHINA DE 1 1/2" X 1 1/2" pza 96.00 12.35 1,185.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 96.00 1,185.60 100.00% CERRADURA PARA FORTE TRES GOLPES EN PUERTA und 8.00 84.50 676.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 676.00 100.00% CERRADURA SAPITO PARA VENTANAS und 24.00 7.44 178.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.00 178.56 100.00% MANIJA DE BRONCE PARA DE 4" PARA PUERTAS und 7.00 39.00 273.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 273.00 100.00% VIDRIOS, CRISTALES Y SIMILARES VIDRIO SEMIDOBLE NACIONAL TRANSPARENTE p2 1,503.95 5.31 7,985.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,503.95 7,985.97 100.00% PINTURA PINTURA LATEX EN VIGAS Y CIELORRASOS (2 MANOS) m2 1,082.21 12.00 12,986.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,082.21 12,986.52 100.00% PINTURA LATEX EN MUROS Y COLUMNAS (2 MANOS) m2 1,478.68 15.54 22,978.69 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,478.68 22,978.69 100.00% PINTURA EN PUERTAS DE MADERA CON BARNIZ m2 23.00 18.93 435.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.00 435.39 100.00% PINTURA BARNIZ EN VENTANAS DE MADERA m2 55.20 16.83 929.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.20 929.02 100.00% PINTURA DE CONTRAZOCALOS CON ESMALTE m2 37.74 12.41 468.35 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.74 468.35 100.00% SISTEMA DE AGUAS DE LLUVIA

m3 0.51 481.69 245.66 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.51 245.66 100.00% CANALETA DE ZINC DE 6" PARA EVACUACION PLUVIAL IN. EMBUDO COLECTOR ml 44.36 61.43 2,725.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 44.36 2,725.03 100.00% MONTANTE DE BAJADA DE AGUA DE LLUVIA PVC SAL 3" ml 48.80 52.22 2,548.34 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.80 2,548.34 100.00% INSTALACIONES ELECTRICAS TABLERO GENERAL und 1.00 3,953.83 3,953.83 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 3,953.83 100.00% TABLERO MODULOS und 3.00 3,675.11 11,025.33 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 11,025.33 100.00% SALIDAS DE TECHO (CENTROS DE LUZ) pto 24.00 74.80 1,795.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.00 1,795.20 100.00%

DADO DE CONCRETO F'C=140 KG/CM2 PROTECCION MONTANTE DE BAJADA DE AGUA DE LLUVIA

Page 9: Valorizcion Nº 05 - Febrero

VALORIZACIÓN DE OBRA VALORIZACION DE OBRA Nº 05 (DEL 01/02/2015 AL 28/02/2015)

ESPECIFICACION PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZARPARTIDADESCRIPCION UNIDADMETRADOPRECIO UNITARIO PARCIAL METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YAUYUCAN OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)

SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675) DISTRITO: YAUYUCAN PROVINCIA : SANTA CRUZ

SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE PUESTA A TIERRA pto 40.00 87.78 3,511.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.00 3,511.20 100.00% TUBERIAS PVC SEL (ELECTRICAS) D=20MM ml 660.00 3.40 2,244.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 660.00 2,244.00 100.00% TUBERIAS PVC SEL (ELECTRICAS) D=30MM ml 84.00 3.53 296.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 84.00 296.52 100.00% CABLE TW AWG 2.5 mm2 ml 910.00 2.62 2,384.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 910.00 2,384.20 100.00% CABLE TW AWG 4 MM2 ml 740.00 5.30 3,922.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 740.00 3,922.00 100.00% CABLE TW AWG 6 MM2 ml 180.00 10.10 1,818.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 180.00 1,818.00 100.00% TABLERO GENERAL und 1.00 3,953.83 3,953.83 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 3,953.83 100.00% LAMPARAS FLUORESCENTES RECTAS DE 2 X 40 W und 22.00 110.75 2,436.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.00 2,436.50 100.00% LAMPARAS FLUORESCENTES RECTAS DE 2 X 20 W und 20.00 93.72 1,874.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 1,874.40 100.00% POZO DE PUESTA A TIERRA und 1.00 653.88 653.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 653.88 100.00% CONEXION A RED EXTERNA Y MEDIDOR und 1.00 974.22 974.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 974.22 100.00%

02.00.0 PABELLOÓN 02, SSHH DE ALUMNOS Y DOCENTES. TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 284.13 0.74 210.26 284.13 210.26 100.00% 0.00 0.00% 284.13 210.26 100.00% 0.00 0.00 0.00% TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 288.56 2.95 851.25 288.56 851.25 100.00% 0.00 0.00% 288.56 851.25 100.00% 0.00 0.00 0.00% MOVIMIENTO DE TIERRAS CORTE DE MATERIAL SUELTO CON MAQUINARIA PARA EXPLANACIONES m3 196.85 7.58 1,492.12 196.85 1,492.12 100.00% 0.00 0.00% 196.85 1,492.12 100.00% 0.00 0.00 0.00% EXCAVACION MANUAL PARA CIMIENTOS Y ZAPATAS m3 132.19 36.96 4,885.74 132.19 4,885.74 100.00% 0.00 0.00% 132.19 4,885.74 100.00% 0.00 0.00 0.00% RELLENO COMPACTADO CON MATERIAL PROPIO m3 61.95 44.42 2,751.82 61.95 2,751.82 100.00% 0.00 0.00% 61.95 2,751.82 100.00% 0.00 0.00 0.00% AFIRMADO COMPACTADO E=6" PARA ZAPATAS m2 43.67 39.85 1,740.25 43.67 1,740.25 100.00% 0.00 0.00% 43.67 1,740.25 100.00% 0.00 0.00 0.00% AFIRMADO COMPACTADO E=4" PARA CIMIENTOS m2 50.64 28.81 1,458.94 50.64 1,458.94 100.00% 0.00 0.00% 50.64 1,458.94 100.00% 0.00 0.00 0.00% NIVELACION INT. PARA FALSO PISO Y VEREDAS m2 272.77 3.31 902.87 272.77 902.87 100.00% 0.00 0.00% 272.77 902.87 100.00% 0.00 0.00 0.00% AFIRMADO COMPACTADO E=4" PARA PISOS Y VEREDAS m2 272.77 28.81 7,858.50 272.77 7,858.50 100.00% 0.00 0.00% 272.77 7,858.50 100.00% 0.00 0.00 0.00% ACARREO INTERNO DE MATERIAL EXCEDENTE m3 333.87 15.11 5,044.78 333.87 5,044.78 100.00% 0.00 0.00% 333.87 5,044.78 100.00% 0.00 0.00 0.00% ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) m3 333.87 29.06 9,702.26 333.87 9,702.26 100.00% 0.00 0.00% 333.87 9,702.26 100.00% 0.00 0.00 0.00% OBRAS DE CONCRETO SIMPLE SOLADOS SOLADO PARA ZAPATAS DE E=4" MEZCLA 1:12 CEMENTO:HORMIGON m2 43.67 40.26 1,758.15 43.67 1,758.15 100.00% 0.00 0.00% 43.67 1,758.15 100.00% 0.00 0.00 0.00% CIMIENTO CORRIDO CIMIENTO CORRIDO MEZCLA C:H = 1:10 30% P.G. m3 28.68 338.92 9,720.23 28.68 9,720.23 100.00% 0.00 0.00% 28.68 9,720.23 100.00% 0.00 0.00 0.00% SOBRECIMIENTOS SOBRECIMIENTOS, CONCRETO 1:8+25% PM m3 10.43 368.05 3,838.76 10.43 3,838.76 100.00% 0.00 0.00% 10.43 3,838.76 100.00% 0.00 0.00 0.00% SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 113.69 31.00 3,524.39 113.69 3,524.39 100.00% 0.00 0.00% 113.69 3,524.39 100.00% 0.00 0.00 0.00% FALSO PISO FALSO PISO DE 4" DE CONCRETO C:H = 1:8 m2 171.10 42.46 7,264.91 0.00 0.00 0.00% 171.10 7,264.91 100.00% 171.10 7,264.91 100.00% 0.00 0.00 0.00% OBRAS DE CONCRETO ARMADO ZAPATAS ZAPATAS, CONCRETO f'c=210 kg/cm2 m3 26.20 447.37 11,721.09 26.20 11,721.09 100.00% 0.00 0.00% 26.20 11,721.09 100.00% 0.00 0.00 0.00% ZAPATAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 464.14 5.34 2,478.51 464.14 2,478.51 100.00% 0.00 0.00% 464.14 2,478.51 100.00% 0.00 0.00 0.00% VIGAS DE CIMENTACION VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2 m3 9.34 445.12 4,157.42 9.34 4,157.42 100.00% 0.00 0.00% 9.34 4,157.42 100.00% 0.00 0.00 0.00% VIGAS DE CIMENTACION , ENCOFRADO Y DESENCOFRADO m2 74.72 37.87 2,829.65 74.72 2,829.65 100.00% 0.00 0.00% 74.72 2,829.65 100.00% 0.00 0.00 0.00% VIGAS DE CIMENTACION, ACERO CORRUGADO fy=4200 kg/cm2 kg 2,006.71 5.34 10,715.83 2,006.71 10,715.83 100.00% 0.00 0.00% 2,006.71 10,715.83 100.00% 0.00 0.00 0.00% COLUMNAS Y COLUMNETAS COLUMNAS Y COLUMNETAS, CONCRETO f'c=210 KG/CM2 m3 19.73 543.25 10,718.32 9.87 5,361.88 50.03% 9.86 5,356.45 49.97% 19.73 10,718.32 100.00% 0.00 0.00 0.00% COLUMNAS Y COLUMNETAS , ENCOFRADO Y DESENCOFRADO NORMAL m2 270.75 32.37 8,764.18 135.37 4,381.93 50.00% 135.38 4,382.25 50.00% 270.75 8,764.18 100.00% 0.00 0.00 0.00% COLUMNAS Y COLUMNETAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 4,044.15 5.34 21,595.76 3,235.31 17,276.58 80.00% 808.84 4,319.18 20.00% 4,044.15 21,595.76 100.00% 0.00 0.00 0.00% VIGAS, VIGUETAS Y DINTELES VIGAS, VIGUETAS Y DINTELES, CONCRETO f'c=210 KG/CM2 m3 31.81 456.61 14,524.76 15.00 6,849.15 47.15% 16.81 7,675.61 52.85% 31.81 14,524.76 100.00% 0.00 0.00 0.00% VIGAS, VIGUETAS Y DINTELES , ENCOFRADO Y DESENCOFRADO NORMAL m2 494.64 48.70 24,088.97 250.00 12,175.00 50.54% 244.64 11,913.97 49.46% 494.64 24,088.97 100.00% 0.00 0.00 0.00% VIGAS, VIGUETAS Y DINTELES, ACERO CORRUGADO fy=4200 kg/cm2 kg 5,199.25 5.34 27,764.00 2,500.00 13,350.00 48.08% 2,699.25 14,413.99 51.92% 5,199.25 27,764.00 100.00% 0.00 0.01 0.00% LOSAS ALIGERADAS

Page 10: Valorizcion Nº 05 - Febrero

VALORIZACIÓN DE OBRA VALORIZACION DE OBRA Nº 05 (DEL 01/02/2015 AL 28/02/2015)

ESPECIFICACION PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZARPARTIDADESCRIPCION UNIDADMETRADOPRECIO UNITARIO PARCIAL METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YAUYUCAN OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)

SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675) DISTRITO: YAUYUCAN PROVINCIA : SANTA CRUZ

LOSAS ALIG., CONCRETO f'c=210 KG/CM2 m3 47.50 440.38 20,918.05 0.00 0.00 0.00% 47.50 20,918.05 100.00% 47.50 20,918.05 100.00% 0.00 0.00 0.00% LOSAS ALIG., ENCOFRADO Y DESENCOFRADO m2 475.00 31.20 14,820.00 0.00 0.00 0.00% 475.00 14,820.00 100.00% 475.00 14,820.00 100.00% 0.00 0.00 0.00% LOSAS ALIG., ACERO CORRUGADO fy=4200 kg/cm2 kg 3,280.81 5.34 17,519.53 1,500.00 8,010.00 45.72% 1,780.81 9,509.53 54.28% 3,280.81 17,519.53 100.00% 0.00 0.00 0.00% LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.15 X 0.25 X 0.30 M. und 2,213.00 2.99 6,616.87 1,100.00 3,289.00 49.71% 1,113.00 3,327.87 50.29% 2,213.00 6,616.87 100.00% 0.00 0.00 0.00% LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.12 X 0.25 X 0.30 M. und 2,209.00 2.78 6,141.02 0.00 0.00 0.00% 2,209.00 6,141.02 100.00% 2,209.00 6,141.02 100.00% 0.00 0.00 0.00% LOSAS MACIZAS LOSAS MACIZAS, CONCRETO F´C=210 KG/CM2 m3 0.65 1,600.61 1,040.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.65 1,040.40 100.00% LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO NORMAL m2 3.25 38.58 125.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.25 125.39 100.00% LOSAS MACIZAS., ACERO fy=4200 kg/cm2 kg 153.51 5.34 819.74 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 153.51 819.74 100.00% ESCALERAS ESCALERAS, CONCRETO f'c=210 KG/CM2 m3 7.52 510.71 3,840.54 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.52 3,840.54 100.00% ESCALERAS, ENCOFRADO Y DESENCOFRADO NORMAL m2 30.24 49.53 1,497.79 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.24 1,497.79 100.00% ESCALERAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 336.95 5.34 1,799.31 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 336.95 1,799.31 100.00% MUROS Y TABIQUE DE ALBAÑILERIA MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 312.28 61.25 19,127.15 218.59 13,388.76 70.00% 93.69 5,738.39 30.00% 312.28 19,127.15 100.00% 0.00 0.00 0.00% MURO DE CABEZA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 226.80 99.02 22,457.74 158.76 15,720.42 70.00% 68.04 6,737.32 30.00% 226.80 22,457.74 100.00% 0.00 0.00 0.00% CUBIERTAS COBERTURA DE TEJA ANDINA SOBRE LOSA DE CONCRETO m2 316.03 83.05 26,246.29 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 316.03 26,246.29 100.00% CUMBRERA DE TEJA ANDINA ml 37.90 34.43 1,304.90 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.90 1,304.90 100.00% REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO PRIMARIO RAYADO m2 118.98 19.70 2,343.91 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 118.98 2,343.91 100.00% TARRAJEO EN INTERIORES Y EXTERIORES E=1.5 CM, MEZC: C:A=1:3 m2 1,078.15 20.68 22,296.14 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,078.15 22,296.14 100.00% TARRAJEO DE COLUMNAS MZ.C:A=1:3, E=1.5 CM. m2 270.75 29.04 7,862.58 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 270.75 7,862.58 100.00% TARRAJEO DE VIGASE=1.5 CM, MEZC. C:A=1:3, m2 294.64 33.97 10,008.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 294.64 10,008.92 100.00% VESTIDURA DE DERRAMES E=1.5 CM. MEZCLA C:A=1:3 ml 130.39 12.38 1,614.23 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 130.39 1,614.23 100.00% CIELORRASOS CIELORRASOS CON MEZCLA C:A=1:3, INC. TARRAJEO DE FONDO ESCALERA m2 478.27 24.18 11,564.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 478.27 11,564.57 100.00% PISOS Y PAVIMENTOS CONTRAPISO DE CEMENTO 48 MM m2 305.14 23.65 7,216.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 305.14 7,216.56 100.00% PISO DE CEMENTO PULIDO COLOREADO BRUÑADO E=2" m2 20.00 30.29 605.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 605.80 100.00% PISO CERAMICO 0.30 X 0.30 M. m2 268.04 65.45 17,543.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 268.04 17,543.22 100.00% PISO CERAMICO 0.20 X 0.30 M. m2 37.10 65.16 2,417.44 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.10 2,417.44 100.00% REVESTIMIENTO GRADAS CON MORTERO 1:4 X 2 cm PULIDO MEZCLA 1:2 X 1 cm ml 36.00 39.02 1,404.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.00 1,404.72 100.00% VEREDAS DE CONCRETO F'C 175KG/CM2 m2 93.93 61.18 5,746.64 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 93.93 5,746.64 100.00% SARDINEL, CONCRETO f'c= 175 kg/cm2, 15X35 XM ml 4.56 64.36 293.48 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.56 293.48 100.00% SARDINEL, ENCOFRADO Y DESENCOFRADO m2 30.40 42.22 1,283.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.40 1,283.49 100.00% JUNTAS ASFALTICAS EN VEREDAS 1:5, E=1" ml 49.10 5.16 253.36 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.10 253.36 100.00% CANTONERA 2" X 2" DE ALUMINIO, ESCALERA ml 27.00 23.03 621.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.00 621.81 100.00% ZOCALOS Y CONTRAZOCALOS ZOCALO CERAMICO DE 0.20 X 0.30 DE COLOR m2 66.10 88.51 5,850.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 66.10 5,850.51 100.00% CONTRAZOCALO DE CERAMICO H=10 CM, A=30 CM ml 38.65 14.66 566.61 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.65 566.61 100.00% CONTRAZOCALO DE CEMENTO PULIDO H=20 CM EN EXTERIORES ml 97.49 8.57 835.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 97.49 835.49 100.00% CONTRAZOCALO DE CEMENTO PULIDO H=10 CM EN INTERIORES ml 182.95 8.22 1,503.85 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 182.95 1,503.85 100.00% CARPINTERIA DE MADERA PUERTA DE MADERA CEDRO P-1 TABLERADA S/MODELO D 1.05X2.80 M. und 5.00 1,300.00 6,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 6,500.00 100.00% PUERTA DE MADERA CEDRO P-2 TABLERADA S/MODELO DE 0.90X2.80 M. und 1.00 1,100.00 1,100.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,100.00 100.00% PUERTA DE MADERA CEDRO P-3 TABLERADA S/MODELO DE 1.05X2.25 M. und 3.00 850.00 2,550.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 2,550.00 100.00% PUERTA DE MADERA CEDRO P-4 TABLERADA S/MODELO DE 0.90X2.15 M. und 3.00 850.00 2,550.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 2,550.00 100.00% PUERTA DE MADERA CEDRO P-5 CONTRAPLACADA S/MODELO DE 0.60X1.40 M. und 7.00 500.00 3,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 3,500.00 100.00% VENTANA DE MADERA DE CEDRO V-1 DE 3.175 X 1.60 M. und 5.00 700.00 3,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 3,500.00 100.00% VENTANA DE MADERA DE CEDRO V-2 DE 4.225 X 1.60 M. und 3.00 800.00 2,400.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 2,400.00 100.00% VENTANA DE MADERA DE CEDRO V-3 DE 4.225 X 1.30 M. und 8.00 650.00 5,200.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 5,200.00 100.00%

Page 11: Valorizcion Nº 05 - Febrero

VALORIZACIÓN DE OBRA VALORIZACION DE OBRA Nº 05 (DEL 01/02/2015 AL 28/02/2015)

ESPECIFICACION PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZARPARTIDADESCRIPCION UNIDADMETRADOPRECIO UNITARIO PARCIAL METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YAUYUCAN OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)

SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675) DISTRITO: YAUYUCAN PROVINCIA : SANTA CRUZ

VENTANA DE MADERA DE CEDRO V-4 DE 3.15 X 0.40 M. und 1.00 400.00 400.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 400.00 100.00% VENTANA DE MADERA DE CEDRO V-5 DE 3.15 X1.50 M. und 1.00 600.00 600.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 600.00 100.00% VENTANA DE MADERA DE CEDRO V-5 SS.HH. 0.75 X0.75 M. und 4.00 200.00 800.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 800.00 100.00% VENTANA DE MADERA DE CEDRO V-6 SS.HH. 0.75 X0.75 M. und 4.00 200.00 800.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 800.00 100.00% VENTANA DE MADERA DE CEDRO V-15 DE 0.60 X0.25 M. und 4.00 175.00 700.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 700.00 100.00% CARPINTERIA METALICA BARANDA METALICA PASAMMANO DE ALUMINIO EN ESCALERA ml 6.90 455.84 3,145.30 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.90 3,145.30 100.00% BARRAS DE SEGURIDAD FIERRO LISO 1/2" EN VENTANAS ml 337.70 8.60 2,904.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 337.70 2,904.22 100.00% CERRAJERIA BISAGRA CAPUCHINA DE 4" X 4" und 44.00 14.55 640.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 44.00 640.20 100.00% BISAGRA CAPUCHINA DE 1 1/2" X 1 1/2" pza 112.00 12.35 1,383.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 112.00 1,383.20 100.00% CERRADURA PARA FORTE TRES GOLPES EN PUERTA und 11.00 84.50 929.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.00 929.50 100.00% CERRADURA SAPITO PARA VENTANAS und 36.00 7.44 267.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.00 267.84 100.00% MANIJA DE BRONCE PARA DE 4" PARA PUERTAS und 19.00 39.00 741.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.00 741.00 100.00% VIDRIOS, CRISTALES Y SIMILARES VIDRIO SEMIDOBLE NACIONAL TRANSPARENTE p2 1,154.92 5.31 6,132.63 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,154.92 6,132.63 100.00% PINTURA PINTURA LATEX EN VIGAS Y CIELORRASOS (2 MANOS) m2 972.91 12.00 11,674.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 972.91 11,674.92 100.00% PINTURA LATEX EN MUROS Y COLUMNAS (2 MANOS) m2 1,348.90 15.54 20,961.91 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,348.90 20,961.91 100.00% PINTURA EN PUERTAS DE MADERA CON BARNIZ m2 80.26 18.93 1,519.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.26 1,519.32 100.00% PINTURA BARNIZ EN VENTANAS DE MADERA m2 230.94 16.83 3,886.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 230.94 3,886.72 100.00% PINTURA DE CONTRAZOCALOS CON ESMALTE m2 37.79 12.41 468.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.79 468.97 100.00% SISTEMA DE AGUAS DE LLUVIA

m3 0.51 481.69 245.66 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.51 245.66 100.00% CANALETA DE ZINC DE 6" PARA EVACUACION PLUVIAL IN. EMBUDO COLECTOR ml 59.16 61.43 3,634.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 59.16 3,634.20 100.00% MONTANTE DE BAJADA DE AGUA DE LLUVIA PVC SAL 3" ml 57.80 52.22 3,018.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 57.80 3,018.32 100.00% INSTALACIONES ELECTRICAS SALIDAS DE TECHO (CENTROS DE LUZ) pto 45.00 74.80 3,366.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 45.00 3,366.00 100.00% SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE PUESTA A TIERRA pto 19.00 87.78 1,667.82 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.00 1,667.82 100.00% TUBERIAS PVC SEL (ELECTRICAS) D=20MM ml 924.00 3.40 3,141.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 924.00 3,141.60 100.00% TUBERIAS PVC SEL (ELECTRICAS) D=30MM ml 84.00 3.53 296.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 84.00 296.52 100.00% CABLE TW AWG 2.5 mm2 ml 1,274.00 2.62 3,337.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,274.00 3,337.88 100.00% CABLE TW AWG 4 MM2 ml 1,036.00 5.30 5,490.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,036.00 5,490.80 100.00% CABLE TW AWG 6 MM2 ml 252.00 10.10 2,545.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 252.00 2,545.20 100.00% TABLERO GENERAL und 1.00 3,953.83 3,953.83 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 3,953.83 100.00% LAMPARAS FLUORESCENTES RECTAS DE 2 X 40 W und 22.00 110.75 2,436.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.00 2,436.50 100.00% LAMPARAS FLUORESCENTES RECTAS DE 2 X 20 W und 20.00 93.72 1,874.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 1,874.40 100.00% CONEXION A RED EXTERNA Y MEDIDOR und 1.00 974.22 974.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 974.22 100.00% INSTALACIONES SANITARIAS APARATOS SANITARIOS Y ACCESORIOS INODORO DE LOSA BLANCA TANQUE BAJO pza 8.00 219.76 1,758.08 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 1,758.08 100.00% LAVATORIO DE LOSA BLANCA 1 LLAVE pza 3.00 190.56 571.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 571.68 100.00% URINARIOS CORRIDO SEGUN DISEÑO REVESTIDO CON CERAMICO A=0.65 M. pza 2.35 176.28 414.26 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.35 414.26 100.00% BEBEDERO CORRIDO DE CONCRETO REVEST. C/MAYOLICA 20 X 30 ml 6.00 380.32 2,281.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 2,281.92 100.00% PAPELERA DE LOZA BLANCA pza 8.00 91.70 733.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 733.60 100.00% JABONERA DE LOSA BLANCA pza 3.00 36.70 110.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 110.10 100.00% INSTALACIONES SANITARIAS SALIDA DE DESAGUE PVC SAL 2" pto 10.00 69.63 696.30 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 696.30 100.00% SALIDA DE DESAGUE PVC SAL 4" pto 12.00 72.01 864.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 864.12 100.00% SALIDA DE VENTILACION PVC SAL 2" pto 13.00 41.60 540.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 540.80 100.00% TUBERIA DE DESAGUE PVC SAL 2" ml 40.00 11.93 477.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.00 477.20 100.00% TUBERIA DE DESAGUE PVC SAL 4" ml 72.00 15.11 1,087.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 72.00 1,087.92 100.00%

DADO DE CONCRETO F'C=140 KG/CM2 PROTECCION MONTANTE DE BAJADA DE AGUA DE LLUVIA

Page 12: Valorizcion Nº 05 - Febrero

VALORIZACIÓN DE OBRA VALORIZACION DE OBRA Nº 05 (DEL 01/02/2015 AL 28/02/2015)

ESPECIFICACION PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZARPARTIDADESCRIPCION UNIDADMETRADOPRECIO UNITARIO PARCIAL METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YAUYUCAN OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)

SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675) DISTRITO: YAUYUCAN PROVINCIA : SANTA CRUZ

SUMIDERO DE BRONCE 2" und 3.00 61.05 183.15 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 183.15 100.00% REGISTROS ROSCADO DE BRONCE DE 2" und 5.00 48.63 243.15 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 243.15 100.00% REGISTROS ROSCADO DE BRONCE DE 4" und 12.00 54.63 655.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 655.56 100.00% CAJA DE REGISTRO DE 12" X 24" CON TAPA METALICA und 3.00 121.27 363.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 363.81 100.00% CONEXION A LA RED COLECTORA DE DESAGUE CONEXION A RED PUBLICA DE DESAGUE glb 1.00 500.00 500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 500.00 100.00% SISTEMA DE AGUA FRIA Y CONTRA INCENDIO SALIDA DE AGUA FRIA PVC-SAP 1/2" pto 12.00 101.52 1,218.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 1,218.24 100.00% TUBERIA PVC SAP C-10 DE 1/2" ml 155.00 8.11 1,257.05 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 155.00 1,257.05 100.00% TUBERIA PVC SAP C-10 DE 3/4" ml 62.00 8.78 544.36 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 62.00 544.36 100.00% VALVULA COMPUERTA DE BRONCE DE 1/2" und 5.00 65.72 328.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 328.60 100.00% VALVULA COMPUERTA DE BRONCE DE 3/4" und 2.00 71.72 143.44 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 143.44 100.00% CAJA PARA VALVULA (NICHO DE MAYOLICA) und 6.00 244.52 1,467.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,467.12 100.00% CONEXION A RED PUBLICA DE AGUA POTABLE und 1.00 221.68 221.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 221.68 100.00%

