MUNICIPALIDAD DISTRITAL DE CAPILLAS
PRESUPUESTOOBRA: CERCO PERIMETRICOUNIDAD: CINAT
DEPARTAMENTO : LIMAPROVINCIA : LIMADISTRITO : SANTIAGO DE SURCO
ITEM DESCRIPCION UND METRADO P.U
01.00.00 TRABAJOS PRELIMINARES DE OBRA01.01.00 RETIRO DE ARBOL pza 1.00 53.5001.02.00 DEMOLICION DE CONSTRUCCION EXISTENTE glb 1.00 400.0001.03.00 TRANSPORTE DE MATERIALES A LA OBRA glb 1.00 300.0002.00.00 MOVIMIENTO DE TIERRA02.01.00 TRAZADO Y REPLANTEO SIN EQUIPO m2 5,627.05 1.0902.02.00 EXCAVACION ZANJAS P/CIMIENTO MAT. SUELTO H=1.00M m3 145.92 28.6802.03.00 ELIM. MATERIAL +30% ESPONJAMIENTO CARG.125HP/VOLQUETE 6 M3 m3 62.30 23.6902.04.00 RELLENO COMPACTADO A MANO m3 83.62 19.0002.05.00 RELLENO CON MATERIAL DE PRESTAMO m3 29.70 82.7803.00.00 OBRAS DE CONCRETO SIMPLE03.01.00 CIMIENTOS CORRIDOS, CONCRETO CICLOPEO 1:10 (C:H) + 30%P.G. m3 10.53 142.7203.02.00 SOBRECIMIENTO, CONCRETO 1:6 C:H + 25%P.M. m3 23.30 232.7303.03.00 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 310.69 31.8303.04.00 CONTRAZOCALO DE CEMENTO PULIDO H=30 CM. MEZCLA 1:5 m 364.71 11.0304.00.00 VARIOS04.01.00 CERCO METALICO CON COLUMNAS METALICAS 3",ANGULOS 1 1/2"x1 1/2"x1/8" Y PLATINAS 1 1/2"x1/8" m 121.00 652.54
04.02.00 und 2.00 800.76
04.03.00 und 1.00 2,955.00
04.04.00 PINTURA ESMALTE EN ELEMENTOS METALICOS, PREVIO ANTICORROSIVO m2 568.70 12.2405.00.00 PLATAFORMA DE INGRESO VEHICULAR05.01.00 CORTE DE TERRENO HASTA 0.20M DE PROFUNDIDAD m2 22.70 6.3005.02.00 COMPACTACION TERRENO NORMAL/CON COMPACTADORA m2 22.70 2.8805.03.00 ELIM.MATERIAL + 30% ESPONJAMIENTO CARG. 125HP/VOLQUETE 6 M3, V=30 D=5KM m3 5.90 23.6905.04.00 BASE CON MATERIAL GRANULAR C/COMPACTADORA e=0.10m m2 22.7 7.5105.05.00 PLATAFORMA DE INGRESO, CONCRETO Fc=210 Kg/cm2 e=0.15m m3 3.4 268.46
COSTO DIRECTOGASTOS GENERALES (10%)
UTILIDAD (7%)SUB TOTAL
IGV (18%)PRESUPUESTO DE OBRA
SUPERVISION DE OBRA (5%)EXPEDIENTE TECNICO (4%)
TOTAL PRESUPUESTO OBRA
PUERTAS METALICAS PM-1(1.00x2.30)m CON ANGULOS 1 1/2"x1 1/2"x1/8", PLATINAS 1 1/2"x1 1/2"x1/8" Y TUBO CUADRADO LAC 4"
PORTON DE INGRESO METALICO DE DOS HOJAS PM-2 (5.00x2.30)m CON ANGULOS 1 1/2"x1 1/2"x1/8", PLATINAS 1 1/2"x1 1/2"x1/8" Y TUBO CUADRADO LAC 4" Y 3"
SUB - TOTAL TOTAL
753.5053.50
400.00300.00
15,841.536,133.484,184.901,475.821,588.762,458.57
20,837.821,502.845,423.009,889.234,022.75
90,474.3578,956.94
1,601.52
2,955.00
6,960.89
1,431.40143.0165.38
139.77170.48912.76
COSTO DIRECTO 128,585.10GASTOS GENERALES (10%) 12,858.51
UTILIDAD (7%) 12,858.51SUB TOTAL 154,302.12
IGV (18%) 27,774.38PRESUPUESTO DE OBRA 182,076.50
SUPERVISION DE OBRA (5%) 9,103.82EXPEDIENTE TECNICO (4%) 7,283.06
TOTAL PRESUPUESTO OBRA 198,463.38
S10
Análisis de precios unitarios
OBRA 1117005 CERCO PERIMETRICO
UNIDAD CINAT
Partida 1.01 RETIRO DE ARBOL
Rendimiento Pza/DIA 4.0000 EQ. 4.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 CAPATAZ hh 0.1000 0.2000
0101010005 PEON hh 2.0000 4.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 0.0500
Partida 1.02 DEMOLICION DE CONSTRUCCION EXISTENTE
Rendimiento glb/DIA 500.0000 EQ. 500.0000 Costo unitario directo por : m
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010005 DEMOLICION DE CONSTRUCCION EXISTENTE glb 1.0000
Partida 1.03 TRANSPORTE DE MATERIALES ALA OBRA
Rendimiento glb/DIA EQ. Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Materiales
2399980004 TRANSPORTE DE MATERIALES glb 1.0000
Partida 2.01 TRAZADO Y REPLANTEO SIN EQUIPO
