OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,2 : APERTURA HUECO PARA POSTE O TEMPLETE DE MEDIA TENSINUNIDAD : UN.
I - MATERIALESDESCRIPCIN
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor obreros
III - TRANSPORTEDESCRIPCIN
Campero (Transporte Herramienta)
IV - MANO DE OBRADESCRIPCIN
CapatazObrero
UNIDAD
TIPO
UNIDAD
JORNAL53.72741.888
CANTIDAD
TARIF./DIA17.408
TARIF./DIA125.063
FAC. PRES.1,71,7
VR. UNIT.
RENDIMIEN.5
RENDIMIEN.26,16
RENDIMIEN.55
VR. PARC.0
VR. PARC.3.482
VR. PARC.4.781
VR. PARC.18.26714.242
TOTAL COSTOS DIRECTOS
SUBTOTAL
0
SUBTOTAL
3.482
SUBTOTAL
4.781
SUBTOTAL
32.509
40.772
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACINSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEMS 1,1 : REPLANTEO RED DE SUBTRANSMISIN, MEDIA TENSINUNIDAD : KM
I - MATERIALESDESCRIPCIN
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Equipo de Topografa
III - TRANSPORTEDESCRIPCIN
Campero
IV - MANO DE OBRADESCRIPCIN
Comisin de topografaCapataz
UNIDAD
TIPO
UNIDAD
JORNAL345.38353.727
CANTIDAD
TARIF./DIA350.652
TARIF./DIA125.063
FAC. PRES.1,71,7
VR. UNIT.
RENDIMIEN.3
RENDIMIEN.2
RENDIMIEN.33
VR. PARC.0
VR. PARC.116.884
VR. PARC.62.532
VR. PARC.195.71730.445
TOTAL COSTOS DIRECTOS
SUBTOTAL
0
SUBTOTAL
116.884
SUBTOTAL
62.532
SUBTOTAL
226.162
405.578
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACINSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,3 : POSTE DE FERROCONCRETO DE 12MTS. x510 KGF.UNIDAD : UN
I - MATERIALESDESCRIPCIN
Poste de ferroconcreto de 12 mts. x 510 Kgf.
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor unierasGra
III - TRANSPORTEDESCRIPCIN
CamabajaZorro
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaDos (2) Ayudantes
UNIDADUN
TIPO
UNIDAD11
JORNAL53.72754.29950.264
CANTIDAD1
TARIF./DIA17.408
358.175
TAR1F./DIA700.00055.485
FAC. PRES.1,71,71,7
VR. UNIT.540.020
RENDIMIEN.33
RENDIMIEN.123
RENDIMIEN.333
VR. PARC.540.020
'
VR. PARC.5.803
119.392
VR. PARC.58.33318.495
VR. PARC.30.44530.76928.483
TOTAL COSTOS DIRECTOS
SUBTOTAL
540.020
SUBTOTAL
125.195
SUBTOTAL
76.828
SUBTOTAL
89.697
831.740
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACINSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS. BRISAS DEL CUSiANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,5 : VESTIDA DE ESTRUCTURA DE PASO, P - 101UNIDAD : UN
I - MATERIALESDESCRIPCIN
Cruceta metlica de 3/16" x 2 1/2" x 2 m.Diagonal metlica en V de 1 ,1 m.Espiga para cruceta metlica - 13,2 KVEspiga para extremo de poste - 13,2 KVAislador espiga de 13.2 KV ANS 55-5Perno de mquina 1/2" X 2"Perno de mquina 5/8" X 8"Arandela redonda de 1/2"Arandela de presin de 1/2"Arandela redonda de 5/8"Arandela de presin de 5/8"
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor unieras
III - TRANSPORTEDESCRIPCIN
Camin 350
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaAyudante
UNIDADUNUNUNUNUNUNUNUNUNUNUN
TIPO
UNIDAD
JORNAL53.72754.29925.132
CANTIDAD11213242266
TARIF./DIA17.408
TARIF./DIA550.054
FAC. PRES.1,71,71,7
VR. UNIT.61.43726.23713.47111.64822.661
9943.200253171605226
RENDIMIEN.6
RENDIMIEN.33,24
RENDIMIEN.666
VR. PARC.61.43726.23726.942
11.64867.9831.988
12.800506342
3.6301.356
VR. PARC.2.901
VR. PARC.16.548
VR. PARC.15.22315.3857.121
TOTAL COSTOS DIRECTOS
SUBTOTAL
214.869
SUBTOTAL
2.901
SUBTOTAL
16.548
SUBTOTAL
37.729
272.047
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACINSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,7 : VESTIDA DE ESTRUCTURA RETENCIN, R - 550UNIDAD : UN
I - MATERIALESDESCRIPCINCruceta metlica de 3/16" x 2 1/2" x 2 m.Diagonal metlica en V de 1,1 m.Aislador de suspensin de 6 1/2" ANS 52-1Grapa de retencin ACSR N 4 - 2/0Tuerca de ojo de 5/8" alargadaPerno de mquina 1/2" X 2"Perno de mquina 5/8" X 8"Esprrago de 5/8" X 10"Arandela redonda de 1/2"Arandela de presin de 1/2"Arandela redonda de 5/8"Arandela de presin de 5/8" '
II - EQUIPO Y HERRAMIENTADESCRIPCINHerramienta menor linieros
III - TRANSPORTEDESCRIPCINCamin 350
IV - MANO DE OBRADESCRIPCINCapatazElectricistaAyudante
UNIDADUNUNUNUNUNUNUNUNUNUNUNUN
TIPO
UNIDAD
JORNAL53.72754.29925.132
CANTIDAD2293341344
1313
TARIF./DIA17.408
TARIF./DIA550.054
FAC. PRES.1,71,71,7
VR. UNIT.61.43726.23729.37418.9816.610
9943.2005.574
253171605226
RENDIMIEN.4
RENDIMIEN.24,919
RENDIMIEN.4
44
VR. PARC.122.87452.474
264.36656.94319.8303.9763.200
16.7221.012
6847.8652.938
VR. PARC.4.352
VR. PARC.22.074
VR. PARC.22.83423.07710.681
TOTAL COSTOS DIRECTOS
SUBTOTAL
552.884
SUBTOTAL
4.352
SUBTOTAL
22.074
SUBTOTAL
56.592
635.902
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACINSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN, BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1 ,8 : VESTIDA DE ESTRUCTURA RETENCIN, R - 560UNIDAD : UN
I - MATERIALESDESCRIPCIN