03.00.0 PABELLON 03 TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 222.27 0.74 164.48 222.27 164.48 100.00% 0.00 0.00% 222.27 164.48 100.00% 0.00 0.00 0.00% TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 222.26 2.95 655.67 222.26 655.67 100.00% 0.00 0.00% 222.26 655.67 100.00% 0.00 0.00 0.00% MOVIMIENTO DE TIERRAS CORTE DE MATERIAL SUELTO CON MAQUINARIA PARA EXPLANACIONES m3 196.85 7.58 1,492.12 196.85 1,492.12 100.00% 0.00 0.00% 196.85 1,492.12 100.00% 0.00 0.00 0.00% EXCAVACION MANUAL PARA CIMIENTOS Y ZAPATAS m3 107.83 36.96 3,985.40 107.83 3,985.40 100.00% 0.00 0.00% 107.83 3,985.40 100.00% 0.00 0.00 0.00% RELLENO COMPACTADO CON MATERIAL PROPIO m3 49.28 44.42 2,189.02 49.28 2,189.02 100.00% 0.00 0.00% 49.28 2,189.02 100.00% 0.00 0.00 0.00% AFIRMADO COMPACTADO E=6" PARA ZAPATAS m2 43.67 39.85 1,740.25 43.67 1,740.25 100.00% 0.00 0.00% 43.67 1,740.25 100.00% 0.00 0.00 0.00% AFIRMADO COMPACTADO E=4" PARA CIMIENTOS m2 31.15 28.81 897.43 31.15 897.43 100.00% 0.00 0.00% 31.15 897.43 100.00% 0.00 0.00 0.00% NIVELACION INT. PARA FALSO PISO Y VEREDAS m2 200.97 3.31 665.21 200.97 665.21 100.00% 0.00 0.00% 200.97 665.21 100.00% 0.00 0.00 0.00% AFIRMADO COMPACTADO E=4" PARA PISOS Y VEREDAS m2 200.97 28.81 5,789.95 200.97 5,789.95 100.00% 0.00 0.00% 200.97 5,789.95 100.00% 0.00 0.00 0.00% ACARREO INTERNO DE MATERIAL EXCEDENTE m3 319.25 15.11 4,823.87 319.25 4,823.87 100.00% 0.00 0.00% 319.25 4,823.87 100.00% 0.00 0.00 0.00% ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) m3 319.25 29.06 9,277.41 319.25 9,277.41 100.00% 0.00 0.00% 319.25 9,277.41 100.00% 0.00 0.00 0.00% OBRAS DE CONCRETO SIMPLE SOLADOS SOLADO PARA ZAPATAS DE E=4" MEZCLA 1:12 CEMENTO:HORMIGON m2 43.67 40.26 1,758.15 43.67 1,758.15 100.00% 0.00 0.00% 43.67 1,758.15 100.00% 0.00 0.00 0.00% CIMIENTO CORRIDO CIMIENTO CORRIDO MEZCLA C:H = 1:10 30% P.G. m3 18.94 338.92 6,419.14 18.94 6,419.14 100.00% 0.00 0.00% 18.94 6,419.14 100.00% 0.00 0.00 0.00% SOBRECIMIENTOS SOBRECIMIENTOS, CONCRETO 1:8+25% PM m3 7.51 368.05 2,764.06 7.51 2,764.06 100.00% 0.00 0.00% 7.51 2,764.06 100.00% 0.00 0.00 0.00% SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 74.72 31.00 2,316.32 74.72 2,316.32 100.00% 0.00 0.00% 74.72 2,316.32 100.00% 0.00 0.00 0.00% FALSO PISO FALSO PISO DE 4" DE CONCRETO C:H = 1:8 m2 134.00 42.46 5,689.64 0.00 0.00 0.00% 134.00 5,689.64 100.00% 134.00 5,689.64 100.00% 0.00 0.00 0.00% OBRAS DE CONCRETO ARMADO ZAPATAS ZAPATAS, CONCRETO f'c=210 kg/cm2 m3 26.20 447.37 11,721.09 26.20 11,721.09 100.00% 0.00 0.00% 26.20 11,721.09 100.00% 0.00 0.00 0.00% ZAPATAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 464.14 5.34 2,478.51 464.14 2,478.51 100.00% 0.00 0.00% 464.14 2,478.51 100.00% 0.00 0.00 0.00% VIGAS DE CIMENTACION VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2 m3 9.34 445.12 4,157.42 9.34 4,157.42 100.00% 0.00 0.00% 9.34 4,157.42 100.00% 0.00 0.00 0.00% VIGAS DE CIMENTACION , ENCOFRADO Y DESENCOFRADO m2 74.72 37.87 2,829.65 74.72 2,829.65 100.00% 0.00 0.00% 74.72 2,829.65 100.00% 0.00 0.00 0.00% VIGAS DE CIMENTACION, ACERO CORRUGADO fy=4200 kg/cm2 kg 2,006.71 5.34 10,715.83 2,006.71 10,715.83 100.00% 0.00 0.00% 2,006.71 10,715.83 100.00% 0.00 0.00 0.00% COLUMNAS Y COLUMNETAS COLUMNAS Y COLUMNETAS, CONCRETO f'c=210 KG/CM2 m3 17.85 543.25 9,697.01 8.93 4,851.22 50.03% 8.92 4,845.79 49.97% 17.85 9,697.01 100.00% 0.00 0.00 0.00% COLUMNAS Y COLUMNETAS , ENCOFRADO Y DESENCOFRADO NORMAL m2 225.15 32.37 7,288.11 112.57 3,643.89 50.00% 112.58 3,644.21 50.00% 225.15 7,288.11 100.00% 0.00 0.00 0.00% COLUMNAS Y COLUMNETAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 3,725.66 5.34 19,895.02 2,980.53 15,916.02 80.00% 745.13 3,979.00 20.00% 3,725.66 19,895.02 100.00% 0.00 0.00 0.00% VIGAS, VIGUETAS Y DINTELES VIGAS, VIGUETAS Y DINTELES, CONCRETO f'c=210 KG/CM2 m3 29.62 456.61 13,524.79 10.21 4,662.99 34.48% 0.00 0.00% 10.21 4,662.99 34.48% 19.41 8,861.80 65.52%

Page 13: Valorizcion Nº 05 - Febrero

VALORIZACIÓN DE OBRA VALORIZACION DE OBRA Nº 05 (DEL 01/02/2015 AL 28/02/2015)

ESPECIFICACION PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZARPARTIDADESCRIPCION UNIDADMETRADOPRECIO UNITARIO PARCIAL METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YAUYUCAN OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)

SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675) DISTRITO: YAUYUCAN PROVINCIA : SANTA CRUZ

VIGAS, VIGUETAS Y DINTELES , ENCOFRADO Y DESENCOFRADO NORMAL m2 458.76 48.70 22,341.61 250.00 12,175.00 54.49% 208.76 10,166.61 45.51% 458.76 22,341.61 100.00% 0.00 0.00 0.00% VIGAS, VIGUETAS Y DINTELES, ACERO CORRUGADO fy=4200 kg/cm2 kg 4,801.67 5.34 25,640.92 2,000.00 10,680.00 41.65% 2,801.67 14,960.92 58.35% 4,801.67 25,640.92 100.00% 0.00 0.00 0.00% LOSAS ALIGERADAS LOSAS ALIG., CONCRETO f'c=210 KG/CM2 m3 40.57 440.38 17,866.22 0.00 0.00 0.00% 20.29 8,933.11 50.00% 20.29 8,933.11 50.00% 20.29 8,933.11 50.00% LOSAS ALIG., ENCOFRADO Y DESENCOFRADO m2 405.71 31.20 12,658.15 0.00 0.00 0.00% 202.86 6,329.08 50.00% 202.86 6,329.08 50.00% 202.86 6,329.07 50.00% LOSAS ALIG., ACERO CORRUGADO fy=4200 kg/cm2 kg 2,981.96 5.34 15,923.67 1,490.98 7,961.83 50.00% 745.49 3,980.92 25.00% 2,236.47 11,942.75 75.00% 745.49 3,980.92 25.00% LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.15 X 0.25 X 0.30 M. und 1,732.00 2.99 5,178.68 675.48 2,019.69 39.00% 528.26 1,579.50 30.50% 1,203.74 3,599.18 69.50% 528.26 1,579.50 30.50% LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.12 X 0.25 X 0.30 M. und 2,209.00 2.78 6,141.02 0.00 0.00 0.00% 1,104.50 3,070.51 50.00% 1,104.50 3,070.51 50.00% 1,104.50 3,070.51 50.00% MESAS DE LABORATORIO MESA DE LABORATORIO, CONCRETO f'c=210 KG/CM2 m3 2.98 510.71 1,521.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.98 1,521.92 100.00% MESA DE LABORATORIO, ENCOFRADO Y DESENCOFRADO NORMAL m2 28.37 49.53 1,405.17 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.37 1,405.17 100.00% MESA DE LABORATORIO, ACERO CORRUGADO fy=4200 kg/cm2 kg 201.96 5.34 1,078.47 0.00 0.00 0.00% 201.96 1,078.47 100.00% 201.96 1,078.47 100.00% 0.00 0.00 0.00% MUROS Y TABIQUE DE ALBAÑILERIA MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 140.14 61.25 8,583.58 98.10 6,008.38 70.00% 42.04 2,575.20 30.00% 140.14 8,583.58 100.00% 0.00 0.00 0.00% MURO DE CABEZA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 226.80 99.02 22,457.74 158.76 15,720.42 70.00% 67.14 6,648.66 29.61% 225.90 22,369.07 99.61% 0.90 88.67 0.39% CUBIERTAS COBERTURA DE TEJA ANDINA SOBRE LOSA DE CONCRETO m2 246.74 83.05 20,491.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 246.74 20,491.76 100.00% CUMBRERA DE TEJA ANDINA ml 37.90 34.43 1,304.90 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.90 1,304.90 100.00% REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO EN INTERIORES Y EXTERIORES E=1.5 CM, MEZC: C:A=1:3 m2 733.87 20.68 15,176.43 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 733.87 15,176.43 100.00% TARRAJEO DE COLUMNAS MZ.C:A=1:3, E=1.5 CM. m2 225.15 29.04 6,538.36 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 225.15 6,538.36 100.00% TARRAJEO DE MUROS DE SOPORTE DE MESAS DE LABORATORIO m2 458.76 29.04 13,322.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 458.76 13,322.39 100.00% TARRAJEO DE VIGASE=1.5 CM, MEZC. C:A=1:3, m2 117.55 33.97 3,993.17 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 117.55 3,993.17 100.00% VESTIDURA DE DERRAMES E=1.5 CM. MEZCLA C:A=1:3 ml 117.55 12.38 1,455.27 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 117.55 1,455.27 100.00% CIELORRASOS CIELORRASOS CON MEZCLA C:A=1:3, INC. TARRAJEO DE FONDO ESCALERA m2 396.35 24.18 9,583.74 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 396.35 9,583.74 100.00% PISOS Y PAVIMENTOS CONTRAPISO DE CEMENTO 48 MM m2 268.04 23.65 6,339.15 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 268.04 6,339.15 100.00% PISO DE CEMENTO PULIDO COLOREADO BRUÑADO E=2" m2 20.00 30.29 605.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 605.80 100.00% PISO CERAMICO 0.30 X 0.30 M. m2 268.04 65.45 17,543.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 268.04 17,543.22 100.00% ENCHAPE CON MAYOLICA DE 0.15 X0.15 M EN MESAS DE LABORATORIO m2 16.56 65.45 1,083.85 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.56 1,083.85 100.00% VEREDAS DE CONCRETO F'C 175KG/CM2 m2 66.96 61.18 4,096.61 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 66.96 4,096.61 100.00% SARDINEL, CONCRETO f'c= 175 kg/cm2, 15X35 XM ml 3.26 64.36 209.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.26 209.81 100.00% SARDINEL, ENCOFRADO Y DESENCOFRADO m2 21.74 42.22 917.86 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.74 917.86 100.00% JUNTAS ASFALTICAS EN VEREDAS 1:5, E=1" ml 23.10 5.16 119.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.10 119.20 100.00% CANTONERA 2" X 2" DE ALUMINIO, ESCALERA ml 27.00 23.03 621.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.00 621.81 100.00% ZOCALOS Y CONTRAZOCALOS CONTRAZOCALO DE CEMENTO PULIDO H=20 CM EN EXTERIORES ml 97.49 8.57 835.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 97.49 835.49 100.00% CONTRAZOCALO DE CEMENTO PULIDO H=10 CM EN INTERIORES ml 182.95 8.22 1,503.85 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 182.95 1,503.85 100.00% CARPINTERIA DE MADERA PUERTA DE MADERA CEDRO P-1 TABLERADA S/MODELO D 1.05X2.80 M. und 5.00 1,300.00 6,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 6,500.00 100.00% PUERTA DE MADERA CEDRO P-2 TABLERADA S/MODELO DE 0.90X2.80 M. und 1.00 1,100.00 1,100.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,100.00 100.00% VENTANA DE MADERA DE CEDRO V-1 DE 3.175 X 1.60 M. und 5.00 700.00 3,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 3,500.00 100.00% VENTANA DE MADERA DE CEDRO V-2 DE 4.225 X 1.60 M. und 3.00 800.00 2,400.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 2,400.00 100.00% VENTANA DE MADERA DE CEDRO V-3 DE 4.225 X 1.30 M. und 8.00 650.00 5,200.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 5,200.00 100.00% VENTANA DE MADERA DE CEDRO V-4 DE 3.15 X 0.40 M. und 1.00 400.00 400.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 400.00 100.00% VENTANA DE MADERA DE CEDRO V-5 DE 3.15 X1.50 M. und 1.00 600.00 600.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 600.00 100.00% CARPINTERIA METALICA BARRAS DE SEGURIDAD FIERRO LISO 1/2" EN VENTANAS ml 337.70 8.60 2,904.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 337.70 2,904.22 100.00% CERRAJERIA BISAGRA CAPUCHINA DE 4" X 4" und 44.00 14.55 640.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 44.00 640.20 100.00% BISAGRA CAPUCHINA DE 1 1/2" X 1 1/2" pza 112.00 12.35 1,383.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 112.00 1,383.20 100.00%

Page 14: Valorizcion Nº 05 - Febrero

VALORIZACIÓN DE OBRA VALORIZACION DE OBRA Nº 05 (DEL 01/02/2015 AL 28/02/2015)

ESPECIFICACION PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZARPARTIDADESCRIPCION UNIDADMETRADOPRECIO UNITARIO PARCIAL METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YAUYUCAN OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)

SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675) DISTRITO: YAUYUCAN PROVINCIA : SANTA CRUZ

CERRADURA PARA FORTE TRES GOLPES EN PUERTA und 11.00 84.50 929.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.00 929.50 100.00% CERRADURA SAPITO PARA VENTANAS und 36.00 7.44 267.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.00 267.84 100.00% MANIJA DE BRONCE PARA DE 4" PARA PUERTAS und 19.00 39.00 741.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.00 741.00 100.00% VIDRIOS, CRISTALES Y SIMILARES VIDRIO SEMIDOBLE NACIONAL TRANSPARENTE p2 1,098.70 5.31 5,834.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,098.70 5,834.10 100.00% PINTURA PINTURA LATEX EN VIGAS Y CIELORRASOS (2 MANOS) m2 855.10 12.00 10,261.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 855.10 10,261.20 100.00% PINTURA LATEX EN MUROS Y COLUMNAS (2 MANOS) m2 959.02 15.54 14,903.17 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 959.02 14,903.17 100.00% PINTURA EN PUERTAS DE MADERA CON BARNIZ m2 80.26 18.93 1,519.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.26 1,519.32 100.00% PINTURA BARNIZ EN VENTANAS DE MADERA m2 230.94 16.83 3,886.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 230.94 3,886.72 100.00% PINTURA DE CONTRAZOCALOS CON ESMALTE m2 37.79 12.41 468.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.79 468.97 100.00% SISTEMA DE AGUAS DE LLUVIA

m3 0.51 481.69 245.66 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.51 245.66 100.00% CANALETA DE ZINC DE 6" PARA EVACUACION PLUVIAL IN. EMBUDO COLECTOR ml 59.16 61.43 3,634.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 59.16 3,634.20 100.00% MONTANTE DE BAJADA DE AGUA DE LLUVIA PVC SAL 3" ml 57.80 52.22 3,018.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 57.80 3,018.32 100.00% INSTALACIONES ELECTRICAS SALIDAS DE TECHO (CENTROS DE LUZ) pto 24.00 74.80 1,795.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.00 1,795.20 100.00% SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE PUESTA A TIERRA pto 34.00 87.78 2,984.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 34.00 2,984.52 100.00% TUBERIAS PVC SEL (ELECTRICAS) D=20MM ml 600.00 3.40 2,040.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 600.00 2,040.00 100.00% TUBERIAS PVC SEL (ELECTRICAS) D=30MM ml 84.00 3.53 296.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 84.00 296.52 100.00% CABLE TW AWG 2.5 mm2 ml 910.00 2.62 2,384.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 910.00 2,384.20 100.00% CABLE TW AWG 4 MM2 ml 740.00 5.30 3,922.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 740.00 3,922.00 100.00% CABLE TW AWG 6 MM2 ml 180.00 10.10 1,818.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 180.00 1,818.00 100.00% TABLERO GENERAL und 1.00 3,953.83 3,953.83 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 3,953.83 100.00% LAMPARAS FLUORESCENTES RECTAS DE 2 X 40 W und 14.00 110.75 1,550.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 1,550.50 100.00% LAMPARAS FLUORESCENTES RECTAS DE 2 X 20 W und 20.00 93.72 1,874.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 1,874.40 100.00% CONEXION A RED EXTERNA Y MEDIDOR und 1.00 974.22 974.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 974.22 100.00%

04.00.0 CONSTRUCCION DE CERCO PERIMETRICO TRABAJOS PRELIMINARES TRAZO Y REPLANTEO m2 262.27 1.60 419.63 262.27 419.63 100.00% 0.00 0.00% 262.27 419.63 100.00% 0.00 0.00 0.00% MOVIMIENTO DE TIERRAS EXCAVACION MANUAL EN TERRENO NATURAL m3 157.36 36.96 5,816.03 15.74 581.60 10.00% 0.00 0.00% 15.74 581.60 10.00% 141.62 5,234.43 90.00% NIVELACION Y COMPACTACION DE TERRANO m2 157.36 3.31 520.86 15.74 52.09 10.00% 0.00 0.00% 15.74 52.09 10.00% 141.62 468.77 90.00% ACARREO INTERNO DE MATERIAL EXCEDENTE A MANO m3 196.70 15.11 2,972.14 19.67 297.21 10.00% 0.00 0.00% 19.67 297.21 10.00% 177.03 2,674.93 90.00% ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) m3 196.70 29.06 5,716.10 19.67 571.61 10.00% 0.00 0.00% 19.67 571.61 10.00% 177.03 5,144.49 90.00% AFIRMADO COMPACTADO E=4" PARA CIMIENTOS m2 157.36 28.81 4,533.54 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 157.36 4,533.54 100.00% OBRAS DE CONCRETO CONCRETO C:H = 1:10 + 30% P.G. PARA CIMIENTO CORRIDO m3 94.42 338.92 32,000.83 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 94.42 32,000.83 100.00% SOBRECIMIENTOS REFORZADOS, F´C=210 KG/CM2 m3 23.60 503.19 11,875.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.60 11,875.28 100.00% SOBRECIMIENTOS REFORZADOS, ENCOFRADO Y DESENCOFRADO m2 314.72 31.00 9,756.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 314.72 9,756.32 100.00% SOBRECIMIENTOS REFORZADOS, ACERO fy=4200 kg/cm2 kg 1,354.46 5.34 7,232.82 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,354.46 7,232.82 100.00% COLUMNAS, CONCRETO f'c=210 KG/CM2 m3 20.63 543.25 11,207.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.63 11,207.25 100.00% COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 165.00 32.37 5,341.05 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 165.00 5,341.05 100.00% COLUMNAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 2,387.25 5.34 12,747.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,387.25 12,747.92 100.00% VIGAS, CONCRETO f'c=210 KG/CM2 m3 22.55 456.61 10,296.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.55 10,296.56 100.00% VIGAS, ENCOFRADO Y DESENCOFRADO m2 188.40 32.37 6,098.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 188.40 6,098.51 100.00% VIGAS, ACERO fy=4200 kg/cm2 kg 2,337.08 5.34 12,480.01 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,337.08 12,480.01 100.00% MUROS Y ENLUCIDOS MURO DE SOGA LADRILLO ARCILLA 18 HCOS, CARAVISTA m2 581.31 57.30 33,309.06 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 581.31 33,309.06 100.00% JUNTAS DE CONSTRUCCION CON TEKNOPORT m2 20.63 26.50 546.70 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.63 546.70 100.00% TARRAJEO EXTERIOR MEZCLA: C:A=1:3 m2 501.44 20.68 10,369.78 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 501.44 10,369.78 100.00% PINTURA LATEX EN CERCO PERIMETRICO m2 423.00 13.23 5,596.29 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 423.00 5,596.29 100.00%

DADO DE CONCRETO F'C=140 KG/CM2 PROTECCION MONTANTE DE BAJADA DE AGUA DE LLUVIA

Page 15: Valorizcion Nº 05 - Febrero

VALORIZACIÓN DE OBRA VALORIZACION DE OBRA Nº 05 (DEL 01/02/2015 AL 28/02/2015)

ESPECIFICACION PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZARPARTIDADESCRIPCION UNIDADMETRADOPRECIO UNITARIO PARCIAL METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YAUYUCAN OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)

SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675) DISTRITO: YAUYUCAN PROVINCIA : SANTA CRUZ

CARPINTERIA METALICA PORTON METALICO SEGUN DISEÑO und 1.00 6,500.00 6,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 6,500.00 100.00% PUERTA METALICA SEGUN DISEÑO und 1.00 1,500.00 1,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,500.00 100.00%

05.00.0 PATIO DE FORMACION TRAZO Y REPLANTEO m2 250.00 1.60 400.00 250.00 400.00 100.00% 0.00 0.00% 250.00 400.00 100.00% 0.00 0.00 0.00% CORTE DE TERRENO CON MAQUINARIA m3 225.00 7.58 1,705.50 225.00 1,705.50 100.00% 0.00 0.00% 225.00 1,705.50 100.00% 0.00 0.00 0.00% NIVELACION Y COMPACTACION CON MAQUINARIA m2 250.00 2.80 700.00 250.00 700.00 100.00% 0.00 0.00% 250.00 700.00 100.00% 0.00 0.00 0.00% REFINE Y COMPACTACION DE SUBRASANTE m2 250.00 6.97 1,742.50 250.00 1,742.50 100.00% 0.00 0.00% 250.00 1,742.50 100.00% 0.00 0.00 0.00% ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) m3 281.25 29.06 8,173.13 281.25 8,173.13 100.00% 0.00 0.00% 281.25 8,173.13 100.00% 0.00 0.00 0.00% MEJORAMIENTO DE SUBRASANTE E=15 CM CON PIEDRA DE RIO T. MAX 3" m3 81.00 181.06 14,665.86 42.00 7,604.52 51.85% 0.00 0.00% 42.00 7,604.52 51.85% 39.00 7,061.34 48.15% AFIRMADO E=6" PARA BASE GRANULAR m2 37.50 28.14 1,055.25 23.00 647.22 61.33% 0.00 0.00% 23.00 647.22 61.33% 14.50 408.03 38.67% LOSA DE CONCRETO f'c=175 KG/CM2, E=0.10 M. m2 25.00 40.13 1,003.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.00 1,003.25 100.00% SARDINEL, CONCRETO f'c= 175 kg/cm2 m3 4.75 476.32 2,262.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.75 2,262.52 100.00% DADOS, CONCRETO F'C=175 KG/CM2 m3 1.25 476.32 595.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.25 595.40 100.00% ENCOFRADO Y DESENCOFRADO DE SARDINEL m2 35.80 37.87 1,355.75 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 35.80 1,355.75 100.00% JUNTAS DE DILATACION ASFALTICAS, E=1" ml 180.00 7.64 1,375.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 180.00 1,375.20 100.00% CURADO DE OBRAS DE CONCRETO m2 361.00 1.04 375.44 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 361.00 375.44 100.00% VARIOS LIMPIEZA GENERAL Y ENTREGA DE OBRA glb 1.00 2,446.76 2,446.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 2,446.76 100.00% PLACA RECORDATORIA und 1.00 750.00 750.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 750.00 100.00% FLETE POR TRANSPORTE DE MATERIALES glb 1.00 49,450.47 49,450.47 0.91 44,999.93 91.00% 0.00 0.00% 0.91 44,999.93 91.00% 0.09 4,450.54 9.00% COLOCACION DE POSTES DE CONCRETO INCL. LUMINARIA und 8.00 2,000.00 16,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 16,000.00 100.00% SEMBRADO DE GRAS PARA JARDINERAS m2 85.00 74.50 6,332.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 85.00 6,332.50 100.00% SEMBRADO DE PLANTONES und 10.00 153.75 1,537.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 1,537.50 100.00% NIVELACION Y COMPACTACION MANUAL m2 67.66 3.31 223.95 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 67.66 223.95 100.00% REJILLA DE FIERRO PARA EVACUACION DE AGUA DE LLUVIAS ml 65.00 89.25 5,801.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.00 5,801.25 100.00% CABLEADO DE ILUMINACION EXTERIOR DE POSTES, INCL. DADO DE CONCRETO ml 180.00 22.93 4,127.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 180.00 4,127.40 100.00% PISOS Y PAVIMENTOS AFIRMADO COMPACTADO E=4" m2 67.66 28.81 1,949.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 67.66 1,949.28 100.00% CAMA DE ARENA E = 5 CM. m2 65.00 25.08 1,630.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.00 1,630.20 100.00% SARDINEL, CONCRETO f'c= 175 kg/cm2, 15X35 XM ml 180.00 64.36 11,584.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 180.00 11,584.80 100.00%

