CALCULO DE ZAPATA Z-1 (foro) DATOS Pu = 56035.34 kg. cap. de carga = 14.00 ton/m2. vs = 1.7 ton/m3 vc = 2.4 ton/m3 prof de desplante = D = 1.35 m DIMENSIONES DE DADO suponiendo dado de 30x30 cm. b = 70.00 cm h = 70.00 cm d = 60.00 cm DIMENSIONAMIENTO DE ZAPATA 70.00 cm qn = Pu - ((H )( vc )+ (D-H)( qn = 11.215 ton/m2 area requerida A = 4.996 m2 suponiendola cuadrada B = 2.235 m L1 = 2.30 m por lo tanto queda de L2 = 2.30 m Au = 5.290 m2 qu = Pu/Au qu = 10.593 ton/m2 cortante ultimo qu = 105.93 kg/cm Peralte por cortante trabajando como viga (considerando 1m) Vu = 8474.40 ### d 712.30 d igualando d = 10.36 cm Peralte por cortante trabajando como losa (por penetracion) 51136.97 -148.3 d - 1.0593 ### 59.13 igualando d = 65.89 cm Peralte por flexion Mmax = 338976.00 kg.cm d = 1/2 (0.9)(250)(100)(0.2)(1-0.59*0.2) d = 9.24 cm resulta critico por penetracion por lo tanto el peralte queda de d = 70.00 cm CALCULO DE ACERO DE REFUERZO Mu = 338976.00 kg.cm q = 0.0031 P = q * (250/4200) P = 0.0002 < Pmin = 0.0 As= (P)(b)(d) As = 12.60 cm2 as = 2.87 cm2 separación de varillas S = (as)(100)/As S = 22.78 cm eralte total = H = ) 1/2 Vu = qu ((L1-b)-d)) Vc = (0.85)(0.53)(250 1/2 )(100)d Vu = (L1) 2 - (b + d) 2 (qu/100) d 2 Vc = 0.85(1.1)(250 1/2 )(4)(b+d)(d) Vc = d + d 2 Mmax = (qu)(L1-b) 2 / 2 q= 0.848 - (0.719 - (Mu / (0.53)(250)(100)(d 2) )) 1/2 se proponen var. de f 3

Zapatas

Embed Size (px)

DESCRIPTION

parea calcular una zapata de un portico

Citation preview

Page 1: Zapatas

CALCULO DE ZAPATA Z-1 (foro)

DATOSPu = 56035.34 kg.

cap. de carga = 14.00 ton/m2. vs = 1.7 ton/m3 vc = 2.4 ton/m3

prof de desplante = D = 1.35 m

DIMENSIONES DE DADOsuponiendo dado de 30x30 cm. b = 70.00 cm

h = 70.00 cmd = 60.00 cm

DIMENSIONAMIENTO DE ZAPATA70.00 cm

qn = Pu - ((H )( vc )+ (D-H)( vs)) qn = 11.215 ton/m2area requerida A = Pu/qn A = 4.996 m2

suponiendola cuadrada B = 2.235 mL1 = 2.30 m

por lo tanto queda de L2 = 2.30 mAu = 5.290 m2

qu = Pu/Au qu = 10.593 ton/m2

cortante ultimo qu = 105.93 kg/cm

Peralte por cortante trabajando como viga (considerando 1m)Vu = 8474.40 -105.93 d

712.30 digualando d = 10.36 cm

Peralte por cortante trabajando como losa (por penetracion)

51136.97 -148.3 d - 1.0593

4139.42 59.13igualando d = 65.89 cm

Peralte por flexion

Mmax = 338976.00 kg.cmd = Mu 1/2 (0.9)(250)(100)(0.2)(1-0.59*0.2)

d = 9.24 cmresulta critico por penetracionpor lo tanto el peralte queda de d = 70.00 cm

