Mexico City, 16-05-2014
A record breaking cable stayed bridge and
future developmentsRusski Island Bridge, Vladivostok, Russia
Erik MELLIER Technical Director Freyssinet
8/10/2019 2359_Presentacion_E_Mellier.pdf
2/104
Milestones in the Recent Cable StayedBridge History
3rd International Bridge SeminarMexico City 15-17 May 2014
2
8/10/2019 2359_Presentacion_E_Mellier.pdf
3/104
Normandy Bridge (France) 1992/1994
2141 m long bridge
854 m steel main span (world longest)
2600 tons of Stay Cables
Semi-bonded strand
(galvanized, waxed and sheathed)
Cross-ties
3rd International Bridge SeminarMexico City 15-17 May 2014
3
8/10/2019 2359_Presentacion_E_Mellier.pdf
4/104
Vasco de Gama Bridge (Portugal) 1996/1998
> Main span 420m
> 192 stays, 1700 tons
> Development of the duct with double helicalfillet to mitigate rain/wind induced vibration
3rd International Bridge SeminarMexico City 15-17 May 2014
4
8/10/2019 2359_Presentacion_E_Mellier.pdf
5/104
Ting Kau Bridge (Hong Kong) 1996/1998
Central Spans of 448 and 475 m
3060 tons
Longest Stay Cable in the world): 465 m
Fast track erection: 1,000 tons of stay installed in 1 Month
3rd International Bridge SeminarMexico City 15-17 May 2014
5
8/10/2019 2359_Presentacion_E_Mellier.pdf
6/104
Oresund Bridge (Denmark) 1998/1999
Main span : 490m
Road/Train Bridge : 2300 tons of stay cables
Dampers on all the cables
3rd International Bridge SeminarMexico City 15-17 May 2014
6
8/10/2019 2359_Presentacion_E_Mellier.pdf
7/104
Millau Viaduct (France) - 2004
Tallest Bridge in the world, main span : 342m
Watertightness testing
3rd International Bridge SeminarMexico City 15-17 May 2014
7
8/10/2019 2359_Presentacion_E_Mellier.pdf
8/104
Rion-Antirion Bridge (Greece) 2004
3 x 560m span
Paraseismic deviator at anchorages
Pendular dampers
Striking protection
3rd International Bridge SeminarMexico City 15-17 May 2014
8
8/10/2019 2359_Presentacion_E_Mellier.pdf
9/104
The Russki Island BridgeVladivostok, Russia
3rd International Bridge SeminarMexico City 15-17 May 2014
9
8/10/2019 2359_Presentacion_E_Mellier.pdf
10/104
3rd International Bridge SeminarMexico City 15-17 May 2014
10
8/10/2019 2359_Presentacion_E_Mellier.pdf
11/104
Golden Horn Bridge- 737 m main span
3rd International Bridge SeminarMexico City 15-17 May 2014
11
Copyright USKMost 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
12/104
3rd International Bridge SeminarMexico City 15-17 May 2014
12Copyright USKMost 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
13/104
The Russky Island Bridge - 1104 m main span
3rd International Bridge SeminarMexico City 15-17 May 2014
13
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
14/104
The 10 longest cable stayed spans in the World
3rd International Bridge SeminarMexico City 15-17 May 2014
14
8/10/2019 2359_Presentacion_E_Mellier.pdf
15/104
Key facts
Main span : 1104 m
Pylon height : 319 m
Longest stay cable : 582 m Designed and built in 4 ans
Minimum temperature during construction operation : -30 C
3rd International Bridge SeminarMexico City 15-17 May 2014
15
8/10/2019 2359_Presentacion_E_Mellier.pdf
16/104
Concrete Cross Section
Side spans
Counterweight to balance the shortness of side spans
3rd International Bridge SeminarMexico City 15-17 May 2014
16
8/10/2019 2359_Presentacion_E_Mellier.pdf
17/104
Steel Cross Section Main Span
Main Span + 70 m in side spans
With : 25,96 m
Depth : 3,20 m
3rd International Bridge SeminarMexico City 15-17 May 2014
17
8/10/2019 2359_Presentacion_E_Mellier.pdf
18/104
Pyons
A shaped
Height 319 m
13 m footings
240 two meter
diameter piles
3rd International Bridge SeminarMexico City 15-17 May 2014
18
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
19/104
Stay Cables
21 cables per fan, 24 m bottom anchorage spacing in main span
27 to 86 150 mm strands per stay, 1860 Mpa strength
2960 km of strands
Russian flag colors
3rd International Bridge SeminarMexico City 15-17 May 2014
19
8/10/2019 2359_Presentacion_E_Mellier.pdf
20/104
Parties involved
Designer: Mostovik
Main contractor : USK Most
Sub constractor on the peninsulaside : Mostovik
