Bridge Falsework Forum-
Welcome & Introduction
Dolores Valls, P.E.
Deputy Division Chief
Offices of Structure Construction
7/24/2019 Fracasos de Obras Falsas en Puentes
2/54
Welcome & Introduction
Introduction of Key Participants Purpose of Forum
Notes & Action Items
7/24/2019 Fracasos de Obras Falsas en Puentes
3/54
Introductions- Key Participants
Facilitator Mike Halverson Falsework Manager John Babcock
OSC F/W Senior Engineers: North = John Walters
South = Ken Burkle
OSC F/W Technical Team
CT/Industry Joint F/W Advisory Team
7/24/2019 Fracasos de Obras Falsas en Puentes
4/54
Falsework Forum - Purpose
High Risk F/W Operation: Contractors, OSC, public
Joint Responsibility for public safety
High profile incident new definition
Time to discuss:
Best Management Practices
Revised Specifications?
7/24/2019 Fracasos de Obras Falsas en Puentes
5/54
Falsework Forum Notes
Action Items will be captured All notes will be posted on Internet
http://www.dot.ca.gov/hq/esc/construction/construc.htm
Division of Engineering Services
Structure Construction
7/24/2019 Fracasos de Obras Falsas en Puentes
6/54
7/24/2019 Fracasos de Obras Falsas en Puentes
7/54
PROGRESSION OF MEETINGS
RELATED TO FALSEWORK
STABILITY
(John Babcock)
INTERNAL FALSEWORK TEAM
JOINT CALTRANS/INDUSTRY
FALSEWORK ADVISORY TEAM
7/24/2019 Fracasos de Obras Falsas en Puentes
8/54
Bridge Falsework Forum
Series of three meetings to addressfalsework stability
7/24/2019 Fracasos de Obras Falsas en Puentes
9/54
Bridge Falsework Forum
Offices of Structure Construction TechnicalTeam, Falsework
Issues Identified
Solutions suggested
7/24/2019 Fracasos de Obras Falsas en Puentes
10/54
Bridge Falsework Forum
Joint Caltrans / Industry FalseworkAdvisory Team Issues Identified
Solutions recommended
7/24/2019 Fracasos de Obras Falsas en Puentes
11/54
7/24/2019 Fracasos de Obras Falsas en Puentes
12/54
INTRODUCTIONS
7/24/2019 Fracasos de Obras Falsas en Puentes
13/54
Agenda REGISTRATION
FORUM INTRODUCTION (Dolores Valls)
INTRODUCTIONS
PROGRESSION OF MEETINGS (John Babcock)
BACKGROUND
ADVISORY TEAM RECOMMENDATIONS
FALSEWORK STABILITY TRAFFIC OPENING REQUIREMENTS
COMMUNICATION/PARTNERING/FALSEWORK DESIGN
PLANS
FALSEWORK ENGINEER PRESENCES AND APPROVALS BEST PRACTICES (Internal by Contractor)
REWRITE FALSEWORK MANUAL, BRIDGE
CONSTRUCTION MEMOS, SPECIFICATIONS
7/24/2019 Fracasos de Obras Falsas en Puentes
14/54
Agenda
ADVISORY TEAM RECOMMENDATIONSWINCHES FOR FALSEWORK REMOVAL
7/24/2019 Fracasos de Obras Falsas en Puentes
15/54
FALSEWORK SUBMITTALS3 0 4
1 0 5
1 7 4
9 5
4 2
9 41 0 4
4 4
1 0 8
1 2 6
6 0
0
5 0
1 0 0
1 5 0
2 0 0
2 5 0
3 0 0
3 5 0
1 9 9 7 1 9 9 8 1 9 9 9 2 0 0 0 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7
Year
Submittals
7/24/2019 Fracasos de Obras Falsas en Puentes
16/54
MAJOR FALSEWORKINCIDENTS
1 1
2
3
0 0
3
1
0
3
1
0
2
4
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007
Year
MajorIncident
7/24/2019 Fracasos de Obras Falsas en Puentes
17/54
FALSEWORK STABILITY
7/24/2019 Fracasos de Obras Falsas en Puentes
18/54
FALSEWORK STABILITY
7/24/2019 Fracasos de Obras Falsas en Puentes
19/54
FALSEWORK STABILITY
7/24/2019 Fracasos de Obras Falsas en Puentes
20/54
FALSEWORK STABILITY
7/24/2019 Fracasos de Obras Falsas en Puentes
21/54
CASE 1
7/24/2019 Fracasos de Obras Falsas en Puentes
22/54
Falsework Elevation View
121 123122
Not attached
per plan
Contractor grading Bent at time of incident.Contractor grading Bent at time of incident.