CALCULO DE ACERO DE REFUERZOMu = 338976.00 kg.cm

q = 0.0031P = q * (250/4200) P = 0.0002 < Pmin = 0.0018As= (P)(b)(d) As = 12.60 cm2

as = 2.87 cm2separación de varillasS = (as)(100)/As S = 22.78 cm

peralte total = H =

B = (A)1/2

Vu = qu ((L1-b)-d))

Vc = (0.85)(0.53)(2501/2)(100)d Vc =

Vu = (L1)2 - (b + d)2 (qu/100) Vu = d2

Vc = 0.85(1.1)(2501/2)(4)(b+d)(d) Vc = d + d2

Mmax = (qu)(L1-b)2 / 2

q= 0.848 - (0.719 - (Mu / (0.53)(250)(100)(d2)))1/2

se proponen var. de f 3/4"

Page 2: Zapatas

CALCULO DE ZAPATA Z-2 (foro)

DATOSPu = 13355.82 kg.

cap. de carga = 10.00 ton/m2. vs = 1.7 ton/m3 vc = 2.4 ton/m3

prof de desplante = D = 0.9 m

DIMENSIONES DE DADOsuponiendo dado de 30x30 cm. b = 50.00 cm

h = 50.00 cmd = 45.00 cm

DIMENSIONAMIENTO DE ZAPATA50.00 cm

qn = Pu - ((H )( vc )+ (D-H)( vs)) qn = 8.120 ton/m2area requerida A = Pu/qn A = 1.645 m2

suponiendola cuadrada B = 1.283 mL1 = 1.30 m

por lo tanto queda de L2 = 1.30 mAu = 1.690 m2

qu = Pu/Au qu = 7.903 ton/m2

cortante ultimo qu = 79.03 kg/cm

Peralte por cortante trabajando como viga (considerando 1m)Vu = 3161.20 -79.03 d

712.30 digualando d = 3.99 cm

Peralte por cortante trabajando como losa (por penetracion)

10856.07 -79.03 d - 0.7903

2956.73 59.13igualando d = 46.26 cm

Peralte por flexion

Mmax = 63224.00 kg.cmd = Mu 1/2 (0.9)(250)(100)(0.2)(1-0.59*0.2)

d = 3.99 cmresulta critico por penetracionpor lo tanto el peralte queda de d = 50.00 cm

CALCULO DE ACERO DE REFUERZOMu = 63224.00 kg.cm

q = 0.0012P = q * (250/4200) P = 0.0001 < Pmin = 0.0018As= (P)(b)(d) As = 9.00 cm2

as = 1.27 cm2separación de varillasS = (as)(100)/As S = 15.63 cm

peralte total = H =

B = (A)1/2

Vu = qu ((L1-b)-d))

Vc = (0.85)(0.53)(2501/2)(100)d Vc =

Vu = (L1)2 - (b + d)2 (qu/100) Vu = d2

Vc = 0.85(1.1)(2501/2)(4)(b+d)(d) Vc = d + d2

Mmax = (qu)(L1-b)2 / 2

q= 0.848 - (0.719 - (Mu / (0.53)(250)(100)(d2)))1/2

se proponen var. de f 1/2"

Page 3: Zapatas

CALCULO DE ZAPATA Z-3 (foro)

DATOSPu = 18663.47 kg.

cap. de carga = 10.00 ton/m2. vs = 1.7 ton/m3 vc = 2.4 ton/m3

prof de desplante = D = 0.9 m

DIMENSIONES DE DADOsuponiendo dado de 30x30 cm. b = 50.00 cm

h = 60.00 cmd = 55.00 cm

DIMENSIONAMIENTO DE ZAPATA50.00 cm

qn = Pu - ((H )( vc )+ (D-H)( vs)) qn = 8.120 ton/m2area requerida A = Pu/qn A = 2.298 m2

suponiendola cuadrada B = 1.516 mL1 = 1.60 m

por lo tanto queda de L2 = 1.60 mAu = 2.560 m2

qu = Pu/Au qu = 7.290 ton/m2

cortante ultimo qu = 72.90 kg/cm

Peralte por cortante trabajando como viga (considerando 1m)Vu = 4009.50 -72.90 d

712.30 digualando d = 5.11 cm

Peralte por cortante trabajando como losa (por penetracion)

