Presupuesto 0000001
Subpresupuesto 001 ESTRUCTURAS. Elaborado por ING. ENRIQUE SIGUAS CAMPOS.
Cliente CORPORACIN AMERICANA DE DESARROLLO. Direccin AV. NICOLS DE PIEROLA N 615
Contratista NQT CONTRATISTA S.A.C. rea Geogrfica 03
Lugar CUSCO-CUSCO-CUSCO. Fecha 04/01/2014
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
ESTRUCTURAS. 44,148.49
OBRAS DE CONCRETO ARMADO. 44,148.49
COLUMNAS. 12,357.01
PARA EL CONCRETO. 6,518.50
CONCRETO F'C=210 KG/CM2. EN COLUMNAS . M3. 20.00 325.92 6,518.50 02
PARA EL ENCOFRADO Y DESENCOFRADO. 2,561.24
ENCOFRADO Y DESENCOFRADO EN COLUMNAS. M2. 60.00 42.69 2,561.24 05
PARA LA ARMADURA DE ACERO. 3,277.28
ACERO FY=4,200KG/CM2. GRADO 60. EN COLUMNAS. KG. 800.00 4.10 3,277.28 04
VIGAS 8,657.80
PARA EL CONCRETO. 2,931.45
CONCRETO F'C=210 KG/CM2. EN VIGAS. M3. 10.00 293.15 2,931.45 02
PARA EL ENCOFRADO Y DESENCOFRADO. 3,268.39
ENCOFRADO Y DESENCOFRADO EN VIGAS. M2. 69.00 47.37 3,268.39 07
PARA LA ARMADURA DE ACERO. 2,457.96
ACERO FY=4,200KG/CM2. EN VIGAS. KG. 600.00 4.10 2,457.96 03
LOSAS. 23,133.68
LOSAS ALIGERADAS CONVENCIONALES. 23,133.68
CONCRETO F'C=210 KG/CM2. EN LOSA ALIGERADA
CONVENCIONAL.M3. 15.00 274.16 4,112.46 02
ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA
CONVENCIONAL.M2. 300.00 33.68 10,104.19 07
ACERO FY=4,200KG/CM2. EN LOSA ALIGERADA
CONVENCIONAL.KG. 690.00 4.10 2,826.65 03
LADRILLO HUECO DE ARCILLA 0.15X0.30X0.30 m. PARA
LOSA ALIGERADA CONVENCIONAL.UND. 2,500.00 2.44 6,090.38 06
ARQUITECTURA. 8,783.63
MUROS Y TABIQUES DE ALBAILERA. 8,783.63
MUROS DE ALBAILERA CONFINADA. 8,783.63
MUROS DE LADRILLO KING KONG DE ARCILLA. 8,783.63
MURO DE LADRILLO KK 18 HCO. APAREJO SOGA. M2. 55.00 49.00 2,694.93 06
MURO DE LADRILLO KK 18 HCO. APAREJO CABEZA. M2. 80.00 76.11 6,088.70 06
52,932.12
5,293.21
6,351.85
64,577.18
11,623.89
76,201.07
ACTIVIDADES CON HOLGURA
66.67%
66.67% 33.33%
PRECIO
UNITARIO
S/.
Semana 05
100.00%
TOTAL
Semana 01 Semana 02 Semana 03 Semana 04
50.00% 50.00%
50.00%
IGV (18%)
14.29% 85.71%
100.00%
80.00% 20.00%
33.33%
RUTA CRTICA
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (12%)
SUBTOTAL
OE.3.1.9.1.2. 50.00%
OE.2.3.9.2.3. 100.00%
57.14% 42.86%
OE.3.1.9.1.1.
OE.2.3.9.2.4.
OE.3.
OE.3.1.
OE.3.1.9.
OE.3.1.9.1.
100.00%
OE.2.3.9.2.2.
OE.2.3.8.2.
OE.2.3.8.2.1.
OE.2.3.8.3.
OE.2.3.8.3.1.
OE.2.3.9.
OE.2.3.9.2.
OE.2.3.9.2.1.
OE.2.3.8.
OE.2.3.8.1.
OE.2.3.8.1.1.
OE.2.3.7.3.
OE.2.3.7.3.1.
100.00%
OE.2.3.7.2.1.
OE.2.3.7.2.
OE.2.
OE.2.3.
OE.2.3.7.
OE.2.3.7.1.
OE.2.3.7.1.1.
CRONOGRAMA DE EJECUCIN DE OBRA - DIAGRAMA GANTT.AMPLIACIN DE LAS OFICINAS DEL SEGUNDO PISO DE LA CORPORACIN AMERICANA DE DESARROLLO (CAD) SEDE CUSCO,
PROVINCIA Y REGIN DE CUSCO.
ITEM DESCRIPCIN UND. METRADOPARCIAL
S/.TOTAL Duracin
Presupuesto 0000001
Subpresupuesto 001 ESTRUCTURAS. Elaborado por ING. ENRIQUE SIGUAS CAMPOS.
Cliente CORPORACIN AMERICANA DE DESARROLLO. Direccin AV. NICOLS DE PIEROLA N 615
Contratista NQT CONTRATISTA S.A.C. rea Geogrfica 03
Lugar CUSCO-CUSCO-CUSCO. Fecha 04/01/2014
Mat.
(S/.)
M.O.
(S/.)
Eq. Y H.M.
(S/.)Parcial (S/.)
Mat.
(S/.)
M.O.
(S/.)
Eq. Y H.M.
(S/.)Parcial (S/.)
Mat.
(S/.)
M.O.
(S/.)
Eq. Y H.M.
(S/.)Parcial (S/.)
Mat.
(S/.)
M.O.
(S/.)
Eq. Y H.M.