Cruceta metlica de 3/16" x 2 1/2" x 2 m.Diagonal metlica en V de 1 ,1 m.Espiga para extremo de poste - 13,2 KVAislador espiga de 13.2 KVANSI 55-5Aislador de suspensin de 6 1/2" ANS 52-1Grapa de retencin ACSR N 4 - 2/0Tuerca de ojo de 5/8" alargadaPerno de mquina 1/2" X 2"Perno de mquina 5/8" X 8"Esprrago de 5/8" X 10"Arandela redonda de 1/2"Arandela de presin de 1/2"Arandela redonda de 5/8"Arandela de presin de 5/8"
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor unieras
III - TRANSPORTEDESCRIPCIN
Camin 350
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaAyudante
UNIDADUNUNUNUNUNUNUNUNUNUNUNUNUNUN
TIPO
UNIDAD
JORNAL53.72754.29925.132
CANTIDAD22111866433441515
TARIF./DIA17.408
TARIF./DIA550.054
FAC. PRES.1,71,71,7
VR. UNIT.61.43726.23711.64822.66129.37418.9816.610994
3.2005.574253171605226
RENDIMIEN.3
RENDIMIEN.16,618
RENDIMIEN.333
VR. PARC.122.87452.47411.64822.661528.732113.88639.6603.9769.60016.7221.012684
9.0753.390
VR. PARC.5.803
VR. PARC.33.100
VR. PARC.30.44530.76914.241
TOTAL COSTOS DIRECTOS
SUBTOTAL
936.394
SUBTOTAL
5.803
SUBTOTAL
33.100
SUBTOTAL
75.455
1.050.752
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACINSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN, BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1 ,9 : VESTIDA DE ESTRUCTURA DE PASO, P - 510UNIDAD : UN
I - MATERIALESDESCRIPCIN
Cruceta metlica de 3/16" x 2 1/2" x 2 m.Diaconal metlica enVde 1,1 m.Espiga para cruceta metlica - 13,2 KVAislador espiga de 13.2 KV ANS 55-5Perno de mquina 1/2" X 2"Perno de mquina 5/8" X 8"Arandela redonda de 1/2"Arandela de presin de 1/2"Arandela redonda de 5/8"Arandela de presin de 5/8"
il - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor linieros
III - TRANSPORTEDESCRIPCIN
Camin 350
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaAyudante
UNIDADUNUNUNUNUNUNUNUNUNUN
TIPO
UNIDAD
JORNAL53.72754.29925.132
CANTIDAD1122222244
TARIF./DIA17.408
TARIF./DIA550.054
PAC. PRES.1,71,71,7
VR. UNIT.61.43726.23713.47122.661
9943.200253171605226
RENDIMIEN.7
RENDIMIEN.39,503
RENDIMIEN.777
VR. PARC.61.43726.23726.94245.3221.9886.400506342
2.420904
VR. PARC.2.487
VR. PARC.13.924
VR. PARC.13.04813-. 1876.103
TOTAL COSTOS DIRECTOS
SUBTOTAL
172.498
SUBTOTAL
2.487
SUBTOTAL
13.924
SUBTOTAL
32.338
221.247
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADQ, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,10 : VESTIDA DE ESTRUCTURA DE PASO EN NGULO, P- 512UNIDAD : UN
I - MATERIALESDESCRIPCIN
Cruceta metlica de 3/16" x 2 1/2" x 2 m.Diagonal metlica en V de 1,1 m.Espiga para cruceta metlica - 13,2 KVAislador espiga de 13.2 KV ANS 55-5Perno de mquina 1/2" X 2"Perno de mquina 5/8" X 8"Esprrago de 5/8" x 1 0"Arandela redonda de 1/2"Arandela de presin de 1/2"Arandela redonda de 5/8"Arandela de presin de 5/8"
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor Jinieros
III - TRANSPORTEDESCRIPCIN
Camin 350
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaAyudante
UNIDADUNUNUNUNUNUNUNUNUNUNUN
TIPO
UNIDAD
JORNAL53.72754.29925.132
CANTIDAD2244422441414
TARIF./DIA17.408
TARIF./DIA550.054
FAC. PRES.1,71,71,7
VR. UNIT.61.43726.23713.47122.661
9943.2005.574253171605226
RENDIMIEN.6
RENDIMIEN.37,38
RENDIMIEN.666
VR. PARC.122.87452.47453.88490.6443.9766.40011.1481.012684
8.4703.164
VR. PARC.2.901
VR. PARC.14.715
VR. PARC.15.22315.3857.121
TOTAL COSTOS DIRECTOS
SUBTOTAL
354.730
SUBTOTAL
2.901
SUBTOTAL
14.715
SUBTOTAL
37.729
410.075
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,11 : VESTIDA DE ESTRUCTURA RETENCIN, R- 514UNIDAD : UN
I - MATERIALESDESCRIPCIN
Cruceta metlica de 3/16" x 2 1/2" x 1/4" x 2 m.Diagonal metlica en V de 1,1 m.Aislador de suspensin de 6 1/2" ANS 52-1Grapa de retencin ACSR N 4 - 2/0Tuerca de ojo de 5/8" alargadaPerno de mquina 1/2" X 2"Perno de mquina 5/8" X 8"Esprrago de 5/8" X 10"Arandela redonda de 1/2"Arandela de presin de 1/2"Arandela redonda de 5/8"Arandela de presin de 5/8"
II - EQUIPO Y HERRAMIENTADESCRIPCINHerramienta menor linieros
III - TRANSPORTEDESCRIPCINCamin 350
IV - MANO DE OBRADESCRIPCINCapatazElectricistaAyudante
UNIDADUN UNUNUNUNUNUNUNUNUNUNUN
TIPO
UNIDAD
*
JORNAL53.72754.29925132
CANTIDAD2
' 2622422441010
TARIF./DIA17408
TARIF./DIA550054
FAC. PRES.1,71,71,7
VR. UNIT.61.43726.23729.37418.9816.610994
3.2005.574253171605226
RENDIMIEN.5
RENDIMIEN.31,149
RENDIMIEN.555
VR. PARC.122.87452.474176.24437.96213.2203.9766.40011.1481.012684
6.0502.260
VR. PARC.3482
VR. PARC.17659
VR. PARC.18.26718.4628545
TOTAL COSTOS DIRECTOS
SUBTOTAL
434.304
SUBTOTAL
3.482
SUBTOTAL
17.659
SUBTOTAL
45.274
500.719
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAYAREA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,12 : VESTIDA DE ESTRUCTURA RETENCIN, R - 515UNIDAD : UN
I - MATERIALESDESCRIPCIN
Cruceta metlica de 3/16" x 2 1/2" x 2 m.Diagonal metlica en V de 1 ,1 m.Aislador de suspensin de 6 1/2" ANS 52-1Grapa de retencin ACSR N 4 - 2/0Tuerca de ojo de 5/8" alargadaPerno de mquina 1/2" X 2"Perno de mquina 5/8" X 8"Esprrago de 5/8" X 10"Arandela redonda de 1/2"Arandela de presin de 1/2"Arandela redonda de 5/8"Arandela de presin de 5/8"
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor linieros
III - TRANSPORTEDESCRIPCIN