06.00.0 SISTEMA DE TRATAMIENTO DE AGUAS SERVIDAS TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 8.14 0.74 6.02 8.14 6.02 100.00% 0.00 0.00% 8.14 6.02 100.00% 0.00 0.00 0.00% TRAZO Y REPLANTEO m2 8.14 1.60 13.02 8.14 13.02 100.00% 0.00 0.00% 8.14 13.02 100.00% 0.00 0.00 0.00% MOVIMIENTO DE TIERRAS EXCAVACION PARA CAMARA SEPTICA (2.5X2.0X2.45) m3 12.25 30.80 377.30 12.25 377.30 100.00% 0.00 0.00% 12.25 377.30 100.00% 0.00 0.00 0.00% EXCAVACION POZA DE PERCOLACION (R=1.00 M, H=3.00M) m3 9.42 30.80 290.14 9.42 290.14 100.00% 0.00 0.00% 9.42 290.14 100.00% 0.00 0.00 0.00% RELLENO CON MATERIAL PROPIO m3 3.07 13.20 40.52 3.07 40.52 100.00% 0.00 0.00% 3.07 40.52 100.00% 0.00 0.00 -0.01% ELIMINACION DE MATERIAL EXCEDENTE m3 11.02 29.06 320.24 11.02 320.24 100.00% 0.00 0.00% 11.02 320.24 100.00% 0.00 0.00 0.00% OBRAS DE CONCRETO SIMPLE SOLADO 2" MEZCLA 1:12 C:H m2 5.00 40.26 201.30 5.00 201.30 100.00% 0.00 0.00% 5.00 201.30 100.00% 0.00 0.00 0.00% OBRAS DE CONCRETO ARMADO CAMARASEPTICA CONCRETO f'c=175 kg/cm2 m3 3.99 498.68 1,989.73 3.99 1,989.73 100.00% 0.00 0.00% 3.99 1,989.73 100.00% 0.00 0.00 0.00% ENCOFRADO Y DESENCOFRADO m2 14.21 39.14 556.18 14.21 556.18 100.00% 0.00 0.00% 14.21 556.18 100.00% 0.00 0.00 0.00% ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 137.26 5.19 712.38 137.26 712.38 100.00% 0.00 0.00% 137.26 712.38 100.00% 0.00 0.00 0.00% POZO DE PERCOLACION CONCRETO f'c=175 kg/cm2 m3 0.75 498.68 374.01 0.75 374.01 100.00% 0.00 0.00% 0.75 374.01 100.00% 0.00 0.00 0.00% ENCOFRADO Y DESENCOFRADO m2 1.21 39.14 47.36 1.21 47.36 100.00% 0.00 0.00% 1.21 47.36 100.00% 0.00 0.00 0.00% ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 28.50 5.19 147.92 28.50 147.92 100.00% 0.00 0.00% 28.50 147.92 100.00% 0.00 0.00 0.00% MUROS Y TABIQUE DE ALBAÑILERIA

Page 16: Valorizcion Nº 05 - Febrero

VALORIZACIÓN DE OBRA VALORIZACION DE OBRA Nº 05 (DEL 01/02/2015 AL 28/02/2015)

ESPECIFICACION PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZARPARTIDADESCRIPCION UNIDADMETRADOPRECIO UNITARIO PARCIAL METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YAUYUCAN OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)

SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675) DISTRITO: YAUYUCAN PROVINCIA : SANTA CRUZ

MURO DE LADRILLO K.K. TIPO IV APAREJO DE CABEZA m2 10.18 54.90 558.88 10.18 558.88 100.00% 0.00 0.00% 10.18 558.88 100.00% 0.00 0.00 0.00% REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO CON IMPERMEABILIZANTE DE MUROS (INCLUYE VERTEDERO) m2 13.65 35.02 478.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.65 478.02 100.00% VARIOS CAMA DE PIEDRA Ø 1/2" - POZO DE PERCOLACION m2 0.94 35.55 33.42 0.94 33.42 100.00% 0.00 0.00% 0.94 33.42 100.00% 0.00 0.00 0.01% TAPA DE FIERRO PARA CAMARA SEPTICA und 1.00 300.00 300.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 300.00 100.00% ACSESORIOS DE DESAGUE mes 3.00 25.00 75.00 2.97 74.13 98.83% 0.00 0.00% 2.97 74.13 98.83% 0.04 0.88 1.17%

07.00.0 CISTERNA - TANQUE ELEVADO TRABAJOS PRELIMINARES TRAZO Y REPLANTEO m2 7.35 1.60 11.76 7.35 11.76 100.00% 0.00 0.00% 7.35 11.76 100.00% 0.00 0.00 0.00% MOVIMIENTO DE TIERRAS NIVELACION Y COMPACTACION MANUAL m2 7.35 3.31 24.33 7.35 24.33 100.00% 0.00 0.01% 7.35 24.33 100.01% 0.00 0.00 0.00% EXCAVACION DE ZANJAS PARA FALSA ZAPATA Y VIGAS DE CIMENTACIÓN m3 16.32 22.66 369.81 16.32 369.81 100.00% 0.00 0.00% 16.32 369.81 100.00% 0.00 0.00 0.00% CORTE DE TERRENO PARA PISOS INTERIORES E=0.35M m3 2.57 34.00 87.38 2.57 87.38 100.00% 0.00 0.00% 2.57 87.38 100.00% 0.00 0.00 0.00% COLOCACION DE GEOTEXTIL 270 GR/M2 A NIVEL DE SUB RASANTE m2 7.35 130.62 960.06 7.35 960.06 100.00% 0.00 0.00% 7.35 960.06 100.00% 0.00 0.00 0.00% RELLENO MANUAL CON MATERIAL PROPIO m3 11.09 44.42 492.62 11.09 492.62 100.00% 0.00 0.00% 11.09 492.62 100.00% 0.00 0.00 0.00% RELLENO CON MATERIAL GRANULAR P/VEREDAS E=0.15 m2 7.35 28.81 211.75 7.35 211.75 100.00% 0.00 0.00% 7.35 211.75 100.00% 0.00 0.00 0.00% ACARREO INTERNO DE MATERIAL EXCEDENTE A MANO m3 7.80 15.11 117.86 7.80 117.86 100.00% 0.00 0.00% 7.80 117.86 100.00% 0.00 0.00 0.00% ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 9.75 64.75 631.31 9.75 631.31 100.00% 0.00 0.00% 9.75 631.31 100.00% 0.00 0.00 0.00% TABLAESTACADO PARA CIMENTACION m2 31.08 35.74 1,110.80 31.08 1,110.80 100.00% 0.00 0.00% 31.08 1,110.80 100.00% 0.00 0.00 0.00% OBRAS DE CONCRETO ARMADO MUROS DE CONTENCIÓN CONCRETO EN CISTERNA SUBTERRANEA f'c=210 kg/cm2 m3 5.23 447.37 2,339.75 5.23 2,339.75 100.00% 0.00 0.00% 5.23 2,339.75 100.00% 0.00 0.00 0.00% MURO DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO m2 21.14 37.33 789.16 21.14 789.16 100.00% 0.00 0.00% 21.14 789.16 100.00% 0.00 0.00 0.00% MURO DE CONTENCIÓN - ACERO Fy= 4200 kg/cm2 kg 534.31 5.56 2,970.76 534.31 2,970.76 100.00% 0.00 0.00% 534.31 2,970.76 100.00% 0.00 0.00 0.00% COLUMNAS COLUMNAS Y COLUMNETAS, CONCRETO f'c=210 KG/CM2 m3 2.52 543.25 1,368.99 2.52 1,368.99 100.00% 0.00 0.00% 2.52 1,368.99 100.00% 0.00 0.00 0.00% COLUMNAS Y COLUMNETAS , ENCOFRADO Y DESENCOFRADO NORMAL m2 33.60 32.37 1,087.63 33.60 1,087.63 100.00% 0.00 0.00% 33.60 1,087.63 100.00% 0.00 0.00 0.00% COLUMNAS Y COLUMNETAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 321.12 5.34 1,714.78 321.12 1,714.78 100.00% 0.00 0.00% 321.12 1,714.78 100.00% 0.00 0.00 0.00% VIGAS VIGAS, VIGUETAS Y DINTELES, CONCRETO f'c=210 KG/CM2 m3 3.14 456.61 1,433.76 3.14 1,433.76 100.00% 0.00 0.00% 3.14 1,433.76 100.00% 0.00 0.00 0.00% VIGAS, VIGUETAS Y DINTELES , ENCOFRADO Y DESENCOFRADO NORMAL m2 29.85 48.70 1,453.70 29.85 1,453.70 100.00% 0.00 0.00% 29.85 1,453.70 100.00% 0.00 0.00 0.00% VIGAS, VIGUETAS Y DINTELES, ACERO CORRUGADO fy=4200 kg/cm2 kg 229.25 5.34 1,224.20 229.25 1,224.20 100.00% 0.00 0.00% 229.25 1,224.20 100.00% 0.00 0.01 0.00% LOSAS MACIZAS LOSAS MACIZAS, CONCRETO F´C=210 KG/CM2 m3 4.05 1,600.61 6,482.47 4.05 6,482.47 100.00% 0.00 0.00% 4.05 6,482.47 100.00% 0.00 0.00 0.00% LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO NORMAL m2 23.36 38.58 901.23 23.36 901.23 100.00% 0.00 0.00% 23.36 901.23 100.00% 0.00 0.00 0.00% LOSAS MACIZAS., ACERO fy=4200 kg/cm2 kg 134.70 5.34 719.30 134.70 719.30 100.00% 0.00 0.00% 134.70 719.30 100.00% 0.00 0.00 0.00% INSTALACIONES SANITARIAS Tuberia Ø = 1-1/4" FoGo ml 10.01 16.85 168.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.01 168.67 100.00% Tuberia Ø = 1- 1/2" FoGo ml 2.40 17.54 42.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 42.10 100.00% Tuberia Ø = 2" FoGo ml 21.90 19.47 426.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.90 426.39 100.00% Valvula Compuerta Ø = 3/4" Bronce und 1.00 48.49 48.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 48.49 100.00% Valvula Compuerta Ø = 2" Bronce und 1.00 92.49 92.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 92.49 100.00% Valvula Compuerta Ø = 1-1/4" Bronce und 3.00 62.49 187.47 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 187.47 100.00% Valvula Compuerta Ø = 3/4" Bronce und 2.00 48.49 96.98 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 96.98 100.00% Valvula Compuerta Ø = 2" Bronce und 2.00 92.49 184.98 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 184.98 100.00% Valvula Check Ø = 1" und 3.00 74.49 223.47 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 223.47 100.00% Valvula Check Ø = 1-1/2" und 1.00 93.49 93.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 93.49 100.00% Valvula Flotadora Ø = 3/4" Bronce und 1.00 73.99 73.99 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 73.99 100.00% Equipo de Bombeo, 02 Electrobombas 1.2 HP glb 1.00 756.49 756.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 756.49 100.00% Rebose de Cisterna de FoGo Ø = 3" glb 1.00 38.49 38.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 38.49 100.00% Rebose de Tanque Alto de FoGo Ø = 2" glb 1.00 21.49 21.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 21.49 100.00%

Page 17: Valorizcion Nº 05 - Febrero

VALORIZACIÓN DE OBRA VALORIZACION DE OBRA Nº 05 (DEL 01/02/2015 AL 28/02/2015)

ESPECIFICACION PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZARPARTIDADESCRIPCION UNIDADMETRADOPRECIO UNITARIO PARCIAL METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YAUYUCAN OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)

SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675) DISTRITO: YAUYUCAN PROVINCIA : SANTA CRUZ

Abrazadera de fijacion de tubo Ø = 1/2" de Fierro Galvanizado e=1.8'' und 2.00 12.49 24.98 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 24.98 100.00% Abrazadera de fijacion de tubo Ø = 1-1/4'' de Fierro Galvanizado e=1.8'' und 2.00 12.49 24.98 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 24.98 100.00% Abrazadera de fijacion de tubo Ø = 2'' de Fierro Galvanizado e=1.8'' und 2.00 12.49 24.98 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 24.98 100.00% Rompe Agua und 2.00 111.49 222.98 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 222.98 100.00% Caja de Reboses und 1.00 216.49 216.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 216.49 100.00%

08.00.0 ADQUISICION DE EQUIPOS Y MOVILIARIO EDUCATIVO MOBILIARIO PIZARRA ACRILICA 4.0 X 1.20 M und 12.00 450.00 5,400.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 5,400.00 100.00% CARPETAS UNIPERSONALES und 120.00 220.00 26,400.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 120.00 26,400.00 100.00% SILLAS DE MADERA ALUMNO und 65.00 95.00 6,175.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.00 6,175.00 100.00% MESAS PARA ALUMNOS und 14.00 300.00 4,200.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 4,200.00 100.00% BANCOS PERSONALES und 72.00 30.00 2,160.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 72.00 2,160.00 100.00% SILLAS APILABLES und 130.00 65.00 8,450.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 130.00 8,450.00 100.00% MESA PARA DESKTOP und 26.00 400.00 10,400.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.00 10,400.00 100.00% ESTANTE DE MADERA DE 1.80 X 0.90 X 0.40 (MELAMINA) und 20.00 150.00 3,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 3,000.00 100.00% PUPITRE DOCENTE und 22.00 280.00 6,160.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.00 6,160.00 100.00% BUTACA DOCENTE und 22.00 180.00 3,960.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.00 3,960.00 100.00% CAMILLA TOPICA und 1.00 4,500.00 4,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 4,500.00 100.00% LITERAS DE PERNOCTACIÓN und 5.00 800.00 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 4,000.00 100.00% EQUIPAMIENTO LAPTOP CORE i3, HD 500 GB RAM=4GB, MONITOR LED 15.6", GRAB. DVD und 22.00 2,200.00 48,400.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.00 48,400.00 100.00% TV LED 32" und 13.00 1,200.00 15,600.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 15,600.00 100.00% REPRODUCTOR DE DVD und 7.00 130.00 910.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 910.00 100.00% SISTEMA DE PROYECCIÓN MULTIMEDIA und 5.00 3,850.00 19,250.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 19,250.00 100.00% RAUTER und 2.00 98.00 196.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 196.00 100.00% FOTOCOPIADORA und 1.00 2,800.00 2,800.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 2,800.00 100.00% BASE DE DATOS BIBLIOTECA VIRTUAL + SERVIDOR und 1.00 5,600.00 5,600.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 5,600.00 100.00% KIT FISICA P/LABORATORIO und 6.00 2,500.00 15,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 15,000.00 100.00% KIT QUIMICA P/LABORATORIO und 6.00 2,500.00 15,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 15,000.00 100.00% KIT BIOLOGIA P/LABORATORIO und 6.00 2,500.00 15,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 15,000.00 100.00% KIT DEPORTIVO und 2.00 2,000.00 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 4,000.00 100.00% MESA DE TRABAJO Y CORTE 2.40X120 und 4.00 700.00 2,800.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,800.00 100.00% PLOTTER FORMATO A1 P/MOLDES und 1.00 3,200.00 3,200.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 3,200.00 100.00% REMALLADORA und 3.00 3,500.00 10,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 10,500.00 100.00% MAQUINA DE COSER und 3.00 2,500.00 7,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 7,500.00 100.00% TALADRO DE MANO und 3.00 750.00 2,250.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 2,250.00 100.00% ESMERIL DE MANO und 4.00 600.00 2,400.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,400.00 100.00% TROZADORA ELECTRICA DE 9" und 3.00 1,300.00 3,900.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 3,900.00 100.00% TALADRO DE BANCO und 3.00 1,850.00 5,550.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 5,550.00 100.00% MAQUINA DE SOLDAR + KIT PROTECCIÓN und 2.00 2,000.00 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 4,000.00 100.00%

09.00.0 MITIGACION DE IMPACTO AMBIENTAL RIEGO PERMANENTE DE LA ZONA DE TRABAJO d 240.00 93.15 22,356.00 90.00 8,383.50 37.50% 0.00 0.00% 90.00 8,383.50 37.50% 150.00 13,972.50 62.50% LIMPIEZA DIARIA DE DESMONTE d 240.00 92.40 22,176.00 90.00 8,316.00 37.50% 0.00 0.00% 90.00 8,316.00 37.50% 150.00 13,860.00 62.50%

glb 1.00 12,500.00 12,500.00 1.00 12,500.00 100.00% 0.00 0.00% 1.00 12,500.00 100.00% 0.00 0.00 0.00%10.00.0 CAPACITACION

CAPACITACION DE DOCENTES SOLDADURA Y FORJA glb 1.00 15,000.00 15,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 15,000.00 100.00% CAPACITACION DE DOCENTES CONFECCION INDUSTRIAL glb 1.00 15,000.00 15,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 15,000.00 100.00% CAPACITACION DE DOCENTES EN METODOLOGIA PEDAGOGICA glb 1.00 12,500.00 12,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 12,500.00 100.00% CAPACITACION DE METODOLOGIA DE AVALUACIÓN glb 1.00 10,500.00 10,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 10,500.00 100.00%

11.00.0 CAPACITACION PARA BENEFICIARIOS CAPACITACION PARA ESCUELA DE PADRES mes 6.00 3,000.00 18,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 18,000.00 100.00%

ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD

Page 18: Valorizcion Nº 05 - Febrero

VALORIZACIÓN DE OBRA VALORIZACION DE OBRA Nº 05 (DEL 01/02/2015 AL 28/02/2015)

ESPECIFICACION PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZARPARTIDADESCRIPCION UNIDADMETRADOPRECIO UNITARIO PARCIAL METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE METRADO PARCIAL % AVANCE

PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YAUYUCAN OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)

SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675) DISTRITO: YAUYUCAN PROVINCIA : SANTA CRUZ

TOTLA DE COSTO DIRECTO ### 674,754.29 27.73% ### 14.05% ### 41.78% ### 58.22%GASTOS GENERALES (8.84%) 215,184.40 59,678.64 30,227.42 89,906.07 125,278.33UTILIDAD (8.00%) 194,637.94 53,980.34 27,341.22 81,321.56 113,316.38SUB TOTAL ### 788,413.28 27.73% ### 14.05% ### 41.78% ### 58.22%IMPUESTO GENERAL A LAS VENTAS (IGV 18%) 511,703.39 141,914.39 71,880.10 213,794.48 297,908.91TOTAL ### 930,327.67 27.73% ### 14.05% ### 41.78% ### 58.22%FACTOR DE RELACION 1.00000 1.00000 1.00000 1.00000 1.00000TOTAL PRESUPUESTO POR F.R. ### 930,327.67 ### ### ###

Page 19: Valorizcion Nº 05 - Febrero

FORMULA POLINÓMICA

AREA GEOGRÁFICA: 4

MONOMIO ELEMENTO SIMBOLO %

1 MANO DE OBRA M 47 0.228 ### 309.81 309.81 0.2282 AGREGADO GRUESO A `05 0.183 ### 305.20 305.20 0.1833 CEMENTO PORTLAND TIPO I C 21 0.159 ### 300.48 300.48 0.1594 ACERO DE CONSTRUCCION CORRUGADO A `03 0.087 ### 288.30 288.30 0.0875 MAQUINARIA Y EQUIPO IMPORTADO M 49 0.198 ### 268.30 268.30 0.1986 INDICE GENERAL DE PRECIOS AL CONSUMIDOR I 39 0.145 ### 325.32 325.32 0.145

K= 1.000

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"

CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

CODIGO I.U.

COEFICIENTE

INCIDENCIA

I.U. BASE MAY - 2014

I.U. SET - 2014

Page 20: Valorizcion Nº 05 - Febrero

FACTOR DE ADELANTO DIRECTO Y ADELANTO DE MATERIALES - OCTUBRE 2014

AREA GEOGRÁFICA: 4

MONOMIO ELEMENTO SIMBOLO %

1 MANO DE OBRA M 47 0.228 ### 309.81 309.81 0.2282 AGREGADO GRUESO A `05 0.183 ### 305.20 305.20 0.1833 CEMENTO PORTLAND TIPO I C 21 0.159 ### 300.48 300.48 0.1594 ACERO DE CONSTRUCCION CORRUGADO A `03 0.087 ### 288.30 288.30 0.0875 MAQUINARIA Y EQUIPO IMPORTADO M 49 0.198 ### 268.30 268.30 0.1986 INDICE GENERAL DE PRECIOS AL CONSUMIDOR I 39 0.145 ### 325.32 325.32 0.145

K= 1.000

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"

CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

CODIGO I.U.

COEFICIENTE

INCIDENCIA

I.U. BASE MAY - 2014

I.U. SET - 2014

Page 21: Valorizcion Nº 05 - Febrero

REAJUSTE DE VALORIZACIÓN Nº 01

AREA GEOGRÁFICA: 4

399,333.87819,534.12

1,639,068.244,097,670.60

1.0001.0001.000

Nº MES VALORIZACION KA KAM K REAJUSTE A CUENTAREAJUSTE MES1.00 ÒCTUBRE - 2014 399,333.87 1.000 1.000 1.000 0.00 0.00 0.00

CONTROL DE REAJUSTE

PROGRAMADONº MES VALORIZACION KA K REAJUSTE

V-1 ÒCTUBRE - 2014 1,101,537.45 1.000 1.000 0.00

EJECUTADONº MES VALORIZACION KA K REAJUSTE

V-1 ÒCTUBRE - 2014 399,333.87 1.000 1.000 0.00

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"

CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

R = REAJUSTE R= V x [(K-1) - [(A/C x [(K/KA)-1] - [AM/C x [(K/KAM)-1]]V = VALORIZACIONA = ADELANTO DIRECTOAM = ADELANTO DE MATERIALESC = MONTO CONTRACTUALK = FACTOR DEL MESKA = FACTOR DEL MES DE ADELANTO - OCTUBRE 2014KAM= FACTOR DE ADELANTO DE MATERIALES - OCTUBRE 2014

NOTA: Como el reajuste ejecutado es menor que el reajuste programado, se paga el 100% el reajuste ejecutado

Page 22: Valorizcion Nº 05 - Febrero

RESUMÉN DE VALORIZACIÓN Nº 05 - CONTRATISTA DE OBRA

MONTO DEL CONTRATO:S/. 3,354,500.00ADELANTO DIRECTO S/. 670,900.00

AREA GEOGRÁFICA: 4

ITEM DESCRIPCION ACUMULADO ANTERIOR MONTO ACTUAL ACUMULADO ACTUAL1.00 MONTO CONTRACTUAL (V)1.01 VALORIZACIÓN 788,413.28 399,333.87 1,187,747.15

2.00 REAJUSTE ®2.01 REAJUSTE 0.00 0.00 0.00

3.00 DEDUCCIONES (D)3.01 RETENCIONES DE REAJUSTES 0.00 0.00 0.00

4.00 VALORIZACIÓN BRUTA (VB)4.01 (VB=V+R-D) 788,413.28 399,333.87 1,187,747.15

5.00 AMORTIZACIONES (M)5.01 AMORTIZACION POR ADELANTO DIRECTO 157,682.66 79,866.77 237,549.43

6.00 VALORIZACIÓN NETA (VN)6.01 (VB-M) 630,730.62 319,467.10 950,197.72

7.00 MULTAS7.01 MULTAS POR ATRASO DE OBRA (M) 0.00 0.00 0.00

8.00 MONTO A PAGAR AL CONTRATISTA8.01 SUB TOTAL (VN-M) 630,730.62 319,467.10 950,197.728.02 EN IGV (VN*.18) 113,531.51 57,504.08 171,035.598.03 MONTO A FACTURAR 744,262.13 376,971.18 1,121,233.31

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"

CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

Page 23: Valorizcion Nº 05 - Febrero

COMPARATIVO DE AVANCE DE OBRA Nº 05 - CURVA "S"

MONTO CONTRATADO S/. 3,354,500.00FECHA DE INICIO DE OBRA 10/1/2014TIEMPO DE EJECUCIÓN 300 DIASFECHA PROYECTADA DE TERMI 7/27/2015

VALORIZACIÓN N° 05

MONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTADOS

MONTOS (Inc/ IGV) PORCENTAJES MONTOS (Inc/ IGV) PORCENTAJESMES PARCIAL ACUMUL. PARCIAL ACUMUL. MES PARCIAL ACUMUL. PARCIAL ACUMUL.