Designer and supplier of the stays :Freyssinet
3rd International Bridge SeminarMexico City 15-17 May 2014
20
Copyright Mostovik 2012Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
21/104
Construction schedule
3rd International Bridge SeminarMexico City 15-17 May 2014
21
8/10/2019 2359_Presentacion_E_Mellier.pdf
22/104
Some design results reflecting how aultra long cable stayed span behaves
3rd International Bridge SeminarMexico City 15-17 May 2014
22
8/10/2019 2359_Presentacion_E_Mellier.pdf
23/104
Dy_max = 1.85m
Dx_max = 50cm
Deflection under traffic loads
3rd International Bridge SeminarMexico City 15-17 May 2014
23
8/10/2019 2359_Presentacion_E_Mellier.pdf
24/104
1.03 m at each jointThe deck is longitudinally free (no fixed point), centered by the stays
and braked by longitudinal dampers at the abutments
Longitudinal thermal movements
3rd International Bridge SeminarMexico City 15-17 May 2014
24
8/10/2019 2359_Presentacion_E_Mellier.pdf
25/104
Vibration modes
Mode shape Frequency (Hz)
Transversal bending n1 0.081
Vertical bending n1 0.176
Vertical bending n2 0.207
Transversal bending n2 0.213
Vertical bending n3 0.273
Torsion 0.492
1
2
3
3rd International Bridge SeminarMexico City 15-17 May 2014
25
8/10/2019 2359_Presentacion_E_Mellier.pdf
26/104
Maximum displacement:
5 cm longitudinally
15 cm transversally
Its high flexibility makes thebridge insensitive to
earthquakes
Seismic behavior
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00
Pseudoa
cceleration(
g)
Period (s)
Eurocode 8
Mostovik
0.35 g
HORIZONTAL - FAULT NORMAL - MORGAN DATA
-1.5000
-1.0000
-0.5000
0.0000
0.5000
1.0000
1.5000
0 2000 4000 6000 8000 10000 12000
time (ms)
acc.
(m/s)
3rd International Bridge SeminarMexico City 15-17 May 2014
26
8/10/2019 2359_Presentacion_E_Mellier.pdf
27/104
Vref = 44m/s at deck level
Max. displacements :
-1.90/+0.85 m vertically
+/- 2.55 m transversally
Wind behavior
3rd International Bridge SeminarMexico City 15-17 May 2014
27
8/10/2019 2359_Presentacion_E_Mellier.pdf
28/104
The Technology : Compact cables withhigh damping
3rd International Bridge SeminarMexico City 15-17 May 2014
28
8/10/2019 2359_Presentacion_E_Mellier.pdf
29/104
Technical Challenges
TECHNICAL CHALLENGES :
Ultra long cables (580 m)
Critical temperatures (-40/+60C)
Compact stays to reduce drag Dampers : High logarithmic dec
Monitoring
Challenging installation schedule
3rd International Bridge SeminarMexico City 15-17 May 2014
29
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
30/104
H2000 range
Stuffing boxBending filtration
Leaktightness
Injection chamberUnsheathed strandWax injection
WedgeFatigue proofed
H2000 stay cable range
Including a patented bending filtration device
Tested protection for
Water ingress
Vibrations and fatigue
Designed for inspection
& maintenance
3rd International Bridge SeminarMexico City 15-17 May 2014
30
8/10/2019 2359_Presentacion_E_Mellier.pdf
31/104
Factors influencing the drag
The cables are acting like a sail whose drag is significant
Dairdrag CDUF =2
2
1
The compact system
Curve force
deck/stay Deck
& pylon
staysTransverse
bending
Span
200 600400 800 1,000
3rd International Bridge SeminarMexico City 15-17 May 2014
31
8/10/2019 2359_Presentacion_E_Mellier.pdf
32/104
Compact PSS systemStandard PSS system
Compact strands
Tightly fitted pipes
Special installation procedure with dedicatedmethodologies
20 % drag reduction
The Compact System
3rd International Bridge SeminarMexico City 15-17 May 2014
32
8/10/2019 2359_Presentacion_E_Mellier.pdf
33/104
Bai Chai bridge, Vietnam
Indian River bridge, USA
Chambal bridge, India
Golden Horn bridge, Russia
Russky Island bridge, Russia
Bai Chai
Russky
The Compact System - references
3rd International Bridge SeminarMexico City 15-17 May 2014
33
8/10/2019 2359_Presentacion_E_Mellier.pdf
34/104
Dampers
5 x Semi-actif pistons
3rd International Bridge SeminarMexico City 15-17 May 2014
34
8/10/2019 2359_Presentacion_E_Mellier.pdf
35/104
Dampers Internal Radial Dampers (IRD)
Internal Radial Dampers (IRD) :
A three piston damper placed at the formwork tubeextremity (deck level).