Camin 350
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaAyudante
UNIDADUNUNUNUNUNUNUNUNUNUNUNUN
TIPO
UNIDAD
JORNAL53.72754.29925.132
CANTIDAD221244422441010
TARIF./DIA17.408
TARIF./D1A550.054
FAC. PRES.1,71,71,7
VR. UNIT.61.43726.23729.37418.9816.610994
3.2005.574253171605226
RENDIMIEN.4
RENDIMIEN.24,919
RENDIMIEN.444
VR. PARC.122.87452.474
352.48875.92426.4403.9766.40011.1481.012684
6.0502.260
VR. PARC.4.352
VR. PARC.22.074
VR. PARC.22.83423.07710.681
TOTAL COSTOS DIRECTOS
SUBTOTAL
661.730
SUBTOTAL
4.352
SUBTOTAL
22.074
SUBTOTAL
56.592
744.748
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,13: VESTIDA DE ESTRUCTURA DE ARRANQUE, NORMA 730UNIDAD : UN
I - MATERIALESDESCRIPCIN
Cruceta metlica de 3/16" x 2 1/2" x 2 m.Diagonal metlica en V de 1 ,1 m.Cortacircuito de 15 KV, 10 KAAislador de suspensin de 6 1/2" ANS 52-1Grapa de retencin ACSR N 4 - 2/0Tuerca de ojo de 5/8" alargadaFusible de 15 KV, 5 a 15 A, tipo TPerno de mquina 1/2" X 2"Perno de mquina 5/8" X 8"Esprrago de 5/8" X 10"Arandela redonda de 1/2"Arandela de presin de 1/2"Arandela redonda de 5/8"Arandela de presin de 5/8"Collarn de 5" - 6" - 2 salidasCinta bandit de 5/8"Hebilla cinta bandit 5/8"Kid Sistema puesta tierra Varilla Cobrizada
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor Unieras
III - TRANSPORTEDESCRIPCIN
Camin 350
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaDos (2) Ayudantes
UNIDADUNUNUNUNUNUNUNUNUNUNUNUNUNUNUNMLUNUN
TIPO
UNIDAD
JORNAL53.72754.29950.264
CANTIDAD22393337137713
' 132121
TARIF./DIA17.408
TARIF./DIA550.054
FAC. PRES.1,71,71,7
VR. UNIT.61.43726.237154.06729.37418.9816.6102.775994
3.2005.574253171605226
15.5573.8061.122
1 60.456
RENDIMIEN.3
RENDIMIEN.30
RENDIMIEN.333
VR. PARC.122.87452.474
462.201264.36656.94319.8308.3256.9583.20016.7221.7711.1977.8652.93831.1143.8062.244
160.456
VR. PARC.5.803
VR. PARC.18.335
VR. PARC.30.44530.76928.483
TOTAL COSTOS DIRECTOS
SUBTOTAL
1.225.284
SUBTOTAL
5.803
SUBTOTAL
18.335
SUBTOTAL
89.697
1.339.120
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSiANAN, BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,14 : VESTIDA DE ESTRUCTURA DE ARRANQUE, NORMA 731UNIDAD : UN
I - MATERIALESDESCRIPCIN
Cruceta metlica de 3/16" x 2 1/2" x 2 m.Diagonal metlica en V de 1,1 m.Cortaoircuito de 15 KV, 10 KAAislador de suspensin de 6 1/2" ANS 52-1Grapa de retencin ACSR N 4 - 2/0Tuerca de ojo de 5/8" alargadaFusible de 15 KV, 5 a 15 A, tipo TPerno de mquina 1/2" X 2"Perno de mquina 5/8" X 8"Esprrago de 5/8" X 10"Arandela redonda de 1/2"Arandela de presin de 1/2"Arandela redonda de 5/8"Arandela de presin de 5/8"Collarn de 5" - 6" - 2 salidasCinta bandit de 5/8"Hebilla cinta bandit 5/8"Kid Sistema puesta tierra Varilla Cobrizada
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor Unieras
III - TRANSPORTEDESCRIPCIN
Camin 350
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaDos (2) Ayudantes
UNIDADUNUNUNUNUNUNUNUNUNUNUNUNUNUNUNMLUN
. UN
TIPO
UNIDAD
JORNAL53.72754.29950.264
CANTIDAD22262226226610102121
TARIF./DIA17.408
TARIF./DIA550.054
FAC. PRES.1,71,71,7
VR. UNIT.61.43726.237154.06729.37418.9816.6102.775994
3.2005.574253171605226
15.5573.8061.122
160.456
RENDIMIEN.5
RENDIMIEN.30
RENDIMIEN.555
VR. PARC.122.87452.474308.134176.24437.96213.2205.5505.9646.40011.1481.5181.0266.0502.26031.1143.8062.244
160.456
VR. PARC.3.482
VR. PARC.18.335
VR. PARC.18.26718.46217.090
TOTAL COSTOS DIRECTOS
SUBTOTAL
948.444
SUBTOTAL
3.482
SUBTOTAL
18.335
SUBTOTAL
53.819
1.024.081
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,15 : INSTALACIN DE TEMPLETE DE MEDIA TENSINUNIDAD : UN
I - MATERIALESDESCRIPCIN
Varilla de anclaj^de 5/8" x 1 .8 mts.Arandela cuadrada de 4" x 4" x 1/4"Aislador tipo tensor de 4 1/4"Vigueta de ferroconcretoGrapa prensahilos RL 1 1Guardacabo de 1/2"Cable de acero extrarreforzado de 1/4"
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor unieres
III - TRANSPORTEDESCRIPCIN
Camin 350
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaAyudante
UNIDADUNUNUNUNUNUNML
TIPO
UNIDAD
JORNAL53.72754.29925.132
CANTIDAD111141
18
TAR1F./DIA17.408
TARIF./DIA550.054
FAC. PRES.1,71,71,7
VR. UNIT.21.3803.63715.60816.19211.1111.4581.628
RENDIMIEN.4,5
RENDIMIEN.127,97
RENDIMIEN.4,54,54,5
VR. PARC.21.3803.63715.60816.19244.4441.458
29.304
VR. PARC.3.868
VR. PARC.4.298
VR. PARC.20.29720.5139.494
TOTAL COSTOS DIRECTOS
SUBTOTAL
132.023
SUBTOTAL
3.868
SUBTOTAL
4.298
SUBTOTAL
50.304
190.493
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,16 : RED DE MEDIA TENSIN 30 EN CABLE ACSR ( 3 x N 2)UNIDAD : ML
I - MATERIALESDESCRIPCIN
Cable ACSR N 2
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor UnierasHerramienta tensionado linea
III - TRANSPORTEDESCRIPCIN
Camin 350Tractor+Zorro
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaAyudante
UNIDADML
TIPO
UNIDAD
JORNAL' 53.727
108.59850.264
CANTIDAD3,15
TAR1F./DIA17.40843.518
TARIF./DIA550.05455.485
FAC. PRES.1,71,71,7
VR. UNIT.1.700
RENDIMIEN.120120
RENDIMIEN.1000.