S/. S/. % % S/. S/. % %1-Oct-14 0.00 0.00 0.00% 0.00% 1-Oct-14 0.00 0.00 0.00% 0.00%31-Oct-14 416,573.27 416,573.27 17.12% 17.12% 31-Oct-14 416,573.28 416,573.28 17.12% 17.12%30-Nov-14 129,090.51 545,663.78 5.31% 22.43% 30-Nov-14 129,090.51 545,663.79 5.31% 22.43%31-Dec-14 129,090.51 674,754.28 5.31% 27.73% 31-Dec-14 129,090.51 674,754.29 5.31% 27.73%31-Jan-15 0.00 674,754.28 0.00% 27.73% 31-Jan-15 0.00 674,754.29 0.00% 27.73%28-Feb-15 223,731.45 898,485.73 9.20% 36.93% 28-Feb-15 341,765.23 1,016,519.52 14.05% 41.78%31-Mar-15 192,269.92 1,090,755.66 7.90% 44.83% 31-Mar-1530-Apr-15 237,870.34 1,328,626.00 9.78% 54.61% 30-Apr-1531-May-15 346,518.40 1,675,144.40 14.24% 68.85% 31-May-1530-Jun-15 348,428.67 2,023,573.07 14.32% 83.17% 30-Jun-1527-Jul-15 409,401.20 2,432,974.27 16.83% 100.00% 27-Jul-15

TOTAL 2,432,974.27 100.00% TOTAL 1,016,519.52 41.78%

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"

CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

1-Oct-14 28-Oct-14 24-Nov-14 21-Dec-14 17-Jan-15 13-Feb-15 12-Mar-15 8-Apr-15 5-May-15 1-Jun-15 28-Jun-15 25-Jul-150%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

17.12%22.43%

27.73% 27.73%

36.93%

44.83%

54.61%

68.85%

83.17%

0.00%

17.12%

22.43%27.73% 27.73%

41.78%

PORCENTAJES DE AVANCE PROGRAMADO Vs. EJECUTADO ACUMULADO

PROGRAMADO

EJECUTADO

PLAZO DE EJECUCION MENSUAL

AV

AN

CE M

EN

SU

AL A

CU

MU

LA

DO

(%

)

Page 24: Valorizcion Nº 05 - Febrero

CONTROL DE METRADOS EJECUTADOS AL MES DE FEBRERO 2015

AREA GEOGRÁFICA: 4

VALORIZACION Nº 03 (01/02/2015 - 28/02/2015)

PARTIDAS UNIDADMETRADOS EJECUTADOS

ANTERIORACTUAL ACUMULADO

01.00.00PABELLON 01 OBRAS PROVISIONALES CARTEL DE IDENTIFICACION DE OBRA DE 8.50 X 3.60 m und 1.00 1.00 0.00 1.00 100.00% 0.00 ALMACEN, CASETA Y GUARDIANIA m2 48.00 48.00 0.00 48.00 100.00% 0.00 CERCO PROVISIONAL DE SEGURIDAD DE OBRA ml 456.00 456.00 0.00 456.00 100.00% 0.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS glb 1.00 0.50 0.00 0.50 50.00% 0.50 TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 224.45 224.45 0.00 224.45 100.00% 0.00 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 224.45 224.45 0.00 224.45 100.00% 0.00 MOVIMIENTO DE TIERRAS CORTE DE MATERIAL SUELTO CON MAQUINARIA PARA EXPLANACIONES m3 258.43 258.43 0.00 258.43 100.00% 0.00 EXCAVACION MANUAL PARA CIMIENTOS Y ZAPATAS m3 126.22 126.22 0.00 126.22 100.00% 0.00 RELLENO COMPACTADO CON MATERIAL PROPIO m3 57.52 57.52 0.00 57.52 100.00% 0.00 AFIRMADO COMPACTADO E=6" PARA ZAPATAS m2 56.15 56.15 0.00 56.15 100.00% 0.00 AFIRMADO COMPACTADO E=4" PARA CIMIENTOS m2 33.53 33.53 0.00 33.53 100.00% 0.00 NIVELACION INT. PARA FALSO PISO Y VEREDAS m2 269.91 224.50 45.41 269.91 100.00% 0.00 AFIRMADO COMPACTADO E=4" PARA PISOS Y VEREDAS m2 269.91 134.50 135.41 269.91 100.00% 0.00 ACARREO INTERNO DE MATERIAL EXCEDENTE m3 408.91 408.91 0.00 408.91 100.00% 0.00 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) m3 408.91 408.91 0.00 408.91 100.00% 0.00 OBRAS DE CONCRETO SIMPLE SOLADOS SOLADO PARA ZAPATAS DE E=4" MEZCLA 1:12 CEMENTO:HORMIGON m2 56.15 56.15 0.00 56.15 100.00% 0.00 CIMIENTO CORRIDO CIMIENTO CORRIDO MEZCLA C:H = 1:10 30% P.G. m3 19.13 19.13 0.00 19.13 100.00% 0.00 SOBRECIMIENTOS SOBRECIMIENTOS, CONCRETO 1:8+25% PM m3 8.08 8.08 0.00 8.08 100.00% 0.00 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 85.92 85.92 0.00 85.92 100.00% 0.00 FALSO PISO FALSO PISO DE 4" DE CONCRETO C:H = 1:8 m2 179.55 0.00 179.55 179.55 100.00% 0.00 OBRAS DE CONCRETO ARMADO ZAPATAS ZAPATAS, CONCRETO f'c=210 kg/cm2 m3 33.68 33.68 0.00 33.68 100.00% 0.00 ZAPATAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 595.98 595.98 0.00 595.98 100.00% 0.00 VIGAS DE CIMENTACION VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2 m3 10.74 10.74 0.00 10.74 100.00% 0.00 VIGAS DE CIMENTACION , ENCOFRADO Y DESENCOFRADO m2 85.92 85.92 0.00 85.92 100.00% 0.00 VIGAS DE CIMENTACION, ACERO CORRUGADO fy=4200 kg/cm2 kg 2,254.18 2,254.18 0.00 2,254.18 100.00% 0.00 COLUMNAS Y COLUMNETAS COLUMNAS Y COLUMNETAS, CONCRETO f'c=210 KG/CM2 m3 23.36 11.68 11.68 23.36 100.00% 0.00 COLUMNAS Y COLUMNETAS , ENCOFRADO Y DESENCOFRADO NORMAL m2 293.33 146.66 146.67 293.33 100.00% 0.00 COLUMNAS Y COLUMNETAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 4,479.69 3,583.75 895.94 4,479.69 100.00% 0.00 VIGAS, VIGUETAS Y DINTELES VIGAS, VIGUETAS Y DINTELES, CONCRETO f'c=210 KG/CM2 m3 35.54 12.00 23.54 35.54 100.00% 0.00 VIGAS, VIGUETAS Y DINTELES , ENCOFRADO Y DESENCOFRADO NORMAL m2 548.46 250.00 298.46 548.46 100.00% 0.00 VIGAS, VIGUETAS Y DINTELES, ACERO CORRUGADO fy=4200 kg/cm2 kg 5,982.27 2,500.00 3,482.27 5,982.27 100.00% 0.00 LOSAS ALIGERADAS LOSAS ALIG., CONCRETO f'c=210 KG/CM2 m3 51.97 0.00 51.97 51.97 100.00% 0.00 LOSAS ALIG., ENCOFRADO Y DESENCOFRADO m2 519.65 0.00 519.65 519.65 100.00% 0.00 LOSAS ALIG., ACERO CORRUGADO fy=4200 kg/cm2 kg 3,588.54 1,500.00 2,088.54 3,588.54 100.00% 0.00 LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.15 X 0.25 X 0.30 M. und 2,360.00 1,000.00 1,360.00 2,360.00 100.00% 0.00 LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.12 X 0.25 X 0.30 M. und 2,694.68 0.00 2,694.68 2,694.68 100.00% 0.00 MUROS Y TABIQUE DE ALBAÑILERIA MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 218.47 152.64 65.83 218.47 100.00% 0.00 MURO DE CABEZA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 151.20 105.84 45.36 151.20 100.00% 0.00 CUBIERTAS COBERTURA DE TEJA ANDINA SOBRE LOSA DE CONCRETO m2 300.43 0.00 0.00 0.00 0.00% 300.43 CUMBRERA DE TEJA ANDINA ml 30.50 0.00 0.00 0.00 0.00% 30.50 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO EN INTERIORES Y EXTERIORES E=1.5 CM, MEZC: C:A=1:3 m2 1,153.43 0.00 0.00 0.00 0.00% 1,153.43 TARRAJEO DE COLUMNAS MZ.C:A=1:3, E=1.5 CM. m2 325.25 0.00 0.00 0.00 0.00% 325.25 TARRAJEO DE VIGASE=1.5 CM, MEZC. C:A=1:3, m2 548.46 0.00 0.00 0.00 0.00% 548.46 VESTIDURA DE DERRAMES E=1.5 CM. MEZCLA C:A=1:3 ml 158.37 0.00 0.00 0.00 0.00% 158.37 CIELORRASOS CIELORRASOS CON MEZCLA C:A=1:3, INC. TARRAJEO DE FONDO ESCALERA m2 533.75 0.00 0.00 0.00 0.00% 533.75 PISOS Y PAVIMENTOS CONTRAPISO DE CEMENTO 48 MM m2 410.75 0.00 0.00 0.00 0.00% 410.75 PISO CERAMICO 0.30 X 0.30 M. m2 410.75 0.00 0.00 0.00 0.00% 410.75 VEREDAS DE CONCRETO F'C 175KG/CM2 m2 90.36 0.00 0.00 0.00 0.00% 90.36 SARDINEL, CONCRETO f'c= 175 kg/cm2, 15X35 XM ml 3.38 0.00 0.00 0.00 0.00% 3.38 SARDINEL, ENCOFRADO Y DESENCOFRADO m2 22.53 0.00 0.00 0.00 0.00% 22.53 JUNTAS ASFALTICAS EN VEREDAS 1:5, E=1" ml 21.60 0.00 0.00 0.00 0.00% 21.60 ZOCALOS Y CONTRAZOCALOS CONTRAZOCALO DE CEMENTO PULIDO H=20 CM EN EXTERIORES ml 97.49 0.00 0.00 0.00 0.00% 97.49 CONTRAZOCALO DE CEMENTO PULIDO H=10 CM EN INTERIORES ml 123.20 0.00 0.00 0.00 0.00% 123.20 CARPINTERIA DE MADERA PUERTA DE MADERA CEDRO P-1 TABLERADA S/MODELO D 1.05X2.80 M. und 7.00 0.00 0.00 0.00 0.00% 7.00 PUERTA DE MADERA CEDRO P-3 TABLERADA S/MODELO DE 1.05X2.25 M. und 3.00 0.00 0.00 0.00 0.00% 3.00 VENTANA DE MADERA DE CEDRO V-1 DE 3.175 X 1.60 M. und 7.00 0.00 0.00 0.00 0.00% 7.00 VENTANA DE MADERA DE CEDRO V-2 DE 4.225 X 1.60 M. und 5.00 0.00 0.00 0.00 0.00% 5.00 VENTANA DE MADERA DE CEDRO V-3 DE 4.225 X 1.30 M. und 12.00 0.00 0.00 0.00 0.00% 12.00 CARPINTERIA METALICA BARRAS DE SEGURIDAD FIERRO LISO 1/2" EN VENTANAS ml 479.40 0.00 0.00 0.00 0.00% 479.40 CERRAJERIA BISAGRA CAPUCHINA DE 4" X 4" und 20.00 0.00 0.00 0.00 0.00% 20.00 BISAGRA CAPUCHINA DE 1 1/2" X 1 1/2" pza 96.00 0.00 0.00 0.00 0.00% 96.00 CERRADURA PARA FORTE TRES GOLPES EN PUERTA und 8.00 0.00 0.00 0.00 0.00% 8.00 CERRADURA SAPITO PARA VENTANAS und 24.00 0.00 0.00 0.00 0.00% 24.00 MANIJA DE BRONCE PARA DE 4" PARA PUERTAS und 7.00 0.00 0.00 0.00 0.00% 7.00

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"

CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

METRADO BASE

% AVANCE

METRADO

A EJECUTAR

Page 25: Valorizcion Nº 05 - Febrero

CONTROL DE METRADOS EJECUTADOS AL MES DE FEBRERO 2015

AREA GEOGRÁFICA: 4

VALORIZACION Nº 03 (01/02/2015 - 28/02/2015)

PARTIDAS UNIDADMETRADOS EJECUTADOS

ANTERIORACTUAL ACUMULADO

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"

CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

METRADO BASE

% AVANCE

METRADO

A EJECUTAR

VIDRIOS, CRISTALES Y SIMILARES VIDRIO SEMIDOBLE NACIONAL TRANSPARENTE p2 1,503.95 0.00 0.00 0.00 0.00% 1,503.95 PINTURA PINTURA LATEX EN VIGAS Y CIELORRASOS (2 MANOS) m2 1,082.21 0.00 0.00 0.00 0.00% 1,082.21 PINTURA LATEX EN MUROS Y COLUMNAS (2 MANOS) m2 1,478.68 0.00 0.00 0.00 0.00% 1,478.68 PINTURA EN PUERTAS DE MADERA CON BARNIZ m2 23.00 0.00 0.00 0.00 0.00% 23.00 PINTURA BARNIZ EN VENTANAS DE MADERA m2 55.20 0.00 0.00 0.00 0.00% 55.20 PINTURA DE CONTRAZOCALOS CON ESMALTE m2 37.74 0.00 0.00 0.00 0.00% 37.74 SISTEMA DE AGUAS DE LLUVIA DADO DE CONCRETO F'C=140 KG/CM2 PROTECCION MONTANTE DE BAJADA DE AGUA DE LLUVIA m3 0.51 0.00 0.00 0.00 0.00% 0.51 CANALETA DE ZINC DE 6" PARA EVACUACION PLUVIAL IN. EMBUDO COLECTOR ml 44.36 0.00 0.00 0.00 0.00% 44.36 MONTANTE DE BAJADA DE AGUA DE LLUVIA PVC SAL 3" ml 48.80 0.00 0.00 0.00 0.00% 48.80 INSTALACIONES ELECTRICAS TABLERO GENERAL und 1.00 0.00 0.00 0.00 0.00% 1.00 TABLERO MODULOS und 3.00 0.00 0.00 0.00 0.00% 3.00 SALIDAS DE TECHO (CENTROS DE LUZ) pto 24.00 0.00 0.00 0.00 0.00% 24.00 SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE PUESTA A TIERRA pto 40.00 0.00 0.00 0.00 0.00% 40.00 TUBERIAS PVC SEL (ELECTRICAS) D=20MM ml 660.00 0.00 0.00 0.00 0.00% 660.00 TUBERIAS PVC SEL (ELECTRICAS) D=30MM ml 84.00 0.00 0.00 0.00 0.00% 84.00 CABLE TW AWG 2.5 mm2 ml 910.00 0.00 0.00 0.00 0.00% 910.00 CABLE TW AWG 4 MM2 ml 740.00 0.00 0.00 0.00 0.00% 740.00 CABLE TW AWG 6 MM2 ml 180.00 0.00 0.00 0.00 0.00% 180.00 TABLERO GENERAL und 1.00 0.00 0.00 0.00 0.00% 1.00 LAMPARAS FLUORESCENTES RECTAS DE 2 X 40 W und 22.00 0.00 0.00 0.00 0.00% 22.00 LAMPARAS FLUORESCENTES RECTAS DE 2 X 20 W und 20.00 0.00 0.00 0.00 0.00% 20.00 POZO DE PUESTA A TIERRA und 1.00 0.00 0.00 0.00 0.00% 1.00 CONEXION A RED EXTERNA Y MEDIDOR und 1.00 0.00 0.00 0.00 0.00% 1.00

02.00.00PABELLOÓN 02, SSHH DE ALUMNOS Y DOCENTES. TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 284.13 284.13 0.00 284.13 100.00% 0.00 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 288.56 288.56 0.00 288.56 100.00% 0.00 MOVIMIENTO DE TIERRAS CORTE DE MATERIAL SUELTO CON MAQUINARIA PARA EXPLANACIONES m3 196.85 196.85 0.00 196.85 100.00% 0.00 EXCAVACION MANUAL PARA CIMIENTOS Y ZAPATAS m3 132.19 132.19 0.00 132.19 100.00% 0.00 RELLENO COMPACTADO CON MATERIAL PROPIO m3 61.95 61.95 0.00 61.95 100.00% 0.00 AFIRMADO COMPACTADO E=6" PARA ZAPATAS m2 43.67 43.67 0.00 43.67 100.00% 0.00 AFIRMADO COMPACTADO E=4" PARA CIMIENTOS m2 50.64 50.64 0.00 50.64 100.00% 0.00 NIVELACION INT. PARA FALSO PISO Y VEREDAS m2 272.77 272.77 0.00 272.77 100.00% 0.00 AFIRMADO COMPACTADO E=4" PARA PISOS Y VEREDAS m2 272.77 272.77 0.00 272.77 100.00% 0.00 ACARREO INTERNO DE MATERIAL EXCEDENTE m3 333.87 333.87 0.00 333.87 100.00% 0.00 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) m3 333.87 333.87 0.00 333.87 100.00% 0.00 OBRAS DE CONCRETO SIMPLE SOLADOS SOLADO PARA ZAPATAS DE E=4" MEZCLA 1:12 CEMENTO:HORMIGON m2 43.67 43.67 0.00 43.67 100.00% 0.00 CIMIENTO CORRIDO CIMIENTO CORRIDO MEZCLA C:H = 1:10 30% P.G. m3 28.68 28.68 0.00 28.68 100.00% 0.00 SOBRECIMIENTOS SOBRECIMIENTOS, CONCRETO 1:8+25% PM m3 10.43 10.43 0.00 10.43 100.00% 0.00 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 113.69 113.69 0.00 113.69 100.00% 0.00 FALSO PISO FALSO PISO DE 4" DE CONCRETO C:H = 1:8 m2 171.10 0.00 171.10 171.10 100.00% 0.00 OBRAS DE CONCRETO ARMADO ZAPATAS ZAPATAS, CONCRETO f'c=210 kg/cm2 m3 26.20 26.20 0.00 26.20 100.00% 0.00 ZAPATAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 464.14 464.14 0.00 464.14 100.00% 0.00 VIGAS DE CIMENTACION VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2 m3 9.34 9.34 0.00 9.34 100.00% 0.00 VIGAS DE CIMENTACION , ENCOFRADO Y DESENCOFRADO m2 74.72 74.72 0.00 74.72 100.00% 0.00 VIGAS DE CIMENTACION, ACERO CORRUGADO fy=4200 kg/cm2 kg 2,006.71 2,006.71 0.00 2,006.71 100.00% 0.00 COLUMNAS Y COLUMNETAS COLUMNAS Y COLUMNETAS, CONCRETO f'c=210 KG/CM2 m3 19.73 9.87 9.86 19.73 100.00% 0.00 COLUMNAS Y COLUMNETAS , ENCOFRADO Y DESENCOFRADO NORMAL m2 270.75 135.37 135.38 270.75 100.00% 0.00 COLUMNAS Y COLUMNETAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 4,044.15 3,235.31 808.84 4,044.15 100.00% 0.00 VIGAS, VIGUETAS Y DINTELES VIGAS, VIGUETAS Y DINTELES, CONCRETO f'c=210 KG/CM2 m3 31.81 15.00 16.81 31.81 100.00% 0.00 VIGAS, VIGUETAS Y DINTELES , ENCOFRADO Y DESENCOFRADO NORMAL m2 494.64 250.00 244.64 494.64 100.00% 0.00 VIGAS, VIGUETAS Y DINTELES, ACERO CORRUGADO fy=4200 kg/cm2 kg 5,199.25 2,500.00 2,699.25 5,199.25 100.00% 0.00 LOSAS ALIGERADAS LOSAS ALIG., CONCRETO f'c=210 KG/CM2 m3 47.50 0.00 47.50 47.50 100.00% 0.00 LOSAS ALIG., ENCOFRADO Y DESENCOFRADO m2 475.00 0.00 475.00 475.00 100.00% 0.00 LOSAS ALIG., ACERO CORRUGADO fy=4200 kg/cm2 kg 3,280.81 1,500.00 1,780.81 3,280.81 100.00% 0.00 LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.15 X 0.25 X 0.30 M. und 2,213.00 1,100.00 1,113.00 2,213.00 100.00% 0.00 LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.12 X 0.25 X 0.30 M. und 2,209.00 0.00 2,209.00 2,209.00 100.00% 0.00 LOSAS MACIZAS LOSAS MACIZAS, CONCRETO F´C=210 KG/CM2 m3 0.65 0.00 0.00 0.00 0.00% 0.65 LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO NORMAL m2 3.25 0.00 0.00 0.00 0.00% 3.25 LOSAS MACIZAS., ACERO fy=4200 kg/cm2 kg 153.51 0.00 0.00 0.00 0.00% 153.51 ESCALERAS ESCALERAS, CONCRETO f'c=210 KG/CM2 m3 7.52 0.00 0.00 0.00 0.00% 7.52 ESCALERAS, ENCOFRADO Y DESENCOFRADO NORMAL m2 30.24 0.00 0.00 0.00 0.00% 30.24 ESCALERAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 336.95 0.00 0.00 0.00 0.00% 336.95 MUROS Y TABIQUE DE ALBAÑILERIA MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 312.28 218.59 93.69 312.28 100.00% 0.00 MURO DE CABEZA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 226.80 158.76 68.04 226.80 100.00% 0.00 CUBIERTAS COBERTURA DE TEJA ANDINA SOBRE LOSA DE CONCRETO m2 316.03 0.00 0.00 0.00 0.00% 316.03 CUMBRERA DE TEJA ANDINA ml 37.90 0.00 0.00 0.00 0.00% 37.90 REVOQUES ENLUCIDOS Y MOLDURAS

Page 26: Valorizcion Nº 05 - Febrero

CONTROL DE METRADOS EJECUTADOS AL MES DE FEBRERO 2015

AREA GEOGRÁFICA: 4

VALORIZACION Nº 03 (01/02/2015 - 28/02/2015)

PARTIDAS UNIDADMETRADOS EJECUTADOS

ANTERIORACTUAL ACUMULADO

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"

CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

METRADO BASE

% AVANCE

METRADO

A EJECUTAR

TARRAJEO PRIMARIO RAYADO m2 118.98 0.00 0.00 0.00 0.00% 118.98 TARRAJEO EN INTERIORES Y EXTERIORES E=1.5 CM, MEZC: C:A=1:3 m2 1,078.15 0.00 0.00 0.00 0.00% 1,078.15 TARRAJEO DE COLUMNAS MZ.C:A=1:3, E=1.5 CM. m2 270.75 0.00 0.00 0.00 0.00% 270.75 TARRAJEO DE VIGASE=1.5 CM, MEZC. C:A=1:3, m2 294.64 0.00 0.00 0.00 0.00% 294.64 VESTIDURA DE DERRAMES E=1.5 CM. MEZCLA C:A=1:3 ml 130.39 0.00 0.00 0.00 0.00% 130.39 CIELORRASOS CIELORRASOS CON MEZCLA C:A=1:3, INC. TARRAJEO DE FONDO ESCALERA m2 478.27 0.00 0.00 0.00 0.00% 478.27 PISOS Y PAVIMENTOS CONTRAPISO DE CEMENTO 48 MM m2 305.14 0.00 0.00 0.00 0.00% 305.14 PISO DE CEMENTO PULIDO COLOREADO BRUÑADO E=2" m2 20.00 0.00 0.00 0.00 0.00% 20.00 PISO CERAMICO 0.30 X 0.30 M. m2 268.04 0.00 0.00 0.00 0.00% 268.04 PISO CERAMICO 0.20 X 0.30 M. m2 37.10 0.00 0.00 0.00 0.00% 37.10 REVESTIMIENTO GRADAS CON MORTERO 1:4 X 2 cm PULIDO MEZCLA 1:2 X 1 cm ml 36.00 0.00 0.00 0.00 0.00% 36.00 VEREDAS DE CONCRETO F'C 175KG/CM2 m2 93.93 0.00 0.00 0.00 0.00% 93.93 SARDINEL, CONCRETO f'c= 175 kg/cm2, 15X35 XM ml 4.56 0.00 0.00 0.00 0.00% 4.56 SARDINEL, ENCOFRADO Y DESENCOFRADO m2 30.40 0.00 0.00 0.00 0.00% 30.40 JUNTAS ASFALTICAS EN VEREDAS 1:5, E=1" ml 49.10 0.00 0.00 0.00 0.00% 49.10 CANTONERA 2" X 2" DE ALUMINIO, ESCALERA ml 27.00 0.00 0.00 0.00 0.00% 27.00 ZOCALOS Y CONTRAZOCALOS ZOCALO CERAMICO DE 0.20 X 0.30 DE COLOR m2 66.10 0.00 0.00 0.00 0.00% 66.10 CONTRAZOCALO DE CERAMICO H=10 CM, A=30 CM ml 38.65 0.00 0.00 0.00 0.00% 38.65 CONTRAZOCALO DE CEMENTO PULIDO H=20 CM EN EXTERIORES ml 97.49 0.00 0.00 0.00 0.00% 97.49 CONTRAZOCALO DE CEMENTO PULIDO H=10 CM EN INTERIORES ml 182.95 0.00 0.00 0.00 0.00% 182.95 CARPINTERIA DE MADERA PUERTA DE MADERA CEDRO P-1 TABLERADA S/MODELO D 1.05X2.80 M. und 5.00 0.00 0.00 0.00 0.00% 5.00 PUERTA DE MADERA CEDRO P-2 TABLERADA S/MODELO DE 0.90X2.80 M. und 1.00 0.00 0.00 0.00 0.00% 1.00 PUERTA DE MADERA CEDRO P-3 TABLERADA S/MODELO DE 1.05X2.25 M. und 3.00 0.00 0.00 0.00 0.00% 3.00 PUERTA DE MADERA CEDRO P-4 TABLERADA S/MODELO DE 0.90X2.15 M. und 3.00 0.00 0.00 0.00 0.00% 3.00 PUERTA DE MADERA CEDRO P-5 CONTRAPLACADA S/MODELO DE 0.60X1.40 M. und 7.00 0.00 0.00 0.00 0.00% 7.00 VENTANA DE MADERA DE CEDRO V-1 DE 3.175 X 1.60 M. und 5.00 0.00 0.00 0.00 0.00% 5.00 VENTANA DE MADERA DE CEDRO V-2 DE 4.225 X 1.60 M. und 3.00 0.00 0.00 0.00 0.00% 3.00 VENTANA DE MADERA DE CEDRO V-3 DE 4.225 X 1.30 M. und 8.00 0.00 0.00 0.00 0.00% 8.00 VENTANA DE MADERA DE CEDRO V-4 DE 3.15 X 0.40 M. und 1.00 0.00 0.00 0.00 0.00% 1.00 VENTANA DE MADERA DE CEDRO V-5 DE 3.15 X1.50 M. und 1.00 0.00 0.00 0.00 0.00% 1.00 VENTANA DE MADERA DE CEDRO V-5 SS.HH. 0.75 X0.75 M. und 4.00 0.00 0.00 0.00 0.00% 4.00 VENTANA DE MADERA DE CEDRO V-6 SS.HH. 0.75 X0.75 M. und 4.00 0.00 0.00 0.00 0.00% 4.00 VENTANA DE MADERA DE CEDRO V-15 DE 0.60 X0.25 M. und 4.00 0.00 0.00 0.00 0.00% 4.00 CARPINTERIA METALICA BARANDA METALICA PASAMMANO DE ALUMINIO EN ESCALERA ml 6.90 0.00 0.00 0.00 0.00% 6.90 BARRAS DE SEGURIDAD FIERRO LISO 1/2" EN VENTANAS ml 337.70 0.00 0.00 0.00 0.00% 337.70 CERRAJERIA BISAGRA CAPUCHINA DE 4" X 4" und 44.00 0.00 0.00 0.00 0.00% 44.00 BISAGRA CAPUCHINA DE 1 1/2" X 1 1/2" pza 112.00 0.00 0.00 0.00 0.00% 112.00 CERRADURA PARA FORTE TRES GOLPES EN PUERTA und 11.00 0.00 0.00 0.00 0.00% 11.00 CERRADURA SAPITO PARA VENTANAS und 36.00 0.00 0.00 0.00 0.00% 36.00 MANIJA DE BRONCE PARA DE 4" PARA PUERTAS und 19.00 0.00 0.00 0.00 0.00% 19.00 VIDRIOS, CRISTALES Y SIMILARES VIDRIO SEMIDOBLE NACIONAL TRANSPARENTE p2 1,154.92 0.00 0.00 0.00 0.00% 1,154.92 PINTURA PINTURA LATEX EN VIGAS Y CIELORRASOS (2 MANOS) m2 972.91 0.00 0.00 0.00 0.00% 972.91 PINTURA LATEX EN MUROS Y COLUMNAS (2 MANOS) m2 1,348.90 0.00 0.00 0.00 0.00% 1,348.90 PINTURA EN PUERTAS DE MADERA CON BARNIZ m2 80.26 0.00 0.00 0.00 0.00% 80.26 PINTURA BARNIZ EN VENTANAS DE MADERA m2 230.94 0.00 0.00 0.00 0.00% 230.94 PINTURA DE CONTRAZOCALOS CON ESMALTE m2 37.79 0.00 0.00 0.00 0.00% 37.79 SISTEMA DE AGUAS DE LLUVIA DADO DE CONCRETO F'C=140 KG/CM2 PROTECCION MONTANTE DE BAJADA DE AGUA DE LLUVIA m3 0.51 0.00 0.00 0.00 0.00% 0.51 CANALETA DE ZINC DE 6" PARA EVACUACION PLUVIAL IN. EMBUDO COLECTOR ml 59.16 0.00 0.00 0.00 0.00% 59.16 MONTANTE DE BAJADA DE AGUA DE LLUVIA PVC SAL 3" ml 57.80 0.00 0.00 0.00 0.00% 57.80 INSTALACIONES ELECTRICAS SALIDAS DE TECHO (CENTROS DE LUZ) pto 45.00 0.00 0.00 0.00 0.00% 45.00 SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE PUESTA A TIERRA pto 19.00 0.00 0.00 0.00 0.00% 19.00 TUBERIAS PVC SEL (ELECTRICAS) D=20MM ml 924.00 0.00 0.00 0.00 0.00% 924.00 TUBERIAS PVC SEL (ELECTRICAS) D=30MM ml 84.00 0.00 0.00 0.00 0.00% 84.00 CABLE TW AWG 2.5 mm2 ml 1,274.00 0.00 0.00 0.00 0.00% 1,274.00 CABLE TW AWG 4 MM2 ml 1,036.00 0.00 0.00 0.00 0.00% 1,036.00 CABLE TW AWG 6 MM2 ml 252.00 0.00 0.00 0.00 0.00% 252.00 TABLERO GENERAL und 1.00 0.00 0.00 0.00 0.00% 1.00 LAMPARAS FLUORESCENTES RECTAS DE 2 X 40 W und 22.00 0.00 0.00 0.00 0.00% 22.00 LAMPARAS FLUORESCENTES RECTAS DE 2 X 20 W und 20.00 0.00 0.00 0.00 0.00% 20.00 CONEXION A RED EXTERNA Y MEDIDOR und 1.00 0.00 0.00 0.00 0.00% 1.00 INSTALACIONES SANITARIAS APARATOS SANITARIOS Y ACCESORIOS INODORO DE LOSA BLANCA TANQUE BAJO pza 8.00 0.00 0.00 0.00 0.00% 8.00 LAVATORIO DE LOSA BLANCA 1 LLAVE pza 3.00 0.00 0.00 0.00 0.00% 3.00 URINARIOS CORRIDO SEGUN DISEÑO REVESTIDO CON CERAMICO A=0.65 M. pza 2.35 0.00 0.00 0.00 0.00% 2.35 BEBEDERO CORRIDO DE CONCRETO REVEST. C/MAYOLICA 20 X 30 ml 6.00 0.00 0.00 0.00 0.00% 6.00 PAPELERA DE LOZA BLANCA pza 8.00 0.00 0.00 0.00 0.00% 8.00 JABONERA DE LOSA BLANCA pza 3.00 0.00 0.00 0.00 0.00% 3.00 INSTALACIONES SANITARIAS SALIDA DE DESAGUE PVC SAL 2" pto 10.00 0.00 0.00 0.00 0.00% 10.00 SALIDA DE DESAGUE PVC SAL 4" pto 12.00 0.00 0.00 0.00 0.00% 12.00 SALIDA DE VENTILACION PVC SAL 2" pto 13.00 0.00 0.00 0.00 0.00% 13.00 TUBERIA DE DESAGUE PVC SAL 2" ml 40.00 0.00 0.00 0.00 0.00% 40.00 TUBERIA DE DESAGUE PVC SAL 4" ml 72.00 0.00 0.00 0.00 0.00% 72.00 SUMIDERO DE BRONCE 2" und 3.00 0.00 0.00 0.00 0.00% 3.00 REGISTROS ROSCADO DE BRONCE DE 2" und 5.00 0.00 0.00 0.00 0.00% 5.00 REGISTROS ROSCADO DE BRONCE DE 4" und 12.00 0.00 0.00 0.00 0.00% 12.00 CAJA DE REGISTRO DE 12" X 24" CON TAPA METALICA und 3.00 0.00 0.00 0.00 0.00% 3.00