Damping in all directions Low temperature sensitivity
3rd International Bridge SeminarMexico City 15-17 May 2014
35
8/10/2019 2359_Presentacion_E_Mellier.pdf
36/104
Dampers Internal Radial Dampers (IRD)
Stroke: +/- 90mm
Flexible structure : Large deflections due to live loads
Long cables : largemovement amplitude
=> Large stroke
Log dec : 4%, Temperature : -40/+60C,
3rd International Bridge SeminarMexico City 15-17 May 2014
36
8/10/2019 2359_Presentacion_E_Mellier.pdf
37/104
Dampers Pendular External Dampers (PED)
Tablier
Oscillationsdes Cables
Pendular External Dampers
Articulated structure transferring and amplifying thecable movement to two hydraulic pistonshydrauliques placed at deck level
=> Optimised efficiency thanks to distance to thebottom anchorage
Damping in all directions Low temperature sensitivity
3rd International Bridge SeminarMexico City 15-17 May 2014
37
8/10/2019 2359_Presentacion_E_Mellier.pdf
38/104
Distance from the anchorage:
8.4m 16 m
Height : 4 et 5 m
Pistons :
Passive
Semi active
Stroke : +/- 100 and +/-150 mm
Log dec : 6%
Dampers Pendular External Dampers (PED)
3rd International Bridge SeminarMexico City 15-17 May 2014
38
8/10/2019 2359_Presentacion_E_Mellier.pdf
39/104
PED with passive dampers :
Stroke +/-100mm ou +/-150mm
Fatigue qualification : 2 million cycle testes
Temperature qualification : Tests at 40 C and +60 C
Test de caractrisation 40CCeq
123
2
1
3
Crit
Cpassive piston
Dampers Pendular External Dampers (PED)
3rd International Bridge SeminarMexico City 15-17 May 2014
39
8/10/2019 2359_Presentacion_E_Mellier.pdf
40/104
PED with semi-active pistons :magneto-rheologicaltechnology
Stroke+/-150mm Working principle : the piston
viscosity in adjusted consituously tothe measured vibration mode. Theviscosity is potimal at any time.
Ceq
123
2
1
3
Crit
Cpassive piston
4
Ceq
123
Crit
< -----Csemi-actif ----->
4
Dampers Pendular External Dampers (PED)
3rd International Bridge SeminarMexico City 15-17 May 2014
40
8/10/2019 2359_Presentacion_E_Mellier.pdf
41/104
Damping performance : in situ testing
3rd International Bridge SeminarMexico City 15-17 May 2014
41
8/10/2019 2359_Presentacion_E_Mellier.pdf
42/104
Monitoring
Permanent monitoring system: 48 accelerometers & 48 load cells
3rd International Bridge SeminarMexico City 15-17 May 2014
42
8/10/2019 2359_Presentacion_E_Mellier.pdf
43/104
Control System :
Load cells
Accelerometers
Monitoring
3rd International Bridge SeminarMexico City 15-17 May 2014
43
8/10/2019 2359_Presentacion_E_Mellier.pdf
44/104
Construction Cable installation
3rd International Bridge SeminarMexico City 15-17 May 2014
44
8/10/2019 2359_Presentacion_E_Mellier.pdf
45/104
Cable Installation - Challenges
Design :
Compact System
Ultra long cables (580 m)
Flexible structure
Environment :
Highly cold : installation with -30C and wind
Schedule :
Working 24 / 7
Adapation
Material, equipements
Procedures
On site training
Optimised installation cycle
3rd International Bridge SeminarMexico City 15-17 May 2014
45
Th ff f ld h k hi ffi i
8/10/2019 2359_Presentacion_E_Mellier.pdf
46/104
The effect of cold weather on workmanship efficiency
3rd International Bridge SeminarMexico City 15-17 May 2014
46
I t ll ti K d t
8/10/2019 2359_Presentacion_E_Mellier.pdf
47/104
Russky Island Bridge (Russia)
MOSTOVIK CK MOCT
20/07/2011 1st red cable
19/10/2011 1st blue cable
06/01/2012 1st white cable
23/03/2012 last Freyssinetcable installed
12/04/2012 Closure of
the Bridge
10/03/2012 worldrecord longest cable
30/08/2011 1st red cable
21/11/2011 1st blue cable
21/01/2012 1st white cable247 days84 pairs
Average cycle : 6 days
Installation Key dates
3rd International Bridge SeminarMexico City 15-17 May 2014
47
I t ll ti W ki l
8/10/2019 2359_Presentacion_E_Mellier.pdf
48/104
Installation Working places
3rd International Bridge SeminarMexico City 15-17 May 2014
48
Installation Working cycle
8/10/2019 2359_Presentacion_E_Mellier.pdf
49/104
H - 48 hrs : Preparation
Duct welding 24 7
Equipment preparation
Anchorage installation
Installation Working cycle
3rd International Bridge SeminarMexico City 15-17 May 2014