475,42
RENDIMIEN.120120120
VR. PARC.5.355
VR. PARC.145363
VR. PARC.550117
VR. PARC.761
1.538712
TOTAL COSTOS DIRECTOS
SUBTOTAL
5.355
SUBTOTAL
508
SUBTOTAL
667
SUBTOTAL
3.011
9.541
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASNARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,17: RED DE MEDIA TENSIN 20 EN CABLE ACSR ( 2 x N 2 )UNIDAD : ML
I - MATERIALESDESCRIPCIN
Cable ACSR N 2
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor llnlerosHerramienta tensionado linea
III - TRANSPORTEDESCRIPCIN
Camin 350Traotor+Zorro
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaAyudante
UNIDADML
TIPO
UNIDAD
JORNAL53.727108.59850.264
CANTIDAD2,1
TARIF./DIA17.40843.518
TARIF./DIA550.05455.485
FAC. PRES.1,71,71,7
VR. UNIT.1.700
RENDIMIEN.172172
RENDIMIEN.1000550
RENDIMIEN.172172172
VR. PARC.3.570
VR. PARC.101253
VR. PARC.550101
VR. PARC.531
1.073497
TOTAL COSTOS DIRECTOS
SUBTOTAL
3.570
SUBTOTAL
354
SUBTOTAL
651
SUBTOTAL
2.101
6.676
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 1,19 y 2,8 : DESPEJE CORREDOR DE LINEA DE M.T.UNIDAD : ML
I - MATERIALESDESCRIPCIN
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Motosierra, hacha y equipo de desmonte
III - TRANSPORTEDESCRIPCIN
Campero (Transporte de herramienta)
IV - MANO DE OBRADESCRIPCINCapataz
Cuadrilla de Obreros
UNIDAD
UNIDAD
UNIDAD
JORNAL53.72783.776
CANTIDAD
TARIF./DIA51.168
TARIF./DIA125.063
FAC. PRES.1,71,7
VR. UNIT.
RENDIMIEN.0,8
RENDIMIEN.17,06
RENDIMIEN.1,21,2
VR. PARC.0
VR. PARC.63.960
VR. PARC.7331
VR. PARC.109.603170.903
TOTAL COSTOS DIRECTOS
SUBTOTAL
0
SUBTOTAL
63.960
SUBTOTAL
7.331
SUBTOTAL
280.506
351.797
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 2.1 : Replanteo red baja tensinUNIDAD : UN
I - MATERIALESDESCRIPCIN
.II - EQUIPO Y HERRAMIENTADESCRIPCIN
Equipo de topografa
III - TRANSPORTEDESCRIPCIN
Campero
IV - MANO DE OBRADESCRIPCIN
Comisin de topografaCapataz
UNIDAD
TIPO
UNIDAD
JORNAL345.38353.727
CANTIDAD
TARIF./DIA350.652
TARIF./DIA125.063
FAC. PRES.1,71,7
VR. UNIT.
RENDIMIEN.3
RENDIMIEN.2
RENDIMIEN.33
VR. PARC.
VR. PARC.116.884
VR. PARC.62.532
VR. PARC.195.71730.445
TOTAL COSTOS DIRECTOS
SUBTOTAL
SUBTOTAL
116.884
SUBTOTAL
62.532
SUBTOTAL
226.162
405.578
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 2,3: APERTURA DE HUECO PARA POSTE O TEMPLETE DE B.T.UNIDAD : UN
I - MATERIALES- DESCRIPCIN
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor obreros
III - TRANSPORTEDESCRIPCIN
Campero
IV - MANO DE OBRADESCRIPCIN
CapatazObreroObrero
UNIDAD
TIPO
UNIDAD
JORNAL53.72720.94420.944
CANTIDAD
TARIF./DIA17.408
TARIF./D1A125.063
FAC. PRES.1,71,71,7
I
VR. UNIT.
RENDIMIEN.6
RENDIMIEN.31,39
RENDIMIEN.666
VR. PARC.0
VR. PARC.2.901
VR. PARC.3.984
VR. PARC.15.2235.9345.934
TOTAL COSTOS DIRECTOS
SUBTOTAL
0
SUBTOTAL
2.901
SUBTOTAL
3.984
SUBTOTAL
27.091
33.976
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 2,4 : POSTE DE FERROCONCRETO DE 8 MTS. x 510 KGF.. UNIDAD : UN
- MATERIALESDESCRIPCIN
Poste ferroconcreto 8 mts. x 510 Kgf.
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor linierosGra
III - TRANSPORTEDESCRIPCIN
Tractocamlon para transporte de postes por vas: primarias y secundarias con puentes con capacidadmxima de 30 toneladas!Carromacho para transporte de postes por vasterciarias con puentes con capacidad mxima de15 toneladasTractor para transporte de postes por sabanaabierta sin vas, mxima capacidad de transporteun poste por vez
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaPareja de Ayudantes
UNIDADUN
TIPO
UNIDAD
1
1
1
JORNAL .53.72754.29950.264
CANTIDAD1
TARIF./DIA17.408
358.175
TARIF./DIA
1.200.000
580.000
153.059
FAC. PRES.1,71,71,7
VR. UNIT.289.815
RENDIMIEN.55
RENDIMIEN.
23
10
6
RENDIMIEN.555
VR. PARC.289.815
VR. PARC.3.482
71.635
VR. PARC.
52.174
58.000
25.510
VR. PARC.18.26718.46217.090
TOTAL COSTOS DIRECTOS
SUBTOTAL
289.815
SUBTOTAL
75.117
SUBTOTAL
135.684
SUBTOTAL
53.819
554.435
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN, BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 2,5 : POSTE DE FERROCONCRETO DE 8 MTS. x 1.050 KGF.UNIDAD : UN
I - MATERIALESDESCRIPCIN
Poste de ferroconcreto de 8 mts. x 1.050 Kgf.