Page 27: Valorizcion Nº 05 - Febrero

CONTROL DE METRADOS EJECUTADOS AL MES DE FEBRERO 2015

AREA GEOGRÁFICA: 4

VALORIZACION Nº 03 (01/02/2015 - 28/02/2015)

PARTIDAS UNIDADMETRADOS EJECUTADOS

ANTERIORACTUAL ACUMULADO

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"

CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

METRADO BASE

% AVANCE

METRADO

A EJECUTAR

CONEXION A LA RED COLECTORA DE DESAGUE CONEXION A RED PUBLICA DE DESAGUE glb 1.00 0.00 0.00 0.00 0.00% 1.00 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO SALIDA DE AGUA FRIA PVC-SAP 1/2" pto 12.00 0.00 0.00 0.00 0.00% 12.00 TUBERIA PVC SAP C-10 DE 1/2" ml 155.00 0.00 0.00 0.00 0.00% 155.00 TUBERIA PVC SAP C-10 DE 3/4" ml 62.00 0.00 0.00 0.00 0.00% 62.00 VALVULA COMPUERTA DE BRONCE DE 1/2" und 5.00 0.00 0.00 0.00 0.00% 5.00 VALVULA COMPUERTA DE BRONCE DE 3/4" und 2.00 0.00 0.00 0.00 0.00% 2.00 CAJA PARA VALVULA (NICHO DE MAYOLICA) und 6.00 0.00 0.00 0.00 0.00% 6.00 CONEXION A RED PUBLICA DE AGUA POTABLE und 1.00 0.00 0.00 0.00 0.00% 1.00

03.00.00PABELLON 03 TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 222.27 222.27 0.00 222.27 100.00% 0.00 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 222.26 222.26 0.00 222.26 100.00% 0.00 MOVIMIENTO DE TIERRAS CORTE DE MATERIAL SUELTO CON MAQUINARIA PARA EXPLANACIONES m3 196.85 196.85 0.00 196.85 100.00% 0.00 EXCAVACION MANUAL PARA CIMIENTOS Y ZAPATAS m3 107.83 107.83 0.00 107.83 100.00% 0.00 RELLENO COMPACTADO CON MATERIAL PROPIO m3 49.28 49.28 0.00 49.28 100.00% 0.00 AFIRMADO COMPACTADO E=6" PARA ZAPATAS m2 43.67 43.67 0.00 43.67 100.00% 0.00 AFIRMADO COMPACTADO E=4" PARA CIMIENTOS m2 31.15 31.15 0.00 31.15 100.00% 0.00 NIVELACION INT. PARA FALSO PISO Y VEREDAS m2 200.97 200.97 0.00 200.97 100.00% 0.00 AFIRMADO COMPACTADO E=4" PARA PISOS Y VEREDAS m2 200.97 200.97 0.00 200.97 100.00% 0.00 ACARREO INTERNO DE MATERIAL EXCEDENTE m3 319.25 319.25 0.00 319.25 100.00% 0.00 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) m3 319.25 319.25 0.00 319.25 100.00% 0.00 OBRAS DE CONCRETO SIMPLE SOLADOS SOLADO PARA ZAPATAS DE E=4" MEZCLA 1:12 CEMENTO:HORMIGON m2 43.67 43.67 0.00 43.67 100.00% 0.00 CIMIENTO CORRIDO CIMIENTO CORRIDO MEZCLA C:H = 1:10 30% P.G. m3 18.94 18.94 0.00 18.94 100.00% 0.00 SOBRECIMIENTOS SOBRECIMIENTOS, CONCRETO 1:8+25% PM m3 7.51 7.51 0.00 7.51 100.00% 0.00 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 74.72 74.72 0.00 74.72 100.00% 0.00 FALSO PISO FALSO PISO DE 4" DE CONCRETO C:H = 1:8 m2 134.00 0.00 134.00 134.00 100.00% 0.00 OBRAS DE CONCRETO ARMADO ZAPATAS ZAPATAS, CONCRETO f'c=210 kg/cm2 m3 26.20 26.20 0.00 26.20 100.00% 0.00 ZAPATAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 464.14 464.14 0.00 464.14 100.00% 0.00 VIGAS DE CIMENTACION VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2 m3 9.34 9.34 0.00 9.34 100.00% 0.00 VIGAS DE CIMENTACION , ENCOFRADO Y DESENCOFRADO m2 74.72 74.72 0.00 74.72 100.00% 0.00 VIGAS DE CIMENTACION, ACERO CORRUGADO fy=4200 kg/cm2 kg 2,006.71 2,006.71 0.00 2,006.71 100.00% 0.00 COLUMNAS Y COLUMNETAS COLUMNAS Y COLUMNETAS, CONCRETO f'c=210 KG/CM2 m3 17.85 8.93 8.92 17.85 100.00% 0.00 COLUMNAS Y COLUMNETAS , ENCOFRADO Y DESENCOFRADO NORMAL m2 225.15 112.57 112.58 225.15 100.00% 0.00 COLUMNAS Y COLUMNETAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 3,725.66 2,980.53 745.13 3,725.66 100.00% 0.00 VIGAS, VIGUETAS Y DINTELES VIGAS, VIGUETAS Y DINTELES, CONCRETO f'c=210 KG/CM2 m3 29.62 10.21 0.00 10.21 34.48% 19.41 VIGAS, VIGUETAS Y DINTELES , ENCOFRADO Y DESENCOFRADO NORMAL m2 458.76 250.00 208.76 458.76 100.00% 0.00 VIGAS, VIGUETAS Y DINTELES, ACERO CORRUGADO fy=4200 kg/cm2 kg 4,801.67 2,000.00 2,801.67 4,801.67 100.00% 0.00 LOSAS ALIGERADAS LOSAS ALIG., CONCRETO f'c=210 KG/CM2 m3 40.57 0.00 20.29 20.29 50.00% 20.29 LOSAS ALIG., ENCOFRADO Y DESENCOFRADO m2 405.71 0.00 202.86 202.86 50.00% 202.86 LOSAS ALIG., ACERO CORRUGADO fy=4200 kg/cm2 kg 2,981.96 1,490.98 745.49 2,236.47 75.00% 745.49 LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.15 X 0.25 X 0.30 M. und 1,732.00 675.48 528.26 1,203.74 69.50% 528.26 LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.12 X 0.25 X 0.30 M. und 2,209.00 0.00 1,104.50 1,104.50 50.00% 1,104.50 MESAS DE LABORATORIO MESA DE LABORATORIO, CONCRETO f'c=210 KG/CM2 m3 2.98 0.00 0.00 0.00 0.00% 2.98 MESA DE LABORATORIO, ENCOFRADO Y DESENCOFRADO NORMAL m2 28.37 0.00 0.00 0.00 0.00% 28.37 MESA DE LABORATORIO, ACERO CORRUGADO fy=4200 kg/cm2 kg 201.96 0.00 201.96 201.96 100.00% 0.00 MUROS Y TABIQUE DE ALBAÑILERIA MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 140.14 98.10 42.04 140.14 100.00% 0.00 MURO DE CABEZA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 226.80 158.76 67.14 225.90 99.61% 0.90 CUBIERTAS COBERTURA DE TEJA ANDINA SOBRE LOSA DE CONCRETO m2 246.74 0.00 0.00 0.00 0.00% 246.74 CUMBRERA DE TEJA ANDINA ml 37.90 0.00 0.00 0.00 0.00% 37.90 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO EN INTERIORES Y EXTERIORES E=1.5 CM, MEZC: C:A=1:3 m2 733.87 0.00 0.00 0.00 0.00% 733.87 TARRAJEO DE COLUMNAS MZ.C:A=1:3, E=1.5 CM. m2 225.15 0.00 0.00 0.00 0.00% 225.15 TARRAJEO DE MUROS DE SOPORTE DE MESAS DE LABORATORIO m2 458.76 0.00 0.00 0.00 0.00% 458.76 TARRAJEO DE VIGASE=1.5 CM, MEZC. C:A=1:3, m2 117.55 0.00 0.00 0.00 0.00% 117.55 VESTIDURA DE DERRAMES E=1.5 CM. MEZCLA C:A=1:3 ml 117.55 0.00 0.00 0.00 0.00% 117.55 CIELORRASOS CIELORRASOS CON MEZCLA C:A=1:3, INC. TARRAJEO DE FONDO ESCALERA m2 396.35 0.00 0.00 0.00 0.00% 396.35 PISOS Y PAVIMENTOS CONTRAPISO DE CEMENTO 48 MM m2 268.04 0.00 0.00 0.00 0.00% 268.04 PISO DE CEMENTO PULIDO COLOREADO BRUÑADO E=2" m2 20.00 0.00 0.00 0.00 0.00% 20.00 PISO CERAMICO 0.30 X 0.30 M. m2 268.04 0.00 0.00 0.00 0.00% 268.04 ENCHAPE CON MAYOLICA DE 0.15 X0.15 M EN MESAS DE LABORATORIO m2 16.56 0.00 0.00 0.00 0.00% 16.56 VEREDAS DE CONCRETO F'C 175KG/CM2 m2 66.96 0.00 0.00 0.00 0.00% 66.96 SARDINEL, CONCRETO f'c= 175 kg/cm2, 15X35 XM ml 3.26 0.00 0.00 0.00 0.00% 3.26 SARDINEL, ENCOFRADO Y DESENCOFRADO m2 21.74 0.00 0.00 0.00 0.00% 21.74 JUNTAS ASFALTICAS EN VEREDAS 1:5, E=1" ml 23.10 0.00 0.00 0.00 0.00% 23.10 CANTONERA 2" X 2" DE ALUMINIO, ESCALERA ml 27.00 0.00 0.00 0.00 0.00% 27.00 ZOCALOS Y CONTRAZOCALOS CONTRAZOCALO DE CEMENTO PULIDO H=20 CM EN EXTERIORES ml 97.49 0.00 0.00 0.00 0.00% 97.49 CONTRAZOCALO DE CEMENTO PULIDO H=10 CM EN INTERIORES ml 182.95 0.00 0.00 0.00 0.00% 182.95 CARPINTERIA DE MADERA

Page 28: Valorizcion Nº 05 - Febrero

CONTROL DE METRADOS EJECUTADOS AL MES DE FEBRERO 2015

AREA GEOGRÁFICA: 4

VALORIZACION Nº 03 (01/02/2015 - 28/02/2015)

PARTIDAS UNIDADMETRADOS EJECUTADOS

ANTERIORACTUAL ACUMULADO

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"

CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

METRADO BASE

% AVANCE

METRADO

A EJECUTAR

PUERTA DE MADERA CEDRO P-1 TABLERADA S/MODELO D 1.05X2.80 M. und 5.00 0.00 0.00 0.00 0.00% 5.00 PUERTA DE MADERA CEDRO P-2 TABLERADA S/MODELO DE 0.90X2.80 M. und 1.00 0.00 0.00 0.00 0.00% 1.00 VENTANA DE MADERA DE CEDRO V-1 DE 3.175 X 1.60 M. und 5.00 0.00 0.00 0.00 0.00% 5.00 VENTANA DE MADERA DE CEDRO V-2 DE 4.225 X 1.60 M. und 3.00 0.00 0.00 0.00 0.00% 3.00 VENTANA DE MADERA DE CEDRO V-3 DE 4.225 X 1.30 M. und 8.00 0.00 0.00 0.00 0.00% 8.00 VENTANA DE MADERA DE CEDRO V-4 DE 3.15 X 0.40 M. und 1.00 0.00 0.00 0.00 0.00% 1.00 VENTANA DE MADERA DE CEDRO V-5 DE 3.15 X1.50 M. und 1.00 0.00 0.00 0.00 0.00% 1.00 CARPINTERIA METALICA BARRAS DE SEGURIDAD FIERRO LISO 1/2" EN VENTANAS ml 337.70 0.00 0.00 0.00 0.00% 337.70 CERRAJERIA BISAGRA CAPUCHINA DE 4" X 4" und 44.00 0.00 0.00 0.00 0.00% 44.00 BISAGRA CAPUCHINA DE 1 1/2" X 1 1/2" pza 112.00 0.00 0.00 0.00 0.00% 112.00 CERRADURA PARA FORTE TRES GOLPES EN PUERTA und 11.00 0.00 0.00 0.00 0.00% 11.00 CERRADURA SAPITO PARA VENTANAS und 36.00 0.00 0.00 0.00 0.00% 36.00 MANIJA DE BRONCE PARA DE 4" PARA PUERTAS und 19.00 0.00 0.00 0.00 0.00% 19.00 VIDRIOS, CRISTALES Y SIMILARES VIDRIO SEMIDOBLE NACIONAL TRANSPARENTE p2 1,098.70 0.00 0.00 0.00 0.00% 1,098.70 PINTURA PINTURA LATEX EN VIGAS Y CIELORRASOS (2 MANOS) m2 855.10 0.00 0.00 0.00 0.00% 855.10 PINTURA LATEX EN MUROS Y COLUMNAS (2 MANOS) m2 959.02 0.00 0.00 0.00 0.00% 959.02 PINTURA EN PUERTAS DE MADERA CON BARNIZ m2 80.26 0.00 0.00 0.00 0.00% 80.26 PINTURA BARNIZ EN VENTANAS DE MADERA m2 230.94 0.00 0.00 0.00 0.00% 230.94 PINTURA DE CONTRAZOCALOS CON ESMALTE m2 37.79 0.00 0.00 0.00 0.00% 37.79 SISTEMA DE AGUAS DE LLUVIA DADO DE CONCRETO F'C=140 KG/CM2 PROTECCION MONTANTE DE BAJADA DE AGUA DE LLUVIA m3 0.51 0.00 0.00 0.00 0.00% 0.51 CANALETA DE ZINC DE 6" PARA EVACUACION PLUVIAL IN. EMBUDO COLECTOR ml 59.16 0.00 0.00 0.00 0.00% 59.16 MONTANTE DE BAJADA DE AGUA DE LLUVIA PVC SAL 3" ml 57.80 0.00 0.00 0.00 0.00% 57.80 INSTALACIONES ELECTRICAS SALIDAS DE TECHO (CENTROS DE LUZ) pto 24.00 0.00 0.00 0.00 0.00% 24.00 SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE PUESTA A TIERRA pto 34.00 0.00 0.00 0.00 0.00% 34.00 TUBERIAS PVC SEL (ELECTRICAS) D=20MM ml 600.00 0.00 0.00 0.00 0.00% 600.00 TUBERIAS PVC SEL (ELECTRICAS) D=30MM ml 84.00 0.00 0.00 0.00 0.00% 84.00 CABLE TW AWG 2.5 mm2 ml 910.00 0.00 0.00 0.00 0.00% 910.00 CABLE TW AWG 4 MM2 ml 740.00 0.00 0.00 0.00 0.00% 740.00 CABLE TW AWG 6 MM2 ml 180.00 0.00 0.00 0.00 0.00% 180.00 TABLERO GENERAL und 1.00 0.00 0.00 0.00 0.00% 1.00 LAMPARAS FLUORESCENTES RECTAS DE 2 X 40 W und 14.00 0.00 0.00 0.00 0.00% 14.00 LAMPARAS FLUORESCENTES RECTAS DE 2 X 20 W und 20.00 0.00 0.00 0.00 0.00% 20.00 CONEXION A RED EXTERNA Y MEDIDOR und 1.00 0.00 0.00 0.00 0.00% 1.00

04.00.00CONSTRUCCION DE CERCO PERIMETRICO TRABAJOS PRELIMINARES TRAZO Y REPLANTEO m2 262.27 262.27 0.00 262.27 100.00% 0.00 MOVIMIENTO DE TIERRAS EXCAVACION MANUAL EN TERRENO NATURAL m3 157.36 15.74 0.00 15.74 10.00% 141.62 NIVELACION Y COMPACTACION DE TERRANO m2 157.36 15.74 0.00 15.74 10.00% 141.62 ACARREO INTERNO DE MATERIAL EXCEDENTE A MANO m3 196.70 19.67 0.00 19.67 10.00% 177.03 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) m3 196.70 19.67 0.00 19.67 10.00% 177.03 AFIRMADO COMPACTADO E=4" PARA CIMIENTOS m2 157.36 0.00 0.00 0.00 0.00% 157.36 OBRAS DE CONCRETO CONCRETO C:H = 1:10 + 30% P.G. PARA CIMIENTO CORRIDO m3 94.42 0.00 0.00 0.00 0.00% 94.42 SOBRECIMIENTOS REFORZADOS, F´C=210 KG/CM2 m3 23.60 0.00 0.00 0.00 0.00% 23.60 SOBRECIMIENTOS REFORZADOS, ENCOFRADO Y DESENCOFRADO m2 314.72 0.00 0.00 0.00 0.00% 314.72 SOBRECIMIENTOS REFORZADOS, ACERO fy=4200 kg/cm2 kg 1,354.46 0.00 0.00 0.00 0.00% 1,354.46 COLUMNAS, CONCRETO f'c=210 KG/CM2 m3 20.63 0.00 0.00 0.00 0.00% 20.63 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 165.00 0.00 0.00 0.00 0.00% 165.00 COLUMNAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 2,387.25 0.00 0.00 0.00 0.00% 2,387.25 VIGAS, CONCRETO f'c=210 KG/CM2 m3 22.55 0.00 0.00 0.00 0.00% 22.55 VIGAS, ENCOFRADO Y DESENCOFRADO m2 188.40 0.00 0.00 0.00 0.00% 188.40 VIGAS, ACERO fy=4200 kg/cm2 kg 2,337.08 0.00 0.00 0.00 0.00% 2,337.08 MUROS Y ENLUCIDOS MURO DE SOGA LADRILLO ARCILLA 18 HCOS, CARAVISTA m2 581.31 0.00 0.00 0.00 0.00% 581.31 JUNTAS DE CONSTRUCCION CON TEKNOPORT m2 20.63 0.00 0.00 0.00 0.00% 20.63 TARRAJEO EXTERIOR MEZCLA: C:A=1:3 m2 501.44 0.00 0.00 0.00 0.00% 501.44 PINTURA LATEX EN CERCO PERIMETRICO m2 423.00 0.00 0.00 0.00 0.00% 423.00 CARPINTERIA METALICA PORTON METALICO SEGUN DISEÑO und 1.00 0.00 0.00 0.00 0.00% 1.00 PUERTA METALICA SEGUN DISEÑO und 1.00 0.00 0.00 0.00 0.00% 1.00

05.00.00PATIO DE FORMACION TRAZO Y REPLANTEO m2 250.00 250.00 0.00 250.00 100.00% 0.00 CORTE DE TERRENO CON MAQUINARIA m3 225.00 225.00 0.00 225.00 100.00% 0.00 NIVELACION Y COMPACTACION CON MAQUINARIA m2 250.00 250.00 0.00 250.00 100.00% 0.00 REFINE Y COMPACTACION DE SUBRASANTE m2 250.00 250.00 0.00 250.00 100.00% 0.00 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) m3 281.25 281.25 0.00 281.25 100.00% 0.00 MEJORAMIENTO DE SUBRASANTE E=15 CM CON PIEDRA DE RIO T. MAX 3" m3 81.00 42.00 0.00 42.00 51.85% 39.00 AFIRMADO E=6" PARA BASE GRANULAR m2 37.50 23.00 0.00 23.00 61.33% 14.50 LOSA DE CONCRETO f'c=175 KG/CM2, E=0.10 M. m2 25.00 0.00 0.00 0.00 0.00% 25.00 SARDINEL, CONCRETO f'c= 175 kg/cm2 m3 4.75 0.00 0.00 0.00 0.00% 4.75 DADOS, CONCRETO F'C=175 KG/CM2 m3 1.25 0.00 0.00 0.00 0.00% 1.25 ENCOFRADO Y DESENCOFRADO DE SARDINEL m2 35.80 0.00 0.00 0.00 0.00% 35.80 JUNTAS DE DILATACION ASFALTICAS, E=1" ml 180.00 0.00 0.00 0.00 0.00% 180.00 CURADO DE OBRAS DE CONCRETO m2 361.00 0.00 0.00 0.00 0.00% 361.00 VARIOS LIMPIEZA GENERAL Y ENTREGA DE OBRA glb 1.00 0.00 0.00 0.00 0.00% 1.00 PLACA RECORDATORIA und 1.00 0.00 0.00 0.00 0.00% 1.00 FLETE POR TRANSPORTE DE MATERIALES glb 1.00 0.91 0.00 0.91 91.00% 0.09 COLOCACION DE POSTES DE CONCRETO INCL. LUMINARIA und 8.00 0.00 0.00 0.00 0.00% 8.00 SEMBRADO DE GRAS PARA JARDINERAS m2 85.00 0.00 0.00 0.00 0.00% 85.00 SEMBRADO DE PLANTONES und 10.00 0.00 0.00 0.00 0.00% 10.00

Page 29: Valorizcion Nº 05 - Febrero

CONTROL DE METRADOS EJECUTADOS AL MES DE FEBRERO 2015

AREA GEOGRÁFICA: 4

VALORIZACION Nº 03 (01/02/2015 - 28/02/2015)

PARTIDAS UNIDADMETRADOS EJECUTADOS

ANTERIORACTUAL ACUMULADO

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"

CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

METRADO BASE

% AVANCE

METRADO

A EJECUTAR

NIVELACION Y COMPACTACION MANUAL m2 67.66 0.00 0.00 0.00 0.00% 67.66 REJILLA DE FIERRO PARA EVACUACION DE AGUA DE LLUVIAS ml 65.00 0.00 0.00 0.00 0.00% 65.00 CABLEADO DE ILUMINACION EXTERIOR DE POSTES, INCL. DADO DE CONCRETO ml 180.00 0.00 0.00 0.00 0.00% 180.00 PISOS Y PAVIMENTOS AFIRMADO COMPACTADO E=4" m2 67.66 0.00 0.00 0.00 0.00% 67.66 CAMA DE ARENA E = 5 CM. m2 65.00 0.00 0.00 0.00 0.00% 65.00 SARDINEL, CONCRETO f'c= 175 kg/cm2, 15X35 XM ml 180.00 0.00 0.00 0.00 0.00% 180.00

06.00.00SISTEMA DE TRATAMIENTO DE AGUAS SERVIDAS TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 8.14 8.14 0.00 8.14 100.00% 0.00 TRAZO Y REPLANTEO m2 8.14 8.14 0.00 8.14 100.00% 0.00 MOVIMIENTO DE TIERRAS EXCAVACION PARA CAMARA SEPTICA (2.5X2.0X2.45) m3 12.25 12.25 0.00 12.25 100.00% 0.00 EXCAVACION POZA DE PERCOLACION (R=1.00 M, H=3.00M) m3 9.42 9.42 0.00 9.42 100.00% 0.00 RELLENO CON MATERIAL PROPIO m3 3.07 3.07 0.00 3.07 100.00% 0.00 ELIMINACION DE MATERIAL EXCEDENTE m3 11.02 11.02 0.00 11.02 100.00% 0.00 OBRAS DE CONCRETO SIMPLE SOLADO 2" MEZCLA 1:12 C:H m2 5.00 5.00 0.00 5.00 100.00% 0.00 OBRAS DE CONCRETO ARMADO CAMARASEPTICA CONCRETO f'c=175 kg/cm2 m3 3.99 3.99 0.00 3.99 100.00% 0.00 ENCOFRADO Y DESENCOFRADO m2 14.21 14.21 0.00 14.21 100.00% 0.00 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 137.26 137.26 0.00 137.26 100.00% 0.00 POZO DE PERCOLACION CONCRETO f'c=175 kg/cm2 m3 0.75 0.75 0.00 0.75 100.00% 0.00 ENCOFRADO Y DESENCOFRADO m2 1.21 1.21 0.00 1.21 100.00% 0.00 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 28.50 28.50 0.00 28.50 100.00% 0.00 MUROS Y TABIQUE DE ALBAÑILERIA MURO DE LADRILLO K.K. TIPO IV APAREJO DE CABEZA m2 10.18 10.18 0.00 10.18 100.00% 0.00 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO CON IMPERMEABILIZANTE DE MUROS (INCLUYE VERTEDERO) m2 13.65 0.00 0.00 0.00 0.00% 13.65 VARIOS CAMA DE PIEDRA Ø 1/2" - POZO DE PERCOLACION m2 0.94 0.94 0.00 0.94 100.00% 0.00 TAPA DE FIERRO PARA CAMARA SEPTICA und 1.00 0.00 0.00 0.00 0.00% 1.00 ACSESORIOS DE DESAGUE mes 3.00 2.97 0.00 2.97 98.83% 0.04