Rendimiento m2/DIA 500.0000 EQ. 500.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 CAPATAZ hh 0.1000 0.0016
101010004 OPERARIO hh 1.0000 0.0160
0101010005 PEON hh 2.0000 0.0320
Materiales
202010022 TIERRA SELECCIONADA kg 0.0050
229060006 AGUA PUESTA EN OBRA bls 0.0250
243040000 MADERA TORNILLO p2 0.0264
Equipos
301010006 HERRAMIENTAS MANUALES %mo 3.0000
337020037 WINCHA DE 30m u 0.0005
Partida 2.02 EXCAVACION DE ZANJAS P/CIMIENTOS MAT. SUELTO H:1.00M
Rendimiento m3/DIA 4.0000 EQ. 4.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 CAPATAZ hh 0.1000 0.2000
0101010005 PEON hh 1.0000 2.0000
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0500
0207070001 AGUA PUESTA EN OBRA m3 0.5000
Partida 2.03 RELLENO COMPACTADO A MANO
Rendimiento m3/DIA 18.0000 EQ. 18.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010004 OFICIAL hh 1.0000 0.4444
0101010005 PEON hh 2.5000 1.1111
Partida 2.04 ELIMINACION DE MATERIAL EXCEDENTE + 30% esponjamiento carga 125 HP/VOLQUETE
Rendimiento m3/DIA 345.0000 EQ. 345.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 CAPATAZ hh 0.1000 0.0023
0101010005 PEON hh 2.0000 0.0464
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0300
348040023 CAMION VOLQUETE 4x2140-210 HP 6m3 hm 4.0000 0.0928
349040009 CARGADOR SOBRE LLANTAS 125 HP 2.5 yd3 hm 1.0000 0.0232
Partida 2.05 RELLENO CON MATERIAL DE PRESTAMO
Rendimiento m3/DIA 25.0000 EQ. 25.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
0101010003 OPERARIO hh 1.0000 0.3200
0101010004 OFICIAL hh 1.0000 0.3200
0101010005 PEON hh 1.0000 0.3200
Materiales
02050600010015 SUELO AFRIMADO und 0.2000
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0300
348040023 CAMION VOLQUETE 4x2140-210 HP 6m3 hm 4.0000 0.0928
Partida 3.01 CIMIENTOS CORRIDOS, CONCRETO CICLOPEO 1:10 (C:H) + 30% P.G.
Rendimiento m3/DIA 25.0000 EQ. 25.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
147000037 OPERADOR DE EQUIPO hh 1.0000 0.3200
0101010003 CAPATAZ hh 0.2000 0.0640
0101010003 OPERARIO hh 2.0000 0.6400
0101010004 OFICIAL hh 1.0000 0.3200
0101010005 PEON hh 8.0000 2.5600
Materiales
201030004 ACEITE PARA MOTOR SAE-30 gal 0.0040
205000033 PIEDRA GRANDE m3 0.5200
221000001 CEMENTO PORTLAND TIPO I (42.5kg) bls 2.9000
234000000 GASOLINA 84 OCTANOS gal 0.1200
238000003 HORMIGON m3 0.7800
239050000 AGUA m3 0.1620
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0300
348010086 MEZCLADORA DE CONCRETO T. TAMBOR 23 HP 11-12P3 hm 1.0000 0.3200
Partida 3.02 SOBRECIMIENTO, CONCRETO 1:6 C:H + 25% P.M
Rendimiento m3/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
147000037 OPERADOR DE EQUIPO hh 1.0000 0.6667
0101010003 CAPATAZ hh 0.2000 0.1333
0101010003 OPERARIO hh 2.0000 1.3333
0101010004 OFICIAL hh 1.0000 0.6667
0101010005 PEON hh 8.0000 5.3333
Materiales
201030004 ACEITE PARA MOTOR SAE-30 gal 0.0083
205000033 PIEDRA GRANDE m3 0.3800
221000001 CEMENTO PORTLAND TIPO I (42.5kg) bls 4.5000
234000000 GASOLINA 84 OCTANOS gal 0.2500
238000003 HORMIGON m3 0.9000
239050000 AGUA m3 0.1620
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0300
348010086 MEZCLADORA DE CONCRETO T. TAMBOR 23 HP 11-12P3 hm 1.0000 0.6667
Partida 3.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS
Rendimiento m3/DIA 16.0000 EQ. 16.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 CAPATAZ hh 0.1000 0.0500
0101010003 OPERARIO hh 1.0000 0.5000
0101010004 OFICIAL hh 1.0000 0.5000
Materiales