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor unierasGra
III - TRANSPORTEDESCRIPCIN
CamabajaTractor+Zorro
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaAyudante
UNIDADUN
TIPO
UNIDAD11
JORNAL53.72754.29950.264
CANTIDAD1
TARIF./DIA17.408
358.175
TARIF./DIA700.00055.485
FAC. PRES.1,71,71,7
VR. UNIT.350.000
RENDIMIEN.44
RENDIMIEN.r 8
1,7
RENDIMIEN.444
VR. PARC.350.000
VR. PARC.4.35289.544
VR. PARC.87.50032.638
VR. PARC.22.83423.07721.362
TOTAL COSTOS DIRECTOS
SUBTOTAL
350.000
SUBTOTAL
93.896
SUBTOTAL
120.138
SUBTOTAL
67.273
631.307
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACINSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN,BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE,
ANLISIS DE PRECIOS UNITARIOS
TEM 2,6 : INSTALACIN DE TEMPLETE DE BAJA TENSINUNIDAD : UN
I - MATERIALESDESCRIPION
Varilla de anclaje de 5/8" x 1.5 mts.Arandela cuadrada de 4" x 4" x 1/4"Vigueta de ferroconcretoGrapa prensahilos RL 1 1Guardacabo de 1/2"Cable de acero extrarreforzado de 1/4"
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor Unieras
III - TRANSPORTEDESCRIPCIN
amin 350
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaAyudante
UNIDADUNUNUNUNUNML
TIPO
UNIDAD
JORNAL53.72754.29925.132
CANTIDAD11121
12
TARIF./D1A17.408
TARIF./DIA550.054
FAC. PRES.1,71,71,7
VR. UNIT.18.2973.63716.19211.1111.4581.628 '
RENDIMIEN.6
RENDIMIEN.66,299
RENDIMIEN.666
VR. PARC.18.2973.63716.19222.2221.458
19.536
VR. PARC.2.901
VR. PARC.8.297
VR. PARC.15.22315.3857.121
TOTAL COSTOS DIRECTOS
SUBTTAL
81.342
SUBTTAL
2.901
SUBTTAL
8.297
[ SUBTTAL
37.729
130.269
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 2,6 : CIMENTACIN POSTE EXTRAREFORZADO DE B.T.UNIDAD : UN
I - MATERIALESDESCRIPCIN
Concreto
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor obreros
III - TRANSPORTEDESCRIPCIN
transporte general
IV - IMANO DE OBRADESCRIPCINCapataz
Pareja de Obreros
UNIDADM3
TIPO
UNIDAD
JORNAL53.72741.888
CANTIDAD0,2
TARIF./DIA17.408
TARIF./DIA550.054
FAC. PRES.1,71,7
VR. UNIT.312.000
RENDIMIEN.14
RENDIMIEN.120
RENDIMIEN.1414
VR. PARC.62.400
VR. PARC.1.243
VR. PARC.4.584
VR. PARC.6.5245.086
TOTAL COSTOS DIRECTOS
SUBTOTAL
62.400
SUBTOTAL
1.243
SUBTOTAL
4.584 '
SUBTOTAL
11.610
79.837
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 WIVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 3.1 : ESTRUCTURA DE SUSPENSIN, LA 320 CON CAJA DE 8 ACOMETIDASUNIDAD : UN
I - MATERIALESDESCRIPCIN
Amarre Plstico para cable trenzadoCable de cobre trenzado para derivacin 3 x 2 + 1N 4 AWGCaja trifsica tipo Intemperie de derivacin 8acometidasCinta de acero inoxidable 5/8" x 0,03"
Conectar de tornillo con chaqueta aislante, tipo 2
Grapa de suspensin para cable trenzado de B.T.Hebilla de acero Inoxidable 5/8"Perno de ojo abierto de 5/8" x 10", completo
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor linieros
III - TRANSPORTEDESCRIPCIN
campero
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaPareja de Ayudantes
UNIDADUN
ML
UNML
UN
UNUNUN
TIPO
UNIDAD
JORNAL53.72754.29925.132
CANTIDAD2
2
12
4
121
TARIF./DIA17.408
TARIF./DIA125.063
FAC. PRES.1,71,71,7
VR. UNIT.417
18.758
137.7723.806
9.775
16.6341.1225.676
RENDIMIEN.7
RENDIMIEN.27,42
RENDIMIEN.777
VR. PARC.834
37.516
137.7727.612
39.100
16.6342.244 5.676
VR. PARC.2.487
VR. PARC.4.561
VR. PARC.13.04813.1876.103
TOTAL COSTOS DIRECTOS
SUBTOTAL
247.388
SUBTOTAL
2.487
SUBTOTAL
4.561
SUBTOTAL
32.338
286.774
UNITARIOS
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACION SUBESTACINBELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, EL SOCORRO Y SAN JOAQUNDE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 3,2:SUMINISTRO E INSTALACIN DE ESTRUCTURA NORMA LA 321UNIDAD:UN
1. MATERIALESDESCRIPCINAmarre Plstico para cable trenzadoGrapa de retencin para cable trenzado de B.T.Perno de ojo tipo 2 de 5/8" x 10" completoConectar de tornillo con chaqueta aislante, tipo 2Conectar de tornillo con chaqueta aislante, tipo 4Tapn sellador de cable 4/0 AWGCaja- trifsica tipo intemperie de derivacin 8 acometidasCable de cobre trenzado para derivacin 3 x 2 + 1 N 4 AWGHebilla de acero inoxidable 5/8"Cinta de acero inoxidable 5/8" x 0,03"
II. EQUIPO Y HERRAMIENTADESCRIPCINHerramienta menor linieros
III. TRANSPORTEDESCRIPCINcampero
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaAyudante
UNIDADUNUNUNUNUNUNUNMLUNML
TIPO
UNIDAD
JORNAL53.72754.29925.132
CANTIDAD3114141622
TARIFA/DA17408
TARIFA/DA125063
FAC. PRES.1,71,71,7
VR. UNITARIO417
26.1155.6769.775
11.0175.240
- 137.77218.7581.1223.806
RENDIMIENTO6
RENDIMIENTO22,54
RENDIMIEN.566
VR. PARCIAL1.251
26.1155.676
39.10011.01720.960
137.772112.548
2.2447.612
VR. PARCIAL2.901
VR. PARCIAL5.548
VR. PARC.15.22315.3857.121
TOTAL COSTO DIRECTO:
SUB TOTAL:
364.295
SUB TOTAL:
2.901
5.548
SUB TOTAL
37.729
410.473
Pgina 1
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BLGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 3,4: ESTRUCTURA DE SUSPENSIN, LA 324 CON CAJA DE 8 ACOMETIDAS
UNIDAD : UN
I - MATERIALESDESCRIPCIN
Amarre Plstico para cable trenzadoCable de cobre trenzado para derivacin 3 x 2 + 1 l\a trifsica tipo Intemperie de derivacin 8 acorn
Cinta de acero inoxidable 5/8" x 0,03"Conectar de tornillo con chaqueta aislante, tipo 2Grapa de retencin aislada para cable trenzado de Hebilla de acero Inoxidable 5/8"Perno de ojo tipo 2 de 5/8" x 1 0", completo
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor Unieras
III - TRANSPORTEDESCRIPCIN
Campero
IV - MANO DE OBRADESCRIPCIN
ElectricistaDos (2) Ayudantes
UNIDADUNMLUNMLUNUNUNUN
TIPO
UNIDAD
JORNAL54.29950.264
CANTIDAD22124222
VR. UNIT.1417
$18,758_J137.-772
$3,806$9.775
$26.115$1.122$5.676
TARIF./DIA17.408
TARIF./DA125.063
FAC. PRES.1,71,7
RENDIMIEN.5
RENDIMIEN.8
REND1MIEN.55
VR. PARC.834
37.516137.7727.612
39.10052.2302.24411.352
VR. PARC.3.482
VR. PARC.15.633
VR. PARC.18.46217.090
TOTAL COSTOS DIRECTOS
SUBTOTAL
288.660
SUBTOTAL
3.482
SUBTOTAL
15.533
SUBTOTAL
35.552
343.327
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACION SUBESTACINBELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN, BELGRADO, EL SOCORRO Y SANJOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 3,5:SUMlNISTRO E INSTALACIN DE ESTRUCTURA NORMA LA 329UNIDAD:UN
I. MATERIALESDESCRIPCINAmarre Plstico para cable trenzadoGrapa de suspensin para cable trenzado de B.T.Perno de ojo abierto de 5/8" x 10", completo
II. EQUIPO Y HERRAMIENTADESCRIPCINHerramienta menor Nnieros
III. TRANSPORTEDESCRIPCIN
campero
IV. MANO DE OBRADESCRIPCINElectricistaPareja de ayudantes
UNIDADUNUNUN
TIPO
UNIDAD
JORNAL54.29950.264
CANTIDAD211
TARIFA/DA17408
TARIFA/DA125063
FAC. PRES.1,71,7
VR. UNITARIO417
16.6345.676
RENDIMIENTO8
RENDIMIENTO22,54
RENDIMIENTO88
VR. PARCIAL834
16.6345.676
VR. PARCIAL2.176
VR. PARCIAL5.548
VR. PARCIAL11.53910.681
TOTAL COSTO DIRECTO:
SUB TOTAL:
23.144
SUB TOTAL:
2.176
5548
SUB TOTAL:
22.220
53.088
UNITARIOS
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 WIVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 3,6 : RED DE BAJA TENSIN 30 - 4 HILOS TRENZADA CABLE ALUMINIO XLPE (2 x 35 mm2 + 1 x 35 mm2)UNIDAD: mi
I. MATERIALESDESCRIPCIN
CABLE ALUMINIO XLPE (2 x 35mm2 + 1 x 35 mm2)
II. EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor linierosHerramienta tensionado lnea
III. TRANSPORTEDESCRIPCIN
caminZorro
IV. MANO DE OBRADESCRIPCIN
CapatazDos (2) Ayudantes
UNIDADML
TIPO
UNIDAD
JORNAL53.72750.264.