07.00.00CISTERNA - TANQUE ELEVADO TRABAJOS PRELIMINARES TRAZO Y REPLANTEO m2 7.35 7.35 0.00 7.35 100.00% 0.00 MOVIMIENTO DE TIERRAS NIVELACION Y COMPACTACION MANUAL m2 7.35 7.35 0.00 7.35 100.00% 0.00 EXCAVACION DE ZANJAS PARA FALSA ZAPATA Y VIGAS DE CIMENTACIÓN m3 16.32 16.32 0.00 16.32 100.00% 0.00 CORTE DE TERRENO PARA PISOS INTERIORES E=0.35M m3 2.57 2.57 0.00 2.57 100.00% 0.00 COLOCACION DE GEOTEXTIL 270 GR/M2 A NIVEL DE SUB RASANTE m2 7.35 7.35 0.00 7.35 100.00% 0.00 RELLENO MANUAL CON MATERIAL PROPIO m3 11.09 11.09 0.00 11.09 100.00% 0.00 RELLENO CON MATERIAL GRANULAR P/VEREDAS E=0.15 m2 7.35 7.35 0.00 7.35 100.00% 0.00 ACARREO INTERNO DE MATERIAL EXCEDENTE A MANO m3 7.80 7.80 0.00 7.80 100.00% 0.00 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 9.75 9.75 0.00 9.75 100.00% 0.00 TABLAESTACADO PARA CIMENTACION m2 31.08 31.08 0.00 31.08 100.00% 0.00 OBRAS DE CONCRETO ARMADO MUROS DE CONTENCIÓN CONCRETO EN CISTERNA SUBTERRANEA f'c=210 kg/cm2 m3 5.23 5.23 0.00 5.23 100.00% 0.00 MURO DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO m2 21.14 21.14 0.00 21.14 100.00% 0.00 MURO DE CONTENCIÓN - ACERO Fy= 4200 kg/cm2 kg 534.31 534.31 0.00 534.31 100.00% 0.00 COLUMNAS COLUMNAS Y COLUMNETAS, CONCRETO f'c=210 KG/CM2 m3 2.52 2.52 0.00 2.52 100.00% 0.00 COLUMNAS Y COLUMNETAS , ENCOFRADO Y DESENCOFRADO NORMAL m2 33.60 33.60 0.00 33.60 100.00% 0.00 COLUMNAS Y COLUMNETAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 321.12 321.12 0.00 321.12 100.00% 0.00 VIGAS VIGAS, VIGUETAS Y DINTELES, CONCRETO f'c=210 KG/CM2 m3 3.14 3.14 0.00 3.14 100.00% 0.00 VIGAS, VIGUETAS Y DINTELES , ENCOFRADO Y DESENCOFRADO NORMAL m2 29.85 29.85 0.00 29.85 100.00% 0.00 VIGAS, VIGUETAS Y DINTELES, ACERO CORRUGADO fy=4200 kg/cm2 kg 229.25 229.25 0.00 229.25 100.00% 0.00 LOSAS MACIZAS LOSAS MACIZAS, CONCRETO F´C=210 KG/CM2 m3 4.05 4.05 0.00 4.05 100.00% 0.00 LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO NORMAL m2 23.36 23.36 0.00 23.36 100.00% 0.00 LOSAS MACIZAS., ACERO fy=4200 kg/cm2 kg 134.70 134.70 0.00 134.70 100.00% 0.00 INSTALACIONES SANITARIAS Tuberia Ø = 1-1/4" FoGo ml 10.01 0.00 0.00 0.00 0.00% 10.01 Tuberia Ø = 1- 1/2" FoGo ml 2.40 0.00 0.00 0.00 0.00% 2.40 Tuberia Ø = 2" FoGo ml 21.90 0.00 0.00 0.00 0.00% 21.90 Valvula Compuerta Ø = 3/4" Bronce und 1.00 0.00 0.00 0.00 0.00% 1.00 Valvula Compuerta Ø = 2" Bronce und 1.00 0.00 0.00 0.00 0.00% 1.00 Valvula Compuerta Ø = 1-1/4" Bronce und 3.00 0.00 0.00 0.00 0.00% 3.00 Valvula Compuerta Ø = 3/4" Bronce und 2.00 0.00 0.00 0.00 0.00% 2.00 Valvula Compuerta Ø = 2" Bronce und 2.00 0.00 0.00 0.00 0.00% 2.00 Valvula Check Ø = 1" und 3.00 0.00 0.00 0.00 0.00% 3.00 Valvula Check Ø = 1-1/2" und 1.00 0.00 0.00 0.00 0.00% 1.00 Valvula Flotadora Ø = 3/4" Bronce und 1.00 0.00 0.00 0.00 0.00% 1.00 Equipo de Bombeo, 02 Electrobombas 1.2 HP glb 1.00 0.00 0.00 0.00 0.00% 1.00 Rebose de Cisterna de FoGo Ø = 3" glb 1.00 0.00 0.00 0.00 0.00% 1.00 Rebose de Tanque Alto de FoGo Ø = 2" glb 1.00 0.00 0.00 0.00 0.00% 1.00 Abrazadera de fijacion de tubo Ø = 1/2" de Fierro Galvanizado e=1.8'' und 2.00 0.00 0.00 0.00 0.00% 2.00 Abrazadera de fijacion de tubo Ø = 1-1/4'' de Fierro Galvanizado e=1.8'' und 2.00 0.00 0.00 0.00 0.00% 2.00 Abrazadera de fijacion de tubo Ø = 2'' de Fierro Galvanizado e=1.8'' und 2.00 0.00 0.00 0.00 0.00% 2.00 Rompe Agua und 2.00 0.00 0.00 0.00 0.00% 2.00 Caja de Reboses und 1.00 0.00 0.00 0.00 0.00% 1.00

08.00.00ADQUISICION DE EQUIPOS Y MOVILIARIO EDUCATIVO MOBILIARIO PIZARRA ACRILICA 4.0 X 1.20 M und 12.00 0.00 0.00 0.00 0.00% 12.00

Page 30: Valorizcion Nº 05 - Febrero

CONTROL DE METRADOS EJECUTADOS AL MES DE FEBRERO 2015

AREA GEOGRÁFICA: 4

VALORIZACION Nº 03 (01/02/2015 - 28/02/2015)

PARTIDAS UNIDADMETRADOS EJECUTADOS

ANTERIORACTUAL ACUMULADO

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"

CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

METRADO BASE

% AVANCE

METRADO

A EJECUTAR

CARPETAS UNIPERSONALES und 120.00 0.00 0.00 0.00 0.00% 120.00 SILLAS DE MADERA ALUMNO und 65.00 0.00 0.00 0.00 0.00% 65.00 MESAS PARA ALUMNOS und 14.00 0.00 0.00 0.00 0.00% 14.00 BANCOS PERSONALES und 72.00 0.00 0.00 0.00 0.00% 72.00 SILLAS APILABLES und 130.00 0.00 0.00 0.00 0.00% 130.00 MESA PARA DESKTOP und 26.00 0.00 0.00 0.00 0.00% 26.00 ESTANTE DE MADERA DE 1.80 X 0.90 X 0.40 (MELAMINA) und 20.00 0.00 0.00 0.00 0.00% 20.00 PUPITRE DOCENTE und 22.00 0.00 0.00 0.00 0.00% 22.00 BUTACA DOCENTE und 22.00 0.00 0.00 0.00 0.00% 22.00 CAMILLA TOPICA und 1.00 0.00 0.00 0.00 0.00% 1.00 LITERAS DE PERNOCTACIÓN und 5.00 0.00 0.00 0.00 0.00% 5.00 EQUIPAMIENTO LAPTOP CORE i3, HD 500 GB RAM=4GB, MONITOR LED 15.6", GRAB. DVD und 22.00 0.00 0.00 0.00 0.00% 22.00 TV LED 32" und 13.00 0.00 0.00 0.00 0.00% 13.00 REPRODUCTOR DE DVD und 7.00 0.00 0.00 0.00 0.00% 7.00 SISTEMA DE PROYECCIÓN MULTIMEDIA und 5.00 0.00 0.00 0.00 0.00% 5.00 RAUTER und 2.00 0.00 0.00 0.00 0.00% 2.00 FOTOCOPIADORA und 1.00 0.00 0.00 0.00 0.00% 1.00 BASE DE DATOS BIBLIOTECA VIRTUAL + SERVIDOR und 1.00 0.00 0.00 0.00 0.00% 1.00 KIT FISICA P/LABORATORIO und 6.00 0.00 0.00 0.00 0.00% 6.00 KIT QUIMICA P/LABORATORIO und 6.00 0.00 0.00 0.00 0.00% 6.00 KIT BIOLOGIA P/LABORATORIO und 6.00 0.00 0.00 0.00 0.00% 6.00 KIT DEPORTIVO und 2.00 0.00 0.00 0.00 0.00% 2.00 MESA DE TRABAJO Y CORTE 2.40X120 und 4.00 0.00 0.00 0.00 0.00% 4.00 PLOTTER FORMATO A1 P/MOLDES und 1.00 0.00 0.00 0.00 0.00% 1.00 REMALLADORA und 3.00 0.00 0.00 0.00 0.00% 3.00 MAQUINA DE COSER und 3.00 0.00 0.00 0.00 0.00% 3.00 TALADRO DE MANO und 3.00 0.00 0.00 0.00 0.00% 3.00 ESMERIL DE MANO und 4.00 0.00 0.00 0.00 0.00% 4.00 TROZADORA ELECTRICA DE 9" und 3.00 0.00 0.00 0.00 0.00% 3.00 TALADRO DE BANCO und 3.00 0.00 0.00 0.00 0.00% 3.00 MAQUINA DE SOLDAR + KIT PROTECCIÓN und 2.00 0.00 0.00 0.00 0.00% 2.00

09.00.00MITIGACION DE IMPACTO AMBIENTAL RIEGO PERMANENTE DE LA ZONA DE TRABAJO d 240.00 90.00 0.00 90.00 37.50% 150.00 LIMPIEZA DIARIA DE DESMONTE d 240.00 90.00 0.00 90.00 37.50% 150.00 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD glb 1.00 1.00 0.00 1.00 100.00% 0.00

10.00.00CAPACITACION CAPACITACION DE DOCENTES SOLDADURA Y FORJA glb 1.00 0.00 0.00 0.00 0.00% 1.00 CAPACITACION DE DOCENTES CONFECCION INDUSTRIAL glb 1.00 0.00 0.00 0.00 0.00% 1.00 CAPACITACION DE DOCENTES EN METODOLOGIA PEDAGOGICA glb 1.00 0.00 0.00 0.00 0.00% 1.00 CAPACITACION DE METODOLOGIA DE AVALUACIÓN glb 1.00 0.00 0.00 0.00 0.00% 1.00

11.00.00CAPACITACION PARA BENEFICIARIOS CAPACITACION PARA ESCUELA DE PADRES mes 6.00 0.00 0.00 0.00 0.00% 6.00

Page 31: Valorizcion Nº 05 - Febrero

CALCULO DE LA PENALIDAD DIARIA

MONTO CONTRATADO ###FECHA DE INICIO DE OBRA 10/3/2014TIEMPO DE EJECUCIÓN 180 DIASFECHA PROYECTADA DE TERMI 3/31/2015

PENALIDAD DIARIA= 0.10 x MONTO CONTRATOF x PLAZO EN DIAS

PENALIDAD DIARIA= 0.10 x 3,354,500.000.15 x 180 DIAS

PENALIDAD DIARIA= 12,424.07

OBRA: "CREACION DE PISTAS Y VEREDAS EN LAS CALLES CAJAMARCA, TRUJILLO, LOS PINOS, SERGIO ORREGO, LAS DALIAS, LOS FAICALES, 2 DE MAYO, LOS ROSALES, DEL DISTRITO DE SANTA CRUZ – PROVINCIA DE SANTA CRUZ – CAJAMARCA"

CONTRATISTA: CONSORCIO RIOS (ING. Armando A. Salomón Higueras)SUPERVISOR : HONSAMAA S.A.C. (ING. Manuel Ulises Cotrina Orrego)

Page 32: Valorizcion Nº 05 - Febrero

CALCULO DE LA PENALIDAD DIARIA"CREACION DE PISTAS Y VEREDAS EN LAS CALLES CAJAMARCA, TRUJILLO, LOS PINOS, SERGIO ORREGO, LAS DALIAS, LOS FAICALES, 2 DE MAYO, LOS ROSALES, DEL DISTRITO DE SANTA

Page 33: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL01.00.00 PABELLON 01

OBRAS PROVISIONALES CARTEL DE IDENTIFICACION DE OBRA DE 8.50 X 3.60 m und 1,478.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,478.70 ALMACEN, CASETA Y GUARDIANIA m2 641.28 4,488.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,130.24 CERCO PROVISIONAL DE SEGURIDAD DE OBRA ml 8,322.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,322.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS glb 1,900.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,900.00 3,800.00 TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 166.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 166.09 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 662.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 662.13 MOVIMIENTO DE TIERRAS CORTE DE MATERIAL SUELTO CON MAQUINARIA PARA EXPLANACIONES m3 1,958.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,958.90 EXCAVACION MANUAL PARA CIMIENTOS Y ZAPATAS m3 4,665.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,665.09 RELLENO COMPACTADO CON MATERIAL PROPIO m3 2,555.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,555.04 AFIRMADO COMPACTADO E=6" PARA ZAPATAS m2 2,237.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,237.58 AFIRMADO COMPACTADO E=4" PARA CIMIENTOS m2 966.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 966.00 NIVELACION INT. PARA FALSO PISO Y VEREDAS m2 0.00 445.20 297.90 0.00 150.30 0.00 0.00 0.00 0.00 0.00 893.40 AFIRMADO COMPACTADO E=4" PARA PISOS Y VEREDAS m2 0.00 3,874.95 0.00 0.00 3,901.17 0.00 0.00 0.00 0.00 0.00 7,776.11 ACARREO INTERNO DE MATERIAL EXCEDENTE m3 6,178.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,178.63

m3 11,882.92

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,882.92 OBRAS DE CONCRETO SIMPLE SOLADOS SOLADO PARA ZAPATAS DE E=4" MEZCLA 1:12 CEMENTO:HORMIGON m2 2,260.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,260.60 CIMIENTO CORRIDO CIMIENTO CORRIDO MEZCLA C:H = 1:10 30% P.G. m3 6,483.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,483.54 SOBRECIMIENTOS SOBRECIMIENTOS, CONCRETO 1:8+25% PM m3 2,973.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,973.84 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 2,663.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,663.52 FALSO PISO 0.00 FALSO PISO DE 4" DE CONCRETO C:H = 1:8 m2 0.00 0.00 0.00 0.00 7,623.69 0.00 0.00 0.00 0.00 0.00 7,623.69 OBRAS DE CONCRETO ARMADO ZAPATAS ZAPATAS, CONCRETO f'c=210 kg/cm2 m3 15,067.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,067.42 ZAPATAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 3,182.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,182.53 VIGAS DE CIMENTACION VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2 m3 4,780.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,780.59 VIGAS DE CIMENTACION , ENCOFRADO Y DESENCOFRADO m2 3,253.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,253.79 VIGAS DE CIMENTACION, ACERO CORRUGADO fy=4200 kg/cm2 kg 12,037.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12,037.32 COLUMNAS Y COLUMNETAS COLUMNAS Y COLUMNETAS, CONCRETO f'c=210 KG/CM2 m3 6,345.16 0.00 0.00 0.00 3,172.58 3,172.58 0.00 0.00 0.00 0.00 12,690.32 COLUMNAS Y COLUMNETAS , ENCOFRADO Y DESENCOFRADO NORMAL m2 4,747.38 0.00 0.00 0.00 2,373.85 2,373.85 0.00 0.00 0.00 0.00 9,495.09 COLUMNAS Y COLUMNETAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 11,960.75 7,176.46 0.00 0.00 2,392.17 2,392.17 0.00 0.00 0.00 0.00 23,921.54 VIGAS, VIGUETAS Y DINTELES VIGAS, VIGUETAS Y DINTELES, CONCRETO f'c=210 KG/CM2 m3 0.00 0.00 5,479.32 0.00 5,374.30 5,374.30 0.00 0.00 0.00 0.00 16,227.92 VIGAS, VIGUETAS Y DINTELES , ENCOFRADO Y DESENCOFRADO NORMAL m2 0.00 0.00 12,175.00 0.00 7,267.50 7,267.50 0.00 0.00 0.00 0.00 26,710.00 VIGAS, VIGUETAS Y DINTELES, ACERO CORRUGADO fy=4200 kg/cm2 kg 0.00 0.00 13,350.00 0.00 9,297.66 9,297.66 0.00 0.00 0.00 0.00 31,945.32

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO)

Page 34: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

LOSAS ALIGERADAS LOSAS ALIG., CONCRETO f'c=210 KG/CM2 m3 0.00 0.00 0.00 0.00 11,443.28 0.00 11,443.28 0.00 0.00 0.00 22,886.55 LOSAS ALIG., ENCOFRADO Y DESENCOFRADO m2 0.00 0.00 0.00 0.00 8,106.54 8,106.54 0.00 0.00 0.00 0.00 16,213.08 LOSAS ALIG., ACERO CORRUGADO fy=4200 kg/cm2 kg 0.00 0.00 8,010.00 0.00 5,576.40 5,576.40 0.00 0.00 0.00 0.00 19,162.80 LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.15 X 0.25 X 0.30 M. und 0.00 0.00 2,990.00 0.00 2,033.20 2,033.20 0.00 0.00 0.00 0.00 7,056.40 LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.12 X 0.25 X 0.30 M. und 0.00 0.00 0.00 0.00 3,745.61 3,745.61 0.00 0.00 0.00 0.00 7,491.21 MUROS Y TABIQUE DE ALBAÑILERIA MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 3,996.56 5,352.52 0.00 0.00 2,016.11 2,016.11 0.00 0.00 0.00 0.00 13,381.29 MURO DE CABEZA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 4,491.55 5,988.73 0.00 0.00 2,245.77 2,245.77 0.00 0.00 0.00 0.00 14,971.82 CUBIERTAS COBERTURA DE TEJA ANDINA SOBRE LOSA DE CONCRETO m2 0.00 0.00 0.00 0.00 0.00 0.00 24,950.71 0.00 0.00 0.00 24,950.71 CUMBRERA DE TEJA ANDINA ml 0.00 0.00 0.00 0.00 0.00 0.00 1,050.12 0.00 0.00 0.00 1,050.12 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO EN INTERIORES Y EXTERIORES E=1.5 CM, MEZC: C:A=1:3 m2 0.00 0.00 0.00 0.00 0.00 0.00 7,950.98 7,950.98 7,950.98 0.00 23,852.93 TARRAJEO DE COLUMNAS MZ.C:A=1:3, E=1.5 CM. m2 0.00 0.00 0.00 0.00 0.00 0.00 3,148.42 3,148.42 3,148.42 0.00 9,445.26 TARRAJEO DE VIGASE=1.5 CM, MEZC. C:A=1:3, m2 0.00 0.00 0.00 0.00 0.00 0.00 6,210.40 6,210.40 6,210.40 0.00 18,631.19 VESTIDURA DE DERRAMES E=1.5 CM. MEZCLA C:A=1:3 ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,960.62 0.00 1,960.62 CIELORRASOS CIELORRASOS CON MEZCLA C:A=1:3, INC. TARRAJEO DE FONDO ESCALERA m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,453.04 6,453.04 0.00 12,906.08 PISOS Y PAVIMENTOS 0.00 CONTRAPISO DE CEMENTO 48 MM m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,857.12 4,857.12 0.00 9,714.24 PISO CERAMICO 0.30 X 0.30 M. m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,441.80 13,441.80 0.00 26,883.59 VEREDAS DE CONCRETO F'C 175KG/CM2 m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,764.11 2,764.11 0.00 5,528.22 SARDINEL, CONCRETO f'c= 175 kg/cm2, 15X35 XM ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 108.77 108.77 0.00 217.54 SARDINEL, ENCOFRADO Y DESENCOFRADO m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 475.61 475.61 0.00 951.22 JUNTAS ASFALTICAS EN VEREDAS 1:5, E=1" ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.46 0.00 111.46 ZOCALOS Y CONTRAZOCALOS CONTRAZOCALO DE CEMENTO PULIDO H=20 CM EN EXTERIORES ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 835.49 0.00 835.49 CONTRAZOCALO DE CEMENTO PULIDO H=10 CM EN INTERIORES ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,012.70 0.00 1,012.70 CARPINTERIA DE MADERA PUERTA DE MADERA CEDRO P-1 TABLERADA S/MODELO D 1.05X2.80 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,550.00 4,550.00 9,100.00 PUERTA DE MADERA CEDRO P-3 TABLERADA S/MODELO DE 1.05X2.25 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,275.00 1,275.00 2,550.00 VENTANA DE MADERA DE CEDRO V-1 DE 3.175 X 1.60 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,450.00 2,450.00 4,900.00 VENTANA DE MADERA DE CEDRO V-2 DE 4.225 X 1.60 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,000.00 2,000.00 4,000.00 VENTANA DE MADERA DE CEDRO V-3 DE 4.225 X 1.30 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,900.00 3,900.00 7,800.00 CARPINTERIA METALICA BARRAS DE SEGURIDAD FIERRO LISO 1/2" EN VENTANAS ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,122.84 0.00 4,122.84 CERRAJERIA BISAGRA CAPUCHINA DE 4" X 4" und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 145.50 145.50 291.00 BISAGRA CAPUCHINA DE 1 1/2" X 1 1/2" pza 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 592.80 592.80 1,185.60 CERRADURA PARA FORTE TRES GOLPES EN PUERTA und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 338.00 338.00 676.00 CERRADURA SAPITO PARA VENTANAS und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.28 89.28 178.56 MANIJA DE BRONCE PARA DE 4" PARA PUERTAS und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 136.50 136.50 273.00 VIDRIOS, CRISTALES Y SIMILARES VIDRIO SEMIDOBLE NACIONAL TRANSPARENTE p2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,992.99 3,992.99 7,985.97 PINTURA

Page 35: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

PINTURA LATEX EN VIGAS Y CIELORRASOS (2 MANOS) m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,895.96 9,090.56 12,986.52 PINTURA LATEX EN MUROS Y COLUMNAS (2 MANOS) m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,893.61 16,085.08 22,978.69 PINTURA EN PUERTAS DE MADERA CON BARNIZ m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.62 304.77 435.39 PINTURA BARNIZ EN VENTANAS DE MADERA m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 278.71 650.31 929.02 PINTURA DE CONTRAZOCALOS CON ESMALTE m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.51 327.84 468.35 SISTEMA DE AGUAS DE LLUVIA

m3 0.00

0.00 0.00 0.00 0.00 0.00 0.00 245.66 0.00 0.00 245.66 CANALETA DE ZINC DE 6" PARA EVACUACION PLUVIAL IN. EMBUDO COLECTOR ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,725.03 0.00 0.00 2,725.03 MONTANTE DE BAJADA DE AGUA DE LLUVIA PVC SAL 3" ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,548.34 0.00 0.00 2,548.34 INSTALACIONES ELECTRICAS TABLERO GENERAL und 0.00 0.00 0.00 0.00 0.00 0.00 3,953.83 0.00 0.00 0.00 3,953.83 TABLERO MODULOS und 0.00 0.00 0.00 0.00 0.00 0.00 11,025.33 0.00 0.00 0.00 11,025.33 SALIDAS DE TECHO (CENTROS DE LUZ) pto 0.00 0.00 0.00 0.00 897.60 897.60 0.00 0.00 0.00 0.00 1,795.20 SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE PUESTA A TIERRA pto 0.00 0.00 0.00 0.00 1,755.60 1,755.60 0.00 0.00 0.00 0.00 3,511.20 TUBERIAS PVC SEL (ELECTRICAS) D=20MM ml 0.00 0.00 0.00 0.00 1,122.00 1,122.00 0.00 0.00 0.00 0.00 2,244.00 TUBERIAS PVC SEL (ELECTRICAS) D=30MM ml 0.00 0.00 0.00 0.00 148.26 148.26 0.00 0.00 0.00 0.00 296.52 CABLE TW AWG 2.5 mm2 ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,384.20 0.00 0.00 2,384.20 CABLE TW AWG 4 MM2 ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,922.00 0.00 0.00 3,922.00 CABLE TW AWG 6 MM2 ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,818.00 0.00 0.00 1,818.00 TABLERO GENERAL und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,953.83 0.00 0.00 3,953.83 LAMPARAS FLUORESCENTES RECTAS DE 2 X 40 W und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,436.50 0.00 2,436.50 LAMPARAS FLUORESCENTES RECTAS DE 2 X 20 W und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,874.40 0.00 1,874.40 POZO DE PUESTA A TIERRA und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 653.88 0.00 653.88 CONEXION A RED EXTERNA Y MEDIDOR und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 974.22 0.00 974.22

02.00.00 PABELLÓN 02, SSHH DE ALUMNOS Y DOCENTES. TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 210.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 210.26 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 851.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 851.25 MOVIMIENTO DE TIERRAS CORTE DE MATERIAL SUELTO CON MAQUINARIA PARA EXPLANACIONES m3 1,492.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,492.12 EXCAVACION MANUAL PARA CIMIENTOS Y ZAPATAS m3 4,885.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,885.74 RELLENO COMPACTADO CON MATERIAL PROPIO m3 2,751.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,751.82 AFIRMADO COMPACTADO E=6" PARA ZAPATAS m2 1,740.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,740.25 AFIRMADO COMPACTADO E=4" PARA CIMIENTOS m2 1,458.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,458.94 NIVELACION INT. PARA FALSO PISO Y VEREDAS m2 902.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 902.87 AFIRMADO COMPACTADO E=4" PARA PISOS Y VEREDAS m2 7,858.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,858.50 ACARREO INTERNO DE MATERIAL EXCEDENTE m3 5,044.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,044.78

m3 9,702.26

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,702.26 OBRAS DE CONCRETO SIMPLE SOLADOS SOLADO PARA ZAPATAS DE E=4" MEZCLA 1:12 CEMENTO:HORMIGON m2 1,758.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,758.15 CIMIENTO CORRIDO CIMIENTO CORRIDO MEZCLA C:H = 1:10 30% P.G. m3 9,720.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,720.23 SOBRECIMIENTOS

