OBRA: "CONSTRUCCION CALLE HIDALGO" LOCALIDAD: LOCALIDAD DE PATAMBAN, MICHOACAN CODIGO DESCRIPCION P-001 ANCHO (A1+A2) D/2 AREA AREA. ACUM. M2 M2 M M2 M2 0+000 6.20 0+010 6.20 12.40 5.00 62.00 62.00 0+020 6.20 12.40 5.00 62.00 124.00 0+030 6.13 12.33 5.00 61.65 185.65 0+040 6.13 12.26 5.00 61.30 246.95 0+050 5.92 12.05 5.00 60.25 307.20 0+060 5.82 11.74 5.00 58.70 365.90 0+070 5.76 11.58 5.00 57.90 423.80 0+080 5.80 11.56 5.00 57.80 481.60 0+090 5.70 11.50 5.00 57.50 539.10 0+100 5.50 11.20 5.00 56.00 595.10 0+110 5.60 11.10 5.00 55.50 650.60 0+120 5.90 11.50 5.00 57.50 708.10 0+130 5.80 11.70 5.00 58.50 766.60 0+140 5.40 11.20 5.00 56.00 822.60 0+150 5.60 11.00 5.00 55.00 877.60 0+160 5.55 11.15 5.00 55.75 933.35 0+170 5.70 11.25 5.00 56.25 989.60 0+180 5.95 11.65 5.00 58.25 1,047.85 0+190 6.05 12.00 5.00 60.00 1,107.85 0+200 6.20 12.25 5.00 61.25 1,169.10 0+210 6.30 12.50 5.00 62.50 1,231.60 0+220 6.50 12.80 5.00 64.00 1,295.60 0+230 6.80 13.30 5.00 66.50 1,362.10 0+240 6.50 13.30 5.00 66.50 1,428.60 0+250 6.65 13.15 5.00 65.75 1,494.35 0+260 6.70 13.35 5.00 66.75 1,561.10 0+270 7.00 13.70 5.00 68.50 1,629.60 0+280 6.70 13.70 5.00 68.50 1,698.10 0+290 7.00 13.70 5.00 68.50 1,766.60 0+300 6.50 13.50 5.00 67.50 1,834.10 1834.10 1,834.10 0+000 0+300 TOTAL (M2) ESTACION OBSERVACIONES: RESUMEN DE TRAZO DE ESTACIÓN A ESTACIÓN VOLUMEN (M2) PRELIMINARES: TRAZO

Volumenes Calle Hidalgo Patamban

Embed Size (px)

DESCRIPTION

trazo y nivelacion

Citation preview

  • OBRA: "CONSTRUCCION CALLE HIDALGO"

    LOCALIDAD: LOCALIDAD DE PATAMBAN, MICHOACAN

    CODIGO DESCRIPCION

    P-001

    ANCHO (A1+A2) D/2 AREA AREA. ACUM.