202000008 ALAMBRE NEGRO RECOCIDO #8 kg 0.2600
202010022 CLAVO C/CABEZA P/ CONSTRUCCION D. PROMEDIO kg 0.1600
243040000 MADERA TORNILLO p2 3.3500
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0300
Partida 3.04 CONTRAZOCALO DE CEMENTO PULIDO H=30CM. MEZCLA 1:5
Rendimiento m3/DIA 17.0000 EQ. 17.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 CAPATAZ hh 0.1000 0.0471
0101010003 OPERARIO hh 1.0000 0.4706
0101010005 PEON hh 0.3333 0.1568
Materiales
204000000 ARENA FINA m3 0.0066
221000001 CEMENTO PORTLAND TIPO I (42.5kg) bls 0.0466
239050000 AGUA m3 0.0017
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0300
Partida 4.01 CERCO METALICO CON COLUMNAS METALICAS 4", ANGULOS 1 1/2"x1 1/2"x1/8" Y PLATINAS 1 1/2"x1/8"
Rendimiento m2/DIA 6.5000 EQ. 6.5000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 OPERARIO hh 0.5000 0.6154
0101010005 PEON hh 0.5000 0.6154
Materiales
229500091 SOLADADURA kg 5.0000
251010064 ANGULO DE FIERRO DE 1 1/2"x1 1/2"x1/8"x6m u 3.0000
251040132 PLATINA DE ACERO 1 1/2"x1/8"x6m u 1.3000
265000118 TUBO CIRCULAR LAC 4"x2.5mmx6m u 1.0000
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0500
348210066 MAQUINA SOLDAR hm 1.0000 1.2308
Partida 4.02 PUERTA METALICA PM-1(1.00x2.30)m CON ANGULOS 1 1/2"x1 1/2"x1/8", PLATINAS 1 1/2"x1 1/2"x1/8" Y TUBO
Rendimiento m2/DIA 0.8000 EQ. 0.8000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 OPERARIO hh 1.0000 10.0000
0101010005 PEON hh 1.0000 10.0000
Materiales
226080005 BISAGRA DE FIERRO DE 4" u 3.0000
226310057 CHAPA FORTE TRES GOLPES u 1.0000
229500091 SOLADADURA kg 3.0000
251010064 ANGULO DE FIERRO DE 1 1/2"x1 1/2"x1/8"x6m u 2.5000
251040132 PLATINA DE ACERO 1 1/2"x1/8"x6m u 3.0000
265000118 TUBO CUADRADO LAC 4"x3.0mmx6m u 1.0000
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0500
348210066 MAQUINA SOLDAR hm 1.0000 10.0000
Partida 4.03 PORTON DE INGRESO METALICO DE DOS HOJAS PM-2(5.00x2.30)m CON ANGULOS 1 1/2"x1 1/2"x1/8",
PLATINAS 1 1/2"x1 1/2"x1/8" Y TUBO CUADRADO LAC 4" Y 3"
Rendimiento m2/DIA 0.3000 EQ. 0.3000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 OPERARIO hh 1.0000 26.6667
0101010005 PEON hh 1.0000 26.6667
Materiales
226040005 CANDADO 4" u 1.0000
226100062 CERROJO CON FIERRO LISO 3/4",L=0.4m,INCLUYE TIRADOR u 1.0000
226100063 GARRUCHA INFERIOR PARA HOJA DE PUERTA BATIENTE u 2.0000
226100064 PICAPORTE CON FIERRO LISO 3/4" L=0.6m u 2.0000
226080095 BISAGRA DE FIERRO DE 6"REFORZADA u 8.0000
265000118 TUBO CUADRADO LAC 3"x2.5mmx6m u 5.0000
229500091 SOLADADURA kg 4.0000
251010064 ANGULO DE FIERRO DE 1 1/2"x1 1/2"x1/8"x6m u 1.0000
251040132 PLATINA DE ACERO 1 1/2"x1/8"x6m u 13.0000
265000118 TUBO CUADRADO LAC 4"x3.0mmx6m u 1.0000
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0500
348210066 MAQUINA SOLDAR hm 1.0000 10.0000
Partida 4.04 PINTURA ESMALTE EN ELEMENTOS METALICOS, PREVIO ANTICORROSIVO
Rendimiento m3/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 CAPATAZ hh 0.1000 0.0400
0101010003 OPERARIO hh 1.0000 0.4000
0101010005 PEON hh 0.3333 0.1333
Materiales
239010050 LIJA P/METAL u 0.1250
254010001 PINTURA ESMALTE SINTETICO gal 0.0500
254060000 PINTURA ANTICORROSIVA gal 0.0500
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0300
Partida 5.01 CORTE DE TERRENO HASTA 0.20m DE PROFUNDIDAD
Rendimiento m3/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 CAPATAZ hh 1.0000 0.2000
0101010005 PEON hh 1.0000 0.2000