DADO DE CONCRETO F'C=140 KG/CM2 PROTECCION MONTANTE DE BAJADA DE AGUA DE LLUVIA

ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO)

Page 36: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

SOBRECIMIENTOS, CONCRETO 1:8+25% PM m3 3,838.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,838.76 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 3,524.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,524.39 FALSO PISO FALSO PISO DE 4" DE CONCRETO C:H = 1:8 m2 0.00 0.00 0.00 0.00 7,264.91 0.00 0.00 0.00 0.00 0.00 7,264.91 OBRAS DE CONCRETO ARMADO ZAPATAS ZAPATAS, CONCRETO f'c=210 kg/cm2 m3 11,721.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,721.09 ZAPATAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 2,478.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,478.51 VIGAS DE CIMENTACION VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2 m3 4,157.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,157.42 VIGAS DE CIMENTACION , ENCOFRADO Y DESENCOFRADO m2 2,829.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,829.65 VIGAS DE CIMENTACION, ACERO CORRUGADO fy=4200 kg/cm2 kg 10,715.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,715.83 COLUMNAS Y COLUMNETAS COLUMNAS Y COLUMNETAS, CONCRETO f'c=210 KG/CM2 m3 5,361.88 0.00 0.00 0.00 2,678.22 2,678.22 0.00 0.00 0.00 0.00 10,718.32 COLUMNAS Y COLUMNETAS , ENCOFRADO Y DESENCOFRADO NORMAL m2 4,381.93 0.00 0.00 0.00 2,191.13 2,191.13 0.00 0.00 0.00 0.00 8,764.18 COLUMNAS Y COLUMNETAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 10,797.85 6,478.73 0.00 0.00 2,159.59 2,159.59 0.00 0.00 0.00 0.00 21,595.76 VIGAS, VIGUETAS Y DINTELES VIGAS, VIGUETAS Y DINTELES, CONCRETO f'c=210 KG/CM2 m3 0.00 0.00 6,849.15 0.00 3,837.81 3,837.81 0.00 0.00 0.00 0.00 14,524.76 VIGAS, VIGUETAS Y DINTELES , ENCOFRADO Y DESENCOFRADO NORMAL m2 0.00 0.00 12,175.00 0.00 5,956.99 5,956.99 0.00 0.00 0.00 0.00 24,088.97 VIGAS, VIGUETAS Y DINTELES, ACERO CORRUGADO fy=4200 kg/cm2 kg 0.00 0.00 13,350.00 0.00 7,207.00 7,207.00 0.00 0.00 0.00 0.00 27,764.00 LOSAS ALIGERADAS LOSAS ALIG., CONCRETO f'c=210 KG/CM2 m3 0.00 0.00 0.00 0.00 10,459.03 0.00 10,459.03 0.00 0.00 0.00 20,918.05 LOSAS ALIG., ENCOFRADO Y DESENCOFRADO m2 0.00 0.00 0.00 0.00 7,410.00 7,410.00 0.00 0.00 0.00 0.00 14,820.00 LOSAS ALIG., ACERO CORRUGADO fy=4200 kg/cm2 kg 0.00 0.00 8,010.00 0.00 4,754.76 4,754.76 0.00 0.00 0.00 0.00 17,519.53 LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.15 X 0.25 X 0.30 M. und 0.00 0.00 3,289.00 0.00 1,663.93 1,663.93 0.00 0.00 0.00 0.00 6,616.87 LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.12 X 0.25 X 0.30 M. und 0.00 0.00 0.00 0.00 3,070.51 3,070.51 0.00 0.00 0.00 0.00 6,141.02 LOSAS MACIZAS LOSAS MACIZAS, CONCRETO F´C=210 KG/CM2 m3 0.00 0.00 0.00 0.00 520.20 520.20 0.00 0.00 0.00 0.00 1,040.40 LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO NORMAL m2 0.00 0.00 0.00 0.00 62.70 62.70 0.00 0.00 0.00 0.00 125.39 LOSAS MACIZAS., ACERO fy=4200 kg/cm2 kg 0.00 0.00 0.00 0.00 409.87 409.87 0.00 0.00 0.00 0.00 819.74 ESCALERAS ESCALERAS, CONCRETO f'c=210 KG/CM2 m3 0.00 0.00 0.00 0.00 3,840.54 0.00 0.00 0.00 0.00 0.00 3,840.54 ESCALERAS, ENCOFRADO Y DESENCOFRADO NORMAL m2 0.00 0.00 0.00 0.00 1,497.79 0.00 0.00 0.00 0.00 0.00 1,497.79 ESCALERAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 0.00 0.00 0.00 0.00 1,799.31 0.00 0.00 0.00 0.00 0.00 1,799.31 MUROS Y TABIQUE DE ALBAÑILERIA MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 5,737.90 7,650.86 0.00 0.00 0.00 0.00 1,912.80 1,912.80 1,912.80 0.00 19,127.15 MURO DE CABEZA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 6,737.32 8,983.09 0.00 0.00 0.00 0.00 0.00 0.00 6,737.32 0.00 22,457.74 CUBIERTAS COBERTURA DE TEJA ANDINA SOBRE LOSA DE CONCRETO m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,123.15 13,123.15 0.00 26,246.29 CUMBRERA DE TEJA ANDINA ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 652.45 652.45 0.00 1,304.90 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO PRIMARIO RAYADO m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,171.96 1,171.96 0.00 2,343.91 TARRAJEO EN INTERIORES Y EXTERIORES E=1.5 CM, MEZC: C:A=1:3 m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,148.07 11,148.07 0.00 22,296.14 TARRAJEO DE COLUMNAS MZ.C:A=1:3, E=1.5 CM. m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,931.29 3,931.29 0.00 7,862.58 TARRAJEO DE VIGASE=1.5 CM, MEZC. C:A=1:3, m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,004.46 5,004.46 0.00 10,008.92 VESTIDURA DE DERRAMES E=1.5 CM. MEZCLA C:A=1:3 ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,614.23 0.00 1,614.23

Page 37: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

CIELORRASOS 0.00 CIELORRASOS CON MEZCLA C:A=1:3, INC. TARRAJEO DE FONDO ESCALERA m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,564.57 0.00 11,564.57 PISOS Y PAVIMENTOS CONTRAPISO DE CEMENTO 48 MM m2 0.00 0.00 0.00 0.00 0.00 3,608.28 3,608.28 0.00 0.00 0.00 7,216.56 PISO DE CEMENTO PULIDO COLOREADO BRUÑADO E=2" m2 0.00 0.00 0.00 0.00 0.00 302.90 302.90 0.00 0.00 0.00 605.80 PISO CERAMICO 0.30 X 0.30 M. m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,771.61 8,771.61 0.00 17,543.22 PISO CERAMICO 0.20 X 0.30 M. m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,208.72 1,208.72 0.00 2,417.44

ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 702.36 702.36 0.00 1,404.72 VEREDAS DE CONCRETO F'C 175KG/CM2 m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,873.32 2,873.32 0.00 5,746.64 SARDINEL, CONCRETO f'c= 175 kg/cm2, 15X35 XM ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 146.74 146.74 0.00 293.48 SARDINEL, ENCOFRADO Y DESENCOFRADO m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 641.75 641.75 0.00 1,283.49 JUNTAS ASFALTICAS EN VEREDAS 1:5, E=1" ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.68 126.68 0.00 253.36 CANTONERA 2" X 2" DE ALUMINIO, ESCALERA ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 310.91 310.91 0.00 621.81 ZOCALOS Y CONTRAZOCALOS ZOCALO CERAMICO DE 0.20 X 0.30 DE COLOR m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,925.26 2,925.26 5,850.51 CONTRAZOCALO DE CERAMICO H=10 CM, A=30 CM ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 283.31 283.31 566.61 CONTRAZOCALO DE CEMENTO PULIDO H=20 CM EN EXTERIORES ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 417.75 417.75 835.49 CONTRAZOCALO DE CEMENTO PULIDO H=10 CM EN INTERIORES ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 751.93 751.93 1,503.85 CARPINTERIA DE MADERA PUERTA DE MADERA CEDRO P-1 TABLERADA S/MODELO D 1.05X2.80 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,950.00 4,550.00 6,500.00 PUERTA DE MADERA CEDRO P-2 TABLERADA S/MODELO DE 0.90X2.80 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 330.00 770.00 1,100.00 PUERTA DE MADERA CEDRO P-3 TABLERADA S/MODELO DE 1.05X2.25 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 765.00 1,785.00 2,550.00 PUERTA DE MADERA CEDRO P-4 TABLERADA S/MODELO DE 0.90X2.15 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 765.00 1,785.00 2,550.00 PUERTA DE MADERA CEDRO P-5 CONTRAPLACADA S/MODELO DE 0.60X1.40 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,050.00 2,450.00 3,500.00 VENTANA DE MADERA DE CEDRO V-1 DE 3.175 X 1.60 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,050.00 2,450.00 3,500.00 VENTANA DE MADERA DE CEDRO V-2 DE 4.225 X 1.60 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720.00 1,680.00 2,400.00 VENTANA DE MADERA DE CEDRO V-3 DE 4.225 X 1.30 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,560.00 3,640.00 5,200.00 VENTANA DE MADERA DE CEDRO V-4 DE 3.15 X 0.40 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 280.00 400.00 VENTANA DE MADERA DE CEDRO V-5 DE 3.15 X1.50 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 180.00 420.00 600.00 VENTANA DE MADERA DE CEDRO V-5 SS.HH. 0.75 X0.75 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 240.00 560.00 800.00 VENTANA DE MADERA DE CEDRO V-6 SS.HH. 0.75 X0.75 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 240.00 560.00 800.00 VENTANA DE MADERA DE CEDRO V-15 DE 0.60 X0.25 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 210.00 490.00 700.00 CARPINTERIA METALICA BARANDA METALICA PASAMMANO DE ALUMINIO EN ESCALERA ml 0.00 0.00 0.00 0.00 0.00 0.00 3,145.30 0.00 0.00 0.00 3,145.30 BARRAS DE SEGURIDAD FIERRO LISO 1/2" EN VENTANAS ml 0.00 0.00 0.00 0.00 0.00 0.00 2,904.22 0.00 0.00 0.00 2,904.22 CERRAJERIA BISAGRA CAPUCHINA DE 4" X 4" und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 192.06 448.14 640.20 BISAGRA CAPUCHINA DE 1 1/2" X 1 1/2" pza 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 414.96 968.24 1,383.20 CERRADURA PARA FORTE TRES GOLPES EN PUERTA und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 278.85 650.65 929.50 CERRADURA SAPITO PARA VENTANAS und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.35 187.49 267.84 MANIJA DE BRONCE PARA DE 4" PARA PUERTAS und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 222.30 518.70 741.00 VIDRIOS, CRISTALES Y SIMILARES VIDRIO SEMIDOBLE NACIONAL TRANSPARENTE p2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,132.63 6,132.63 PINTURA PINTURA LATEX EN VIGAS Y CIELORRASOS (2 MANOS) m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,502.48 8,172.44 11,674.92 PINTURA LATEX EN MUROS Y COLUMNAS (2 MANOS) m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,288.57 14,673.34 20,961.91

REVESTIMIENTO GRADAS CON MORTERO 1:4 X 2 cm PULIDO MEZCLA 1:2 X 1 cm

Page 38: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

PINTURA EN PUERTAS DE MADERA CON BARNIZ m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 455.80 1,063.52 1,519.32 PINTURA BARNIZ EN VENTANAS DE MADERA m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,166.02 2,720.70 3,886.72 PINTURA DE CONTRAZOCALOS CON ESMALTE m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.69 328.28 468.97 SISTEMA DE AGUAS DE LLUVIA

m3 0.00

0.00 0.00 0.00 0.00 0.00 0.00 245.66 0.00 0.00 245.66 CANALETA DE ZINC DE 6" PARA EVACUACION PLUVIAL IN. EMBUDO COLECTOR ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,634.20 0.00 0.00 3,634.20 MONTANTE DE BAJADA DE AGUA DE LLUVIA PVC SAL 3" ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,018.32 0.00 0.00 3,018.32 INSTALACIONES ELECTRICAS SALIDAS DE TECHO (CENTROS DE LUZ) pto 0.00 0.00 0.00 0.00 0.00 0.00 3,366.00 0.00 0.00 0.00 3,366.00 SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE PUESTA A TIERRA pto 0.00 0.00 0.00 0.00 0.00 0.00 1,667.82 0.00 0.00 0.00 1,667.82 TUBERIAS PVC SEL (ELECTRICAS) D=20MM ml 0.00 0.00 0.00 0.00 1,570.80 1,570.80 0.00 0.00 0.00 0.00 3,141.60 TUBERIAS PVC SEL (ELECTRICAS) D=30MM ml 0.00 0.00 0.00 0.00 148.26 148.26 0.00 0.00 0.00 0.00 296.52 CABLE TW AWG 2.5 mm2 ml 0.00 0.00 0.00 0.00 1,668.94 1,668.94 0.00 0.00 0.00 0.00 3,337.88 CABLE TW AWG 4 MM2 ml 0.00 0.00 0.00 0.00 2,745.40 2,745.40 0.00 0.00 0.00 0.00 5,490.80 CABLE TW AWG 6 MM2 ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,545.20 0.00 0.00 2,545.20 TABLERO GENERAL und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,953.83 0.00 0.00 3,953.83 LAMPARAS FLUORESCENTES RECTAS DE 2 X 40 W und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,436.50 0.00 0.00 2,436.50 LAMPARAS FLUORESCENTES RECTAS DE 2 X 20 W und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,874.40 0.00 0.00 1,874.40 CONEXION A RED EXTERNA Y MEDIDOR und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 974.22 0.00 974.22 INSTALACIONES SANITARIAS APARATOS SANITARIOS Y ACCESORIOS INODORO DE LOSA BLANCA TANQUE BAJO pza 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,758.08 0.00 0.00 1,758.08 LAVATORIO DE LOSA BLANCA 1 LLAVE pza 0.00 0.00 0.00 0.00 0.00 0.00 0.00 571.68 0.00 0.00 571.68 URINARIOS CORRIDO SEGUN DISEÑO REVESTIDO CON CERAMICO A=0.65 M. pza 0.00 0.00 0.00 0.00 0.00 0.00 0.00 414.26 0.00 0.00 414.26 BEBEDERO CORRIDO DE CONCRETO REVEST. C/MAYOLICA 20 X 30 ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,281.92 0.00 0.00 2,281.92 PAPELERA DE LOZA BLANCA pza 0.00 0.00 0.00 0.00 0.00 0.00 0.00 733.60 0.00 0.00 733.60 JABONERA DE LOSA BLANCA pza 0.00 0.00 0.00 0.00 0.00 0.00 0.00 110.10 0.00 0.00 110.10 INSTALACIONES SANITARIAS SALIDA DE DESAGUE PVC SAL 2" pto 0.00 0.00 0.00 0.00 0.00 696.30 0.00 0.00 0.00 0.00 696.30 SALIDA DE DESAGUE PVC SAL 4" pto 0.00 0.00 0.00 0.00 0.00 864.12 0.00 0.00 0.00 0.00 864.12 SALIDA DE VENTILACION PVC SAL 2" pto 0.00 0.00 0.00 0.00 0.00 540.80 0.00 0.00 0.00 0.00 540.80 TUBERIA DE DESAGUE PVC SAL 2" ml 0.00 0.00 0.00 0.00 0.00 477.20 0.00 0.00 0.00 0.00 477.20 TUBERIA DE DESAGUE PVC SAL 4" ml 0.00 0.00 0.00 0.00 0.00 1,087.92 0.00 0.00 0.00 0.00 1,087.92 SUMIDERO DE BRONCE 2" und 0.00 0.00 0.00 0.00 0.00 183.15 0.00 0.00 0.00 0.00 183.15 REGISTROS ROSCADO DE BRONCE DE 2" und 0.00 0.00 0.00 0.00 0.00 243.15 0.00 0.00 0.00 0.00 243.15 REGISTROS ROSCADO DE BRONCE DE 4" und 0.00 0.00 0.00 0.00 0.00 655.56 0.00 0.00 0.00 0.00 655.56 CAJA DE REGISTRO DE 12" X 24" CON TAPA METALICA und 0.00 0.00 0.00 0.00 0.00 363.81 0.00 0.00 0.00 0.00 363.81 CONEXION A LA RED COLECTORA DE DESAGUE CONEXION A RED PUBLICA DE DESAGUE glb 0.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00 0.00 0.00 500.00 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO SALIDA DE AGUA FRIA PVC-SAP 1/2" pto 0.00 0.00 0.00 0.00 0.00 1,218.24 0.00 0.00 0.00 0.00 1,218.24 TUBERIA PVC SAP C-10 DE 1/2" ml 0.00 0.00 0.00 0.00 0.00 1,257.05 0.00 0.00 0.00 0.00 1,257.05 TUBERIA PVC SAP C-10 DE 3/4" ml 0.00 0.00 0.00 0.00 0.00 544.36 0.00 0.00 0.00 0.00 544.36 VALVULA COMPUERTA DE BRONCE DE 1/2" und 0.00 0.00 0.00 0.00 0.00 328.60 0.00 0.00 0.00 0.00 328.60 VALVULA COMPUERTA DE BRONCE DE 3/4" und 0.00 0.00 0.00 0.00 0.00 143.44 0.00 0.00 0.00 0.00 143.44

DADO DE CONCRETO F'C=140 KG/CM2 PROTECCION MONTANTE DE BAJADA DE AGUA DE LLUVIA

Page 39: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

CAJA PARA VALVULA (NICHO DE MAYOLICA) und 0.00 0.00 0.00 0.00 0.00 1,467.12 0.00 0.00 0.00 0.00 1,467.12 CONEXION A RED PUBLICA DE AGUA POTABLE und 0.00 0.00 0.00 0.00 0.00 221.68 0.00 0.00 0.00 0.00 221.68

03.00.00 PABELLON 03 TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 164.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 164.48 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 655.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 655.67 MOVIMIENTO DE TIERRAS CORTE DE MATERIAL SUELTO CON MAQUINARIA PARA EXPLANACIONES m3 1,492.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,492.12 EXCAVACION MANUAL PARA CIMIENTOS Y ZAPATAS m3 3,985.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,985.40 RELLENO COMPACTADO CON MATERIAL PROPIO m3 2,189.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,189.02 AFIRMADO COMPACTADO E=6" PARA ZAPATAS m2 1,740.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,740.25 AFIRMADO COMPACTADO E=4" PARA CIMIENTOS m2 897.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 897.43 NIVELACION INT. PARA FALSO PISO Y VEREDAS m2 665.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 665.21 AFIRMADO COMPACTADO E=4" PARA PISOS Y VEREDAS m2 5,789.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,789.95 ACARREO INTERNO DE MATERIAL EXCEDENTE m3 4,823.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,823.87

m3 9,277.41

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,277.41 OBRAS DE CONCRETO SIMPLE SOLADOS SOLADO PARA ZAPATAS DE E=4" MEZCLA 1:12 CEMENTO:HORMIGON m2 1,758.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,758.15 CIMIENTO CORRIDO 0.00 CIMIENTO CORRIDO MEZCLA C:H = 1:10 30% P.G. m3 6,419.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,419.14 SOBRECIMIENTOS SOBRECIMIENTOS, CONCRETO 1:8+25% PM m3 2,764.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,764.06 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 2,316.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,316.32 FALSO PISO 0.00 FALSO PISO DE 4" DE CONCRETO C:H = 1:8 m2 0.00 0.00 0.00 0.00 5,689.64 0.00 0.00 0.00 0.00 0.00 5,689.64 OBRAS DE CONCRETO ARMADO ZAPATAS ZAPATAS, CONCRETO f'c=210 kg/cm2 m3 11,721.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,721.09 ZAPATAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 2,478.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,478.51 VIGAS DE CIMENTACION VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2 m3 1,753.77 2,403.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,157.42 VIGAS DE CIMENTACION , ENCOFRADO Y DESENCOFRADO m2 2,829.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,829.65 VIGAS DE CIMENTACION, ACERO CORRUGADO fy=4200 kg/cm2 kg 10,715.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,715.83 COLUMNAS Y COLUMNETAS COLUMNAS Y COLUMNETAS, CONCRETO f'c=210 KG/CM2 m3 4,851.22 0.00 0.00 0.00 2,422.89 2,422.89 0.00 0.00 0.00 0.00 9,697.01 COLUMNAS Y COLUMNETAS , ENCOFRADO Y DESENCOFRADO NORMAL m2 3,643.89 0.00 0.00 0.00 1,822.11 1,822.11 0.00 0.00 0.00 0.00 7,288.11 COLUMNAS Y COLUMNETAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 9,947.51 5,968.51 0.00 0.00 1,989.50 1,989.50 0.00 0.00 0.00 0.00 19,895.02 VIGAS, VIGUETAS Y DINTELES VIGAS, VIGUETAS Y DINTELES, CONCRETO f'c=210 KG/CM2 m3 0.00 0.00 4,662.99 0.00 4,430.90 4,430.90 0.00 0.00 0.00 0.00 13,524.79 VIGAS, VIGUETAS Y DINTELES , ENCOFRADO Y DESENCOFRADO NORMAL m2 0.00 0.00 12,175.00 0.00 5,083.31 5,083.31 0.00 0.00 0.00 0.00 22,341.61 VIGAS, VIGUETAS Y DINTELES, ACERO CORRUGADO fy=4200 kg/cm2 kg 0.00 0.00 10,680.00 0.00 7,480.46 7,480.46 0.00 0.00 0.00 0.00 25,640.92 LOSAS ALIGERADAS LOSAS ALIG., CONCRETO f'c=210 KG/CM2 m3 0.00 0.00 0.00 0.00 8,933.11 0.00 8,933.11 0.00 0.00 0.00 17,866.22 LOSAS ALIG., ENCOFRADO Y DESENCOFRADO m2 0.00 0.00 0.00 0.00 6,329.08 6,329.08 0.00 0.00 0.00 0.00 12,658.15

ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO)

Page 40: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

LOSAS ALIG., ACERO CORRUGADO fy=4200 kg/cm2 kg 0.00 0.00 7,961.83 0.00 3,980.92 3,980.92 0.00 0.00 0.00 0.00 15,923.67 LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.15 X 0.25 X 0.30 M. und 0.00 0.00 2,019.69 0.00 1,579.50 1,579.50 0.00 0.00 0.00 0.00 5,178.68 LOSAS ALIG., LADRILLO HUECO DE ARCILLA 0.12 X 0.25 X 0.30 M. und 0.00 0.00 0.00 0.00 3,070.51 3,070.51 0.00 0.00 0.00 0.00 6,141.02 MESAS DE LABORATORIO MESA DE LABORATORIO, CONCRETO f'c=210 KG/CM2 m3 0.00 0.00 0.00 0.00 0.00 0.00 760.96 760.96 0.00 0.00 1,521.92 MESA DE LABORATORIO, ENCOFRADO Y DESENCOFRADO NORMAL m2 0.00 0.00 0.00 0.00 0.00 0.00 702.59 702.59 0.00 0.00 1,405.17 MESA DE LABORATORIO, ACERO CORRUGADO fy=4200 kg/cm2 kg 0.00 0.00 0.00 0.00 0.00 0.00 539.24 539.24 0.00 0.00 1,078.47 MUROS Y TABIQUE DE ALBAÑILERIA MURO DE SOGA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 2,574.95 3,433.43 0.00 0.00 1,287.60 1,287.60 0.00 0.00 0.00 0.00 8,583.58 MURO DE CABEZA LADRILLO DE ARCILLA 9X13X24 MEZ. 1:5 m2 6,737.32 8,983.09 0.00 0.00 3,368.66 3,368.66 0.00 0.00 0.00 0.00 22,457.74 CUBIERTAS COBERTURA DE TEJA ANDINA SOBRE LOSA DE CONCRETO m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,491.76 0.00 0.00 20,491.76 CUMBRERA DE TEJA ANDINA ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,304.90 0.00 0.00 1,304.90 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO EN INTERIORES Y EXTERIORES E=1.5 CM, MEZC: C:A=1:3 m2 0.00 0.00 0.00 0.00 0.00 4,552.93 5,311.75 5,311.75 0.00 0.00 15,176.43 TARRAJEO DE COLUMNAS MZ.C:A=1:3, E=1.5 CM. m2 0.00 0.00 0.00 0.00 0.00 1,961.51 2,288.43 2,288.43 0.00 0.00 6,538.36 TARRAJEO DE MUROS DE SOPORTE DE MESAS DE LABORATORIO m2 0.00 0.00 0.00 0.00 0.00 3,996.72 4,662.84 4,662.84 0.00 0.00 13,322.39 TARRAJEO DE VIGASE=1.5 CM, MEZC. C:A=1:3, m2 0.00 0.00 0.00 0.00 0.00 1,197.95 1,397.61 1,397.61 0.00 0.00 3,993.17 VESTIDURA DE DERRAMES E=1.5 CM. MEZCLA C:A=1:3 ml 0.00 0.00 0.00 0.00 0.00 436.58 509.34 509.34 0.00 0.00 1,455.27 CIELORRASOS CIELORRASOS CON MEZCLA C:A=1:3, INC. TARRAJEO DE FONDO ESCALERA m2 0.00 0.00 0.00 0.00 0.00 4,791.87 4,791.87 0.00 0.00 0.00 9,583.74 PISOS Y PAVIMENTOS CONTRAPISO DE CEMENTO 48 MM m2 0.00 0.00 0.00 0.00 0.00 0.00 3,169.58 3,169.58 0.00 0.00 6,339.15 PISO DE CEMENTO PULIDO COLOREADO BRUÑADO E=2" m2 0.00 0.00 0.00 0.00 0.00 0.00 302.90 302.90 0.00 0.00 605.80 PISO CERAMICO 0.30 X 0.30 M. m2 0.00 0.00 0.00 0.00 0.00 0.00 8,771.61 8,771.61 0.00 0.00 17,543.22 ENCHAPE CON MAYOLICA DE 0.15 X0.15 M EN MESAS DE LABORATORIO m2 0.00 0.00 0.00 0.00 0.00 0.00 541.93 541.93 0.00 0.00 1,083.85 VEREDAS DE CONCRETO F'C 175KG/CM2 m2 0.00 0.00 0.00 0.00 0.00 0.00 2,048.31 2,048.31 0.00 0.00 4,096.61 SARDINEL, CONCRETO f'c= 175 kg/cm2, 15X35 XM ml 0.00 0.00 0.00 0.00 0.00 0.00 104.91 104.91 0.00 0.00 209.81 SARDINEL, ENCOFRADO Y DESENCOFRADO m2 0.00 0.00 0.00 0.00 0.00 0.00 458.93 458.93 0.00 0.00 917.86 JUNTAS ASFALTICAS EN VEREDAS 1:5, E=1" ml 0.00 0.00 0.00 0.00 0.00 0.00 59.60 59.60 0.00 0.00 119.20 CANTONERA 2" X 2" DE ALUMINIO, ESCALERA ml 0.00 0.00 0.00 0.00 0.00 0.00 310.91 310.91 0.00 0.00 621.81 ZOCALOS Y CONTRAZOCALOS CONTRAZOCALO DE CEMENTO PULIDO H=20 CM EN EXTERIORES ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 835.49 0.00 835.49 CONTRAZOCALO DE CEMENTO PULIDO H=10 CM EN INTERIORES ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,503.85 0.00 1,503.85 CARPINTERIA DE MADERA PUERTA DE MADERA CEDRO P-1 TABLERADA S/MODELO D 1.05X2.80 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,950.00 4,550.00 6,500.00 PUERTA DE MADERA CEDRO P-2 TABLERADA S/MODELO DE 0.90X2.80 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 330.00 770.00 1,100.00 VENTANA DE MADERA DE CEDRO V-1 DE 3.175 X 1.60 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,050.00 2,450.00 3,500.00 VENTANA DE MADERA DE CEDRO V-2 DE 4.225 X 1.60 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720.00 1,680.00 2,400.00 VENTANA DE MADERA DE CEDRO V-3 DE 4.225 X 1.30 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,560.00 3,640.00 5,200.00 VENTANA DE MADERA DE CEDRO V-4 DE 3.15 X 0.40 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 280.00 400.00 VENTANA DE MADERA DE CEDRO V-5 DE 3.15 X1.50 M. und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 180.00 420.00 600.00 CARPINTERIA METALICA BARRAS DE SEGURIDAD FIERRO LISO 1/2" EN VENTANAS ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 871.27 2,032.95 2,904.22 CERRAJERIA BISAGRA CAPUCHINA DE 4" X 4" und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 192.06 448.14 640.20