49
Installation Working cycle
8/10/2019 2359_Presentacion_E_Mellier.pdf
50/104
H- 24 hrs : Checks
Equipment
Strand
Anchorages and duct
Installation Working cycle
3rd International Bridge SeminarMexico City 15-17 May 2014
50
Installation Working cycle
8/10/2019 2359_Presentacion_E_Mellier.pdf
51/104
H- 10 hrs : Equipment installation
Hydraulic tools pre-heating
Threading equipment installation on the deck
Installation Working cycle
3rd International Bridge SeminarMexico City 15-17 May 2014
51
Installation Working cycle
8/10/2019 2359_Presentacion_E_Mellier.pdf
52/104
H - 5 hrs : Checking
Temporary tools Master strand preparation
QR checking
High level of traceability :
Preparation
Installation
Results
Installation Working cycle
3rd International Bridge SeminarMexico City 15-17 May 2014
52
Installation Working cycle
8/10/2019 2359_Presentacion_E_Mellier.pdf
53/104
H- 2 hrs : Stay pipe lifting
Checking of wind forecast
600 trolleys used forlongest stay pipes
Installation Working cycle
3rd International Bridge SeminarMexico City 15-17 May 2014
53
Installation Working cycle
8/10/2019 2359_Presentacion_E_Mellier.pdf
54/104
D Day: Erection
2 shifts
Special care to information transfer
Installation Working cycle
3rd International Bridge SeminarMexico City 15-17 May 2014
54
Installation Working cycle
8/10/2019 2359_Presentacion_E_Mellier.pdf
55/104
D Day : Cable erection
Compact system, 20% drag reduction
Installation Working cycle
3rd International Bridge SeminarMexico City 15-17 May 2014
55
Installation Working cycle
8/10/2019 2359_Presentacion_E_Mellier.pdf
56/104
Installation Working cycle
3rd International Bridge SeminarMexico City 15-17 May 2014
56
8/10/2019 2359_Presentacion_E_Mellier.pdf
57/104
Russki Island Bridge ConstructionMilestones
3rd International Bridge SeminarMexico City 15-17 May 2014
57
8/10/2019 2359_Presentacion_E_Mellier.pdf
58/104
3rd International Bridge SeminarMexico City 15-17 May 2014
58
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
59/104
3rd International Bridge SeminarMexico City 15-17 May 2014
59
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
60/104
3rd International Bridge SeminarMexico City 15-17 May 2014
60
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
61/104
3rd International Bridge SeminarMexico City 15-17 May 2014
61
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
62/104
3rd International Bridge SeminarMexico City 15-17 May 2014
62
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
63/104
3rd International Bridge SeminarMexico City 15-17 May 2014
63Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
64/104
3rd International Bridge SeminarMexico City 15-17 May 2014
64
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
65/104
3rd International Bridge SeminarMexico City 15-17 May 2014
65
Copyright Mostovik 2012
Construction de louvrage
8/10/2019 2359_Presentacion_E_Mellier.pdf
66/104
3rd International Bridge SeminarMexico City 15-17 May 2014 66
Copyright Mostovik 2012
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
67/104
3rd International Bridge SeminarMexico City 15-17 May 2014 67
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
68/104
3rd International Bridge SeminarMexico City 15-17 May 2014 68
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
69/104
3rd International Bridge SeminarMexico City 15-17 May 2014 69
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
70/104
3rd International Bridge SeminarMexico City 15-17 May 2014 70
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
71/104
3rd International Bridge SeminarMexico City 15-17 May 2014 71Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
72/104
3rd International Bridge SeminarMexico City 15-17 May 2014 72
Copyright Mostovik 2012
8/10/2019 2359_Presentacion_E_Mellier.pdf
73/104
The next record :The 3rd Bosphorus CrossingIstanbul, Turkey
3rd International Bridge SeminarMexico City 15-17 May 2014 73
GEOGRAPHY A NEW LINK BETWEEN EUROPE ANDASIA
8/10/2019 2359_Presentacion_E_Mellier.pdf
74/104
Istanbul
rd !os"#orus !ridge
The northen crossing over theBosphorus Strait.