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0500
Partida 5.02 COMPACTACION TERRENO NORMAL/ CON COMPACTADORA
Rendimiento m3/DIA 120.0000 EQ. 120.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 CAPATAZ hh 0.1000 0.0067
0101010003 OPERARIO hh 1.0000 0.0667
0101010005 PEON hh 1.0000 0.0667
Materiales
239050000 AGUA m3 0.0500
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0500
349030003 COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP hm 1.0000 0.0667
Partida 5.03 ELIMINACION DE MATERIAL EXCEDENTE + 30% esponjamiento carga 125 HP/VOLQUETE
Rendimiento m3/DIA 345.0000 EQ. 345.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 CAPATAZ hh 0.1000 0.0023
0101010005 PEON hh 2.0000 0.0464
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0300
348040023 CAMION VOLQUETE 4x2140-210 HP 6m3 hm 4.0000 0.0928
349040009 CARGADOR SOBRE LLANTAS 125 HP 2.5 yd3 hm 1.0000 0.0232
Partida 5.04 BASE CON MATERIAL GRANULAR C/COMPACTADORA e=0.10m
Rendimiento m3/DIA 350.0000 EQ. 350.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 CAPATAZ hh 0.1000 0.0023
0101010003 OPERARIO hh 1.0000 0.0229
0101010005 PEON hh 4.0000 0.0914
Materiales
205010036 MATERIAL GRAN. P/BASE (PISTAS ZONAS URBANAS) m3 0.1300
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0300
349030003 COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP hm 1.0000 0.0229
Partida 5.05 PLATAFORMA DE INGRESO, CONCRETO F'c=210 kg/cm2 e=0.15m
Rendimiento m3/DIA 22.0000 EQ. 22.0000 Costo unitario directo por : m3
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
147000037 OPERADOR DE EQUIPO hh 2.0000 0.7273
0101010003 CAPATAZ hh 0.2000 0.0727
0101010003 OPERARIO hh 2.0000 0.7273
0101010004 OFICIAL hh 1.0000 0.3636
0101010005 PEON hh 8.0000 2.9091
Materiales
201030004 ACEITE PARA MOTOR SAE-30 gal 0.0045
205000033 PIEDRA GRANDE m3 0.8000
221000001 CEMENTO PORTLAND TIPO I (42.5kg) bls 0.5000
234000000 GASOLINA 84 OCTANOS gal 9.2000
238000003 HORMIGON m3 0.1364
239050000 AGUA m3 0.1800
Equipos
301010006 HERRAMIENTAS MANUALES %mo 0.0500
348010086 MEZCLADORA DE CONCRETO T. TAMBOR 23 HP 11-12P3 hm 1.0000 0.3636
349070004 VIBRADOR DE CONCRETO 4 HP 2.40" hm 1.0000 0.3636
Página : 1
CERCO PERIMETRICO
Fecha presupuesto Nov-12
53.54
Precio S/. Parcial S/.
18.14 3.63
11.84 47.36
50.99
50.99 2.55
2.55
400.00
Precio S/. Parcial S/.
400.00 400.00
300.00
Precio S/. Parcial S/.
300.00 300.00
3.01
Precio S/. Parcial S/.
18.14 0.03
15.12 0.24
11.84 0.38
0.65
3.00 0.02
10.00 0.25
4.50 0.12
0.38
0.65 1.95
54.00 0.03
1.98
36.17
Precio S/. Parcial S/.
18.14 3.63
11.84 23.68
27.31
27.31 1.37
15.00 7.50
8.87
19.00
Precio S/. Parcial S/.
13.14 5.84
11.84 13.16
19.00
23.68
Precio S/. Parcial S/.
18.14 0.04
11.84 0.55
0.59
0.59 0.02
210.93 19.56
151.30 3.51
23.09
82.78
Precio S/. Parcial S/.
15.12 4.84
13.14 4.20
11.84 3.79
12.83
250.00 50.00
50.00
12.83 0.38
210.93 19.56
19.95
142.72
Precio S/. Parcial S/.
17.41 5.57
18.14 1.16
15.12 9.68
13.14 4.20
11.84 30.31
50.92
2.97 0.01
32.00 16.64
14.92 43.27
11.00 1.32
25.00 19.50
5.50 0.89
81.63
50.92 1.53
26.99 8.64
10.16
232.73
Precio S/. Parcial S/.
17.41 11.61
18.14 2.42
15.12 20.16
13.14 8.76
11.84 63.15
106.09
2.97 0.02
32.00 12.16
14.92 67.14
11.00 2.75
25.00 22.50
5.50 0.89
105.47
106.09 3.18
26.99 17.99
21.18
31.82
Precio S/. Parcial S/.
18.14 0.91
15.12 7.56
13.14 6.57
15.04
3.00 0.78
3.00 0.48
4.50 15.08
16.34
15.04 0.45
0.45
11.02
Precio S/. Parcial S/.