16162.4 -72.9 d - 0.729

2956.73 59.13igualando d = 48.56 cm

Peralte por flexion

Mmax = 110261.25 kg.cmd = Mu 1/2 (0.9)(250)(100)(0.2)(1-0.59*0.2)

d = 5.27 cmresulta critico por penetracionpor lo tanto el peralte queda de d = 50.00 cm

CALCULO DE ACERO DE REFUERZOMu = 110261.25 kg.cm

q = 0.0020P = q * (250/4200) P = 0.0001 < Pmin = 0.0018As= (P)(b)(d) As = 9.00 cm2

as = 1.27 cm2separación de varillasS = (as)(100)/As S = 15.63 cm

peralte total = H =

B = (A)1/2

Vu = qu ((L1-b)-d))

Vc = (0.85)(0.53)(2501/2)(100)d Vc =

Vu = (L1)2 - (b + d)2 (qu/100) Vu = d2

Vc = 0.85(1.1)(2501/2)(4)(b+d)(d) Vc = d + d2

Mmax = (qu)(L1-b)2 / 2

q= 0.848 - (0.719 - (Mu / (0.53)(250)(100)(d2)))1/2

se proponen var. de f 1/2"

Page 4: Zapatas

CALCULO DE ZAPATA Z-4 (arcos)

DATOSPu = 13809.29 kg.

cap. de carga = 10.00 ton/m2. vs = 1.7 ton/m3 vc = 2.4 ton/m3

prof de desplante = D = 0.9 m

DIMENSIONES DE DADOsuponiendo dado de 30x30 cm. b = 50.00 cm

h = 50.00 cmd = 45.00 cm

DIMENSIONAMIENTO DE ZAPATA50.00 cm

qn = Pu - ((H )( vc )+ (D-H)( vs)) qn = 8.120 ton/m2area requerida A = Pu/qn A = 1.701 m2

suponiendola cuadrada B = 1.304 mL1 = 1.40 m

por lo tanto queda de L2 = 1.40 mAu = 1.960 m2

qu = Pu/Au qu = 7.046 ton/m2

cortante ultimo qu = 70.46 kg/cm

Peralte por cortante trabajando como viga (considerando 1m)Vu = 3170.70 -70.46 d

712.30 digualando d = 4.05 cm

Peralte por cortante trabajando como losa (por penetracion)

11310.16 -70.46 d - 0.7046

2956.73 59.13igualando d = 46.36 cm

Peralte por flexion

Mmax = 71340.75 kg.cmd = Mu 1/2 (0.9)(250)(100)(0.2)(1-0.59*0.2)

d = 4.24 cmresulta critico por penetracionpor lo tanto el peralte queda de d = 50.00 cm

CALCULO DE ACERO DE REFUERZOMu = 71340.75 kg.cm

q = 0.0013P = q * (250/4200) P = 0.0001 < Pmin = 0.0018As= (P)(b)(d) As = 9.00 cm2

as = 1.27 cm2separación de varillasS = (as)(100)/As S = 15.63 cm

peralte total = H =

B = (A)1/2

Vu = qu ((L1-b)-d))

Vc = (0.85)(0.53)(2501/2)(100)d Vc =

Vu = (L1)2 - (b + d)2 (qu/100) Vu = d2

Vc = 0.85(1.1)(2501/2)(4)(b+d)(d) Vc = d + d2

Mmax = (qu)(L1-b)2 / 2

q= 0.848 - (0.719 - (Mu / (0.53)(250)(100)(d2)))1/2

se proponen var. de f 1/2"