CANTIDAD1,05
TARIFA/DA$17.408$43.518
TARIFA/DAS550.054
$55.485
FAC. PRES.1,701,70
VR. UNITARIO- $11.802
RENDIMIENTO150,00150,00
RENDIMIENTO400,00177,00
RENDIMIENTO70,0070,00
VR. PARCIAL$12.392
VR. PARCIAL$116$290
VR. PARCIAL$1.375
$313
VR. PARCIAL$1.305$1.221
TOTAL COSTO DIRECTO:
SUB TOTAL:
$12.392
SUB TOTAL:
$406
SUB TOTAL:
$1.688
SUB TOTAL:
$2.526
$17.012
Pgina 1
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACION SUBESTACINBELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, EL SOCORRO Y SAN JOAQUNDE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 3,7:Sumnstro e instalacin de puesta a tierra para Terminal de ramal en baja tensin en acero inoxidableUNIDAD:UN
I. MATERIALESDESCRIPCINkit sistema de puesta a tierra para neutro en elsecundario en acero inoxidable.Electrodo tipo varilla en acero inoxidable 10 mm 0 x 1.8m
U. EQUIPO Y HERRAMIENTADESCRIPCINHerramienta menor linieros
III. TRANSPORTEDESCRIPCIN
Camin 350
IV. MANO DE OBRADESCRIPCINElectricistaPareja de ayudantes
UNIDAD
UN'UN
TIPO
UNIDAD
JORNAL54.29950.264
CANTIDAD
1
1
TARIFA/DA17408
TARIFA/DA550054
FAC. PRES.1,71,7
VR. UNITARIO
87.153
50.164
RENDIMIENTO8
RENDIMIENTO30
RENDIMIENTO66
VR. PARCIAL
87.153
50.164
VR. PARCIAL2.176
VR. PARCIAL18.335
VR. PARCIAL15.38514.241
TOTAL COSTO DIRECTO:
SUB TOTAL:
137.317
SUB TOTAL:
2.176
18.335
SUB TOTAL:
29.626
187.454
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN, BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 4,1 : TRANSFORMADOR 10 DE 5 KVA, 13.200 / 240 -120 V, NORMA 710UNIDAD : UN
I --MATERIALESDESCRIPCIN
Transformador 10 de 5 KVACruceta metlica de 3/16" x 2 1/2" x 2 m.Diagonal metlica en V de 1 ,1 m.Cortacircuito de 1 5 KV, 1 0 KAPararrayos de ZnO, 12 KV, 10 KAFusible de 15 KV, 1 a 5 A, Tipo HCollarn para transformadorCable de cobre THW N 6Cable de cobre THW N 8Conectar bimetlico de 2 pernosPerno de mquina 1/2" X 2"Perno de mquina 5/8" X 8"Esprrago de 5/8" X 10"Arandela redonda de 1/2"Arandela de presin de 1/2"Arandela redonda de 5/8"Arandela de presin de 5/8"
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor limerosGra
III - TRANSPORTEDESCRIPCIN
iTractocamln 350 para transporte de materiales;por vas carreteabies primarias y secundarias conpuentes con capacidad mxima de 30 tonCarromacho para transporte de postes por viasterciarias puetes con capacidad mxima de 15toneladasTractor para transporte de transformadores enzonas de sabana no carretables
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaDos (2) AyudantesDos (2) Obreros
UNIDADUNUNUNUNUNUNUNMLMLUNUNUNUNUNUNUNUN
TIPO
UNIDAD
1
1
1
JORNAL53.72754.29950.26441.888
CANTIDAD1222222423822881010
TARIF./DIA17.408
358.175
TARIF./DIA
1.200.000
580.000
156.000
FAC. PRES.1,71,71,71,7
VR. UNIT.1.798.000
61.43726.237154.067168.6402.77529.2146.0114.1446.335994
3.2005.574253171605226
RENDIMIEN.0,082
RENDIMIEN.
9
4
1
RENDIMIEN.1111
VR. PARC.1.798.000122.87452.474308.134337.2805.55058.42824.0448.28819.0057.9526.40011.1482.0241.3686.0502.260
VR. PARC.217.600179.088
VR. PARC.
133.333
145.000
156.000
VR. PARC.91.33692.30885.44971.210
TOTAL COSTOS DIRECTOS
SUBTOTAL
2.771.279
SUBTOTAL
396.688
SUBTOTAL
434.333
SUBTOTAL
340.303
3.942.603
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DEMEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAYAREA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 4,2 : TRANSFORMADOR 10 DE 1 5 KVA, 13.200 / 240 -120 V, NORMA 710UNIDAD : UN
- MATERIALESDESCRIPCIN
Transformador 10 de 15 KVACruceta metlica de 3/16" x 2 1/2" x 2 m.Diagonal metlica en V de 1,1 m.Cortacircuito de 15 KV, 10 KAPararrayos de ZnO, 12 KV, 10 KAFusible de 1 5 KV, 1 a 5 A, Tipo HCollarn para transformadorCable de cobre THW N 6Cable de cobre THW N 8Conector bimetlico de 2 pernosPerno de mquina 1/2" X 2"Perno de mquina 5/8" X 8"Esprrago de 5/8" X 10"Arandela redonda de 1/2"Arandela de presin de 1/2"Arandela redonda de 5/8"Arandela de presin de 5/8"
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor linierosGra
III - TRANSPORTEDESCRIPCIN
Tractocamion para transporte detransformadorespor vias primarias y secundarias con puentes concapacidad mxima de 30 toneladasCarromacho para transporte de transformadorespor vias terciarias con puentes con capacidadmxima de 15 toneladasTractor para transporte de transformadores porsabana abierta sin vias, mxima capacidad detransporte un poste por vez
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaDos (2) AyudantesDos (2) Obreros
UNIDADUNUNUNUNUNUNUNMLMLUNUNUNUNUNUNUNUN
TIPO
UNIDAD
1
1
1
JORNAL53.72754.29950.26441.888
CANTIDAD122222242382288
1010
TARIF./DIA17.408
358.175
TARIF./DIA
1.200.000
580.000
156.000
FAC. PRES.1,71,71,71,7
VR. UNIT.2.250.280
61.43726.237154.067168.6402.77529.2146.0114.1446.335994
3.2005.574253171605226
RENDIMIEN.0,091,86
RENDIMIEN.