18.14 0.85
15.12 7.12
11.84 1.86
9.83
30.00 0.20
14.92 0.70
5.50 0.01
0.90
9.83 0.29
0.29
CERCO METALICO CON COLUMNAS METALICAS 4", ANGULOS 1 1/2"x1 1/2"x1/8" Y PLATINAS 1 1/2"x1/8"
652.54
Precio S/. Parcial S/.
15.12 9.30
11.84 7.29
16.59
11.44 57.20
40.00 120.00
200.00 260.00
188.07 188.07
625.27
16.59 0.83
8.00 9.85
10.68
PUERTA METALICA PM-1(1.00x2.30)m CON ANGULOS 1 1/2"x1 1/2"x1/8", PLATINAS 1 1/2"x1 1/2"x1/8" Y TUBO
1,381.47
Precio S/. Parcial S/.
15.12 151.20
11.84 118.40
269.60
12.00 36.00
60.00 60.00
11.44 34.32
40.00 100.00
200.00 600.00
188.07 188.07
1,018.39
269.60 13.48
8.00 80.00
93.48 PORTON DE INGRESO METALICO DE DOS HOJAS PM-2(5.00x2.30)m CON ANGULOS 1 1/2"x1 1/2"x1/8",
4,520.11
Precio S/. Parcial S/.
15.12 403.20
11.84 315.73
718.93
110.00 110.00
100.00 100.00
150.00 300.00
100.00 200.00
25.00 200.00
122.28 611.40
11.44 45.76
40.00 40.00
200.00 2,600.00
188.07 188.07
3,685.23
718.93 35.95
8.00 80.00
115.95
12.50
Precio S/. Parcial S/.
18.14 0.73
15.12 6.05
11.84 1.58
8.35
2.00 0.25
38.00 1.90
35.00 1.75
3.90
8.35 0.25
0.25
6.30
Precio S/. Parcial S/.
18.14 3.63
11.84 2.37
6.00
6.00 0.30
0.30
3.87
Precio S/. Parcial S/.
18.14 0.12
15.12 1.01
11.84 0.79
1.92
5.50 0.28
0.28
1.92 0.10
23.68 1.58
1.68
23.68
Precio S/. Parcial S/.
18.14 0.04
11.84 0.55
0.59
0.59 0.02
210.93 19.56
151.30 3.51
23.09
7.52
Precio S/. Parcial S/.
18.14 0.04
15.12 0.35
11.84 1.08
1.47
42.00 5.46
5.46
1.47 0.04
23.68 0.54
0.59
268.47
Precio S/. Parcial S/.
17.41 12.66
18.14 1.32
15.12 11.00
13.14 4.78
11.84 34.44
64.20
2.97 0.01
40.00 32.00
35.00 17.50
14.92 137.26
11.00 1.50
5.50 0.99
189.27
64.20 3.21
26.99 9.81
5.45 1.98
15.01
MUNICIPALIDAD DISTRITAL DE CAPILLAS
RELACION DE MANO DE OBRA, MATERIALES Y EQUIPOS EMPLEADOS
OBRA : CERCO PERIMETRICO CINAT
DEPARTAMENTO : LIMAPROVINCIA : LIMADISTRITO : SANTIAGO DE SURCO
Nª RECURSO UND CANTMANO DE OBRA
1 OFICIAL hh 1,378.752 OPERARIO hh 1,007.593 PEON hh 3,858.594 PERSONAL TECNICO PARA EJECUCION DE PRUEBA HIDRAULICA hh 96.775 TOPOGRAFO hh 99.81
MATERIALES
1 ACERO CORRUGADO fy = 4200 kg/cm2 - 1/4" kg 131.342 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 116.323 ADAPTADOR PVC DE 1" und 24.004 ADAPTADOR PVC-C/R 3" und 2.005 ADAPTADOR PVC-C/R 4" und 8.006 ADAPTADOR PVC-SAP C/R 2 1/2" und 20.007 ADAPTADOR PVC-SAP C/R 3" und 3.008 AGUA PUESTA EN OBRA m3 76.779 ALAMBRE NEGRO RECOCIDO N° 16 kg 7.2110 ALAMBRE NEGRO RECOCIDO N° 8 kg 1.2811 ARENA m3 0.3112 ARENA GRUESA m3 3.1013 ASPERSOR IBIS 1" und 12.0014 ASPERSOR XWOOBLER 3/4" und 12.0015 BUSHING PVC 1" - 3/4" und 69.0016 CABLE ACERADO TIPO BOA DE 3/8" m 52.0017 CABLE DE ACERO PARA TEMPLADORES DE 1/4" m 44.8018 CAJA DE CONCRETO PREFABRICADA DE 0.40x0.40cm. und 25.0019 CALAMINA DE ALUMINIO und 20.0020 und 1.0021 CEMENTO PORTLAND TIPO I (42.5 kg) bol 49.0322 CINTA TEFLON und 96.5023 CLAVOS PARA MADERA CON CABEZA DE 3" kg 2.5624 CLAVOS PARA MADERA DE 2" kg 1.0025 CODO HDPE 32MM und 32.0026 