Combining Raod and Rail traffic
Part of the Marmara Motorway(3rd Istanbul Ring Raod)
3rd International Bridge SeminarMexico City 15-17 May 2014 74
BRIDGE CHARACTERISTICS
8/10/2019 2359_Presentacion_E_Mellier.pdf
75/104
High Rigidity Suspension Bridge combining stiffening cables andsuspension cables
597 m322 m
1408 m 378 m378 m
3rd International Bridge SeminarMexico City 15-17 May 2014 75
BRIDGE CHARACTERISTICS
8/10/2019 2359_Presentacion_E_Mellier.pdf
76/104
TunnelAt GradeElevated
2 railway tracks
8 traffic lanes (2 x 4)
2 walkways
58 m
3rd International Bridge SeminarMexico City 15-17 May 2014 76
BRIDGE CHARACTERISTICS
8/10/2019 2359_Presentacion_E_Mellier.pdf
77/104
Back spans: post tensioned, multi cell concrete deck
3rd International Bridge SeminarMexico City 15-17 May 2014 77
BRIDGE CHARACTERISTICS
8/10/2019 2359_Presentacion_E_Mellier.pdf
78/104
78
Towers
320 m height
Reinforced concrete withsteel boxes
Slip forming construction
3rd International Bridge SeminarMexico City 15-17 May 2014
STIFFENING CABLES CHARACTERISTICS
8/10/2019 2359_Presentacion_E_Mellier.pdf
79/104
Strand type: Galvanized semi bonded
1960 MPa strength
Quantity: 8,500 tons of strands
Units: 75 to 151 strands
Cable length: 150 to 600 m
3rd International Bridge SeminarMexico City 15-17 May 2014 79
Parties Involved
8/10/2019 2359_Presentacion_E_Mellier.pdf
80/104
Owner: General Directorate of Highways (KGM)
3rd Ring Road Concessionaire : ICTAS / ASTALDI Joint Venture
3rd Crossing Main Contractor : Hyundai (Korea)
Designers:
Michel Virlogeux Consultant (France)
T-ingnirie J.-F. Klein - (Switzerland)
Bureau dEtudes Greisch (Belgium)
Stiffening cable supplier : Freyssinet
3rd International Bridge SeminarMexico City 15-17 May 2014 80
8/10/2019 2359_Presentacion_E_Mellier.pdf
81/104
A new generation of dampers
3rd International Bridge SeminarMexico City 15-17 May 2014 81
Bakc Span : External Hydraulic Dampers
8/10/2019 2359_Presentacion_E_Mellier.pdf
82/104
Cables S22b to
S10M:External
HydraulicDampers
H
3rd International Bridge SeminarMexico City 15-17 May 2014 82
Main span : Cross links for long cables
8/10/2019 2359_Presentacion_E_Mellier.pdf
83/104
Cables 11to 22:
CrossLinks
3rd International Bridge SeminarMexico City 15-17 May 2014 83
Cross Link technology
8/10/2019 2359_Presentacion_E_Mellier.pdf
84/104
A damping connection between two adjacent cables
Taking the benefit of the relative movement existingbetween two adjacent cables due to differentfrequencies and connection at different heights
High efficiency due to large distance from anchorage
3rd International Bridge SeminarMexico City 15-17 May 2014 84
Cross Link technology
8/10/2019 2359_Presentacion_E_Mellier.pdf
85/104
Cross link principle
Attached between two stiffening cables at about 10m high : High efficiencydue to significant distance from anchorage,
Assymetrical hydraulic piston : avoid out of plane cable motions due tolimited force in compression.