8
4
1
RENDIMIEN.1111
VR. PARC.2.250.280122.87452.474308.134337.2805.550
58.42824.0448.28819.0057.9526.40011.1482.0241.3686.0502.260
VR. PARC.193.422192.567
VR. PARC.
150.000
145.000
156.000
VR. PARC.91.33692.30885.44971.210
TOTAL COSTOS DIRECTOS
SUBTOTAL
3.223.559
SUBTOTAL
385.989
SUBTOTAL
451.000
SUBTOTAL
340.303
4.400.851
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GAR1BAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 4,3 : TRANSFORMADOR 10 DE 25 KVA, 13.200 / 240 - 120 V, NORMA 710UNIDAD : UN
I - MATERIALESDESCRIPCIN
Transformador 10 de 25 KVACruceta metlica de 3/1 6" x 2 1/2" x 2 m.Diagonal metlica en V de 1,1 m.Cortacircuito de 15 KV, 10 KAPararrayos de ZnO, 12 KV, 10 KAFusible de 15 KV, 1 a 5 A, Tipo HCollarn para transformadorCable de cobre THWN. 2Cable de cobre THW N 4Conectar bimetlico de 2 pernosPerno de mquina 1/2" X 2"Perno de mquina 5/8" X 8"Esprrago de 5/8" X 10"Arandela redonda de 1/2"Arandela de presin de 1/2"Arandela redonda de 5/8"Arandela de presin de 5/8"
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor linlerosGra
III - TRANSPORTEDESCRIPCIN
Camin 350
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaDos (2) AyudantesDos (2) Obreros
UNIDADUNUNUNUNUNUNUNMLMLUNUNUNUNUNUNUN
. UN
TIPO
UNIDAD .
JORNAL53.72754.29950.26441.888
CANTIDAD1222222423822881010
TARIF./DIA17.408
358.175
TARIF./DIA550.054
FAC. PRES.1,71,71,71,7
VR. UNIT.3.500.045
61.43726.237154.067168.6402.77529.21414.0119.1006.335994
3.2005.574253171605226
RENDIMIEN.0,12
RENDIMIEN.2
RENDIMIEN.1111
VR. PARC.3.500.045122.87452.474308.134337.2805.55058.42856.04418.20019.0057.9526.40011.1482.0241.3686.0502.260
VR. PARC.174.080179.088
VR. PARC.275.027
VR. PARC.91.33692.30885.449 71.210
TOTAL COSTOS DIRECTOS
SUBTOTAL
4.515.236
SUBTOTAL
353.168
SUBTOTAL
275.027
SUBTOTAL
340.303
5.483.734
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 4,4: Suministro e Instalacin de puesta a tierra en acero inoxidableUNIDAD : UN
I - MATERIALESDESCRIPCIN
Klt puesta a tierra para pararrayos ytransformadores de distribucin en aceroInoxidable. Incluye: Conductor Bajantedescargadores y transformador (1 m 7/8"xmsg18 (1 .2 mm)), cuatro abrazadera de 3/8" x 1.2,cuatro conectores (Juego de tomillos + ochoarandelas), Conectar ajustable para electrodo tipovarilla de 10 mm y una varilla en acero inoxidablede 10 mm dimetro x 2.4 m de longitud.
Conductorconector entre pararrayos de 2.4 m x7/8" msg 18 (1.2 mm) en acero Inoxidable.contrapeso tipo linea o similar que incluye tresconductores tipo fleje de acero inoxidable 304 de2.4 m de largo x 22.2 mm de ancho x 1 .2 mm deespesor, tres varilla en acero inoxidable de 2.4 m ycuatro conectores ajustable de presin ripo u.
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor
III - TRANSPORTEDESCRIPCIN
Camin 350
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaAyudante
UNIDAD
GL
un
gi
TIPO
UNIDAD
JORNAL53.72754.29950.264
CANTIDAD
1
2
1
TARIF./DIA17.408
TARIF./DIA550.054
FAC. PRES.1,71,71,7
VR. UNIT.
108.069
26.913
321.220
RENDIMIEN.4
RENDIMIEN.8,3
RENDIMIEN.333
VR. PARC.
108.069
53.826
321.220
VR. PARC.4.352
VR. PARC.66.272
VR. PARC.30.44530.76928.483
TOTAL COSTOS DIRECTOS
SUBTOTAL
483.115
SUBTOTAL
4.352
SUBTOTAL
66.272
SUBTOTAL
89.697
643.436
fOBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACIONSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 5,1: TRANSFORMADOR 30 DE 1 000 KVA, 34500/1 3.200 VUNIDAD : UN
I - MATERIALESDESCRIPCIN
Transformador trifsico de 1 000 KVA 34.500 V /13.800 VVlvula de sobrepresin
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor linieros
^
III - TRANSPORTEDESCRIPCIN
Vehculo Articulado
IV - MANO DE OBRADESCRIPCIN
CapatazElectricistaDos (2) AyudantesDos (2) ObrerosIng. Electricista
UNIDAD
UN
UN
TIPO
UNIDAD
JORNAL53.72754.29950.26441.888
650.000
CANTIDAD
1
2 '
TARIF./D1A80.262
TARIF./DIA0
FAC. PRES.1,71,71,71,71,7
VR. UNIT.
74.193.6002.262.000
RENDIMIEN.0,2
RENDIMIEN.1,2
RENDIMIEN.0,10,10,10,10,5
VR. PARC.