CODO PVC DE 1" x 45° und 24.0027 CODO PVC DE 2 1/2" x 45° und 10.0028 CODO PVC DE 2 1/2" x 90° und 8.0029 CODO PVC DE 2" x 45° und 6.0030 CODO PVC DE 2" x 90° und 6.0031 CODO PVC SAP S/P 2½" X 90° und 20.0032 CODO PVC SAP S/P 4" X 45° und 13.0033 CODO PVC-SAP S/P 3" X 90° und 2.0034 CODO PVC-SAP S/P 4" X 90° und 20.0035 COLLARINES HDPE DE 110mm X 1" und 32.0036 COLLARINES HDPE DE 63mm X 1" und 20.0037 COLLARINES HDPE DE 75mm X 1" und 30.0038 CONFECCION DE CARTEL DE OBRA und 1.0039 CUADRIPO DE METAL und 18.0040 ENLACE RECTO HDPE 110MM und 30.0041 ENLACE RECTO HDPE 32MM und 18.00
CANASTILLA DE BRONCE DE 4"CANASTILLA DE BRONCE DE 4"
42 ESTACAS DE MADERA und 244.9643 FLETE RURAL glb 1.0044 FLETE TERRESTRE glb 1.0045 GASOLINA gal 0.1546 GRAPAS ACERADAS PARA CABLE TIPO BOA DE 3/8" und 28.0047 HORMIGON m3 0.2448 LLAVE BAYONETA 1" und 18.0049 MADERA TORNILLO p2 20.6450 MADERA TORNILLO PARA LISTONES DE ALMACEN p2 30.0051 MANGUERA HDPE 110 MM (4") C-7.5 m 3.0052 MANGUERA HDPE 32MM m 450.0053 PEGAMENTO OATEY CEMENTO PARA PVC gal 15.1254 PERNO HEXAGONAL ROSCA CORRIENTE 1/4" X 6" CON TUERCA Y ARANDELA und 4.0055 PIEDRA CHANCADA 1/2" m3 3.1656 PLANCHA DE METAL DE 20 X 20 X 1/4 und 4.0057 REDUCCION PVC-SAP S/P DE 2 1/2" A 2" und 10.0058 REDUCCION PVC-SAP S/P DE 4" A 3" und 1.0059 SIKA 1 (balde de 20 kg) bal 0.5960 TALLER DE CAPACITACION EN OPERACION Y MANTENIMIENTO DE RIEGO POR ASPERSION und 3.0061 TAPA METALICA DE FIERRO FUNDIDO CON MARCO DE 0.30x0.30 und 25.0062 TAPA METALICA DE FIERRO FUNDIDO CON MARCO DE 0.35x0.35 und 1.0063 TAPA METALICA DE FIERRO FUNDIDO CON MARCO DE 0.45x0.45 und 1.0064 TEE HDPE 32 MM und 14.0065 TEE PVC-SAP S/P 2½" und 10.0066 TEE PVC-SAP S/P 4" und 11.0067 TEMPLADORES und 28.0068 TIERRA SELECCIONADA m3 226.8069 TRIPLAY DE 1.20X2.40 m X 6 mm und 20.0070 TUBERIA DESAGUE LIVIANA DE 6" X 6 m (COLOR NARANJA) m 44.1671 TUBERIA PVC DE 1" und 13.8072 TUBERIA PVC DE 2 1/2" X 5 m C-7.5 und 106.0073 TUBERIA PVC DE 2" X 5 m C-7.5 und 117.0074 TUBERIA PVC-SAP C-7.5 DE 3" X 5 m und 1.0075 TUBERIA PVC-SAP C-7.5 DE 4" X 5 m und 1.0076 TUBERIA PVC-SAP C-7.5 DE 4" X 5 m und 381.8077 UNION MIXTA DE PVC DE 1" und 138.0078 VALVULA COMPUERTA DE BRONCE DE 2 1/2" und 10.0079 VALVULA COMPUERTA DE BRONCE DE 3" und 1.0080 VALVULA COMPUERTA DE BRONCE DE 4" und 4.0081 VALVULA DE ACOPLE RAPIDO und 20.0082 VALVULA DE ACOPLE RAPIDO 63MM und 20.0083 VALVULA DE ACOPLE RAPIDO 75MM und 29.0084 VALVULA DE AIRE SIMPLE EFECTO DE 1" und 13.0085 VALVULA DE GLOBO DE 1" und 12.0086 VALVULA REDUCTORA DE PRESION 4" und 3.0087 YESO BOLSA 28 kg bol 15.27
EQUIPOS
1 EQUIPO DE PRUEBA HIDRAULICA he 302.402 EQUIPO TOGRAFICO he 91.863 HERRAMIENTAS MANUALES %mo4 MEZCLADORA DE CONCRETO hm 0.155 REGLA DE ALUMINIO 1" X 4" X 8" und 0.01
TOTAL
RELACION DE MANO DE OBRA, MATERIALES Y EQUIPOS EMPLEADOS
P.U PARCIAL TOTALMANO DE OBRA 84,405.19
13.14 18,116.7815.12 15,234.7611.84 45,685.7140.00 3,870.8015.00 1,497.15