Compression : F = 0
Traction : F = C.v
v
F
Compression Traction
7-12m
3rd International Bridge SeminarMexico City 15-17 May 2014 85
Cross Link technology
8/10/2019 2359_Presentacion_E_Mellier.pdf
86/104
A Freyssinet SFD (Seal Free Damper) piston
No working joint
Robust guides working within the oil bath
No possibility of leakage No maintenance
2 axis articulation to allow movement
around the cable
3rd International Bridge SeminarMexico City 15-17 May 2014 86
Design of Cross Links - criteria
P f 6 0 % i ll
8/10/2019 2359_Presentacion_E_Mellier.pdf
87/104
Performance: > 6.0 % vertically
Calculated on modes 1, 2, 3 & 4
Stroke needed = +/- 600 mm
3rd International Bridge SeminarMexico City 15-17 May 2014 87
P t t t t i
Cross Link testing
8/10/2019 2359_Presentacion_E_Mellier.pdf
88/104
Prototype test campaign
Performed at Eucenter Pavia Italy (Prof. Calvi)
Performance tests at several amplitudes : +/- 35, +/-70 & +/- 105mm
Fatigue tests : 80km cumulative
stroke
3rd International Bridge Seminar
Mexico City 15-17 May 2014 88
P t t t t i lt
Cross Link testing
8/10/2019 2359_Presentacion_E_Mellier.pdf
89/104
A = +/-35 mm;A = +/-70 mm
A = +/-105 mmPrototype test campaign: results
=> Real behaviour of the piston matching the expected unsymetrical behavior.
3rd International Bridge Seminar
Mexico City 15-17 May 2014 89
Case study: release of several cables together
Cross Link modeling
8/10/2019 2359_Presentacion_E_Mellier.pdf
90/104
Case study: release of several cables together
3D model able to simulate out-of-
plane movements
Cross Links modelling
Logarithmic decrement assessment Remarkable efficiency
8/10/2019 2359_Presentacion_E_Mellier.pdf
91/104
Logarithmic decrement assessment Remarkable efficiency
=> Assessed globally for the several cables connected as a single cablevibrating uses the reaction of others to dissipate energy through the CrossLink piston
3rd International Bridge Seminar
Mexico City 15-17 May 2014 91
Cross Link aesthetics
8/10/2019 2359_Presentacion_E_Mellier.pdf
92/104
3rd International Bridge Seminar
Mexico City 15-17 May 2014 92
8/10/2019 2359_Presentacion_E_Mellier.pdf
93/104
Current 3rd
Bosphorus CrossingConstruction Progress
3rd International Bridge Seminar
Mexico City 15-17 May 2014 93
8/10/2019 2359_Presentacion_E_Mellier.pdf
94/104
3rd International Bridge Seminar
Mexico City 15-17 May 2014 94
www.3kopru.com
8/10/2019 2359_Presentacion_E_Mellier.pdf
95/104
3rd International Bridge Seminar
Mexico City 15-17 May 2014 95
www.3kopru.com
8/10/2019 2359_Presentacion_E_Mellier.pdf
96/104
3rd International Bridge Seminar
Mexico City 15-17 May 2014 96
www.3kopru.com
8/10/2019 2359_Presentacion_E_Mellier.pdf
97/104
3rd International Bridge Seminar
Mexico City 15-17 May 2014 97
www.3kopru.com
8/10/2019 2359_Presentacion_E_Mellier.pdf
98/104
3rd International Bridge Seminar
Mexico City 15-17 May 2014 98
www.3kopru.com
8/10/2019 2359_Presentacion_E_Mellier.pdf
99/104
3rd International Bridge Seminar
Mexico City 15-17 May 2014 99
www.3kopru.com
8/10/2019 2359_Presentacion_E_Mellier.pdf
100/104
3rd International Bridge Seminar
Mexico City 15-17 May 2014 100
www.3kopru.com
8/10/2019 2359_Presentacion_E_Mellier.pdf
101/104
3rd International Bridge Seminar
Mexico City 15-17 May 2014 101
www.3kopru.com
8/10/2019 2359_Presentacion_E_Mellier.pdf
102/104
3rd International Bridge Seminar
Mexico City 15-17 May 2014 102
www.3kopru.com
8/10/2019 2359_Presentacion_E_Mellier.pdf
103/104
3rd International Bridge Seminar
Mexico City 15-17 May 2014 103
www.3kopru.com
8/10/2019 2359_Presentacion_E_Mellier.pdf
104/104
Thank you foryour attention