7/22/2019 Bomba Molienda
1/3
Informacin General
NI: 51544
Cliente: Amec - Sociedad El Espino S.A
Proyecto: Proyecto El Espino
Contacto: Patricia Alfaro Flores
Fecha :
Total Itemes
In fo rmac in del Equ ipo A rreglo DC: En Lnea-Directo
ITEM: 1
TAG N:
Descripcin: Bombas Alimentacin Hidrociclones
Modelo Selecc: 550 M180-MCR
Flange succin : 26
Flange descarga: 22
Dimetro Impulsor: 1580
Curva n : P-4943
Cantidad Equipos: 2
Valores Operacion ales
Flujo Diseo: 4498 m3/h
TDH pulpa diseo: 31,3 m Accesor ios
TDH Agua 36,1 m Other:
Densidad Pulpa: 1,60 t/m3 Incluye Base: Si incluye
Temperatura 25,0 C Material Base: Structural Steel, ASTM A29-93 G 1030
Viscosidad 48,0 cP Protecciones: Si incluye ASTM A29-93 G 1030
% slido peso: 58,0 %
d50: 600 microns Acoplamiento
Altitud 1000 masl
Eficiencia: 84,7 % Incluye Acoplamiento: Si Incluye
HR 0,867 Tipo Acoplamiento: Reductor ER 0,837
BHP 1158,2 Sistema de Sello
rpm Bomba 281
Veloc. Perif: 24,6 m/s Tipo Sello: Sello Humedo
P. Descarga: 71,1 psi (c/u - total) Requiere Agua: Si, Requiere
2470-PU-0002&003
30 de julio de 2013
6
Weir Minerals Latin America
Seleccin Tcnica de EquiposHoja de datos Equipo Seleccionado
Weir Minerals Latin America
Seleccin Tcnica de EquiposHoja de datos Equipo Seleccionado
7/22/2019 Bomba Molienda
2/3
g p ( ) q g q
20
30
40
50
60
70
80
E
FF
ICIENCY
NPSHr
200 rpm
250 rpm
300 rpm
350 rpm
375 rpm
50% 60%70%
75%
80%84%
86%
86%
84%
4.57m
6.1m
7.62m
9.14m
DiseoFlow = 4498,0 m/hrH(W) = 31,3 m
Speed = 281 rpmEff = 84.7 %NPSHr = 3,25 m
Diseo AguaFlow = 4834,0 m/hrH(W) = 36,1 mSpeed = 303 rpmEff = 84,8 %NPSHr = 3,9 m
NominalFlow = 3885,0 m/hrH(W) = 29,5 m
d
NI: 51544Amec - Sociedad El Espino S.A, Proyecto El EspinoNItem: 1, Bombas Alimentacin HidrociclonesTAG N: 2470-PU-0002&003
SG pulpa: 1,60 t/m3HR: 0 867
Head,H
(m)
Horizontal Pump
550 MCRCURVE SHOWS APPROXIMATE PERFORMANCE FOR CLEAR WATER (ANSI/HI 1.6-2000 Centifugal Pump Test Standard unless otherwise specified). For media other than water,corrections must be made for density, v iscosity and/or other eff ects of solids. WEIR MINERALS reserves the right to change pump performance and/or delete impellers without notice. Framsuitability must be checked for each duty and drive arrangement. Not all frame alternatives are necessarily available from each manufacturing centre.
7/22/2019 Bomba Molienda
3/3
Torque - Speed CurveTorque speed curve depend of BHP calculated for aplication conditions and pump velocity for pump diameter. Torque value is function of operational values of equipment, directly of Slurry Specific Gravity, Flow, TDH, medium particle size
(d50) and derratling setting values(HR and EH if it is applicable for operational conditions).
NI
51544
ITEM
1
TAG N
MODELO BOMBA
550 M180-MCR
POTENCIA MOTOR (HP)
1300
MASA IMPULSOR (KG)
TRANSMISION
Reductor
RATIO
4,95
POLEA MOTOR
-
POLEA BOMBA-
CORREAS
-
DISTANCIA ENTRE EJES
- (pulg)
9/2006 Weir Minerals
All Rights Reserved
Torque Curve:
T/S item_1
2470-PU-0002&003
0,0
5000,0
10000,0
15000,0
20000,0
25000,0
30000,0
0 50 100 150 200 250 300 350
TqNm)
rpm omba