74.193.6004.524.000
VR. PARC.401.310
VR. PARC.0
VR. PARC.913.359923.083854.488712.096
2.210.000
TOTAL COSTOS DIRECTOS
SUBTOTAL
78.717.600
SUBTOTAL
401.310
SUBTOTAL
0
SUBTOTAL
5.613.026
84.731.936
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACINSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 5,2: SUMINISTRO E INSTALACIN DE CENTRO DE TRANSFORMACIN RURAL 34, 5 KV DE 0,5 A 2,0 MVA EQUIPOSNORMA CODENSA CTR 603
UNIDAD : UN
I - MATERIALESDESCRIPCIN
Aislador de suspensin Polimerico 13.2 kvAislador de suspensin Pollmerico 34.5 kvAislador de pin ANS 56-3Varilla de puesta a tierra 5/8" x 2,44 m CuSoldadura exotrmica 150 grGrapa terminal tipo recto para cables 3/0 AWG-266,8 kcmilMetros de cinta de acero Inoxidable 5/8"x 0,03"Hebilla de acero inoxidable de 5/8"Seccionador monopolar400 A 15 kVSeccionador monopolar 600 A 15 kVcable ACSR calibre 266,8 kcmllcable ACSR calibre 4/0 AWGcable ACSR calibre 2/0 AWGCable 2/0 AWG 600 V THHNDescargadores de sobretensin de xido metlico10 kV 10 KaDescargadores de sobretensin de xido metlico30KV 10KAEspigo pin 34.5 kvCortacirculto de cauela con fusible 2 A, 15 kV -100 AAbrazadera de dos salidas ET 432Esprragos de 5/8" x 18"Tor.Carru. ViTuerca hex. V4"Transformador de corriente para neutro deltransformador de Potencia 20 VA, 75-150:5 10P20
Transformador de potencial 25 VA , clase 0,5 12;0kV/O3-120/03VTransformador de potencial 25 VA .clase 0,534,5kV/3-115/3VTmasformador de Corriente 15/30:5 34500 v extConectares y accesorios para conexin de ACSRequiposSoporte para mntale de reconectadorPuntas captaras tipo frankiln
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor Unieras
III - TRANSPORTEDESCRIPCIN
Vehculo Articulado
IV - MANO DE OBRADESCRIPCIN
CapatazElectricista
Dos (2) AyudantesDos (2) ObrerosIng. Electricista
UNIDADUNDUNDUNDUNDUND
UND
MLUNDUNDUNDMLMLMLML
UND
.UNDUND
UND
UNDUNDUNDUND
UND
UND
UND
UND
GBL
UNDUND
TIPO
UNIDAD
JORNAL53.72754.29950.26441.888650.000
CANTIDAD121286
30
30
60120159
308012115
6
9
6
3
527204040
1
3
3
3
1
24
TARIF./DIA80.262
TARIF./DIA0
FAC. PRES.1,71,71.71,71,7
VR. UNIT.39.00052.50069.000135.00019.500
69.0005.250900
469.800565.5007.8005.8503.75021.000
105.000
278.40012.000
135.00014.6187.0501.0501.500
3.977.143
1.885.000
5.220.0001.885.000
2.250.000575.000135.000
RENDIMIEN.0,1
RENDIMIEN.1,2
RENDIMIEN.0,10,10,10,10,6
VR. PARC.468.000630.000552.000810.000585.000
2.070.000315.000103.000
7.047.0005.089.500234.000468.00045.000
2.415.000 .
630.000
2.505.60072.000
405.000760.032
5.076.00042.00060.000
3.977.143
5.655.000
15.660.0005.655.000
2.250.0001.350.000540.000
VR. PARC.802.620
VR. PARC.0
VR. PARC.913.3S9923.083854.488712.096
1.841.667
TOTAL COSTOS DIRECTOS
SUBTOTAL
65.474.275
SUBTOTAL
802.620
SUBTOTAL
0
SUBTOTAL
5.244.693
71.521.588
OBJETO: CONSTRUCCIN REDES DE ENERGA ELCTRICA DE MEDIA, BAJA TENSIN Y REPOTENCIACINSUBESTACIN BELGRADO A 1 MVA 34.500/13800 V PARA LAS VEREDAS BRISAS DEL CUSIANAN.BELGRADO, ELSOCORRO Y SAN JOAQUN DE GARIBAY REA RURAL MUNICIPIO DE MAN CASANARE.
ANLISIS DE PRECIOS UNITARIOS
TEM 5,3: Suministro e instalacin y programacin de Reconectador GVR 15 de 15 kV de tensin mxima, corriente nominal de630 A, corriente de ruptura de 6 kA patentado por WHIPP & BOURNE, modelo standard equipado con rel polar con capacidad demedir corrientes de las fases y tierras con TC's Internos, diseado con microprocesador de bajo consumo; protegido contraambientes severos, equipado con bateras de litio para control, puede ser ajustado desde teclado o display, con puerto serial paradescarga de datos en ambiente Windows, registro y alamcenamlento de datos de las ltimas 20 secuencias, disparos y fallas,puede ser controlado local o remotamente.
UNIDAD : UN
I - MATERIALESDESCRIPCIN
Reconectador GVR 15 de 15 kV de tensinmxima, corriente nominal de 630 A, corriente deruptura de 6 KA patentado por WHIPP & BOURNE,modelo standard equipado con rel polar concapacidad de medir corrientes de las fases ytierras con TC's Internos, diseado conmicroprocesador de bajo consumo; protegidocontra ambientes severos, equipado con baterasde litio para control, puede ser ajustado desdeteclado o display, con puerto serial para descargade datos en ambiente Windows, registro y _alamcenamlento de datos de las ltimas 20secuencias, disparos y fallas, puede sercontrolado local o remotamente.Cruceta metlica de 2 1/2" x 3/16" x 2 metrosDiagonal en V de 1 ,1 m entre huecosSeccionador monopolar de 15 kv. 600 APararrayos de ZnO, 12 KV, 10 KA, tipo lineaCollarn para transformadorCollarn de 6"- 8" de 2 salidasEsparrago galvanizado de 5/8" x 12"Perno de maquina de 1/2"x 2"Torrecilla metlica galvanizada 8 m. x 51 0 Kqf.Arandela redonda de 1/2"Pernos de carriaie de SIS" x 1/2"Cable de cobre desnudo N'2Varilla de cobre 99% de pureza de 5/8" x 2,4 mTubo metlico galvanizado de 1/2" x 3 metrosSoldadura exotrmica de 115 gr.Cinta bandit de 5/8"Hebilla para cinta bandil de 5/8"Tratamiento qumico
II - EQUIPO Y HERRAMIENTADESCRIPCIN
Herramienta menor linierosGra
III - TRANSPORTEDESCRIPCIN
Camin 350
IV - MANO DE OBRADESCRIPCIN
CapatazElectricista
Dos (2) AyudantesDos (2) ObrerosInq. Electricista
UNIDAD
UN
UNUNUNUNUNUNUNUNUNUNUNMLUNUNUNMLUN
DOSIS
TIPO
UNIDAD
JORNAL53.72754.29950.26441.888650.000
CANTIDAD
1
2236222448618111681
TAR1F./DIA17.408
358.175
TARIF./DIA550.054
FAC. PRES.1.71,71.71.71.7
VR. UNIT.
43.226.33361.43727.585300.000168.64029.21417.1826.178994171253
1.60013.813124.01526.03516.9043.8061.122
207.974
RENDIMIEN.0,12
RENDIMIEN.1
RENDIMIEN.0,10,10,10.10,6
VR. PARC.
43.226.333122.87455.170900.000
1.011.84058.42834.36412.3563.976684
2.0249.600
248.634124.01526.03516.90422.8368.976
207.974
VR. PARC.174.080179.088
VR. PARC.550.054
VR. PARC.913.359923.083854.488712.096
1.841.667
TOTAL COSTOS DIRECTOS
SUBTOTAL
46.093.023
SUBTOTAL
353.168
SUBTOTAL
550.054
SUBTOTAL
5.244.693
52.240.938