7/24/2019 Fracasos de Obras Falsas en Puentes
23/54
Falsework Bent Elevation
W24 X 131
CenterlineBent 123
Cable Bracing
Cripple Cap
7/24/2019 Fracasos de Obras Falsas en Puentes
24/54
CASE 1
7/24/2019 Fracasos de Obras Falsas en Puentes
25/54
CASE 2
7/24/2019 Fracasos de Obras Falsas en Puentes
26/54
CASE 2
7/24/2019 Fracasos de Obras Falsas en Puentes
27/54
7/24/2019 Fracasos de Obras Falsas en Puentes
28/54
CASE 2
7/24/2019 Fracasos de Obras Falsas en Puentes
29/54
CASE 3
7/24/2019 Fracasos de Obras Falsas en Puentes
30/54
CASE 3
7/24/2019 Fracasos de Obras Falsas en Puentes
31/54
CASE 3
7/24/2019 Fracasos de Obras Falsas en Puentes
32/54
CASE 3
7/24/2019 Fracasos de Obras Falsas en Puentes
33/54
CASE 3
7/24/2019 Fracasos de Obras Falsas en Puentes
34/54
LESSONS LEARNED
Stability measures must be in place at all times Multi-tiered systems require special attention Dont adjust falsework over or adjacent to
traffic
34
7/24/2019 Fracasos de Obras Falsas en Puentes
35/54
DONT ADJUST
FALSEWORK OVER OR
ADJACENT TO TRAFFIC
Contract Special Provisions Maintaining Traffic
7/24/2019 Fracasos de Obras Falsas en Puentes
36/54
HOW DO WE MAINTAIN FALSEWORKSTABILITY?
Or
WHAT IS IT THAT CAUSESFALSEWORK TO BECOME UNSTABLE?
7/24/2019 Fracasos de Obras Falsas en Puentes
37/54
ADVISORY TEAM
RECOMMENDATIONS -
STABILITY
7/24/2019 Fracasos de Obras Falsas en Puentes
38/54
1. Traffic Opening requirements
1.1 Independently stable/ stand aloneframes
1.2 Connection criteria
1.3 Customary to increase load withincreased risk
1.4 Continuity between structure columns
1.5 Implementation:
1.5.1 Falsework Manual
1.5.2 Specifications
7/24/2019 Fracasos de Obras Falsas en Puentes
39/54
2. Communication/Partnering/Falsework Design Plans
2.1 Require meetings at criticalbenchmarks
2.1.1 Erection
2.1.2 Grading
2.1.3 Removal
2.1.4 Prior to opening to traffic (forfalsework over traffic)
7/24/2019 Fracasos de Obras Falsas en Puentes
40/54
2. Communication/Partnering/Falsework Design Plans
2.2 Erection and Removal Plans2.2.1 General at time of falsework plan
submittal
2.2.2 Detailed at pre-activity meeting
2.3 Implementation
7/24/2019 Fracasos de Obras Falsas en Puentes
41/54
3. Falsework Engineer of RecordPresence and Approvals
3.1 At Critical benchmarks3.1.1 Certify prior to traffic opening (for
falsework over traffic)
3.1.2 Onsite during grading operations
3.1.3 Progressive stages of construction
3.2 Implementation
7/24/2019 Fracasos de Obras Falsas en Puentes
42/54
4. Best Practices(Internal by Contractor)
4.1 Training4.2 Company Certification
4.3 Implementation
5 R i F l k M l
7/24/2019 Fracasos de Obras Falsas en Puentes
43/54
5. Rewrite Falsework Manual,
Bridge Construction Memos,Specifications
5.1 Longitudinal Stability Analysis
5.2 Friction Transfer Capacity (FTC)
Allowance
5.3 Testing and use of clamps
7/24/2019 Fracasos de Obras Falsas en Puentes
44/54
WINCHES FOR
FALSEWORK
REMOVAL
7/24/2019 Fracasos de Obras Falsas en Puentes
45/54
WINCHES FOR FALSEWORK REMOVAL
Traffic window limitations
Operation cannot be reasonably doneotherwise
Does not encroach upon the vertical
and horizontal traffic clearances
7/24/2019 Fracasos de Obras Falsas en Puentes
46/54
WINCHES FOR FALSEWORK REMOVAL
Will not cause a traffic disruptionWork is performed at night with a
closure
Load is static to structure soffit
7/24/2019 Fracasos de Obras Falsas en Puentes
47/54
ADVISORY TEAM RECOMMENDATIONS
Winches for Falsework Removal
7/24/2019 Fracasos de Obras Falsas en Puentes
48/54
ADVISORY TEAM RECOMMENDATIONS
1. Redundant systems are used
1.1 Use High Strength rods or strands
and winches
1.2 High strength rods or strands1.2.1 Requires redundant system
1.2.2 Requires use of new strand
7/24/2019 Fracasos de Obras Falsas en Puentes
49/54
ADVISORY TEAM RECOMMENDATIONS
1.3 Winches only
1.3.1 Safety factor (5:1)
1.3.2 Certification
1.4 Inspection of critical elements (NDT)
7/24/2019 Fracasos de Obras Falsas en Puentes
50/54
ADVISORY TEAM RECOMMENDATIONS
2. Implementation
2.1 Provide additional direction
2.2 Update Falsework Manual
7/24/2019 Fracasos de Obras Falsas en Puentes
51/54
7/24/2019 Fracasos de Obras Falsas en Puentes
52/54
7/24/2019 Fracasos de Obras Falsas en Puentes
53/54
Discussion
7/24/2019 Fracasos de Obras Falsas en Puentes
54/54
Adjourn