MATERIALES 98,238.985.61 736.823.96 460.632.00 48.008.00 16.00
10.00 80.0010.00 200.008.00 24.00
15.00 1,151.5512.00 86.5212.00 15.36
120.00 37.20120.00 372.00190.00 2,280.0025.00 300.003.00 207.00
15.00 780.0010.00 448.00
200.00 5,000.0025.00 500.00
300.00 300.0021.00 1,029.631.50 144.75
12.00 30.7212.00 12.008.00 256.003.00 72.00
12.00 120.0012.00 96.0010.00 60.0010.00 60.0012.00 240.0025.00 325.0018.00 36.0025.00 500.0025.00 800.0010.00 200.0012.00 360.00
1,000.00 1,000.0050.00 900.0050.00 1,500.009.00 162.00
2.00 489.925,428.76 5,428.765,500.00 5,500.00
16.00 2.405.00 140.00
120.00 28.8015.00 270.007.00 144.487.00 210.00
25.00 75.002.20 990.00
110.00 1,663.2025.00 100.00
120.00 379.2040.00 160.0010.00 100.0010.00 10.00
100.00 59.004,020.00 12,060.00
150.00 3,750.00140.00 140.00140.00 140.0015.00 210.0030.00 300.0045.00 495.0040.00 1,120.0020.00 4,536.0045.00 900.0015.00 662.4015.00 207.0048.00 5,088.0040.00 4,680.0048.00 48.0052.00 52.0052.00 19,853.602.50 345.00
180.00 1,800.00200.00 200.00350.00 1,400.0015.00 300.0015.00 300.0015.00 435.0070.00 910.0015.00 180.00
400.00 1,200.0015.00 229.05
98,238.18
EQUIPOS 5,942.6810.00 3,024.0010.00 918.60
1,997.3810.00 1.50
120.00 1.20
TOTAL 188,586.86
RESUMEN GENERAL DE METRADOS
OBRA:
PROPIETARIO:
PROYECTISTA:
Item
METRADO DE ESTRUCTURAS
02.00
02.01
02.02
02.03
03.00
03.01
03.02
03.03
03.04
03.05
4.00
4.01
4.02
4.03
5.00
5.01
5.02
5.03
5.04
6.00
6.01
6.02
6.03
6.04
6.05
RESUMEN GENERAL DE METRADOS
"CERCO PERIMETRICO CINAT DISTRITO DE SANTIAGO DE SURCO - LIMA - LIMA
PROPIETARIO:
PROYECTISTA:
Descripcion
METRADO DE ESTRUCTURAS
ESTRUCTURAS
OBRAS PRELIMINARES
RETIRO DE ARBOL
DEMOLICION DE CONSTRUCCION EXISTENTE
TRANSPORTE DE MATERIALES
MOVIMIENTO DE TIERRAS
TRAZADO Y REPLANTEO SIN EQUIPO
EXCAVACION DE ZANJAS PARA CIMIENTO
ELIM. MATERIAL +30% ESPONJAMIENTO CARG.125HP/VOLQUETE 6 M3
RELLENO COMPACTADO A MANO
RELLENO CON MATERIAL DE PRESTAMO
OBRAS DE CONCRETO SIMPLE
CIMIENTO CORRIDO C:H 1:10+30% PM
CONCRETO EN SOBRECIMIENTO C:H 1:8+25% PM
ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO
VARIOS
CERCO METALICO CON COLUMNAS METALICAS 3",ANGULOS 1 1/2"x1 1/2"x1/8" Y PLATINAS 1 1/2"x1/8"
PUERTAS METALICAS PM-1(1.00x2.30)m CON ANGULOS 1 1/2"x1 1/2"x1/8", PLATINAS 1 1/2"x1 1/2"x1/8" Y TUBO CUADRADO LAC 4"
PORTON DE INGRESO METALICO DE DOS HOJAS PM-2 (5.00x2.30)m CON ANGULOS 1 1/2"x1 1/2"x1/8", PLATINAS 1 1/2"x1 1/2"x1/8" Y TUBO CUADRADO LAC 4"
PINTURA ESMALTE EN ELEMENTOS METALICOS, PREVIO ANTICORROSIVOPLATAFORMA DE INGRESO VEHICULAR
CORTE DE TERRENO HASTA 0.20M DE PROFUNDIDAD
COMPACTACION TERRENO NORMAL/CON COMPACTADORA
ELIM.MATERIAL + 30% ESPONJAMIENTO CARG. 125HP/VOLQUETE 6 M3, V=30 D=5KM
BASE CON MATERIAL GRANULAR C/COMPACTADORA e=0.10m
PLATAFORMA DE INGRESO, CONCRETO Fc=210 Kg/cm2 e=0.15m
RESUMEN GENERAL DE METRADOS
FECHA: NOVIEMBRE 2012
Unidad Metrado Total
METRADO DE ESTRUCTURAS
M2 1,281.65 1,281.65
M2 583.20 583.20
M2 88.71 88.71