    M2 M2 M M2 M2

    0+000 6.20

    0+010 6.20 12.40 5.00 62.00 62.00

    0+020 6.20 12.40 5.00 62.00 124.00

    0+030 6.13 12.33 5.00 61.65 185.65

    0+040 6.13 12.26 5.00 61.30 246.95

    0+050 5.92 12.05 5.00 60.25 307.20

    0+060 5.82 11.74 5.00 58.70 365.90

    0+070 5.76 11.58 5.00 57.90 423.80

    0+080 5.80 11.56 5.00 57.80 481.60

    0+090 5.70 11.50 5.00 57.50 539.10

    0+100 5.50 11.20 5.00 56.00 595.10

    0+110 5.60 11.10 5.00 55.50 650.60

    0+120 5.90 11.50 5.00 57.50 708.10

    0+130 5.80 11.70 5.00 58.50 766.60

    0+140 5.40 11.20 5.00 56.00 822.60

    0+150 5.60 11.00 5.00 55.00 877.60

    0+160 5.55 11.15 5.00 55.75 933.35

    0+170 5.70 11.25 5.00 56.25 989.60

    0+180 5.95 11.65 5.00 58.25 1,047.85

    0+190 6.05 12.00 5.00 60.00 1,107.85

    0+200 6.20 12.25 5.00 61.25 1,169.10

    0+210 6.30 12.50 5.00 62.50 1,231.60

    0+220 6.50 12.80 5.00 64.00 1,295.60

    0+230 6.80 13.30 5.00 66.50 1,362.10

    0+240 6.50 13.30 5.00 66.50 1,428.60

    0+250 6.65 13.15 5.00 65.75 1,494.35

    0+260 6.70 13.35 5.00 66.75 1,561.10

    0+270 7.00 13.70 5.00 68.50 1,629.60

    0+280 6.70 13.70 5.00 68.50 1,698.10

    0+290 7.00 13.70 5.00 68.50 1,766.600+300 6.50 13.50 5.00 67.50 1,834.10

    1834.10

    1,834.10

    0+000 0+300

    TOTAL (M2)

    ESTACION

    OBSERVACIONES:

    RESUMEN DE TRAZO

    DE ESTACIN A ESTACIN VOLUMEN (M2)

    PRELIMINARES: TRAZO

  • OBRA: "CONSTRUCCION CALLE HIDALGO"

    LOCALIDAD: LOCALIDAD DE PATAMBAN, MICHOACAN

    CODIGO DESCRIPCION

    P-001

    PRELIMINARES: TRAZO

    OBRA: "CONSTRUCCION CALLE HIDALGO"

    LOCALIDAD: LOCALIDAD DE PATAMBAN, MICHOACAN

    CODIGO DESCRIPCION

    P-001

    ANCHO (A1+A2) D/2 AREA AREA. ACUM.

    M2 M2 M M2 M2

    0+310 6.40 12.90 5.00 64.50 1,898.60

    0+320 6.70 13.10 5.00 65.50 1,964.10

    0+330 6.60 13.30 5.00 66.50 2,030.60

    0+340 6.63 13.23 5.00 66.15 2,096.75

    0+350 6.40 13.03 5.00 65.15 2,161.90

    0+360 6.30 12.70 5.00 63.50 2,225.40

    0+370 6.50 12.80 5.00 64.00 2,289.40

    0+380 6.60 13.10 5.00 65.50 2,354.90

    0+390 7.55 14.15 5.00 70.75 2,425.65

    0+400 6.50 14.05 5.00 70.25 2,495.90

    0+410 6.60 13.10 5.00 65.50 2,561.40

    0+420 5.75 12.35 5.00 61.75 2,623.15

    0+430 6.30 12.05 5.00 60.25 2,683.40

    0+440 6.70 13.00 5.00 65.00 2,748.40

    0+450 6.35 13.05 5.00 65.25 2,813.65

    0+460 6.70 13.05 5.00 65.25 2,878.90

    0+470 7.20 13.90 5.00 69.50 2,948.40

    0+480 6.30 13.50 5.00 67.50 3,015.90

    0+490 5.60 11.90 5.00 59.50 3,075.40

    0+500 5.50 11.10 5.00 55.50 3,130.90

    0+510 5.20 10.70 5.00 53.50 3,184.40

    0+520 6.00 11.20 5.00 56.00 3,240.40

    0+530 6.70 12.70 5.00 63.50 3,303.90

    0+540 7.30 14.00 5.00 70.00 3,373.90

    0+550 8.00 15.30 5.00 76.50 3,450.40

    0+560 7.70 15.70 5.00 78.50 3,528.90

    0+570 6.75 14.45 5.00 72.25 3,601.15

    0+580 6.50 13.25 5.00 66.25 3,667.40

    0+590 5.15 11.65 5.00 58.25 3,725.65

    0+600 5.50 10.65 5.00 53.25 3,778.90

    0+610 5.20 10.70 5.00 53.50 3,832.40

    0+620 5.15 10.35 5.00 51.75 3,884.15

    0+630 5.25 10.40 5.00 52.00 3,936.15

    0+640 5.80 11.05 5.00 55.25 3,991.40

    0+650

    0+660

    0+670

    0+6800+690

    3991.40

    183.90

    4,175.30

    0+000 0+640

    AREA DE POLIGONO (ABANICO)

    TOTAL (M2)

    OBSERVACIONES: AREA DE POLIGONO (ABANICO) = 183.90 M2

    RESUMEN DE TRAZO

    DE ESTACIN A ESTACIN VOLUMEN (M2)

    PRELIMINARES: TRAZO

    ESTACION