(S/.)Parcial (S/.)
Mat.
(S/.)
M.O.
(S/.)
Eq. Y H.M.
(S/.)Parcial (S/.)
ESTRUCTURAS. 44,148.49
OBRAS DE CONCRETO ARMADO. 44,148.49
COLUMNAS. 12,357.01
PARA EL CONCRETO. 6,518.50
CONCRETO F'C=210 KG/CM2. EN COLUMNAS . M3. 20.00 6,518.50 3,666.92 2,503.17 348.40 6,518.50
PARA EL ENCOFRADO Y DESENCOFRADO. 2,561.24
ENCOFRADO Y DESENCOFRADO EN COLUMNAS. M2. 60.00 2,561.24 983.23 1,015.01 50.75 2,048.99 245.81 253.75 12.69 512.25
PARA LA ARMADURA DE ACERO. 3,277.28
ACERO FY=4,200KG/CM2. GRADO 60. EN COLUMNAS. KG. 800.00 3,277.28 2,285.60 944.45 47.22 3,277.28
VIGAS 8,657.80
PARA EL CONCRETO. 2,931.45
CONCRETO F'C=210 KG/CM2. EN VIGAS. M3. 10.00 2,931.45 1,833.46 993.99 104.00 2,931.45
PARA EL ENCOFRADO Y DESENCOFRADO. 3,268.39
ENCOFRADO Y DESENCOFRADO EN VIGAS. M2. 69.00 3,268.39 204.28 250.13 12.51 466.91 1,225.68 1,500.76 75.04 2,801.48
PARA LA ARMADURA DE ACERO. 2,457.96
ACERO FY=4,200KG/CM2. EN VIGAS. KG. 600.00 2,457.96 571.40 236.11 11.81 819.32 1,142.80 472.23 23.61 1,638.64
LOSAS. 23,133.68
LOSAS ALIGERADAS CONVENCIONALES. 23,133.68
CONCRETO F'C=210 KG/CM2. EN LOSA ALIGERADA
CONVENCIONAL.M3. 15.00 4,112.46 2,750.19 1,175.07 187.20 4,112.46
ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA
CONVENCIONAL.M2. 300.00 10,104.19 2,728.80 2,900.02 145.00 5,773.82 2,046.60 2,175.02 108.75 4,330.37
ACERO FY=4,200KG/CM2. EN LOSA ALIGERADA
CONVENCIONAL.KG. 690.00 2,826.65 1,971.33 814.59 40.73 2,826.65
LADRILLO HUECO DE ARCILLA 0.15X0.30X0.30 m. PARA
LOSA ALIGERADA CONVENCIONAL.UND. 2,500.00 6,090.38 2,870.33 1,189.92 0.00 4,060.25 1,435.17 594.96 0.00 2,030.13
ARQUITECTURA. 8,783.63
MUROS Y TABIQUES DE ALBAILERA. 8,783.63
MUROS DE ALBAILERA CONFINADA. 8,783.63
MUROS DE LADRILLO KING KONG DE ARCILLA. 8,783.63
MURO DE LADRILLO KK 18 HCO. APAREJO SOGA. M2. 55.00 2,694.93 662.50 652.35 32.62 1,347.47 662.50 652.35 32.62 1,347.47
MURO DE LADRILLO KK 18 HCO. APAREJO CABEZA. M2. 80.00 6,088.70 1,706.44 1,274.19 63.71 3,044.35 1,706.44 1,274.19 63.71 3,044.35
52,932.12 4,654.55 2,870.99 143.55 7,669.09 3,352.18 2,941.55 147.08 6,440.80 6,845.81 5,907.08 518.60 13,271.48 6,714.01 5,101.81 195.59 12,011.41 9,132.95 4,050.83 355.54 13,539.33
5,293.21 766.91 644.08 1,327.15 1,201.14 1,353.93
6,351.85 920.29 772.90 1,592.58 1,441.37 1,624.72
64,577.18 9,356.29 7,857.78 16,191.21 14,653.92 16,517.98
11,623.89 1,684.13 1,414.40 2,914.42 2,637.71 2,973.24
76,201.07 11,040.42 9,272.18 19,105.63 17,291.63 19,491.21
100.00% 14.49% 12.17% 25.07% 22.69% 25.58%AVANCE PROGRAMADO
GASTOS GENERALES (10%)
UTILIDAD (12%)
SUBTOTAL
IGV (18%)
TOTAL
OE.3.1.9.1.2.
COSTO DIRECTO
OE.3.1.9.1.
OE.3.1.9.1.1.
OE.3.1.9.
OE.2.3.9.2.3.
OE.2.3.9.2.4.
OE.3.
OE.3.1.
OE.2.3.9.2.2.
OE.2.3.9.
OE.2.3.9.2.
OE.2.3.9.2.1.
OE.2.3.8.3.
OE.2.3.8.3.1.
OE.2.3.8.2.
OE.2.3.8.2.1.
OE.2.3.8.
OE.2.3.8.1.
OE.2.3.8.1.1.
OE.2.3.7.3.
OE.2.3.7.3.1.
OE.2.3.7.2.
OE.2.3.7.2.1.
OE.2.3.
OE.2.3.7.
OE.2.3.7.1.
OE.2.3.7.1.1.
OE.2.
CRONOGRAMA DE VALORIZADO DE EJECUCIN DE OBRA.AMPLIACIN DE LAS OFICINAS DEL SEGUNDO PISO DE LA CORPORACIN AMERICANA DE DESARROLLO (CAD)
SEDE CUSCO, PROVINCIA Y REGIN DE CUSCO.
ITEM DESCRIPCIN UND. METRADOPARCIAL
S/.TOTAL
Semana 01 Semana 02 Semana 03 Semana 04 Semana 05
Recommended