M3 111.68 111.68
M3 49.90 49.90
M2 825.68 825.68
M2 104.40 104.40
M2 662.80 662.80
M3 49.90 49.90
M3 7.01 7.01
M2 52.25 52.25
M3 9.31 9.31
KG 523.46 523.46
M2 558.40 558.40
ML 192.00 192.00
M2 57.60 57.60
M2 315.28 315.28
METRADO
OBRA:
PROPIETARIO:
PROYECTISTA:
Item Descripcion
METRADO 01.00 OBRAS PROVISIONALES01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 x 2.40 m01.02 ALAMACEN, OFICINA Y CASETA DE GUARDIANIA01.03 MOVILIZACION DE MATERIALES, MAQUINARIA Y HERRAMIENTAS
02.00 OBRAS PRELIMINARES02.01 RETIRO DE ARBOL
02.02 DEMOLICION DE CONSTRUCCION EXISTENTE
02.03 TRANSPORTE DE MATERIALES
03.00 MOVIMIENTO DE TIERRAS03.01 TRAZADO Y REPLANTEO SIN EQUIPO
03.02 EXCAVACION DE ZANJAS PARA CIMIENTOPARA CERCO PERIMETRICO
3.03 ELIM. MATERIAL +30% ESPONJAMIENTO CARG.125HP/VOLQUETE 6 M3
3.04
3.05 RELLENO CON MATERIAL DE PRESTAMO
4.00 OBRAS DE CONCRETO SIMPLE
"CERCO PERIMETRICO CINAT DISTRITO DE SANTIAGO DE SURCO - LIMA - LIMA
RELLENO COMPACTADO A MANO
4.01 CIMIENTO CORRIDO C:H 1:10+30% PM
TUBOS CUADRADOS 4"
4.02 CONCRETO EN SOBRECIMIENTO C:H 1:8+25% PM
PARA TUBOS CUADRADOS DE 4"
4.03 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO
PARA CERCO PERIMETRICO
5.00 VARIOS5.01 CERCO METALICO CON COLUMNAS METALICAS 3",ANGULOS 1 1/2"x1 1/2"x1/8" Y PLATINAS 1 1/
PARA CERCO PERIMETRICO
5.02 PUERTAS METALICAS PM-1(1.00x2.30)m CON ANGULOS 1 1/2"x1 1/2"x1/8", PLATINAS 1 1/2"x1
PARA CERCO PERIMETRICO
5.03 PORTON DE INGRESOPARA CERCO PERIMETRICO
5.04 PINTURA ESMALTE EN ELEMENTOS METALICOS, PREVIO ANTICORROSIVO
METRADO
FECHA:
Descripcion Unidad Nº Veces Longitud
METRADO
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 x 2.40 m UND 1.00ALAMACEN, OFICINA Y CASETA DE GUARDIANIA M2 5.00 MOVILIZACION DE MATERIALES, MAQUINARIA Y HERRAMIENTAS GLB 1.00
M2En toda el area 1.00
M2
1.00 1.00
M2
M2
1.00 140.68
M3
47.00 0.45 13.00 0.45 42.00 0.45
1.00 55.00
ELIM. MATERIAL +30% ESPONJAMIENTO CARG.125HP/VOLQUETE 6 M3 M2
M2 47.00 0.30 13.00 0.30 47.00 0.30 13.00 0.30
M21.00 55.00
M3
130.00 0.45
CONCRETO EN SOBRECIMIENTO C:H 1:8+25% PM M3
121.00 2.85
ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO M2
242.00 2.85
CERCO METALICO CON COLUMNAS METALICAS 3",ANGULOS 1 1/2"x1 1/2"x1/8" Y PLATINAS 1 1/ P2
TUBOS CUADRADOS 4" 2.00 2.00 ANGULOS 5.00 10.00
PLATINAS DE ACERO 2.00 3.00
PUERTAS METALICAS PM-1(1.00x2.30)m CON ANGULOS 1 1/2"x1 1/2"x1/8", PLATINAS 1 1/2"x1 und
2.00
und1.00
PINTURA ESMALTE EN ELEMENTOS METALICOS, PREVIO ANTICORROSIVO m2121.00
METRADO
NOVIEMBRE 2012
Ancho Altura Subtotal TotalTOTAL
METRADO
1.00 1.00 3.00 15.00 15.00
1.00 1.00
1.00 1.00 1.00
1.00
1.00 1.00
1.00 1.00 1.00
5,627.00
40.00 5,627.00
59.63
0.45 0.85 8.09 0.45 0.85 2.24 0.45 0.85 7.23 0.45 1.70 42.07
56.68
0.30 0.45 1.90 2.96 0.30 0.45 0.53 0.30 0.45 1.90 0.30 0.45 0.53
24.75 0.45 1.00 24.75
10.53
0.45 0.40 10.53
20.69
0.15 0.40 20.69
275.88
0.40 275.88
121.00
2.00 8.00 2.00 100.00 2.00 12.00
2.00
2.00
1.001.00
568.704.70 568.70