METRADOS ALCANTARILLA TMC D= 24 PULG. TIPO I, L= 5.67 m1.0 TRAZO Y REPLANTEO

D 0.60m:= L 5.67m:= C 0.65m:= F 0.70m:= E 1.00m:= B 0.20m:=

W 0.65m:= A 0.75m:= R0.75m

40.19m=:= M 0.45m .30m+ 0.75m=:=

T RL 0.025⋅

4+

0.22m=:= Entrada Alcantarilla Salida Emboquillado

TR A B+( ) 2⋅ D⋅ 2D L⋅+ W 2 C⋅ D+( )⋅+ E 2C D+( )⋅+ 11.08m2

=:=

2.0 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS

J 0.10m:= A 0.95m:= N 0.75m:= O 0.30m:= G 0.60m:=

H 0.45m:= P M L 0.025⋅+ 0.89m=:=Cajuela Alcantarilla

V1 B N+ J+ O+( ) 2⋅ D⋅ A⋅ 1.54m3

=:= V2 J D+ M+( ) L⋅ 2⋅ D⋅ 9.87m3

=:=

Aletas Salida/emboquillado

V3 F G H+ B+( )⋅D

2⋅ 2⋅ 0.53m

3=:= V4 E W+( ) 2C D+( )⋅ 2⋅ B 1.25m

3=:=

VE V1 V2+ V3+ V4+ 13.18m3

=:=

3.00 RELLENO CON MATERIAL PROPIO SELECCIONADO

VR V2 π D2

4⋅ L⋅− 8.26m

3=:= VR 8.26m

3=

4.00 ELIMINACION DE MATERIAL EXCEDENTE VEL VE VR− 4.92 m3

=:=

5.00 CAMA DE APOYO CON MAT. GRANULAR EN ALCANTARILLA

NIV 2 D⋅ L⋅ 0.10⋅ m 0.68 m3

=:= NIV 0.68 m3

=

6.00 COLOCACION DE TUBERIA TMC Ø 24 PULG. LT L 5.67 m=:=

Page 2: Mathcad - Alcantarillas Tmc 24 Pulg. 5.67 m Tipo i

8.00 CONCRETO F'C= 175 KG/CM2+25% P.M.

Cajuela V1 N O+ B+ J+( ) A⋅ B⋅ 2⋅ 2D 2B−( ) B⋅ N O+ B+ J+( )⋅+ A 2⋅ D⋅ B⋅+ 0.96 m3

=:=

Alcan/parapetoV2

P M+( )

2B

T R+( )

2+

⋅ 2⋅ D 2⋅ D J+ B+( ) 2⋅ D⋅ B T+( )⋅ 2⋅+ 1.71 m3

=:=

V2 V2 π D2

4⋅ B T+( )⋅ 2⋅− 1.47 m

3=:=

V32G H+( )

2

D

2⋅ F⋅ 2⋅ 0.35 m

3=:=Aletas

V42C D+ 2D+( )

2W⋅ 2⋅ B 0.4 m

3=:=Piso/salida

VP V1 2V2+ V3+ V4+ 4.65 m3

=:=

9.00 ENCOFRADO Y DESENCOFRADO DE ALCANTARILLAS

Caja/entrada A1 2A 2D+( ) N O+( )⋅ 2⋅ 2 D M+( )⋅ 2⋅ D⋅+ 9.75 m2

=:=

A2 D P+( ) 2⋅ D⋅ 2⋅2G H+( )

2F⋅ 4⋅+ 5.89 m

2=:=Aletas/salida

AE A1 A2+ 15.64 m2

=:=

10.00 EMBOQUILLADO DE PIEDRA EN ALCANTARILLAS e=0.25 m

Z 0.30m:=Emboquillado

VE 2C D+( ) E⋅ Z⋅ 2C D+( )3 B⋅

2⋅ B⋅+ 0.68 m

3=:=

UñaVEMB VE 0.68 m

3=:=

11. PINTURA ESMALTE EN PARAPETOS

AREA 2 D⋅ 2⋅ 0.30⋅ m( ) 2 B⋅ 2⋅ D⋅+ 1.2 m2

=:=

AREA 1.2 m2

=