Page 41: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

BISAGRA CAPUCHINA DE 1 1/2" X 1 1/2" pza 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 414.96 968.24 1,383.20 CERRADURA PARA FORTE TRES GOLPES EN PUERTA und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 278.85 650.65 929.50 CERRADURA SAPITO PARA VENTANAS und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.35 187.49 267.84 MANIJA DE BRONCE PARA DE 4" PARA PUERTAS und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 222.30 518.70 741.00 VIDRIOS, CRISTALES Y SIMILARES VIDRIO SEMIDOBLE NACIONAL TRANSPARENTE p2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,750.23 4,083.87 5,834.10 PINTURA 0.00 PINTURA LATEX EN VIGAS Y CIELORRASOS (2 MANOS) m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,078.36 7,182.84 10,261.20 PINTURA LATEX EN MUROS Y COLUMNAS (2 MANOS) m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,470.95 10,432.22 14,903.17 PINTURA EN PUERTAS DE MADERA CON BARNIZ m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 455.80 1,063.52 1,519.32 PINTURA BARNIZ EN VENTANAS DE MADERA m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,166.02 2,720.70 3,886.72 PINTURA DE CONTRAZOCALOS CON ESMALTE m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.69 328.28 468.97 SISTEMA DE AGUAS DE LLUVIA

m3 0.00

0.00 0.00 0.00 0.00 0.00 0.00 245.66 0.00 0.00 245.66 CANALETA DE ZINC DE 6" PARA EVACUACION PLUVIAL IN. EMBUDO COLECTOR ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,634.20 0.00 0.00 3,634.20 MONTANTE DE BAJADA DE AGUA DE LLUVIA PVC SAL 3" ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,018.32 0.00 0.00 3,018.32 INSTALACIONES ELECTRICAS SALIDAS DE TECHO (CENTROS DE LUZ) pto 0.00 0.00 0.00 0.00 0.00 0.00 1,795.20 0.00 0.00 0.00 1,795.20 SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE PUESTA A TIERRA pto 0.00 0.00 0.00 0.00 0.00 0.00 2,984.52 0.00 0.00 0.00 2,984.52 TUBERIAS PVC SEL (ELECTRICAS) D=20MM ml 0.00 0.00 0.00 0.00 1,020.00 1,020.00 0.00 0.00 0.00 0.00 2,040.00 TUBERIAS PVC SEL (ELECTRICAS) D=30MM ml 0.00 0.00 0.00 0.00 148.26 148.26 0.00 0.00 0.00 0.00 296.52 CABLE TW AWG 2.5 mm2 ml 0.00 0.00 0.00 0.00 1,192.10 1,192.10 0.00 0.00 0.00 0.00 2,384.20 CABLE TW AWG 4 MM2 ml 0.00 0.00 0.00 0.00 1,961.00 1,961.00 0.00 0.00 0.00 0.00 3,922.00 CABLE TW AWG 6 MM2 ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,818.00 0.00 0.00 1,818.00 TABLERO GENERAL und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,953.83 0.00 0.00 3,953.83 LAMPARAS FLUORESCENTES RECTAS DE 2 X 40 W und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,550.50 0.00 0.00 1,550.50 LAMPARAS FLUORESCENTES RECTAS DE 2 X 20 W und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,874.40 0.00 0.00 1,874.40 CONEXION A RED EXTERNA Y MEDIDOR und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 974.22 0.00 974.22

04.00.00 CONSTRUCCION DE CERCO PERIMETRICO TRABAJOS PRELIMINARES TRAZO Y REPLANTEO m2 0.00 419.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.63 MOVIMIENTO DE TIERRAS EXCAVACION MANUAL EN TERRENO NATURAL m3 0.00 581.60 0.00 0.00 0.00 0.00 5,234.43 0.00 0.00 0.00 5,816.03 NIVELACION Y COMPACTACION DE TERRANO m2 0.00 52.09 0.00 0.00 0.00 0.00 468.77 0.00 0.00 0.00 520.86 ACARREO INTERNO DE MATERIAL EXCEDENTE A MANO m3 0.00 297.21 0.00 0.00 0.00 0.00 2,674.93 0.00 0.00 0.00 2,972.14

m3 0.00

571.61 0.00 0.00 0.00 0.00 5,144.49 0.00 0.00 0.00 5,716.10 AFIRMADO COMPACTADO E=4" PARA CIMIENTOS m2 0.00 0.00 0.00 0.00 0.00 0.00 4,533.54 0.00 0.00 0.00 4,533.54 OBRAS DE CONCRETO CONCRETO C:H = 1:10 + 30% P.G. PARA CIMIENTO CORRIDO m3 0.00 0.00 0.00 0.00 0.00 0.00 9,600.25 22,400.58 0.00 0.00 32,000.83 SOBRECIMIENTOS REFORZADOS, F´C=210 KG/CM2 m3 0.00 0.00 0.00 0.00 0.00 0.00 3,562.58 8,312.70 0.00 0.00 11,875.28 SOBRECIMIENTOS REFORZADOS, ENCOFRADO Y DESENCOFRADO m2 0.00 0.00 0.00 0.00 0.00 0.00 2,926.90 6,829.42 0.00 0.00 9,756.32 SOBRECIMIENTOS REFORZADOS, ACERO fy=4200 kg/cm2 kg 0.00 0.00 0.00 0.00 0.00 0.00 2,169.85 5,062.97 0.00 0.00 7,232.82 COLUMNAS, CONCRETO f'c=210 KG/CM2 m3 0.00 0.00 0.00 0.00 0.00 0.00 3,362.17 7,845.08 0.00 0.00 11,207.25 COLUMNAS, ENCOFRADO Y DESENCOFRADO m2 0.00 0.00 0.00 0.00 0.00 0.00 1,602.32 3,738.73 0.00 0.00 5,341.05

DADO DE CONCRETO F'C=140 KG/CM2 PROTECCION MONTANTE DE BAJADA DE AGUA DE LLUVIA

ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO)

Page 42: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

COLUMNAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 0.00 0.00 0.00 0.00 0.00 0.00 3,824.38 8,923.54 0.00 0.00 12,747.92 VIGAS, CONCRETO f'c=210 KG/CM2 m3 0.00 0.00 0.00 0.00 0.00 0.00 3,088.97 7,207.59 0.00 0.00 10,296.56 VIGAS, ENCOFRADO Y DESENCOFRADO m2 0.00 0.00 0.00 0.00 0.00 0.00 1,829.55 4,268.96 0.00 0.00 6,098.51 VIGAS, ACERO fy=4200 kg/cm2 kg 0.00 0.00 0.00 0.00 0.00 0.00 3,744.00 8,736.01 0.00 0.00 12,480.01 MUROS Y ENLUCIDOS MURO DE SOGA LADRILLO ARCILLA 18 HCOS, CARAVISTA m2 0.00 0.00 0.00 0.00 0.00 0.00 9,992.72 23,316.34 0.00 0.00 33,309.06 JUNTAS DE CONSTRUCCION CON TEKNOPORT m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 546.70 0.00 546.70 TARRAJEO EXTERIOR MEZCLA: C:A=1:3 m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,184.89 5,184.89 0.00 10,369.78 PINTURA LATEX EN CERCO PERIMETRICO m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,596.29 0.00 5,596.29 CARPINTERIA METALICA PORTON METALICO SEGUN DISEÑO und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,500.00 0.00 6,500.00 PUERTA METALICA SEGUN DISEÑO und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,500.00 0.00 1,500.00

05.00.00 PATIO DE FORMACION TRAZO Y REPLANTEO m2 400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 400.00 CORTE DE TERRENO CON MAQUINARIA m3 1,705.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,705.50 NIVELACION Y COMPACTACION CON MAQUINARIA m2 700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 700.00 REFINE Y COMPACTACION DE SUBRASANTE m2 1,742.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,742.50 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) m3 8,173.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,173.13 MEJORAMIENTO DE SUBRASANTE E=15 CM CON PIEDRA DE RIO T. MAX 3" m3 0.00 7,604.52 0.00 0.00 0.00 0.00 7,061.34 0.00 0.00 0.00 14,665.86 AFIRMADO E=6" PARA BASE GRANULAR m2 0.00 647.22 0.00 0.00 0.00 0.00 408.03 0.00 0.00 0.00 1,055.25 LOSA DE CONCRETO f'c=175 KG/CM2, E=0.10 M. m2 0.00 0.00 0.00 0.00 0.00 0.00 1,003.25 0.00 0.00 0.00 1,003.25 SARDINEL, CONCRETO f'c= 175 kg/cm2 m3 0.00 0.00 0.00 0.00 0.00 0.00 2,262.52 0.00 0.00 0.00 2,262.52 DADOS, CONCRETO F'C=175 KG/CM2 m3 0.00 0.00 0.00 0.00 0.00 0.00 595.40 0.00 0.00 0.00 595.40 ENCOFRADO Y DESENCOFRADO DE SARDINEL m2 0.00 0.00 0.00 0.00 0.00 0.00 1,355.75 0.00 0.00 0.00 1,355.75 JUNTAS DE DILATACION ASFALTICAS, E=1" ml 0.00 0.00 0.00 0.00 0.00 0.00 1,375.20 0.00 0.00 0.00 1,375.20 CURADO DE OBRAS DE CONCRETO m2 0.00 0.00 0.00 0.00 0.00 0.00 375.44 0.00 0.00 0.00 375.44 VARIOS LIMPIEZA GENERAL Y ENTREGA DE OBRA glb 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,446.76 2,446.76 PLACA RECORDATORIA und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 750.00 750.00 FLETE POR TRANSPORTE DE MATERIALES glb 37,087.85 7,912.08 0.00 0.00 741.76 741.76 741.76 741.76 741.76 741.76 49,450.47 COLOCACION DE POSTES DE CONCRETO INCL. LUMINARIA und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16,000.00 0.00 16,000.00 SEMBRADO DE GRAS PARA JARDINERAS m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,332.50 0.00 6,332.50 SEMBRADO DE PLANTONES und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,537.50 0.00 1,537.50 NIVELACION Y COMPACTACION MANUAL m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 223.95 0.00 223.95 REJILLA DE FIERRO PARA EVACUACION DE AGUA DE LLUVIAS ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,801.25 0.00 5,801.25 CABLEADO DE ILUMINACION EXTERIOR DE POSTES, INCL. DADO DE CONCRETO ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,127.40 0.00 4,127.40 PISOS Y PAVIMENTOS AFIRMADO COMPACTADO E=4" m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,949.28 0.00 1,949.28 CAMA DE ARENA E = 5 CM. m2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,630.20 0.00 1,630.20 SARDINEL, CONCRETO f'c= 175 kg/cm2, 15X35 XM ml 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,584.80 0.00 11,584.80

06.00.00 SISTEMA DE TRATAMIENTO DE AGUAS SERVIDAS TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 6.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.02 TRAZO Y REPLANTEO m2 13.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.02 MOVIMIENTO DE TIERRAS EXCAVACION PARA CAMARA SEPTICA (2.5X2.0X2.45) m3 0.00 377.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 377.30

Page 43: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

EXCAVACION POZA DE PERCOLACION (R=1.00 M, H=3.00M) m3 290.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 290.14 RELLENO CON MATERIAL PROPIO m3 40.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.52 ELIMINACION DE MATERIAL EXCEDENTE m3 320.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.24 OBRAS DE CONCRETO SIMPLE SOLADO 2" MEZCLA 1:12 C:H m2 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 201.30 OBRAS DE CONCRETO ARMADO 0.00 CAMARASEPTICA 0.00 CONCRETO f'c=175 kg/cm2 m3 1,989.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,989.73 ENCOFRADO Y DESENCOFRADO m2 556.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 556.18 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 712.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 712.38 POZO DE PERCOLACION CONCRETO f'c=175 kg/cm2 m3 0.00 374.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 374.01 ENCOFRADO Y DESENCOFRADO m2 0.00 47.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47.36 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 0.00 147.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 147.92 MUROS Y TABIQUE DE ALBAÑILERIA MURO DE LADRILLO K.K. TIPO IV APAREJO DE CABEZA m2 0.00 558.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 558.88 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO CON IMPERMEABILIZANTE DE MUROS (INCLUYE VERTEDERO) m2 0.00 0.00 0.00 0.00 0.00 0.00 478.02 0.00 0.00 0.00 478.02 VARIOS CAMA DE PIEDRA Ø 1/2" - POZO DE PERCOLACION m2 0.00 33.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.42 TAPA DE FIERRO PARA CAMARA SEPTICA und 0.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 0.00 0.00 300.00 ACSESORIOS DE DESAGUE mes 0.00 25.00 49.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 74.13

07.00.00 CISTERNA - TANQUE ELEVADO TRABAJOS PRELIMINARES TRAZO Y REPLANTEO m2 11.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.76 MOVIMIENTO DE TIERRAS NIVELACION Y COMPACTACION MANUAL m2 24.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.33 EXCAVACION DE ZANJAS PARA FALSA ZAPATA Y VIGAS DE CIMENTACIÓN m3 369.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 369.81 CORTE DE TERRENO PARA PISOS INTERIORES E=0.35M m3 87.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 87.38 COLOCACION DE GEOTEXTIL 270 GR/M2 A NIVEL DE SUB RASANTE m2 960.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 960.06 RELLENO MANUAL CON MATERIAL PROPIO m3 492.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 492.62 RELLENO CON MATERIAL GRANULAR P/VEREDAS E=0.15 m2 211.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 211.75 ACARREO INTERNO DE MATERIAL EXCEDENTE A MANO m3 117.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 117.86 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 631.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 631.31 TABLAESTACADO PARA CIMENTACION m2 1,110.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,110.80 OBRAS DE CONCRETO ARMADO MUROS DE CONTENCIÓN CONCRETO EN CISTERNA SUBTERRANEA f'c=210 kg/cm2 m3 2,339.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,339.75 MURO DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO m2 0.00 789.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 789.16 MURO DE CONTENCIÓN - ACERO Fy= 4200 kg/cm2 kg 0.00 2,970.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,970.76 COLUMNAS COLUMNAS Y COLUMNETAS, CONCRETO f'c=210 KG/CM2 m3 0.00 1,368.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,368.99 COLUMNAS Y COLUMNETAS , ENCOFRADO Y DESENCOFRADO NORMAL m2 0.00 1,087.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,087.63 COLUMNAS Y COLUMNETAS, ACERO CORRUGADO fy=4200 kg/cm2 kg 0.00 1,714.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,714.78 VIGAS VIGAS, VIGUETAS Y DINTELES, CONCRETO f'c=210 KG/CM2 m3 0.00 1,433.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,433.76

Page 44: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

VIGAS, VIGUETAS Y DINTELES , ENCOFRADO Y DESENCOFRADO NORMAL m2 0.00 1,453.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,453.70 VIGAS, VIGUETAS Y DINTELES, ACERO CORRUGADO fy=4200 kg/cm2 kg 0.00 1,224.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,224.20 LOSAS MACIZAS LOSAS MACIZAS, CONCRETO F´C=210 KG/CM2 m3 0.00 6,482.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,482.47 LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO NORMAL m2 0.00 901.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 901.23 LOSAS MACIZAS., ACERO fy=4200 kg/cm2 kg 0.00 719.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 719.30 INSTALACIONES SANITARIAS Tuberia Ø = 1-1/4" FoGo ml 0.00 0.00 0.00 0.00 0.00 0.00 168.67 0.00 0.00 0.00 168.67 Tuberia Ø = 1- 1/2" FoGo ml 0.00 0.00 0.00 0.00 0.00 0.00 42.10 0.00 0.00 0.00 42.10 Tuberia Ø = 2" FoGo ml 0.00 0.00 0.00 0.00 0.00 0.00 426.39 0.00 0.00 0.00 426.39 Valvula Compuerta Ø = 3/4" Bronce und 0.00 0.00 0.00 0.00 0.00 0.00 48.49 0.00 0.00 0.00 48.49 Valvula Compuerta Ø = 2" Bronce und 0.00 0.00 0.00 0.00 0.00 0.00 92.49 0.00 0.00 0.00 92.49 Valvula Compuerta Ø = 1-1/4" Bronce und 0.00 0.00 0.00 0.00 0.00 0.00 187.47 0.00 0.00 0.00 187.47 Valvula Compuerta Ø = 3/4" Bronce und 0.00 0.00 0.00 0.00 0.00 0.00 96.98 0.00 0.00 0.00 96.98 Valvula Compuerta Ø = 2" Bronce und 0.00 0.00 0.00 0.00 0.00 0.00 184.98 0.00 0.00 0.00 184.98 Valvula Check Ø = 1" und 0.00 0.00 0.00 0.00 0.00 0.00 223.47 0.00 0.00 0.00 223.47 Valvula Check Ø = 1-1/2" und 0.00 0.00 0.00 0.00 0.00 0.00 93.49 0.00 0.00 0.00 93.49 Valvula Flotadora Ø = 3/4" Bronce und 0.00 0.00 0.00 0.00 0.00 0.00 73.99 0.00 0.00 0.00 73.99 Equipo de Bombeo, 02 Electrobombas 1.2 HP glb 0.00 0.00 0.00 0.00 0.00 0.00 756.49 0.00 0.00 0.00 756.49 Rebose de Cisterna de FoGo Ø = 3" glb 0.00 0.00 0.00 0.00 0.00 0.00 38.49 0.00 0.00 0.00 38.49 Rebose de Tanque Alto de FoGo Ø = 2" glb 0.00 0.00 0.00 0.00 0.00 0.00 21.49 0.00 0.00 0.00 21.49 Abrazadera de fijacion de tubo Ø = 1/2" de Fierro Galvanizado e=1.8'' und 0.00 0.00 0.00 0.00 0.00 0.00 24.98 0.00 0.00 0.00 24.98 Abrazadera de fijacion de tubo Ø = 1-1/4'' de Fierro Galvanizado e=1.8'' und 0.00 0.00 0.00 0.00 0.00 0.00 24.98 0.00 0.00 0.00 24.98 Abrazadera de fijacion de tubo Ø = 2'' de Fierro Galvanizado e=1.8'' und 0.00 0.00 0.00 0.00 0.00 0.00 24.98 0.00 0.00 0.00 24.98 Rompe Agua und 0.00 0.00 0.00 0.00 0.00 0.00 222.98 0.00 0.00 0.00 222.98 Caja de Reboses und 0.00 0.00 0.00 0.00 0.00 0.00 216.49 0.00 0.00 0.00 216.49

08.00.00 ADQUISICION DE EQUIPOS Y MOVILIARIO EDUCATIVO MOBILIARIO PIZARRA ACRILICA 4.0 X 1.20 M und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,700.00 2,700.00 5,400.00 CARPETAS UNIPERSONALES und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,200.00 13,200.00 26,400.00 SILLAS DE MADERA ALUMNO und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,087.50 3,087.50 6,175.00 MESAS PARA ALUMNOS und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,100.00 2,100.00 4,200.00 BANCOS PERSONALES und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,080.00 1,080.00 2,160.00 SILLAS APILABLES und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,225.00 4,225.00 8,450.00 MESA PARA DESKTOP und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,200.00 5,200.00 10,400.00 ESTANTE DE MADERA DE 1.80 X 0.90 X 0.40 (MELAMINA) und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,500.00 1,500.00 3,000.00 PUPITRE DOCENTE und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,080.00 3,080.00 6,160.00 BUTACA DOCENTE und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,980.00 1,980.00 3,960.00 CAMILLA TOPICA und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,250.00 2,250.00 4,500.00 LITERAS DE PERNOCTACIÓN und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,000.00 2,000.00 4,000.00 EQUIPAMIENTO LAPTOP CORE i3, HD 500 GB RAM=4GB, MONITOR LED 15.6", GRAB. DVD und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48,400.00 48,400.00 TV LED 32" und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,600.00 15,600.00 REPRODUCTOR DE DVD und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 910.00 910.00 SISTEMA DE PROYECCIÓN MULTIMEDIA und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,250.00 19,250.00 RAUTER und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 196.00 196.00

Page 45: Valorizcion Nº 05 - Febrero

CALENDARIO ACELERADO PROGRAMADO DE OBRA

AREA GEOGRÁFICA: 4

PARTIDA DESCRIPCION UNIDAD MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL

OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA ISTITUCION EDUCATIVA FRANCISCO BOLOGNESI CERVANTES DE LA LOCALIDAD DE YANAYACU ALTO, DISTRITO DE YAUYUCAN-SANTA CRUZ- CAJAMARCA"CONTRATISTA: CONSORCIO LA FE (ING. ELEUTERIO SANCHEZ VEGA CIP Nº 40173)SUPERVISOR : HONSAMAA S.A.C. (ING. YENDER WILLIANS MORALES CADTO CIP Nº 142675)

FOTOCOPIADORA und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,800.00 2,800.00 BASE DE DATOS BIBLIOTECA VIRTUAL + SERVIDOR und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,600.00 5,600.00 KIT FISICA P/LABORATORIO und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,000.00 15,000.00 KIT QUIMICA P/LABORATORIO und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,000.00 15,000.00 KIT BIOLOGIA P/LABORATORIO und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,000.00 15,000.00 KIT DEPORTIVO und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,000.00 4,000.00 MESA DE TRABAJO Y CORTE 2.40X120 und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,800.00 2,800.00 PLOTTER FORMATO A1 P/MOLDES und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,200.00 3,200.00 REMALLADORA und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,500.00 10,500.00 MAQUINA DE COSER und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,500.00 7,500.00 TALADRO DE MANO und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,250.00 2,250.00 ESMERIL DE MANO und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.00 2,400.00 TROZADORA ELECTRICA DE 9" und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,900.00 3,900.00 TALADRO DE BANCO und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,550.00 5,550.00 MAQUINA DE SOLDAR + KIT PROTECCIÓN und 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,000.00 4,000.00

09.00.00 MITIGACION DE IMPACTO AMBIENTAL RIEGO PERMANENTE DE LA ZONA DE TRABAJO d 2,794.50 2,794.50 2,794.50 0.00 2,328.75 2,328.75 2,328.75 2,328.75 2,328.75 2,328.75 22,356.00 LIMPIEZA DIARIA DE DESMONTE d 2,772.00 2,772.00 2,772.00 0.00 2,310.00 2,310.00 2,310.00 2,310.00 2,310.00 2,310.00 22,176.00

glb 0.00

12,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12,500.0010.00.00 CAPACITACION

CAPACITACION DE DOCENTES SOLDADURA Y FORJA glb 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,000.00 5,000.00 5,000.00 15,000.00 CAPACITACION DE DOCENTES CONFECCION INDUSTRIAL glb 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,000.00 5,000.00 5,000.00 15,000.00 CAPACITACION DE DOCENTES EN METODOLOGIA PEDAGOGICA glb 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,166.67 4,166.67 4,166.67 12,500.00 CAPACITACION DE METODOLOGIA DE AVALUACIÓN glb 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,500.00 3,500.00 3,500.00 10,500.00

11.00.00 CAPACITACION PARA BENEFICIARIOS CAPACITACION PARA ESCUELA DE PADRES mes 0.00 0.00 0.00 0.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 18,000.00

TOTLA DE COSTO DIRECTO 416,573.27 ### 129,090.51 0.00 223,731.45 ### 237,870.34 346,518.40 348,428.67 ### ###GASTOS GENERALES (8.84%) 36,843.82 11,417.41 11,417.41 0.00 19,787.93 17,005.31 21,038.44 30,647.82 30,816.77 36,209.49 215,184.40UTILIDAD (8.00%) 33,325.86 10,327.24 10,327.24 0.00 17,898.52 15,381.59 19,029.63 27,721.47 27,874.29 32,752.10 194,637.94SUB TOTAL 486,742.96 ### 150,835.16 0.00 261,417.90 ### 277,938.41 404,887.69 407,119.74 ### ###IMPUESTO GENERAL A LAS VENTAS (IGV 18%) 87,613.73 27,150.33 27,150.33 0.00 47,055.22 40,438.23 50,028.91 72,879.78 73,281.55 86,105.30 511,703.39TOTAL 574,356.69 ### 177,985.49 0.00 308,473.12 ### 327,967.33 477,767.47 480,401.29 ### ###FACTOR DE RELACION 1.00000 1.00000 1.00000 1.00000 1.00000 1.00000 1.00000 1.00000 1.00000 1.00000 1.00000TOTAL PRESUPUESTO POR F.R. 574,356.69 ### 177,985.49 0.00 308,473.12 ### 327,967.33 477,767.47 480,401.29 ### ###PORCENTAJE DE AVANCE PROGRAMADO DE OBRA PORMES 17.12% 5.31% 5.31% 0.00% 9.20% 7.90% 9.78% 14.24% 14.32% 16.83% 100.00%PORCENTAJE DE AVANCE PROGRAMADO DE OBRA ACUMULADO 17.12% 22.43% 27.73% 27.73% 36.93% 44.83% 54.61% 68.85% 83.17% 100.00%

ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD